Text of form 10

Form - 10

Form - 10 REPORT OF EXAMINATION AND TEST OF DUST EXTRACTION OR SUPPRESSION SYSTEM [ See rule 88 Schedules IV, VI,VIII & X] 1. Name of the Factory : 2. Description of system : 3. Hood/Enclosure : .1 Sr. No. of Hood/Enclosure : .2 Contaminant captured : .3 Capture Velocities (at point to be specified) : Design Value Actual Value .4 Volume Exhausted at Hood/Enclosure : ............ m3/hr 4. Pressure Drop at : .1 Joints : .2 Any other points (to be specified) : 5. Transport velocity in duct (At points along ducts to be specified) : 6. Air cleaning device : .1 Type used : .2 Velocity at inlet : .3 Static pressure at inlet : .4 Velocity at outlet : .5 Static pressure at outlet : 7. Fan : .1 Type used : Atomic Energy Factory Rules, 1996 ( 2 ) .2 Volume handled : .3 Static Pressure : .4 Pressure drop at outlet of fan : 8. Fan Motor : .1 Type : .2 Speed in r.p.m. & power in kW : 9. Particulars of defects if any, disclosed during the test in any of the above components : I certify that on (Date).................. the above dust extraction system was thoroughly cleaned and (so far as its construction permits) made accessible for thorough examination;. I further certify that on the said date, I thoroughly examined the above dust extraction system including the components and fittings and that the above is a true report of my examination. Signature: Date: Name : N.B. All measurement units shall be in metric system. Atomic Energy Factory Rules, 1996

Previous and next

All provisions of Atomic Energy (Factories) Rules, 1996

Questions people ask

Is form 10 of Atomic Energy (Factories) Rules, 1996 still in force?

No repeal of Atomic Energy (Factories) Rules, 1996 is recorded.