(n) Electrical crossing over railway track abstract as specified in Form XIV.
(2) Index Plan and Section sheet shall be prepared as laid down in
paragraphs 443 to 451 of the Indian Railways Code for the Engineering
Department as reproduced in Schedule.
(a) Completion drawings of bridges, with drawings showing each type
of girders used and giving the loading standard for which each is
designed, and (if called for by the Commissioner), details of the
calculations of their strength;
(b) Completion drawings of tunnels, if any;
(c) Diagrammatic plans of station yards showing the gradients, the layout
of tracks and particulars of turn out, block working and of any signals
and interlocking installed;
(d) Implantation of diagrams of Over Head Equipment masts, if applicable.
(3) List of Questions and Answers shall be prepared in terms of questions
enlisted in Form XV.
(4) Certificates of works shall comprise-
(a) Certificate in Form XVI containing the comments on the following
2009 GI/2000—7
50 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
matters, namely :-
(i) maximum and minimum dimensions;
(ii) strength of bridges;
(iii) number of engines on one span;
(iv) brake and communications;
(v) accommodation in coaches to cater, for different categories of
passengers;
(vi) system of working;
(vii) electric traction equipment (only if applicable); and
(viii) types of rolling stock proposed along with list of restrictions.
(5) List of infringements of maximum and minimum dimensions shall be
prepared in Form XVII and shall show the gauge of the railway and items
infringed and shall contain full explanation for the infringement and the
reference to the authority under which the infringement is permitted or
allowed.
(6) Working orders to be enforced at each station on the railway to be
opened shall be prepared in accordance with the rules provided in Chapter
V of the General Rules and shall specify any special conditions that are
required to be met with.
(7) Where it involves introduction of electric traction on the railway line the
working orders shall include traction working rules.
51
CHAPTER III
DUTIES OF THE GENERAL MANAGER
6. Deviation from or infringement of Standard Codes and
Manuals of Practice to be notified - (1) The General Manager shall
ensure that the railway proposed to be opened is operationally fit in
every respect before inspection.
(2) The General Manager shall, while making the reference under rule 3,
bring to the notice of the Commissioner any deviation in design, material
and construction of the works, rolling stocks or appliances of the railway,
instances in which Maximum and Minimum Dimensions have not been
observed, or the bridges, tunnels are not capable of carrying the
prescribed or standard load without exceeding the stress specified in the
Indian Railways Standard Codes and Manuals of Practice.
7. General Manager to make special arrangements - (1) The General
Manager shall make such arrangements as are necessary to facilitate the
inspection by the Commissioner, of the railway, which is to be opened.
(2) The General Manager shall be responsible to make such special
arrangements as the Commissioner may require for inspection and testing
of bridges and tunnels on the railway, which is to be opened.
8. Supply of information to Commissioner - The General Manager
shall supply all the information and give all the assistance in his power to
the Commissioner and supply or provide all instruments and apparatus
required for making measurements, testing of bridges and electrical and
other installations.
52 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]
9. Dismantling of any work on request by Commissioner - (1) The
General Manager shall, on receipt of a request made by the
Commissioner, make arrangements to dismantle any structure on the
railway to be opened, with a view to make complete examination of the
details or workmanship of the structure, as quickly and completely as
possible.
(2) The Commissioner, while requesting the dismantling of the structure,
shall be responsible to see that such dismantling does not arfect the utility
or strength of the structure, unless total dismantling is necessary for its
proper inspection.
10. General Manager to accompany Commissioner at inspection -
(1) The General Manager shall accompany the Commissioner throughout
the inspection.
(2) If, for any unavoidable reason it is not possible for the General
Manager to accompany the Commissioner, men, an officer not below the
rank of Under Secretary to the Government of India authorised by general
or special order of the Central Government issued under section 28, shall
accompany the Commissioner and shall be present during the entire
period of inspection.
(3) During the inspection of each portion or division of the railway, the
engineer or officer who is or was in immediate charge of mat portion or
division of the railway during its construction may also be present.
(4) An officer not below the rank of Assistant Engineer shall be made
responsible for making arrangements for testing bridges on the railway
line.
53
CHAPTER IV
DUTIES OF THE COMMISSIONER
11. Commissioner to make full and complete examination - (1) On
receiving a reference under rule 3 from the General Manager of any
railway for inspection of a railway to be opened for public carriage of
passengers, the Commissioner shall, with a view to determine whether it
is fit to be so opened, enquire into all matters which appears to him
relevant for the safety of public carriage of passengers and goods, on that
railway.
(2). The Commissioner shall satisfy himself mat -
(a) the Indian Railways(Open Lines) General Rules, 1976 have been
applied to the railway or portion of a railway proposed to be opened;
(b) the maximum and minimum dimensions have been observed;
(c) the works, structures, rolling stocks and appliances belonging to, or
working on, the railway are designed properly or constructed in such
manner so as to guard the system against accident and failure.
12. Provisions for handling traffic at stations -The Commissioner shall
satisfy himself that at every station on a railway proposed to be opened -
(a) adequate provisions have been made for handling of traffic of
passengers and goods; and
(b) arrangements have been made for easy access by road.
13. Accommodation works - Where the accommodation works made
under section 16 are to be inspected, the Commissioner shall ensure that
such works are sufficient and suitable for the purpose for which they are
provided or constructed.
14. Inspection of light railways - The Commissioner shall, while
54 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)l
inspecting any light railway to be opened for public carriage of
passengers, take into consideration -
(a) speed limits which are specified with reference to narrow
gauge of the line and the kind of traffic proposed to be
handled;
(b) standard of convenience of the passengers keeping in view
the condition in which the light railway shall be operated,
and shall lay down the speed limits to be observed and the kind of traffic
the light railway may be allowed to handle.
