JERC Notification dated 11.08.2011
Notification - The Electricity Act, 2003
- Kind: Notification
- Under: The Electricity Act, 2003
Text of this notification
1 | P a g e
NOTIFICATION
F. No. JERC-15/2010. In exercise of the powers conferred on it by Section 181 (1) and
181 (2) read with Section14 of the Electricity Act 2003, and all powers enabling it
in that behalf, the Joint Electricity Regulatory Commission for the State of Goa and the
Union Territories hereby makes the following Regulations to enforce standards with
respect to Quality, Continuity and Reliability of service by the licensees.
Chapter 1: GENERAL
1.1 SHORT TITLES, COMMENCEMENT, EXTENT AND INTERPRETATION:
1) These regulations may be called “Joint Electricity Regulatory Commission”
(Distribution Code) Regulations, 2010.
2) These Regulations shall come into force from the date of its publication in the
official gazette.
3) These Regulations shall extend to the whole State of Goa and Union Territories of
Andaman & Nicobar Islands, Chandigarh, Dadra & Nagar Haveli, Daman & Diu,
Puducherry and Lakshadweep.
1.2 DEFINITIONS
In these regulations, the following words and expressions shall, unless the subject
matter or context otherwise requires or is inconsistent therewith, bear the following
meanings:
2 | P a g e
(a) “Act” means the Electricity Act, 2003 (Act no. 36 of 2003).
(b) “Agreement” means an agreement entered into by the Distribution Licensee and the
User.
(c) “Apparatus” means electrical apparatus and includes all machines, fittings,
accessories and appliances connected to the Electrical Distribution System
(d) “CBIP” means Central Board of Irrigation and Power
(e) “CEA” means Central Electricity Authority
(f) “Circuit” means an arrangement of conductor(s) for the purpose of conveying
electrical energy and forming a system or a branch of system.
(g) “Commission” means Joint Electricity Regulatory Commission for the State of Goa
& UTs
(h) “Conductor” means any wire, cable, bar, tube, rail or plate used for conducting energy
and electrically connected to the system.
(i) “Connected Load” means aggregate of the manufacture’s rating of all energy
consuming apparatus duly wired and connected to the power supply system of
licensee including portable apparatus in the consumer’s premises. This shall not
include the load of spare plug, sockets, load exclusively installed for firefighting
purposes. The load of either water and room heating or room cooling apparatus,
whichever is higher, shall be taken into account as per prevailing season (1st April to
30th September for cooling use and 1st October to 31st March for heating use). The
definition of connected load shall be used only for the purpose of assessment in
case of direct theft or dishonest abstraction of energy or unauthorized use of energy.
(j) “Control Person” means a person identified as having technical capability and
responsibility for cross boundary safety.
(k) “DCR” means Distribution Code Review.
(l) “DCRP” means Distribution Code Review Panel.
(m) “Distribution Code” means the JERC (Distribution Code) Regulations, 2010 as
enforced from time to time.
(n) “Embedded” means having a direct electrical connection to an intra state electrical
system.
(o) “Extra High Tension (EHT)” means the voltage 33000 Volts and above under
normal conditions subject to the percentage variation permissible under the Indian
Electricity Rules 1956.
(p) “GSS” means Grid Sub-station.
3 | P a g e
(q) “High Tension (HT)” means the voltage between 650 volts and 33000 Volts under
normal conditions subject to the percentage variation permissible under the Indian
Electricity Rules 1956.
(r) “Indian Standards ("IS")” means those Standards and specifications approved by the
Bureau of Indian Standards.
(s) “Interface Point” means a point at which a User’s electrical system is connected to
the Licensee’s Distribution System.
(t) “Low Tension (LT)” means the voltage of 230 volts between phase and neutral
or
400 volts between any two phases under normal conditions subject to the
percentage variation permissible under the Electricity Rules.
(u) “Power Factor” means the ratio of Active Power (kW) to Apparent Power
(KVA). (v) “PTW” means permit to work.
(w) “REC” means Rural Electrification Corporation.
(x) “Transmission System” means the system consisting of extra high voltage electric
lines being operated at EHT (excluding generator interconnection facilities)
owned and/or operated by the Transmission Licensee for the purposes of the
transmission of electricity from one power station to a sub-station or to another
power station or between sub-stations or to or from any external
interconnection equipment up to the interconnection with the distribution
system, any plant and apparatus and meters owned or used by the
Transmission Licensee in connection with the transmission of electricity, but
shall not include any part of the Licensee distribution system.
(y) “User” means any person having electrical interface with, or using the Distribution
System of the Distribution Licensee to whom this Code is applicable. Any other
Distribution Licensee, Transmission Licensee and generating units connected
to the Distribution system are also included in this term.
Words and expressions used and not defined in this Code but defined in the Acts
shall have the meanings assigned to them in the said Acts. Expressions used
herein but not specifically defined in these regulations or in the said Acts but
defined under any law passed by a competent legislature and applicable to the
electricity industry in the state shall have the meaning assigned to them in such
law. Subject to the above, expressions used herein but not specifically defined in
these regulations or in the Acts or any law passed by a competent legislature
shall have the meaning as is generally assigned in the electricity industry.
1.3 ABBREVIATIONS:
Abbreviations used in these regulations, are listed and explained in the list
of abbreviations annexed to these regulations as Annexure 5.
5 | P a g e
1.4 INTRODUCTION:
a) The Distribution Code deals with technical aspects of the supply of electricity,
which have impact on the quality, continuity and reliability of service by licensees
and the use of the Licensee’s Distribution System for the distribution of electricity.
It specifies the rights and obligations of the Distribution Licensee and the Users in
system planning and operation.
b) The Distribution Code is not exhaustive as to the requirements to be complied with
by the Distribution Licensee and the Users connected or seeking connection to the
Licensee’s Distribution System. The Distribution Licensee and all
Users/Consumers must also comply with the requirement as laid down in various
codes, standard and regulations under relevant laws in force.
1.5 OBJECTIVES:
The main objectives of this Distribution Code
are-
a) To ensure the development and maintenance of an efficient, co-ordinated and
economical distribution system and the distribution licensee and all
distribution system participants comply with respective obligations as
provided in the Act, and
b) To bring together a set of rules, for using the distribution network and to
provide-
(i) The technical aspects of working relationship between the licensee’s
distribution system and to those connected and seeking connection to
it,
(ii) The facilitation of operation, maintenance, development and
planning of economical and reliable power distribution network.
1.6 APPLICABILITY:
1) These Regulations shall apply to all distribution licensees and the consumers of
electricity.
2) These regulations shall be interpreted and implemented in accordance with and not
at variance from, the provisions of the Electricity Act, 2003 read with the Indian
Electricity Rules, 1956 and any Central Electricity Authority regulations in this
regard.
1.7 IMPLEMENTATION:
1. The distribution licensee shall be responsible for the implementation of the
Distribution code
2. Nothing contained in this Code should be interpreted as imposing obligations /
duties on Consumers / Distribution Licensees greater or more onerous than those
mentioned in the Electricity Act, 2003 under relevant clauses.
5 | P a g e
3. The Distribution Code contains procedures for the management of day to
day technical situations in the Distribution System, taking into account a wide
range of operational conditions likely to be encountered under both normal and
abnormal conditions. The Distribution Code cannot foresee all the possible
operating conditions. Users must therefore understand and accept that the
Distribution
Licensee, in such unforeseen circumstances, may be required to act decisively and
with due expedition to discharge his obligations under the License. Users shall
provide such reasonable co-operation and assistance as the Distribution Licensee
may require in such circumstances. The concerned Distribution Licensee shall
however refer all such cases for ratification in to the “Distribution Code Review
Panel.”
1.8 CONFIDENTIALITY
Under the terms of Distribution Code, the Distribution Licensee will receive
information from Users relating to their business. The Distribution Licensee shall
not, other than as required by Distribution Code, disclose such information to any
other person without the prior written consent of such informant, unless required
by Central/State government departments or any authority.
1.9 COMPLIANCE:
Non compliance with any provision of the Distribution Code by the Distribution
Licensee shall attract the consequences as provided in the Acts or in the License.
However, in the event of non-compliance with the Distribution Code, the
Distribution Licensee shall prepare and submit to Commission a plan of action for
compliance with the Distribution Code. Commission may exempt the Licensee
from compliance of any provisions for a particular period, if it is found that the
compliance is not feasible for such period, considering the resources available and
the circumstances prevailing.
1.10 PROCEDURES TO SETTLE DISPUTES:
In the event of any dispute regarding interpretation of any regulations provided in
the Distribution Code between any User and the Distribution Licensee, the matter
shall be referred to Joint Electricity Regulatory Commission. Commission’s
decision shall be final and binding on both the parties.
6 | P a g e
Chapter - 2
MANAGEMENT OF DISTRIBUTION CODE
2.1 OBJECTIVE:
The chapter defines the method of managing Distribution Code, pursuing of any
changes/ modifications required and the responsibilities of the Distribution
Licensees and the Users/ Consumers in this regard. This section facilitates
revisions taking into account the views of all parties in an equitable manner.
2.2 DISTRIBUTION CODE REVIEW PANEL:
1. A standing body (Distribution Code Review Panel) shall be constituted by
Commission comprising of the representatives of Distribution Licensee as well as
the Users of the Distribution System in line with the provisions of Distribution
Code.
2. The chairperson and members except the secretary shall be part time members of
the panel. The review panel shall generally consist of the following members and
having knowledge and practical experience of technical matters related to
electricity supply by utilities. Commission shall nominate the chairperson and
secretary of the Distribution Code Review Panel on rotation basis from among the
members of the Distribution Licensees, but at no point of time the chairperson and
secretary shall belong to the same Distribution Licensee. The secretary shall be a
full time member of the review Panel. The members of the review panel shall be as
follows:
(a) One senior technical officer from each Distribution Licensee not below the rank
of Executive Engineer.
(b) One Member from Transmission Utility or SLDC.
(c) One Member from a Transmission Licensee to represent all Transmission
Licensees. After the tenure over, such Member, the representative of a different
Transmission Licensee will be a member of review panel.
