Notification of the Government of India in the erstwhile Ministry of Surface Transport (Roads Wing) number S.O. 78 (E) dated 04.02.1999
Notification - The National Highways Authority of India Act, 1988
- Kind: Notification
- Under: The National Highways Authority of India Act, 1988
Text of this notification
mm 31o Ema-3300409 REGD. NO. D. L.-33004/99
~
,
(We (gazette of fiadia
EXTRAORDINARY
WIT II—m 3—314!“ (ii)
PART lI—Section Hub-section (ii)
PUBLISHED BY AUTHORITY
‘H’. 4] fifififi,m,mfi 1, gen/11111 11,1934
No. 4]
‘
‘
NEW DELHI, TUESDAY, JANUARY 1, 2013/PAUSA 11, 1934
mafiafiaflrmfifimfim
'
War
Him 1311311 2013
WW 4(“)—W11w8,11mefiumfiawfimfimwaffifi1m 1988(1988371
68)fiv°ffl1'\’111 331312—310 finémamm$aafifiqw 111311—51 113113111
(113.2533) afimmww 78 (31),?11fia4wafi, 1999, 321311.11. 1192 (31),
W3 féwai 20013111 251,311.11. 920 (31),31€11§28 311m, 2002 WWWfi
WWW 8200.000 137.1111} 388.000 135.111. (MfiW/W
finflmmgvma Wfimfifiamfifiw 821% 388.000fi3.1fi11516.000%.1fi(
W/WW 1131311311113)a'cfi; WWfi WWW—76 3%
114.000 fiixfifizzoooo 13.111. (Wfimjmfimmwfifiw-m
21380001213311.1111000133311. (3321513331131 )aw WW1? mwrg‘fm
WWEW WWW 79112014000 firth. 1} 182.000 @111. 325
(W11 W)WNWWWWW%W 3111131130
m‘m”fiafiafim w%)afi1fim%;
W,WW%,WW(WW $ 133*? 3fi11¥111figa$31111111$
hw—Wmmflq)fim, 1997,?1fiflamr111‘fm3fiafiaafim,
1997WWW§RHEQTWW 31111111301)fi2111,2008$111311%311§fla
WW,1956(1956w48)fifim7mmwmmmafia§q 11m
Wfimmmfiawfi$w¢mafi$mw,fifiw
awmwwmaam3mmm3;
6 01/2013 (1)
2
. THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
(i) 119111111 W 11 W11 111111111 11911 791 111 0.000 %.19 11 35.000 131.111 3111
1113311 11111111 111911 — 79 111 15.000 %.111 11 81.000 191.111 1115 11 1903911
$1,311.11. 2049 (31), 311111 23 3111111 2012 11111 ~
(ii) 1191111111 11111 11‘ 11111111 11111111 111911 — 79 111 81.000 %.111 11163900 197.111
_.
11111 111 WE 15131111". 1783 (31), 11111111 9 3111111 2012 3111
(iii) WW9 11151311'111111111111911 —79111159.000191~.111.11188500191111,
WWW- 791168.5“00191111111111111151111, WWW
-76$213.000 191.111 11119111111719}, 1111191193911 111131111. 3289 (31)
111111112419119120099111
'
(iv) 1111191111 11111 9 W9 11111111 111911 — 76 111 113.830 9.111. 11 213.000
191.111. 1115 9 1993' 93 111311.11. 1930 (31), 11111111 21 3111111 2012 3111
(v) 1111191111 11w 11 1195111 111111111 11191 - 8 111 278.000 W91. 11 348.000 191.111.
_
1191 9 1913a 15131111. 1714 (31), 1111111 26 911111 2012 3111
(vi) 9111111939131111111111111 31391991111190— 81113480..01961fi11388180
'
191.111 11$$11U3911911311112623 (31),1111119303111111112012§111
(vii) 11111111 11111 11 W11 111111111 11911 — 8 111 388.180 191.111 11 443.000 $111. 119?
