Power Conferred by Section 61 of the Petroleum and Natural Gas Regulatory Board Act, 2006
Notification - The Petroleum and Natural Gas Regulatory Board Act, 2006
- Kind: Notification
- Under: The Petroleum and Natural Gas Regulatory Board Act, 2006
Text of this notification
12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III —SEC. 4]
Gas Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board hereby makes the
following regulations, namely:-
1. Short title and commencement.
(1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Access Code for
Common Carrier or Contract Carrier Petroleum and Petroleum Products Pipelines) Regulations, 2016.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. Definitions.
(1) In these regulations, unless the context otherwise requires, -
(a) “access arrangement” means a contract document between the authorized entity and the shipper
specifically defining terms and conditions for the access to the petroleum and petroleum products
pipeline and placed on the web site of the authorized entity;
(b) “Act” means the Petroleum and Natural Gas Regulatory Board Act, 2006”;
(c) “appointed day” means the date of October 1, 2007 when the Central Government notified the
establishment of the Petroleum and Natural Gas Regulatory Board;
(d) “batch” means a quantity of petroleum product of like specifications moved through the pipeline as
an identifiable unit;
(e) “Board” means the Petroleum and Natural Gas Regulatory Board established under the Petroleum
and Natural Gas Regulatory Board Act, 2006;
(f) ”capacity”:
i. “booked capacity” means maximum daily quantity (MDQ) of petroleum and petroleum
products on any day to be delivered at an entry point or off taken at an exit point as per
the access arrangement between the shipper and the transporter;
ii. “contracted capacity” means the petroleum and petroleum products quantity contracted
for transportation through a pipeline system on daily, monthly or yearly basis;
(g) “custody transfer meter” means a device or a set of devices which measures the quantity of
petroleum and petroleum products for transfer of custody from one entity to another;
(h) “dispute” means any conflict or difference arising between the entities under or in connection with
these regulations or the access arrangement or with regard to specifications of the products;
(i) “entry point” means the point at which the petroleum and petroleum product delivered by shipper is
injected into the petroleum and petroleum products pipeline;
(j) “exit point” means the point at which the petroleum and petroleum product is withdrawn from the
petroleum products pipeline for delivery to the shipper as per the access arrangement;
(k) “grade” means the classification of petroleum and petroleum product according to its chemical
composition and characteristics such as its Research Octane Number (RON), sulphur content,
additive content, freezing point and the quantity or proportion thereof;
(l) “grade band” means the range of minimum and maximum acceptable composition, characteristics,
quantity or proportion thereof for petroleum and petroleum product;
(m) “interface" means the mixture which occurs in normal pipeline operations between batches of
petroleum products having different specifications;
(n) “transmix” means the product removed from the pipeline system between two separate product
batches that cannot be blended with the first or second product;
(o) “maximum daily quantity” means the maximum volume of petroleum and petroleum products
contracted, booked or scheduled for delivery in a particular day within twenty four hours of the day;
(p) "petroleum and petroleum products pipeline" means any pipeline including a branch or spur lines for
transport of petroleum and petroleum products and includes all connected infrastructure such as
pumps, metering units, storage facilities at originating, delivery, tap off points or terminal stations
and the like connected to the common carriers or contract carriers including line balancing tanks and
tankage required for unabsorbed interface, essential for operating a pipeline system but excluding
pipelines, which are dedicated for supply of petroleum products to a specific consumer which
are not for resale :
¹Hkkx III µ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 13
Provided that the transporter may own, hire, outsource or use on hospitability basis such connected
facilities on non discriminatory basis.
Note: For the purpose of access, the facilities declared by the authorized entity for operating a petroleum
and petroleum project pipeline system shall be considered as common carrier or contract carrier;
(q) “petroleum and petroleum products pipeline section” means a part of petroleum and petroleum
products pipeline between an entry point and an exit point or between two exit points or between
two entry points;
(r) “shipper” means an entity and also includes a consumer who intends to utilize the capacity in the
pipeline for transmission of petroleum and petroleum products;
(s) “transportation loss” (TL) means the unaccounted quantity of petroleum and petroleum products
resulting due to inaccuracy of custody meter, leakages or releases during regular operation and
maintenance of the pipeline system but not occurring due to any third party damage;
(t) “transporter” means an entity authorized by the Board or authorized by the Central Government
prior to the appointed date for laying, building, operating or expanding petroleum and petroleum
products pipeline;
(u) “unit of measurement” means unit for measurement of quantity of petroleum and petroleum
products excluding LPG and shall be in kilo liter corrected as per American Society for Testing and
Materials (ASTM) table 53B for density of the product at 15 degree Celsius and table 54B for
volume to 15 degree Celsius or shall be Metric Tonne as the case may be. For LPG the “unit of
measurement” shall be Metric Ton:
Provided that this measurement should be corrected by density over 24 hours to get the mass of
petroleum product for the purpose of accounting.
(2) Words and expressions used in these regulations, but defined in the Act or in the rules or regulations made
there under, shall have the meanings respectively assigned to them in the Act or in the rules or regulations,
as the case may be.
3. Application.
These regulations shall apply to all entities operating or proposing to operate petroleum and petroleum
products pipeline and shipper who engage or intend to engage in transportation service for petroleum and
petroleum products pipeline.
4. Declaration of capacity.
(1) The capacity of a petroleum and petroleum products pipeline shall be as determined by the Board as
specified in the Petroleum and Natural Gas Regulatory Board (Determining Capacity of Petroleum,
Petroleum Products and Natural Gas Pipeline) Regulations, 2010.
(2) The transporter shall declare capacity for petroleum and petroleum products pipeline system including entry
and exit point-wise section capacity, and available capacity and host the same on its web site on the 1st of
every month in the prescribed manner as per format specified at Schedule-I and shall send the information
to the Board and the same shall also be hosted by the Board on its website.
(3) The available capacity declared by the transporter under sub-regulation (2) shall be available for use on
common carrier or contract carrier basis or both and shall be allocated in line with the provisions under
regulation 13.
5. Petroleum and Petroleum Products parameters.
(1) The petroleum and petroleum products to be transported shall be in accordance with the following products
specification:
(a) Motor Spirit (MS) - As per the latest version of Bureau of Indian Standards (BIS)- IS2796;
(b) High Speed Diesel (HSD) - As per the latest version of Bureau of Indian Standards (BIS)- IS1460;
(c) Superior Kerosene Oil (SKO) - As per the latest version of Bureau of Indian Standards (BIS)-
IS1459;
(d) Naptha: As per the latest version of Industry Quality Control Manual (IQCM);
(e) Liquefied Petroleum Gas (LPG): As per the latest version of Bureau of Indian Standards (BIS)-
IS4576; and
(f) Aviation Turbine Fuel (ATF): As per the latest version of Bureau of Indian Standards (BIS)-
14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III —SEC. 4]
IS1571.