(d) One Member from among Embedded Generator Captive Power Plants, co-
generation units, conventional and non-conventional generating units, to
represent all such users in State of Goa/ UT’s.
(e) Open Access Customers connected to Distribution Systems.
(f) Such other member as the Commission may direct and find appropriate.
(g) Commission shall develop a list of potential candidates to serve on the
Distribution Code Review Panel, which reflects a balance of the various interest
groups in consultation with the Distribution Licensee.
3. The members of the Review Panel shall normally have tenure of two years unless
he ceases for any reason to be member of the Review Panel. Chairperson of the
7 | P a g e
Review Panel with the approval of Commission shall jointly consider the
replacement of such members.
4. The functioning of the panel shall be co-ordinated by the secretary of the Review
Panel.
5. Commission shall publish the names of the members of Review Panel and also
inform to each Distribution Licensee.
6. The model code of functioning of Review Panel shall be finalized at first meeting
of Review Panel.
2.3 FUNCTIONS OF THE REVIEW PANEL:
The functions of the Review Panel shall be:
(a) Maintenance of the Distribution Code and its working under continuous scrutiny
and review.
(b) Consideration of all requests for review made by any User and publication of
their recommendations for changes in the Distribution Code together with
reasons for such changes.
(c) Provide guidance on interpretation and implementation of the Distribution
Code.
(d) Examination of the problems raised by any User as well as resolution of the
problems.
(e) Ensuring that the changes/modifications proposed in the Distribution Code are
consistent and compatible with standard technical manual or guidelines, codes,
laws, acts, rules and regulations in force at that point of time.
2.4 REVIEW AND REVISIONS:
1. The Users seeking any amendment to the Distribution Code shall send written
requests to the secretary of the Review Panel with a copy to Commission. If the
request is sent to Commission directly, the same shall be forwarded to the secretary
of Review Panel who shall, in consultation with the concerned entities and such
other persons as the Commission may direct, review the Distribution Code
provisions. The secretary will circulate the proposed changes/modifications to all
the panel members for their written comments within a reasonable time frame or
the secretary may call for the Review Panel meeting in consultation with the
chairperson. Based on this interaction/ discussion, the necessary amendments/
revisions may be incorporated in Distribution Code after the approval of the
Commission.
2. The secretary shall send the following reports to the Commission at the conclusion
of each review meeting of the panel:
(a) Reports on the outcome of such review.
(b) Any proposed revision to the Distribution Code and its rationale.
(c) All written representations and objections submitted by the Users at the
time of review.
8 | P a g e
3. All revisions to the Distribution Code require the approval of Commission. The
secretary shall publish revisions to the Distribution Code, after the approval of
Commission. The Review Panel may also submit proposals for relaxation in such
cases where Users / Distribution Licensees have difficulties in meeting the
requirements of the Distribution Code.
4. Any change from the previous version shall be clearly marked in the margin. In
addition, a revision sheet shall be placed at the front of the revised version, noting the
number of every changed Sub-section, together with reasons for such change.
5. The secretary shall maintain copies of the Distribution Code incorporating the
latest amendments and shall make it available at a reasonable cost to any person
requiring it.
6. The Commission, may, on the application of the licensee or otherwise, call the
emergency meeting of the review panel as and when the situation so dictates and
make such alterations and amendments in the Distribution Code as it thinks fit.
Chapter - 3
DISTRIBUTION PLANNING CODE
3.1 OBJECTIVES
1. The following are the objectives of the Distribution Planning Code:
(a) To enable the planning, design and construction of the Distribution System for a
safe and economical operation with the specified degree of reliability conforming
to the following standards:
(i) Distribution System Planning and Security Standard as mentioned under
Attachment –1 of this code
(ii) Provisions applicable to Distribution System under Power System
Management and Operating Standard and Power System Safety Standard as
prescribed by authority under Electricity Act 2003.
(iii) Statutory Acts and Rules, which are in force,
(iv) Relevant Indian Standard Specifications, if applicable. The deviations may
be permitted as per specified limit; however, in any case the security and
safety shall not be hampered.
(v) REC (Rural Electrification Corporation) Construction Standards and
manuals.
(b) To facilitate the use of the Distribution System by any User connected to or
seeking connection with it,
(c) To prescribe the technical conditions to be followed by the respective Distribution
Licensees and Users in meeting the standards for an efficient operation of the
common electrical interface,
(d) To prescribe the procedure for the exchange of the system planning data between
the Distribution Licensee and the Users,
(e) To provide the required information to the Users for connection, planning and
9 | P a g e
development of their own systems and make them compatible with the Distribution
System,
(f) To enable the Distribution Licensee to co-operate with the STU in furnishing the
required data as detailed in the Central / State Grid Code as the case may be.
3.2 PLANNING POLICY
1. The Distribution Planning Code specifies the technical & design criteria and
procedures to be followed by the Distribution Licensee for a proper planning and
development of the Distribution System. This Code is also applicable to the Users
of the Distribution System for their planning and development in so far as they
affect the Distribution System.
2. The requirement of the Users may necessitate extension or reinforcement of the
Distribution System. In some cases the same may even require the Distribution
Licensee to seek the extension or reinforcement to the capacity of the Transmission
System at the Connection Point/ Interface Point. This may arise for a number of
reasons mentioned below, but not limited to the same:
(a) A development by any User in his system already connected to the
Distribution System;
(b) Introduction of a new Connection Point/ Interface Point between the User’s
System and the Licensee's System;
(c) To increase the capacity of the Distribution System for meeting the security
standards, removal of constraints in operation etc., and accommodate a
general increase in Demand.
3. The development of the Distribution System must be planned sufficiently in
advance allowing adequate time to obtain the required statutory clearances,
consents or way leaves, the detailed engineering, design and construction work to
be carried out and completed. The suitable management techniques shall be
implemented allowing for sufficient time for critical activities and to co-ordinate
all the activities in an efficient manner. These shall be taken care of at the time of
planning itself.
3.3 LOAD DATA
1 The Distribution Licensee shall develop load curves for the area fed by the
concerned substation of the Transmission Licensee from the metering data
available at the Connection Point/ Interface Point. Such data shall be compiled for
the entire Area of Supply combining the load curves of each substation feeding its
Distribution System. The Distribution Licensees shall collect data and map the
power factor of network (feeder wise as well as consumer category wise by
installing meters on typical distribution transformers.)
10 | P a g e
2 The actual energy drawn by the Distribution System as recorded in the energy
meters installed at Connection Points / Interface Points shall be reconciled with the
actual energy sales in overall Area of Supply. The aggregate distribution losses
computed from these data shall be furnished to the Commission every quarter.
3 All the Users with Demands of 1 MW and above seeking connection shall furnish
their load data/characteristic of the load and other relevant details to the
Distribution Licensee as detailed in Annexure 1.
The embedded generators connected with the Distribution System are
seeking new connections shall furnish planning data in the format specified at
Annexure 2.
The Distribution Licensee shall exercise special care to monitor the actual
development of loads in respect of Consumers desiring to avail loads of 1 MW and
above at a single point. The Distribution Licensee on his part shall furnish relevant
data for designing and selecting the electrical equipment, details of metering and
relay for purpose of protection and System data as detailed in Annexure 3, if
required by the user seeking connection to his Distribution System. The
Distribution Licensee shall update the system data regularly and at least once a
year.
3.4 FORECAST METHODOLOGY
1 The Distribution Licensee shall formulate a short-term demand forecast (to enable
the State Transmission Utility (STU) or SLDC in drawing down the annual
planning process corresponding to a 5 years forward annual plan for intra state
transmission system). This shall be formulated after considering the previous
financial year as base and projecting the demand for the succeeding 5 years,
considering the overall development of various sectors in his Area of Supply in
succeeding five years. He should follow prudent practices to arrive at load forecast
for succeeding five years after considering all the aspects viz. government policy/
economic development etc. During this process he shall also review the status of
loads materializing as per the previous load forecast. Further these forecasts shall
be in line with the plan to be developed at national level by CEA. The variation to
the forecast shall be incorporated by the Distribution Licensee, as and when it is
known to Distribution Licensee and revise the forecast annually.
2 Energy sales in each tariff class shall be projected in the forecast period over the
corresponding figures relating to the base year by adopting an appropriate
statistical method.
3 The projections shall take into account the assumed normal growth for non-specific
loads, specific and identified loads of 1 MW and above, and the effects of demand
side management, if any, and energy conservation.
11 | P a g e
4 The peak load requirements at each Connection Point/ Interface Point shall be
estimated. The peak load requirement at each Connection Point / Interface Point
will essentially ensure that the Transmission Utility or SLDC may determine the
corrective measures to be taken to maintain the capacity adequacy in the
Transmission System up to the Connection Point /Interface Point. This will
facilitate the Transmission Utility (STU) to develop the compatible Transmission
System. However, if the Distribution Licensee receive power at a number of
Connection Points / Interface Points in a compact area, which are interconnected in
a ring, then such Distribution Licensee shall forward the overall short term
Demand forecast at each Connection Point / Interface Point with the variation or
tolerance as mutually discussed and agreed upon with the Transmission Utility.
5 The aggregate energy and peak load requirements for the Area of Supply shall be
estimated. The Distribution Licensee shall forward the short term demand forecast
or each Connection Point/ Interface Point for peak load requirement as well as
aggregate energy and peak load demand for Area of Supply on annual basis to the
Transmission Utility (STU) and Commission along with the following details on
the basis of which the forecast is made:
(a) Data,
(b) Methodology,
(c) Assumptions.
6 It shall be the responsibility of all the Distribution Licensees to fully co-operate
with the Transmission Licensees in preparation of demand forecasts for their area
of supply. The Distribution Licensee shall furnish the necessary peak load and
energy forecasts to Transmission Utility (STU) for a period succeeding 5 years and
submit the same annually by 31st March to STU in order to enable Transmission
Utility or SLDC in formulating the perspective plan, as detailed out in JERC (State
Grid Code) Regulations, 2010.
