A Generation Details
S.No. Constituents 1 2 3 ------ N REGION
Gross Generation (MkWh)
Thermal
(i) Coal
(ii) Liquid
(iii) Gas Open Cycle
(iv) Gas Combined Cycle
(v) Nuclear
Hydro
IPPs
CPPs
Wind Mills
Total (MkWh) (I)
(II) Dedicated Power Stations#
(i)
(ii)
Total (MkWh) (I)+(II)
(II) Actual Demand Met (Gross MW)
B Energy Availability / Requirement (Ex-Bus) (MkWh)
Constituents Constituents # 1 Constituents #2 Constituents # N Region
1 Own Generation
Thermal
(i) Coal
(ii) Liquid
(iii) Gas Open Cycle
(iv) Gas Combined Cycle
(v) Nuclear
Hydro
IPPs*
CPPs**
Wind Mills
Total (1)
2 Dedicated Power Stations#
2.1
2.2
Total Own Generation, IPPs*, CPPs** &
Dedicated
3
Net Drawl from Grid (including
Bilateral)
4 Total Availability
5
Unrestricted Requirement (From Table
C)
6 Shortage (5-4)
7 % Shortage [{(5-4)/5}*100]
Provisional Power Supply Position in _______________________Region for the Month of __________
(I)
150 THE GAZETTE OF INDIA : EXTRAORDINARY
C Details of Calculations FORMAT-28 Page 2/3
1 Availability
2 Frequency Correction
3 Load Shedding
4 Power Cuts
5 Unrestricted Requirement (1+2+3+4)
D Peak Demand/ Demand Met (Ex-Bus) (MW)
1 Peak Demand
2 Demand Met
3 Date & Time of Peak Demand Met
4 Frequency Correction
5 Load Shedding
6 Power Cuts
7 Shortage
8 % Shortage
9 Avg. of Daily Max. Shortage
10 Max. of Daily Max. Shortage
E Frequency Profile of ________________Regional Grid
Frequency Range Below 48.5 Hz
Between 48.5 Hz & 48.8
Hz
Between 48.8Hz &
49.0 Hz
Between 49.0 Hz &
49.5 Hz
Between 49.5
Hz & 49.8 Hz
Between 49.8
Hz & 50.2 Hz
Between 50.2
Hz & 50.5 Hz
Between
50.5 Hz &
51.0 Hz
Between
51.0 Hz &
51.5 Hz
Above
51.5 Hz
( % of time)
MONTHLY
AVERAGE
Hz Time Hz Time Hz Time Hz Time Hz
* IPP- Independent Power Producer ** CPP- Captive Power Plant
# Dedicated Power Stations: Power Stations whose generation is solely meant for the concerned State(s).
Previous and next
Questions people ask
Is form AT-28 Page 1/3 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?
No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.