15. List of questions and answers - (1) The Commissioner shall take
into consideration the answers provided by the General Manager to the
questions listed in the list of questions and answers submitted in relation
to them under sub-rule (4) of rule 5 and satisfy himself that the points
enumerated therein have been duly observed by the concerned railway
administration.
(2) The Commissioner may, if he considers it necessary, modify the
requirements specified in answers in accordance with the circumstances
of each case.
16. Inspection of railway bridges - (1) The Commissioner shall satisfy
himself that the railway bridges and other elevated structures on the
railway proposed to be opened for public carriage of passengers are
designed and constructed as to the loads specification specified in the IRS
Bridges Rules, 1964 and that the loads specification and stress limits are
not exceeded.
(2) The Commissioner shall be responsible to see that under no
circumstances the stresses specified in the Standard Codes of Practice for
bridges are exceeded, unless the Central Government, by general or
55
special order, specify different stresses or loads specification, for the
reasons recorded therein, in a specific base.
(3) Where the Commissioner is satisfied that first class standards are not
required in the cases such as temporary bridges, railway worked at low
speed or with small axle loads, he may recommend departure from the
IRS Bridge Rules, 1964 and the Standard Codes of Practice on such
conditions as he may deem fit, provided that the Commissioner shall
forward with his report the calculations showing that the opening of such
bridges, railways or axle loads will not be dangerous to the public carriage
of passengers and the railway servants.
(4) Where any particular bridge is not up to the standards mentioned in
sub-rules (1) to (3), the Commissioner shall submit the design of the
bridge along with the standard of loading to the Central Government along
with his recommendations as to whether the bridge may be brought in use
and if so, under what conditions.
17. Procedure for inspection of bridges - (1) The Commissioner shall
examine at least one bridge of each different pattern or type and satisfy
himself about the adequacy with reference to safety of -
(a) the general design of the bridge;
(b) designs of different parts or portions of the bridge;
(c) the construction and erection of the whole structure of the
bridge;
(d) girder spans and their bedding at all four supports; and
(e) type and design of bearings in regard to pre-stressed bridges.
(2) Where the Commissioner feels that it is necessary for the purpose of
inspection and to see whether any riveting has been properly and
efficiently executed, he may order the cutting out any rivets and may also
order the dismantling of any part of the structure of the bridge for more
detailed examination.
(3) If the Commissioner considers it necessary, in addition to the
certificate of a Bridge Engineer employed for the purpose, he can call for
the Load Deflection Test under the loads for which the bridge is designed
and where this is not possible under the heaviest loads available.
56 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]
(4) (a) When making Card Deflection Test, the test cards are to be placed
at right angles to the centre line of the track, in order to record oscillation
and the recording pencil point should be as fine as possible.
(b) When central deflection is measured, allowance shall be made for the
deflection, if any, of the abutments.
(5) In order to record the static deflection, the test shall be carried out at
dead slow speed and at the maximum permissible speed of the section
and the speed shall be carefully measured by stopwatch or by some
automatic means.
(6) The actual deflection cards shall be submitted to the Commissioner
together with a statement of deflections and oscillations in Form XVIII.
(7) The deflection of the girder shall be worked out theoretically and shall
be shown in column 12 of Form XVIII to enable a comparison being
made with the observed deflection.
(8) In addition to the Card Deflection Test, the Commissioner may, at his
discretion, require Stress Recorder Test to be carried out on any plate or
open web girders of clear spans exceeding 30 metres.
(9) (a) Stress Recorder Test shall be carried out with a stress recorder of
approved type.
(b)Tests loads and speeds shall be as specified for card Deflection Tests.
(c)Tests shall be taken, on the chords or flanges at mid span and on such
web and floor members as the Commissioner shall specify,
(d) If a sufficient number of instruments are available, these tests shall be
made simultaneously.
(10) The stress recorder diagrams together with calculations showing how
the maximum stress under the design load with full impact (including
dead load stresses) is deduced from the measured stress shall be
submitted to the Commissioner who shall, before sanctioning the opening
of the bridge, satisfy himself that the stresses in the girders will not
exceed those specified in the IRS Steel Bridge Code, 1962.
(11) If the Commissioner is satisfied that the girder has been properly
designed for the work it is intended to perform, then, the open web and
plate girders are not required to be tested.
57
(12) New plate girders of standard designs need not be tested if those
girders were inspected at the time of their manufacture by the Research,
Design and Standards Organisation or any other inspecting agency and a
certificate of satisfactory erection including the seating of the bearings and
field riveting has been given.
(13) The Commissioner may decide that the second hand plate girders are
not required to be tested if he is satisfied that -
(i) the girder is strong enough for the work it is intended to
perform; and
(ii) the responsible officer of the concerned railway has certified
that the condition of the material and workmanship are such
that the use of the girder for the specified loading shall not
involve stresses in excess of those permitted in the IRS Steel
Bridge Code,1962, provided that this sub-rule shall not apply
to welded girders.
(14) The Commissioner may have tests of any number of spans made and
may have a span tested any number of times and at any speeds as he
considers desirable, up to the maximum permissible speed of the Section
(15) Card Deflection Test shall be carried out for each welded girder
including second hand girders, and results of such tests, together with the
cards, shall be supplied to the Commissioner
(16) The Commissioner shall examine as many welded girders as possible
and shall also have Card Deflection Test of any welded girder carried out
in his presence.
(17) The Commissioner shall be supplied with a certificate from the
engineer (not below the Junior Administrative Grade) responsible for
design and construction of the bridge to the effect that welds have been
designed in accordance with the IRS Code for Mild Steel Bridges
carrying rail, 1972 and executed to the satisfaction of the said engineer.