7 The licensee shall supply whole system data to the transmission Utility (STU) and
other distribution system participants on the formats as devised by the STU under
the JERC (State Grid Code) Regulations, 2010.
12 | P a g e
3.5 TECHNICAL AND DESIGN CRITERIA:
The Distribution Licensee shall plan and develop his Distribution System on the
basis of the following technical and design criteria:
1 The load demand of all the existing Users connected to the Distribution Licensee’s
system and all Users seeking connection with the Distribution Licensee’s system
shall be taken into consideration. All the Apparatus and Circuits shall have
adequate capacity to cater to their needs of electricity in a safe, economical and
reliable manner.
2 The Distribution Licensee shall assess and forecast the load demand of each
category of Consumers in his Area of Supply on annual basis or more frequently as
decided by the Commission.
3 The Distribution Licensee shall have a thorough knowledge of the nature of
electricity usage by the Consumers and the way they use electrical energy and
other alternative sources of energy in his area. The load forecasting shall take into
account all these along with other conservation programs and the demand side
management or off-peak usage programs which the Licensee may sponsor,
resulting in reduction of energy used and peak demand of the Consumers over the
years.
4 The Distribution Licensee shall implement an appropriate load fore cast program
for the systematic collection of data describing Consumers' energy usage patterns
and analysis of these data for energy and demand forecast. For this purpose, the
Consumers shall be divided into all the tariff classes and may be broadly in the
following classes:
(a) Domestic sector,
(b) Commercial sector,
(c) Agricultural sector,
(d) Industrial sector
The pattern of energy consumed by each sector and the load demand, the period of
peak demand etc., shall be determined on the basis of sample surveys taking
representative samples from each sector for its different seasonal requirements.
A suitable questionnaire shall be prepared for these sample surveys and the data
obtained shall be analyzed using suitable statistical models. Based on this,
distribution licensee shall be implementing demand side management techniques to
match the availability from time to time.
13 | P a g e
5 The load fore cast program shall assess the following:
(a) Demand at the time of system peak, daily, monthly, seasonal or annual,
(b) Hourly demand for the day of the system peak, monthly, seasonal or annual,
(c) Total energy consumption for each category by month, season or year.
6 Based on the results of the above analysis the load forecast shall be made using the
appropriate modern forecasting tools wherever applicable.
7 The optimum Circuit loading and the maximum number of Circuits at any
electrical interface between the Distribution and Transmission Systems shall
conform to the Distribution System Planning and Security Standard as mentioned
under Attachment –1 of this code, Distribution System under Power System
Management and Operating Standard and Distribution System under Power System
Safety Standard as prescribed by authority under Electricity Act 2003.
8 As far as practicable, separate Circuits shall be provided for the following:
(a) Urban non-industrial power supply,
(b) Urban industrial power supply,
(c) Rural supply -: (a) Agricultural Supply, (b) Non - Agricultural Supply
9 The loads shall be arranged as far as possible in discrete load blocks to facilitate
load management during emergency operations.
10 Load flow and other system studies shall be conducted to locate the position of
outlets from substations, capacitor installations, distribution transformers, and to
contain voltage variation and energy losses within reasonable limits.
11 The following parameters of equipments and system designs shall be standardized
to facilitate easy replacement and reduction of inventories of spares in stores:
(a) Capacities of power transformers,
(b) Capacities and designs of distribution transformers,
(c) Substation / Switching Station layouts,
(d) Pole mounted substations,
(e) Sizes of bus bars,
(f) Capacities and ratings of circuit breakers and instrument transformers,
(g) Earthing,
(h) Lightning arresters,
(i) Control panels,
(j) Station batteries,
(k) Fire extinguishers.
(l) Maintenance tools
(m) Safety equipments
(n) Energy meters
(o) Wires and accessories
(p) Insulators and accessories
14 | P a g e
12 The planning of the Distribution System shall always keep in view the cost
effectiveness and reduction in energy losses without sacrificing the requirements of
Security Standards and Safety Standards for the Distribution System.
13 The Distribution Licensee shall plan the Distribution System expansion and
reinforcement keeping the following in view along with all other measures to
accommodate the advancement in technology prevailing at the time:
(a) Economic ratio of HT and LT line lengths,
(b) Use of aerial bunched conductors,
(c) Underground cables,
(d) Optimizing the number of distribution transformers and their location at the
electrical load centers.
3.6 ENERGY AUDIT
1. The Distribution Licensee shall create responsibility centers for energy audit. Load
survey meters with a data retaining capacity of at least 45 days shall be installed for
all the incoming/outgoing feeders in the area identified for each such responsibility
centre.
2. The Distribution Licensee shall carry out energy audit of his total system
compiling the data and analysis carried out in each responsibility centre in the best
possible manner. The energy received from each substation shall be measured at
the 11 KV terminal switchgear of all the outgoing feeders installed with appropriate
energy meters such that the energy supplied to the each feeder is accurately
available. It shall be compared with the corresponding figures of monthly energy
sales and the distribution loss for each feeder shall be worked out. In case the
Distribution Licensee has adopted ring main system at 11KV and there is difficulty
in determining the distribution losses for each feeder, then the Distribution
Licensee shall work out distribution losses for the overall Area of Supply.
3. An action plan for reduction of losses with adequate investments and suitable
improvements in governance shall be drawn up and shall be submitted to the
Commission Annually
16 | P a g e
.
Chapter - 4
CONNECTIVITY CONDITIONS
4.1 OBJECTIVES
The Connectivity Conditions are provided to ensure that:
a) The basic rules for connections are complied by all agencies. This will help to treat
all agencies in a non-discriminatory manner.
b) Any new or modified connection, when established, shall not suffer unacceptable
effects due to its connection to the Distribution System nor produce unacceptable
effects on the system or any other connected agency.
c) The ownership and responsibility for all the equipments shall be clearly specified
in a schedule (site responsibility schedule) for every site, where a connection is
made.
The Connectivity Conditions specify the minimum technical and design
criteria, which shall be complied by any agency connected to, or seeking
connection to the Distribution System. The Distribution Licensee shall ensure
compliance of the above criteria by any agency as a pre-requisite for the
establishment of an agreed connection. The connectivity conditions should fulfill
the requirement stipulated in section 50 and 53 of the Electricity Act, 2003.
4.2 OPERATIONAL LABELING
The Licensee and the Consumers shall be responsible for the provision and
maintenance of clear, unambiguous signs and labels indicating the numbering and /
or name of the equipment / apparatus and circuit at the substations and connection
sites. The equipment installed shall confirm to its relevant I.S specification and the
ratings and salient specification shall be maintained on the equipment’s nameplate.
No electrical equipment shall be used without its manufacturers nameplate
permanently affixed to it. In the event of such discrepancies observed, the same
shall be treated as per pertinent section of Electricity Act, 2003.
4.3 SYSTEM PERFORMANCE:
1. The design and construction of all the equipment connected to the Distribution
System shall satisfy the relevant Indian Standard Specifications. In case of
equipment for which the Indian Standard Specifications do not exist, the
appropriate IEC, or IEEE or other International Standards shall apply.
2. Installation of all electrical equipment shall comply with rules and code of practice
in force.
3. For every new connection sought, the Distribution Licensee shall specify the
Connection Point/ Interface Point and the supply voltage, along with the metering
17 | P a g e
and protection requirements as specified in the "Metering and Protection code"
under section – 7 of this code.
4. The operation of the Distribution System shall be in accordance with the
"Distribution System Operating Standard" under Power System Management &
Operation Standard as prescribed by authority under Electricity Act 2003. The
User shall however be subject to the distribution discipline prescribed by the
SLDC/Distribution Licensee.
5. The insulation co-ordination of the Users' equipment shall conform to the
applicable Indian Standards/Code of practices. The rupturing capacity of the
switchgear shall not be less than that notified by the Distribution Licensee.
4.4 CONNECTION POINT/ INTERFACE POINT:
1. Connection to Transmission System shall be governed by the relevant clauses of
Central / State Grid Code as the case may be.
2. Connection of Small Generators (not below 1MW to Distribution Systems:- Bus
bars may be provided at the Generating station. All generating units shall inject the
output into the bus bars via the synchronizing breaker. The isolator between the
synchronizing breaker and the bus bars is the boundary between the Generator and
the Distribution Licensee. The current transformers for the metering shall be
connected near the synchronizing breaker. The voltage transformers (including the
standby set) of the metering shall be connected to the bus-bars. However, the small
generators based on non-conventional source of energy will be allowed for the
connection with Distribution System/ Transmission System as feasible and decided
by the Commission on case to case basis.
3. EHT/HT Consumers: The supply voltage may be 220kV, 132kV, 66kV, 33 kV, 22
kV or 11 kV or voltage as agreed by the Distribution Licensee. The substations
shall be owned by the Users. The boundary shall be the feeder entry in the
premises of the Users or when so provided it shall be the busbar between breakers
of the Distribution Licensee and the EHT/ HT Consumers.
4. Low voltage and Medium Voltage Consumers: The incoming terminal of the cut
out circuit breaker installed by the Consumer is the boundary of low voltage and
medium voltage Consumers. The metering shall be provided before a fuse unit /
circuit breaker of the Consumer. The metering equipment shall be provided at the
entry point of Consumer Premises in a safe location, preferably at the entry of the
Premises or in a common passage on ground floor for easy access for the purpose
of meter reading, maintenance, repairs, inspection, etc. The metering equipment
shall be provided inside a box sealed by the Distribution Licensee and the
User/Consumer shall not disturb the seal metering equipment and shall take
reasonable care for protecting the meter and equipment.
18 | P a g e
4.5 PROCEDURE FOR APPLICATIONS FOR CONNECTIONS TO THE
SYSTEM:
Any User seeking use of Distribution System may submit an application for
connection to the Licensee as per the procedures and formats prescribed under JERC
(Electricity Supply Code) Regulations 2010 or in a format specially developed by
Licensees for specific users. Prospective large customers may
enclose information as per Annexure – 1.
4.6 ACCEPTANCE OR REJECTION OF APPLICATION FOR
CONNECTION:
The acceptance or rejection of Consumer’s application for supply connection shall be
as per JERC (Electricity Supply Code) Regulations, 2010.
