Rule 3, Amendment to the principal rules of the National Highways Fee (Determination of Rates and Collection) Rules, 2008: For sub-rule (6) of rule 6 of the said rules, the following shall be substituted, namely
Amendment to the principal rules of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 - Rule 3
Text of rule 3
For sub-rule (6) of rule 6 of the said rules, the following shall be substituted, namely
3. For sub-rule (6) of rule 6 of the said rules, the following shall be substituted, namely:-
"(6) (a). The fee shall be collected by the Central Government or the executing
Authority as the case may be and for a specified period in accordance with the terms of
agreement entered by the Concessionaire.
5
' ti THE GAZETTE Of INDIA : EXTRAORDINARY [PMT ll-SF.c . .3(i)J
(b) The fee as noti lied as per Concession Agreement shall be leviable till the end of the
concession period and after the Concession Agreement is over, the fee shall be collected by the
Central Government executing authority at a reduced rate of 40% of the fee on the elate of
transfer of such section of National Highways, bridge, tunnel or bypass, as the case may be, to be
revised annually in accordance with these rules:
Provided that after the recovery of capital cost through user fee realised, in respect of a
public funded project, the fee leviable would be reduced to 40% of the user fee for such section
of National Highways, bridge, tunnel or bypass as tile case may be, to be revised annually in
accordance with these rules.".
Previous and next
Questions people ask
Is rule 3 of Amendment to the principal rules of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 still in force?
No repeal of Amendment to the principal rules of the National Highways Fee (Determination of Rates and Collection) Rules, 2008 is recorded.