(18) If radiographic examination of the welds is specified in the drawing
or procedure sheet or is required to be done in accordance with the
provisions of the IRS Code for Mild Steel Bridges carrying rail, 1972, the
results of such examination shall be annexed to the certificate
2009 GI/2000—8
58 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
CHAPTER V
THE INSPECTION REPORT
18. Contents of Inspection Report - (1) The Inspection Report of the
Commissioner shall specify that -
(a) he has made a careful inspection of the railway and the rolling
stock that may be used thereon;
(b) the moving and fixed dimensions as laid down have not been
infringed;
(c) the structure of lines of rails, strength of bridges, general
structural character of the works and the size of, and maximum gross
load upon the axles of any rolling stock, comply with the requirements
laid down; and
(d) in his opinion, the railway can be opened for the public carnage of
passengers without any danger to the public using it.
(2) The Inspection Report shall be clear and concise and shall deal with
all matters which are required to be considered, particularly whether the
railway line is designed for standard loading and the instances of deviation
or infringement of Maximum and Minimum Dimensions.
19. Documents accompanying Inspection Report - The following
documents shall accompany the Inspection Report, namely :-
(i) Index Plan and Section of railways;
(ii) Tabulated details in Forms I to XIV;
(iii) List of Questions and Answers in Form XV ;
(iv) Certificate by the General Manager of the concerned railway in Form
XVI;
(v) List of infringements of Maximum and Minimum Dimensions in
Form XVII;
(vi) Results of the bridge test in Form XVIII;
Explanation. - When sanction is required for the initiation of electric
traction on a line already opened for passenger traffic, only such of the
documents, as are required by the Commissioner, need be forwarded to
him.
59
20. Submission of Report to Central Government - In respect of every
reference made to him under sub-rule (3) of rule 3, the Commissioner
shall submit an Inspection Report to the Central Government.
CHAPTER VI
SANCTION TO OPEN RAILWAY FOR PUBLIC
CARRIAGE OF PASSANGERS
21. Sanctioning of opening of railway - (1) The Central Government
may, after considering the Inspection Report of the Commissioner,
sanction the opening of any railway or a portion of a railway for the public
carriage of passengers.
(2) While sanctioning of the opening of any railway, the Central
Government shall give due consideration to the suggestions or conditions
subject to which the Commissioner has recommended the opening of the
railway.
(3) Where the Commissioner has not recommended the opening of any
railway, or has proposed to cancel the sanction already given, the Central
Government shall confirm, modify or cancel the sanction given to the
opening of such railway or a portion thereof and shall take steps to
remove the defects or short comings pointed out by the Commissioner in
his Inspection Report in the case of Government railway, and in the case
of non-Government railway direct the General Manage) concerned to
remove the defects or short comings reported by the Commissioner.
(4) Where the defects or shortcomings are such that they cannot be
removed unless the railway or a portion thereof is dismantled, then the
Central Government shall order the closing of the railway forthwith for
the public carriage of the passengers.
(5) A railway line, which is closed for the public carriage of passengers
under section 25, shall not be reopened unless it is duly inspected by the
Commissioner in accordance with the provisions of Chapter IV of these
rules and the Commissioner recommends the reopening of such railway
line.
(6) The actual date of opening of a new railway line or a section or portion
60 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]
of such line for passenger traffic shall be notified by the concerned
General Manager, after consulting the Central Government, by
notification in the Official Gazette, and in the local news papers of the
areas through which the railway line passes.
Explanation.- In this Chapter new lines of railway shall include -
(a) extensions of existing railways, new double, treble or other
running lines laid alongside existing lines and conversion from
one gauge to another;
(b) the initiation of electric traction on the existing line.
22. Temporary opening of railways by Commissioner - (1) The
Commissioner may sanction the temporary opening of new railway lines
for public carriage of passengers, subject to such conditions as he may
impose during the period of inspection in the interest of the passengers.
(2) On receipt of the Inspection Report of the Commissioner, the Central
Government may confirm, modify or cancel the sanction given under sub-
rule (1) subject to such conditions, alterations or relaxation as may be
considered necessary.
23.Sanction to use locomotive engines and rolling stock on new lines-
(1) The Commissioner may sanction the use of locomotive engines,
rolling stock, or any other motive power under section 27 which is already
running on any Zonal railway, or any division or section of any non-
Government railway, or on any new lines in accordance with the
provisions of the Indian Railways(Open Lines) General Rules, 1976 or
orders on the subject issued by the Central Government from time to
time.
(2) Before according sanction under sub-section (1), the Commissioner
shall ascertain that the application of the Indian Railways(Open Lines)
General Rules, 1976 by the concerned railway administration which
operates the line has been previously sanctioned and notified in the
Official Gazette.
61
CHAPTER VII
OPENING OF BRIDGES, MINOR WORKS,
DIVERSIONS AND USE OF NEW TYPES OF
ROLLING STOCK ON EXISTING RAILWAYS
24. Notice of construction of deviation lines, etc. - (1) Where it is
proposed, on the railway which had been opened after inspection, to
construct any deviation lines, stations, junctions or crossings on the level,
or to make any addition, alteration or reconstruction materially affecting
the character of any work and such work forms part of, or is directly
connected with the working of that railway, the railway administration
concerned shall give notice to that effect to the Commissioner.
(2) Before any such work, the execution of which may affect the running
of trains carrying passengers, is put in hand, the concerned railway
administration shall furnish to the Commissioner for his approval
drawings or particulars of the work and of any temporary arrangements
necessary for carrying it out
(3) Every temporary deviation line irrespective of its length and any
permanent diversion less than 2 kilometres in length, where no new
station is involved, shall be treated as new minor works.
(4) In case of an accident, temporary diversions may be opened under
section 24 after a responsible officer of the concerned railway certifies
that the use of such diversion will not be attended with danger to
passengers or to the railway servants.
