Model Building Construction and
Development Byelaws and Model
Zoning Regulations for Development
Authorities of Uttar Pradesh, 2025
Housing & Urban Planning Department
Government of Uttar Pradesh
3 July 2025 Version: PRF3
1
Model Building Construction and Development Byelaws and
Model Zoning Regulations for Development Authorities of
Uttar Pradesh, 2025
Housing and Urban Planning Department
Government of Uttar Pradesh
This document (except Chapter 15 and Appendix 15) constitutes the Building Construction and
Development Byelaws for Development Authorities of Uttar Pradesh, 2025. Chapter 15 along
with Appendix 15 of this document constitute the Model Zoning Regulations for Development
Authorities of Uttar Pradesh, 2025. Building Byelaws and Zoning Regulations have been
integrated into a single document to ensure ease of understanding, consistency, user-friendliness
and to address potential discrepancies.
2
Contents
1 Short Title and Definitions .............................................................................................................. 7
1.1 Short Title and extent .............................................................................................................. 7
1.2 Definitions ............................................................................................................................... 7
1.3 Applicability of byelaws ....................................................................................................... 17
1.4 Difficulty Removal ............................................................................................................... 18
1.5 Effect on relevant Government Orders ................................................................................. 18
1.6 Sectoral Policies .................................................................................................................... 18
2 Permission for Land Development and Building Construction .................................................... 19
2.1 Land Development and Building Construction Permission .................................................. 19
2.2 Procedure for obtaining Development and/or Building Permission ..................................... 22
2.3 All Plans ................................................................................................................................ 26
2.4 Signing of Plans .................................................................................................................... 29
2.5 Application/Notice for alteration .......................................................................................... 30
2.6 Permit Fees ............................................................................................................................ 31
2.7 Permit Process ....................................................................................................................... 31
2.8 Procedures during Development and Construction Work .................................................... 34
2.9 Notice of Completion ............................................................................................................ 35
2.10 Permission near protected monuments/heritage sites ........................................................... 37
2.11 Permission along the riverbanks ........................................................................................... 37
2.12 Architectural control ............................................................................................................. 38
3 Standards for Land Development and Building Construction ...................................................... 39
3.1 General Land Development Requirements ........................................................................... 39
3.2 Development Standards (Plot Size, FAR, Building Height, Setbacks) ................................. 45
3.3 Requirements of Parts of Building ........................................................................................ 65
4 Residential Buildings .................................................................................................................... 80
4.1 Plotted Development - Single/ Multi-units. .......................................................................... 80
4.2 Group Housing ...................................................................................................................... 81
4.3 EWS and LIG housing requirements .................................................................................... 83
4.4 Affordable Housing standards .............................................................................................. 85
5 Commercial Buildings .................................................................................................................. 88
5.1 Bazaar Street ......................................................................................................................... 88
5.2 Shops, Commercial Complex and Shopping Malls .............................................................. 89
5.3 Hotels .................................................................................................................................... 91
5.4 Single Screen Cinema, Miniplex and Multiplex ................................................................... 93
3
5.5 Petrol Pump/Filling Station (CNG/PNG/EV Charging Station) ........................................... 95
5.6 LPG Gas Godown ................................................................................................................. 97
5.7 Open-air/ Rooftop Restaurants .............................................................................................. 97
6 Institutional Buildings & Community Facilities ........................................................................... 99
6.1 Hospitals and healthcare Buildings ....................................................................................... 99
6.2 Educational Institutions....................................................................................................... 101
6.3 Marriage Hall / Banquet/ Multi-purpose Hall ..................................................................... 103
6.4 Auditorium and Convention Centre .................................................................................... 104
7 Industrial and Agricultural Use Buildings .................................................................................. 106
7.1 Industries ............................................................................................................................. 106
7.2 Farmhouse ........................................................................................................................... 107
7.3 Dairy Farm .......................................................................................................................... 108
8 Mixed-Use and Transit-Oriented Development .......................................................................... 110
8.1 Mixed Use Development .................................................................................................... 110
