S.O 485 (E) dated 26th February, 2010 issued under section 11 of the National Highways Authority of India Act, 1988 (68 of 1988),
Notification - The National Highways Authority of India Act, 1988
- Kind: Notification
- Under: The National Highways Authority of India Act, 1988
Text of this notification
W 110 E30 1180-33004/99 RFGDNO. D. L.-33004/99
am .
Elm (Gazette of(Sacha
EXTRAORDINARY
WI"! IX—E’U'S 3—314“! (ii)
PART l'I—Section Hub-section (ii)
m it warm:
PUBLISHED BY AUTHORITY
Iii. 350] '1? W,W,mfi 15, 2013/1111: 26, 1934
No. 350] NEW DELHI, FRIDAY, FEBRUARY 15, 2013/MAGHA 26, 1934
mmmmm
wimp-v11
Ts‘fififi, 1411711111, 2013
151.311. 377(31).- 31am 1111511 «*1, 111116121 (Iva-11 1131:1111 111111311111 311111212111.
1988(1988a1168)£1t1111Ilavamaamfinémmfimamqfiaw
3111 115111121 113113111 3111133511 11w 31.311485903111111 2611mm, 2010 {am am 11321
fir 11116311 115111111 1113111 17 $ 148.000 136.111. 11 318.000 131.111. (sag-WW
Wmmmmmmmm(mflfimmm"mm'firw
%)$TH‘TQT?;
mmmmmm, 1988 (1988111168)afiram1431
‘Wfimfi,mfimmfifiafiafimm§mmm,sfr27.03.2009
wwfifimmmmammmmmws.
mm,figfi.3,ém%w.%aTfi1E-5oooa4,mfi%(mswfi3fi1m
1121mm” 551112113), azmmaumw‘r-n #311151; 148.000 ma. 111230.000
115.111.w-émawaamfifisafimmmwfimrmmmmmmaa
WWfimmmmw$mmW$mmmfi
(mmmmmmmwmml
620 01/2013 (1)
*E”l.JllkLJ.UL wu-wmnmnmh
m.m...».lx.”mm..mmmwmm”mina
uwmunll‘nuwum
4nm
ozw(flfiwmfllfi)mwmfi
‘5(.312
gfimaw)(m)m&wm%)
avewmmfuwwmnmmumwmw
0”CamaEmmimme
9‘”flwmwww‘mww
99'0mmwmfle‘m.fi
(z)(L)
film)
mmwufiuw
wmkeo-Loozummum
Luau:
dwfigmthwam
mm$wmmmmamfiflwgmmgm
‘Emnmmmm‘awwmufhgwaemwfifn
www‘mmwwwwcwmmmw1.1
mmwxmwwmuwwwmwflawmm:
fi§fiflh¥€#(3)fifi¥LMnQ$$w$ifl$fifimflékW$
m$wmmmmmww$wxmwgam2®ifi
afi‘aiamgm1gwaatgtcimnfimxwm‘wimlw
Lamb-1922mm
mw‘mmmbw‘wmmwmyflgg
wmmmseemsefimms‘mummwwW)sooz
‘m(mmmmmwm)fiewm‘mmme.25
[(105039-111W4]
.
AHVNIGHOVHLXH:VIGNId0amazvoEIHJ.