4.7 CONNECTION AGREEMENTS:
A connection Agreement of Consumer shall be as per JERC (Electricity Supply
Code) Regulations, 2010.
Chapter – 5
OPERATION CODE
5.1 OBJECTIVES:
1. This Chapter contains the procedures and practices to be followed for a safe and
efficient operation of the Distribution System by the Distribution Licensee and by
the Users of the Distribution System of their electrical plant and lines which are
connected to the Distribution Licensee’s system. This shall also apply to any
electrical interface between two Distribution Licensee’s for a safe and efficient
operation of interface.
2. The following aspects of operation are covered in this section:
(a) Demand Estimation
(b) Outage Planning
(c) Contingency Planning
(d) Demand Side Management and Load Shedding
(e) Interface with Small Generating Plant including CPPs
(f) Communication
19 | P a g e
(g) Monitoring and Control of voltage, frequency and power factor.
(h) Safety Co-ordination.
(i) Maintenance and testing
(j) Tools and spares
(k) Training
5.2 DEMAND ESTIMATION:
1. The Distribution Licensee shall estimate his hourly and daily Demand for his Area
of Supply on the basis of relevant load curves drawn on day ahead basis subject to
modifications depending upon the communication received from any specific User
or caused by any contingency. This may be given to SLDC as may be required.
2. For this purpose, the concerned major Users identified by the Distribution Licensee
shall furnish the required data pertaining to their demands of their installation to
him.
5.3 OUTAGE PLANNING:
1. The Distribution Licensee shall furnish his proposed outage programs to the SLDC
on a month ahead basis.
2. The outage program shall contain identification of lines and equipment of the
Distribution System proposed by Licensee.
3. The outage plan proposed by the Licensee shall come into effect only after the
SLDC releases the finally agreed outage plan.
4. However at the time the line or equipment is taken out of service, the Distribution
Licensee shall intimate the Transmission Licensee to facilitate in accommodating
their maintenance work, if possible, even though the same is not already included
in the approved plan.
5. The above procedure shall not apply under the following circumstances:
a) ‘Emergency situations’ to save plant and machinery;
b) In case of the unforeseen emergency situations requiring isolation of lines or
equipment to save human life,
c) Where disconnection is to be effected on any User installation due to breach of
Agreement. In this case the SLDC shall be informed wherever the load to the
extent of 1 MW or more is affected.
20 | P a g e
6. Planned outages of Power System for the duration as specified in Standard of
Performance for Licensee for maintenance purposes shall be intimated to the public
through media including publishing in at least two largely circulated Newspapers
(one in English and one in local language) of that area, two days in advance.
5.4 CONTINGENCY PLANNING:
1. A contingency situation may arise in the event of a total or partial blackout in the
Transmission System. A contingency may also arise on a part of the Distribution
System due to local breakdowns in the Distribution System itself. It may also arise
due to a breakdown in the Apparatus of the Transmission Licensee at the point of
interconnection.
2. Transmission System Failure:
a) In case of a total blackout at any point in the Area of Supply of Distribution
Licensee, the Distribution Licensee shall follow the black start procedures
framed by the Transmission Utility (STU)/SLDC.
b) The Distribution Licensee shall sectionalize the Distribution System into
discrete blocks of demand. The Licensee shall advise and co-operate with the
SLDC for the amount of MW load likely to be picked up on switching each
demand block.
c) The Distribution Licensee shall prepare a schedule of essential and non-
essential loads in order of priority at each connection to be picked up during
the restoration process.
d) The Distribution Licensee shall ensure and maintain the load generation
balance under the direction of the SLDC.
e) The Distribution Licensee shall maintain direct communication links with the
SLDC.
f) The Distribution Licensee shall furnish the names and designations of the
person(s) with their telephone numbers and stations, authorized to deal with
contingency operations, to the SLDC, who shall co-ordinate for restoration
process as per State/ Central Grid Code/ Regulations as the case may be.
3. Distribution System Failure:
a) Interruptions to power supply in any part of the Distribution System lasting for
the period as specified in JERC (Standard of Performance) Regulations 2009
for Licensee due to breakdown in any part of the Distribution System may be
termed as a Distribution System Failure.
21 | P a g e
b) The Distribution Licensee shall evolve a restoration process for such a
Distribution System Failure.
4. Failure of the Apparatus of the Transmission Licensee:
a) The Distribution Licensee shall immediately contact the authorized person at
the substation of the Transmission Licensee, and assess the probable period of
restoration and the probable restriction of load drawl from the affected
substation.
b) The Distribution Licensee shall affect the demand management plan
accordingly.
5.5 DEMAND MANAGEMENT AND LOAD SHEDDING:
1. Temporary Load Shedding may be resorted to for maintaining the load generation
balance as instructed by the SLDC. This may also be necessary due to loss of any
circuit or equipment or any other operational contingency.
2. The Distribution Licensee shall estimate loads that may be shed in discrete blocks
at each Connection Point / Interface Point or in overall Area of Supply in
consultation with the Users supplied through independent circuits as required. Such
Users shall co-operate with the Licensee in this regard. The Distribution Licensee
shall work out the sequence of load shedding operations and the detailed procedure
shall be furnished to the person’s in-charge of substations concerned where such
load shedding has to be carried out. In case of automatic load shedding through
under frequency relays, the circuits and the amount of load to be interrupted with
corresponding relay settings shall be co-ordinated with the SLDC and persons in
charge of the substations of the Distribution Licensee as necessary.
3. If the duration of unplanned load shedding to any part of the Distribution System
exceeds 60 minutes, the affected Consumers having contract demand of 1MW and
above may be suitably intimated. The essential services such as public hospital,
public water works, sewage works, etc. shall be intimated over the telephone
wherever possible.
5.6 INTERFACES WITH SMALL GENERATING UNITS INCLUDING CPPS
If the Distribution Licensee has an interface with any generating unit including
CPP and an Agreement for this purpose exists, the Distribution Licensee and the
concerned owner of the generating unit shall abide by the following provisions in
addition to the provisions contained in this Code as applicable to all the Users:
a) The owner shall provide suitable protection at the interface to protect his
system from any damage due to normal and abnormal conditions in the
Distribution System.
22 | P a g e
b) In case of induction generator, the owner shall take adequate precautions to
limit the system disturbances, when the induction generator is synchronized in
consent with the Distribution Licensee. Induction generators shall be installed
with adequate capacitors to compensate the reactive power drawl. Also
whenever the power factor is found very low during starting period and causes
voltage dip in the Licensee’s system the Licensee may advise the owner to
install capacitors and the owner shall comply. Failure to comply entails
penalty and/or disconnection from the system as per provision of rules and
Acts.
c) The owner shall comply with the provisions of the (State / Central) Grid Code
/ Regulations as the case may be.
5.7 COMMUNICATION:
Reliable communication links viz telephone, fax, teleprinter, etc. shall be
established for exchange of data, information and operating instructions between
the Licensee, Consumer with a demand of 1 MW and above and the SLDC. Each
constituent shall ensure installation and maintenance of proper communication
infrastructure at his end.
5.8 MONITORING AND CONTROL OF VOLTAGE, FREQUENCY AND
POWER FACTOR:
1. The Distribution Licensee shall monitor the voltage, frequency and power factors
in the Distribution System at different points at peak and off-peak hours and take
reasonable measures for improvement of the same in co-ordination with the Users
with demand of 1 MW and above, and the Transmission Licensee.
2. The Distribution Licensee shall take power factor improvement measures at
strategic points in the Distribution System by carrying out system studies and
installing the required reactive compensation equipment.
3. The voltage in the Distribution System may vary depending upon the available
generation, system demand, and the configuration of Transmission and Distribution
Systems at any time. Under normal operating conditions the Licensee shall
exercise proper voltage management in the Distribution System beyond the point
of connection with the Transmission System to maintain voltage at all levels
according to the quality of supply mentioned in the Distribution System Planning
and Security Standard as mentioned under Attachment –1 of this code. The
capacitors, wherever available in the Grid substations shall be operated to maintain
reactive compensation to be within acceptable limits of power factor of at least 0.9
keeping the bus voltage in view.
4. Users having loads with high harmonic content, low Power Factor and fluctuations
shall install appropriate correction equipment.
23 | P a g e
5. The Distribution Licensee shall abide by the instructions issued by the SLDC from
time to time on load management for maintaining the frequency of supply within
the specified limits.
5.9 SAFETY CO-ORDINATION
1. The Distribution Licensee and the Users and any other Distribution Licensee
having common electrical interface with the Licensee shall designate suitable
persons to be responsible for safety co-ordination. These persons shall be referred
to as Control Persons. Their designations and telephone numbers shall be
exchanged between all the concerned persons. Any change in the list shall be
notified promptly to all the concerned.
2. The Distribution Licensee and such Users shall prepare safety manuals
incorporating all the safety precautions to be taken for each component of the
Distribution System. All the safety rules and precautions shall be observed when
work is to be carried out on any line or apparatus, switchgear or circuits in any part
of the Distribution System or in any part of the User System. The safety manuals
thus prepared shall be issued to all the control persons and such Users for
compliance.
3. There shall be co-ordination between persons of the Distribution Licensee and the
Users, between persons of two Distribution Licensees having electrical interfaces,
for carrying out the work on any apparatus or lines etc., belonging to either party at
the point of interconnection.
4. The provisions of the (State / Central) Grid Code / Regulation (as the case may be)
shall be followed at Connection Points/ Interface Points in co-ordination with the
Transmission Licensee.
5. The disconnecting device(s) at each electrical interface, which shall be capable of
effectively disconnecting the system of the Distribution Licensee and the other
Users, and the grounding devices of the respective systems at the control boundary
shall be identified and marked by the Licensee and the respective Users. These
shall be maintained in good condition at all times. To prevent inadvertent switching
operations by unauthorized persons, such disconnecting devices shall be provided
with interlocks.
