Reallocation of Generating Capacity to Discom
Rules made under MADHY PRADESH ELECTRICITY REFORMS ACT 2000
- Made under: MADHY PRADESH ELECTRICITY REFORMS ACT 2000
This text is shown as one document.
Full text
~~ www.govtpressmp.nic.init
~~~ fcp;rr ~ "BCmIT %.
~264] ~, ~'t"fCIR, ~ 18 ~ 2011-~ 28, ~ 1933
~i%'qJTf
JOi51 1<'"1 4, "Cfffi'q 'qCR,~
~,~ 18 ~ 2011
1. No. 4353-F-3-24-2009-XIII - State Government has notified M.P. Electricity Reforms
Transfer Schemes Rules 2006 vide notification dated 3rd June 06 whereby the functions,
properties, interest rights and obligations of the Residual Madhya Pradesh State
Electricity Board relating to Bulk Purchase and Bulk Supply of Electricity along with the
related agreements and arrangements have been transferred and vested in MP Power
Trading Company Limited (TRADECO).
2. In order to keep the retail tariff uniform in the entire State without sacrificing the incentive
for loss reduction & efficiency gains by Discoms during the transient phase of power
sector reforms and since the revenue requirement are different for all the three Discoms,
the State Government reallocated the capacity available as on May 2010 vide Gazette
Notification No. 3823-F-3-24-2009-XIII dated 11 th May 2010.
3. With the similar intent, vide this order, the State Government supersedes Gazette
Notification No. 3823-F-3-24-2009-XIII dated 11 th May 2010 in order to allocate new
capacities and achieve the same objective of maintaining uniform retail tariff in the entire
527
f1
528 l1~ ~,~ 18 ~ 2011
State and hence reallocates the capacity available as on date to the three Distribution
companies in the manner prescribed below:
(i) Summary of total installed generation capacity available to the State:-
Table - 1: Total Available Generation Capacity
S.
MP's Power Share Firm In firm Total
N
from (MW) (MW) (MW)
0
1 Central sector WR 1931 170.98 2101.98
2 Central sector ER 0.00 74.00 74.00
3 DVC 200.00 200.00
4 Indira Sagar Project 1000.00 -- 1000.00
5 Sardar Sarovar 826.50 -- 826.50
Project
6 Omkareshwar HEP 520.00 -- 520.00
7 GENCO Thermal 2807.50 -- 2807.50
8 GENCO Hydro 927.17 -- 927.17
Total 8212.17 244.98 8457.15
(ii) The total available generation capacity as shown in Table 1 above is
reallocated to the Discoms as shown below:-
Table - 2: Reallocation of Generating Capacity to Discoms
Discom Generation
Capacity Allocation
% MW
M.P. Madhya Kshetra Vidyut Vitaran Co. ltd. 32.89% 2781.68
M.P. Paschim Kshetra Vidyut Vitaran Co. ltd. 38.22% 3232.05
M.P. Poorv Kshetra Vidyut Vitaran Co. ltd. 28.87% 2441.67
(iii) The plant-wise reallocation of available generation capacities to the Discoms
shall be as per Appendix- I.
(iv) The power generation available from captive power producers, mini! micro
hydel projects or from non conventional energy sources not included in the
above capacity allocation, are deemed to be assigned to the Discoms in
whose geographical location such power project exists.
4. In addition to the above allocation, the specific allocation of 200 MW made
available to the State from the un-allocated power of CGSs of WR for supply to
drought prone districts of Bundelkhand Region are assigned to the MP Poorv
Kshetra Vidyut Vitaran Co. Ltd., for the drought prone area Sagar Region
exclusively.
After considering the specific allocation for Bundelkhand Region the effective
allocation of generating capacity to the Discoms shall be as under
Table -3: Final allocation of Generating Capacity to Discoms
Discom Generation
Capacity Allocation
% MW
M.P. Madhya Kshetra Vidvut Vitaran Co. Ltd. 32.15% 2781.68
M.P. Paschim Kshetra Vidyut Vitaran Co. Ltd. 37.33% 3232.05
M.P. Poorv Kshetra Vidyut Vitaran Co. Ltd. 30.51% 2641.67
11~~,~ 18 ~ 2011
5. The above allocation is subject to following conditions:
a. The allocation of power is tentative and may be reviewed on a quarterly basis if
required. The quarterly allocation to the three Discoms is presented in Table- 4
. below:
Table - 4: Discorn wise Quaterly Allocation for the year FY 2011·12
Quarter M.P. Madhya M.P. Paschim M.P. Poorv Kshetra
Kshetra Vidyut Kshetra Vidyut Vidyut Vitaran Co.
