Standard of Performance Regulation
Regulations made under The Electricity Act, 2003
- Made under: The Electricity Act, 2003
This text is shown as one document.
Full text
UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION
No. UPERC/Secy./Regulation/656
Lucknow dated: December 16, 2019
Notification
In exercise of powers conferred by section181 (1) and 181 (2) (za &zb) read with sections 57 (1),
57 (2), 59 (1) and 86 (1) (i) all other provisions enabling in this behalf, the Uttar Pradesh
Electricity Regulatory Commission hereby makes the following Regulations, namely:
1. Short Title and Commencement-
(a) These Regulations shall be called the Uttar Pradesh Electricity Regulatory Commission
(Standards of Performance) Regulations, 2019;
(b) These regulations shall come into force on the date of their publication in official gazette.
2. Definitions-
2.1 In these Regulations, unless the context otherwise requires:
(a) "Act" means the Electricity Act, 2003 and subsequent amendments thereof,
(b) "Area of Supply" means the area within which a Licensee is authorized by its License to
supply electricity;
(c) "CGRF" means 'Consumer Grievance Redressal Forum' constituted by each Distribution
Licensee pursuant to section 42(5) of the Electricity Act, 2003 and these Regulations;
(d) "CGRF & Ombudsman Regulations" means UPERC (Consumer Grievance Redressal Forum &
Electricity Ombudsman) Regulations, 2007 and its amendments thereof;
(e)
"Class-I Cities"means the cities with population of 10,00,000 or above as per census of India
2011 and including Noida and Greater Noida;
(f)"Commission" means the Uttar Pradesh Electricity Regulatory Commission;
(g) "Complaint Centre" means suitable infrastructure/ setup for submission of complaint or
claim of compensation 24X7 electronically (SMS, e-mail, mobile App, website of the Licensee) or
telephonically (voice call-Landline / Mobile) or in writing or through any other mode as
mentioned in the manual prepared as per Regulations 9.3;
(h) "Extra High Tension/Extra High Voltage" means the voltage exceeding 33kV under normal
conditions;
(i) "Franchisee" means a persons authorized by a Distribution Licensee to distribute electricity
on its behalf, in a particular area within his area of supply;
(j) "High Tension/High Voltage" means the voltage exceeding 440 volts but not exceeding 33kV
under normal conditions;
(k) "Licensee" means any person licensed under Part-IV of the Act to distribute electricity;
(l) "Low Tension/Low Voltage" means the voltage level that does not exceed 440 volts under
normal conditions;
(m) "Normal Fuse Off" means fuse blown off because of overloading or ageing;
(n) "Rural Areas" means the areas included in Gram Panchayat excluding the areas covered
under Class-I Cities and urban areas,
(o) "SOP" means standards of performance;
(p) "Urban Areas" means the areas covered by all Municipal Corporations and other
Municipalities including the areas falling under the various Urban Development Authorities,
Cantonment Authorities and industrial estates or townships, excluding the areas covered under
Class-1 Cities.
(q) Words and expressions used and not defined in these Regulations but defined in the Act
shall have the meanings assigned to them in the Act. Expressions used herein but not
specifically defined in these Regulations or in the Acts but defined ünder any law passed by a
Competent Legislature and Applicable to the electricity sector in the state shall have the
meaning assigned to them in such law.
3. Extent of Application-
3.1 These Regulations shall be applicable to all the Distribution Licensees under section 14 of
the Act, and Franchisee and all its consumers in the State of Uttar Pradesh.
3.2 Any standards and compensation defined in this regulation will override the standards and
compensation mentioned in supply code or any Regulation of the Commission.
4. Interpretation-
4.1 In the interpretation of these Regulations, unless the context otherwise requires:
(a) words in singular or plural term, as the case may be, shall also be deemed to include plural
or singular term, respectively;
(b) references herein to the "Regulations" shall be considered as a reference to these
Regulations as amended or modified by the Commission from time to time as per applicable
laws.
