Form C, Marble Development and Conservation Rules, 2002: FORM-C
Marble Development and Conservation Rules, 2002 - Form C
Text of form C
FORM-C
FORM-C
ANNUAL RETURN
(See rule 37(1)(b)
MINE/QUARRY CODE ………………..
(For the year 1st April,200… to 31st March , 200….
(To be submitted before 1st July each year for the preceding year or within 90 days of the
date of abandonment/surrender)
i) Type of the marble worked:
ii) Name(s) of other mineral(s), if any:
To,
State Government concerned or any
person so authorised under rule 47
1. Name and Location of the quarry/mine:
Name of mine/quarry:
village: Post Office:
Taluka/Tehsil: District: State:
2. Name and Address of lessee/mine/quarry owner:
3. Lease Details
Area in hectares: Date of Execution:
Period(years):
4. No. of days the quarry/mine worked during the year:
5. Indicate reason(s) for work stoppage Reasons No. of
days
due to strike, lockout, monsoon,
non-availability of labour, less
demand etc. and number of days of
work stoppage for each of these factors.
6. Employment of Qualified Personnel and Labour:
6.1 Number of technical and supervisory staff:
________________________________________________________________________
Description Fully employed Partly employed
________________________________________________________________________
a. Graduate Mining Engineer
b. Diploma Mining Engineer
c. Geologist
d. Other administrative, clerical
and technical supervisory staff
________________________________________________________________________
6.2 Labour Employment : Male Female
a. Average daily employment
b. Wages (Rs.)
7. Production, Despatches, Stocks and Pit's Mouth Value:
7.1 Production of Raw sizes blocks during the year (Unit : Cu.M):
________________________________________________________________________
Items Total
________________________________________________________________________
a. Opening Stock
b. Production
c. Despatches
(i) Direct Exports
(ii) Domestic sale
d. Closing stock
e. Pit's Mouth Value(Rs.)
________________________________________________________________________
7.2 Cumulative Production:
(since opening of quarry/mine in Cu.M/tonnes)
7.3 Waste and Rejects (Unit : Cu.M/tonnes)
________________________________________________________________________
Item During the year Cumulative total
________________________________________________________________________
a) Quantity of waste
generated as overburden
b) Quantity of waste generated
incidental to mining of raw blocks
c) Quantity of waste generated as
rejected blocks and dressing rejects
d) Despatches of waste and rejects
(in accordance with above classification)
________________________________________________________________________
8. Mining Machinery used during the year
________________________________________________________________________
Type of Machinery No. of units Engine Horse Power of No. of hours
each unit worked
________________________________________________________________________
(a)
(b)
(c)
(d)
________________________________________________________________________
9. Reserves (proved, probable, possible) in-situ and recoverable:
10. Quantity and Cost of material consumed during the year
Quantity Cost(Rs.)
(i) Fuel(Lt.):
(ii) Electricity (KWH)
(iii) Other Materials:
11. Amount of Rent and Royalty paid (Rs).
12. Annual production (last 3 years) (Quantity in cubic metres):
13. Exports (last 3 years)
(Separately for dimensional blocks in tonnage )
14. Reasons for increase/decrease in production during the
current year as compared to the preceding year:
I certify that the information furnished above is correct and complete in all respects.
Place: Name and Signature of
Date: Owner/Agent/Mining Engineer/Manager
------------------------------------------------------------------------------------------------------------
Note:
(a) In case there is stoppage of work, indicate reasons for work stoppage and number
of days of work stoppage.
(b) Average daily employment is obtained by dividing the number of man days worked by
the number of working days.
(c) Wage includes all cash payments including bonuses. Employers' contributions to
provident funds, welfare activities etc. Concessions in kind should not be included in
wages
(d) The Pit's Mouth Value should represent the sale value of the marble at the pit head.
In case of sales effected on F.O.R or F.O.B or any other basis, pit head sale value
should be arrived at after deducting all the expenses incurred from quarry/mine to
railway station or port or other point of sale, as the case may be (such as expenses on
transportation, loading and unloading charges, railway freight, sampling and analysis,
port handling, export duty and cess).
(F.No.1/2/99-MVI)
(S.P.GUPTA)
JOINT SECRETRY TO THE GOVERNMENT OF INDIA.
Previous and next
All provisions of Marble Development and Conservation Rules, 2002
Questions people ask
Is form C of Marble Development and Conservation Rules, 2002 still in force?
No repeal of Marble Development and Conservation Rules, 2002 is recorded.