S.O 920 (E) dated 28.10.2002 issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988),
Notification - The National Highways Authority of India Act, 1988
- Kind: Notification
- Under: The National Highways Authority of India Act, 1988
Text of this notification
1111111 11° 31° 111°733004/99 31560110. D. L.-33004/99
111mm
~
am -
(L112 60262:”: of findia
EXTRAORDINARY
W‘T Il—‘G‘TS 3—3‘11'6‘13 (ii)
PART lI—Scction 3—Sub-section (ii)
WEEK 11 uazrfinfi
PUBLISHED BY AUTHORITY
11. 11714] W? Wazwfiawfiam 6,2012/‘111E15J934
,No. 1714] NEW DELHI, THURSDAY, SEPTEMBER 6, 2012/11112101111 15, 1934
mmmwm
311711153111
11 W, 23 311m, 2012
311.311. 2049(31).—FW11 1111511 1 111111111 11112111 111111111 WW 311111911111, 1988
(1988117168) 317511111111 a1e12fi=16111121911r§111111111€m1a1afim3fi=111§$1fiafi
3111111111111 113111111 551 31W 111—91115 1171.311. 920 (31) 0111131 28 3111111, 2002 [3111
1171.311. 1192 (8)81111a3fi111a12001311111fi121m11w11111i11111mfi11. 791111
0.000 116.111. 11 35.000 116.111. 1115 3111 111:111 WP? 11'. 79 a1 14.000 115. 1’11. 11
182.000 116.111. (WW—W's! 131111;) FEE] a1 11131—6 1171 11118111 11111111 111111111
9110mm (111113111 31111111111111“m1‘%1151111"?n8111111%)afi 111111111;
m:m,$é1&wm1rfiu1m1fiw(a11wmwafi111m)fim2008
(1111151111s11cht13fl111‘8wfi1111”m5111111%)a1fiafi3311flaqfifi1n€t11
WW,1956(195615148)a%111117§11113111fi111111m;111111wa§§
WW 111115111 111111111 11. 791 1110.000 116.111. 11 35.000 116.111. 3111111311
1111111111. 7911115000 103.111. 181.000 116.111.611318118111111111111111110111
a1w211fi1fi§€311m131®1111§1110mafim131fi1w§w (1111111
WWW$W$WWNWWWW31WWW
$m)1fifim1$w1fififififinfi$afifi1wmsfifi$mméa
wfifiwwmfimmfiwafimafifiwfifi$wfimw
$mmfimwwmmfigmfimfi 3111111:
3334 Gl/ZOIZ (l)
1
_firEgB@Bm
sgfipwfififipfigfigwfififimagfigsfifiw
EEEfiEwgfigfifigfigwgfiwfig
EveEEEKEEMEEEWFEE.q
Efig
EfiEEE
EfiwgfiafiyE””3555E
_
3.55%
wwwfimgéfiawwPMEfifiwfifié
Egan
gangEEEEH?
Ems
EEEEEfiEEfifiEEEE.m
LEwEEEEEfiEwSON.E
AEvfiEEVMVEWEWEEMAEEEEEVE
8.2:fifiEEmEfiEEE.EfiNTFENE.m
8.2:35fiFEEwE55.9%§.&8.8
MNNFEE
E.AwGE:wEwEmaEEEE
ufifiwéafigfiwgfififiafiwg
Efiggfiwggfifiwgémfig.r
o3.AwwméfimfivEggsfigs
AfimmmczfiCamirfiflwmwmEfmfié
3mEEM3&5EwiEwwszE
o:
..Egggé
o3
.
AENEWEEEE
moe5E§EEEE.§£E
80ESEEsfigpg
E3
$33.
E§.%.&Euwfi
$8.38FEE»E5EH
5cmBml::3:525505.93”EOEmoBEESmE
\mEEEEEEmEE
EgEEEmEEéfigfigEEQNEM
HEEQQNSEEEEKEAEEKWEEEEE
ngfifiw.EEE«NEE:WWIHEE
E‘Effifi_
flgfififllgaiogfig.WE:
Egfifiazsgwfi?@mfiwegépfiifififiwws
EE?E£.E$E%FENEE¢EEAE%
$.5va%E%_Kfigvfifigfigfififir
EfigfigngvE%E.EF£WE~5FFE
EEEEfigfiEmWEEEFEEFVWBP—UME
.EE.E§E§W¢BMEFEWEEEEE
figgfigfigggfigficvvmwfimwmflgg
Egg
Efiéfififiifigfiézsfigiswfiggfi
figfigfififififififiwfimgfimfimEgg
sEEEfiggfimiggémWEAfimfi
ExsEEEEEEEEE_E@2&Em
FEEEBESQE:EFEE.EE.2
_EE%¢E€EE%EE%EE
E$ovfimfiwfifi¢w§wrwnwmmwufiflfirmWHEENWMN”m.