(5) Where the use of the temporary diversion is likely to be extended to
for more than three days, the Commissioner shall take action to inspect
the diversion at the earliest opportunity
25. P o w e r o f C o m m i s s i o n e r to open m i n o r w o r k s - ( 1 ) The
62 THE GAZETTE OF INDIA EXTRAORDINARY [PART II--SEC (i)]
Commissioner may, without previous notice, sanction the opening of any
minor work for passenger traffic, if he is satisfied, either with or without
inspection, that the provisions of clauses (b),(c)and (d) of sub section (1)
of section 22 have been duly fulfilled
(2) For the works opened without inspection, the Commissioner shall
take steps for carrying out a subsequent inspection
(3) The authority for opening any work shall be communicated in writing
by the Commissioner to the concerned railway administration and a
record of all works so authorised during each year, with particulars of the
prior or subsequent inspection, if made, shall be maintained by the
Commissioner.
26 Infringements of Maximum and Minimum Dimensions - No
infringement of the Maximum and Minimum Dimensions shall be
permitted without the prior sanction of the Commissioner or of the
Central Government
27 Opening of new or strengthened bridges - (1) No railway bridge
shall be erected or re-opened to traffic, after strengthening, without the
sanction of the Commissioner even though it is able to carry the loads
without exceeding the stresses prescribed in the relevant Codes of
Practice or in the absence of any such reference, the design criteria
approved by the Central Government
(2) No load shall be imposed on any railway bridge which would cause
in any member thereof stresses greater than those specified in sub-
rule (1), without the sanction of the Commissioner
(3) Closure of an existing bridge shall require the sanction of the
Commissioner
63
28. Use of new types of locomotives or rolling stock - (1) Any railway
administration which desires to use new types of locomotives or rolling
stock different from those already running on any section or division of
its railways, shall apply for sanction for the same to the Central
Government through the Commissioner.
(2) The application under sub-rule (1) shall be accompanied by -
(i) such diagrams as may be necessary to give full particulars
of the axle loads, wheel spacing, length over buffers and other
principal dimensions of the rolling stock for which sanction is
required;
(ii) a certificate signed by the Chief Engineer, the Chief
Mechanical Engineer and the Chief Electrical Engineer (for
Electric stock) of the concerned railway in the Form given
below: -
"CERTIFICATE
Certified that it is safe to run (particulars of locomotive and
rolling stock proposed to run) not exceeding units (in the case
of locomotive) coupled together on the section (station) to
(station) from (km) to (km) of the Railway at a
maximum speed of ) km/h) against a maximum speed of
(km/h) certified by Research, Designs and Standards
Organisation, subject to the following speed restrictions and conditions:-
(a)
Sl.
No.
Speed restrictions
From Km. Nature of speed
to Km. restriction
Brief Reason for
restriction
6 4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
(b) Special conditions
1 ...
2 ...
3 ...
4 ...
To be signed by -
l.The Chief Mechanical Engineer... 2.The Chief Engineer....
3.The Chief Electrical Engineer ... 4. The Chief Signalling and
Telecommunications Engineer...
5.The Chief Operating Manager ...
Note 1. - The Chief Operating Manager and The Chief Signalling
and Telecommunications Engineer should be associated when the
increase in the speed of a loco/rolling stock is contemplated over
the maximum sanctioned speed for a specific category of train
(Passenger or Goods) over a particular section of the railway.
Note 2. - Over the railways where both the shop maintenance and
open line maintenance of electric locos and Electric Multiple Unit
rolling stock are under the control of the Electric Department only,
the Chief Electrical Engineer, otherwise the Chief Mechanical
Engineer should also sign.
Note 3. - When motive power with chopper control is to be used,
the Chief Electrical Engineer and the Chief Signalling and
Telecommunication Engineer should sign the certificate."
(iii) Such calculations and stress sheets showing
65
(a) the conclusions arrived at;
(b) the external forces on which the stress calculations
are based;
(c) the stresses which will be produced in the various
bridges over which the proposed rolling stock will
run; and
(d) the effects which the said rolling stock will have on
various structures or tracks as compared with
those caused by the rolling stock already in use, or
allowed by the existing Government orders.
(iv) The calculations, stress sheets must show as to what
allowance has been made for any secondary or
deformation stresses in addition to the primary stresses
caused by the external forces and what relief of stress, if
any, has been included.
(v) The cost of modification to signalling and
telecommunication installations necessitated by the use,
if any of chopper or thyristor control systems shall also
be indicated.
(vi) , An approximate estimate of the cost of such
improvements in existing structures or track as the use of
the proposed rolling stock is likely to render necessary on
The railway concerned, whether immediately or in the
near future.
(3) The proposal must be scrutinised by the Commissioner and his
recommendations thereon shall be submitted to the Central Government
for its orders.
(4) No new type of engine or rolling stock which would cause stresses
2009 GI/2000—9
66 'THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]
exceeding those specified in the IRS Bridge Rules, 1964, or the Standard
Codes of Practice , or in the absence of any such reference, the design
criteria approved by the Central Government for existing structures or
excessive stresses in track shall be ordered until the sanction of the
Central Government has been received through the Commissioner for
doing so.
(5) (a) For permitting new designs of locomotives, the Commissioner
may require oscillation trials to be conducted and call for the records for
his scrutiny.
(b) The certificate referred to in clause (ii) of sub-rule (1) shall indicate
clearly mat the speed certified does not exceed the limits laid down by
the Research, Designs and Standard Organisation. In addition, the
maximum number of motive power units proposed to be coupled
together for multiple operation shall be specifically mentioned.
Note.- Provisions contained in this clause shall also apply for increasing
the speed of existing rolling stock by making improvements.
(c) For increase of speed beyond 100 km/hour on broad, gauge and 75
km/hour on meter gauge of nominated trains on specific routes, the
Commissioner may require route proving run by portable accelerometer
or confirmatory oscillograph car run as per the instructions for the time
being in force on the entire route at the maximum proposed speed. The
Chief Signal and Telecommunication Engineer and the Chief Operations
Manager shall sign the joint safety certificate in this case also.