6. Wherever any Consumer has installed an emergency power supply system, either
an electronic system with storage batteries or with generators, the arrangement
shall be such that the same cannot be operated without clearly isolating the system
from the supply mains. The responsibility of making the required arrangement for
isolation from supply mains shall be of the User and this shall be part of the
electrical layout submitted to Electrical Inspector for his approval. The possibility
of a feedback from these devices to the Distribution System from any of the
conductors, including the neutral conductor shall be clearly ruled out.
24 | P a g e
7. The appropriate Control Person at the electrical interface shall issue written
permission to his counterpart for carrying out the work on any apparatus,
switchgear or lines beyond the electrical interface. Such permissions shall be
termed as "Permit to Work" (PTW). The format for PTW shall be standardized by
the Distribution Licensee and shall be used by all concerned.
8. The Distribution Licensee in consultation with the concerned User shall frame
checklist of operations to be carried out and the procedures for safety coordination
for each electrical interface, before issue and return of PTWs. Such procedures and
checklists shall be issued to all the concerned by the Licensee for implementation.
5.10 MAINTENANCE AND TESTING
1. The Distribution Licensee shall prepare maintenance schedules for lines and
equipment to meet the level of maintenance as required in the "Distribution System
under Power System Management and Operating Standard" and "Distribution
System under Power System Safety Standard ".
2. Regular testing of all the equipments, such as transformers, switchgear, protective
relays etc., should be carried out as recommended by the manufacturers and the
relevant code of practices issued by the Bureau of Indian Standards and CBIP.
These shall be carried out at the prescribed intervals and the test results shall be
recorded in the maintenance registers. Wherever the test results indicate a decline
in the insulation resistance and/or deterioration of the equipment, preventive
maintenance shall be carried out to ensure serviceability, safety and efficiency.
3. The Distribution Licensee shall maintain well trained hot-line personnel, and all
the required tools in good condition, and conduct the maintenance work by using
hot-line technique, wherever possible, to reduce the period of interruption.
4. The Users shall maintain their Apparatus and Power Lines at all times conforming
to I.E. Rules 1956 which are in force for time being and will be replaced by new
rules made under Electricity Act, 2003 and shall be suitable for being connected to
the Distribution System in a safe and reliable manner.
5.11 TOOLS AND SPARES
1. The Distribution Licensee shall ensure availability of proper tools and tackles at all
work places for carrying out the maintenance. The tools and tackles shall be
checked from time to time and their serviceability shall be ensured.
2. The Distribution Licensee shall maintain an inventory of spares required for
maintenance and replacement purposes at suitable locations according to a clear
policy to be laid down by the Licensee.
5.12 TRAINING
The Distribution Licensee shall make appropriate arrangements for imparting
training to his workmen and supervisory staff, incorporating up-to-date techniques
of Distribution System design, construction and maintenance, safety, consumer
services etc. He shall frame a suitable syllabus for this purpose.
25 | P a g e
Chapter – 6
METERING AND PROTECTION CODE
6.1 OBJECTIVES:
The Chapter specifies the procedure for metering in Distribution System with
respect to operational metering as well as tariff and commercial metering. This
section also specifies the general guidelines for protection of Distribution system.
Provided that the regulations on Installation and Operation of Meters made by
Central Electricity Authority, if any, shall prevail over provisions 7.2 to 7.4 of this
Distribution Code.
6.2 OPERATIONAL METERING:
The minimum requirement of operational metering at Distribution System
substations shall be as follows:
(a) Grid substation
66 / 33 kV bus voltage
33 / 22 / 11 kV bus voltage
66 / 33 / 22 / 11 kV incoming / outgoing current in each phase and each
circuit
Power transformer primary and secondary currents in each phase of every
transformer.
HT outgoing feeder current in each phase for each feeder.
Power factor in each HT feeder.
Load survey meters having memory duration of at least 45 days for all the
incoming and outgoing feeders.
Facility to record energy in MWH and frequency at interval of 15 minutes at
point of connection with Transmission Licensee.
(b) User’s System with Demand of 1 MW and above
Voltage
Current
Load
Power Factor
Energy
6.3 TARIFF AND COMMERCIAL METERING:
1. Tariff metering shall be provided at each point of interconnection between the
Distribution and Transmission Systems in accordance with the Central / State Grid
Code as the case may be and the Transmission Services Agreement thereof.
26 | P a g e
2. Tariff metering shall be provided at the Connection Points/ Interface Points
between the User’s system and the Distribution System and shall be governed by
the provision in the Distribution Services Agreement.
3. All the meters, instrument transformers (CT/PT), metering cubicles and testing
procedures shall conform to the relevant Indian Standard Specification and relevant
provision made under the Electricity Act, 2003.
4. The CT/PT deployed for metering of energy supplied to the Consumers shall be of
class 0.2 accuracy. However, in case of rating of instrument transformers in
service, which are of 0.5 class, which may continue to be used. These shall also
conform to relevant IEC or IS specifications. On failure, the same shall be replaced
by suitable CT/PT of 0.2 class accuracy after exhausting the CT/PT of 0.5 class
accuracy (as available in their inventory). It is desirable that the Distribution
Licensee shall purchase new CT/PT of 0.2 class accuracy.
5. The open access consumer, Generating company, Distribution licensee and traders
shall provide Meters, as may be specified by the Commission for such consumer
based on voltage, point and period of supply and tariff category (as also
incorporated in JERC (State Grid Code) Regulations 2010).
6.4 MEASUREMENT OF ENERGY IMPORT/ EXPORT:
1. The Distribution Licensees shall install the following meters for all of their sub-
transmission lines connecting the generating stations, and substations for the
measurement of energy import/export from each Connection Point/ Interface Point,
energy generated in generating units and energy consumed in power stations and
substations:
(a) Active energy import.
(b) Active energy export.
(c) Reactive energy import.
(d) Reactive energy export.
Each metering point associated with the determination of energy exported or
imported, between the Generating Companies, Transmission Licensees and
Distribution Licensees shall be provided with both main and check meters. The
minimum standard of accuracy of these meters shall be of accuracy class 0.2.
These meters shall conform to the relevant IEC or IS specifications. However, the
Distribution Licensee shall continue to use the available meters, until not exhausted
in their inventory. However, the meter purchased after implementation of this code,
the Distribution Licensee shall purchase the meter of 0.2 class accuracy.
2. All the instrument transformers used in conjunction with commercial (tariff)
metering shall also be of accuracy class 0.2 and conform to the relevant IEC or IS
specifications. The rating shall be suitable for catering the burdens of lead wires
and metering. However, in case of rating of instrument transformers in service,
27 | P a g e
which are of 0.5 class, which may continue to be used. These shall also conform to
relevant IEC or IS specifications. On failure, the same shall be replaced by suitable
CT/PT of 0.2 class accuracy after exhausting the CT/PT of 0.5 class accuracy (as
available in their inventory). It is desirable that the Distribution Licensee shall
purchase new CT/PT of 0.2 class accuracy.
3. Data collection shall be used to integrate impulses from meters over each
integration period as per agreement, store values, and to transmit the same to the
data collection system of the Distribution Licensee. Data shall be collected from
both the main and check metering schemes.
4. Voltage failure relays shall be provided to initiate alarm on loss of one or more
phases of the voltage supply to the meter.
5. Main and check meters shall be provided at all Connection Points/ Interface Points.
All the meters shall be tested and calibrated according to the guidelines provided in
the relevant IEC/IS specifications at least once a year and also whenever the
difference in readings between the main and check meters exceed 0.5%.
6. Records of these calibrations and tests shall be maintained for reference.
7. The Generating Companies, Transmission Licensees and Distribution Licensees
shall formulate and agree upon a procedure covering summation, collection and
processing of tariff meter readings at various interconnection sites of their area.
Whenever necessary, these procedures can be revised.
8. The ownership, responsibility of maintenance and testing of these meters shall be
as mutually agreed to between the Users and the concerned Licensees.
9. The term ‘Meter’ shall include Current transformers, voltage/potential
transformers, wiring between them and meter box/panel.
6.5 PROTECTION SYSTEM:
1. No item of electrical equipment shall be allowed to remain connected to the system
unless it is covered by the appropriate protection aimed at reliability, selectivity,
speed and sensitivity. The Distribution Licensees shall cooperate with the
Transmission Licensee to ensure correct and appropriate settings of protection to
achieve effective, discriminatory isolation of faulty line/equipment within the time
target clearance specified by the Transmission Licensee.
2. Protection settings shall not be altered, or protection bypassed and/or disconnected
without consultation and agreement of all the affected Users. In case the protection
has been bypassed and/or disconnected by agreement due to any cause, the same
should be rectified and protection restored to normal condition as quickly as
possible. If agreement has not been reached, the electrical equipments shall be
isolated forthwith.
28 | P a g e
3. The settings of protective relays for 33 kV, 22 kV and 11 kV lines shall be such
that a fault in any section does not affect the section between the generating unit
and the faulty section under all conditions. The Transmission Licensee shall notify
the initial settings and any subsequent changes to the Users from time to time.
Routine checks on the performance of the protective relays shall be conducted and
any malfunction shall be noted and corrected as soon as possible. Short circuit
studies required for deciding the relay settings shall be conducted by the Licensee
with the data collected from the Transmission Licensee and the Users.
Representatives of the Generating Companies, Transmission Licensees and
Distribution Licensees shall meet periodically to discuss such malfunctions,
changes in the system configuration, if any, and possible revised settings of relays.
4. The Transmission Licensee shall be responsible for arranging periodical meetings
between the Generating Companies and the Distribution Licensees to discuss
coordination of protection. The Transmission Licensee shall investigate any
malfunction of protection or other unsatisfactory protection issues. The concerned
Licensees shall take prompt action to correct any protection malfunction or other
unsatisfactory protection issue as discussed and agreed to in these periodical
meetings.
5. All generating units and all associated electrical equipment of the Generating
Company connected to the Distribution System shall be protected by adequate
protection, as per CBIP manual, so that the system does not suffer due to any
disturbances originating at the generating unit.
