Rule 26, The Explosives Rules, 2008: Approval of manufacturing process
The Explosives Rules, 2008 - Rule 26
Text of rule 26
Approval of manufacturing process
26. Approval of manufacturing process.—(1) No
new explosive after its inclusion in the list of authorised
explosives shall be manufactured unless the process of
manufacture is approved by the licensing authority and
his permission obtained in writing.
(2) A person intending to manufacture an authorised
explosive shall submit to the Chief Controller separately
for each explosive a project report in duplicate containing,
among other relevant data, the following particulars,
namely :—
(a) the detailed process starting from the raw
materials, to the finished product describing
the plant and equipment, quantities of materials
handled, operating conditions and parameters,
nature of controls and safety devices provided
in the proposed method of treating effluents
and waste explosives;
(b) the nature and composition of the explosives;
(c) the limiting percentage of each ingredient of
explosives;
(d) the specification of the various raw materials
including substitutes, if any, used in the
process of manufacture;
(e) physical and chemical characteristics of final
product;
(f) name and percentage of marking agent to be
added in plastic explosives for detection by
vapour detection technique;
(g) safety management plan as stated in sub-rule
(3) to be followed by the company in case of
high explosives or blasting accessories;
(h) any other particulars as may be required by
the licensing authority;
(i) prescribed scrutiny fee.
(3) Safety management plan referred to in clause (g)
of sub-rule (2) shall include the following, namely :—
(a) assigned responsibilities and organisational
structure, including resource assessment;
¹Hkkx II¹[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 175
(b) hazard identification, risk assessment and
control;
(c) provision of information, education and
training to the work force, contractors and
visitors;
(d) accident reporting and investigation;
(e) emergency response planning and
preparedness such as first aid, testing of
emergency plan once in a year;
(f) provision of escape route;
(g) evacuation plan, appropriate fire fighting
controls, consequence minimising steps like
control of spills, appropriate off-site response
plan etc.;
(h) maintenance of records;
(i) maintenance of schedules for plant and
equipment;
(j) standard operating procedures where absence
of such procedures may adversely affect
safety;
(k) availability of Material Safety Data Sheet
(MSDS );
(l) security of explosives;
(m) transport and storage of explosives;
(n) material handling;
(o) explosives and man limit in each building and
location;
(p) precaution against adverse conditions, natural
as well as artificial such as lightning,
earthquake, load shedding, trips in the process,
etc.;
(q) restriction of source of ignition;
(r) segregation of incompatible materials;
(s) disposal of waste explosives and ingredients,
including burning grounds procedures;
(t) competence of personnel for tasks; and
(u) safety meetings, self auditing and external
safety auditing of system and procedures.
(4) The Chief Controller, after scrutiny of the project
report, the Safety management plan and after making such
further enquiries as may be considered necessary, may if
he is satisfied, approve the process for each explosive
separately.
(5) No person shall make any change in the process,
nature and composition of explosives, specification and
limiting percentages of raw materials and ingredients
without prior approval of the licensing authority.
(6) The Chief Controller may cause at any time any
test on any raw material, ingredients or explosives to
ascertain if these conform to the particulars given under
sub-rule (2).
27. Submission of safety management plan to
District Magistrate—The applicant shall submit a copy
of the safety management plan to the District Magistrate.