LawGrids logoLAWGRIDS.ORG

Form AT-28 Page 1/3, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-28 Page 1/3

Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-28 Page 1/3

Text of form AT-28 Page 1/3

FORMAT-28 Page 1/3

FORMAT-28 Page 1/3 PERIODICITY- MONTHLY SUBMISSION BY- 5TH DAY A Generation Details S.No. Constituents 1 2 3 ------ N REGION Gross Generation (MkWh) Thermal (i) Coal (ii) Liquid (iii) Gas Open Cycle (iv) Gas Combined Cycle (v) Nuclear Hydro IPPs CPPs Wind Mills Total (MkWh) (I) (II) Dedicated Power Stations# (i) (ii) Total (MkWh) (I)+(II) (II) Actual Demand Met (Gross MW) B Energy Availability / Requirement (Ex-Bus) (MkWh) Constituents Constituents # 1 Constituents #2 Constituents # N Region 1 Own Generation Thermal (i) Coal (ii) Liquid (iii) Gas Open Cycle (iv) Gas Combined Cycle (v) Nuclear Hydro IPPs* CPPs** Wind Mills Total (1) 2 Dedicated Power Stations# 2.1 2.2 Total Own Generation, IPPs*, CPPs** & Dedicated 3 Net Drawl from Grid (including Bilateral) 4 Total Availability 5 Unrestricted Requirement (From Table C) 6 Shortage (5-4) 7 % Shortage [{(5-4)/5}*100] Provisional Power Supply Position in _______________________Region for the Month of __________ (I) 150 THE GAZETTE OF INDIA : EXTRAORDINARY C Details of Calculations FORMAT-28 Page 2/3 1 Availability 2 Frequency Correction 3 Load Shedding 4 Power Cuts 5 Unrestricted Requirement (1+2+3+4) D Peak Demand/ Demand Met (Ex-Bus) (MW) 1 Peak Demand 2 Demand Met 3 Date & Time of Peak Demand Met 4 Frequency Correction 5 Load Shedding 6 Power Cuts 7 Shortage 8 % Shortage 9 Avg. of Daily Max. Shortage 10 Max. of Daily Max. Shortage E Frequency Profile of ________________Regional Grid Frequency Range Below 48.5 Hz Between 48.5 Hz & 48.8 Hz Between 48.8Hz & 49.0 Hz Between 49.0 Hz & 49.5 Hz Between 49.5 Hz & 49.8 Hz Between 49.8 Hz & 50.2 Hz Between 50.2 Hz & 50.5 Hz Between 50.5 Hz & 51.0 Hz Between 51.0 Hz & 51.5 Hz Above 51.5 Hz ( % of time) MONTHLY AVERAGE Hz Time Hz Time Hz Time Hz Time Hz * IPP- Independent Power Producer ** CPP- Captive Power Plant # Dedicated Power Stations: Power Stations whose generation is solely meant for the concerned State(s).

Previous and next

All provisions of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007

Questions people ask

Is form AT-28 Page 1/3 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?

No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.