LawGrids logoLAWGRIDS.ORG

Form AT-20, Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007: FORMAT-20

Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 - Form AT-20

Text of form AT-20

FORMAT-20

FORMAT-20 Periodicity-Annual Data of year 20--- 20--- Submission by -30th June R E A S O N S F O R E L E C T R I C A L A C C I D E N T S Name of Undertaking: ___________________ Sl. R E A S O N S H U M A N A N I M A L S TOTAL No. --------------------------------------- ------------------------------------------- FATAL NON-FATAL FATAL NON-FATAL (i) SNAPPING OF CONDUCTORS (ii) ACCIDENTAL CONTACT WITH LIVE ELECTRIC WIRE / EQUIPMENT (iii) VIOLATION / NEGLECT OF SAFETY MEASURES / LACK OF SUPERVISION (iv) DEFECTIVE APPLIANCES/ APPARATUS / TOOLS (v) INADEQUATE / LACK OF MAINTENANCE (vi) UNAUTHORISED WORK (vii) ANY OTHER REASONS TOTAL N.B. : Main reasons for accidents mentioned at Sl.No.(vii) are :- (Please specify) 135 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4] FORMAT-21, Page 1 of 2 Periodicity-Annual Data of previous year 20--- 20--- Submission by – 30th June ANNUAL DATA OF HV/EHV INDUSTRY HAVING ELECTRICITY DEMAND OF 1 MW OR ABOVE 1. Name of factory, complete postal address, Distt & State, Telephone Nos. Fax No., and E-mail address 2. Whether the industry is located in rural area Yes/No 3. Is the industry a continuous process industry 4. No. of shifts per day and No. of working days per annum 5. Demand in kVA contracted with electricity supplier; and name of electricity supplying entity 6. Connected Load : Sl.No. Particulars Previous Yr. Beginning Additions during previous yr. Additions proposed Year(s) in which additions expected 6.1 Motors in kW 6.2 Lighting in kW 6.3 Furnace in kW/ kVA 6.4 Rectifier in kW 6.5 Any other equipment 6.6 Total in kW 7. Maximum Electricity Demand (Previous Year) Sl.No . Item Max. Demand in kVA Max. Demand in kW 7.1 On the utility system 7.2 On captive generation, if any 7.3 Simultaneous Max. Demand 8. Electricity Consumption (Previous Year) Sl.No. Item Consumption in kWh 8.1 On utility system 8.2 On captive generation, if any 8.3 Total 136 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4] FORMAT- 21, Page 2 of 2 9. Production – Previous Year Sl No Item Product-1 Product-2 And so on 9.1 Name of product(Include all products) 9.2 Name of unit used to measure production quantity 9.3 Installed production capacity (Product wise) at year end 9.4 Consumption Norm of electrical energy (kWh/Unit of Production) 10. Brief details of electric power restrictions/cuts, if any during previous year. 11. Loss of production due to power cuts/restrictions (Indicate product wise quantity). 12. Details of Captive Electricity Generating Plants. 12.1 Type of Prime mover Unit No. Installed Capacity in kW Name of main fuel used Stand by/ Base Load Gross Generation in kWh Auxiliary Consumption 1. 2. 3. Hydro Turbine/ Steam Turbine/Gas Turbine/Diesel Engine/Wind Turbine etc 4. & so on 12.2 Other data : a) Aggregate Installed Electricity Generating Capacity (kVA) of the Plant. b) Power Factor c) Electrical energy purchased (kWh) from other sources (Source-Wise) d) Electrical energy sold (kWh) to other sources (Source–Wise) 13. Energy Conservation: i. Details of steps taken during previous year for conserving electrical energy. ii. Annual savings due to above steps in terms of kWh. Generation data for the date: Name of the organisation: (A) UNIT WISE GENERATION Name Of Station Unit No. Unit Capacity in MW Gross Energy Generated during the day in MkWh Peak load during the day (MW) Station 1 Station 2 (i) Details of Units remained out of bars & Units tripped/ taken out of the bar during the day Name Of Station Unit No. Outage Date & Time Expected date of return Outage Reason(s) Reason(s) of extended outage, if any Remarks (ii) Details of Units revived during the day Name Of Station Unit No. Outage Date & Time Synchronization Date & Time Outage Duration in Hours Outage Reason(s) Generation Loss MkWh 137 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Data for newly commissioned units ( if any) * Remarks, if any Daily Operational Data of Thermal Power Stations and Nuclear Power Stations ( Generation and Outage data) Submission by 1030 hrs. Periodicity-Daily Format No - 22 Page1 /2 (B) UNIT WISE OUTAGES ( Planned/Forced) Forced outage Planned outage Planned outage Forced outage Name Of Station Unit No. Unit Capacity in MW Energy Loss due to fuel shortage Energy Loss due to low system Demand Energy Loss due to system constraints Energy Loss due to Equipment Problems Remarks, if any Station 1 Station 2 Partial loss in MkWh = (Cr1 x Hr1 +Cr2 xHr2…+ Crn x Hrn) /1000 NOTE: (I) Following categories of capacities of units/stations are monitored: a. Thermal (Steam) units having station capacity of more than 20 MW. b. All gas/diesel units supplying committed power to grid. c. Hydro stations having capacity of 2 MW and above. (II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished. (III) *From the date of synchronisation to the date of commercial operation 138 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Format No - 22 Page2 /2 (C) UNIT WISE PARTIAL ENERGY LOSS DATA (DAY WISE IN MkWh) (D) ADDITIONAL INFORMATION IN BRIEF, IF ANY Where Cr1……………Crn are "the reduction in the output of the operating units in MW due to constraints in Auxiliaries/equipments or any other causes." and Hr1……Hrn are the duration in hours of operation of the units at reduced output during the period considered (day or month). Generation Data for the date: Name of the organisation: (A) UNIT WISE GENERATION Name Of Station Unit No. Unit Capacity in MW Gross Energy Generated during the day in MkWh Peak Load during the day (MW) Station 1 Station 2 (i) Details of Units remained out of bars & Units tripped/ taken out of the bars during the day Name Of Station Unit No. Outage Date & Time Expected date of return Outage Reason (s) Reason (s) of extended outage, if any Remarks (ii) Details of Units revived during the day Name Of Station Unit No. Outage Date & Time Synchronization Date & Time Outage Duration in Hours Outage Reason (s) Generation Loss MkWh 139 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] (B) UNIT WISE OUTAGES ( Planned/Forced) Format 23 Page1/2 Data for newly commissioned units ( if any)* Remarks, if any Daily Operational Data of Hydro Power Stations ( Generation, outage and reservoir level data) Periodicity-Daily Submission by- 1030 hrs Forced outage Planned outage Planned outage Forced outage Page 41 of 2 Format 23 Page2/2 Name Of Station Unit No. Unit Capacity in MW Energy Loss due to flood Energy Loss due to weeding Energy Loss due to silt flushing Energy Loss due to high silt content Energy Loss due to reduced inflows Energy Loss due to system constraint Energy Loss due to Equipment Problems Remarks, if any Station 1 Station 2 Gross Storage in MCM Live Storage in MCM Live Storage in MCM Energy Contents in MkWh (E) Additional information in brief, if any NOTE: (I) Following categories of capacities of units/stations are monitored: a. Thermal (Steam) units having station capacity of more than 20 MW. b. All gas/diesel units supplying committed power to grid. c. Hydro stations having capacity of 2 Mw or above. (II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished. (III) *From the date of synchronisation to the date of commercial operation ** data to be furnished in case of new units/stations and any changes in the existing units Signature 140 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] (C) ENERGY LOSS DUE TO REASONS OTHER THAN FORCED OUTAGE AND PLANNED MAINTENANCE (DAY WISE IN MkWh) Present Reservoir level MetresName Of Station/ Reservoir (D) Hydro Reservoir levels: Full Reservoir level (FRL)** Minimum Draw Down level (MDDL)** Metres Metres Page 42 of 2 Data for the Month: Name of the organization: (A) UNIT WISE GENERATION, UNIT AUX . & STATION AUX. POWER CONSUMPTION Name Of Station Unit No. Unit Capacity in MW Gross Energy generated during the Month in MkWh Unit Aux. Consumption in MkWh Station Aux. Consumption in MkWh Unit Peak Load during the month ( MW ) Station Peak Load during the month ( MW ) Station 1 Station 2 (B) UNIT WISE OUTAGES ( Planned/Forced) (i) Details of Units remained out of bars & Units tripped/ taken out of the bars during the Month Name Of Station Unit No. Tripping Date & Time Expected date of return Outage Reason (s) Reason (s) of extended outage, if any Remarks (ii) Details of Units revived during the month Name Of Station Unit No. Tripping