LawGrids logoLAWGRIDS.ORG

Form XVIII, GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000: FORM XVIII

GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000 - Form XVIII

Text of form XVIII

FORM XVIII

FORM XVIII [See rule 17(6) and 17(7)] DEFLECTION TESTS OF BRIDGES Railway SECTION: Date of Tests GAUGE:1.676M LENGTH: Description of Test Load(lncluding Engine No.) Bridge Number 1 Kilome- terage 2 Material of girders 3 Clear Span between bearing plates 4 Overall Depth of girders 5 Speed of Test Load train EUDL 6 7 Deflection Design in M.M load EUDL for B.M 8 9 Ratio of Design load B.M to test toad B.M 10 Reduced Defection under design load(for Slow speed tests) =(8x10) 11 Theoretical (calculated) deflection (approx.) under designed load 12 108 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]

Previous and next

All provisions of GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000

Questions people ask

Is form XVIII of GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000 still in force?

No repeal of GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000 is recorded.