Rule 21, Marble Development and Conservation Rules, 2002: System of working
Marble Development and Conservation Rules, 2002 - Rule 21
Text of rule 21
System of working
21. System of working.- (1) System of working in marble quarries shall be
performed by formation of benches.
(2) Such benches in marble and overburden including weathered marble
shall be formed separately and the benches in overburden or weathered marble
shall be kept sufficiently in advance so that their working does not interfere with
the working of marble.
(3) In order to ensure optimum production with minimum waste generation,
every lease holder shall endeavour to deploy machinery and equipment as
indicated below:-
(a) For small quarry or mine (having area upto one hectare)
(i) Compressor …
one
(ii) Jack hammer or any other pneumatic or
hydraulic drill …
one
(iii) Chain pulley block …
one
(iv) Winch or 8 to 10 tonnes capacity crane … one
(v) Wedges, chisels and hammers ….. as needed
(vi) Water pump …
one
(b) For medium size quarry or mine (having area above one hectare and
upto three hectares):
(i) Compressors …
two
(ii) Jack hammer or any other pneumatic or … hydraulic
drill … as needed
(iii) Mobile cranes (15 to 20 tonnes) … one to two
(iv) Derrick crane or Loader … one
(v) Excavator (0.3 cu.m. to 0.9 cu.m.) …
one
(vi) Tippers or Loaders …
two
(vii) Wire saws or chain saws … as
needed
(viii) Hydraulic jacks … as need
(c) For large quarry or mine (having area more than three hectares
(i) Compressors … three to
four
(ii) Mobile cranes (15 to 20 tonnes) … as needed
(iii) Derrick crane (20 to 40 tonnes)or Loader … as
needed
(iv) Excavator (0.9 cu.m. to 1.1 cu.m.) … as
needed
(v) Tippers or Loaders … two for each excavator
(vi) Wagon drills
(vii) Slot liners
(viii) Line drilling machines as
needed
(ix) Diamond wire saws
(x) Chain saws or diamond belt saws
(xi) Hydraulic jacks
(4) The State Government may, from time to time, notify scale of
deployment of machinery indicated in clauses (a), (b) and (c) of sub-
rule(3)
Previous and next
All provisions of Marble Development and Conservation Rules, 2002
Questions people ask
Is rule 21 of Marble Development and Conservation Rules, 2002 still in force?
No repeal of Marble Development and Conservation Rules, 2002 is recorded.