Rule 47, Marble Development and Conservation Rules, 2002: Delegation of powers
Marble Development and Conservation Rules, 2002 - Rule 47
Text of rule 47
Delegation of powers
47. Delegation of powers.- The State Government may, by notification in the Official
Gazette, direct that any power exercisable by it under these rules may, in relation to such
matters and subject to such conditions, if any, as may be specified in the notification be
exercisable also by such officer or authority subordinate to the State Government
SCHEDULE
FORM –A
(Yearly Report of Prospecting Operations carried out)
(See rule 11)
To
State Government concerned or any
person so authorised under rule 47
1. Type of the marble for which prospecting : (a)
operations has been granted (b)
2. Name and address of the licencee :
3. Particulars of the prospecting licencee :
(i) Date of execution :
(ii) Period : Years From : to :
(iii) Area under licence : Hectares
(iv) No. and date assigned by State Government
to Prospecting Licencee. No. Date :
4. Location of the prospecting licenced area :
(i) Topo Sheet Number :
(ii) Cadastral Survey or Khasra Number :
(iii) Village : Taluka/Tehsil : District : State :
(iv) Post Office : Police Station :
(v) Nearest railway station : Distance :
(vi) Nearest Rest House/Dak Bungalow :
5. Particulars of the Geologist or mining Engineer employed optionally, if any, for
the prospecting licenced area:
(i) Name and address :
:
:
(ii) Qualification :
(iii) Date of appointment :
(iv) Status of employment : Whole time : Part time
:
6. Status of Prospecting Operation: In Progress :
please tick mark one of the boxes Completed :
whichever is applicable Abandoned :
7. Total Surface area covered by prospecting work (hectare) :
8. Prospecting work completed during the year :
a. Geological mapping : Area in Hectare : Scale :
b. Pitting (i) No. of Pits :
(ii) Grid Pattern :
(iii) Depth (Mts.) Average :
Maximum :
Minimum :
c. Trenching (i) No. of trenches (with interval) :
(ii) Length (Mts) Average :
Maximum :
Minimum :
d. No. and size of samples :
e. Drilling :
(i) No. of boreholes completed during the year (with size of core) :
(ii) No. of boreholes in progress :
(iii) Total yearly drilling (Mts.) :
f. Particulars of drilling machines Type Make Capacity No.of drills
g. Details of samples tested:
(i) No. of samples tested :
(ii) Complete report :
(Testing the suitability as per market requirement)
Place : Signature :
Date : Name in full :
Designation :
________________________________________________________________________
Note : Please enclose a geological report describing the prospecting operations
undertaken so far accompanied by the detailed geological plans and sections
showing structural details such as joints, fractures, folds, faults, grain size,
texture etc. and also showing locations of (a) bore holes, (b) pits, (c) trenches
(d) sample positions etc. The report shall also contain the bore hole logs and
the inferences drawn as a result of the study of the geology of the area and the
interpretation of the bore hole cores, pits, trenches, reserves of marble and
complete report of at least two representative samples indicating stone quality and
suitability as per market requirements and the blocks proposed for mining
operations.
Previous and next
All provisions of Marble Development and Conservation Rules, 2002
Questions people ask
Is rule 47 of Marble Development and Conservation Rules, 2002 still in force?
No repeal of Marble Development and Conservation Rules, 2002 is recorded.