S.O 78 (E) dated 4th February, 1999 issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988),
Notification - The National Highways Authority of India Act, 1988
- Kind: Notification
- Under: The National Highways Authority of India Act, 1988
Text of this notification
,EE.(”)-NQ-_D- L.—33904/99
07112 (50262:: of fludia
EXTRAORDINARY
W 11—13“? 3—31-1303 (ii)
PART lI—Section 3—Sub-section (ii)
WW 1?: mfina
PUBLISHED BY AUTHORITY
11'. 2273|
'7
a? W,§W,W 21, 2012/3.1193; 30,1934
No. 2273| NEw DELHI, WEDNESDAY, NOVEMBER 21, 2012/KARTIKA 30, I934
mufiafiafiwmflm
31W
K
315 W, 21 131312012
3-1311. 2753(3),— Efifim W %, mm: W mm“ WW, 1988(1988
mewafimnzfimfifiwfiafifiwmifiafifififi W BREE?
W(Wi§3) afiaféua’fimman 78 (mam 4m,1999
mwmmfi W W 11'. 23% 93.00 filfifir 479.00 fifir.
a’cfi (3W /Wmfim—W W)WIWWWW
Wfifiwfimmwffimw’fiaflfifim W%)fifim%;
afiV,WW%,WWGW(WW$ gas-2mm
W$.W$WW-Wfifimfifimfim)fim, 1997Er§fim113,5
afi’xrnfiwaqfiawéjwmfimfiufi,1956(1956m48)afim73fi7wflw
W(§Rfiafia®fiw,1997zfifiwsifimfiw(z)mmfi¥rfififimm
W (meww Perm )afiafiwmfiwman. 2267 (3T),
am 25W2008mwmmfi "(@5311 W01 3‘? 250.500
fififi. 1?: 321.100 fivfi. Wqfimafivsamw G’sfimwfim
W“mas”mfifiafifim W%)W$fiflfi?$fi€fl§€m$ 1%{0
2013213731370 IN Wfififi'firafi mwmwmmmm
WWWEWWWWW
(l)
4346 01/2012
03$A.Ep»wE:E.wEKEV#Pfloommm
“gummy”.
\
Ema
Efiw.fi.&VEEEAF—~Ev5F:fwfivE5:
\"Epfizsafiggwwfififiafiwg
Eafimgwwafiwfifiwwfikmfiéémfigg.F
“Ease
oweEEWEERE:55«SE@355
gmmmwgvAfimwvgay”5Abani
3E5pawa»5EwiEu5%?
8.“msgwsfiwfi
omdCwfifim@BMEEN
mo;EMEEEEWEE.EEEE
3.0gglfimfirwfifig
EE
p»HE
m225.fi&anE
.-
”Faofloowg.V—EEEmEh.
TE
EEEEEWEfiEEfiEEEfiEEfiEE
EggsWEEEESPETWEEEEE
9&nggrfifikfirEgrfigfifingfiflawfi
Eggfigmwflfiflwcygfigfiwggfirfigfiflwwfim
fiflfimfifi03$EfigfigémmgE5588E
mmEfiwémvnmmm55.59%gyMEEEEE
Em5%EN835@3582.EflatrfivwfipmfibafifimrEmZNAm
EEhEE.EEEEVEKE-E30NE
Ag£5EEEEEEEEE.§
_mEmoom.EAE%EEEEW
EWQEwmmfimoomEmwfiw.AsvmmmEEEBEE
.vaEEerwvaamfiEEwfipwfiBmFgfl
AEEEE-fimfifipfimwgfiazgwwfig
fivgfigefiafifififimgfiafiafiwrfim
”EwmE\BEKE%\EwE%vE%
.vomrwwflAmmEvaEwfimeEEEwEEm
mEmamAmeEmmmmeerWEEHmefib¢E§.%
.Ecm.851:if:>M<ZHQMO<MHXM”32m0mtmfioE
EEEEfiEEfifisfifiwggmgpfiE
E§_mw§wfimooo.mmw.gfiwfivmfiwmsfigfiflu.m
EVEEEEWHEE
-BfigpfavfiEE¢-EE€EEsEEE
Evfismsgmgmfiafiwfigfimvfifimfipasfifig
«WEEVEWEEEEE@Egfiégwfié
fiffififitioafigsfifiwg”1Egg.m
gapfigwflwmfifi
figwfifiEfifiwfiEEfifiEfiEE.n
_%E%fiEwWEWEEE%EEmEE
gfipEfiEEEEEEEEWEEE.0
_EEWB%EE%¢Egfimufigfifig
EEEEEEEWWEVPXEEEMWEgg
EEEEEEEEEEfigfifimfipfié
Egfifipmmsfigafifivgfisgsfiwfi@5555.m
fl_fiwEEE§§5
EfipwfifiwpfimfiEgfifiwfifiémgfiw
EEEEWEEfififigfifigfigwgéfifi
EVEEggmgfimfigfiwfimmgg+
{I‘l‘I
EEE
Efifimfiwfi
EwfiwwfifibfiflgE
.
