LawGrids logoLAWGRIDS.ORG

Rule 30, Atomic Energy (Factories) Rules, 1996: CLEANING OF LATRINES, URINALS, WORKPLACES & SPITTOONS

Atomic Energy (Factories) Rules, 1996 - Rule 30

Text of rule 30

CLEANING OF LATRINES, URINALS, WORKPLACES & SPITTOONS

30. CLEANING OF LATRINES, URINALS, WORKPLACES & SPITTOONS.- Latrines, urinals, washplaces & spittoons shall be maintained in clean & sanitary conditions by employing adequate number of sanitary staff. 31. Qualifications of competent person with reference to various Sections of the Act are given in the schedule below. SCHEDULE The Competent Person is a person who is having a degree in the discipline mentioned or equivalent followed by experience as specified, in responsible position in the field and designated by the Competent Authority. Sl. No. Rules made under section of the Act requiring competency Type of work Discipline Experience 1 2 3 4 5 1. Section(6) Civil construction structural work. Civil or & structural engineering Minimum 10 yrs in design, construction testing or repairs of structures, knowledge of various codes pertaining to the non destructive testing methods. 2. Section21(2) Operation of dangerous machines Electrical or mechanical engineering or equivalent Minimum 7 yrs in design, operation maintenance, testing of relevant machinery, guards, safety devices etc. 3. Section 28 Lifts & Hoists - do - Min. 7 yrs. in design, erection maintenance, inspection and test procedures of Hoists & lifts. Atomic Energy Factory Rules, 1996 18 Rule 31(Sch.) 1 2 3 4 5 4. Section 29 Lifting Machinery Lifting tackles Electrical, Mechanical or Metallurgical Min.7 yrs. in design, erection maintenance, inspection. testing of lifting machinery or lifting tackle 5. Section 31 Pressure plant Chemical, Electrical or mechanical or metallurgical Engineering or equivalent Min. 10 yrs experience in design, erection, maintenance, testing examination, inspection of pressure plants and knowledge of non destructive testing & codes of safety requirement of pressure vessels. 6. Section 36 Dangerous fumes Chemical engineering or masters degree in chemistry Min.7 yrs. experience in collection and analysis of environmental samples and calibration of monitoring equipment. 7. Section 41-C (b) Supervision of handling of hazardous substances Chemical engineering or masters degree in chemistry Min. 7 yrs. experience on the shop floor in handling & disposal of hazardous chemicals. 8. Section 87 Ventilation system Electrical or mechanical engg. Min.7 yrs. in design, fabrication, installation, testing of ventilation systems and systems used for collection of dusts, fumes etc. Atomic Energy Factory Rules, 1996 19 Rule 32(Sch.) CHAPTER IV SAFETY 32. Without prejudice to the provisions of sub-section (1) of section 21 of the Act in regard to fencing , the further precautions specified in Schedules annexed here to shall apply to machines mentioned in each Schedule. SCHEDULE I WOODWORKING MACHINERY 1. Definitions.-For the purposes of this schedule - (a) "woodworking machine" means a circular saw, band saw, planing machine, chain mortising machine or vertical spindle moulding machine operating on wood or cork; (b) "circular saw" means a circular saw working in a bench (including a rack bench), but does not include a pendulum or similar saw which is moved towards the wood for the purpose of cutting operation; (c) "band saw" means a band saw, the cutting portion of which runs in a vertical direction but does not include a log saw or band re-sawing machine; and (d) "planing machine" means a machine for overhead planing or for thicknessing or for both operations. 2. Stopping and starting device.- An efficient stopping and starting device shall be provided on every woodworking machine. The control of this device shall be in such a position as to be readily and conveniently operated by the person in charge of the machine. 3. Space around machines.- The space surrounding every woodworking machine in motion shall be kept free from obstruction. 4. Floors.-The floor surrounding every woodworking machine shall be maintained in good and smooth condition, and shall not be allowed to become slippery, and as far as practicable shall be kept free from chips or other loosely scattered material. 5. Training and supervision.- (a) No person shall be employed at a woodworking machine unless he has been sufficiently trained to work that class of machine, or unless he works under the adequate supervision of a person who has a thorough knowledge of the working of the machine. Atomic Energy Factory Rules, 1996 20 Rule 32 (Sch) (b) A person who is being trained to work a woodworking machine shall be fully and carefully instructed as to the dangers of the machine and the precautions to be observed to secure safe working of the machine. 6. Circular saws.