Corrigendum to S.O. 425 (E), dated 06.03.2012, issued under Section 11 of the National Highways Authority of India Act, 1988 (68 of 1988),
Notification - The National Highways Authority of India Act, 1988
- Kind: Notification
- Under: The National Highways Authority of India Act, 1988
Text of this notification
1W,fv‘o 310 we 33004/99
{HRH
(Ike @azegmg of Judie
EXTRAORDINARY
31W lI—E‘Tg 3~31I-‘G1T5' (ii)
PART Il-Section 3—Sub-secti0n (ii)
m 1} Wm
PUBLISHED BY AUTHORITY
if l7l6|
W
=1? fiTv—vfi,¥h'narr,§a1§ 22, 2013/3111“; 31,1935
N0. l7l6| NEW DELHI,MONDAY, JULY 22, 2013/ASADHA 31, 1935
31361). No. D. L,-33064/99
mmmmm
31W
fifiw‘mzawézom
151m. 2228(3) — 176: 26735111 WW? 7?, 1117—6121 W WW WW, 1988 (1988 E51 68) 451
2111111 E‘mfifimfifinéWWUEWfiamufiafisfiYWWfiWWI
351.311. 452 (31), W 1673~2012WW WW 6661:: WM 235 (WWW Wm 334 ) ch
7.4691376173166482 136.141(WfiWW)WWWWWWW®WW(Mswfimuwm
"W©W”Wfiamw%)afifim%;
WUH:,WW6.WWWWWNW,1988(1985W68)J%W1421§Wdumzfi
W791, 15.07.2011mafiaafiwmmwmwwmmmmmmw
83117770 Wiszyfimaazzom, Wfii‘fimwfimmfimfimflmfimwr %).a‘7‘11121 «1:511:
VIEW Wan 235 C1? 7.469 W (@7613?! W 7.469) 1% 66.482 (1%?ng aw 73.512) an; '4? W (3111 $1111 swfi
W”WW"WWW§)WW§RW,W,WWW(WW)WWW§H
a3wmmsfivmmaéwmafivwmégommmzafimW§(WWWWHW1
chw“mfiififimrrm %)I
waszajsrgfiaww.WWW(HYTWW3MW)W.2006mfi’m'msfiwq.
zoosfiwzmfi. 838 (a)mwf§m1%mwawW3fivm. zomfimzmfi. 950 (31), 12 51W, 2011 a‘fi
711,371,191.15(somwsfiuwffio‘mw(Wwfimm”fiw"fififimw§)%fifiwazfiwufifim
NWW, 1956 (1956W4a)fimawmmmfififimmafifi§qmw$fiw,ajwwWu
afizW.wgqamWWWW,WW,WWWWWHWW$W
gumwafismffiafiwmfimfigq.mwafiwmfifiémmfimmwmafififiifl
1mu1mwfi6<fimfim$m,wfi1Efiwzfifififieflwfimwfiwfiqwm”mwav
{Wffimnm’s‘m‘dfimfiW$mmfizfimwmafim$fimfifimmfimzssosWW
ét’rfifiwvmfiffififi‘fimafimfiWmflfiéaWHEWafiwmawmmfimm
szMWmWWWWWfiWfimwmfifimWQWH
WSWWW,WWWETWWWUTWWWEiwfiwrfiHfiGfimafifififlflfil
afimfiam,W1$Wfifififiwffimw3wwmawmfimfiam$mmmé:
3121 (31121113 (I)
_EWEE§E§“§%%E
fiEMwEEEEfimNEEgongfiwgflvfifigfiggnmwgfiAg
figfigrgwfigwfieflswfiasfifiwggmggmfiwgg.m
Erfigapfifiw
ggxwfimfiwnfiw555%wvcgfifiggéfig
fifiwgfigrmEmmwgnwmwéfifinémay
39E;
EcwEgGWEEHEEE£95.;
”EggfifigfimgfiupflfififlmEfififiwmwggE.v
_EEB&VEE
EEEEfiEwfivfigfi»EAE%EEEVMEWE§KKGEAE
EEfifivE035EamEuErEMmilmamwwwfiEfigfiwafifimany.
