Rule 26, Marble Development and Conservation Rules, 2002: Removal and utilisation of top soil
Marble Development and Conservation Rules, 2002 - Rule 26
Text of rule 26
Removal and utilisation of top soil
26. Removal and utilisation of top soil.- (1) Where top soil exists and is to be
excavated for prospecting or mining operations for marble, it shall be removed separately.
(2) The top soil so removed shall be utilised for restoration and rehabilitation
of the land which is no longer required for prospecting or mining operations or for
stabilising or landscaping the external dumps.
(3) Where top soil cannot be used concurrently, it shall be stored separately
for future use.