(6) Any modification in the design of the coach which alters the system
of operation and control over the rolling stock, like change in the braking
system or change in the principle of traction shall be considered as a
material modification and shall constitute a change in the type and design
of the rolling stock.
67
(7) Any modification in the coach or rolling stock affecting the salient
dimensions or suspension system or running gears and any other
modifications including body, seating arrangements and the like
irrespective of whether such modifications affect the riding quality of the
rolling stock or not, shall also constitute a change in type or design of the
rolling stock.
(8) Introduction of any train consisting of new coaching stocks of
different design or type which are not already running on the section of a
railway system shall also require the sanction of the Commissioner.
29. Testing of bridges - Before sanctioning the opening of new or
strengthened bridges or the running of heavier loads over existing
bridges, the Commissioner may require Card Deflection or Stress
Recorder Test to be carried out as specified in Chapter IV. Tests on Pre
Stress Concrete girder or composite girder bridge may also be carried
out.
30. Use of new types of Block Instruments - (1) A railway
administration, which desires to use a new type of block instrument, or
main Signalling instrument, which is not an approved type, shall apply
for sanction to the Commissioner.
(2) The application under sub-rule (1) must be accompanied by -
(i) a list of the requirements which the instrument fulfils, together
with the results of the field trial conducted by the railway concerned;
(ii) a certificate from the Chief Signalling and Telecommunications
Engineer in the form given below:-
68 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
" CERTIFICATE
Certified that it is safe to use (particulars of the equipment) at the
station / on the section of the railway, with the following precautions:-
1
2.
3.
4. etc. . .
[Sd/-- ]
The Chief Signalling and Telecommunications Engineer.
Note. - The application should be scrutinised by the Commissioner, who
if satisfied, will communicate his sanction to the concerned railway, In
case he is not fully satisfied, he will give his comments and
recommendations for suitable further action.
(iii) A statement whether the equipment complies with the
specifications approved by the Central Government,
(iv) A statement giving comments on the performance of the
equipment as a result of bench trials conducted by Research,
Designs and Standards Organisation.
(v) The circuit diagrams and other relevant diagrams and
explanations, as may be necessary, to give full particulars of the
principles of operation and safety features incorporated.
(vi) A copy of the instructions approved by the Chief Operating
Manager, to be issued for the operation of the equipment by the
operating staff, including those instructions for working under
abnormal or failure conditions;
69
CHAPTER VII
REQUIREMENTS AND RECOMMENDATIONS FOR
SIGNALLING AND INTERLOCKING INSTALLATIONS
31. Signals - (1) The number of signals provided and the height of such
signals shall be limited to the extent to the actual necessity for safety and
traffic purposes.
(2) The distance between the Distant/Warner and the first stop signal
ahead shall be such that a train approaching the former at the highest
authorised speed with due allowance for weight, braking power, gradient
and sighting distance can be stopped before passing the latter.
(3) The subsidiary signals shall be readily distinguishable from the
running signals.
(4)Where a signal or its back light is not visible to the railway servant
operating the signals, the aspect of the signal and the condition of the
light shall be repeated at the place of operation.
(5)It is desirable mat the signalling at all block stations and interlocked
level crossings in the same section shall conform to the same standard
and type.
(6) Signals shall be so designed as to give the most restrictive aspect in
the event of failure of any part of the mechanism, which operates mem.
(7) The location and type of signals shall be in accordance with the
provisions contained in Chapter VII of the Signal Engineering Manual,
Part I and Chapter III of the Indian Railways(Open Lines) General
Rules, 1976.
32. Points - (1) Points shall be so located mat movements over mem
shall be within the view of the cabin or the location from which they are
worked unless an approved alternative arrangement for direct vision is
70 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]
provided
(2) The points, locks and bars shall not be worked by wire but by
reading or by power operation.
(3) Spring points shall not be used.
(4) Movable crossings and movable diamond crossings on passenger
lines shall be provided with complete facing point equipment of
approved type.
(5) The requirements of points as stipulated in Chapter VII of the Signal
Engineering Manual, Part I, shall be followed.
33. Interlocking - (1) Signal and interlocking apparatus and
installations shall be in accordance with Chapter VII of the Signal
Engineering Manual, Part I.
(2) Apparatus provided for operation and control of signals, points, etc.,
shall be interlocked and arranged to comply with the essentials of
interlocking and other requirements as laid down in Chapter VII of the
Signal Engineering Manual, Part I.
(3) The operation of the signalling gears may be from a lever frame or a
panel with individual operation of points, signals and other functions or a
panel providing operation of route setting type or any other approved
means in accordance with the provisions of Chapter VII of the Signal
Engineering Manual, Part I.
71
(4) When a signal is controlled by more than one agency, it shall be
possible for every such controlling agency to replace the signal to "ON"
position.
(5) The Station Master shall be provided with interlocked mechanical or
electrical control of the Home and Last Stop Signals except where the
conditions stipulated in the Signal Engineering Manual, Paragraph 7.88.2
are fulfilled.
(6) Standards of signalling and interlocking shall be arrange complying
with the requirements of the Signal Engineering Manual.
34. Siding and trap points - (1) Sidings shall be arranged in such a
manner that shunting operations upon them shall involve the least
possible use of, or obstruction to, running lines.
(2) Trap points shall be provided upon goods lines and sidings at their
junctions with passenger lines, with the points normally set against the
passenger lines and interlocked with the signals.
(3) Bay and loop platforms line and refuge loops shall be isolated from
main through lines.
72 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
35. Junctions - Bars or other approved devices shall be provided in
order to define the folding points of junctions, loops, siding connections,
crossings and the like.