-Every circular saw shall be fenced as follows:- (a) behind and in direct line with the saw there shall be a riving knife, which shall have a smooth surface, shall be strong, rigid and easily adjustable, and shall also conform to the following conditions:- (i) the edge of the knife nearer the saw shall form an arc of a circle having a radius not exceeding the radius of the largest saw used on the bench; (ii) the knife shall be maintained as close as practicable to the saw, having regard to the nature of the work being done at the time, and at the level of the bench table. The distance between the front edge of the knife and the teeth of the saw shall not exceed 12 millimeters; and (iii) for a saw of a diameter of less than 60 cm., the knife shall extend upwards from the bench table to within 25 mm. of the top of the saw, and for a saw of a diameter 60 cm. or over shall extend upwards from the bench table to a height of at least 23 cm. (b) the top of the saw shall be covered by a strong and easily adjustable guard, with a flange at the side of the saw farthest from the fence. The guard shall be kept so adjusted that the said flange shall extend below the roots of the teeth of the saw. The guard shall extend from the top of the riving knife to a point as low as practicable at the cutting edge of the saw; and (c) the part of the saw below the bench table shall be protected by two plates of metal or other suitable material, one on each side of the saw; such plates shall not be more than 15 cm. apart, and shall extend from the axis of the saw outwards to a distance of not less than 5 cm. beyond the teeth of the saw. Metal plates, if not beaded, shall be of a thickness of at least 2.5 mm., or if beaded, be of a thickness of at least 1.25 mm. 7. Push Sticks.-A push stick or other suitable appliance shall be provided for use at every circular saw and at every vertical spindle moulding machine to enable the work to be done without unnecessary risk. 8. Band saws.-Every band saw shall be guarded as follows:- (a) both sides of the bottom pulley shall be completely encased by sheet or expanded metal or other suitable material; Atomic Energy Factory Rules, 1996 21 Rule 32 (Sch.I-II) (b) the front of the top pulley shall be covered with sheet or expanded metal or other suitable material; and (c) all portions of the blade shall be enclosed or otherwise securely guarded, except the portion of the blade between the bench table and the top guide. 9. Planing machines.- (a) A planing machine (other than a planing machine which is mechanically fed) shall not be used for overhand planing unless it is fitted with a cylindrical cutter block. (b) Every planing machine used for overhand planing shall be provided with a "bridge" guard capable of covering the full length and breadth of the cutting slot in the bench, and so constructed as to be easily adjusted both in a vertical and horizontal direction. (c) The feed roller of every planing machine used for thicknessing, except the combined machine for overhand planing and thicknessing, shall be provided with an efficient guard. 10. Adjustment and maintenance of guards.-The guards and other appliances required under this schedule shall be - (a) maintained in an efficient state; (b) constantly kept in position while the machinery is in motion; and (c) so adjusted as to enable the work to be done without unnecessary risk. 11. Exemptions.-Paragraphs 6, 8, 9 and 10 shall not apply to any woodworking machine in respect of which it can be proved that other safeguards are provided, maintained and used which render the machine as safe as it would be if guarded in the manner prescribed in this schedule. SCHEDULE II CENTRIFUGAL MACHINES 1. Definition.-"Centrifugal machines" include centrifugal extractors, separators and driers. 2. Every part of centrifugal machine shall be (a) of good design and construction and of adequate strength; (b) properly maintained; and Atomic Energy Factory Rules, 1996 22 Rule 32 (Sch.II-III) (c) examined thoroughly by a competent person at regular intervals to check for unbalance & in case unbalance at high speeds is observed steps to restore the balance shall be taken before commissioning the machine. 3. Interlocking guard for drum or basket.- (a) The cage housing the rotating drum or basket of every centrifugal machine shall be provided with a strong lid. The design and construction of the cage as well as the lid shall be such that no access is possible to the drum or basket when the lid is closed. (b) Every centrifugal machine shall be provided with an efficient interlocking device that will effectively prevent the lid referred to in sub-paragraph (a) from being opened while the drum or basket is in motion and prevent the drum or basket being set in motion while the lid is in the open position. 4. Braking arrangement.-Every centrifugal machine shall be provided with an effective braking arrangement capable of bringing the drum or basket to rest within as short a period of time as reasonably practicable after the power is cut off. 5. Operating speed.