Form AT-20, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-20
Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-20
Text of form AT-20
FORMAT-20
FORMAT-20
Periodicity-Annual
Data of year 20--- 20---
Submission by -30th June
R E A S O N S F O R E L E C T R I C A L A C C I D E N T S
Name of Undertaking: ___________________
Sl. R E A S O N S H U M A N A N I M A L S TOTAL
No. --------------------------------------- -------------------------------------------
FATAL NON-FATAL FATAL NON-FATAL
(i) SNAPPING OF CONDUCTORS
(ii) ACCIDENTAL CONTACT WITH LIVE
ELECTRIC WIRE / EQUIPMENT
(iii) VIOLATION / NEGLECT OF SAFETY
MEASURES / LACK OF SUPERVISION
(iv) DEFECTIVE APPLIANCES/
APPARATUS / TOOLS
(v) INADEQUATE / LACK OF
MAINTENANCE
(vi) UNAUTHORISED WORK
(vii) ANY OTHER REASONS
TOTAL
N.B. : Main reasons for accidents mentioned at Sl.No.(vii) are :- (Please specify)
135 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
FORMAT-21, Page 1 of 2
Periodicity-Annual
Data of previous year 20--- 20---
Submission by – 30th June
ANNUAL DATA OF HV/EHV INDUSTRY HAVING ELECTRICITY DEMAND OF 1 MW OR ABOVE
1. Name of factory, complete postal address, Distt & State, Telephone Nos. Fax No., and E-mail address
2. Whether the industry is located in rural area Yes/No
3. Is the industry a continuous process industry
4. No. of shifts per day and No. of working days per annum
5. Demand in kVA contracted with electricity supplier; and name of electricity supplying entity
6. Connected Load :
Sl.No. Particulars Previous Yr.
Beginning
Additions
during
previous yr.
Additions
proposed
Year(s) in which
additions expected
6.1 Motors in kW
6.2 Lighting in kW
6.3 Furnace in kW/ kVA
6.4 Rectifier in kW
6.5 Any other equipment
6.6 Total in kW
7. Maximum Electricity Demand (Previous Year)
Sl.No
.
Item Max. Demand in kVA Max. Demand in kW
7.1 On the utility system
7.2 On captive generation, if any
7.3 Simultaneous Max. Demand
8. Electricity Consumption (Previous Year)
Sl.No. Item Consumption in kWh
8.1 On utility system
8.2 On captive generation, if any
8.3 Total
136 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
FORMAT- 21, Page 2 of 2
9. Production – Previous Year
Sl
No
Item Product-1 Product-2 And so on
9.1 Name of product(Include all products)
9.2 Name of unit used to measure production quantity
9.3 Installed production capacity (Product wise) at year end
9.4 Consumption Norm of electrical energy (kWh/Unit of
Production)
10. Brief details of electric power restrictions/cuts, if any during previous year.
11. Loss of production due to power cuts/restrictions (Indicate product wise quantity).
12. Details of Captive Electricity Generating Plants.
12.1
Type of Prime
mover
Unit
No.
Installed
Capacity in kW
Name of main
fuel used
Stand by/
Base Load
Gross Generation
in kWh
Auxiliary
Consumption
1.
2.
3.
Hydro Turbine/
Steam Turbine/Gas
Turbine/Diesel
Engine/Wind
Turbine etc
4. & so
on
12.2 Other data :
a) Aggregate Installed Electricity Generating Capacity (kVA) of the Plant.
b) Power Factor
c) Electrical energy purchased (kWh) from other sources (Source-Wise)
d) Electrical energy sold (kWh) to other sources (Source–Wise)
13. Energy Conservation:
i. Details of steps taken during previous year for conserving electrical energy.
ii. Annual savings due to above steps in terms of kWh.
Generation data for the date:
Name of the organisation:
(A) UNIT WISE GENERATION
Name Of
Station
Unit
No.
Unit
Capacity
in MW
Gross Energy
Generated during
the day in MkWh
Peak load during
the day (MW)
Station 1
Station 2
(i) Details of Units remained out of bars & Units tripped/ taken out of the bar during the day
Name Of
Station
Unit
No.
Outage
Date &
Time
Expected date of
return
Outage
Reason(s)
Reason(s) of
extended outage,
if any Remarks
(ii) Details of Units revived during the day
Name Of
Station
Unit
No.
Outage
Date &
Time
Synchronization
Date & Time
Outage Duration
in Hours Outage Reason(s)
Generation Loss
MkWh
137 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Data for newly commissioned units ( if any) *
Remarks, if any
Daily Operational Data of Thermal Power Stations and Nuclear Power Stations
( Generation and Outage data)
Submission by 1030 hrs.