1'1 1393 fig 111131111. 2922 (31), 1111119 17 1911111 2012 3111
(viii) WW9 11211111119111 111911— 8 111443000 191.111 11 495.000 %.111. 1115
$m9gmm.11. 2923 (31,) 6111191719111120129111
3111, WWWWW,1988(198811168)999R11491
9199199131111101911119119191111111111 31113911311919 @9199, f911‘1U1, 1911, 91111111
81111111111 3111111911181111111111111111’191179—1 11108.3019111. (19913511 9911 0.000
191.111 )111111i1111111111111119118111509295 191.111. (19111111 9911 555.480191.111)1115
19111111115— 31111311- 31311911119191130911131111311911111113‘ ”3111119113’mwfiafl
wmfifimW9§29W20119m§aW$mfi1fimmfifiwm
19111111131—391131-31151111111191111119 $1199319111311111fi11311 WiMamfiw
3111,2511111991111313‘193—311,110001118(fi113111131111111913“11211111011é1”w
111119) 91111911131111(1911131111311111111113113911111511w9)191m9;
31131131193111 W111rv11111111a1(1111111311111116111111111101)191111 2008
$1981.$1.191.111911838(31),1991$ 59111111 2008193819311911119121111111211311119111
11115119.. 950(31) 19113 3 1911912010, 111117119. 15 (31), 191119112 111111111 2011 3111 .1
111.911.19.756 (30191111112 3193‘9120113111111111911191111111191H91113119mm
‘W”111191197mw9)91fi99391mqfia11§mwn1311919m1956(1956
m48)fiam8$§l11199111%m1911w19319§q3fi13119119911119111513n.2049(31),
911111 23.08.2012
, 911.311.1783 (31), 1111113 09.08.2012, 351.311 3289 (31), 111913
24.12.2009
, 151.311.1930 (31), 1111111 21.08.2012
, 151.31.1714 (31), 1111111 26.07.2012
,
[WW II—W 3(ii)] ‘TRH 'GFI WW5! : WW 3
Emanzezs (31), We 30.10.2012
,
371.311.2922 (GI), am 17.12.2012 3111515112923
(31),01‘€1E17.12.2012 mammammmmmwmwam
rwwfifi-mmfiafiqmfi 715%)de $fi11‘rw,31j1m,yam_fim
,ffififia WWW,WW ,memfiwmfimflafirfifi
mgfifimafimafimfiwfigmmmikfis mm_
790 $ 0.830 105.741. $1 36.100 $111, w W — 79 $ 15.000 fivfi. 15 164.000
flimwmfimwmwmmmaeoofiwfi.) WNW-76$
213.000 %.111 (130013713: 315% fi 001%) $1 117.500 135.111. (mm Wm fl
W)QW$WWW—eifir509295fivfl(WWMMH
0.000 $111,131 @0115? W$555480 fifi.mafi,WWfififlfififi1§531.66‘
fii.3fi.$firqfifiwfi1sfiqzfififi¥m$afifiwmmwmafizfiafi
mmgfi/Wsfiw W1afim(2)fi firFq‘Er afiw(mwfimm
“3112mm! ”WWWE‘Mfimom‘mafimafimmmw 7mm
WW$W$W$WWW$ éqwfiawafi'fimafivmfi
WWWmWfiWWfiWWfiWfiWfi
00031305101402? fi,fifimfifi,wfififiqwafimfiaa¢,wwfiaw
mmfimmmfl
'mwfi1
WWW mai2007-oaa‘1fimwfi
. fis.fi.gfisaflslmwav
(was)
(1) (2)
mafia.fi=rm5mfitam 0.65
WWW,WWWWWW 1.05
wmaafla‘rgfiafi) 2.20
Wmefmgfim) 2.40
111% mm W (W) 211 ffiefi? 2313:1- $ 3.45
W(W)WWWW(WXwfia-gga)
@WWW (mmafimgfimfi) 34.20
W2
wafimw (ufilmfinfimmfi)
1211251361,!!! 3333135 m, 3;); :26 6115111 071111011, $311251?
amafifismfi) 6510,30 W In at? W’ 21161211571
mm
3175!,
“311 mm mqwfi
I113?