5. Objective-
5.1 These standards lay down the guidelines to maintain distribution system parameters within
the permissible limits. These standards shall serve as guidelines for Licensees for providing an
efficient, reliable, coordinated and economical system of electricity distribution.
5.2 The objectives of these Regulations are:
(a) to lay down standards of performance;
(b) to measure performance against the standards for the Licensee in providing service;
(c) to ensure that the distribution network performance meets a minimum standard which is
essential for the consumers installation to function properly;
(d) to enable the consumers to design their systems and equipment to suit the electrical
environment that they operate in;
(e) to enhance the quality of the services to meet acceptable consumer service standards in the
short term and gradually move towards improved customer service standards in the
long term; and
(f)to develop mechanism for ensuring fair compensation to the consumers in case the Licensee
fails to achieve guaranteed standard of performance as described in Schedule-I of these
Regulations.
6. Standards of Performance-
6.1 The standards specified in Schedule-I shall be the guaranteed standards of performance,
which are the minimum standards of service that a distribution Licensee shall achieve.
6.2 The standards specified in Schedule-II shall be the overall standards of performance which
Licensee shall seek to achieve in the discharge of its obligations.
6.3 The failure of Licensee to achieve the guaranteed standards of service shall entail payment
of compensation to the consumer as per Schedule-III.
7. Complaint Handling Mechanism-
7.1 Process of handling complaints-
7.1.1 The Consumers of the Distribution Licensee may register a complaint electronically (SMS,
e-mail, mobile App, website of the Licensee) or telephonically (voice call-Landline/Mobile) or in
writing or through any other mode as mentioned in the manual prepared as per Regulations
9.3.
7.1.2 The consumer shall provide the account number or registered mobile number at the time
of registration of the Complaint. No Complaint shall be registered in case no such information is
provided by the consumer.
7.1.3 A Complaint number shall be generated and issued for complaint registered by the
Consumer.
7.1.4 The Complaint number shall be communicated to the Consumer by the Licensee within 30
minutes of receiving the complaint, through the same mode as employed by the
Consumer for registration of complaint:
Provided that in case of registration of complaint through telephone, the complaint number
shall be provided immediately to the consumer on call:
Provided that in case mobile number and/ or email-id of the Consumer has been registered, the
complaint details shall also be sent through SMS and e-mail to the registered mobile number
and e-mail-id of the consumer within 30 minutes on receiving the Complaint.
7.1.5 Record details of each complaint (As per Annexure III);
7.1.6 After the resolution of the Complaint the Licensee shall update and record the total time
taken for resolution of the complaint.
8. Compensation Mechanism-
8.1 If Licensee fails to meet the guaranteed standards of performance as specified in Schedule-I,
Licensee shall pay compensation to the affected person upon lodging of a claim for
compensation. The compensation to be paid by the Licensee to the affected person is specified
in Schedule-III of these Regulations. If the Consumer has any arrear, beyond 30 days, on the
date of filing the claim for compensation then no compensation shall be payable to the
consumer:
Provided if there is a stay order by any Court, Forum Tribunal, or by Commission, staying the
recovery of any dues from consumer and during the operating period of any such order
compensation shall become due but shall be payable to the Consumer only after the final
decision of the case:
Further, provided that the compensation paid by the Licensee to its consumers shall not be
allowed as an eligible expenditure to be recovered in the Annual Revenue Requirement/ True-
up of the Licensee.
8.2 The total compensation that will be payable by the Licensee to the consumer by means of
this Regulation shall not exceed 30% of the total Fixed Charges/Demand Charges payable by the
consumer in a given Financial Year.
8.3 In all cases of compensation, the payment of compensation shall be made only by
adjustment
against current and immediate future bills for supply of electricity by the Licensee. The details
of the total compensation due and the amount paid thereof shall be shown in every electricity
bill of the consumer.
8.4 Process of Claiming Compensation-
8.4.1 After the resolution of the complaint or in case the complaint is pending to be resolved for
more than two weeks, the consumer shall lodge claim for compensation as per the modes in
Regulations 7.1.1. Such claim shall be made by the Consumer within 60 days after the date of
resolution of the Complaint by the Licensee. The consumer shall provide the account number at
the time of registration of the Claim.