Z
(age.2mg)mug;000'68Lwage
00steagle)"my00'88ln:“19.1mmmt
amuféngwwmwmm)mme&mm
Imwnaazuemam$aihm
Agsemmmmmmwflmmmw'L
{M
mgmme
mummm
Wm‘w
sszzOQ'LMD090am2192It!42
Agnew
wmmmm
wmmm
mweww
os'vov'eszz9H9m{imaging
has:fl
mmmmm
wwww
mmmmugs
909v9091Lmfimmm
0::ea910919Quiet
@205
1:131:03m:
. (an:unmiti-mm
3323*:mmmm
mm)nflkmmmmm:
m:mmmfiwwwhentymfiwm
muJammienuns:1m‘nue'mangfim‘nflugm
(mwmmamgufi
am
2:
mm:maMy.[005Eon—1111M]
4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II~SEC. 3(ii)]
2. W$afiflw,fimfiffiagwgfi)lfimflfimfifivwa§m,m
mfifififiwfifia$fiasfi8fifimfimmmwammm
s‘mn
mmnmfisfi) Wfifitfi(fi7flfij3fltm(fizm
if) m fin: 3mm gas m M
aims m
111a": mum-17 qr 188.00 13:311. 18.000 mm. 125.540 $213 «0
(ram 8331/ 189.000 131.711. (@3133 17.000 mm. 150.400 was F0
€713)
11.000 mm. 74.370 am: 2:0
3. 382012-13fim,mmm$mfimfimfiazoo.omm
‘(fixfimnfi)%5mmfiumafi(afimmmammm,2008*
smanfiwmmaémfiufiawmfil
4. mammwagufinfigqumfimfifiaafiwmfimm,ms
mm WWW mam
ammm
mm$mafifir§5 a’r m$mamw
gar
mmafimmmrafiaw mmafim 11312181311000me
fiumzfifirwma‘r
@5173
5. mummmasmmm$mmwmamm
mfifigmfimwwafimmmmmmmmfifima:
mmmgmm‘mmmmmmmmmafimflw
fifimmfimmfimamml
6. WWfiuafi.mfimmfium,Wm$m,mfi§W
mafiafiamfimfiufififififiwmm$mfim
7. mfiwfim12$a§wfimfim$mafifiafifi
WWWI
8. mfiufi$fiw5$a§mgfifiafi$mammfimmfigafi
uEEfi132mfiaafiI$mmfiéfifififlfififimm|
[151. If. W/13013/628/fitafi/11—12Nfiafi—afisfifis (14800—23000) afiafiz’r]
WW,WW
11'
111 11 1- 11.11111- 1111-1111m1mm11u1 ”“1”"
1
11111111111|n1pur11u1
1
1.11111911141111 W.”
11 11 11-111
T“ Wynn.“
11m
[wm 114mg 3(ii)] m er W : 31mm 5
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 14th February, 2013
8.0. 377(E)-—Whereas by notification of the Government of India in the Ministry of
Road Transport and Highways number SD. 485 (E), dated the 26th February,
2010, issued under section 11 of the National Highways Authority of India. Act,
1988 ( 68 of 1988), the Central Government has entrusted the stretch from
kilometer 148.000 to kilometer 318.000 ( Kannur — Vengalam - Kuttipuram
section) of National Highway No. 17 in the State of Kerala to the National Highways
Authority of India (hereinafter referred to as the “Authority’j;
And whereas, pursuant to the provision of section 14 of the National
Highways Authority of India Act, 1988 ( 68 of 1988), the Authority has entered into
an Agreement (hereinafter referred to as said agreement) with M/ s North Malbar
Expressway Private Limited, having its registered office at MCH No. 555, Arora
Colony, Road No. 3, Banjara Hills, Hyderabad — 500034, India (hereinafter referred
to as the “Concessionaire”), the successful bidder for bids submitted on
27.03.2009 for the development of Kannur —Vengalam section from Km M81000 to
Km 230.000 on National Highway No. 17 (hereinafter referred to as the “said
section”) to four lane divided carriageway and operation and maintenance of the
said section.
Now, therefore, in exercise of the powers conferred by section 8A of the National
Highways Act, 1956 (48 of 1956), read with rule 3 of the National Highways Fee
(Determination of Rates and Collection) Rules, 2008 ( hereinafter referred to as the
“Rules”), the Central Government, having regard to the expenditure involved in
building, maintenance, management and operation of the said section, interest on
the capital invested, reasonable return, the volume of traffic and the period of the
agreement entered into between the authority and the concessionaire, hereby
notifies that there shall be levied and collected fees on mechanical vehicles for the
use of the said section at the rate specified in columns (2) of the Table 1 for net
road section length for use of the four and more lane sections ( hereinafter referred
to as “base rate”) and at the base rates specified in the Table No.2 for
bridges/structure / bypass costing Rupees Fifty crore or more on the Type of
Vehicles specified in Table 1 and 2 below, and authorizes the said Concessionaire
to collect and retain the fee on and from the date of commercial operation or
publication of this notification in the Official Gazette, whichever is later, till the
termination date as specified in the agreement;
gzoal/fl H?