Egggfiwfifiifififiwgwfiefiérfiéggfiag
.m
mE
EEEE$szEwE08.3EEw25
MEfa03%wE33mv.5Egm
WmEEE8%»Kim5%”wE08.8mgm1.Wmfi3.5
um
EEEoomom3%EwE02.:E
vaw.
8%
WmEEE8.9.EuMm
EEE08.33%E”wE8:3EE583NEE>mwvwrEMmm
9%
_mfibg£E§éA¢EVE%FEEEZ§Egfiogvgg
FmfiwéafigfimmfifiwgfiwfipmmwwzazEEEEMEEEEEEEEEEE
Egfi‘gfigvfiwwwmflfigfigvégwggwéN
998EE8.3EuMmErFEMEREwwEME
mEEW5SEQcmrigWEEASEEVE»EmoEv:25Em
_
”Egggagfifiwmaafiwfiwmwfigggggfiwfififimfifig
e
oi.Emémfiflsfipéwflwgzgwm
Agfigfiwfifigggfiwsaiwfi
asEpm5:»fig5%“EVrfiwFEWE
3Eggfiwé
8NEwgmfififig
m3Eggagwggfim.g§wfim
3o
rmfivyrfimfiwmguzhw
33
EEVEEE»
GENWAEfifluEfiELSNFEEgg
TE
KimEm\::3:>M<ZEMO§FXmH<57:“—0mrEKmN<OmIFN
w
11117111- 7% 3(ii)l W 37113051 : 3191141071
6. mmmmeammmemmmmammmmemgmm
wwwmmmmmmmeememmmeamfimwm
mammwmafimmwfiifinmwnMHfimmnfimmi
WWWfiWWfiEfiWfiTfiI
s. mfiflfifiwnatam,wfinfiafiafimemwafifianmfihmml
9 WW1neat—3W,maizoovmoszsmrfitmfitwfimarewmmfie
memmmwmmamwmameemmmem
W,Wmflfiml WWmfiamfizfiwnmafieWWeam-e—w
w—wwammmmmmmemsmmmeme
Wmmanmw Wm,mefiiu§%%wfimwmnfimmaimfi
wwafimfiattfimafiéfiahfinfifimmi
[371.11. WWI/1i i4/olan/aizfitfizaiml
31W mi, 13133?! W
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 22nd July. 2013
5.0. 2228 (E).— Whereas by notification ofthe Government oflndia in the erstwhile Ministry ofRoad 'I‘ranspon
and Highways number 8.0. 452 (E) dated 16.03.2012, issued under Section 11 ofthe National Highways Authority of lndia
Act, 1988 (68 of 1988), the Central Government has entrusted the stretch from kilometer 7.469 to kilometer 66.482 (Meerul
to Bulandshahar section) ofNational Highway No. 235 (New National Highway No. 334) in the State of Uttar Pradesh tn
the National Highways Authority ofIndia (hereinafter referred to as the “Authority”);
And whereas, pursuant to the provision of Section 14 of the National Highways Authority
of India Act, 1988 (68 of 1988), the Authority has entered into an Agreement on 04.01.2012
(hereinafter referred to as said agreement) on with M / s C&C Western UP Expressway Ltd. having
its registered office at plot No. -70, Sector-32, Gurgaon-l22001, India (hereinafter referred to as
the “Concessionaire”), for bids submitted on 15.07.2011 for the development of Meerut to
Bulandshahar section from km 7.469 (desing ch. 7.469) to km 66.482 (desing ch. 73.512) on
National Highway No. 235 (hereinafter referred to as the “said section”) to four lane standards
and operation and maintenance of the said section on Design, Build, Finance, Operate and
Transfer (DBFOT) basis.