8.4.2 The compensation claim number shall be communicated to the Consumer by the
Licensee through the same mode as employed by the Consumer for lodging claim for
compensation:
Provided that in case of lodging of claim for compensation through telephone, the
compensation claim number shall be provided immediately to the consumer on call: Provided
that in case mobile number and/ or email-id of the Consumer has been registered, the
compensation claim number shall be sent through SMS and e-mail to the registered mobile
number and e-mail-id of the consumer.
8.4.3 In case of failure of the Licensee to provide the compensation to the Consumer within 45
days from the date of lodging of claim or the consumer is not satisfied with the decision of the
Licensee, then the consumer may approach CGRF of area of jurisdiction for redressal within 60
days. Any interest amount payable thereof on the compensation due to the Consumer shall be
determined by CGRF/Electricity Ombudsman.
8.4.4 In case the CGRF does not decide the amount of Compensation within the specified time
as per the CGRF and Ombudsman Regulations or the aggrieved consumer is not satisfied with
the decision of the CGRF, the consumer may approach Electricity Ombudsman who shall deal
and decide according to the CGRF and Ombudsman Regulations. The decision of Electricity
Ombudsman shall be final. In case of non-compliance of any order of CGRF or Ombudsman by
Discom the Consumer may approach Commission U/s 142 of the Act.
8.4.5. In case in the reports submitted by the Licensee as per Regulations 9.1 it is highlighted
that the Licensee fails to provide compensation to the Consumers even after the directions of
CGRF and Ombudsman, as the case may be, the suitable action may be taken by the
Commission at the time of True-up/ ARR and determination Tariff of the Distribution Licensee.
9. Responsibilities Of The Licensee-
9.1 Submission Of Reports-
9.1.1 Licensee shall furnish to the Commission, quarterly report providing the following
information, within 30 days from the close of each quarter of the Financial Year:
(a) performance levels achieved by Licensee with reference to the guaranteed standards and
overall standards as specified in Schedule-I and Schedule-II of these Regulations in the format as
provided in Annexure-1 and Annexure-II respectively of these Regulations; The Commission
shall publish the same on its website as deemed appropriate by the Commission.
(b) details regarding the cases in which compensation was paid as per format provided" in
Annexure-l and Annexure III of these Regulations:
(c) Details of complaint (As per Annexure III);
(d) measures taken to improve the performance;
(e) separate projection of the capital expenditure for meeting requirements of these
Regulations along with the performance trajectory;
9.1.2 Licensee shall develop report generation framework on its website, within six months
from the date of notification of these Regulations, to generate reports related to complaints and
claim for compensation. Such reports shall be generated dynamically based on the search
parameters including but not limited to type of complaint, status of complaint, Name of
Division, Complaint Number, Compensation Claim Number or äs directed by the Commission
from time to time. The report generation framework shall be approved by the Commission or
the person authorized by the Commission.
9.2 Establishment of complaint Centre(s)
9.2.1 Licensee or its Franchisee shall develop suitable mechanism for providing, customer
interface channels to handle consumer complaints and claim for compensation by >consumers
and establish suitable infrastructure/ setup for submission of complaint or claim of
compensation electronically/telephonically through SMS/ e-mail/ mobile applications etc. or in
writing or through any other mode mentioned in the manual prepared as per Regulations 9.3.
9.2.2 Licensee or its Franchisee shall establish complaint centre (s) within the following time
limits from the date of commencement of these Regulations:
(a) for "Class-I Cities", within 9 months;
(b) for "Urban Areas", within 12 months; and
(c) for "Rural Areas", within 18 months
9.2.3 Such complaint centre (s) shall be accessible to its consumers 24x7.
9.2.4 Licensee or its Franchisee shall use the existing channels for recording the customer
complaints as per the procedure defined in Regulation 7 till the establishment of complaint
centre(s).