6. Distribution System:- For Power Transformers of HV class in the Distribution
System, differential protection shall be provided for 10 MVA and above along with
backup time lag over current and earth fault protection with directional feature for
parallel operation. Transformers of 1 MVA and above but less than 10 MVA shall
be protected by time lag over current and earth fault. . In addition, all power
transformers shall be provided with gas operated relays, winding and oil
temperature alarm and protection.
7. Distribution lines: - All the 33 kV, 22 kV and 11 kV lines at Connection Points /
Interface Points shall be provided with a minimum of over current and earth fault
relays as follows:
a) Plain radial feeders: Non-directional time lag over current and earth fault relays
with suitable settings to obtain discrimination between adjacent relay settings.
b) Parallel/ring feeders: Directional time lag over current and earth fault relay.
6.6 FIRE PROTECTION:
All adequate precaution shall be taken and protection shall be provided against fire
hazards to all apparatus in the System conforming to the relevant Indian Standard
Specifications and/or provisions of under other relevant rules as amended from
time to time.
29 | P a g e
Chapter - 7
CROSS BOUNDARY SAFETY CODE
7.1 OBJECTIVE:
The objective of this section is to achieve an agreement on the principles of safety
when working across a control boundary between the Distribution Licensee and the
Users.
This chapter specifies the requirements for safe working practices for maintenance
of equipment associated with cross boundary operations and lays down the
procedure to be followed when the work is carried out on electrical equipment
connected to another User's System. User may mean another Licensee so that this
Code applies for safety across the boundary between two Licensees also, by
substituting “another Licensee” for User.
7.2 CONTROL PERSONS AND THEIR RESPONSIBILITY:
The Distribution Licensee and all the Users (comprising Generation Companies,
Transmission Licensees and consumers having load above 1MW or dedicated line)
shall nominate suitably authorized and technically qualified persons to be
responsible for the co-ordination of safety across their boundary. These persons
shall be referred to as "Control Persons".
7.3 PROCEDURE:
1. The Distribution Licensee shall issue a list of Control Persons with their names,
designations, addresses and telephone numbers, to all the Users having direct
control boundary with him. This list shall be updated promptly whenever there is
any change of name, designation or telephone number of any Control Person
named in the list.
2. All the Users such as mentioned in 8.3.1 having a direct control boundary with the
Distribution Licensee shall issue a similar list of their Control Persons to the
Licensee. This list shall be updated promptly whenever there is any change of
name, designation or telephone number of any Control Person named in the list.
3. Whenever any work across a cross boundary is to be carried out by the User or the
Distribution Licensee, the Control Person of the User or the Licensee as the case
may be, who has to carry out the work, shall directly contact his counterpart. Code
words shall be agreed to at the time of work to ensure correct identification of both
the parties. Contact between Control Persons shall normally be made by direct
telephone.
4. If the work extends beyond one shift, the Control Person shall hand over charge to
31 | P a g e
the relief Control Person and fully brief him on the nature of work and the code
words in the operation.
5. The Control Persons shall co-operate to establish and maintain the precautions
necessary to be taken for carrying out the required work in a safe manner. Both the
established isolation and the established earth shall be kept in the locked positions
wherever such facilities exist, and these shall be clearly identified.
6. The Control Person in charge of the work shall satisfy himself that all the safety
precautions to be taken are established before commencing the work. He should
issue the safety documentation to the working party to allow the work to
commence.
7. After the completion of the work, the Control Person in charge of the work being
carried out should satisfy himself that the safety precautions taken are no longer
required, and shall make a direct contact with his counterpart Control Person and
request removal of the safety precautions. The equipment shall be declared as
suitable for return to service only after confirmation of removal of all the safety
precautions, by direct communication, using the code word contact between the
two Control Persons, and the return of agreed safety documentation from the
working party.
8. The Distribution Licensee shall develop an agreed written procedure for Cross
Boundary Safety and continuously update the same.
9. Any dispute concerning Cross Boundary Safety shall be resolved at the level of
transmission licencee, if transmission licencee is not a party. In case where
transmission licencee is a party, the dispute shall be referred to the Commission for
resolution of the dispute.
7.4 SPECIAL CONSIDERATIONS:
1. All the equipment on Cross Boundary Circuits, which may be used for the purpose
of safety co-ordination and establishment of isolation and earthing, shall be
permanently and clearly marked with an identification number or name being
unique to the particular sub-station. These equipments shall be regularly inspected
and maintained in accordance with the manufacturer's specifications.
2. Each Control Person shall maintain a legibly written safety log, in chronological
order, of all operations and messages relating to the safety co-ordination sent and
received by him. All these safety logs shall be retained for a period of not less than
ten years.
3. As far as possible each of the Distribution Licensees shall maintain an updated map
of his system pertaining to the area fed by each substation. Otherwise the schematic
diagram of the system for 11kV and above shall be maintained and exhibited in the
concerned area offices of the Distribution Licensee.
32 | P a g e
Chapter - 8
INCIDENT/ACCIDENT REPORTING
8.1 OBJECTIVE
This Chapter covers procedure of major incident / accident reporting (which occur
in Distribution System) by User to Licensee and Licensee to User and
Commission.
8.2 MAJOR INCIDENT OR ACCIDENT REPORTING:
1. The Distribution Licensee shall send a preliminary report to Commission all the
significant Incidents in the Licensee's Area of Supply, which results in interruption
to service, substantial damage to equipment or loss of life or significant injury to
human beings within one week of its occurrence followed by a detailed report
within one month.
2. The Distribution Licensee and the Users shall establish a format and procedure for
exchange of information.
3. The Users shall furnish information to the Distribution Licensee regarding any
major incident occurring in their Systems promptly.
8.3 REPORTING PROCEDURE
1. All reportable incidents occurring in the lines and equipments of 11 kV and above
substations shall be promptly reported orally by the Licensee whose equipment has
experienced the incident, to all other significantly affected Users identified by the
Distribution Licensee and the Transmission Licensee. The reporting Distribution
Licensee should submit a written report to the Transmission Licensee within one
hour of such oral report. If the reporting incident is of major nature, the written
report shall be submitted within two hours duly followed by a comprehensive
report within 48 hours of the submission of the initial written report. In other cases,
the reporting Distribution Licensee shall submit a report within five working days
to the Transmission Licensee.
2. The Transmission Licensee shall call for a report from any Distribution Licensee
on any reportable incident affecting other Users and particularly in case such User
whose equipment might have been a source of the reportable incident does not
report the same. However this shall not relieve any User from the obligation to
report Events in accordance with Rules framed under relevant provision made
under Electricity Act, 2003. The format for such a report shall be as per the
approval of the Distribution Code Review Panel and shall typically contain the
following:
a) Location of the incident,
b) Date and time of the incident,
c) Plant or Equipment involved,
33 | P a g e
d) Supplies interrupted and the duration wherever applicable,
e) Amount of Generation lost, wherever applicable,
f) System Parameters before and after the incident, (Voltage, Frequency,
Load, Generation, etc.)
g) Network configuration before the incident,
h) Relay indications and performance of protection,
i) Brief description of the incident,
j) Estimated time of return to service,
k) Any other relevant information,
l) Recommendations for future improvement,
m) Name and designation of the reporting person.
3. The report shall contain sufficient detail to describe the event to enable the
recipient to assess the implications and risks arising out of the same. The recipient
may ask for clarifications and additional information wherever necessary and it is
obligatory that the reporting User shall put his best efforts and provide all the
necessary and reasonable information.
4. In case of a request by either party, the oral report shall be written down by the
sender and dictated by way of a telephone message or sent by Fax/e-mail to the
recipient. In case of an emergency the report can be given only orally and followed
by written confirmation.
5. Reporting of accidents shall be in accordance with the rules framed under relevant
provision made under Electricity Act, 2003 or other applicable rules. Till such
rules are made, the Distribution Licensee shall follow reporting of accidents as
mentioned in Power System Safety Standard (Indian Electricity Rule 1956) as per
Annexure 4 to these regulations.
34 | P a g e
ATTACHMENT - 1
DISTRIBUTION SYSTEM PLANNING AND SECURITY STANDARD
1. OBJECTIVE
1 The Distribution System Planning and Security Standard specifies the guidelines for
planning methodology of the Distribution System. The scope of this standard covers:
(a) Quality of power supply
(b) Load forecast
(c) Planning procedure.
(d) Service area of a distribution network.
(e) Planning standards.
(f) Reliability analysis.
(g) Standardisation of design of distribution transformer
(h) Standardisation of substation layouts
(i) Reactive Compensation
(j) Service Mains
(k) Metering Cubicles
(l) Security Standards
2. QUALITY OF POWER SUPPLY
1. Frequency: The rated frequency shall be 50 Hz. All the constituents of the Power
System shall make all possible efforts to ensure that the grid frequency remains
within the bandwidth of 49.0 -50.5 Hz.
2. Voltage: - The voltage at any point of the system under normal operating
conditions shall not depart from the declared voltage by more than the values
specified under IS Specification.
3. Harmonic content: - As per IEEE recommendations, the total harmonic content in
the supply voltage for sensitive loads shall not exceed 5 percent, with any single
harmonic content not exceeding 3 percent. The respective User responsible for
generating harmonics and affect the distribution system shall be responsible for
corrective action.
3. LOAD FORECAST:
1 The Distribution Licensee shall prepare a rolling short - term load forecast annually
for a period of five years in his Area of Supply duly estimating the probable load
growth and the consumption pattern of the Consumers. The forecast thus made
shall be updated every year depending on the actual load that has come in that year
and the changes in assumption, if any, required for the next years.
2 Preliminary Load Estimation/Assessment:
1. Domestic and Commercial Loads: The consumption in domestic and commercial
sectors shall be estimated on the basis of the number of Consumers and their
35 | P a g e
specific consumption. The past growth rate in the number of Consumers in the
area shall be studied. In cases where power shortages have been experienced in
the recent past, the growth rate to be adopted shall take into consideration the
appropriate demand making due allowance in the growth rate to account for
increased tempo of household electrification envisaged in the future. The higher
level of electrification planned in the area should be kept in view. Energy
consumption per Consumer shall be estimated after studying the past trends and
taking into account the anticipated improvements in the standard of living.