Note: Petroleum and Petroleum Products specifications as above shall be applicable at exit points of petroleum
and petroleum products pipeline. Entry point specifications shall compensate for deterioration during storage or
transit.
(2) The authorized entity shall formulate the grade band for the petroleum and petroleum products to be
transported through petroleum and petroleum products pipeline keeping in view the following parameters,
namely:-
(a) grade of its own petroleum and petroleum products proposed to be transported;
(b) grade of firmed up contracted capacity of petroleum and petroleum products;
(c) requirements of downstream consumers of petroleum and petroleum products on the pipeline;
(d) technical requirement of the pipe line system; and
(e) grade of the inter-state pipelines either supplying petroleum and petroleum products into the
pipeline system or receiving petroleum and petroleum products from this pipeline system.
(3) The transporter shall publish grade band referred to in sub-regulation (2) on its website within a period of
one month of authorization by the Board, as referred to in sub-regulation (2) of regulation 4, under
intimation to the Board in the format as provided in Schedule-II:
Provided that the entities authorized before the publication of these regulations shall publish the grade band
within a period of one month of the date of publication of these regulations.
(4) Grade band referred to in sub-regulation (2) shall be applicable to all shippers on non-discriminatory basis.
(5) The transporter may review the Grade band for petroleum and petroleum products from time to time taking
into account changes, if any, in the Industry Quality Control Manual (IQCM) / Bureau of Indian Standards
(BIS) and accordingly would update the grade band details on its web site:
Provided that transporter shall immediately inform the Board as and when such updation is carried out by
the transporter besides putting the same on its web site.
(6) The threshold limits for elements in petroleum and petroleum products viz. specific gravity, viscosity,
vapour pressure, permissible contamination level shall be as given in Schedule II.
(7) The transporter shall define the petroleum and petroleum products parameters at entry points in terms of
petroleum and petroleum products hydraulics specifying the acceptable range of pressure and temperature
and the same shall be hosted on the website of the transporter. In addition, minimum required batch size for
different products, estimated transmix generation and pipeline loss allowance etc. shall also be hosted on
the website of transporter as well as it will become part of “Access Arrangement”.
(8) Shipper shall supply petroleum and petroleum products conforming to product specifications as published
by the transporter under sub-regulation (3) and given in Schedule II and the transporter shall deliver
petroleum and petroleum product at exit point conforming to product specifications as per sub-regulation
(3).
6. Acceptance of Petroleum and Petroleum products.
(1) Petroleum and petroleum product shall be accepted by the transporter for transportation -
(a) only if it meets required quality and specifications as published by the transporter under sub-
regulation (3) of regulation 5 and in Schedule II;
(b) only when product is free from any water, non-hydrocarbon blending elements and other
impurities;
(c) only if any additives and inhibitors, including Drag Reducing Agent (“DRA”) and corrosion
inhibitor compound, to be included in shipper’s petroleum products have been accepted by the
shipper. Shippers will be given 30 days notice stating any changes in additive or inhibitor to be
injected (generic and trade name), the maximum quantity, the petroleum and petroleum products
into which it will be injected, and the date, the injection shall begin;
(d) only when petroleum and petroleum product are delivered by shipper or made available to the
transporter at the time mutually agreed by shipper and transporter to meet transporter’s shipment
schedule. If such petroleum and petroleum products are not delivered by shipper in time to meet
said schedule, transporter reserves the right to cancel, bypass or delay said shipment. Transporter
reserves the right to require petroleum and petroleum product to be available for shipment at entry
¹Hkkx III µ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 15
point 24 hours prior to the time scheduled for shipment from entry point;
(e) only if the shipper assures the availability of tankage or storage at the exit point at expected
delivery time in case the tankage or storage is owned by the shipper.
(2) Transporter may sample and test any batch for the specifications of petroleum and petroleum products
received prior to acceptance or during receipt of batch, and, in the event of variance between shipper’s
Quality Certification and transporter’s test, transporter’s test shall prevail.
(3) In case of any dispute in test results, the testing or certification shall be carried out by an accredited third
party as mutually agreed.
(4) In case of any fault in the test of transporter, the expenses on this account shall be borne by the
transporter and in case no fault is found in the test, the expenses shall be borne by the shipper.
(5) Transporter’s acceptance and delivery of petroleum and petroleum products to any facility provided by
shipper shall not evidence transporter’s approval of the adequacy of such facilities or the competency of
shipper’s personnel responsibility for such facilities and personnel shall be exclusively that of the shipper.
(6) In the event the transporter has accepted petroleum and petroleum products for transportation in reliance
upon shipper’s representations as to acceptance at exit points, and there is failure to accept such
petroleum and petroleum products at exit points within mutually agreed time frame, transporter shall have
the right to divert, re-consign or make whatever arrangements for disposal of the petroleum and
petroleum products as it deems appropriate to clear the pipeline facilities including levy of pipeline idling
charges as per the access arrangement.
(7) Transporter shall have the right to reject any petroleum and petroleum products offered for transportation
which may be involved in litigation or the title of which may be in dispute, or which may be encumbered
by a lien or charge of any kind. Transporter may seek the satisfactory evidence of shipper’s perfect and
unencumbered title and satisfactory bond indemnifying transporter against any losses as per the access
arrangement.
7. Transmix and Transmix handling.
(1) Wherever interface is being absorbed by the transporter during the transportation of the petroleum and
petroleum products, suitable provision shall be duly incorporated in the access arrangement between
shipper and transporter.
(2) Wherever interface absorption is not feasible, transmix generated between two petroleum and petroleum
products in case of multi-product pipeline will be stored in a separate tank owned by transporter, where it
may mix with other transmix.
(3) Transporter shall allocate transmix to shippers that have shipped the petroleum and petroleum products
on the pipeline section in proportion to each shipper’s volume of petroleum and petroleum products
transported in that pipeline section.
(4) Transporter will physically distribute transmix to the shippers as it becomes available to assure that over
time each shipper receives its proportionate share.
(5) Shipper shall ensure to lift transmix share within mutually agreed time it is made available to shipper.
(6) Shipper will have sole responsibility for the disposition of its allocated transmix within mutually agreed
period
(7) The quantity of transmix given to shipper will be part of the petroleum and petroleum products delivered
to shipper and shall be accounted in total products delivered to shipper at exit points.
(8) Transporter may agree to lift transmix with suitable techno-commercial provisions mutually agreed and
detailed as part of access arrangement.
8. Demurrage.
(1) If petroleum and petroleum products are delivered in transporter owned tank, then, transporter shall have
the right to clear tankage for incoming deliveries by advising shipper to withdraw the petroleum and
petroleum products within mutually agreed time as per the access arrangement.
(2) Petroleum and petroleum products including transmix, not removed at the time period provided in sub-
regulation (1) is subject to a daily demurrage charge as mentioned in the access arrangement. Demurrage
charge shall continue until the shipper’s product including transmix has been removed from transporter’s
tank.