-No centrifugal machine shall be operated at a speed in excess of the manufacturer's rating which shall be legibly stamped at easily visible places both on the inside of the basket and on the outside of the machine casing. SCHEDULE III POWER PRESS 1. Application.- The Schedule shall apply to all types of power presses including press brakes, except when used for working hot metal. 2. Definition.- For the purpose of this Schedule - (a) "approved" means approved by the Competent Authority; (b) "fixed fencing" means fencing provided for the tools of a power press being fencing which has no moving parts associated with or dependent upon the mechanism of a power press and includes that part of a closed tool which acts as a guard; (c) "power press" means a machine used in metal or other industries for moulding, pressing, blanking raising drawing and similar purposes; (d) "safety device" means the fencing and any other safeguard provided for the tools of a power press. 3. Starting and stopping mechanism.- The starting and stopping mechanism shall be provided with a safety stop so as to prevent Atomic Energy Factory Rules, 1996 23 Rule 32 (Sch.III) over running of the press or descent of the ram during tool setting, etc. 4. Protection of tool and die.- (a) Each press shall be provided with a fixed guard with a slip plate on the underside enclosing the front and sides of the tool. (b) Each die shall be provided with a fixed guard surrounding its front and sides, and extending to the back in the form of a tunnel through which the pressed article falls to the rear of the press. (c) The design, construction and mutual position of the guards referred to in (a) and (b) such as to preclude the possibility of the worker's hand or fingers approaching the danger zone. (d) The machine shall be fed through a small aperture at the bottom of the die guard, but a wider aperture may be permitted for second or subsequent operations if feeding is done through a chute. (e) Notwithstanding anything contained in sub-clauses (a) and (b) an automatic or an inter-locked guard may be used in place of a fixed guard, but where such guards are used they shall be maintained in an efficient working condition and if any guard develops a defect, the power press shall not be operated unless the defect of the guard is removed. 5. Appointment of persons to prepare power presses for use .- (a) Except as provided in paragraph (4), no person shall set, re-set, adjust or try out the tools on a power press or install or adjust any safety device thereon, being installation or adjustment preparatory to production of die proving, or carry out an inspection and test of any safety device thereon required by paragraph 8 unless he- (i) has attained the age of eighteen; (ii) has been trained in accordance with the sub-paragraph (b); and (iii) has been appointed by the occupier of the factory to carry out those duties in respect of the class or description of power press or the class or description of safety device to which the power press or the safety device (as the case may be) belongs; and the name of every such person shall be entered in a register in Form 1. Atomic Energy Factory Rules, 1996 24 Rule 32(Sch.III) (b) The training shall include suitable and sufficient practical instruction in the matters in relation to each type of power press & safety device in respect of which it is proposed to appoint the person being trained. 6. Examination and testing of power presses and safety devices.- (a) No power press or safety device shall be taken into use in any factory for the first time in that factory, or in case of a safety device for the first time on any power press, unless it has been thoroughly examined and tested, in the case of a power press, after installation in the factory, or in the case of a safety device, when in position on the power press in connection with which it is to be used. (b) No power press shall be used unless it has been thoroughly examined and tested by a competent person within the immediately preceding period of 12 months. (c) No power press shall be used unless every safety device (other than fixed fencing) thereon has within the immediately preceding period of six months when in position on that power press, been thoroughly examined and tested by a competent person. (d) The competent person carrying out an examination and test under the foregoing provisions shall make a report of the examination and test containing the following particulars and every such report shall be kept readily available for inspection: (i) name of the occupier of the factory; (ii) address of the factory; (iii) identification number or mark sufficient to identify the power press or the safety device; (iv) date on which the power press or the safety device was first taken into use in the factory; (v) the date of each periodical thorough examination carried out as per requirements of sub-paragraph (b) above; (vi) particulars of any defects affecting the safe working of the power press or the safety device found at any such thorough examination and steps taken to remedy such defects; Atomic Energy Factory Rules, 1996 25 Rule 32(Sch.III) 7. Defects disclosed during a thorough examination and tests .