9.2.5 Every Licensee shall employ or engage sufficient number of officers or employees at its
Complaint centre(s).
9.2.6. For registering complaint and lodging of claim for compensation through telephone/
mobile, the Licensee shall earmark or allot or establish a basic telephone or cellular mobile
number having sufficient lines or connections to be called as the "toll free number" or helpline
number as the case may be,at its call centre(s). For registering complaint/compensation claim
through telephone/mobile/email address automated system shall be developed. All details
including email-id, toll free numbers, mobile application, address of complaint centres shall be
communicated to the consumers through advertisements in newspapers at regular interval and
on the website of the Licensee.
9.2.7 No call charges or short message service charges shall be levied upon, or payable by its
consumers, for calls made, or, short message service sent, to the "toll free number" or "help line
number", as the case may be.
9.2.8 Every Licensee"or its Franchisee shall, immediately upon establishment of its Complaint
centre(s), inform through a public notice in news papers in circulation in the Area of Supply and
should also ensure proper circulation of information to the consumers in case of any changes in
the details..
9.3 Manual of practice for handling consumer complaints-
9.3.1 Every Licensee shall publish a "Manual of practice for handling customer complaints"
containing following information within four months from the date of commencement
of these Regulations:
(a) channels of complaint registration details of personnel, offices, Complaint centre
(s) electronic complaint like SMS/ e-mail/ mobile applications etc.;
(b) process of handling complaints taking into consideration Regulation 7;
(c) duties and obligations of Licensee- guaranteed standards of performance, overall standard of
performance and compensation details as per Schedule-I, Schedule-II and Schedule-III
respectively; and
(d) any other information which may be affecting the consumers.
9.3.2 The manual shall be prepared in Hindi and English language.
9.3.3 The manual shall be available for reference of consumers at every office of Licensee and
down loadable from its website.
9.3.4 A copy of the manual certified by Licensee as "true copy" thereof shall be filed with the
Commission within four months from the date of commencement of these Regulations.
9.4 Creating awareness-
9.4.1 Licensee or its Franchisee shall ensure that the following steps are undertaken for creating
proper awareness among consumers and Licensee staff:
9.4.2 "Manual of practice for handling customer complaints" shall be available for reference of
consumers at every office of Licensee and downloadable from its website;
9.4.3 Licensee or its Franchisee should publish the guaranteed standards of performance along
with compensation structure, information on procedure for filing of complaints, on their
website and in the newspapers for month of January and July. If possible, it shall also be
published at the back of the bills or separate hand out may be distributed along with the bills.
10. Fees and Fines-
10.1 No fees shall be levied/ applicable to the consumer for lodging a complaint / claim under
these Regulations with the Licensee and application/ complaint for redressal of the claim for
compensation to the CGRF or Ombudsman.
11. Exclusions of Events-
11.1 The application of the standard of performance specified in these Regulations shall not be
applicable in case of the following events:
(a) force majeure events such as war, mutiny, civil commotion, riots, flood, cyclone,
lightning, earthquake or other force and strike, lockout, fire affecting Licensee's installations and
activities;
(b) outages due to grid failure.
(c) outages that are initiated by the National Load Despatch Centre/ Regional Load Despatch
Centre/ State Load Despatch Centre;
12. Power to Remove Difficulties-
If any difficulty arises in giving effect to any of the provisions of these Regulations, the
Commission may, by general or special order, do or undertake or direct the Licensees to do or
undertake things, which in the opinion of the Commission are necessary or expedient for the
purpose of removing the difficulties.
13. Power to Amend-
13.1 The Commission may at any time, vary, alter, modify, or amend any provisions of these
Regulations.
14. Power to Relax-
14.1 The Commission may by general or special order, for reasons to be recorded in writing, and
after giving an opportunity of hearing to the parties likely to be affected by grant of relaxation,
may relax any of the provisions of these regulations on its own motion or on an application
made before it by an interested person.
