Form 5, Atomic Energy (Factories) Rules, 1996: Form - 5
Atomic Energy (Factories) Rules, 1996 - Form 5
Text of form 5
Form - 5
Form - 5
REPORT OF EXAMINATION OR TEST OF PRESSURE
VESSEL OR PLANT
( See rule 36(9)(b))
1. Name of the Factory :
2. Details of pressure vessel or plant and
location (i.e. Distinctive no. max. & safe
working pressure etc.
:
3. Name, address of the manufacturer and
reference no. of test certificate by
manufacturer and/or competent person &
date.
:
4. Nature of process in which the pressure
vessel/plant is used.
:
5. Particulars of pressure vessel or plant. :
.1 Date of construction. :
.2 Method of construction (e.g.
supported)
:
.3 Thickness of walls.(mm.) : :
.4 Date on which the pressure
vessel/plant first taken into use
:
.5 Maximum permissible working
pressure specified by the manufacturer
:
.6 Design pressure(if known) : :
6. Date of last hydrostatic test (if any) and
pressure applied.
:
.1 If Hydrostatic test could not be carried
out due to constraints of construction
Date of ultrasonic/magnetic particle /
or any other suitable test as approved
by the Competent Authority
:
7. Is the pressure vessel/plant in open or
otherwise exposed to weather or damp or
corrosive environment.
:
Atomic Energy Factory Rules, 1996
( 2 )
8. What parts were inaccessible :
9. What examinations and tests were made
(specify pressure if hydrostatic test is made)
:
10. Condition of pressure vessel/ External plant
(state any defects materially affecting the
max. permissible working/ safe Internal
working pressure)
:
.1 If any defect is observed affecting safe
working pressure, is the new safe
working pressure marked with date.
:
11. Are the required fittings and appliances
provided in accordance with rules
:
.1 Are all fittings and appliances properly
maintained in good condition.
:
12. Have the pressure settings of safety valves
been checked?
:
13 Repairs. :
.1 Required :
.2 Period within which repairs should be
carried out.
:
.3 Any other condition which the person
making the examination thinks it
necessary for securing safe working.
:
14. Maximum permissible working pressure
calculated from dimensions and from other
data ascertained by present examination, due
allowance being made for conditions of
working if unusual or exceptionally severe.
:
.1 Minimum thickness of pressure vessel,
plant measured during the
examination.
:
Atomic Energy Factory Rules, 1996
( 3 )
15. Where repairs affecting the maximum
working pressure are required state the
working pressure.
:
.1 Before expiration of period specified
in 13.2.
:
.2 After the expiration of such period if
the required repairs have not been
complete.
:
.3 After the completion of the required
repairs.
:
16. Other observations. :
I certify that on (Date)...............the pressure vessel/plant described above was thoroughly cleaned
and (so far as construction permits) made accessible for thorough examination and for such tests
as were necessary for thorough examination and that on the said date, I thoroughly examined this
pressure vessel/plant, including its fittings and that above is a true report of my examination.
Signature:
Date: Name:
Atomic Energy Factory Rules, 1996
Previous and next
Questions people ask
Is form 5 of Atomic Energy (Factories) Rules, 1996 still in force?
No repeal of Atomic Energy (Factories) Rules, 1996 is recorded.