WW
am
W
mm
Maw
10 "a 15 5 7.50 15 16.50 22 30
W5 E5115 2611?) $1 31% 1 1.50 3 3.30 4.50, 6
afivwvfimmaw,
4 THE GAZETTE OF INDIA : EXTRAORDINARY [Pm 11—30:. 3(0)}
WWWW
mmmm$m
new? WWO
81185311131 811W
mw,msfirfiafi
mmmmm
WWEFW,
0.75 1.15 2.25 2.45 3.40 4.50
215‘} WWO
31%,me
mmmmma‘w
W.
0.50 0.75 1.50 1.65 2.25 3
1. fimfiawmwfimm(
mmmwwmwm=
WWW-52m
wafi)%§fifilzgaa§m
aawaflmafimm—fimmmfia) m(%.m.a.)mw
I
me?
mafia W 6. — 79 (60.500 ffil‘fi) IN 40.75 %.1fi. W 90.50
wwfimmfi WWWEEW
W W FT: 79 ( 120.500 fiirfi ) 1N 100.750 %.1fi. 61.84
11?,W81firfizfimmmfi Wmfim
W W 17. - 79 ( 184.170 @5141.) 11? 183.900 70.13
€5.10“, WWfiWWfiWWWW
$332335
W W 5‘. - 76 ( 260.755 €5,111 ) 1T\’ 165.800 90.84
fivfiqzwmfi 33113,? $1318 Wmak
51616125
0123!: W 5. — 8 (394.185 failfi )‘Tx’ 348.450 103.75
€581.02 WWfiW W5 2531M Tria$
W
W W 5'. — 8 ( 461.685 fiitfi. )‘R’ 415.500 62.00
$101K WWfiWWfiWWEfiW
wan W11? 5. — 8 (518.185 %.Ifi. )‘Tx’ 472.200 105.81. 52.71
[um 11—15015 3(ii)] w $1 m : 31mm
wwmfi 1119mm WIT Wm$fiafi$
(E)UZ a: mwmmwfizfim
flam(mafi)m W 436ml? m(%.m.8)m
(15584555)
. WWW?-
WW 8. -79 (60.500 fiSJfi) 11? 90.50
40.75 %.fi.w,wmfimfifi
1% WW$W
wan W 8. - 79 ( 120.500 fizz?! ) 17? 61.84
100.750 fiilfi. In, W m #2113313!
8184 WW$W
may W Yi— 79 (184.170 fiitfi) a? 70.13
163.900 fiwfi. w
,
W m 1%
WWfiMWWW$W
W W 11’. —76’(260.755 fimfi) 1:? 86.94
165.800 103,111.97, WWfi mg?
ml? WW$W
W W 111-8 (394.185 fizfi )1T\’ 94.75
348.450 fiirfi. w, W W T31 33213?
181518 fish—slit 111628 mam
WU WW? 5. — 8 (461.685 fiitfi. )W 62.00
415.500 fiflfi. a? W m if W
1%? 1% dam 71111 $ 71616125
W W11? *8. — 8 (518.185 ma. )0? 65.50
472.200 am. W,WWIT Trim-«111?
m8 Wm$maa
zaqvjfi$afi1fiw fiaaw(wsfi)a§fimamafififiEM(m
Efiwfififi$m)%§fififfifi§am$8¢mfl%fimifimflafiaw$
181113-88an 13161160972135 WWWE‘W:
aam(mafi)mW-fimn mfimfifinfi.
(WW) fifimfimafififi
Wm?
4917,34;
THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
53213? W ( 323.875 fisflfi. ) tr? 14.500 22.76
135.141“: WWfi, WWW???
W
3.m$m,mw/m/mm$mgg(m$wa
afi$m)fiflafimfifififizafi néé,fiwfirffiaa§rm(wafi)w
W W mmmm.