Vitaran Co. Ltd. Vitaran Co. Ltd. Ltd.
Q1 32.00% 36.50% 31.50%
Q2 34.00% 34.10% 31.90%
Q3 30.60% 41.00% 28.40%
Q4 31.90% 38.00% 30.10%
b. The above proportions of capacity allocation shall be revised in case of change in
allocation of unallocated power in inter-state Generating Stations (ISGS) by the
Gol,
c. MP Power Trading Company Ltd. (Tradeco) shall arrange short term power
purchases which shall be allocated by Tradeco to Discoms based on their
requisition or otherwise allocation shall be done among the three Discoms in the
same proportion as indicated in Table - 4 above.
6. The capacities as indicated in Table - 5 below are assigned to the Madhya
Pradesh Power Trading Company Limited (Tradeco) subject to the condition that
three distribution companies of the State shall be having first charge on such
capacities. Tradeco will allocate power as per the requirement subject to the
available capacity and surplus power if any, shall be traded by Tradeco. Bulk
Power Supply Tariff shall be decided by the Appropriate Commission.
Table - 5: New Generating Stations expected during FY 2011·12
New Generation Stations MW
NTPC Sipat - Stage I 188.67
DVC (Chandrapur TPS Extn.) 200.00
Case-I (Essar Power)(private) 75.00
PTC - Torrent Surat (Gas)(private) 104.32
Maheswar Hydel 400.00
Korba West-III 60.00
Total 1027.99
In addition to above additional capacity, if any including Central/State Sector the
same shall also be assigned to Tradeco.
7. The capacities/energy as indicated below are assigned to the MP Power Trading
Co. Ltd., (Tradeco) subject to the condition that three Distribution Companies of
the state shall be having first charge on such capacities. Tradeco will allocate
power to the Discoms from time to time as per the requirement subject to the
available capacity and surplus power, if any, shall be traded by Tradeco.
i. The capacities not assigned to any of the Discoms
ii. Additional capacities, if any, added from the new generating stations
expected during FY 2011-12
iii. Un-allocated energy to the Discoms, out of the available energy, in the Tariff
Order for FY 2011-12 due to 'Merit Order Dispatch (MOD)'.
528 (1)
528 (2) ll~~, fc:::Wfi 18 ~ 2011
8. Following general guidelines shall be applicable for monthly allocation of
power among Discoms:
a. Each Discom shall submit their demand to MP Tradeco for the next month by 15th
of each month.
b. MP Tradeco shall allocate the unallocated capacity as shown in Table - 5 among
Discoms by 20th of each month. Allocation shall be as per the requirement subject
10 the available capacity.
c. For day ahead scheduling of power, the prevalent rules and regulations as laid
down by Madhya Pradesh Electricity Regulatory Commission shall be applicable.
d. On the basis of capacity allocation, SLDC shall intimate entitlement of each
Dlscom in ISGS, MPPGCL (MP Share), NHDC Joint Ventures, SSP etc. to MP
Tradeco.
e. MP Tradeco, in consultation with Discoms, shall furnish the requisition of power of
respective Discom in ISGS, MPPGCL (MP Share), NHDC Joint Ventures, SSP
etc. to SLDC limited to entitlement.
f. MP Tradeco shall also furnish details of Short Term Power Purchase to be
allocated to Discoms based on their requisition.
g. Discoms while SUbmitting their requisition to MP Tradeco shall also indicate
surplus! deficit if any, which can be allocated to other Discoms by SLDC in
consultation with respective Discom.
h. SLDC after receipt of MP drawal schedule from WRLDC shall compile and issue
drawal schedule of each Discom to MP Tradeco and generation schedule to
MPPGCL (MP share) based on merit order despatch.
The surplus power shall be sold outside the state or to any other utilities by the
MP Tradeco in case of non-absorption by the Discoms.
j. Priority in allocation shall be given to those Discoms who submit the demand in
time. If any Discom fails to submit the demand in time, allocation shall be made
appropriately by MP Tradeco as per overall availability.
k. SLDC will calculate the UI charges among Discoms I Generators based on Total
allocation and scheduling (Intra State ABT).
