Form AT-29 Page 1/4, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-29 Page 1/4
Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-29 Page 1/4
Text of form AT-29 Page 1/4
FORMAT-29 Page 1/4
FORMAT-29 Page 1/4
PERIODICITY- MONTHLY
SUBMISSION BY- 18TH DAY
A Generation Details
S.No. Constituents 1 2 3 ------ N REGION
Gross Generation (MkWh)
Thermal
(i) Coal
(ii) Liquid
(iii) Gas Open Cycle
(iv) Gas Combined Cycle
(v) Nuclear
Hydro
IPPs
CPPs
Wind Mills
Total (I)
(II) Dedicated Power Stations#
(i)
(ii)
Total (MkWh) (I)+(II)
(II)
Actual Demand Met (Gross
MW)
B Shared/ Common Projects Generation (MkWh)
S.No.
1
2
3
C
Constituents 1 2 3 ------ N REGION
1. Own Generation
Thermal
(i) Coal
(ii) Liquid
(iii) Gas Open Cycle
(iv) Gas Combined Cycle
(v) Nuclear
Hydro
IPPs
CPPs
Wind Mills
Total
2 Dedicated Power Stations#
2.1
2.2
Total Own Generation, IPPs*,
CPPs** & Dedicated
3. Share from Shared Projects
(I)
(II)
4. Bilateral Import
5. Bilateral Export
6.
Total Drawl from Grid including
bilateral (includes transmission
losses)
7. Total Availability (1+3+6)
8.
Unrestricted Requirement
(From Table D)
9. Shortfall
153 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
(I)
Station Name
Revised Power Supply Position in _______________________Region for the Month Of _____________
Total
Energy / Availability / Requirement (Ex-Bus) (MkWh)
Ex-BusGross
D Details of Calculations FORMAT-29 Page 2/4
S.No. Constituents 1 2 3 ------ N REGION
1 Net Actual Energy Supplied
2 Frequency Correction
3 Unscheduled Load Shedding
4
Scheduled Load Shedding
/Power Cuts
5
Unrestricted Requirement
(1+2+3+4)
E Peak Demand/ Unrestricted Peak Demand (Ex-Bus) (MW)
S.No. Constituents 1 2 3 ------ N REGION
1 Peak Unrestricted Demand (from Table F)
2 Peak Demand Met
3 Shortfall
4 % Shortfall
F Details of Calculations for Unrestricted Peak Demand (MW)
S.No. Constituents 1 2 3 ------ N REGION
1 Peak Demand Met
2 Frequency Correction
3 Unscheduled Load Shedding
4 Scheduled Load Shedding
5
Peak Unrestricted Demand
(1+2+3+4)
G
Declared
Capacity
Scheduled
Capacity
(Ex-Bus) (Ex-Bus)
(MkWh) (MkWh) (MkWh)
(i)
(ii)
(iii)
.
.
H
(MkWh)
(i)
(ii)
(iii)
.
.
.
I Frequency Profile of ________________Regional Grid
Monthly
Average
Hz Time Hz Time Hz Time Hz Time Hz
J Frequency Profile ( % of time)
Frequency Range Below 48.5 Hz
Between 48.5
Hz & 48.8 Hz
Between 48.8Hz. &
49.0 Hz
Between 49.0 Hz
& 49.5 Hz
Between 49.5 Hz
& 49.8 Hz
Between 49.8 Hz
& 50.2 Hz
Between 50.2 Hz
& 50.5 Hz
Between
50.5 Hz &
51.0 Hz
Between
51.0 Hz &
51.5 Hz
Above
51.5 Hz
( % of time)
154 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Instantaneous Maximum Instantaneous Minimum 15-Minutes Block Maximum 15-Minutes Block Minimum Frequency Variation
Index (FVI)
Total
Constituents
Scheduled Drawl
(Ex-Bus)
(MkWh)
Entitlement
(Ex-Bus)
(MkWh)
Gross Generation
(MkWh)S.No. CGSs
Total
S.No.
Actual Total
Drawl from Grid
including Grid
Loss
Details of Gross Generation, Declared Capacity, Scheduled Generation and Injection from CGSs (MkWh)
Total Entitlement, Schedule and Drawl by Constituents (MkWh)
Injection
Previous and next
Questions people ask
Is form AT-29 Page 1/4 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?
No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.