(a) Public Lighting and Water Works: The estimates of electricity consumption in
public lighting and water works shall be based on the average consumption per
kilowatt of connected load, projected on the basis of trends, keeping in mind the
likely increase in public lighting and water supply facilities. The number of
hours of operation shall be estimated taking into account the past trends and the
power cuts if any effected in the area.
(b) Agricultural Loads: The power requirement for irrigation pump sets shall be
based on the program of energisation of pump sets in the plan period, available
resources and the ultimate ground water potential. The average capacity of pump
sets shall be worked out considering the mid-year figures for connected load and
the number of pump sets. The consumption per IP set per year shall be estimated
by means of representative sample studies till all the IP sets are metered.
(c) Industrial Loads: The power requirements for industrial sector shall be
estimated under following three categories, viz.
(a) L.T. Industries;
(b) H.T. Industries with a demand of less than 1 MW;
(c) H.T. Industries with a demand of 1 MW & above.
The consumption in category (a) & (b) shall be on the basis of historical data
duly considering the developments in future. In case of category (c), projection
shall be made separately for each industrial unit on the basis of the information
furnished by the industrialists and the Department of Industries.
3 Non-industrial Bulk Supply: The available data regarding the consumption of bulk
supply to non-industrial Consumers such as research establishments, port trusts,
military engineering services, supply to power projects etc., and the probable future
developments in these areas, shall be considered for the forecast.
4. Other Loads: For other loads, the projections shall be based on the best Judgment.
4. LOAD FORECAST PROCEDURE
1. Load forecasting methods using the above data and relevant indices by adopting
one of the suitable methods applicable to specific locations and prevailing
conditions shall be adopted.
36 | P a g e
2. In addition to the above, the effects of demand side management, requirement of
power for pending applications, the increase in demand due to improvement in the
operating frequency close to 50 Hz shall also be estimated. The Distribution
Licensee shall work out Peak Demand for each of the succeeding five years
relating to Connection Point/ Interface Point with the Transmission System as well
as the annual Energy Demand and Peak Demand for each of the succeeding five
years for overall Area of Supply on the basis of Load forecast. However, if the
Distribution Licensee receive power at a number of Connection Points / Interface
Points in a compact area, which are interconnected in a ring, then such Distribution
Licensee shall forward the overall short term Demand forecast at each Connection
Point / Interface Point with the variation or tolerance as mutually discussed and
agreed upon with the Transmission Utility or SLDC.
3. The diversity factor of each category of Consumers fed in the Area of Supply shall
be worked out by installation of load survey meters at selected typical locations. A
record of such data shall be maintained and continuously updated. The short-term
load forecast for a period of five years, based on these data shall be prepared.
5. PLANNING PROCEDURE
The Distribution System shall be planned and developed in such a way that the
system should be capable of catering the requirement of all categories of Consumers
with a safe, reliable, economical and quality supply of electricity as indicated in
clause 2.0 of this section. However the Consumer shall extend full support to the
Distribution Licensee to enable the Distribution Licensee for quality supply of
electricity. The Distribution System shall conform to the statutory requirements of
all the relevant code, standards and acts in force.
6. PLANNING STANDARDS
6.1 Standardization of Sizes and Ratings: Adequate provision for future load
development shall be made while selecting the sizes of power conductors and
rating of distribution transformers. The sizes of power conductors, insulators,
lightning arresters, transformers, switchgear, etc. used in the Distribution System
shall be standardized with the objective of reducing inventory and standard
specifications shall be prepared.
Design Criteria for Distribution Lines
1. Radial system of distribution can be adopted in rural areas and as far as possible
loop system with provision for feeding from at least one alternate source shall
be adopted in urban areas.
2. The HT and LT distribution lines shall be any of the following types according
to the necessity at the required area.
(a) Over-head line with bare conductors;
(b) Over-head line with Aerial Bunched Cables;
(c) Under-ground Cables.
37 | P a g e
3. In thickly populated cities, in areas having heavy traffic densities, underground
cable installation shall be considered to the extent possible. Wherever a number
of trees are encountered, either in residential locations or in gardens and forests,
over-headlines with aerial bunched cables shall be adopted. In other places over-
headlines with bare conductors shall be adopted. The following standards shall
be adopted for planning and design purposes:
(a) The design and construction of over-headlines with bare conductors shall be
generally in accordance with IS 5613 Part I, sections 1 and 2.
(b) Vertical configuration of conductors for LT distribution lines, to prevent
accidental short circuit due to galloping of conductors, shall preferably be
adopted in rural areas since the spans are large in such areas.
(c) The maximum length of LT and HT lines shall be maintained within the
prescribed limit so as a safe and quality power may be delivered.
(d) The design and construction of over-headlines with aerial bunched cables shall
be generally in accordance with REC Specifications 32 and IS 14255.
(e) The design and construction of under-ground cables shall be generally in
accordance with IS 1255.
4. The line supports can be of steel, wood, RCC or PCC. The RCC and PCC poles
are preferred over the other two considering their cost and longer life. The
choice of the size of conductor for a line shall be made based on the following
criteria:
(a) Power to be transmitted and the techno-economic studies conducted for
selecting the size of conductor according to the cost of loss of power and the
interest and depreciation charges on the cost of the conductor thus selected;
(b) Length of Line;
(c) Line Voltage;
(d) Permissible voltage regulation;
(e) Mechanical strength;
(f) In coastal areas and other areas where severe corrosion is expected due to
heavy rainfall and/or salinity in atmosphere and theft prone areas, appropriate
conductors only shall be used.
6.2 Standardisation of Design and Rating of Distribution Transformers
1. The design and rating of distribution transformers shall be standardised. As an
initial step, the various technical parameters required for the design shall be
incorporated in the specifications based on the experience on performance
gained among the various designs so far adopted. Later, standard designs of the
transformers and their detailed construction drawings shall be evolved based on
the performance of these transformers. These shall be adopted for future
procurement. This also ensures the inter-changeability of components of similar
transformers manufactured by any manufacturer.
2. A good quality assurance plan shall be aimed at the following:
38 | P a g e
(a) Good quality of raw materials;
(b) Quality control during manufacturing and routine tests;
(c) Acceptance tests at the time of taking delivery;
(d) Inspection and tests on transformers received at stores on random sampling;
(e) Thorough test on one transformer in a lot selected at random. The transformer
should be completely dismantled. The qualities of core, coil, insulation etc are
physically inspected and samples of insulation and other components used etc.,
are tested.
(f) Ensuring performance guarantee for all distribution transformers for a
minimum period of 3 years.
6.3 Standardisation of Sub-Station Layouts
The Distribution Licensee shall develop standard layouts following relevant
standards, manuals and provisions of Electricity Act, 2003. The Licensee shall
also adopt latest technology as well as feedback from the experience gained.
6.4 Reactive Compensation
1 Shunt capacitors un-switched/switched type, shall be installed at the appropriate
places in the Distribution System for power factor improvement, maintaining
satisfactory voltage profile and reduction of sub-transmission and Distribution
losses. The size and location of the capacitor installations shall be determined
using an appropriate program, with reliable field data. Suitable precautionary
measures, such as automatic switching etc., shall be adopted to avoid over
voltages at light load periods.
2 Optimization studies of shunt compensation shall be conducted by the
Distribution Licensee to determine the most appropriate sizes and locations for
shunt capacitor installations.
6.5 Service Area of a Distribution Network
1. The service area of a distribution network is an area in which the load is supplied
by a substation by one or more number of feeders, as required. The distribution
network fed from the distribution transformers and the substations from which
the 11 kV feeders emanate shall be initially planned as independent networks
within their respective service area. Further, wherever possible, provision shall
be made for interconnection with adjacent networks and/or substations for an
alternate supply in case of failure. The design of distribution lines shall
incorporate features to enable their augmentation in future, with minimum
interruption to power supply. The existing right of way shall be fully exploited.
2. The Distribution Licensee shall take suitable measures, sufficiently in advance,
to augment the capacity of the feeders in the event the voltage regulation limit is
exceeded within the area.
3. Appropriate software to compute the design of the distribution network shall be
39 | P a g e
used to obtain lowest possible energy losses for different loading conditions for
the following:
(a) The location and the capacity of the distribution transformers;
(b) Routing of LV and HV networks;
(c) The sizes of conductors;
(d) The ratio of the lengths of HT and LT distribution lines for the new lines
planned shall be optimized and the existing Distribution System shall be
modified in a phased manner to reduce the distribution losses.
(e) The voltage regulation limits for all loading conditions.
6.6 Service Mains
The service mains to Consumers shall be laid in accordance with relevant REC
Construction Standards for 230 V single phase and 400 V three phase supply and
shall conform to the provisions of Relevant Rules under Electricity Act, 2003.
6.7 Metering Cubicles
1. The metering for 230 V single-phase supply shall be provided on a suitable
board, located in such a place protected from sun and rain and shall be in a
convenient position for taking readings. The terminals of the meter shall be made
tamper-proof and sealed. For 400 Volts three phase supply, the meters and
associated metering equipment including connections shall be enclosed in a
suitable tamper-proof box. The tamper-proof box shall be of sufficient strength
and design with locking and sealing devices and shall have adequate provision
for heat dissipation with the required electrical clearances. The design shall
permit readings to be taken without access to the meter or its connections.
2. For HT Consumers the meters, maximum demand indicators, and secondary
connections, shall be housed in a separate compartment and other secondary
apparatus such as instrument transformers and connections required shall be
housed in a separate metering compartment, which shall be locked / sealed to
prevent tampering.
3. The HT metering cubicle shall be suitable for cable entry on both sides or at
least on one side. No fuses are permitted in the secondary circuits of the
instrument transformers. The metering cubicle shall be painted with suitable
epoxy paint for installation in coastal areas and other areas experiencing heavy
rainfall. The instrument transformers shall be of fixed ratio and shall not have
any taps. The primary current rating of the current transformers shall match with
the normal full load current and the saturation point of the core shall be higher
than the maximum current that may occur due to simultaneous full load
operation of all the connected equipment and machinery.