vfiggwfiafifififigmfiwéfifiwggwgfi
fiEEE_mEEmmmEEEfiEm
.mfigfigfimwfigmfifigégg
Eggwfigafififiwrfiiigfigg.m
_Ews&p_mfififi
fifiwEmWEmfifiEEEFEMMEEx
Efizfiswfigfififfiagifiwggsfifi
EVE».EmwwsgmwEEEEEMWFSEE.w
Ewsawmmfizuggfifisfiéfigfifififies
EEEEEEEEEKEEEEmWEmWE
EEEEEEEEEEfiEfifiwmfiwEé
EfifiEEwmaaEmeEngEEgg.m
5555uEEBE
2::El:£5
THE GAZETTE OF INDIA : EXTRAORDINARY [PART 11~SEC. 3(ii)]
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 23rd August, 2012
SO. 2049(E).‘-Whereas by notification of the'Gpvernment of India in the erstwhile
Minis‘t’ry'w Road Transport and Highways number SD. 920 (E) dated 28“I
August, 2002 [and number SO. 1192 (E) dated 03rd December, 2001, issued
under section 11 of the National Highways Authority of India Act, 1988 (68 of
1988), the Central Government has entrusted the stretch from kilometer 0.000
to kilometer 35.000 of National Highway No. 79A and from km 14.000 to km
182.000 (Nasirabad to Chittorgarh Section) of National Highway No. 79 in the
State of Rajasthan to the National Highways Authority of India (hereinafter
referred to as the “Authority”);
Now, therefore, in exercise of the powers conferred by section 7 of the
National Highways Act, 1956 (48 of 1956), read with Rule 3 of the National
Highways Fee (Determination of Rates and Collection) Rules, 2008 ( hereinafter
referred to as the “said Rules”) ,
the Central Government hereby levies the fee at
the base rate specified in columns (2) of the Table 1 for net road section length(hereinafter referred to as “base rate”) [for use of the four and more. lane
sections and at one and one half times the base rate for bypasses costing
Rupees ten crore or more ] on the Type of Vehicles specified in column (1) of
Table below, for the use of the section from kilometer 0.000 to kilometer
35.000 on the National Highway No. 79A and section from kilometer 15.000 to
kilometer 81.000 on the National Highway No. 79 in the State of Rajasthan and
authorises the Authority to collect, either through its officials or through a
contractor, the said fee, namely:—
TABLE
Type of vehicle I Base rate of fee per
km for the base year
2007-08
(in Rupees)
_
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini 1 05
Bus
Bus or Truck (Two Axles) 2.20
Three-axle commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving 3.45
Equipment (EME) or Multi Axle Vehicle (MAV) (four to
six axles)
5
Oversized Vehicles (seven or more axles) 4.20
_)
FIFTH—@113 3(ii)] W 311 W : WW
Notes : -
l. The fee levied and collected hereunder shall be due and payable at the
following Toll Plaza for net road length specified for such Toll Plaza:
Location of Toll Plaza (chainage) Length (in km) for which
Fee is payable
Km 80.800 (near Kawaliyas village in Bhilwara 101.000
district)
'
2. The rate of monthly pass for local personal traffic is Rs. 190.00 (Rupees One
Hundred Ninty only) for the year 2011—12 which is subject to revision every
year as per the provisions of the National Highways Fee (Determination of
Rates and Collection) Rules, 2008.
3. For multiple journey on the highway section, passes shall be issued at the
following rates, namely.
i Amount Payable Maximum number of Period of validity
one way journeys
allowed
One and half times of the fee for Two Twenty four hours
one way journey from the time of
payment
Two—third of amount of the fee Fifty One month from date
ayable for fifty single journeys of payment
4. Fee for commercial vehicle (excluding vehicles plying under National permit)
registered in the district where the fee plaza falls shall be 50% of the
prescribed rate for that category of vehicle provided no service road or
alternative roaduis available for use of such commercial vehicles.
Mechanical vehicles which is loaded in exceSS of permissible load specified
for its category under the rules, shall be liable to pay fee at such rates which
is applicable for the next higher category of the vehicles and shall not be
entitled to make use of the highway section unless the excess load has been
removed from such mechanical vehicle.
All definitions including category of mechanical vehicles, its permissible
load, category of exempted vehicles, service road, alternative road etc. shall
be as per definitions specified in the rules.
The fee rates shall be displayed for information of the users in accordance
with rules 12 of the said rules.
The fee rates shall be revised annually in accordance with the rule 5 of the'
said rules provided that no revision shall be effected within six’months.
The estimated capital cost of the project is Rupees 326 crores. The
Authority shall maintain a record of the recovery of capital cost through user
fee realised and after recovery of the capital cost, the fee leviable shall be
333 L; ‘73 12,2,
THE GAZETTE OF INDIA : EXTRAORDINARY [PART ll‘~SEC. 3(ii)]
reduced to 40% of the rates and shall be revised annually in accordance
with the said rules.
10. The rate of fee for the use of a section of a national highway consisting of
bypass or tunnel constructed on or after 11th September, 1956 but before
5th December, 2008, through public funded project or build, operate and
transfer (annuity) project, shall be the same, as provided in sub— rule (2) and
(3) for the Section of a national highway, and, shall be revised in accordance
with the provisions of rule 5. F
Provided that notwithstanding whether the Section of the national Highway
or the bridge has been taken for further lane upgradation or not, the
increase in the rate of fee for use of a Section of such national highway,
permanent bridge, bypass or tunnel constructed through any public funded
'project or any build, operate and transfer (annuity) project constructed
before the commencement of the said rules, shall not be increased after the
commencement of the National Highways Fee (Determination of Rates and
Collection) Second Amendment, Rules, 2011 by more than twenty—five per
cent of the rates of fee applicable immediately before such commencement
and further annual increase shall in no case be more than twenty—five per
cent of the rate applicable in the immediately preceding year.”
[F. No. NHAI/l 3013/8 l/l 1-12/CO/Chittorgarh]
B. B. MOHAPATRA, Director
Foot note:-This is in supersession of the notification of the Government of
India in the erstwhile Ministry of Shipping, Road Transport and
Highways ( Department of Road Transport and Highways) number SC.
16005)), dated the 03.02.2005 except as respects things done or omitted
to be done before such supersession.
‘
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-l10064
and Published by the Controller of Publications, Delhi-l 10054