(3) Third party agreements, if any, by shipper for intermediate or additional storage shall not form part of
16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III —SEC. 4]
access arrangement.
9. Pipeline transportation loss.
(1) Transporter shall account to each shipper for all petroleum and petroleum products received. The pipeline
transportation loss resulting from shrinkage, evaporation, sampling, dormant during storage and
measurement error etc., which will be on shipper’s account. This will be calculated for each batch of
transportation and will be adjusted or settled to each shipper’s account in accordance with access
arrangement:
Provided that the pipeline transportation loss shall be limited to 0.015% of the total volume of the
petroleum and petroleum products transported in the pipeline on annual basis or limit prescribed by
Central Board of Excise and Customs, or the actual whichever be the lowest.
(2) All other product losses not resulting from the transporter's negligence will be on the account of the
concerned shipper. However, accounting of product loss due to pilferage shall be as per mutually agreed
terms and conditions specified in access arrangement.
10. Measurement and Accounting of petroleum and petroleum products.
(1) The transporter shall ensure provision of necessary equipment including requisite infrastructure and
arrangements at both the entry and exit points to measure petroleum and petroleum products quantity,
composition, grade, pressure and temperature as specified in regulation 12 and API Manual for
Petroleum Measurement Standards.
(2) Provision of necessary equipment including infrastructure and arrangements to measure petroleum and
petroleum products composition and grade shall be mandatory for cases of custody transfer in terms of
mass(e.g. LPG).
(3) Measurement of petroleum and petroleum products quantity shall be as per sub-regulation (1) either by
usage of flow measuring equipment or, in case shipper’s product is placed in transporter’s tankages
inside the transporter's premises as per Access Arrangement, then, by measurement of relevant tank dips.
Services of a third party surveyor shall be used at the cost of the shipper as per the Access Arrangement.
(4) Measurement of grade and petroleum and petroleum products parameter as provided in sub-regulations
(1) and sub-regulation (3) shall be sufficient for billing and other contractual purposes for all exit points.
(5) Total error limit, accuracy and repeatability of the measuring equipment shall be as per the technical
specifications of the Original Equipment Manufacturers (OEMs).
(6) The transporter shall carry out verification, calibration or proving of measuring equipment as per the
relevant codes, standards and statutory requirements.
(7) The shipper may install check meters at requisite points with a pre-condition so as not to interfere with
the measurement equipment installed by the transporter for custody transfer purpose.
(8) In case of any dispute in metering, the meter proving or certification shall be carried out by an
accredited third party as mutually agreed.
(9) In case of any fault in the meter of transporter, the expenses on this account shall be borne by the
transporter and in case no fault is found in the meter, the expenses shall be borne by the shipper.
(10) Petroleum and petroleum products accounting shall be done on daily basis or as per mutually agreed
billing cycle and the stipulations of Central Excise and Customs department of Government of India and
the petroleum and petroleum products reconciliation, billing and other terms shall be as decided between
the transporter and shipper in accordance with access arrangement.
11. Obligations at entry point and exit point.
(1) At the entry point, shipper shall furnish certified laboratory reports of the petroleum and petroleum
products offered for transportation from the accredited party as mutually agreed.
(2) At the entry point, when the shipper places the petroleum and petroleum products that does not meet the
requirements as specified in sub-regulation (3) of regulation 5 and Schedule II, in respect of grade band
and threshold level of other elements of petroleum and petroleum products, the transporter may-
(a) refuse to accept it and in such cases shipper shall be liable to pay liquidated damages to the
transporter as per the access arrangement; or
(b) accept any petroleum and petroleum products that does not meet the requirements of petroleum and
petroleum products in terms of parameters-
¹Hkkx III µ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 17
(i) as specified in Schedule II:
Provided that transporter may charge reasonable cost of service from the shipper, as
may be mutually agreed, for any additional facilities or treatment for cleaning up or
integrity requirements of the pipeline and to upgrade petroleum and petroleum products
to pipeline specifications:
Provided further that such grade of petroleum and petroleum products do not adversely
affect the existing shippers’ quality specifications committed by the transporter at the
exit points;
(ii) as specified in sub-regulation (3) of regulation 5:
Provided that the transporter may charge reasonable cost of service for the capacity
adjustment from the shipper for transportation of such petroleum and petroleum
products and for capacity constraints in the system:
Provided further that such grade of petroleum and petroleum products do not adversely
affect the existing shippers’ quality specifications committed by the transporter at the
exit points.
(3) At the exit point, when the transporter delivers petroleum and petroleum products that does not meet the
quality requirements as specified in sub-regulation (8) of regulation 5, the shipper may -
(a) refuse to accept delivery and in such a case the transporter shall be liable to pay liquidated damages
to the shipper as per the access arrangement; or
(b) accept the petroleum and petroleum products provided that shipper may charge reasonable cost of
service from the transporter, as may be mutually agreed, for any additional facilities or treatment to
upgrade petroleum and petroleum products.
(4) The transmix generated and absorbed between batches of different products during the pipeline
transportation will be as specified in the sub-regulation (1) to (7) of the regulation 7.
(5) Any entity authorized by the Board to lay, build, operate or expand a petroleum and petroleum products
pipeline under the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build,
Operate or Expand Petroleum and Petroleum Products Pipelines) Regulations, 2010 or authorized to do
so by the Central Government before the appointed day, can add new entry and exit point or abandon any
existing entry and exit point on the pipeline on techno-economic considerations provided that the existing
consumers or shippers on the pipeline are not adversely affected by the decision of the entity.
12. Facilities at entry point and exit point.
(1) Shipper shall arrange to deliver petroleum and petroleum products at entry point on the petroleum and
petroleum products pipeline or storage facilities of the transporter as per the access arrangement and shall
provide the requisite facilities, for custody transfer and delivery of petroleum and petroleum products to
the transporter unless otherwise agreed to between shipper and transporter.
(2) Transporter may execute hooking up facility of shipper to the entry point at the cost of shipper.
(3) Shipper or his authorized nominee shall make their own arrangements to operate and maintain facilities
upstream of entry points at his own cost and risk unless the facilities are provided by the transporter under
a separate contract.
(4) The transporter shall own and operate facilities and measuring equipment at exit point for custody transfer
and delivery of petroleum product to the shipper unless otherwise agreed to between shipper and
transporter. The transporter may also offer storage facilities at the exit point in case the shipper requires on
mutually agreed terms and conditions.
(5) The transporter may execute, at the cost of shipper, the facility of hooking up of shipper facility with that
of transporter at exit point.
(6) The shipper shall provide space and cooperate with the transporter in installing, operating, maintaining
and modifying any specific exit point facilities when such exit point facilities are provided in the premises
of the shipper on mutually agreed terms and conditions.
(7) The shipper may provide check meter, conforming to the applicable standard and specifications, at the exit
point in petroleum and petroleum products pipeline:
Provided that in case of any variation in the readings in the meter of transporter and shipper, the reading of
the transporter meter shall be taken as final.