Discoms shall provide short-term power requirement to MP Tradeco at least four
months in advance.
m. In the event of non submission of monthly requirement by Discoms in time, the
decision of MP Tradeco shall be final and binding on the Discoms in regard to
i. Capacity allocation (of unallocated capacity) and
Ii. Arrangements made for short term power purchase
9. Following guidelines shall be followed for the purpose of billing:
a. On the basis of State Energy Accounting issued by SLDC, MP Tradeco shall
issue energy charges bills for the previous month to Discoms by 10'h of each
month on the basis of actual two-part tariff. Supplementary bills if necessary
shall be issued within one month from the date of issue of monthly energy
bill.
b. To meet its own expenses, MP Tradeco shall supply the power to DISCOMs
at the tariff as determined! approved by the MPERC plus "trading margin",
also as approved by MPERC. Till trading margin is decided by MPERC,
monthly bills shall be raised by MP Tradeco to Discoms to meet out their
expenses on actual basis in proportion to the energy drawl by respective
Discom.
10. Right to amend the reallocation of generating capacity:
The State Government by issue of separate orders from time to time may amend
reallocation of generating capacity among the Discoms and make such provisions
as may appear to be necessary for removing the difficulties arising satisfying the
consumer demand across the state in a judicious manner.
By order and in the name of the Governor of Madhya Pradesh,
M. K. GUPTA, Add!. Secy.
11~~,~ 18 ~ 2011
Allocation of Installed Generation Capacity Among MP Discorns
528 (3)
Appendix-1
ALLOCATION (excluding specific ALLOCATION (excluding specific
alioeation of 200 MW to aliocatlon of 200 MW to Bundelkhand
51 Name of Total Firm Share in Total(MP Bundelkhand region) region)
No. Power Station Capacity Alloeation Unaliocated Share) (In%) (inMW)