15. Repeal and Savings-
15.1 Save as otherwise provided in these Regulations, the chapter-7 along with concerned
annexures (Standards of Performance) along with annexures in earlier Regulations namely
"Uttar Pradesh Electricity Regulatory Commission (Supply Code) Regulations, 2005" read with all
amendments thereto, as applicable to the subject matter of these Regulations are hereby
repealed.
15.2 Notwithstanding such repeal, anything done or action taken or purported to have been
taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been
taken under these Regulations to the extent that same were not inconsistent with the Act.
16. Schedule-1: Guaranteed Standards of Performance-
16.1 Operation of complaint centre(s);
16.1.1 First response against a consumer call: The response time for the consumer call at the
complaint centre(s) shall be 10 minutes and any delay in the response time beyond
standard time allowed shall be subject to compensation as per Schedule-III of these
Regulations;
16.1.2 Registration and issuance of complaint/compensation number:
There registration and issuance of complaint compensation number shall be completed as per
the provisions of Regulation 7 and Regulation 8 of these Regulations and any delay beyond
standard time allowed shall be subject to compensation as per Schedule-III of these
Regulations.
16.2 Restoration of supply;
16.2.1 Normal fuse-off: Licensee or its Franchisee shall restore power supply in the case of
normal fuse-off calls, fuses at the distribution transformer or at the consumer premises within 2
hours of receiving the complaint in Class-I Cities, within 4 hours of receiving the complaint in
Urban Areas and within 6 hours of receiving the complaint in Rural Areas
16.2.2 Overhead line/cable breakdowns: In case of overhead line/cable breakdowns, Licensee or
its Franchisee shall ensure restoration of power supply within 2 hours of occurrence of
breakdown in Class-1 Cities, within 3 hours of occurrence of breakdown in Urban Areas and
within 24 hours of occurrence of breakdown in Rural Areas.
16.2.3 Underground cable breakdowns: In case of breakdown of underground cable, Licensee or
its Franchisee shall ensure restoration of power supply within 12 hours of occurrence of
breakdown in Class-I Cities & Urban Areas and within 48 hours of occurrence of breakdown in
Rural Area.
16.2.4 Distribution transformer failure: Licensee or its Franchisee shall restore supply in the case
of distribution transformer failures by replacement of transformer within 6 hours of receiving
the complaint in Class-1 Cities, within 8 hours of receiving the complaint in Urban Areas and
within 48 hours of receiving the complaint in Rural Areas.
16.2.5 Period of scheduled outages: Interruption in power supply due to scheduled outages,
other than the load-shedding, shall be notified by Licensee or its Franchisee at least 24 hours in
advance. Total scheduled outages for any 11kV feeder, for Class-I and Urban shall not exceed
more than 12 hours in Urban and Class-1 Cities and 24 hours in Rural in a month.
For Instance, in case of rural schedule, in case as per roaster, the power is to be supplied for 10
hours, the period of scheduled outage will be calculated for outage during the period of 10
hours only. In reference to load shedding (in case of rural schedule) and scheduled outage, the
complete details shall be published by Licensee or its Franchisee, on their website. The Licensee
or its Franchisee shall maintain such data for at least past one year on their website.
16.3 Quality of supply-
16.3.1 Voltage fluctuations: Licensee or its Franchisee shall maintain voltages at the point of
commencement of the supply to a consumer within the limits stipulafed as under, with
reference to the declared voltage:
(a) In the case of Low Voltage, +6% and -6%;
(b) In the case of High Voltage, +6% and -9%; and
(c) In the case of Extra High Voltage, +10% and -12.5%.
16.3.2 The above standards shall be applicable subject to voltage availability at transmission
distribution interfaces within the specified limits.
16.3.3 On receipt of a voltage fluctuation complaint, Licensee shall verify if the voltage
fluctuations exceeding the limits specified and upon confirmation, Licensee shall:
(a) ensure that the voltages are brought within the specified limits, within 2 days of original
complaint provided the fault is identified to a local problem on the transformer;
(b) ensure that the voltages are brought within the specified limits, within 10 days of original
complaint provided no expansion/enhancement of the network is involved; and
(c) resolve the complaint within 120 days, if up-gradation of the distribution system is required.