18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III —SEC. 4]
(8) In case of any dispute in metering, the meter proving or certification shall be carried out by an
accredited third party as mutually agreed.
(9) In case of any fault in the meter of transporter, the expenses on this account shall be borne by the
transporter and in case no fault is found in the meter, the expenses shall be borne by the shipper.
13. Pipeline capacity booking.
(1) More than one shipper can hold capacity at any entry or exit point.
(2) The booked capacity shall be through a contract between shipper and transporter under the access
arrangement.
(3) When a transporter receives a request for access from a shipper it shall respond within ten days from the
date of receipt of request from the shipper-
(a) confirming that spare capacity exists to satisfy the request and specifying the charges and terms and
conditions upon which it will make the service available; or
(b) advising that spare capacity does not exist to satisfy the request; or
(c) advising that the data provided by the shipper require technical study to accommodate his request
and such study shall be completed within seven days; or
(d) advising that it is not technically or operationally feasible to provide access.
(4) The shipper may release the capacity in favour of other shippers to the extent of the capacity booked
under intimation to the transporter.
(5) The nomination of petroleum and petroleum products for transportation shall contain the expected
petroleum and petroleum products flow details of one or more day’s daily-nominated quantities as per the
agreed schedule between the shipper and the transporter.
14. Interconnection of common carrier and contract carrier petroleum and petroleum products pipelines.
(1) The interconnection of common carrier and contract carrier pipeline systems may be necessitated by either
a transporter or a shipper and such interconnection shall be allowed subject to capacity available in the
receiving common carrier pipeline provided it is operationally and technically feasible.
(2) The petroleum and petroleum products specifications for interconnecting pipelines should be compatible
and as per regulation 5.
(3) The cost of such interconnection including the infrastructure to facilitate access shall be borne by the entity
that has triggered such requirement for interconnection provided it is executed by the transporter.
(4) The execution of the interconnection facilities may also be carried out by the shipper and transporter may
facilitate such interconnection.
(5) The interconnection point shall be mutually agreed between transporter and the shipper.
(6) Interconnection of pipeline network is like adding an exit point to the existing pipeline and all such
provisions shall be applicable for such interconnection.
(7) The entity denying the interconnection shall inform the Board within a week with the reasons thereof.
15. Methodology for providing access.
(1) The contracted capacity between shipper and transporter shall be in accordance to the provisions of sub-
regulation 5 (6) (i) of the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build,
Operate or Expand Petroleum and Petroleum Products Pipelines) Regulations, 2010 and regulation 6 of
Petroleum and Natural Gas Regulatory Board (Guiding Principles for Declaring or Authorizing Petroleum
and Petroleum Products Pipelines as Common Carrier or Contract Carrier) Regulations, 2012.
(2) The extra capacity for use as common carrier by any third party on open access and non-discriminatory
basis shall be allocated on first come first serve basis
16. Planned maintenance.
(1) The transporter is required to draw up and publish a maintenance plan well ahead of time for a defined
period identifying those entry and exit points where petroleum and petroleum products flows may be
restricted by maintenance works, the extent of the restrictions and the time of occurrence and the transporter
shall plan such maintenance so as to minimize disruption to affected parties and can request information
from shippers on their survival flows at entry and exit points to assist the transporter for such maintenance
schedule.
¹Hkkx III µ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 19
(2) Dates for scheduled maintenance shall be informed well in advance which can be adjusted on thirty days
advance notice to and from affected shippers.
(3) The planned maintenance period shall not exceed ten days in a year but in no case more than five
continuous days per event.
(4) Transporter and shipper may further mutually agree upon the time and extent of the scheduled planned
maintenance for the shipper’s facilities not affecting the time limits provided for transporter’s maintenance
plan at sub-regulation (3).
17. Information about force majeure.
(1) The affected party shall on occurrence of any force majeure-
a) as soon as reasonably practicable notify each of the other parties of the occurrence and nature of the
force majeure, the expected duration thereof insofar as the same can reasonably be assessed and the
obligations of the affected party performance of which is affected thereby; and
b) from time to time thereafter provide to each other party reasonable details of the following, namely:
(i) developments in the matters notified under clause (a);
(ii) the steps being taken by the affected party to overcome the force majeure occurrence or its effects
and to resume performance of its relevant obligations.
(2) The entities shall be relieved of their respective obligations in the event of force majeure except for the
obligation to pay when due.
18. Operational planning.
(1) Shipper shall make daily, weekly or monthly nominations to the transporter for the quantities of petroleum
and petroleum products that it wishes to deliver to at a particular entry point and off-take at a particular exit
point from the pipeline system in line with the provisions under these regulations.
(2) (a) Transporter shall schedule the quantities of petroleum and petroleum products for transportation based
on the nominations received and capacity available in the pipeline system.
(b) Transporter may schedule the nomination for quantities of petroleum, and petroleum products over and
above the booked capacity subject to a maximum of ten per cent of the declared pipeline capacity.
(3) (a) Transporter shall allocate quantity of petroleum and petroleum products to various shippers as
determined under clause (b) of sub-regulation (2) and as per the scheduling exercise.
(b) Allocation scheduled shall be delivered to the shippers as per the destination wise (exit point wise)
schedule prepared.
19. Emergencies.
The procedures to be followed by shipper and the transporter in the event of an emergency shall be included in
the access arrangement by shipper and transporter on mutually agreed terms.
20. Confidentiality of information.
All documentation, information, data, submissions and comments disclosed or delivered whether in writing or
otherwise by any entity to the transporter, shipper or to any other party either in connection with or in
consequence of the requirements of these regulations shall be regarded and treated as confidential and shall not
be disclosed either in full or part of any or all of the documentation, information, data, submissions and
comments including the contents and copies thereof in any form except in connection with any proceedings in
any court.
21. Miscellaneous.
(1) The Board may issue guidelines from time to time relating to Access Code for Common Carrier or Contract
Carrier Petroleum and Petroleum Products Pipelines.
(2) If any question arises as to the interpretation of these regulations, the same shall be decided by the Board.
