Form V, Offshore Areas Mineral Concession Rules, 2006: FORM V

Offshore Areas Mineral Concession Rules, 2006 - Form V

Text of form V

FORM V

FORM V [See rule 53] (Six monthly Report of the Exploration Operations carried out) Progress report of exploration operation in respect of [the name of the mineral(s)] for the six month period ending IMPORTANT This Form, duly filled in must reach the concerned authorities within thirty days after expiration of six month period from the date of execution of exploration licence or the expiry of explorati on licence or abandonment of exploration operations, whichever is earlier. To 1. 2. 3. The Controller General Indian Bureau of Mines, Nagpur - 440 001 The Director general Geological Survey of India Kolkata The Secretary, Deptt. of Atomic Energy (Only in respect of Atomic Minerals) 1. Name oMhe minerals for which exploration licence has been granted. 2. Name and address of the licensee 3. 4. 5. Particulars of Exploration Licence (EL): (i) Date of execution (ii) Period years, from to _ (iii) Area under licence (iv) Number and date assigned by Central Government to Exploration Licence. Location of "the Exploration Licenced Area: (between latitude and longitude) Particulars of Geologist/Mining Engineers-in- Charge of exploration operations: (i) Name and address (ii) Qualifications (iii) Date of appointment (iv) Nature of appointment Please tick (V) mark one of the boxes whichever is applicable (a) Number^ (b) Date _ PIN (whole time () Part time () 6. (i) Status of exploration operation In progress [ ] Please tick (V) mark one of the boxes whichever is applicable Completed [ ] Abandoned [ ] (ii) If exploration operation is completed or abandoned, date of such completion or ; abandonment 7. Total surface area covered by exploration work (hectares) as on date 8. Completion of exploration work during the year: (a) Bulk sampling (i) Number of bulk samples (ii) Depth (metres) Average Maximum _ ^ ^ _ „ Minimum (b) Dredging (i) Number of Dredge samples (ii) Length (metres) Average Maximum Minimum (c) Drilling Surface Underground (i) Number of boreholes completed during the year (ii) Number of boreholes in progress, if any (iii) Total annua! drilling (metres) (d) Particulars of drilling machines Type Make Capacity Number of drills (e) Exploratory mining, if any (1) Total development (metres) , (2) Quantity of ore produced with grade (f) Number of samples analysed .(1) Main constituent (please specify) (2) Complete analysis Note: Please enclose a geological report describing the exploration operations undertaken so far along with the detailed geological plans and sections showing locations of (a) boreholes, (b) bulk samples, (c) dredge samples, (d) exploratory workings, (e) ore zones and other geological features. In addition, details of sea bed sampling ( surface/subsurface), water sampling and other offshore parameters like current data, underwater photography, physical parameters like temperature, salinity, conductivity, etc., may also be given, if undertaken. 3518 CH/2006—28 208 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] jhe Report shall contain the borehole logs and interpretation and the inferences drawn as a result of the study of the geology of the area and the interpretation of the borehole cores, -pits, trenches, assay data, reserves of ore and contain results of complete analysis of at least two representative samples of ore and the blocks proposed for mining operations. The report shall also contain the results of any beneficiation study carried out on the ores or minerals of the area. Signature: Place: Name in full: Date: Designation: Owner/Agent/Mining * Engineer/Manager FORM W ' [See rule 58] (Six monthly Report of Production Operations carried out) Progress report of production operations-in respect of [the name of the mineral(s)] for the six month period ending To (i) Name of the Mineral I The Controller General Indian Bureau of Mines. Nagpur-440 001 (ii) Name of the Mine 2.The Director General Geological Survey of India. Kolkata {iii) Name(s) of other mineral(s), if any, produced 3The Secretary. from the same mine during the year 20 Deptt. of Atomic Energy (Onlv in respect of Atomic Minerals), To .