- (a) Where any defect is disclosed in any power press or in any safety device by any examination and test under paragraph 6 and in the opinion of the competent person carrying out the examination and test, either- (i) the said defect is a cause of danger to workers and in consequence the power press or safety device (as the case may be ) ought not to be used until the said defect has been remedied; or (ii) the said defect may become a cause of danger to workers and in consequence the power press or safety device (as the case may be) ought not to be used after the expiration of a specified period unless the said defect has been remedied. Such defect shall, as soon as possible after the completion of the examination and test, be notified in writing by the competent person to the occupier of the factory and, in the case of a defect falling within clause (ii) of this sub-paragraph such notification shall include the period within which, in the opinion of the competent person, the defect ought to be remedied. (b) In every case where notification has been given under this paragraph, a copy of the report made under paragraph 6(d) shall be sent by the competent person to the inspector for the area within fourteen days of the completion of the examination and test. (c) Where any such defect is notified to the occupier in accordance with the foregoing provisions of this paragraph the power press or safety devise (as the case may be ) having the said defect shall not be used - (i) in the case of a defect falling within clause(i) of sub- paragraph (a) until the said defect has been remedied; and (ii) in the case of defect falling within clause (ii) of sub-paragraph (a), after the expiration of the specified period. (d) As soon as is practicable after any defect of which notification has been given under sub-paragraph(a) has been remedied, a record shall be made by or on behalf of the occupier stating the measures by which and the date on which the defect was remedied. 8. Inspection and test of safety devices.- (a) No power press shall be used after the setting, resetting or adjustment of the Atomic Energy Factory Rules, 1996 26 Rule 32(Sch.III) tools thereon unless a person appointed or authorised for the purpose under Paragraph 5 has inspected and tested every safety device thereon while it is in position on the said power press: Provided that any inspection, test and certificate as aforesaid not be required where any adjustment of the tools has not caused or resulted in any alteration to or disturbance of any safety device on the power press and if, after the adjustment of the tools, the safety devices remain, in the opinion of such a person as aforesaid, in efficient working order. (b) Every power press and every safety device thereon while it is in position on the said power press shall be inspected and tested by a trained person every day. 9. Defects disclosed during an inspection and test.- (a) Where it appears to any person as a result of any inspection and test carried out by him under paragraph 8 that any necessary safety device is not in position or is not properly in position on a power press or that any safety device which is in position on a power press is not in his opinion suitable, he shall notify the manager forthwith. (b) Except as provided in sub-paragraph (c) where any defect is disclosed in a safety device by any inspection and test under paragraph 8, the person carrying out the inspection and test shall notify the manager forthwith. (c) Where any defect in a safety device is the subject of a notification in writing under paragraph 7 by virtue of which the use of the safety device may be continued during a specified period without the said defect having been remedied, the requirement in sub-paragraph (b) of this paragraph shall not apply to the said defect until the said period has expired. 10. Identification of power presses and safety devices.- For the purpose of identification every power press and every safety device provided for the same shall be distinctively and plainly marked. 11. Training and instructions to operators.- The operators shall be trained and instructed in the safe method of work before starting work on any power press. It shall be ensured by adequate supervision that correct operating procedures are being followed. 12. Exemptions.