20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III —SEC. 4]
SCHEDULE – I
Format for declaring capacity of Pipeline
(See regulation 4(2))
1. Name of entity:
2. Name of pipeline:
3. Details of capacity of Pipeline (as per table below):
Name of
Section
Capacity approved by
PNGRB
Break up of capacity for period ……….. (MMT)
Total
Including
Common
carrier
(MMT)
Common
Carrier
(MMT)
Own
Require
ment
Firmed-up contracted
capacity with other entities
for a period of at least one
year
Common Carrier Capacity
with other entities for a
period of less than one year
Contracted Available Contracted Available
4. Number of entry points on the pipeline route:
5. Location of entry points:
6. Number of exit points:
7. Location of exit points:
8. Technical parameters:
(a) Inlet pressure at entry point:
(b) Grade band at entry point:
(c) Temperature:
(d) Other elements as per Schedule - II:
9. Any demand pending with the transporter for common carrier usage of the pipeline along with duration of such
pendency:
10. Preference on entry and exit points:
SCHEDULE – II
(See Regulations 5(6), 5(8), 11(2)(b)(i))
Petroleum Product Physical Characteristics Specifications
(A) For Motor Spirit ( EURO-IV) (B) For High Speed Diesel (EURO-IV)
Parameter Limit Parameter Limit
Sulphur
(Maximum ppmw)
As per latest
IS:2796
DENSITY @ 150C, KG/M3
As per latest IS:1460
Research Octane Number (RON)
(Minimum)
SULPHUR, PPM (Maximum)
Benzene, Vol %
(Maximum)
DISTILLATION
95% Recovery oC
(Maximum)
Aromatics, Vol%
(Maximum)
CETANE NO. (Minimum)
Olefins, Vol% WATER CONTENT (% by Vol)
¹Hkkx III µ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 21
(Maximum) (Maximum)
Motor Octane Number (MoN)
(Minimum)
Polycyclic Aromatic
Hydrocarbon (PAH) wt (%)
Reid Vapour Pressure (RVP)
(kPa)(Maximum)
Any other parameter (limits as per
IS standards) Any other parameter (limits as per
IS standards)
K. RAJESWARA RAO, OSD (R)
[ADVT.-III/4/Exty./188 (166)]
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
(C) For other Petroleum Products
Products
Specific Gravity
(at 15°C)
Viscosity
(CST)
Vapour Pressure (Kg/sq.cm)
Liquefied Petroleum Gas (LPG)
As per latest IS:4576
Superior Kerosene Oil (SKO) As per latest IS:1459
Aviation Turbine Fuel
(ATF)
As per latest IS:1571
NAPTHA As per latest Industry Quality Control Manual (IQCM)
THE PETROLEUM AND NATURAL GAS REGULATORY BOARD
CORRIGENDUM NOTIFICATION
New Delhi, the 22nd May, 2015
F. No. PNGRB/NGPL/REGULATIONS/AMEND-2015.— In the notification of the Petroleum
and Natural Gas Regulatory Board, F. No. L-MISC/VI/I/2007 dated 1
st
January 2015 published in the
Gazette of India, Part III, Section 4, Extraordinary,—
(i) In clause (1) of para 1, “the Petroleum and Natural Gas Regulatory Board (Authorizing
Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Second Amendment
Regulations, 2014” may be read as the “the Petroleum and Natural Gas Regulatory Board
(Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Amendment
Regulations, 2015”.
(ii) In para 2, “Regulation 21” may be read as “Regulation 22” in both places.
UPAMANYU CHATTERJEE, Secy.
[ADVT.-III/4/Exty./188/15(69)]
Foot Note: Principal regulations were notified vide No. G.S.R. 340 (E) dated 6
th
May 2008 and
subsequently amended vide G.S.R. 802(E) dated 19
th
November 2008, G.S.R. 769(E) dated
20
th
October 2009, G.S.R. 38 (E) dated 18
th
January 2010, G.S.R. 480(E) dated 7
th
June
2010, G.S.R. 594(E) dated 9
th
July 2010, F. No. PNGRB/M(C)/48 dated 17
th
February
2014, F. No. PNGRB/NGPL/REGULATIONS/AMEND-2014 dated 8
th
August 2014 and F.
No. L-MISC/VI/I/2007 dated 1
st
January 2015.
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 15
PETROLEUM AND NATURAL GAS REGULATORY BOARD
NOTIFICATION
New Delhi, the 19th May 2015
F. No. Infra/PNGRB/Capdet/CGD/02/2015.—In exercise of the powers conferred by section 61 of the
Petroleum and Natural Gas Regulatory Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board
hereby makes the following regulations, namely:—
1. Short title and commencement.
(1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Determining Capacity of City or
Local Natural Gas Distribution Network) Regulations, 2015.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. Definitions.
(1) In these regulations, unless the context otherwise requires,-
(a) “Act” means the Petroleum and Natural Gas Regulatory Board Act, 2006;
(b) “appointed day” means the date of October 1, 2007 when the Central Government notified the establishment of the
Petroleum and Natural Gas Regulatory Board;
(c) “authorized area” means the area as defined under the Petroleum and Natural Gas Regulatory Board (Authorizing
Entities to Lay, Build, Operate or Expand City or Local Natural Gas Distribution Networks) Regulations, 2008;
(d) "authorised entity" means an entity that is authorised to lay, build, operate or expand a city or local natural gas
distribution network in a geographical area (GA) under the Act and the relevant regulations made thereunder;
(e) “Board” means the Petroleum and Natural Gas Regulatory Board established under sub-section (1) of section 3 of the
Act;
(f) "capacity assessment group" means a group comprising representatives of two authorised entities other than the entity
of which the CGD network capacity is to be certified and a representative of the Board as decided by the Board on case
to case basis or any agency or entity or authorized person or any approved third party authorized by the Board for
determining the capacity of the CGD network;
(g) “CGD network capacity” means the maximum quantity in standard cubic metres per hour (SCMH) of natural gas that
can be injected into or off taken from the steel pipeline network at specific points, meeting all the technical and
operational parameters fixed in steel network at steady state conditions, that is, all parameters like flow, pressure,
temperature, are in harmony and vary only along the steel network but not with time or the aggregate rated capacity (in
SCMH) of all City Gate Stations (CGS) connected to steel network, whichever is lower. For cases, where any entry
points (CGS/DPRS/custody metering systems) are connected directly to the medium density poly ethylene (MDPE)
network without involvement of any steel network, the rated capacity of such entry points shall be considered;
16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]
(h) “CGD declared capacity” means the capacity (in SCMH) that the steel pipeline network is capable of distributing under
the steady state operating conditions determined based on the approved flow equation and the selected software
package or the aggregate rated capacity (in SCMH) of all City Gate Stations connected to steel network, whichever is
lower. For cases, where any entry points (CGS/DPRS/custody metering systems) are connected directly to the MDPE
network without involvement of any steel network, the rated capacity of such entry points shall also be declared;
(i) “city or local natural gas distribution network” (hereinafter referred to as CGD network) means a pipeline network as
defined under clause (i) of section 2 of the Act;
(j) “CNG Station Capacity” shall be the maximum rated capacity of running compressors at respective stations or the
maximum capacity determined at the inlet flange of the compressors whichever is lower;
(k) consumer” means consumer as defined under clause (d), (e), (f) or (g) of sub- regulation 1 of regulation 2 of the
Petroleum and Natural Gas Regulatory Board (Code of Practice for Quality of Service for City or Local Natural Gas
Distribution Networks) Regulations, 2010;
(l) “operator” means an entity that operates CGD network with authorization of the Board;
(m) “selected software package” means the software package used by the entity for determination of capacity of the CGD
network;
(n) “steady state condition” means calculation carried out based on time-invariant pressure, temperature and flow profiles
throughout a steel pipeline network using specified boundary conditions and network element set points that are
entered. In other words, the steady-state run calculates the hydraulic state of a network operating at equilibrium;
(o) “steel pipeline network” means the steel pipeline laid and commissioned originating from the source (primarily at tap-
off point from any transportation / transmission /primary network or city gate station) up to the Distribution Pressure
Regulating Station or District Regulating Station (DPRS or DRS), Metering and Regulating Station (MRS) and inlet
flange of CNG compressor station;
(p) “third party contracted capacity” means the quantity (in SCMH) of natural gas contracted with any third party for
transportation through a pipeline system;
(2) Words and expressions used and not defined in these regulations, but defined in the Act or in the rules or regulations
made thereunder, shall have the meanings respectively assigned to them in the Act or in the rules or regulations, as the
case may be.