fififihgE
Emwwgmww
figwgfiaww.wEbyF5E
Egfim
EfififlreflfiEEEmmaEwan”
“E55.EEEEWM§EE%§EEEd
EEEEE
2”EEEwagfimgwfifgwfifiaggfi
EMEE.yfifmwfifiuFEEEEEOOSNVWKWEEH"
Efifl-~5~t~EEfiEmVrwwfifiwfifiowwpfiwpwfimw
5555uEawES.2::ME\=EL
THE GAZEl IE OF INDIA : EXTRAORDINARY |PARI' II~SEC. 3(ii)|
mafiYWmafimfifimatmmwwafiafifiW4m
afifimwwsfivmfiufiatwafiafiarwamfimml
31.03.2012a25 fiscammenmafinafiamml
1o. mafiafifiqfifinfitfimfimammatefifimwafiafi
a mmeamfiam
Dar. n2 W/13013/326/o7—03/fian/6W—wm (250.5—321.10)]
arm WIT, again afaa
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, die letNovember, 2012
5.0175305)! Whereas by notification of the Goverirmgnt of India in the erstwhile Ministry of Surface
Transport (Roads Wing) number So 78 G2), dated 04 February, 1999, issued under section 1 1 of the
National Highways Authority of India Act, 1988 (68 of 1988), the Central Government entrusted the
stretch from kilometer 93.00 to kilometer 479.00 (Haryana/Uttar Pradesh border - Kanpur section) of
National Highway No. 2 in the State of Uttar Pradesh to the National Highways Authority of India
(hereinafler referred to as the “Authority”);
And whereas, in exercise of the powers conferred by section 7 of the National Highway Act
1956 (48 of 1956) read with rules 3,5 and 11 of the National Highways (Fees for the Use of National
Highways Section and Permanent Bridge - Public Funded Project) Rules, 1997 and sub-rule (2) of Rule
3 of the National Highways (Rate of Fee) Rules, 1997, the Central Government by notification of the
Government of India in the erstwhile Ministry of Shipping, Road Transport and Highways (Department
of Road Transport and Highways) number So. 2267(E), dated 25‘“ September, 2008, authorised the
National Highways Authority of India for levying and collecting fee on mechanical vehicles for the use
of four-laned stretch fi'om km 250.500 to km 321.100 (hereinafier referred to as the “said stretch”)
Makhanpur to Etawah and Etawah Bypass section of National Highway No. 2 in the State of Uttar
Pradesh at the rates specified in its schedule.
And whereas, the Central Government, in exercise of the powers conferred by section 9 of the
National Highways Act, 1956 (48 of 1956) and in supersession of the National Highways (Temporary
Bridges) Rules, 1964, the National Highways (Collection of Fees by any person for the Use of Section
of National Highways/Permanent Bridge/Temporary Bridge on National Highways) Rules, 1997, the
National Highways (Fees for the use of National Highway Section and Permanent Bridge-Public
Funded Project) Rules, 1997 and the National Highways Rate of Fees) Rules, 1997, has flamed the
National
Highways Fee (Determination of Rates and Collection) Rules, 2008
,
vide G.S.R. 838 (E)
dated the 5 Dec, 2008, for collection of fee for use of sections of national highways, permanent
bridges, bypasses and tunnels.