16.3.4 In cases where sub-station is required to be erected to resolve voltage fluctuation
complaints, Licensee shall, within one month of the receipt of such complaint, submit to the
Commission a proposal for erection of sub-station, together with the time required to complete
erection and commissioning of such substation and get the same approved by the Commission.
In such cases, Licensee is required to inform the consumer about the likely time of resolution of
the complaint:
Provided that where such sub-station is covered in Licensee's capital expenditure plan approved
by the Commission, Licensee shall complete the erection and commissioning of such sub-station
within the-time period specified in such capital expenditure plan.
16.3.5 The compensation for industrial and agricultural consumers, who are expected to install
capacitors at their end, shall not be paid the compensation if capacitors of adequate eapacity
are not installed at their premises.
16.4 Meter complaints:
16.4.1 Licensee shall perform the meter related activities as provided in Regulations 16.4.2 to
16.4.6 subject to the provisions provided in the Supply Code and other associated Regulations
and Codes.
16.4.2 Licensee shall read consumer's meter at least once in every 6 months. If Smart
meter/Prepaid meter is installed at consumer premises then the necessity to read the
consumer's meter is not required.
16.4.3 Licensee shall inspect and check the correctness of the meter, on receiving the
complaint, as per the provisions of section 5.6 of the UPERC Electricity Supply Code and its
amendments.
16.4.4 Licensee shall replace the non-working/ defective meters including but not limited to
stuck up, running slow, fast or creeping meter as per the provisions of Section 5.9 of the UPERC
Electricity Supply Code and its amendments.
16.4.5 In case of complaint for burnt meter, Licensee, shall take necessary actions as per the
provisions of section 5.8 of the UPERC Electricity Supply Code and its amendments.
16.4.6 Licensee shall replace the burnt-out meters as per the provisions of section 5.9 of the
UPERC Electricity Supply Code and its amendments. The cost of Replacement of meters shall be
borne by the consumer or the Licensee as per the provisions of section 5.9 of the UPERC
Electricity Supply Code and its amendments.
16.5 Shifting of meters/service lines:
16.5.1 Wherever the consumer's requests for shifting the service connection in the existing
premises or for deviation for the existing lines at their own cost, Licensee shall inspect and
inform the estimated cost to the consumer within 7 days of receipt of application in Class-I
Cities, within 10 days of receipt of application in Urban Areas and 15 days of receipt of
application in Rural Areas.
16.5.2 The time schedule shall be observed for completing the works from date of payment of
the charges and necessary clearances of Shifting of meter/service line shall be 7
days.
16.6 New connections/additional load/reduction in load:
16.6.1 in cases of New Connections where extension of distribution mains is not required, the
Licensee shall take necessary actions as per the provisions of section 4.7 of the UPERC
Electricity Supply Code.
16.6.2 In cases of New Connections where extension of distribution mains is required, the
Licensee shall take necessary actions as per the provisions of section 14.8 of the UPERC
Electricity Supply Code.
16.6.3 In case request for reduction in Contracted Load, the Licensee shall take necessary
actions as per the provisions of section 4.41 of the UPERC Electricity Supply Code.
16.6.4 In case request for enhancement of Load, the Licensee shall take necessary actions as per
the provisions of section 4.43 of the UPERC Electricity Supply Code.
16.7 Transfer of ownership and change of category:
16.7.1 Licensee shall give effect to transfer of ownership, change of category and conversion of
the existing services from Low Tension to High Tension and vice-versa within the following time
limits:
(a) Title transfer of owner ship-within second billing cycle from the date of receipt of
application, and
(b) change of category, as shown below:
Change of category Time limit
Conversion from single phase to Low Within second billing cycle from the
Tension 3-phase and vice-versa payment of necessary charges.
Conversion from Low Tension 3-phase to Within second billing cycle from the
High Tension 3-phase and vice-versa payment of necessary charges.