- (a) If in respect of any factory, the Competent Authority is satisfied that owing to the circumstances or infrequency of the processes or for any other reason, all or any of the provisions of this Schedule are not necessary for the Atomic Energy Factory Rules, 1996 27 Rule 32(Sch.III-IV) protection of the workers employed on any power press or any class or description of power press or in the factory, the Competent Authority by a certificate in writing(which he may in his discretion revoke at any time), exempt such factory from all or any of such provisions subject to such conditions, if any, as he may specify therein. (b) Where such exemption is granted, a legible copy of the certificate, showing the conditions (if any) subject to which it has been granted, shall be kept posted in the factory in a position where it may be conveniently read by the persons employed. SCHEDULE IV WELDING AND GAS CUTTING 1. Arc Welding.- (a) Definition.- Arc welding is a welding process wherein coalescence is produced by heating with an electric arc, with or without application of pressure and with or without the use of filler metal. (b) Correct and proper electric earthing shall be provided for the welding machine, the casing and the job to be welded. These shall be electrically checked for any leakage of current by an authorised and trained electrician. (c) The welding machine shall be kept at a dry place and materials shall not be kept around it. (d) The welding cable shall be in good condition. The metal wire shall not be in an exposed state anywhere. The welding cable connections shall be tight. The cable shall not lie on wet surface nor shall it pass through water. Building structure, fuel tanks, railings etc., shall not be used to support welding cables. As far as possible cable shall not be laid across the passages. (e) The welder shall not wear any wet dresses, footwear, hand gloves etc. These articles must be dry before working with welding machines. The welder shall wear rubber shoes, hand gloves and use welding screens while doing welding jobs. Welding screen shall be used around the welding area to stop welding flashes from affecting others. The welder must check the welding holder thoroughly before starting the job and shall also see that the insulation of the holder is proper. (f) The welding cable and holder etc., shall be fastened to the overhead structures with non-conductors to prevent these from dropping down. Atomic Energy Factory Rules, 1996 28 Rule 32 (Sch.IV) (g) Scaffolding made of corrugated sheets shall be used below the areas where welding is to be done to prevent sparks dropping down below. (h) While welding in confined areas like inside of tanks, pipes etc., proper ventilation shall be provided with the help of a fan. (i) Welding on a gas or fuel line shall never be done without a special approved procedure written specially for the particular job. (j) All welding work shall be started only after obtaining a welding permit from authorised agency indicating special precautions including the fire fighting details. (k) For welding work on overhead equipment such as crane etc. a separate earth cable shall be run up to the work place and shall be connected to work piece. 2. Gas Cutting.- (a) Definition.- Gas cutting is a process used for cutting mild steel by a flame torch using compressed gases Hydrogen/Acetylene and oxygen to preheat the metal and cutting it by forcing oxygen at higher pressure. (b) The gas cylinders shall be kept well away from any fire or hot areas. The rubber pipes, joints, gas torches, valve connections shall be thoroughly checked for leakage of gas. (c) The gas cutter shall use proper safety appliances viz. gas cutters goggles, hand gloves, safety shoes, helmets and safety belts. (d) The rubber hose shall not come in contact with any hot material and it shall not be taken through hot areas. (e) The gas torch shall be fastened to a fixed overhead structural or with the body of the gas cutter to stop it from dropping down. (f) The rubber hose shall not obstruct the movement of others. When necessary to lower the rubber hose with fittings, a fibre rope should be used. A metal sheet shall be used below the job to arrest any sparks/hot slags from falling down. (g) Before starting any gas cutting, a written permit clearance shall be obtained from authorised person which will indicate all Safety precautions including fire fighting details. Atomic Energy Factory Rules, 1996 29 Rule 32(Sch.IV-V) (h) Gas cutting at or near fuel line/hazardous area etc., shall be done only after obtaining a special approved procedure for that job. (i) Provisions of Gas Cylinder Rules shall be complied with. SCHEDULE V SHEARS, SLITTERS AND GUILLOTINE MACHINES 1. Definition.- For the purpose of this Schedule - (a) "guillotine" means a machine ordinarily equipped with straight, bevel-edged blade operating vertically against a stationery resisting edge and used for cutting metallic or non- metallic substances; (b) "shears" or "shearing machine" means a machine ordinarily equipped with straight, bevel-edged blades operating vertically against resisting edges, or with rotary, overlapping cutting wheels, and used for shearing metals or non-metallic substances; and (c) "slitter" or "slitting machine" means a machine ordinarily equipped with circular disc-type knives, and used for trimming or cutting into metal or non-metallic substances or for slitting them into narrow strips; for the purpose of this Schedule, this term includes bread or other food slicers equipped with rotary knives or cutting discs. 