Central Western Eastern Central Western Eastern
Discorn Dlscorn Discorn Discorn Discorn Discorn
A, SHARE ALLOCATION FROM CENTRAL SECTOR STATION (WR):-
1 KSTPS 2100.00 400.00 37.76 437.76 34% 24% 42% 147.09 105.06 1B3.86
2 V5TPS·j 1260.00 385.00 28.27 413.27 41% 30% 29% 169.44 123.98 119.85
3 V5TPS·1i 1000.00 273.00 22.82 295.82 40% 30% 30% 118.33 88.75 88.75
4 VSTPS·III 1000.00 200.00 24.33 224.33 40% 40% 20% 89.73 89.73 44.87
5 KAWA5 GPP 656.20 140.00 0.00 140.00 20% 48% 32% 28.00 67.20 44.80
6 GANDHAR GPP 657.39 117.00 0.00 117,00 20% 48% 32% 23.40 56.16 37.44
7 KAKRAPAR APS 440.00 93.00 7.19 100.19 33% 44% 22% 33.41 44.53 22.24
8 TARAPUR APS (unit 3 & 4) 1080.00 180.00 26.28 206.28 34% 45% 21% 70.14 93.55 42.60
95IPAT-1I 1000,00 143.00 24.33 167.33 45% 20% 35% 75.30 33.47 58.57
TOTAL 9193.59 1931,00 170.98 2101.98 36% 33% 31% 754.84 702,43 642.96
B. SHARE ALLOCATION FROM CENTRAL SECTOR STATION (ER):-
1 FARAKKA STPS 1600.00 0.00 0.00 20% 55% 25% 0.00 0,00 0.00
2 KAHALGAON STPS 840.00 0.00 0.00 20% 55% 25% 0.00 0.00 0.00
3 KAHALGAON-II 5TPS 1500.00 74.00 74.00 20% 55% 25% 14.80 40.70 18.50
4 TALCHER STP5 1000.00 0.00 0.00 20% 55% 25% 0,00 0.00 0.00
5 DVC(CTPS} 200.00 200.00 0.00 200.00 15% 55% 30% 30.00 110.00 60.00
TOTAL 5140.00 200.00 74.00 274.00 16% 55% 29% 44,80 150,70 78.50
C, SHARE ALLOCATION FROM ISP (JOINT VENTURE OF NHPC & GoMP):-
1 8x125 MW INDIRA SAGAR 1000,00 1000.00 25% 55% 20% 250.00 550.00 200.00
D. SHARE ALLOCATION FROM SSP :-
1 CANAL HEAD POWER STATION 250.00 142.50 20% 50% 30% 28.50 71.25 42,75
21RIVER BED POWER HOUSE 1200.00 684.00 20% 50% 30% 136.80 342,00 205.20
I TOTAL 1450.00 826.50 20% 50% 30% 165.30 413,25 247.95
E. SHARE ALLOCATION FROM OMKARESHWAR HEP:-
IOmkareshwar Complex I 520,00 520.00 20% 50% 30% 104.00 260,00 156.00
F. SHARE ALLOCATION FROM MPPGCL (MP SHARE BASIS):.
THERMAL TOTAL MP5HARE
1 AMARKANTAK COMPLEX 240.00 240.00 240.00 41% 28% 31% 98.40 67.20 74.40
2 AMARKANTAK EXTN. 210,00 210,00 210.00 41% 28% 31% 86.10 58.80 65.10
3 SATPURA PH·I (Inter -State) 312.50 312.50 187.50 41% 28% 31% 76.88 52.50 58.13
4 SATPURA COMPLEX (PH-II & III) 830,00 830.00 830.00 41% 28% 31% 340.30 232.40 257.30
5 SANJAYGANDHI COMPLEX 840.00 840.00 840.00 41% 28% 31% 344.40 235.20 260.40
6 SANJAY GANDHI COMPLEX-EXT 500,00 500.00 500.00 41% 28% 31% 205.00 140.00 155.00
Sub-Total (MPPGCL- Thermal) 2932.50 2932.50 2807.50 41% 28% 31% 1151,OB 786.10 870.33
MPPGCL -Inter State (HydeI)
1 GANDHI SAGAR 115.00 57.50 50% 30% 20% 28.75 17.25 11.50
2 RANAPRATAP & JAWAHARSAGAR 271.00 135.50 50% 30% 20% 67.75 40.65 27.10
3 RNGHAT 45,00 22.50 40% 40% 20% 9.00 9.00 4.50
4 PENCH 160.00 106.67 40% 40% 20% 42.67 42.67 21.33
Sub-Total (MPPGCL-Inter State Hydel) 591.00 322.17 46% 34% 20% 148.17 109.57 64.43
MPPGCL Hydel Projects for MP
1 BARGI 90.00 90.00 20% 50% 30% 18.00 45.00 27.00
2 BARGI (L85) 10.00 10,00 20% 50% 30% 2.00 5.00 3.00
3 BIRSINGHPUR 20,00 20.00 20% 50% 30% 4.00 10.00 6.00
4 BAN5AGAR-1 (TONS) 315,00 315,00 30% 40% 30% 94.50 126.00 94,50
5 8AN5AGAR-1I (5ILPARA) 30.00 30,00 30% 40% 30% 9.00 12.00 9,00
6 BAN5AGAR-11I (DEOLOND) 60,00 60,00 30% 40% 30% 18.00 24,00 18,00
7 BAN5AGAR-IV (JHINNA) 20.00 20.00 30% 40% 30% 6,00 8.00 6,00
8 MARHIKHEDA complex 60.00 60.00 20% 50% 30% 12.00 30,00 18,00
Sub-Total (MPPGCL·State Hydel) 605.00 605.00 27% 43% 30% 163,50 260.00 1B1.50
TOTAL MPPGCL HYDEL(lnciuding Inter state
1196.00 927.17 34% 40% 27% 311.67 369.57 245.93
projects}
TOTAL MPPGCL (Thermal+ Hydel including
4128,50 3734.7 39% 31% 30% 1462.74 1155.67 1116.26
Inter state)
Gross Capacity (Central
Seetor+ISP+SSP+OMKARE5HWAR+Laneo+M 21432.1 84S7.1 32,89% 38,22% 28.87% 2781.68 3232,05 2441.67
PPGCL)
Page 1
Titles
1Pl�r ~1~r11rtr
(~)
~~ ��~� .nz. I
Images
Image 1
Page 2
Tables
Table 1
Table 2
Table 3
Page 3