WW(W3fi )afiw (aw) Ila/Wmfiucbfiqafirfiaa gas‘w'éu
? afi mi(fia.wfi.fi)sfiwam(firfl3
Wei)
m (fimfi. 13%) Erma (HR): w it)
mg? m ( 323.875 fifififi. ) 1N 1.02 fiifi. 140.64
,
14.500 fivfi TR, W m ff, saw—1
WW$W
4.mwlmzsomg‘mmmmaanmmmmmmfigfifi
mmwwfifiw%wmfizafiqsfififiqfimwéwwfia
wwmmmfimwwafifiifimfigfiwafiqwml
'
5. mmmmmmm—szsmmgmgmw
aamfizofisfirflflfia? "@5151 mm afi2012-1325fivmr Wwafi
av2oo.oow(€mfimm) WWW mwmwmwm
W)fim,2oos$m2fia%m mmwwmmmm
6. mewsfi$mwfififimafiwwmmfi,mz—
WW
WW’rfifiNWW fir m$w€1ifiifiv
5a.?“ 5%
mmafimmmafia‘» mmmmfim Wrafi Wfiw
Mafiawfimma‘r m5
@151? ”'
lmmviwwusmi‘wfiafimafimfimm (WW$
mwfimafiafim$mwwmfia§ mafimfia‘ifiawmsm
amm51®mmm$mn$mmmw amen We; W
WWW-5'}!
[am 1143“: 3(0)] m an m : arm
3. WWW M$afifimmfi$mfiufifiaafiamafimmafiifim
aafigafifimfiwwwwmmvfimmBEM$mfii$
mmm%afiie%aawqmniwmmmfimmwnfimfisw*
fiafiafiamnafimmafiwafimml
9. WW$W,WWWWQEWW$WW€EW
Wmnfiawfimfifififififiemfiaiwfifil
10.mmwm1zfimmfifimfi$mwafiafiafi
WWW!
11.:5qra1‘rt'fi1sfi‘r2fi wefifinmfimw—oarfimwfififiafimafi
$mw,ufi$afiafifi mmmwmmamm
mfiwfiefirmmfiafiizfimsafim Wm WWW
WmsfiwefiswnfiawmfiémfimafimmwwW
m—fi—mmafivmwafimw Wfimmml
—
[in If. W/l3013/686W—Blfil/11112/fil1fi mg! (0.000 fiat. ii 555.500 fiat) 50.30.21]
mmi, “'71“?! aha
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the lst January, 2013
SO‘ 405).- Whereas by notification of the Government of India in the erstwhile
Ministry of Shipping Road Transport and Highway number S. O. 78 (E), dated the 4'11
February, 1999, 8.0. 1192 (E), dated the 3"1 December, 2001 and 8.0. 920 (E),
dated the 28th August, 2002 issued under section 11 of the National Highways
Authority of India Act, 1988 (68 of 1988), the Central Government has entrusted the
stretch from kilometer 0.000 to kilometer 388.000‘ (Ajmer to Rajasthan / Gujarat
Border) of National Highway Number — 8 in the State of Rajasthan, from kilometer
388.000 to kilometer 516.000 (Rajasthan / Gujarat Border to Ahmedabad) of
National Highway Number — 8 in the State of Gujarat; from kilometer 114.000 to
kilometer 220.000 (Chittorgarh to Udaipur) of National Highway Number 76 and
from kilometer 6.000 to kilometer 17.000 (Udaipur Bypass) of National Highway
Number — 76 in the State of Rajasthan, from kilometer 14.000 to kilometer 182.000
(Nasirabad to Chittorgarh) of National Highway Number — 79 in the State of
Rajasthan and National Highway Number — 79A respectively to the National Highways
Authority of India (hereinafter referred to as the “Authority”);
And whereas, in exercise of the powers conferred by section 7 of the National
Highway Act 1956 (48 of 1956) read with National Highways (Fees for the Use of
National Highways Section and Permanent Bridge - Public Funded Project) Rules,
1997, National Highways (Rate of Fee) Rules, 1997 and National Highway Fee
(Determination of Rates and Collection) Rules 2008, the Central Government by
notification of the Government of India authorized Authority for levying and
collecting fee on mechanical vehicles for the use of stretches as follows :
(i) Vide $0. No. 2049 (E) dated 23rd August, 2012 for the stretch from km.