2. Guillotine and Shears.- (a) Where practicable, a barrier metal guard of adequate strength shall be provided at the front of the knife, fastened to the machine frame and shall be so fixed as would prevent any part of the operator's body to reach the descending blade from above, below or through the barrier guard or from the sides: Provided that in case of machines used in the paper printing and allied industries, where a fixed barrier metal guard is not suitable on account of the height and volume of the material being fed, there shall be provided suitable starting devices which require simultaneous action of both the hands of the operator or an automatic device which will remove both the hands of the operator from the danger zone at every descent of the blade. (b) At the back end of such machines, as inclined guard shall be provided over which the slit pieces would slide and be collected at a safe distance in a manner as would prevent a person at the back from reaching the descending blade. Atomic Energy Factory Rules, 1996 30 Rule 32 (Sch.V) (c) Power-driven guillotine cutters, except continuous feed trimmers, shall be equipped with - (i) starting devices which require the simultaneous action of both hands to start the cutting motion and of at least one hand on a control during the complete stroke of the knife; or (ii) an automatic guard which will remove the hands of the operator from the danger zone at every descent of the blade, used in conjunction with one- hand starting devices which require two distinct movements of the device to start the cutting motion, and so designed as to return positively to the non-starting position after each complete cycle of the knife. (d) Where two or more workers are employed at the same time on the same power- driven guillotine cutter equipped with two- hand control the device shall be so arranged that each worker shall be required to use both hands simultaneously on the safety trip to start the cutting motion, and at least one hand on a control to complete the cut. (e) Power-driven guillotine cutters, other than continuous trimmer, shall be provided, in addition to the brake or other stopping mechanism, with an emergency device which will prevent the machine from operating in the event of failure of the brake when the starting mechanism is in the non-starting position. 3. Slitting Machines.- (a) Circular disc-type knives on machines for cutting metal and leather, paper, rubber, textiles or other non-metallic substances shall, if within reach of operators standing on the floor or working level, be provided with guards enclosing the knife edges at all times as near as practicable to the surface of the material, and which may either- (i) automatically adjust themselves to the thickness of the material; or (ii) be fixed or manually adjusted so that the space between the bottom of the guard and the material will not exceed 6 mm (1/4 in.) at any time. (b) Portions of blades underneath the tables or benches of slitting machines shall be covered by guards. 4. Index Cutters and Vertical Paper Slotters.- Index cutters, and other machines for cutting strips from the ends of books, and for similar operations, shall be provided with fixed guards, so arranged that the fingers of the operators cannot come between the blades and the tables. Atomic Energy Factory Rules, 1996 31 Rule 32(Sch.V-VI) 5. Corner Cutters.- Corner cutters, used in the manufacture of paper boxes, shall be equipped with - (a) suitable guard fastened to the machines in front of the knives and provided with slots or perforations to afford visibility of the operations; or (b) other guards equally efficient for the protection of the fingers of the workers. 6. Band Knives.- Band wheels on band knives, and all portions of the blades except the working side between the sliding guide and the table on vertical machines, or between the wheel guards on horizontal machines, shall be completely enclosed with hinged guards of sheet metal not less than 1 mm(0.04 in) in thickness or of other material of equal strength. SCHEDULE VI AGITATORS AND MIXING MACHINES 1. Definition.- "Agitators and Mixing Machines" means a tank or other container equipped with power-driven mixing arms, blades or paddle wheels fixed to revolvable shafts or other simple mechanical devices for blending stirring liquids with other liquids or with solid substances or combinations of these. 2. When the top of an open agitator tank, beater tank or paddle tank or similar vessel is less than 1 M above the adjacent floor or working level, adequate standard railings shall be installed on all open sides. 