8.2 Transit Oriented Development (TOD) ................................................................................ 112
8.3 Other requirements .............................................................................................................. 113
9 Additional Floor Area Ratio ....................................................................................................... 115
9.1 Compensatory Floor Area Ratio (FAR) .............................................................................. 115
9.2 Purchasable & Premium Purchasable FAR......................................................................... 115
9.3 Additional FAR on Green Buildings .................................................................................. 118
10 Fire Prevention and Life Safety .............................................................................................. 120
10.1 Fire prevention and life safety measures. ............................................................................ 120
10.2 Minimum Standards for Fire prevention and Life Safety for permanent structures ........... 121
10.3 Issuance of Fire Safety Certificate and its renewal ............................................................. 122
11 Structural Safety and Quality Control ..................................................................................... 123
11.1 Structural Design and Safety............................................................................................... 123
11.2 Structural Design Basis Report (SDBR) ............................................................................. 124
11.3 Review of Structural Design ............................................................................................... 124
11.4 Quality Control and Safety during Construction ................................................................ 125
11.5 Periodic Evaluation of Buildings ........................................................................................ 125
11.6 Seismic Strengthening/Retrofitting ..................................................................................... 126
11.7 Format for Structural Design Basis Report (SDBR) ........................................................... 126
11.8 Requirements for earthquake resistant construction ........................................................... 127
12 Provisions for differently abled, elderly and children ............................................................. 131
12.1 Definitions ........................................................................................................................... 131
12.2 Scope ................................................................................................................................... 131
12.3 Site Development Specifications ........................................................................................ 131
4
12.4 Building Requirements ....................................................................................................... 132
13 Environmental Sustainability .................................................................................................. 135
13.1 Water Conservation ............................................................................................................ 135
13.2 Energy Conservation ........................................................................................................... 136
13.3 Topography and Natural Drainage ...................................................................................... 138
13.4 Solid Waste Management ................................................................................................... 139
13.5 Wastewater Recycling......................................................................................................... 139
13.6 Air Quality & Noise ............................................................................................................ 140
13.7 Green Cover/ Tree Plantation ............................................................................................. 142
13.8 Environment Impact Assessment ........................................................................................ 143
13.9 Environment Management Plan .......................................................................................... 143
14 Qualifications and Competence of Licensed Technical Persons ............................................ 144
14.1 Essential Requirements ....................................................................................................... 144
14.2 Qualifications and Competence of Licensed Persons ......................................................... 144
14.3 Builder/ Developer Entity ................................................................................................... 146
14.4 Licensed qualified third-party agency for fire and life safety systems ............................... 146
15 Model Zoning Regulations...................................................................................................... 147
15.1 Objectives of Zoning ........................................................................................................... 147
15.2 Definitions of land use activities ......................................................................................... 149
15.3 Permissibility of various activities in major land use zones ............................................... 159
15.4 Order of land use zones from lowest to highest order and determination of Impact fee .... 164
16 Compounding of Building Construction and Development .................................................... 166
16.1 Title and Commencement ................................................................................................... 166
16.2 Compounding of Offences .................................................................................................. 166
16.3 Compounding Process ........................................................................................................ 166
17 Provision of Electric Charging Infrastructure ......................................................................... 173
17.1 Electric Vehicle Charging Infrastructure (EVCI) ............................................................... 173
17.2 Explanatory Note on Electric Vehicle Charging Infrastructure (Annexure E-1): ............... 175
17.3 Rationale for EVCI establishment ...................................................................................... 176
17.4 EV Charging Technology ................................................................................................... 176
17.5 Options for EV Charging .................................................................................................... 177
17.6 Charger Specifications and PCS Infrastructure................................................................... 178
17.7 Location of PCS / FCB CS in local area / building precincts ............................................. 179
17.8 Public Charging Infrastructure (PCI) - Minimum Requirements (Annexure E-2) ............. 180
18 In-Building Solutions for Common Telecom Infrastructure (CTI) ......................................... 184