0.000 to km. 35.000 on NH-79A and section from km. 15.000 to km.
81.000 on the NH—79 in the State of Rajasthan.
THE GAZETTE OF INDIA : EXTRAORDINARY [PART H—SEC. 3(ii)]/
(ii) Vide S.O. No. 1783 (E) dated 9th August, 2012 for the stretch from km.
81.000 to km. 163.900 on NH—79 in the State of Rajasthan.
(iii) Vide $0. No. 3289 (E) dated 24th December, 2009 for the stretch from
km. 159.000 to km 168.500 of NH—79, taking off at km 168.500 of NH-79
and merging at km 213.000 of NH-76 in the State of Rajasthan. ,
(iv) Vide S.O. No. 1930 (E) dated 21st August, 2012 for the stretch from km. ,’
'
113.830 to km. 213.000 on NH-76 in the State of Rajasthan.
‘
(v) Vide 5.0. No. 1714 (E) dated 26th July, 2012 for the stretch from km.
278.000 to km. 348.000 on NH—8 in the State of Rajasthan.
(Vi) Vide S.O. No. 2623 (E) dated 30Lh October, 2012 for the stretch from km:
348.00 to km. 388.180 on NH—8 in the States of Rajasthan and Gujarat.
(vii) Vide S.O. No. 2922 (E) dated 17th December, 2012 for the stretch from km.
388.180 to km. 443000 on NH—8 in the State of Gujarat. ,
(viii) Vide 8.0. No. 2923 (E) dated 171h December, 2012 for the stretch from km.
443.000 to km. 495.000 on NH—8 in the State of Gujarat.
And whereas, pursuant to the provision of section-14 of the National Highways
Authority of India Act (68 of 1988) the Authority has entered into an Agreement
(hereinafter referred to as said Agreement) with M/s GMR Kishangarh Udaipur
Ahmedabad Expressways Limited, hawng its registered office at 4th Floor, Birla
Tower, 25, Barakhamba Road, New Delhi — 11001, India (hereinafter referred to as
the “Concessionaire”), the successful bidder for bids submitted on 29th July, 2011
for the development of six laning of Kishangarh — Udaipur - Ahmedabad Section
from kilometer 0.830 of NH-79A (Design Chainage» 0.000) to kilometer 509.295 of
NH—8 (Design Chainage -555.480) (hereinafter referred to as the “said section") in the
state of Rajasthan and Gujarat on Design, Build, Finance, Operate and Transfer
(DBFOT) basis;
Now, therefore, in exercise of the powers conferred by section 8A of the National
Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee
(Determination of Rates and Collection) Rules, 2008 published vide G.S.R 838(E)
dated 5Lh December, 2008 and amended vide G.S.R 950(E) dated 3ml December,
2010,G.S.R 15(E) dated 12Lh January, 2011 (hereinafter referred to as the “Rules”),
and in supersession of the notification bearing No. 3.0. 2049(E) dated 23.08.2012, S.O.
1783(E) dated 09.08.2012, 8.0. 3289 (E) dated 24.12.2009, S.O. 1930(E) dated
21.08.2012, S.O. 1714(E) dated 26.07.2012, 80. 2623(E) dated 30.10.2012, S.O.
2922(E) dated 17.12.2012, and 8.0. 2923(E) dated 17.12.2012 except as respects
things done or omitted to be done before such supersession, the Central
Government, having regard to the expenditure involved in building, maintenance,
management and operation of the said section, interest on the capital invested,
reasonable return, the volume of traffic and the period of the Agreement entered into
between the Authority and the Concessionaire, hereby notifies that there shall be
levied and collected fees on mechanical vehicles for the use of the section from km.