Now, therefore, in exercise of the powers conferred by section 8A of the National
Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination
of Rates and Collection) Rules, 2008 published vide G.S.R 838(E) dated 5th December, 2008 and
amended vide G.S.R 950(E) dated 3““1 December, 2010, G.S.R 15(E) dated 12Lh January, 2011
(hereinafter referred to as the “Rules”), the Central Government, having regard to the
expenditure involved in building, maintenance, management and operation of the said section,
interest on the capital invested, reasonable return, the volume of traffic and the period of the
agreement entered into between the Authority and the Concessionaire, hereby notifies that there
shall be levied and collected fees on mechanical vehicles for the use of the said section at the
rate specified in columns (2) of the Table 1 for net road section length of 36.618 km for use of the
four and more lane sections (hereinafter referred to as “base rate") and at one and half times the
base rate for four numbers of bypasses having an aggregate length of 25.903 km costing on the
Type of Vehicles specified in Table 1 below, and authorizes the said Concessionaire to collect and
retain the fee on andfrom the Date of Commercial Operation (COD) declared by the Authority
and on getting the Completion Certificate or the Provisional Certificate, as the case may be, from
the Authority or publication of this notification in the Official Gazette, whichever is later, till the
termination date as specified in the agreement;
THE GAZETTE OF INDIA : EXTRAORDINARY [PAR] 117 SLL‘. 3(ii)|
Table 1
Type of vehicle Base rate of fee per km
for the base year
2007-08
(in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three-axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving 3.45
Equipment (EME) or Multi Axle Vehicle (MAV) (four to six
axles)
Oversized Vehicles (seven or more axles) 4.20
l. The fee levied and collected hereunder shall be due and payable at the following Toll
Plaza for the distance specified for such Toll P1am(s):
Location of Toll Plaza(s) (chainage) Length (in km) for which
Fee is payable
At km 48.00 near village Hridyapur/ Kurana in Hapur District 36.618
2. In addition to above, the following fee shall also be due and payable for the use of the
following bypass(es) at the following Toll Plaza(s) at one and half times of the base rate for the
length of bypass(es) specified for such Toll Plaza(s):
Location of Toll P1aza(s) Length of bypass (in km) for which additional fee is payable
(chainage)
At km 48.00 near village 2.700 Faffunda Bypass taking off at km 12.100 and
Hridyapur/ Kurana in merging at km 14,800
Hapur District 3.200 Kharkhunda Bypass taking off at km 17.700
and merging at km 20.900
12.428 Hapur Bypass taking off at km 23.400 and
merging at km 35.456 and then from km
38.978 to km 39.350
7.575 Gulothi Bypass taking off at km 49.800 and
merging at km 57.375
3. The rate of monthly pass for a person who owns a mechanical vehicle registered for non-
commercial purposes and resides within a distance of twenty kilometers from the toll plaza is Rs.
215.00 (Rupees Two Hundred only) for the year 2013-14 which is subject to revision every year
as per the provisions of the National Highways Fee (Determination of Rates and Collection)
Rules, 2008.
4. For multiple journey on the highway section, passes shall be issued at the following
rates, namely.
\
Amount Payable Maximum number of Period of validity
one way journeys
allowed
One and half times of the fee for Two Twenty four hours
one way journey from the time of
payment
'I‘wo—third of amount of the fee Fifty or more One month from date
payable for fifty or more single of payment
journeys
[um [17W 3(ii)] we an new : mum u.
5. Fee for commercial vehicle (excluding vehicles plying under national permit) registered in
the district where the fee plaza falls shall be 50% of the prescribed rate for that category of
vehicle provided no service road or alternative road is available for use of such commercial
vehicles.
6. Mechanical vehicles which is loaded in excess of permissible load specified for its
category under the Rules, shall be liable to pay fee at such rates which is applicable for the next
higher category of the vehicles and shall not be entitled to make use of the highway section
unless the excess load has been removed from such mechanical vehicle.
7. All definitions including category of mechanical vehicles, its permissible load, category of
exempted vehicles, service road, alternative road etc. shall be as per definitions specified in the
Rules.
8. The fee rates shall be displayed for information of the users in accordance with rules 12
of the said Rules.
9. Based on the Base rate of fee per km for the base year 2007-08 as mentioned in Table-1,
the actual amount of fee to be charged from the mechanical vehicles and the discounts will be
calculated by the Authority on the basis of the completed portion of the length of the Project
Highway. The same shall be got published by the Authority through the Concessionaire in at
least one newspaper, each in English and vernacular language and thereafter revised annually in
accordance with the rule 5 of the said rules and provisions of the Concession Agreement
provided that no revision shall be effected within a period of six months from the date of the
preceding revision of fee.
[FNo NHAl/l 3-14/COr’GC(Meerut-Bulandshahar]
ALKESH Si lARMA, Jt. Secy.
Printed by the Manager, Government of lndra Press, Ring Road‘ Mayapnn. New Delhi-110064
and Published by the Controller of Publications. Delhi-l10054