THE GAZETTE OF INDIA : EXTRAORDINARY [PART lI—SEC. 3(ii)]
Table 1
[' Type of vehicle Base rate of fee per
km for the base year
2007-08
(in Rupees)
(1) (2)
Car, Jeep, Van or Light Motor Vehicle 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini 1.05
Bus
Bus or Truck (’I‘wo Axles) 2.20
Heavy Construction Machinery (HCM) or Earth Moving 3.45
Equipment (EME) or Multi Axle Vehicle (MAV) ( Three to
Six Axles)
Oversized Vehicles (Seven or more Axles) 4.20
Table 2
Base rate of fee (Rupees per vehicle per trip
Cost of permanent bridge, Car, Light Truck HCM, Oversiz
or tunnel (Rupees in Jeep, Commercial or EME ed
crore) Van or Vehicle, Bus or Vehicle
Light Light Goods (Two MAV (Seven
Motor Vehicle or Axels) (Three or
Vehicle Mini Bus to Six more
Axels) Axles)
10 to 15 5 7.50 15 22 30
For every additional Rupees 1 1.50 3 4.50 6
five crore or part thereof,
exceeding Rupees fifteen
crore and up to Rupees one
hundred crore.
For every additional Rupees 075 1.15 2.25 3.40 4.50
five crore or part thereof,
exceeding Rupees one
hundred crore and up to
Rupees two hundred crore.
.,
For every additional Rupees 0.50 0.75 1.50 2.25 3
five crore or part thereof,
exceeding Rupees two
hundred crore.
Notes: -
1. The fee levied and collected hereunder shall be due and payable at the
following Toll Plaza for the distance specified for such Toll Plaza:
Location of Toll Plaza (chainage) Length (in km) for which
Fee is payable
th 188.000 (Existing chainage)/Km 189.000 (Design
chainage) on NH— 17
37.200
m u m mum: mm )NWIY‘M'HI) m—mu
u
u Mull!) M~MIIIII1 9 .,H,.....ly...m mw H u huw van mum «an»
[‘TPT 11—8“: 3(ii)] W al-TT WW3 : W 7
2. In addition to above, the following fee shall also be due and payable for the
1ise of the following bridge(s)/structure(s), cost of which is specified hereunder, at
the following Toll Plaza:
Location of Toll Plaza (chainage) Length (in km) and Cost of bypass
(in Rupees crore) for which
additional fee is payable
-
Length Cost .
18.000 Km Rs.125.540 crore
Km 188.000 (Existing chainage) /Km 17.000 Km Rs. 150.400 crore
189.00 (Design chainage) on NH-l? . 11.000-Km Rs.74.3~70 crore
3. The rate of monthly pass for local personal traffic is Rs. 200.00 ( rupees Two
Hundred only) for the year 2012—13 which is subject to revision every year as per
the provisions of the National Highways Fee (Determination of Rates and
Collection) Rules, 2008.
4. For multiple journeys on the highway section, passes shall be issued at the
following rates, namely.
Amount Payable Maximum number of one Period of validity
wayjourneys allowed
One and half times of the fee Twat Twenty four. hours .
for one way journey from the time of
payment
Two-third of amount of the fee Fifty or more One month from
payable for fifty single date of payment
journeys or more
L
5. Mechanical vehicle which is loaded in excess of permissible load specified for
its category under the Rules, shall be liable. to. pay. {seat such rates whichis
applicable for the next higher category of the vehicles and shall not be entitled to
make use of the highway section unless the excess load has been removed from
such mechanical vehicle.
6. All definitions including category of mechanical vehicles, its permissible load,
category of exempted vehicles, service road, altemative road etc. shalt be as per
definitions specified in the Rules.
7. The fee rates shall be displayed for information of the users in accordance
with rules 12 of the said Rules.
8. The fee rates shall be revised annually in accordance with the Rule 5 of the
said rules provide that no revision shall be effected within six months.’
[F. No. NHAI/13013/628/CO/11-12/GC Koziakode (14800-23000) BOT]
ALKESH SHARMA, Jt. Secy.
Printed by the Manager, Govemment of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.