Date & Time Synchronization Date & Time Outage Duration in Hours- Minutes Outage Reason (s) Generation Loss in MkWhs 141 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Data for newly commissioned units ( if any)* Monthly Operational Data of Thermal Power Stations and Nuclear Power Stations ( Generation and Outage data) Periodicity-Monthly Submission by-7th day Format : 24 Page 1/2 Planned outage Forced outage Forced outage Planned outage Page 1 of 2 Name Of Station Unit No. Unit Capacity in MW Reason(s) for partial energy loss Generation loss (MkWh) Remarks, if any Station 1 Station 2 Partial loss in MkWh = (Cr1 x Hr1 +Cr2 xHr2…+ Crn x Hrn) /1000 NOTE: (I) Following categories of capacities of units/stations are monitored: a. Thermal (Steam) units having station capacity of more than 20 MW. b. All gas/diesel units supplying committed power to grid. c. Hydro stations having capacity of 2 MW and above. (II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished. (III) *From the date of synchronisation to the date of commercial operation 142 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Where Cr1……………Crn are "the reduction in the output of the operating units in MW due to constraints in Auxiliaries/equipments or any other causes." and Hr1……Hrn are the duration in hours of operation of the units at reduced output during the period considered (day or month). (D) ADDITIONAL INFORMATION IN BRIEF, IF ANY (C) UNIT WISE PARTIAL ENERGY LOSS DATA (DAY WISE IN MkWh) Format : 24 Page 2/2 Page 2 of 2 Data for the Month: Name of the organization: (A) UNIT WISE GENERATION, UNIT AUX. , STATION AUX. POWER CONSUMPTION & TRANSFORMATION LOSS Name Of Station Unit No. Unit Capacity in MW Gross Energy generated during the Month in MkWh Unit Aux. Consumption in MkWh Station Aux. Consumption in MkWh Unit wise transformation loss in MkWh Station wise transformation loss in MkWh Peak Load reached during the month ( MW ) Station 1 Station 2 (i) Details of Units remained out of bars & Units tripped/ taken out of the bars during the Month Name Of Station Unit No. Outage Date & Time Expected date of return Outage Reason(s) Reason(s) of extended outage, if any Remarks (ii) Details of Units revived during the month Name Of Station Unit No. Outage Date & Time Synchronization Date & Time Outage Duration in Hours- Minutes Outage Reason(s) Generation Loss in MkWh Name Of Station Unit No. Capacity (MW) Energy Loss in MkWh Reason(s) of Energy Loss Remarks, if any Station 1 Station 2 Monthly Operational Data of Hydro Power Stations ( Generation, Outage and Reservoir Level data) 143 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Format no-25 Page 1/2 Periodicity- Monthly Submission by- 7th day Data for newly commissioned units ( if any)* Planned outage (D) ADDITIONAL INFORMATION IN BRIEF, IF ANY (C) ENERGY LOSS DUE TO REASONS OTHER THAN FORCED OUTAGES & PLANNED MAINTENANCE (B) UNIT WISE OUTAGES ( Planned/Forced) Planned outage Forced outage Forced outage Page 1 of 2 Reservoir inflow data for the month- year (mm-yy): Gross Storage in MCM Live Storage in MCM NOTE: (I) Following categories of capacities of units/stations are monitored: a. Thermal (Steam) units having station capacity of more than 20 MW. b. All gas/diesel units supplying committed power to grid. c. Hydro stations having capacity of 2 MW and above. (II) Wherever actual auxiliary consumption is not being metered, proportionate auxiliary consumption may be furnished. (III) *From the date of synchronisation to the date of commercial operation 144 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] Metres Metres (E) Hydro Reservoir Inflow data Format no-25 Page2/2 Inflows during the month (MCM) Outflows during the month (MCM) (D) ADDITIONAL INFORMATION IN BRIEF, IF ANY Name Of Station/ Reservoir Full Reservoir level (FRL) Minimum Draw Down level (MDDL) Page 2 of 2 145 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III – SEC.4]

Previous and next

All provisions of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007

Questions people ask

Is form AT-20 of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 still in force?

No repeal of Central Electricity Authority (Furnishing of Statistics, Returns & Information) Regulations, 2007 is recorded.