- .. Controller General, Indian Bureau of Mines, Nagpur. PART -1 (General) 1. Location of Mine: Offshore area between latitude and longitude - 2. Name and Address of > (i) Lessee/Owner: (ii) Registered Office of Lessee: (iii) Agent: (iv) Manager: (v) Mining Engineer in charge: (vi) Geologist in charge: (vii) Transferer {previous lessee) if any, and date of transfer: 3. (i) Area under lease (ii) Date of execution of production lease deed [*rmii—^^3(1) 3 ms ^r w m : SFRT*TO \ 209 v (Hi) Period of lease (iv) Date and period of renewal (if applicable) 4. Ownership/exploiting »agency of mine (i) PUBLIC SECTOR (ii) PRIVATE SECTOR (iii) JOINT SECTOR PART - II (Employment & Wages) 1. Number of technical and supervisory staff employed at the mine Description Wholly Partly employed employed (vi) Graduate Mining Engineer (vii) Diploma Mining Engineer (viii) Geologist (ix) Other administrative, clerical and technical supervisory staff 2. (i) Number of days the mine worked: (ii) Number of shifts per day: (iii) Indicate reasons for work stoppage in the mine during the year such as due to strike, lockout, monsoon, non-availability of labour, transport bottleneck, lack of demand, uneconomic operation etc. and the number of days of work stoppage for each of the factors separately. 3. Employment of labour and wages paid Maximum number of persons employed on any one day during the year Classification Total No. of mandays No. of days Average daily Total wages worked during the six worked during number of persons salary bill for month period. the pwriod. employed the period (Rs) Direct Contract Total Male Female Total (1) (2A) (2B) (2C) (3) (4A) (4B) (4C) (5) (I) On land (i) 00 (iii) (I) On ship, barges, etc. (i) (ii) m__ , . 210 THE GAZETTE OF INDIA; EXTRAORDINARY [PART II—SEC. 3(i)] PART- III (Consumption of Materials) 1. Quantity and Cost of material consumed during the six month period Description (i) Fuel (a) Coal (b) Diesel Oil (c) Petrol (d) Kerosene (a) Gas] (ii) Lubricant (a) Lubricant oil (b) Grease I Tonnes Litres Litres Litres' Cu.m. ^ -* Ltrs. Kgs. Unit Quantity Value (Rs.) (iii) Explosives (of all types) (iv) Other Material, Spares & Stores 2. Royalty and fixed rent Paid for current six month Paid towards past arrears period 3^ax©5 and cesses 4. Other expenses (Rs.) (i) Overhead (ii) Maintenance (iii) Money value of other benefits paid to workmen •(iv) Payment made to professional agencies (v) material handlings •(vi) others PART- IV (General Geology & Mining) 1. Give a brief account of exploration/development work done during the year. 2. Reserves (in tone) and basis of estimation. Classification Proved Probable Possible Total In situ reserves Quantity Grade Mineable reserves Quantity Grade ' Basis of estimation: 3. Type and Aggregate Horse Power of Machinery: Type of Machinery No. of units Capacity HP. PART- V (Production, Despatcheaand Stocks) (Unit of Quantity in Tonnes) 1. Production and Stocks of ROM ore at mine-head Type of Machinery No. of Units Capacity H.P. (a) Opening stock (b) Production (c) closing stock 2. Quantity of waste removed: 3. Quantity of mineral rejects with grades:' 4. Grade-wise Production, Despatches and Stock of Processed Ore Grades (indicate Opening Production Despatches Closing PMV actual grade) stock at from mine- stock at (Rs/MT) mine-head head mine-head 5. Details of deductions (from FOR/FOB prices) used for computation of PMV (Rs./Tonne)" (a) Cost of Transportation (indicate loading stations and distance from mine) (b) Loading and unloading charges (c) Port handling/export duty/and other charges, etc. (indicate name of port) 6. Sales/Despatches for Domestic consumption and for Exports: Grade of ore For Domestic Consumption For export [Place of sale] Consignee Quantity Sale value Country Quantity FOB value (Rs.) (Rs.) 7. Give reasons for increase/decrease in production, if any, during the year compared to the previous year. PART- VI (Cost of Production) Cost of production per tonne of ore/mineral produced Item Cost per metric tonne (Rs.) 212 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] (i) Direct Cost: (a) Exploration (b) Mining (c) BerreficratioR' (Mechanical only) (ii) Over-head cost (iii) Depreciation (iv) Interest (v) Royalty (vi) Taxes (vii) Fixed'Rent (viii) Others (specify) Total -# Note: Information given under Part-UI will be kept confidential, if required. The Government. however, will be free to utilise the information for general studies without revealing the identity or working cost of the firm. I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full: Designation:Owner/Agent/ ~~ Mining Engineer/Manager

Previous and next

All provisions of Offshore Areas Mineral Concession Rules, 2006

Questions people ask

Is form V of Offshore Areas Mineral Concession Rules, 2006 still in force?

No repeal of Offshore Areas Mineral Concession Rules, 2006 is recorded.