0.830 to km. 36.100 of NH—79A, from km. 15.000 to km 164.000 (start of existing
Chittorgarh bypass), existing Chittorgarh bypass (29.600 km) of NH—79, from km
213.000 of NH-76 (end of existing Chittorgarh bypass) to km 117.500 (start of
proposed Udaipur bypass), proposed Udaipur bypass (24.500 km) of NH—76 and from
"
km 287.000 (end of proposed Udaipur bypass) to km 509.295 (existing Chainage) of
NH—8 near Ahmedabad i.e. from km. 0.000 to km. 555.480 of the design chainage at
the rate specified in columns (2) of the Table 1 for net road section 531.66 km for
use of the four and more lane sections (hereinafter referred to as “base rate”) and at
the base rates specified in the Table No.2 for bridges/structures costing Rupees
[am 11.43": 3(ii)] W 3-7! m : WW
Fifty Crore or more and at one and half times the base rate for bypasses costing
Rupees ten crore or more on the Type of Vehicles specified in Table 1 and 2 below
and authorizes the said Concessionaire to collect and retain the fee on and from the
date of commercial operation or publication of this notification in the Official
Gazette, whichever is later, till the termination date as specified in the agreement.
Table 1
‘
Base rate of fee per
km for the hue year
-
Type of vehicle
2007-08
(in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three-axle commercial vehicles 2.40
Heavy Construction Machinery (l-ICMl or Earth Moving 3.45
Equipment (EME) or Multi Axle Vehicle (MAV) (four to six
axles)
Oversized Vehicles (seven or more axles] 4.20
,
Table 2
“Base rate of fee Ru ees r vehicle r tri
Light
C313 Jeep. Commercia HCM
Cost of permanent
'
Van or 1Vehicle, Truck Threeaxle EME, Oversized
bridge, or tunnel Light Light or commercial or Vehicle
(Rupees in Crore] .
Motor Goods Bus vehmles
MAV
Vehicle Vehicle or
Mini Bus
10 to 15
’
5 7.50 15 16.50 22 30
For every additional
Rupees five Crore or
part thereof,
exceeding Rupees l 1.50 3 3.30 4.50 6
fifteen Crore and up
'
to Rupees one
hundred Crore.
For every additional
Rupees five Crore or
part thereof,
exceeding Rupees one 0.75 1.15 2.25 2.45 3.40 4.50
hundred Crore and
upto Rupees two
hundred Crore.
For every additional
Rupees five Crore or
part thereof, 0.50 0.75 1.50 1.65 2.25 3
exceeding Rupees two
hundred Crore.
Notes:
1. The fee levied and collected hereunder shall be due and payable at the following
Toll Plaza for the distance specified for such Toll Plaza(s):
é a C} n
— x
10 THE GAZETTE OF INDIA : EXTRAORDINARY [Pm Il—SEC. 301)]
V
_
A. During Construction Period:
Location of Toll Plaza(s) Existing
(Design) Chainage
Length (in km) for which Fee is payable
At km 40.75 on NH-79 (km
60.500), near village
Bandanwara in Ajmer district in
the State of Rajasthan
90.50
At km 100.750 on NH-79 (km
120.500), near village Larnbia
in Bhilwara district in the State
of Rajasthan
‘1
3
61.84
At km 163.900 on NH—79 (km
184. 170), near village Jojro Ka
Kheda in Chittorgarh district in
the State of Rajasthan
70.13
At km 165.800 on NH—76 [km
260.755), near village
Narayanpura in Udaipur
district in the State of
Rajasthan
90.84
At km 348.450 on NH-8 (km
394.185), near village Khandi
Obn' in Udaipur district in the
State of Rajasthan
103.75
At km 415.500 on NH—8 (km
461.685), near village Vantada
in Sabarkantha district in the
State of Gujarat
62.00
At km 472.200 on NH-8 (km
518.185), near village Kathpur
in Gandhinagar district in the
State of Gujarat
52.71
B. After completion of six laning:
Location of 'I‘oll Plaza(s) Existing
(Design) Chainage
Length (in km) for which Fee is payable
At km 40.75 on NH—79 (km
60.500), near village
. . . . . 90.50
Bandanwara 1n Ajmer district in
the State of Rajasthan
At km 100.750 on NH—79 (km
120.500), near village Lambia
in Bhilwara district in the State 61.84
of Rajasthan
[um II~1§E 3(ii)] qua an m : mam ll
At km 163.900 on NH-79 (km
184.170), near village Jojro Ka
Kheda in Chittorgarh district in
the State of Rajasthan
70.13
At km 165.800 on NH-76 (km
260.755), near village
Narayanpura in Udaipur
district in the State of
Rajasthan
86.94
At km 348.450 on NH-8 (km
394.185), near village Khandi
0in in Udaipur district in the
State of Rajasthan
94.75
At km 415.500 on NH—8 (km
461.685), near village Vantada
. in Sabarkantha district in the
. State of Gujarat
62.00
At km 472.200 on NH-8 (km
'
518.185), near village Kathpur
in Gandhinagar district in the
State of Gujarat
65.50
2. In addition to above, the following fee shall also be due and payable for the use of
the following bypass(es) at the following toll plaza(s) at one and half times of the
base rate for the length of bypass(es) specified for such toll plaza(s)( after
completion of Bypass):
Chainage
Location of Toll Plaza(s) Existing (Design)
Length of Bypass (in km)
for which additional Fee is
payable
At km 14.500 on Udaipur bypass( km
323.875), near village Dakan Kotada in
Udaipur district in the state of Rajasthan.