36. Provision for isolation at stations - (1) The speed of trains running
through stations shall be governed by the General Rules for all open tines
administered by the railway administrations, both Government and the
non-Government railways and shall be subject also to the restrictions
relating to standards of interlocking prescribed in the Signal Engineering
Manual.
(2) At no station at which isolation has not been provided through
running trains shall be permitted unless the conditions laid down in the
second paragraph of rule 4.11 of the General Rules are complied with.
(3) At any station where mere is a speed restriction for through running
trains different from neighbouring stations, a speed restriction board
should be erected at the first approach signal or where no signals are
provided, at full braking distance outside the first facing point.
(4) In order to maintain safety for through running, points for trap
sidings must not be inserted in the main tine or through tine, except
under approved Special Instructions in accordance with the Signal
Engineering Manual, Part I.
(5) All passenger running tines shall be isolated from all goods lines or
sidings connected thereto.
(6) All goods running tines may be isolated from all sidings connected
thereto.
(7) It is not necessary to isolate one goods receiving line from another
(8) Isolation may be accomplished by -
(a) connection to another tine or long siding;
(b) the provision of short dead end siding; or
73
(c) the provision of trap.
Note. -
(i) Whichever may be the method for isolation, a starter signal
shall be provided, except when omitted under approved special
instructions.
(ii) When a trap is provided, the trap switch should be located
with the heel of the switch in rear of the fouling mark and
preferably on the straight. The switch should be in the rail
away from the line to be protected.
(9) The various methods of isolation are illustrated in the diagrams
given in Appendix A attached to these rules and the following
instructions shall apply to their use in the case of running lines, namely :-
Method A: This method shall apply to cases in which the line on which
the train will run when me points are set for isolation of the through line,
is kept clear for the adequate distance prescribed in Rule 3.40 of the
Indian RaiIways(Open Lines) General Rules, 1976.
Method B: When a short dead end siding is provided, it shall not
ordinarily be long enough to permit of vehicles being stabled thereon.
To obtain the adequate distance prescribed under rule 3.40 of the
General Rules the points of the dead end siding shall be set for the cross
over and against the siding, before a train is admitted on a line trapped by
mis method. Where it is necessary for the short dead end siding to be
extended for the purpose of stabling vehicles, the above rule shall apply,
unless a trap is provided on the dead end siding at a distance of not less
than 180 metres (120 metres in case of stations provided with multi
aspect signalling) from the starter signal where provided or from points
leading to the main or through line. A train must be admitted on the
running line unless the trap is set and locked against vehicles occupying
2009 GI/2000—10
74 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
the further part of the dead end siding.
Method C: When a trap is used, a train must not be admitted on to the
trapped line unless the trap has been closed, so that the train will not be
derailed if the driver over shoots the trap.
(10) When Method A cannot be used, and for any reason it is not
convenient to use Method B or Method C and to provide adequate
distance by setting the points of the short dead end siding or trap for the
cross over and against the siding or trap, a sand hump of approved
design should be used as a substitute for adequate distance as provided
in rule 3.40(4) of the Indian Railways(Open Lines) General Rules, 1976.
In that case the length of the siding should be at least one rail length and
formation should be made up for a short distance beyond the hump.
37. General - (I) The requirements and regulation of Block Instruments
shall be in accordance with section 'N' and section 'R' of Chapter VII of
the Signal Engineering Manual, Part I.
(2) The requirements of Centralised Traffic Control shall be in
accordance with section 'Q' of Chapter VII of the Signal Engineering
Manual, Part I.
75
CHAPTER VIII
RULES FOR THE DESIGN AND INSPECTION OF
EQUIPMENT FOR ELECTRIC TRACTION.
38. Designs of electric installations - (1) The design of all electrical
installations, namely, transmission and distribution lines, substation,
switching stations, Over Head Equipment, etc. shall be according to
approved standards laid down by the Central Government and the
Indian Electricity Rules, 1956 or any other relevant statutory rules for
the time being in force. Wherever, any departure from accepted norms
becomes necessary, approval of the Central Government shall be
obtained.
(2) (a)Adequate protective arrangements shall be made to ensure that
the public cannot come in contact with the electric equipment on line
within the railway premises.
(b) Suitable protective screens shall be provided where live conductors
pass under or over bridges.
(3) The structures supporting overhead equipment shall be designed in
accordance with the relevant Indian Standards. The wind pressure to be
adopted in such cases shall be generally in accordance with IS 875-64
except when a higher value is prescribed by the State Government,
which should be ascertained by a reference to the State Government,
unless a notification on the subject in connection with the electric
installation other than the electric traction on railways is already issued
by the State Government.
(4) When the distribution system involves overhead wires carried on
steel structures including bridges and roofs and a return circuit via
running rails or earth, all such structures, masts and associated tracks
shall be effectively earthed and bonded or other precautions taken to
76 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II---SEC. 3(i)]
ensure that contact with the steel work of the structure will not be
dangerous to the public and the railway staff. In AC traction earthing
and bonding shall be as per the approved Code for Bonding and
Earthing.
(5) Earthing arrangements at power supply installations shall strictly
conform to the Indian Electricity Rules, 1956 and accepted Codes of
Practice for Bonding and Earthing for AC traction.
(6) No earth wire shall cross any track. Where structures to be
connected to an earth wire are located on opposite sides of a track,
separate wire runs shall be used for connecting the structures. In
complicated areas, structures may be connected to individual earthing
stations.
(7) When over head lines transmitting electric power (other man lines
forming part of the railway traction equipment) have to be carried
across railway track, the details of the equipment provided in
connection with such lines must be designed with the object of
minimising danger in the event of breakage and in accordance with the
regulations for the Electrical Crossing, 1987. These details must be
approved of the Electrical Inspector to the Government of India(EIG)
Note. - The Chief Electrical Engineer of a Zonal Railway functions as
the Electrical Inspector to the Government of India
(8) Lighting arresters of standard or approved types shall be provided
wherever they are necessary.