40 | P a g e
4. For EHT Consumers, the secondary terminals of the instrument transformers
shall be locked and sealed and the secondary wires brought out in a suitable GI
conduit pipe upto the metering panel. There shall be no joints in the conduit
pipes. The meters shall be as close to the instrument transformers as possible
and in no case shall exceed ten (10) meters. The metering panel shall be housed
in a weatherproof and tamperproof box and sealed.
7. RELIABILITY ANALYSIS
1. The planning of the extension and improvement to a Distribution System shall
also take into consideration the improvement in reliability of power supply to
Consumers. The appropriate reliability indices of power supply in the area fed
by the Distribution System before and after the implementation of the extension
and improvement program shall be estimated. The planning of the distribution
system shall also take into consideration the improvement in reliability and
efforts should be made to collect the data in this regard.
2. The following factors, which affect reliability indices, shall be considered
subject to availability of data:
(a) Momentary incoming supply failures
(b) Momentary interruptions on 22 and 11 kV feeders
(c) Breakdown on LT feeders
(d) Prearranged shutdowns on lines and feeders
(e) Blowing out of distribution transformer fuses
(f) Individual fuse off calls
8. STANDING COMMITTEE FOR DESIGN, CONSTRUCTION AND
MAINTENANCE PRACTICES.-
1. Standing Committee for design, construction and maintenance practices shall
under the chairmanship of the technical Member/Director of the licensee be
constituted by the licensee, within one month w.e.f. the commencement of this
Code and shall comprise of-
(a) the senior most Engineer (Planning) of the licensee
(b) the senior most Engineer (Materials Management) of the licensee
(c) the senior most Engineer (Design and Planning) of the STU ; and
(d) any other person as the licensee may deem appropriate.
2. The Standing Committee shall be an advisory body having perpetual term and
shall hold its meeting at least once in each quarter. The Standing Committee
shall suggest and make recommendations to the licensee on matters amongst
others in the following areas:-
(a) to review and suggest the latest practices on design and technical
specifications of line materials, meters and metering equipment, service line
41 | P a g e
materials, sub-station equipments like transformers, circuit breakers, CT/PT
sets etc;
(b) to suggest vendor selection and short listing procedures for various
equipments and materials being used in bulk;
(c) to suggest best industry practices and innovative techniques for
construction, operation, maintenance of HT / LT lines and Grid Sub-
stations, Pole mounted and other plinth mounted sub-stations etc;
(d) to recommend and suggest the latest technology up gradation and process
such as IT tools and SCADA and other Control System;
(e) to recommend embargo and restrictions on dangerous, unhygienic practices
and material from point of view of safety, environmental up-keep and
pollution norms.
9. SECURITY STANDARDS
1. The Distribution System shall be planned and maintained so as to fulfill the
following security standards except under Force Majeure conditions beyond the
reasonable control of the Distribution Licensee.
2. The feeders, either HT or LT, feeding important loads such as hospitals,
crematoria, airports, railway stations, and the like shall be planned to have a
selective switching system, so that selective switching can be operated to
transfer the load on to an alternate healthy feeder. Appropriate safety
precautions shall invariably be taken in this regard. In case of failure of the
feeder, these switches shall be operated immediately either manually or
automatically depending on the importance of the load.
3. The feeders connected to important industries which are very sensitive to
interruption of even short duration shall be planned to have automatic
switchover to an alternate healthy feeder in case of failure of supply.
4. Loading in any current carrying component of the Distribution System (e.g.
Conductors, joints, transformers, switchgear, cables and other apparatus) shall
not exceed 75% of their respective thermal limit.
5. The rupturing capacity of the switchgear employed in the system shall have at
least 25% more capacity than the short circuit level computed even considering
the anticipated future development of the system.
6. Provision shall be made for every HT feeder, either primary or secondary, to
manually switch over to the immediately available HT feeder of the same
voltage class available in the vicinity. Provision shall be made in the design
itself for any HT feeder to share at least 50% of the loads in the adjacent feeder
during emergencies.
7. In case of single contingency; failure of any substation equipment controlling
any outgoing 11 kV feeder, the load interrupted shall not generally exceed 50%
of the total demand on the substation. The Distribution Licensee has to bring it
down to 20% within a period of three years.
42 | P a g e
8. There shall be adequate stand by capacity in the system.
9. The design of the Distribution System shall accommodate the arrangements in
such a way that the electricity supply need not be interrupted for more than the
specified duration as per JERC (Standard of Performance) Regulations 2009 of
Licensee in case of breakdown of any distribution transformer. Similarly in case
of failure of 11 kV feeders including terminal equipment, the design shall
accommodate an arrangement for the power supply not to be interrupted to the
extent possible.
10. CONSTRUCTION PRACTICES .-
1. All electric supply lines and apparatus shall be of sufficient ratings for power,
insulation and estimated fault current and of sufficient mechanical strength, for
the duty, which may be required to be performed under the environmental
conditions of installation, and shall be constructed, installed, protected, worked
and maintained in such a manner as to ensure safety of human beings, animals
and property.
2. The relevant Code of Practices of the Bureau of Indian Standards, REC
Standard, including National Electrical Code, if any, may be followed. The
material and apparatus used shall conform to the relevant specification of the
Bureau of Indian Standards where such specifications have been already laid.
3. The licensee and the User shall prepare and observe the Construction and
Maintenance Manuals for various equipment/works for HT / LT Lines and Grid
/ Switching sub-stations. The Construction and Maintenance Manual shall be
prepared taking into consideration the following:-
(a) Technical Standards for construction of electrical plants, electric lines and
connectivity to the grid specified by the Central Electricity Authority under
Clause (b) of section 73 of the Electricity Act 2003;
(b) Safety requirements for construction, operation and maintenance of
electrical plants and electric lines specified by the Central Electricity
Authority under Clause (c) of section 73 of the Act ;
(c) REC Construction Standards and Standard Design Layouts;
(d) CBIP Publications on Code of Practices;
(e) Code of Practices issued by the Bureau of Indian Standards for various
equipment and maintenance practices; and
(f) Instruction Manuals for installation, operation and maintenance issued by
standard equipments manufacturer concerned.
4. The standard tables for conductor size, fuse size, wire gauge, electrical
clearance, ground wire size, insulation resistance and earth resistively etc. shall
be included in the Construction and Maintenance Manuals. The licensee shall
ensure that its construction and maintenance staff strictly observe these
Manuals. The copy of Construction and Maintenance Manuals shall be
furnished to the Commission.
43 | P a g e
11. PREVENTIVE MAINTENANCE SCHEDULE AND INSPECTION
MANUAL . -
1. The licensee and the User shall prepare a Preventative Maintenance Schedule
and Inspection Manual for various line and sub-station equipment installed in
distribution system.
2. The Preventive Maintenance Schedule and Inspection Manual shall cover the
following:-
(a) Recommended Schedule for inspection;
(b) Recommended Schedule for preventive maintenance; and
(c) Recommended Schedule for overhauling.
3. The inspection schedule and preventive maintenance schedule shall have daily,
weekly, monthly, quarterly and annual periodic activity, to be carried out for
various equipment.
12. MAINTENANCE RECORDS .-
1. The licensee as User shall maintain records of periodic inspections carried out in
the standard formats prescribed in the Preventive Maintenance Schedule and
Inspection Manual.
2. Periodic testing of all the equipments such as transformers, switchgear, protective
relays, etc., should be carried out as recommended by the manufacturer and the
relevant Code of Practices issued by the Bureau of Indian Standards and the
CBIP. These shall be carried out at the fixed intervals and the test results shall
be recorded in the maintenance registers. Wherever the test results indicate a
decline in the insulation resistance and/or deterioration of the equipment,
preventive maintenance shall be carried out to ensure serviceability, safety and
efficiency.
3. The licensee shall maintain well trained hot-line maintenance personnel with all
the required tools in good condition and conduct maintenance work by using
hot-line technique, wherever possible, to reduce period of interruption.
4. The consumers shall maintain their apparatus and power lines at all times
conforming to the Electricity Rules, and these shall be suitable for connection to
distribution system in a safe and reliable manner.
13. ENERGY CONSERVATION .-
1. The licensee, in order to minimize the overall requirement, energy conservation
and Demand Side Management (DSM), shall accord high priority to ensure
compliance of the Energy Conservation Act, 2001 and shall adhere to the
guidelines of the Bureau of Energy Efficiency.
2. The licensee shall ensure that the periodic energy audits, wherever made
compulsory for power intensive industries under the Energy Conservation Act,
2001 are complied with by its consumers. Other industrial consumers may also
be encouraged to adopt energy audits and energy conservation measures.
43 | P a g e
3. In the agriculture sector the licensee shall promote the pump sets and the water delivery
system engineered for high efficiency. In the industrial sector, the licensee shall take
action for promoting energy efficient technologies as energy conservation measures.
Motors and drive system are the major source of high consumption in agricultural and
industrial sector. The licensee shall encourage that the consumers use high efficiency
motors in agricultural and industrial sector. The licensee shall take effective steps so that
energy efficient lighting technologies are adopted in industries, commercial and domestic
establishments.
SANDESH KUMAR SHARMA, Secy. JERC
[ADVT III/4/218-I/11/Exty.]
ANNEXURE 1
LOAD DATA FOR DEMANDS FOR OF 1 MW AND ABOVE
1. Type of Load: (E.g. Furnace loads, rolling mills, traction loads, pumping loads, industrial
loads etc.)
2. Maximum Demand (KVA)
3. Year(s) by which full/part load supply is required:
(Phasing of loads shall be furnished)
4. Location of load with a location map drawn to scale:
5. Rated voltage, frequency and number of phases at which supply is required:
6. Description of equipment:
a) Motors: (State the purpose and number of installations, voltage and KW rating,
method of starting, starting current and duration, type of motors, types of drives
and control equipments etc.)
b) Heating: (Type and KW rating)
c) Furnace: (Type, Furnace Transformer capacity and voltage ratio)
d) Electrolysis: (Purpose and KVA capacity)
e) Lighting: KW Demand.
f) Any other loads with particulars:
7. Sensitivity of Demand to fluctuations in voltage and