16.7.2 In case of change of category Licensee shall examine the technical feasibility upon receipt
of such application and inform the consurner within 7 days of receipt of application about the
feasibility.
16.8 Temporary supply of power:
16.8.1 The Temporary supply shall be provided as per the section 4.10 of UPERC Electricity
Supply Code.
16.9 Consumer bills complaint:
16.9.1 In case of billing related complaints, the Licensee shall take necessary actions as per the
provisions of section 6.5 of IUPERC Electricity Supply Code.
16.10 Permanent Disconnection of supply:
16.10.1 The Licensee can disconnect the supply on receipt of request for permanent
disconnection as per the provisions of section 4.38 of UPERC Electricity Supply Code.
16.11 Reconnection of supply following disconnection due to non-payment of bills:
16.11.1 The Licensee shall restore power supply to a consumer, whose supply has been
disconnected due to non-payment of electricity bills as per the provisions of section 4.39 of the
UPERC Electricity Supply Code:
Provided that in case prepaid meters have been installed at the premises of the consumers, the
power shall be restored by the Licensee within 2 hours of recharge of the prepaid meters by the
consumers.
17. Schedule-II: Overall Standards Of Performance-
Overall
Standard
Code
Guaranteed
Standard
Reference
Parameter
1 2 3
17.1 16.2.1 Normal fuse off: Licensee shall maintain the, percentage of fuse-off
calls rectified within the time limits specified to a value not less
than 95% of the total calls.
17.2 16.2.2 Overhead Line/Cable Breakdowns: Licensee shall ensure
restoration of power supply within the time limits specified in at
least 95% of overall cases of line breakdowns.
17.3 16.2.3 Underground Cable Breakdown: Licensee shall ensure
. restoration of power supply within the time limits specified in at
least 95% of overall cases of line breakdowns.
17.4 16.2.4 Distribution Transformer Failures: Licensee shall maintain the
percentage of distribution transformers replaced within the time
limits specified to a value not less than 95% of the total
distribution transformers failures.
17.5 16.2.5 Reconnection of supply following disconnection due to non-
Payment of bills: Licensee shall achieve the standards of
performance as specified in at least 95% of the cases.
17.6 Period of scheduled outages: Licensee shall achieve the standards of performance as
specified in Regulation 16.2.5 of Schedule-1 in at least 95% of the cases.
17.7 Shifting of meters/service lines: Licensee shall achieve the standards of performance as
specified in Regulation 16.5.1 and 16.5.2 of Schedule-1 in at least 95% of the cases.
17.8 New connection/additional load/ reduction in load: Licensee shall achieve the standards
of performance as specified in Regulations 16.6.1, 16.6.2 and 16.6.3 of Schedule-1 in at least
95% of the cases.
17.9 Transfer of ownership and change of category: Licensee shall achieve the standards of
performance as specified in Regulation 16.7.1 and 16.7.2 of Schedule-1 in at least 95% of the
cases.
17.10 Temporary supply of power: Licensee shall achieve the standards of performance as
specified in Regulation 16.8.1 of Schedule-1 in at least 95% of the cases
17.11 Disconnection of supply: Licensee shall achieve the standards of performance as
specified in Regulation 16.10. lof Schedule-1 in at least 95% of the cases.
17.12 Faulty meters: Licensee shall maintain the percentage of defective meters to the total
number of meters in service, at a value not greater than 3%.
17.13 Billing mistakes: Licensee shall maintain the percentage of bills requiring modifications
following complaints to the total number of bills issued, at a value not greater than 0.1%.
17.14 Load shedding: In case of shortage of power, Licensee shall submit the load shedding plan
to the Commission and get it approved. Licensee shall publish the same in the newspaper at
least 48 hrs in advance.
17.15 Power Supply Hours: The Licensee shall achieve the standard of performance in at least
96% against the scheduled power of supply.
17.16 Reliability Indices:
17.16.1 The Commission shall impose a uniform system of recording and reporting of
distribution system reliability performance. The same reliability indices shall be imposed on all
Licensees. The performance target levels set by the Commission shall be unique to each
Licensee to be based initially on the historical performance of Licensee.
