LawGrids logoLAWGRIDS.ORG

THE SCHEDULE

Schedule - The Oil Industry (Development) Act, 1974

Text of this schedule

17 THE SCHEDULE [See section 15 (1)] Sl. No. Name of item The maximum rate at which duty of excise may be collected 1. 2 3 1. Crude oil . . . . . . . 1[Rupees two thousand five hundred per tonne.] 2. Natural gas . . . . . . . 2[Rupees three hundred per thousand cubic meters.] 1. Subs. by Act 21 of 2006, s. 73, for “Rupees two thousand per tonne” (w.e.f. 18-4-2006). 2. Subs. by Act 11 of 1987, s. 106, for “Rupees fifty per thousand cubic metres” (w.e.f. 12-5-1987). In diaC ode

All of The Oil Industry (Development) Act, 1974