Periodicity-Daily
Format No - 22 Page1 /2
(B) UNIT WISE OUTAGES ( Planned/Forced)
Forced outage
Planned outage
Planned outage
Forced outage
Name Of Station Unit No.
Unit
Capacity in
MW
Energy Loss
due to fuel
shortage
Energy Loss
due to low
system
Demand
Energy
Loss due to
system
constraints
Energy
Loss due to
Equipment
Problems Remarks, if any
Station 1
Station 2
Partial loss in MkWh = (Cr1 x Hr1 +Cr2 xHr2…+ Crn x Hrn) /1000
NOTE: (I) Following categories of capacities of units/stations are monitored:
a. Thermal (Steam) units having station capacity of more than 20 MW.
b. All gas/diesel units supplying committed power to grid.
c. Hydro stations having capacity of 2 MW and above.
(II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished.
(III) *From the date of synchronisation to the date of commercial operation
138 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Format No - 22 Page2 /2
(C) UNIT WISE PARTIAL ENERGY LOSS DATA (DAY WISE IN MkWh)
(D) ADDITIONAL INFORMATION IN BRIEF, IF ANY
Where Cr1……………Crn are "the reduction in the output of the operating units in MW due to constraints in Auxiliaries/equipments or
any other causes." and Hr1……Hrn are the duration in hours of operation of the units at reduced output during the period considered
(day or month).
Generation Data for the date:
Name of the organisation:
(A) UNIT WISE GENERATION
Name Of
Station
Unit
No.
Unit
Capacity
in MW
Gross Energy
Generated during
the day in MkWh
Peak Load during
the day (MW)
Station 1
Station 2
(i) Details of Units remained out of bars & Units tripped/ taken out of the bars during the day
Name Of
Station
Unit
No.
Outage
Date &
Time
Expected date of
return
Outage Reason
(s)
Reason (s) of
extended outage,
if any Remarks
(ii) Details of Units revived during the day
Name Of
Station
Unit
No.
Outage
Date &
Time
Synchronization
Date & Time
Outage Duration
in Hours Outage Reason (s)
Generation Loss
MkWh
139 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
(B) UNIT WISE OUTAGES ( Planned/Forced)
Format 23 Page1/2
Data for newly commissioned units ( if any)*
Remarks, if any
Daily Operational Data of Hydro Power Stations
( Generation, outage and reservoir level data)
Periodicity-Daily
Submission by- 1030 hrs
Forced outage
Planned outage
Planned outage
Forced outage
Page 41 of 2
Format 23 Page2/2
Name Of Station Unit No. Unit Capacity
in MW
Energy Loss
due to flood
Energy Loss
due to
weeding
Energy Loss
due to silt
flushing
Energy Loss
due to high
silt content
Energy Loss due
to reduced
inflows
Energy Loss
due to system
constraint
Energy Loss
due to
Equipment
Problems
Remarks,
if any
Station 1
Station 2
Gross Storage
in MCM
Live Storage in
MCM
Live Storage
in MCM
Energy
Contents
in MkWh
(E) Additional information in brief, if any
NOTE: (I) Following categories of capacities of units/stations are monitored:
a. Thermal (Steam) units having station capacity of more than 20 MW.
b. All gas/diesel units supplying committed power to grid.
c. Hydro stations having capacity of 2 Mw or above.
(II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished.
(III) *From the date of synchronisation to the date of commercial operation
** data to be furnished in case of new units/stations and any changes in the existing units
Signature
140 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
(C) ENERGY LOSS DUE TO REASONS OTHER THAN FORCED OUTAGE AND
PLANNED MAINTENANCE (DAY WISE IN MkWh)
Present Reservoir level
MetresName Of Station/
Reservoir
(D) Hydro Reservoir levels:
Full Reservoir level (FRL)**
Minimum Draw Down level
(MDDL)**
Metres Metres
Page 42 of 2
Data for the Month:
Name of the organization:
(A) UNIT WISE GENERATION, UNIT AUX . & STATION AUX. POWER CONSUMPTION
Name Of
Station
Unit
No.
Unit
Capacity in
MW
Gross Energy
generated during the
Month in MkWh
Unit Aux.
Consumption in
MkWh
Station Aux.
Consumption in
MkWh
Unit Peak Load during
the month ( MW )
Station Peak
Load during the
month ( MW )
Station 1
Station 2
(B) UNIT WISE OUTAGES ( Planned/Forced)
(i) Details of Units remained out of bars & Units tripped/ taken out of the bars during the Month
Name Of
Station
Unit
No.