3. Applicability
(1) These regulations shall apply to an entity which is laying, building, operating or expanding or which proposes to lay,
build, operate or expand a city or local natural gas distribution network.
(2) These regulations cover the procedure, parameters both constant and variable and frequency of declaration of CGD
network capacity in SCMH for CGD network.
(3) These regulations shall not be applicable to sub-transmission pipelines, MDPE network system downstream of
DPRS/DRS and service lines, including GI/copper piping of CGD network.
Note: In case, any sub-transmission pipeline has been laid by the authorised entity, the details of the same upto CGS or
upto connectivity with primary network in the authorized GA shall be provided by the entity as per Annexure-3. The
capacity of sub-transmission pipeline from Custody Transfer Flange downstream of connectivity from transmission
pipeline upto CGS or upto connectivity with primary network in the authorized GA shall also be determined.
4. Objective.
(1) It is intended to apply these regulations to all CGD networks for the purpose of declaration of CGD network capacity.
(2) The capacity of the CGD network so determined shall be used for providing access to shipper on non-discriminatory
basis under the Petroleum and Natural Gas Regulatory Board (Access Code for City or Local Natural Gas Distribution
Networks) Regulations, 2011.
5. Determining capacity of a City or Local Natural Gas Distribution Network.
¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 17
(1) The determination of capacity for the CGD network shall be based on selected software package and flow equation
approved by the Board under these regulations. It is not necessary for the entities to buy and install any specific
software package. The entities may continue to use or operate the system based on the previously installed software but
shall have to determine the capacity of the system based on the flow equation approved by the Board in any of the
selected software package for the purpose of these regulations.
(2) The entity while submitting the capacity of the CGD network to the Board, shall furnish a declaration that the capacity
has been calculated using the approved flow equation. The entity shall also submit the detailed report of the capacity
and indicate the software used for the purpose within ninety days of the notification of these regulations and thereafter
as per the periodicity for determining capacity of CGD network defined in regulation 7.
(3) The parameters for running the steady state simulation for determining the CGD network capacity shall be considered
as given below, namely:-
(a) Constant parameters in the unit as specified in the approved flow equation as per sub-clause (v) of this clause.
(i) Internal diameter (ID) – The internal diameter shall be determined by deducting twice the thickness from outer
diameter of steel pipes used in the CGD network. Further, the internal diameter shall be determined based on
weighted average of internal diameters based on different pipe thicknesses used in different sections in the
pipeline system.
(ii) Length – The actual length (for already installed pipeline) or proposed length (for yet to be installed pipeline) of
the pipe in the pipeline system.
(iii) Roughness – This is a fixed value for a pipe which determines the unevenness inside a pipe. Depending on the
pipe material, the below given value for roughness factor shall be used :
Type of Material Roughness (micron)
Steel – New Pipe (up to ten years old)
- With internal coating 10-15
- Without internal coating 25-45
Steel–Old Pipe (more than ten years old)
- With internal coating 15-20
- Without internal coating 45-100
For old pipelines already operating, roughness factor shall be determined by duly calibrating actual field data in the
approved flow equation. These factors shall be assessed by the capacity assessment group. For new pipelines,
roughness factor used shall be decided keeping in view the operating conditions and pipeline feature like bends,
valves, or any other restrictions present in the system:
Provided that the entity shall declare in advance the roughness factor considered for the pipes with relevant
operating data to support the value chosen.
(iv) Efficiency factor –
Steel Pipeline – Efficiency factor within the range of 0.85 to 1.0 shall be used. For old pipelines already operating,
efficiency factor shall be determined by duly calibrating actual field data in the approved flow equation. These
factors shall be assessed by the capacity assessment group. For new pipelines efficiency factor used shall be decided
keeping in view the operating conditions and pipeline feature like bends, valves, life of pipeline or any other
restrictions present in the system:
Provided that the entity shall declare in advance the efficiency factor considered for the pipes with relevant
operating data to support the value chosen giving complete analysis. The Board may direct the entity to improve
upon such design.
18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]
(v) Formula – For determination of flow rate and pressure drop in the pipeline, the following flow equation shall be used:
Type of Network Name of Flow equation
Steel Network Colebrook White / Fundamental pipe equation with flow dependent (Colebrook White) friction factor
(vi) Velocity – The maximum allowable velocity of the gas in the steel pipeline section of CGD network shall be 30
m/s.
(vii) The steel pipeline network capacity shall be determined at maximum operating pressure (MOP) for the CGD
network and with the following standard Pressure and Temperature conditions:
Standard pressure – 1.01325 bar (a).
Standard temperature – 15.56 degree C
(b) Varialble parameters-
(i) Operating temperature – For the purpose of determining the capacity and for annual capacity declaration to the
Board, the summer temperature of 30 ºC shall be considered by all the entities.
(ii) Inlet temperature – This is the actual inlet temperature (º C) of the gas from the source into the CGD network.
(iii) Outlet temperature- This is the actual outlet temperature (º C) of the gas at the delivery point.
(iv) Inlet pressure – The maximum pressure (in barg) that is available at the entry point to the CGD network and shall
be declared by the CGD entity during capacity declaration.
(v) Outlet pressure – The minimum pressure (in barg) that is required by the consumer at the delivery or exit point as
per access arrangement entered into by the shipper and the authorised entity.
(vi) Maximum operating pressure (MOP) – This is the highest pressure (in barg) at which a CGD Network operates
during normal operating cycle and shall be declared by the CGD entity for capacity determination. However, in
case an entity is operating the CGD network at certain pressure which is at variance from above for more than or
equal to five years, need to submit calculation carried in line with the Petroleum and Natural Gas Regulatory Board
(Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution
Networks) Regulations, 2008 and ASME B31.8 (Latest edition) supporting the revised MOP considered in
determination of CGD network capacity. For the purpose of determining MOP, the Board shall be guided by
incoming pressure at city gate station or custody transfer point.
Note: In case, any sub-transmission pipeline has been laid by the CGD entity, the details of the same upto the
connectivity with primary network in the authorized GA shall be provided by the entity as per Annexure-3 for the
purpose of arriving at the incoming pressure at the entry of primary network in the authorized GA.
