Form AT-41, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-41

Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-41

Text of form AT-41

FORMAT-41

FORMAT-41 Periodicity-Quarterly Submission 40 days before the commencement of the quarter PROPOSED COAL ALLOCATION FOR SHORT TERM LINKAGES FOR THERMAL POWER STATIONS 1. Name of the Power Station 2. No. of Units & Total installed capacity 3. Name of the Quarter (Period) 4. Planned Outage: Outage Period Sl. No. Unit No. Capacity in MW From To Nature of maintenance 5. Generation Target for the Quarter in MkWh First Month Second Month Third Month Average Target Generation 6. Average Overall Specific Coal Consumption (Kg/kWh) for Station. 7. Coal Requirement to achieve Targeted Generation in metric tonnes: First Month Second Month Third Month Average Target Generation 8. Average Stock Building per month in metric tonnes subject to stocking capacity of the station’s stock yard. 9. Average monthly coal requirement during the quarter in metric tonnes (details below) Sl. No. Source of supply/field/company Mode of Transportation Quantity Total Sl.No Item 1 2 3 4 Installed capacity ( Installed capacity & Unit rating in MW and No. of Units) 5 Type of station (Whether CCGT/ OCGT) 6 Energy generation of station during the month Target Actual (MkWh) 7 Alternate fuel being used (Naphtha/ HSD) 8 Fuel supply position of the month (1.) Allocation Gas HSD Naphtha MMSCM kl mt (a.) As per original allocation for the month by Gas Linkage Committee (b.) Present allocation for the month (2.) Consumed during the month (a.) For generation from existing Units (b.) For commissioning, testing etc. of new Units 9 Cumulative consumption during the year 10 Average gross calorific value of the fuel for the month kcal/SCM kcal/ kl kcal/ kg 11 Generation loss in MkWh, if any, due to shortage of gas/alternate fuel during the month 12 Reasons for short supply of fuel compared to present allocation, if any 13 Source of supply 14 Mode of transport from source to power station (Rail/Road/Pipeline) 15 Landed cost (Average for month) of fuel at power station in Rs./SCM Rs./SCM Rs./kl Rs./mt 16 Remarks, if any. MMSCM-Million Metric Standard Cubic Metre mt = metric tonne kl = kilo litre Submission by 15th day Particulars/ Data Owner's name: Name of the gas based Thermal power station MONTHLY FUEL SUPPLY DATA OF GAS BASED THERMAL POWER STATIONS (UTILITY) FOR THE MONTH ……. YEAR 20-- 170 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Telephone No. Fax No. Mailing address:

Previous and next

All provisions of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007

Questions people ask

Is form AT-41 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?

No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.