18.1 Introduction to Communication System ............................................................................. 184
18.2 In- Building and Gated Buildings Solutions ....................................................................... 185
5
18.3 Incorporation in State Building Bye Laws .......................................................................... 185
18.4 At Layout Level .................................................................................................................. 186
18.5 Other procedures for setting up In-Building Solution (IBS)/Fiber Networks ..................... 187
Appendix-1: List of Government Orders, Policies, Rules, Byelaws (B.1.6) ...................................... 190
Appendix-2: Application form for development permit (B.2.2.1) ...................................................... 191
Appendix-3: Notice to start land development work (B.2.8.1.1) ........................................................ 192
Appendix-4: Application Form-D for completion certificate of layout plan (B.2.9.1) ....................... 193
Appendix-5: Application Form for building permit (B.2.2.1) ............................................................ 197
Appendix-6: Form to intimate start of building construction (B.2.8.1.2) ........................................... 198
Appendix-7: Application Form-A for completion certificate of residential building (> 500 sqm.) –
(B.2.9.2) .............................................................................................................................................. 199
Appendix-7: Application Form-B for completion certificate of group housing, commercial and multi-
storey building (B.2.9.2) ..................................................................................................................... 202
Appendix-7 Application Form-C for completion certificate of buildings other than residential, group
housing, commercial and multi-storey buildings (B.2.9.2) ................................................................. 205
Appendix-8: Building Information Schedule (B.11.8.2) .................................................................... 208
Appendix-9: Structural Safety Certificate (B.11.8.2) ......................................................................... 209
Appendix-10: Structural and Foundation Design Certificate .............................................................. 210
Appendix-11: Structural Safety Certificate on Completion of Building (B.11.8.4) ........................... 211
Appendix-12: Affidavit for Development/Building Permission (B.2.2.1).......................................... 212
Appendix-13: Site Inspection Notice (B.2.8.1) ................................................................................... 213
Appendix-14: Format for Structural Design Basis Report (SDBR) (B.11.7) ..................................... 214
Appendix-15: Use zones across different master plans ...................................................................... 221
Appendix-16: Case examples with illustrated calculations ................................................................ 227
Appendix-17: Graphical Illustrations .................................................................................................. 239
Appendix-18: List of Service and Cottage Industries ......................................................................... 244
6
7
1 Short Title and Definitions
1.1 Short Title and extent
(i) These bye-laws will be called… (Name of Authority)… Development Authority Building
Construction and Development Byelaws 2025.
(ii) These bye-laws will be applicable to the entire …(Name of development area)… development
area.
1.2 Definitions
Sl. Item Definition
1 Access “Access” or “Means of Access” or “Approach Road” means a clear
approach to a plot or a building from a road/street. (This refers to any
road, street, lane, passage giving access to the plot being a right of way,
and includes such features as drain, median strip, shoulder or berm, bridge,
culvert, burrow pit etc. between the two boundary walls of the premises on
either sides of such right of way or, where a street alignment has been
fixed and the area within such alignment has been acquired by authority or
other agency/ institution and the alignment has been demarcated or is
capable of being demarcated up to such alignment.)
2 Act “Act” unless specified otherwise, means the Uttar Pradesh Urban Planning
and Development Act, 1973.
3 Addition, Revision
and/or Alteration
“Addition, Revision and/or Alteration” means a change from one
occupancy to another, or a structural change including an addition to the
area or change in height or the removal of part of building, or any change
to the structure, such as the construction or removal or cutting into of any
wall or part of a wall, partition, column, beam, joist, floor including a
mezzanine floor or other support, or a change to or closing of any required
means of access ingress or egress as provided in these Bye-Laws.
4 Affordable Housing
Scheme
“Affordable Housing Scheme” refers to government initiatives or
programs designed to make housing accessible and affordable for low to
middle-income individuals and families, often through subsidized housing,
interest rate reductions, or other financial incentives. E.g. Pradhan Mantri
Awas Yojana (PMAY) and similar programs.
5 Air-conditioning “Air-conditioning” means the process of treating air to control
simultaneously its temperature, humidity, purity, distribution and air
movement and pressure to meet the requirements of the conditioned space.
6 Amenity “Amenity” includes roads, water supply, street lighting, drainage,
sewerage, development of public parks and open spaces, solid waste
management and disposal, sewage treatment plant and other public works
including utilities, services, and such other conveniences as the State
Government may, by notification in the Gazette, specify to be an amenity
for the purposes of UP Urban Planning and Development Act, 1973.
7 Ancillary Use “Ancillary Use” means any use of the premises subordinate to the
principal use and incidental to the principal/ main use.
8 Application “Application” means an application made in such form as may be
prescribed by the Authority from time to time.
9 Approved “Approved” means as approved/sanctioned by the Authority.
10 Area “Area” in relation to a building means the superficies of a horizontal
section thereof made at the plinth level inclusive of the external walls and
of such portions of the party walls as belong to the building.
8
Sl. Item Definition
11 Atrium “Atrium” means the internal court/ entrance hall of a building, which is
sky lighted or covered with a transparent permanent structure on the
terrace floor.
12 Authority “Authority” means the Urban Development Authority which has been
created under the provisions of Uttar Pradesh Urban Planning and
Development Act, 1973 or the Uttar Pradesh Housing and Development
Board established under the Uttar Pradesh Awas Evam Vikas Parishad
Act, 1965.
13 Balcony “Balcony” means a horizontal projection, cantilevered or otherwise
including a parapet handrail, balustrade, to serve as a passage or sit out
place.