Tripping
Date &
Time
Expected date of
return
Outage Reason
(s)
Reason (s) of
extended outage,
if any Remarks
(ii) Details of Units revived during the month
Name Of
Station
Unit
No.
Tripping
Date &
Time
Synchronization
Date & Time
Outage
Duration in
Hours- Minutes
Outage Reason
(s)
Generation Loss in
MkWhs
141 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Data for newly commissioned units ( if any)*
Monthly Operational Data of Thermal Power Stations and Nuclear Power Stations
( Generation and Outage data)
Periodicity-Monthly
Submission by-7th day
Format : 24 Page 1/2
Planned outage
Forced outage
Forced outage
Planned outage
Page 1 of 2
Name Of
Station
Unit
No.
Unit
Capacity
in MW
Reason(s) for
partial energy loss
Generation loss
(MkWh) Remarks, if any
Station 1
Station 2
Partial loss in MkWh = (Cr1 x Hr1 +Cr2 xHr2…+ Crn x Hrn) /1000
NOTE: (I) Following categories of capacities of units/stations are monitored:
a. Thermal (Steam) units having station capacity of more than 20 MW.
b. All gas/diesel units supplying committed power to grid.
c. Hydro stations having capacity of 2 MW and above.
(II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished.
(III) *From the date of synchronisation to the date of commercial operation
142 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Where Cr1……………Crn are "the reduction in the output of the operating units in MW due to constraints in Auxiliaries/equipments
or any other causes." and Hr1……Hrn are the duration in hours of operation of the units at reduced output during the period
considered (day or month).
(D) ADDITIONAL INFORMATION IN BRIEF, IF ANY
(C) UNIT WISE PARTIAL ENERGY LOSS DATA (DAY WISE IN MkWh)
Format : 24 Page 2/2
Page 2 of 2
Data for the Month:
Name of the organization:
(A) UNIT WISE GENERATION, UNIT AUX. , STATION AUX. POWER CONSUMPTION & TRANSFORMATION LOSS
Name Of
Station
Unit
No.
Unit
Capacity
in MW
Gross Energy
generated during
the Month in MkWh
Unit Aux.
Consumption in
MkWh
Station Aux.
Consumption in
MkWh
Unit wise
transformation
loss in MkWh
Station wise
transformation
loss in MkWh
Peak Load reached during the
month ( MW )
Station 1
Station 2
(i) Details of Units remained out of bars & Units tripped/ taken out of the bars during the Month
Name Of
Station
Unit
No.
Outage
Date &
Time
Expected date of
return Outage Reason(s)
Reason(s) of
extended outage,
if any Remarks
(ii) Details of Units revived during the month
Name Of
Station
Unit
No.
Outage
Date &
Time
Synchronization
Date & Time
Outage Duration
in Hours- Minutes Outage Reason(s)
Generation Loss
in MkWh
Name Of
Station
Unit
No.
Capacity
(MW)
Energy Loss in
MkWh
Reason(s) of
Energy Loss Remarks, if any
Station 1
Station 2
Monthly Operational Data of Hydro Power Stations
( Generation, Outage and Reservoir Level data)
143 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Format no-25 Page 1/2
Periodicity- Monthly
Submission by- 7th day
Data for newly commissioned units ( if any)*
Planned outage
(D) ADDITIONAL INFORMATION IN BRIEF, IF ANY
(C) ENERGY LOSS DUE TO REASONS OTHER THAN FORCED OUTAGES & PLANNED MAINTENANCE
(B) UNIT WISE OUTAGES ( Planned/Forced)
Planned outage
Forced outage
Forced outage
Page 1 of 2
Reservoir inflow data for the month- year (mm-yy):
Gross Storage in
MCM
Live Storage in
MCM
NOTE: (I) Following categories of capacities of units/stations are monitored:
a. Thermal (Steam) units having station capacity of more than 20 MW.
b. All gas/diesel units supplying committed power to grid.
c. Hydro stations having capacity of 2 MW and above.
(II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished.
(III) *From the date of synchronisation to the date of commercial operation
144 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
Metres Metres
(E) Hydro Reservoir Inflow data
Format no-25 Page2/2
Inflows during the
month (MCM)
Outflows during the month
(MCM)
(D) ADDITIONAL INFORMATION IN BRIEF, IF ANY
Name Of
Station/
Reservoir
Full Reservoir level (FRL) Minimum Draw Down level (MDDL)
Page 2 of 2
145 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]
Previous and next
Questions people ask
Is form AT-20 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?
No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.