(vii) Minimum committed pressure (MCP) – This is the minimum pressure (in barg) at the exit points and shall be
declared by the CGD entity during capacity declaration.
(viii) Source supply flow – This is the maximum flow (in SCMH) that can be available from the source (primarily a
Tap-off point from any Transportation / Transmission / Sub-Transmission Pipeline or City Gate Station).
(ix) Delivery flow – This is the maximum flow (in SCMH) that is required by the consumers at the exit point as per
access arrangement entered into by the shipper and the operator.
(x) Elevation difference – Depending on the terrain of the ground profile, this factor will be considered from the mean
sea level of the area.
(xi) Gas composition – The gas composition indicating all components totaling 100% by volume is to be given with
the level of impurities as per the Petroleum and Natural Gas Regulatory Board (Access Code for City or Local
Natural Gas Distribution Networks) Regulations, 2011. From this, necessary input to the flow equation shall be
worked out.
In case of more than one source, the weighted average composition of commingled natural gas beyond the second
source of entry point shall be considered.
(xii) In case of CGD network, the gas quality at exit point shall be as per the Petroleum and Natural Gas Regulatory
Board (Access Code for City or Local Natural Gas Distribution Networks) Regulations, 2011.
¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 19
(4) All entities shall declare to the Board the constant parameters and the variable parameters for the CGD network -
(i) on first working day of October every year; and
(ii) whenever there is any addition or deletion of the supply source of natural gas.
The entities shall also provide on first working day of October the network diagram superimposed on the authorized area
map for the CGD network.
(5) The methodology for calculation of CGD network capacity shall be as under:
(i) The entire steel pipeline network shall be configured in the selected software package operating offline. The steady
state condition of the pipeline hydraulics with variable parameters (pressure, temperature and flow) at entry that is
downstream flange of City Gate Station and declared exit points shall be simulated in the selected software package.
(ii) Assuming gas at the entry point (single source or multiple source of gas) is unlimited, the selected software shall be
run till inlet flange of any industrial PRS, DRS and CNG Compressor connected to the system till it reaches limiting
condition of pressure required at any exit point or limiting velocity in steel pipeline network as calculated by
software or maximum flow capacity is reached at exit points.
(iii) After satisfactory completion of simulation, add dummy load at the farthest exit points of steel network, considering
the minimum committed pressure.
(iv) Now, simulate the steel pipeline network till inlet flange of any industrial PRS, DRS, CNG Compressor and dummy
load connected to the system reaches limiting condition of pressure required or limiting velocity in pipeline as
calculated by software or maximum flow capacity is reached at exit points.
(v) The sum of flow (in SCMH) at each exit point (i.e. Inlet flanges of Industrial PRS, DRS and CNG compressor) and
dummy load in all the charge areas is the total steel network capacity.
(vi) The entity shall submit the details of maximum achievable steel network capacity so derived, under the steady state
simulation with the details of variable and constant parameters, to the Board in the specified format at Schedule A
along with the hydraulic gradient and system flow diagram for the steel network system. The entity shall submit the
details of rated capacity of all entry points (CGS/DPRS/custody metering systems) including entry points, if any,
connected directly to the MDPE network without any steel pipeline in between along with details of rated capacity
of exit points like DRS/IPRS/CNG station etc. in Annexure-1.
(vii) The capacity of CGD network shall be as per the operation days specified in the Petroleum and Natural Gas
Regulatory Board (Access Code for City or Local Natural Gas Distribution Networks) Regulations, 2011 for
respective system.
(viii) If the aggregate CGS capacity is less than the determined steel network capacity, then, the aggregate CGS capacity
shall be considered as the steel network capacity.
(ix) The steel network capacity so determined shall be the CGD network capacity provided that if any entry point
(CGS/DPRS/custody metering systems) is connected directly to the MDPE network without involvement of any
steel network, the rated capacity of such entry point shall also be considered for the purpose of capacity declaration.
6. Declaring capacity of a City or Local Natural Gas Distribution Network by the Board.
(a) The Board, after having analyzed the report submitted by the entity regarding capacity of the CGD network with
respect to the provisions of these regulations, shall decide-
(i) to reject the capacity so determined and direct the entity to revise the capacity calculations based on the revised
parameters; or
(ii) to go ahead with the proposal with or without modification.
(b) The capacity so determined shall be declared by the Board as the capacity of the CGD network. The Board shall
declare the capacity of the CGD network in the format specified at Schedule B.
(c) The entity, after declaring the CGD network capacity by the Board, shall publish the same in line with the provisions
of the relevant Regulations on the Petroleum and Natural Gas Regulatory Board (Access Code for City or Local
Natural Gas Distribution Networks) Regulations, 2011, on their website.
20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]
7. Periodicity for determining capacity of city or local natural gas distribution networks.
(i) The capacity of a CGD network shall be determined on first working day of October every year or whenever
there is a change in quantity of natural gas plus or minus 10% of previous declared capacity due to any of the
following :
(a) change in quality of gas,
(b) modification, upgradation, addition or deletion of entry or exit points,
(c) addition or deletion of loop lines, compressor etc.
(ii) The entity shall submit the details of the so re-determined capacity of the pipeline to the Board in line with the
provisions of these regulations for the purpose of declaration of capacity.
8. Miscellaneous.
(1) If any dispute arises with regard to the interpretation of any of the provisions of these regulations, the decision of the
Board shall be final.
(2) The Board may, either suo moto or on a complaint, refers the issue of determination of the capacity of a CGD network,
to any external consultant or expert. Cost in this regard shall be borne by the entity or the complainant or as deemed fit
by the Board on a case specific basis. However, the recommendation of the consultant or expert shall be advisory in
nature to the Board and shall not be binding.
(3) The Board may validate the computed capacity with actual capacity as per the flow regime of the pipeline with actual
flow conditions as and when desired.
SCHEDULE A
[see regulation 5(5) (vi)]
Format for furnishing information regarding determination of CGD network capacity
Date of submission of capacity to the Board: ………………………………
Applicable for the period: ______________________________________________
1 Name of entity
2 Address and contact details of entity
3 Name of CGD network
4 Length and diameter of steel pipeline network (attach complete details with diagram)
5 Name of software package used
6 Confirm Colebrook White equation / Fundamental pipe equation with flow dependent
(Colebrook White) friction factor is used
Yes/ No
7 Details of injection/entry points, delivery or exit points (Location, diameter, pressure,
temperature, rated capacity, actual flow rate etc.) and charge areas in CGD networks.
Details to be given as per Annexure 1.
8 Composition of natural gas. Details to be given for each entry point as per Annexure 2.
9 Entity agrees to have complied with the technical standards, specifications and safety
standards as specified by the Board
Yes/ No
10 Entity agrees to have complied with the provisions of other relevant Petroleum and
Natural Gas Regulatory Board Regulations
Yes/ No
11 Constant and variable parameters used under steady state conditions for determining
capacity of the steel network in CGD networks as per Annexure 2 .