17.16.2 Based on the information submitted by Licensees, the Commission would notify the
target levels for the reliability indices annually. Licensee shall be evaluated annually to compare
Licensees actual performance with the targets.
17.16.3 The Licensee shall compute the following distribution reliability indices separately for
the Urban Area including Class-I Cities, rural and agricultural feeders:
(a) System Average Interruption Frequency Index (SAIFI): The Licensee shall calculate the value
as per the formula and methodology specified in Regulation 17.17.1.
(b) System Average Interruption Duration Index (SAIDI): The Licensee shall calculate the value as
per the formula and methodology specified in Regulation 17.17.1.
(c) Momentary Average Interruption Frequency Index (MAIFI): The Licensee shall calculate the
value as per the formula and methodology specified in Regulation 17.17.1.
17.17 Method of computing reliability indices:
17.17.1 The Indices shall be computed for Licensee as a whole by stacking, for each month all
the 11kV feeders in the supply area, excluding the agricultural feeders, and then aggregating the
number and duration of all interruptions in that month for each feeder. The Indices would then
be computed using the following formulae:
NOTE:
(a) The feeders must be segregated into Urban Area including Class-1 cites and ruraland the
value of the indices must be reported separately for each month.
(b) Licensee shall compute the value of these indices separately for agriculture feeders. The
methodology for computation of indices shall remain the same as in the case of other feeders.
8. Schedule-III: Compensation-
18.1 In case of failure of Licensee to meet the guaranteed standards of performance as specified
in Regulation 16: of these regulations, compensation shall be payable to the consumer, as
shown in the table below.
TABLE
Parameter Compensation payable to individual in
case event affects single consumer
(in Rs.) (in case of each fault)
Operation of Call Centre
First response against a Consumer Call 50
Registration of Consumer Call and issue of complaint (Unique 50
Identification Number) number
Hours of Power Supply-
If Consumer gets lesser supply than scheduled
supply on monthly basis as per regulation 16.2.5.
1 2
New connection/ additional load where supply can be provided after 250/day
extension/augmentation of network.
Erection of substation to extend supply 500/day
Issue of tempornry connection 100/day
Shifting of meters/ service lines-
Shifting of meter service lines in same premises 50/day
Meter complaints-
Meter Reading 200/day
Replacement of defective meter after test report 50/day
Replacement of burnt meter 50/day
Transfer of ownership, change of category-
Title, transfer of ownership and conversion of services 50/day
Change of category 50/day
Consumer bill complaint-
Billing complaint resolution 50/day
Billing-
Reduction/Enhancement of load 50/day
Termination of agreement 50/day
Carry forward of fictitious arrear 100/cycle
Disconnection of supply-
Disconnection of supply (Permanent Disconnection) after payment of dues 50/day
Refund of security deposit etc. 50/day
Issue of no dues certificate 50/day
Reconnection of supply following disconnection due to non-payment of bills-
Reconnection (on temporary disconnection) after removal of cause of disconnection 50/day
16.8
SI no. Month Ni-
Connected
lead of
ith feeder
affected for
each
nterruption
Ci-Total
number of
momentary
interruptions
(each less
than or
equal to 5
minutes) on
ith feeder
for the
month
Nt-Total
connected
load at
11kV in
Licensee
area of
supply (1)
MAIFI-
(2)/(1)
1
2
Total
21. ANNEXURE-III-
Sl.
No.
Date of
receiving
complaint
Time of
receiving
complaint
Consumer
ID
Nature of
complaint
Reference
Guaranteed
standard
Time &
Date of
redressal
of
complaint
Total time
taken for
complaint
redressal
(inHrs/mts)
1
2
3
By order of the Commission,
SANJAY KUMAR SINGH,
Secretary.
पी०एस०यू०पी० 32 असाधारण गजट-7-01-2020-150 प्रतियाां (डी०टी०पी०/ आफसेट ।