Now, therefore, in exercise of the powers conferred by section 7 of the National Highways Act,
1956 (48 of 1956), read with rule 3 of the National Highways Fee (Determination of Rates and
Collection) Rules, 2008 and amended from time to time (hereinafier referred to as the “said Rules“),
and in supersession of the notification bearing No. 5.0. 2267(E), dated 25"' September, 2008, the
Central Government hereby levies the fee at the base rate specified in column (2) of Table l for net road
section length of 72.940 km (hereinafler referred to as “base rate”), for use of the four and more lane
sections on the type of Vehicles specified in column (I) of Table 1 below, for the use of the “said
stretch” and authorises the Authority to collect, either through its officials or through a contractor, the
said fee, namely:-,
[arm nfizav'e 3(ii)] we an W : 3mm
TABLE 1
'
'
I
Type of vehicle Base rate of fee per km for
the base year 2007-08 (in
Rupees)
(I) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Good Vehicle or Mini Bus 1.05
Bus or Truck (Two Axles) 2.20
Three-axle Commercial vehicles 2.40
Heavy Construction Machinery (HCM) or Earth Moving 3.45
Equipment (EME) or Multi Axle Vehicle (MAV) (four to six
axles)
-
Oversized Vehicles (seven or more axles) 4.20
Notes: -
l. The fee levied and collected hereunder shall be due and payable at the following Toll Plaza for
net road length specified for such Toll Plaza (5):
Location of Toll Plaza(s) (chainage) Length (in km) for which fee is payable
Km/ch. 285.00 (near Gaurau village in Ferozabad district) 72.940
2. The rate of monthly pass for a person who owns a mechanical vehicle registered for non»
commercial purposes and resides within a distance of twenty kilometers from the toll plaza is Rs.
200.00 (Rupees Two Hundred only) for the year 2012-l3 and is subject to revision every year as per the
provisions of the National Highways Fee (Determination of Rates and Collection) Rules, 2008.
l
3. For multiple journey on the highway section, passes shall be issued at the following rates,
namely:
Amount Payable Maximum number of one Period of val idity
way journeys allowed
One and half times of the fee for one Two Twenty four hours from
way journey the time of payment
Two-third of amount of the fee payable Fifty One month from date of
for fifty single journeys payment
4.
I
Fee for commercial vehicle (excluding vehicles plying under National Permit) registered in the
district where the fee plaza falls shall be 50% of the prescribed rate for that category of vehicle
provided no service road or alternative road is available for use of such commercial vehicles.
5. Mechanical vehicle which is loaded in excess of permissible load specified for its category
under the rules, shall be liable to pay fee at such rates which is applicable for the next higher category
of the vehicles and shall not be entitled to make use of the highway section unless the excess load has
been removed from such mechanical vehicle.
6. All definitions including category of mechanical vehicles, its permissible load, category of
exempted vehicles, service road, alternative road etc. shall be as per definitions specified in the said
rules.
7. The fee rates shall be displayed for information of the users in accordance with rule 12 of the
said rules.
(45% @2/12’2
THE GAZETTE OF INDIA : EXTRAORDINARY [PART ll—SEC. 3(ii)]
8. Based on the Base rate of fee per km for the base year 2007-08 as mentioned in Table-l, the
actual amount of fee to be charged from the mechanical vehicles and the discounts will be calculated by
the Authority and revised annually in accordance with the rule 5 of the said rules and the same shall be
published in at least one newspaper, each in English and vernacular language accordingly.
9. The estimated capital cost of the project is Rs. 486.000 Crores. The Authority shall maintain a
record of the recovery of capital cost through user fee realized and afier recovery of the capital cost, the
fee leviable shall be reduced to 40% of the rates and shall be revised annually in accordance with the
said rules. A total of Rs. 50.67 Crores has been recovered from the users fee realized till 31.03.20l2.
10. The increase in the rates of fee shall in no case be more than twenty—five percentflf the rates of
fee applicable in the immediately preceding year.
1"
[F.NONHAl/l3013/326/07-08/CO/GC—Agm(2505-321.10)]
(
ALKESH SI lARMA, .lt. Secy.
Primed by the Manager, Government of India Press, Ring Road, Mayapuri. New Delhi-l IOOM
and Published by the Controller of Publications, Delhi-l10054.
f