(9) All component parts of the equipment which carry live conductors
shall be provided with devices approved by the Electrical Inspector to
me Government of India to prevent unauthorised persons climbing
them. Anti-climbing device shall also be provided, wherever necessary,
on structures carrying high-tension equipment within railway premises.
77
(10) On both sides of roads at level crossings, gauges of suitable
design shall be provided to ensure that no part of any road vehicle or its
load shall come in contact with overhead equipment.
(11) Warning notices shall be erected in conspicuous positions at level
crossings and the like indicating to the existence of live electrical
equipment.
39. Display of caution boards and notices - The following caution
board and notices written in English, Hindi and the regional language
shall be displayed at the various locations indicated below:-
(a) "Treatment for electric shock" boards, giving instructions for
treatment of electric shock at all railway stations signalling cabins,
Offices of the Station Managers, the Assistant Station Managers,
Senior Sectional Engineers(Permanent Way), the Senior Sectional
Engineer (Works), the Senior Sectional Engineer (Signal), Over
Head Equipment Maintenance depots, Over Head Equipment
Inspection Car Sheds, substations, switching station cubicles, loco
sheds and the like.
(b) General 'Caution notices' regarding danger of high voltage traction
wires for public at various entrances to railway stations and for staff
at prominent places at each station, particularly on stanchions or
pillars supporting platform roof.
(c) "25 KV cautions Boards" shall be affixed on to the screen erected
on foot over and road over bridges.
(d) "Danger" boards on level crossing height gauges.
(e) "Engine stop" boards, at termination of Over Head Equipment in
the sections to be energised.
(f) "Caution-Unwired turn out" boards ahead of all unwired turn outs
or crossovers taking off from wired tracks.
(g) "Warning" boards for neutral sections.
(h) Boards for "Switching on" and "Switching off" of power at neutral
sections.
78 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]
(i) "Danger" boards to be installed on Over Head Equipment near
watering stations, if any.
(j) "25/2 x 25 KV caution" boards at substations and switching
stations.
(k) "Caution" notices on all diesel, Electric and steam locos, which
work on the energised section, including those owned by private
parties.
(1) "Caution" boards at such signal posts where protective screening
cannot be provided for signal and telecommunication staff.
40. Protection of private property against inductive effects of AC
traction - Under 25/2 x 25KV AC traction, there is a heavy induction
on all metallic structures and conductors in the vicinity of track.
Inductive effects show themselves on any overhead conductor, such as
metallic clothes lines, power lines, and the like belonging to private
parties running parallel and close to the electrified tracks. Wide
publicity shall be given to the effects of the induction, so that special
precautions may be taken by private parties concerned against the
possibility of electric shocks from conductors running in their premises.
41. Approval of energizsation of High Tension installations -
(1) Application shall be submitted at least a fortnight before
energization to the Chief Electrical Engineer and the Electrical Inspector
of the concerned railways for the following :-
(a) Formal approval, if not already received to the design and layout
of all high voltage equipment including traction sub-stations,
transmission lines, 25kv/2 x 25 kv feeders, switching stations,
booster stations, etc;
(b) Approval for energization of High Tension installations
mentioned above including Over Head Equipment;
(c) The application should be accompanied by documents as
prescribed in Volume II(Part-l) of the Manual of AC Traction
9
Maintenance and Operation, 1994 ( sub-paragraph 2 of paragraph
21007).
(2) On receipt of an application under sub-rule(l), the Electrical
Inspector shall scrutinise and inspect the design and installations in
respect of the following, namely :-
(a) The layout and design for substations, Over Head Equipment and
other installations for compliance with the Indian Electricity Act,
1910 (9 of 1910) and the rules made thereunder;
(b) Inspection of the completed installations, either personally or by
deputising his officers for compliance with the safety
requirements.
(3) After conducting the inspection under sub-rule (2), the Inspector
shall convey his approval for the engerization of 25 KV/2x25 feeder
lines from traction sub-station to feeding posts, switching stations,
booster transformer stations and Auxiliary transformer stations, subject
to such directions as he may consider necessary.
42. Submission of application to commissioner - An application
shall be submitted to the Commissioner with all relevant documents and
certificates and notifications mentioned in paragraph 21008 and sub-
paragraph 2 of paragraph 21009 of the Manual of AC Traction
Maintenance and Operation, 1994, Volume II (Part I) alongwith the
approval of the Electrical Inspector to the Government of India for
energization.
43.Procedure for a energization of traction installations-( l)(i) After
obtaining the sanction of the Electrical Inspector to the Government of
India for energization under rule 41, the sub-station should be
commissioned sufficiently in advance of the energization of Over Head
Equipment.
80 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
(ii) Before energization of the sub-station, full communication facilities
should be available and power supply authorities should be ready to
give power supply.
(iii) On the appointed day necessary clearance certificate should be
obtained from the Senior Divisional Electrical Engineer (Construction)
and others who had been hitherto working in the sub- station premises
to the effect that their staff had been withdrawn and the sub station
could be energised.
(iv) After final measuring of the whole installation and check on the
satisfactory operation of all equipments including protective relays, the
traction sub stations and other installations may be energised.
(2) In addition to giving wide publicity through newspapers and other
media, the Station Master shall -
(i) warn all passengers about the danger of 25/2 KV AC Over
Head Equipment and not allow them to ride on tops of coaches;
(ii) advise all diesel and steam engine drivers not to climb on
engines when they are under the Over Head Equipment;
(iii) warn all members of the staff engaged in watering not to climb
on the carriages without power being made off and obtaining
order of the concerned controlling authority.
(3) Energization of Over Head Equipment shall be progressively
undertaken starting with 25/2x25KV feeders from the sub-stations to
the feeding posts, bus bars of the feeding posts followed by one sub
sector after another.