12 Maximum achievable capacity of the steel network under steady state conditions as
determined under regulation 5 of these regulations
13 Aggregate of rated capacity of all entry points connected to steel network (Details of
¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 21
each CGS/entry point to be provided separately in Annexure 1)
14 Rated capacity of entry points (CGS, PRS and Custody Metering Systems), if any,
connected directly to MDPE network (Details of each entry point to be provided
separately in Annexure 1)
15 Maximum achievable capacity of the steel network (lower of Sl. No. 12 or 13)
Note: Submit network diagram superimposed on the authorized area map for the CGD network along with the hydraulic
gradient and system flow diagram for the steel network.
[Sign. & Stamp of Authorized Signatory of the Entity]
SCHEDULE B
[see regulation 6(b)]
Format for declaring capacity of City or Local Natural Gas Distribution Networks
Date of declaration of capacity by the Board: ……………………………
Applicable for the period: ______________________________________________
1 Name of entity
2 Address and contact details of entity
3 Name of CGD network
4 Details of injection or entry points and delivery or exit points connected to
steel networks (location, diameter, pressure, temperature, rated capacity etc.)
and charge areas in CGD networks (details enclosed)
5 Details of rated capacity, location, pressure etc. of each injection or entry point
connected directly to MDPE network without any steel network in between
6 Name of the software package used by the entity
7 Flow equation used for the purpose
8 Gas composition considered for the purpose of capacity determination of steel
network in CGD.
9 Maximum achievable capacity of the CGD steel network under steady state
conditions.
10 Maximum achievable capacity of sub-transmission pipeline laid, if any.
11 Aggregate of rated capacity of all entry points connected to steel network
12 Maximum capacity of the steel network (lowest of Sl. No. 9,10 or 11 above)
13 Rated capacity of entry points (CGS, DPRS and Custody Metering Systems),
if any, connected directly to MDPE network (Details of each entry point
enclosed)
Dated:
Secretary
Petroleum and Natural Gas Regulatory Board
K. Rajeswara Rao, OSD (R)
[ADVT-III/4/EXTY./188/15(62)]
22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]
Annexure-1
[see regulation 5 (5)(vi)]
Format for furnishing Details of Injection/ Entry points and Delivery/ Exit points
1. Name of entity
2. Address and contact details of entity
3. Name of CGD Network
4. Details of Entry and Exit Points on Steel Network
a)
Entry Point 1:
� Name:
� Location:
� Internal Diameter of Pipe (after entry point):
� Length of Steel Pipe (give details with diagram):
� Class/Thickness of Pipe:
� MOP as per Class of Pipe:
� Revised MOP, if any (enclose technical justification
and supporting calculation in terms of these
Regulations):
� Pressure:
i) at upstream of Entry Point
ii) at downstream of Entry point
� Inlet temperature:
� Maximum Rated Capacity (in SCMH) of Entry Point
(enclose certified Technical Documents):
[Note: Provide similar details for all other entry points.
Also, provide relevant details for entry points connected
directly to MDPE network]
b) Exit Point 2:
� Name:
� Location including name of Charge Area:
� Internal Diameter of Steel Pipe (before exit point):
� Length of Steel Pipe till upstream of Exit Point:
� Class/Thickness of Pipe:
� MOP as per Class of Pipe:
� Revised MOP, if any (enclose technical justification
and supporting calculation in terms of these
Regulations):
� Pressure:
i) at upstream of Exit Point
ii) at downstream of Exit Point
� Temperature:
� Maximum Rated Capacity (in SCMH) of Exit Point
(enclose certified Technical Documents):
[Note: Provide similar details for all other exit points]
¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 23
Annexure-2
[see schedule A (8) and (11)]
Format for furnishing Details of Constant and Variable parameters of Steel Network and Gas Composition at
Injection or Entry points and Delivery or Exit points
a) Constant parameters:
Parameter Details
Name of Steel Pipe/ Section:
Internal Diameter (mm/inch)
Length (Km)
Pipeline Roughness (micron) [Enclose Technical
Justification]
Efficiency Factor/Pipeline Efficiency (%)[Enclose
Technical Justification]
Formula/ Gas Flow Equation Used
Velocity (m/s)
STP
Standard pressure : 1.01325 bar (a)
Standard temperature : 15.56 deg C
Note: i) Similar Details for all steel pipes/ sections, size changes etc. may be provided.
ii) Pressure drop at Rated Capacity pertaining to each entry point may be provided (enclose Technical
document)
a) Variable parameters:
Parameter Details
Name of Steel Pipe/ Section:
Operating Temperature (30 deg C)
Inlet Temperature (deg C)
Inlet Pressure (kg/cm2g or barg)
Outlet Pressure (kg/cm2g or barg)
Maximum Operating Pressure (kg/cm2g or barg) [Enclose
Justification]
Minimum Committed Pressure (kg/cm2g or barg)
(Enclose relevant documents)
Velocity (m/s)
Supply Source Flow (MMSCMD)
Delivery Flow (MMSCMD)
Elevation Difference
Gas Composition (Mole Percent)
Methane:
Ethane:
Propane:
Isobutene:
Isopentene:
Hexane:
Nitrogen:
Sp. Gravity:
GCV: Kcal/SCM
NCV: Kcal/SCM
GCV: Kcal/SCM
NCV: Kcal/SCM
24 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]
Annexure-3
[see regulations 3 and 5]
Format for furnishing Details of Constant and Variable parameters of Sub-Transmission Pipeline (STPL)
a) Constant parameters:
Parameter Details
Name of steel pipeline/section:
Name and Location (with longitude/latitude) of inlet and
outlet of STPL i.e. from custody transfer point to
connectivity with primary network
Internal Diameter (mm/inch)
Length (Km)
Pipeline Roughness (micron) [Enclose Technical
Justification]
Efficiency Factor/Pipeline Efficiency (%)[Enclose
Technical Justification]
STP Standard pressure – 1.01325 bar (a)
Standard temperature –15.56 degree C
a) Variable parameters:
Parameter Details
Name of Steel Pipe/ Section:
Operating Temperature (30 deg C)
Inlet Temperature (deg C)
Inlet Pressure (kg/cm2g or barg)
Outlet Pressure (kg/cm2g or barg)
Maximum & Minimum Committed Pressure
(kg/cm2g or barg)
Elevation Difference
Gas Composition (Mole Percent)
Methane:
Ethane:
Propane:
Isobutene:
Isopentene:
Hexane:
Nitrogen:
Sp. Gravity:
GCV: Kcal/SCM
NCV: Kcal/SCM
GCV: Kcal/SCM
NCV: Kcal/SCM
Note: Copies of agreement/tie-in agreement with transporter/transmission entity indicating agreed/ committed delivery
pressure, temperature etc to be provided.
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
All of The Petroleum and Natural Gas Regulatory Board Act, 2006