3. Agitators and mixing machines shall be provided with an efficient inter-lock arrangement for the top lid, to prevent access to the agitating, stirring or similar devices, whilst in motion and would prevent restart under power with the lids in open position. 4. When other inspection or examination openings are provided at the top or sides of the containers vessels of the agitator and mixing machines, such openings shall be provided with standard grill guards as would prevent access of any part of the operator's body coming in contact with agitator stirring or similar devices whilst in motion. 5. When discharge holes, openings, chutes or similar arrangements are provided at bottom or at the sides of the container vessels of the agitator and mixing machines, they shall, be so designed, shaped guarded, or situated as would prevent access of any part of operator's body coming in contact Atomic Energy Factory Rules, 1996 32 Rule 32 (Sch.VI-VII) with agitating, stirring or similar devices, whilst in motion inside the vessel. SCHEDULE VII CONVEYORS 1. Application.- The schedule shall apply to all types of conveyors. 2. Definition.- Conveyor means a horizontal, inclined or vertical device for moving or transporting bulk materials, packages & objects in a path predetermined by the design of device and having points of loading or discharge fixed or selective. 3. General.- The conveyors shall be so designed installed, operated & maintained as per the national code & standards. Safe procedures shall be laid down to include the following, namely:- (a) All moving parts of conveyors such as gears, sprockets, sheaves etc. shall be guarded; (b) The starting switch of conveyor shall be located at such a place so that the operator shall have clear view of the entire conveyor length; (c) The entire system shall be so interlocked by electrical or mechanical means that it can stop automatically if there is a blockage at any place along the length; (d) Conveyors operating in series shall have controls so designed that if one of the conveyor stops others shall automatically stop; (e) Electrical machines operating the conveyors equipped with brakes which are mechanically applied or released by movement of operating device, shall be so designed that if the electrical power is interrupted with brakes in OFF position, load can descend only at controlled speed; (f) Antirunaway or backstop devices shall be provided on reversible type of conveyors where reversing can cause hazard; (g) Overload protecting devices shall be provided on conveyors which shall disconnect the electrical power. All restarting devices shall remain locked till the cause of overload is removed; (h) For conveyors feeding the hopper at or near level of floor, the hopper shall be provided with screen or railing and toe-board; Atomic Energy Factory Rules, 1996 33 Rules 32 (Sch.VII)-34 (i) Conveyors handling flammable material or fine powders shall have only explosion proof electrical fixtures. The dust levels in the area shall be restricted to PLE Limits by suitable means; and (j) Conveyors running in tunnels & pits shall have sufficient clearance at sides for workers engaged in lubricating or repair works. 4. Conveyors at height.- (a) Conveyors at elevated locations shall be provided with access platform with toe- board & guard rails. (b) Conveyors installed within 2 metres of floor or walkway surface shall be provided with crossovers or passages (c) Overhead conveyors shall be provided with sideboards along the edges & screen guards underneath. Underpasses shall be provided with sheet metal ceiling for protection of the persons crossing. (d) Conveyors passing through building floors, walls shall have interlocks installed in such a way that all will have to operate at one time to start the system. These switches shall be clearly marked & area near them shall be kept clean and free of obstructions. The openings shall be guarded with hand rails, toe-boards etc. 5. Maintenance.- The operation, maintenance of conveyors shall be done under work permit system keeping in mind the nature of materials handled. The entire mechanism of conveyors, electrical switches, interlocks etc. shall be inspected and maintained regularly especially for brakes, back stops, anti-runaway devices, overload releases and such other safety devices. 6. Fire Fighting.- The entire length of the conveyor shall be covered by installation of fire detection and warning system. Wherever conveyor passes through wall or floor openings, automatic system shall be installed for closing of them to stop the passage of flame through them. Wherever necessary automatic water sprinkler system shall also be provided.

Previous and next

All provisions of Atomic Energy (Factories) Rules, 1996

Questions people ask

Is rule 30 of Atomic Energy (Factories) Rules, 1996 still in force?

No repeal of Atomic Energy (Factories) Rules, 1996 is recorded.