(4) Before running electric rolling stock on the newly electrified section
a confirmatory field test for the proper operation of the protective relays
shall be conducted.
(5) (i) The inspection of the entire section shall be carried out by means
81
of an Over Head Equipment Inspection Car by the Commissioner.
(ii) A responsible officer preferably the Chief Project Manager or the
Chief Electrical Engineer {Construction) and a Senior Administrative
Grade officer of Electrical Department nominated by the General
Manager (open lines) should accompany the Commissioner throughout
the inspection.
(iii) The engineers who had been in charge of the section during
construction, the Divisional Railway Manager and concerned Divisional
Officers should also be present.
(iv) During inspection, particular attention shall be paid to the safety
and operational aspects of the train movements and to see that staff are
in possession of statutory rule books, instructions books, registers,
forms, etc. and the Transportation, Electrical, Permanent Way and
Signalling and Telecommunications staff are fully acquainted with the
duties to be carried out after A.C traction is introduced.
(6) Subject to the inspection being satisfactory an "all concerned
message" may be issued by the Commissioner communicating his
sanction for the introduction of commercial services under electric
traction.
(7) The signalling and telecommunication requirements in 25 KV 50 Hz
AC electrified sections shall be in accordance with the provisions of
section 'R' of the Signal Engineering Manual, Part I and
Telecommunication Manual for 25 KV 50 Hz AC Traction.
Note. - A catechism dealing with the requirements of signalling and
Telecommunication installation for 25 KV 50 Hz AC electrified
sections are enlisted as Appendices B and C to these rules.
2009 GI/2000—11
82 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II—SEC. 3(i)]
SCHEDULE
( See rule 5(2))
Paragraphs 443 to 451 of the Indian Railways Code for the Engineering Department
443. Plans, Sections and Design for Works - A set of plans and sections for a project should
consist of :-
(j) General Map of the country traversed by the project scale about 25 km. to 1 cm.
(ii) Index Map, scale about 2.5 km. to 1 cm.
(iii) Index Plan and Sections.
(iv) Detailed Plans and Sections.
(v) Plans and Cross Section.
(vi) Plans of Station Yards.
(vii) Detailed Drawings of Structures.
(viii) Plans of Junction Arrangements.
444. As exceptions to this rule, Index Plans and Sections and plans of stations may be longer than
1200 mm if necessary, to enable all the information to be shown on one sheet. In such cases,
however, the width of 840 mm should still be kept to, and the length in excess which however
should not exceed 1020 mm should be folded so as not to project beyond the edges of the other
sheets.
A Catalogue of maps published by the Survey of India is obtainable from the Director,
Map Publication Survey of India, Hathibarkala Estate, Post Box No.28, Dehradun-248000.
2. The latest information on availability of maps and aerial photographs of the region would
be available from the concerned Regional Director of Survey of India.
445. Throughout each set of plans and sections the kilometreage should be reckoned from the
same fixed point. This fixed point should, if practicable, be at that end which is in the direction
of the nearest sea port with which the line is in through communication by rail, and should be
clearly defined on the Index Plan and section and on at least the first and last sheets of the
Detailed Plans and sections. If the line takes off from an existing railway station the zero point
should be fixed at the centre of the existing station yard, and when it ends at an existing station
the end of the survey should be taken as the centre of that station. Each sheet should be plotted
in the direction of the through kilometrage so that the kilometrage may be read from left to
right.
83
446. The datum used for all plans and sections should be Mean Sea Level, and all heights
should be referred to this datum in metres and decimals. If any other datum is adopted for
temporary use during the progress of the survey the figures referring to such temporary datum
should be reduced to Mean Sea Level before being entered on the plans and sections.
447. On each sheet should be noted a reference of letter, the name of the railway or section
of the railway, the gauge and the scale. The scale may be described in words, and need not be
drawn. The magnetic north should be indicated on each map and plan by a line not less than
150 mm in length.
448. The Index Plan and Section and the first and last sheets of the set of Detailed Plans and
Sections should be signed and dated by the Engineer In-charge of the survey. Every sheet
should be signed and dated by the officer responsible for its preparation.
449. Index Plan and Section - The Index Plan and Section should be drawn to a scale of
0.5 km. to a cm. horizontal and 10 metres to a cm vertical, the plan being drawn above the
section on the same sheet.
450. The Index Plan - On the Index Plan should be shown all towns, roads, canals, rivers,
hills boundaries of states and districts within a distance of 10 kilometres on each side of the
railway. The centre line of the proposed railway should be indicated by a full red line 0.8 mm.
in thickness. The degree and radius of all curves should be figured. The position of each
station should be shown by a red block, the name of the station being given. The kilometrage
from the "fixed point" should be marked and figured at every kilometre and the extent of each
sheet of the detailed plan shown. Where practicable, the Index Plan should be traced from the
sheets of the Survey of India Map published to a scale of 0.5 km. to a cm. The details in the
immediate neighbourhood of the railway being filled in or corrected, if necessary, from the
information given by the railway survey. For a districts where a map to the scale of 0.5 km. to
a cm. Is not available, the information required should be plotted to that scale from such other
maps or data as can be obtained.
451 The Index Section — The Index Section should show the formation level by a red line;
the gradients should be figured, and the height of formation above Mean Sea Level entered at
each change of gradient. The position of each important bridge with the name of river and
number and size of bridge spans should be indicated, also level crossings with their
classification "as special", "A", "B", "C" or "D" class and position of each station with its name
and distance from the "fixed point". The kilometrage from the "fixed point" should be marked
and figured at every kilometrage.
84 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
Previous and next
All provisions of GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000
Questions people ask
Is form XIII and of GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000 still in force?
No repeal of GSR 625 (E) The Railways (Opening for Public Carriage of Passengers) Rules, 2000 is recorded.