22.76
3. In addition to above, the following fee shall also be due and payable for the use of
the following bridge(s)/structure(s), cost of which is specified hereunder, at the
following Toll Plaza(s) ( after completion of Bypass):
Location of ’I‘oll Plaza(s) Existing
(Design) Chainage
Length (in km) and Cost of bridge
/structure (in Rupees Crore) for
which additional fee is payable
Length Cost
At km 14.500 on Udaipur bypass( km
323.875), near village Dakan Kotada in
Udaipur district in the state of 1.02 km 140.64
Rajasthan.
4. As regards bridges and bypasses costing Rs. 50 crore or more and costing Rs. 10
crore or more respectively as specified in Note 2 and 3 above, the fee levied shall
be due and payable only after completion of such bypasses and structures.
12 THE GAZETTE OF INDIA : EXTRAORDINARY [pm II—Sac. 3(ii)]
5. The rate of monthly pass for a person who owns a mechanical vehicle registered
for non-commercial purposes and resides within a distance of twenty kilometers
from the toll plaza is Rs. 200.00 (Rupees Two Hundred only) for the year 2012-13
which is subject to revision every year as per the provisions of the National
Highways Fee (Determination of Rates and Collection) Rules, 2008.
6. For multiple journeys on
following rates, namely.
'
the highway section, passes shall be issued at the
Amount Payable
Maximum number of one
way journeys allowed
Period of validity
One and half times of
the fee for one way
journey
Two
Twenty four hours
from the time of
payment
TWO-third of amount of
the fee payable for fifty
or more single journeys
Fifty or more
One month from
date of payment
7. Fee for commercial vehicle (excluding vehicles plying under national permit)
registered in the district where the fee plaza falls shall be 50% of the prescribed
rate for that category of vehicle provided no service road or alternative road is
available for use of such commercial vehicles.
8. Mechanical vehicles which is loaded in excess of permissible load specified for its
category under the Rules, shall be liable to pay fee at such rates which is
applicable for the next higher category of the vehicles and shall not be entitled to
make use of the highway section unless the excess load has been removed from
such mechanical vehicle.
9. All definitions including category of mechanical vehicles, its permissible load,
category of exempted vehicles, service road, alternative road etc. shall be as per
definitions specified in the Rules.
10.
11.
The fee rates shall be displayed for information of the users in accordance with
rules 12 of the said Rules.
‘
Based on the Base rate of fee per km for the base year 2007~08 as mentioned in
Table-1 85 2, the actual amount of fee to be charged from the mechanical
vehicles and the discounts will be calculated by the Authority and revised
annually in accordance with the rule 5 of the said rules provided that no
revision shall be effected within six months and the same shall be published in
at least one newspaper, each in English and vernacular language accordingly.
[F.Nn.NHAl/13013/686/CMD-C0/1l-12/GC Udaipur (Km 0.000 to Km 555.500) BOT]
ALKESH SHARMA, n. Secy.
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064