LawGrids logoLAWGRIDS.ORG

Form AT-29 Page 1/4, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-29 Page 1/4

Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-29 Page 1/4

Text of form AT-29 Page 1/4

FORMAT-29 Page 1/4

FORMAT-29 Page 1/4 PERIODICITY- MONTHLY SUBMISSION BY- 18TH DAY A Generation Details S.No. Constituents 1 2 3 ------ N REGION Gross Generation (MkWh) Thermal (i) Coal (ii) Liquid (iii) Gas Open Cycle (iv) Gas Combined Cycle (v) Nuclear Hydro IPPs CPPs Wind Mills Total (I) (II) Dedicated Power Stations# (i) (ii) Total (MkWh) (I)+(II) (II) Actual Demand Met (Gross MW) B Shared/ Common Projects Generation (MkWh) S.No. 1 2 3 C Constituents 1 2 3 ------ N REGION 1. Own Generation Thermal (i) Coal (ii) Liquid (iii) Gas Open Cycle (iv) Gas Combined Cycle (v) Nuclear Hydro IPPs CPPs Wind Mills Total 2 Dedicated Power Stations# 2.1 2.2 Total Own Generation, IPPs*, CPPs** & Dedicated 3. Share from Shared Projects (I) (II) 4. Bilateral Import 5. Bilateral Export 6. Total Drawl from Grid including bilateral (includes transmission losses) 7. Total Availability (1+3+6) 8. Unrestricted Requirement (From Table D) 9. Shortfall 153 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] (I) Station Name Revised Power Supply Position in _______________________Region for the Month Of _____________ Total Energy / Availability / Requirement (Ex-Bus) (MkWh) Ex-BusGross D Details of Calculations FORMAT-29 Page 2/4 S.No. Constituents 1 2 3 ------ N REGION 1 Net Actual Energy Supplied 2 Frequency Correction 3 Unscheduled Load Shedding 4 Scheduled Load Shedding /Power Cuts 5 Unrestricted Requirement (1+2+3+4) E Peak Demand/ Unrestricted Peak Demand (Ex-Bus) (MW) S.No. Constituents 1 2 3 ------ N REGION 1 Peak Unrestricted Demand (from Table F) 2 Peak Demand Met 3 Shortfall 4 % Shortfall F Details of Calculations for Unrestricted Peak Demand (MW) S.No. Constituents 1 2 3 ------ N REGION 1 Peak Demand Met 2 Frequency Correction 3 Unscheduled Load Shedding 4 Scheduled Load Shedding 5 Peak Unrestricted Demand (1+2+3+4) G Declared Capacity Scheduled Capacity (Ex-Bus) (Ex-Bus) (MkWh) (MkWh) (MkWh) (i) (ii) (iii) . . H (MkWh) (i) (ii) (iii) . . . I Frequency Profile of ________________Regional Grid Monthly Average Hz Time Hz Time Hz Time Hz Time Hz J Frequency Profile ( % of time) Frequency Range Below 48.5 Hz Between 48.5 Hz & 48.8 Hz Between 48.8Hz. & 49.0 Hz Between 49.0 Hz & 49.5 Hz Between 49.5 Hz & 49.8 Hz Between 49.8 Hz & 50.2 Hz Between 50.2 Hz & 50.5 Hz Between 50.5 Hz & 51.0 Hz Between 51.0 Hz & 51.5 Hz Above 51.5 Hz ( % of time) 154 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Instantaneous Maximum Instantaneous Minimum 15-Minutes Block Maximum 15-Minutes Block Minimum Frequency Variation Index (FVI) Total Constituents Scheduled Drawl (Ex-Bus) (MkWh) Entitlement (Ex-Bus) (MkWh) Gross Generation (MkWh)S.No. CGSs Total S.No. Actual Total Drawl from Grid including Grid Loss Details of Gross Generation, Declared Capacity, Scheduled Generation and Injection from CGSs (MkWh) Total Entitlement, Schedule and Drawl by Constituents (MkWh) Injection

Previous and next

All provisions of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007

Questions people ask

Is form AT-29 Page 1/4 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?

No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.