Rule 2, Atomic Energy (Factories) Rules, 1996: DEFINITIONS
Atomic Energy (Factories) Rules, 1996 - Rule 2
Text of rule 2
DEFINITIONS
2. DEFINITIONS.-In these rules, unless the context otherwise requires,-
(a) "Act" means the Factories Act, 1948 (63 of 1948);
(b) "Certifying Surgeon" means the medical officer of the factory concerned;
(c) "Competent Authority" means any officer or authority appointed by the Central
Government by notification in the official Gazette for the purposes of these rules;
(d) "Form" means forms set out in the appendix to these rules;
(e) "Indian Standard" means the Indian Standard as defined in clause (g) of section 2 of the
Bureau of Indian Standards Act, 1986 (63 of 1986);
(f) "Inspector" means an officer appointed under section 8 of the Act and includes the
Competent Authority;
Atomic Energy Factory Rules, 1996
2
Rules 2-3
(g) "Manager" of the factory means the person responsible to the occupier for the working of
the factory for the purposes of the Act;
(h) words and expressions used but not defined in these rules shall have the meanings
respectively assigned to them in the Factories Act, 1948 (63 of 1948).
3. APPROVAL OF PLANS -
(1) Every proposal for obtaining the previous permission for locating the site on which the
factory is to be situated or for the construction or expansion of a factory shall be made to
the Competent Authority in writing and shall be accompanied by the document specified
in sub-rule (2).
Explanation.- Extension for the purpose of these rules shall include any modification to
the process, equipments, alterations in layouts & structures.
(2) The following documents shall accompany every proposal made under sub-
rule(1),namely:-
(a) a flow chart of the manufacturing process supplemented by a brief description of
the process in its various stages;
(b) plans in duplicate drawn to scale showing-
(i) the site of the factory and lands, buildings and other structures, roads,
drains to its North, South, East and West respectively to the extent such
particulars can with reasonable accuracy be described;
(ii) the plan, elevation and necessary cross-section of the various buildings,
indicating all relevant information relating to lighting, ventilation clearly
indicating the position of the plant, machinery, aisles and passageways,
and the safety measures provided for escape and evacuation of persons
employed in the factory in case of emergency;
(c) details of exhaust ventilation and control of gaseous releases and such other
factors controlling the work environment;
(d) arrangements made for effluent treatment and discharges;
(e) safety analysis and emergency plans, and such other particulars as the competent
authority may require; and
(f) number of persons likely to be employed during the construction/operation at any
particular time.
Atomic Energy Factory Rules, 1996
3
Rules 3-4
(3) The decision of the Competent Authority that the plans are in consonance with the
requirements of the Act, subject to such conditions as it may specify, shall be final.
Approval shall be communicated to the applicant under the signature of the Competent
Authority on one copy of each of the plans. The Competent Authority may if he thinks fit,
call for such other particulars required for such certification from the applicant which
shall be complied with by the applicant within the period prescribed.
Previous and next
Questions people ask
Is rule 2 of Atomic Energy (Factories) Rules, 1996 still in force?
No repeal of Atomic Energy (Factories) Rules, 1996 is recorded.