LawGrids logoLAWGRIDS.ORG

Form C, Marble Development and Conservation Rules, 2002: FORM-C

Marble Development and Conservation Rules, 2002 - Form C

Text of form C

FORM-C

FORM-C ANNUAL RETURN (See rule 37(1)(b) MINE/QUARRY CODE ……………….. (For the year 1st April,200… to 31st March , 200…. (To be submitted before 1st July each year for the preceding year or within 90 days of the date of abandonment/surrender) i) Type of the marble worked: ii) Name(s) of other mineral(s), if any: To, State Government concerned or any person so authorised under rule 47 1. Name and Location of the quarry/mine: Name of mine/quarry: village: Post Office: Taluka/Tehsil: District: State: 2. Name and Address of lessee/mine/quarry owner: 3. Lease Details Area in hectares: Date of Execution: Period(years): 4. No. of days the quarry/mine worked during the year: 5. Indicate reason(s) for work stoppage Reasons No. of days due to strike, lockout, monsoon, non-availability of labour, less demand etc. and number of days of work stoppage for each of these factors. 6. Employment of Qualified Personnel and Labour: 6.1 Number of technical and supervisory staff: ________________________________________________________________________ Description Fully employed Partly employed ________________________________________________________________________ a. Graduate Mining Engineer b. Diploma Mining Engineer c. Geologist d. Other administrative, clerical and technical supervisory staff ________________________________________________________________________ 6.2 Labour Employment : Male Female a. Average daily employment b. Wages (Rs.) 7. Production, Despatches, Stocks and Pit's Mouth Value: 7.1 Production of Raw sizes blocks during the year (Unit : Cu.M): ________________________________________________________________________ Items Total ________________________________________________________________________ a. Opening Stock b. Production c. Despatches (i) Direct Exports (ii) Domestic sale d. Closing stock e. Pit's Mouth Value(Rs.) ________________________________________________________________________ 7.2 Cumulative Production: (since opening of quarry/mine in Cu.M/tonnes) 7.3 Waste and Rejects (Unit : Cu.M/tonnes) ________________________________________________________________________ Item During the year Cumulative total ________________________________________________________________________ a) Quantity of waste generated as overburden b) Quantity of waste generated incidental to mining of raw blocks c) Quantity of waste generated as rejected blocks and dressing rejects d) Despatches of waste and rejects (in accordance with above classification) ________________________________________________________________________ 8. Mining Machinery used during the year ________________________________________________________________________ Type of Machinery No. of units Engine Horse Power of No. of hours each unit worked ________________________________________________________________________ (a) (b) (c) (d) ________________________________________________________________________ 9. Reserves (proved, probable, possible) in-situ and recoverable: 10. Quantity and Cost of material consumed during the year Quantity Cost(Rs.) (i) Fuel(Lt.): (ii) Electricity (KWH) (iii) Other Materials: 11. Amount of Rent and Royalty paid (Rs). 12. Annual production (last 3 years) (Quantity in cubic metres): 13. Exports (last 3 years) (Separately for dimensional blocks in tonnage ) 14. Reasons for increase/decrease in production during the current year as compared to the preceding year: I certify that the information furnished above is correct and complete in all respects. Place: Name and Signature of Date: Owner/Agent/Mining Engineer/Manager ------------------------------------------------------------------------------------------------------------ Note: (a) In case there is stoppage of work, indicate reasons for work stoppage and number of days of work stoppage. (b) Average daily employment is obtained by dividing the number of man days worked by the number of working days. (c) Wage includes all cash payments including bonuses. Employers' contributions to provident funds, welfare activities etc. Concessions in kind should not be included in wages (d) The Pit's Mouth Value should represent the sale value of the marble at the pit head. In case of sales effected on F.O.R or F.O.B or any other basis, pit head sale value should be arrived at after deducting all the expenses incurred from quarry/mine to railway station or port or other point of sale, as the case may be (such as expenses on transportation, loading and unloading charges, railway freight, sampling and analysis, port handling, export duty and cess). (F.No.1/2/99-MVI) (S.P.GUPTA) JOINT SECRETRY TO THE GOVERNMENT OF INDIA.

Previous and next

All provisions of Marble Development and Conservation Rules, 2002

Questions people ask

Is form C of Marble Development and Conservation Rules, 2002 still in force?

No repeal of Marble Development and Conservation Rules, 2002 is recorded.