14 Basement or Cellar “Basement or Cellar” means the lower storey of a building, below or
partly below ground level, with one or more than one levels. The
maximum height of the basement above ground level shall not be more
than 1.20 meters.
15 Bazaar Street “Bazaar Street” means a linear mixed-use construction along the road
which is identified in the Master Plan/Zonal Plan.
16 Building “Building” means a structure constructed with any materials whatsoever
for any purpose, whether used for human habitation or not, and includes:
(i) foundation, plinth, walls, floors, roofs, chimneys, plumbing and
building services, fixed platforms etc., (ii) verandahs, balconies, cornices,
projections etc., (iii) parts of a building or anything affixed thereto; (iv)
any wall enclosing or intended to enclose any land or space, sign and
outdoor display structures; etc., (v) tanks constructed or fixed for storage
of chemicals or chemicals in liquid form and for storage of water, effluent,
swimming pool, ponds etc., (vi) all types of buildings as defined under the
‘use group or occupancy’ or based on ‘design, height or other features’,
except tents, shamianas and tarpaulin shelters erected temporarily for
temporary purposes (for less than three months) and ceremonial occasions,
shall be considered to be "buildings".
Types of buildings based on use of premises or activity (Use group or
Occupancy):
(a) “Residential building” includes a building in which sleeping and
living accommodation is provided for normal residential purposes, with
cooking facilities and includes one or more family dwellings, apartment
houses, boarding houses, flats, and private garages of such buildings.
(b) “Educational buildings” includes a building exclusively used for a
school or college or training institution recognized by appropriate board or
university or any other competent authority, involving assembly for
instruction, education or recreation incidental to educational use, and
including a building for such other uses as research institution. It shall
also include quarters for essential staff required to reside in the premises,
and building used as a hostel captive to an educational institution whether
situated in its campus or outside.
(c) “Institutional buildings” includes a building used for such purposes
as hospital, nursing home, health center or other treatment or care of
persons suffering from physical or mental illness, handicap, disease or
infirmity, care of orphans, abandoned women, children and infants,
convalescents, destitute or aged persons and for penal or correctional
detention with restricted liberty of inmates ordinarily providing sleeping
accommodation and includes dharmshalas, hospitals, sanatoria, custodial
and penal institutions such as jails, prisons, mental hospitals, reform
homes, etc.
9
Sl. Item Definition
(d) “Assembly Building” includes a building or part thereof, where
groups of people (not less than 50) congregate or gather for amusement,
recreation, social, religious, patriotic, civil, travel and related purposes, and
this includes buildings such as theatre, cinema hall, community hall,
auditorium, exhibition hall, museum, skating rink, gymnasium, , eating or
boarding houses, place of worship, dance hall, clubs, gymkhanas and
passenger station/ terminals of air, land or other public transportation
services, amusement park, etc.
(e) “Mercantile/Commercial Building” includes a building or part
thereof used for shops, stores, restaurants, markets for display and sale of
wholesale or retail goods or merchandise including office, storage, and
service facilities incidental thereto and located in the same building.
(f) “Office/business building” includes a building or part thereof used
principally for transaction of business and/or keeping of accounts and
records including offices, banks, professional establishments, court houses,
etc., if their principal function is transaction of business and/or keeping of
books and records.
(g) “Industrial building” includes a building or part thereof wherein
products or material are fabricated, assembled, or processed, such as
assembly plants, laboratories, power plants, refineries, gas plants, mills,
dairies, and factories, etc.
(h) “Storage building” includes a building or part thereof used primarily
for storage or shelter of goods, wares, merchandise and includes a building
used as a warehouse, cold storage, freight depot, transit shed, store house,
public garage, hanger, truck terminal, grain elevator, silos, barn, and
stables.
(i) “Hazardous building” includes a building or part thereof used for –(a)
storage, handling, manufacture or processing of radioactive substances or
highly combustible or explosive materials or products which are liable to
burn with extreme rapidity and/or producing poisonous fumes or explosive
emanations, or (b) storage, handling, manufacture or processing of which
involves highly corrosive, toxic or noxious alkalis, acids, or other liquids,
gases or chemicals producing flame, fumes, and explosive mixtures, etc.,
or which result in division of matter into fine particles capable of
spontaneous ignition.
(j) “Mixed Use Building” means a building partly used for non-residential
activities and partly for residential purpose or a mix of two non-residential
activities.
(k) “Wholesale Establishment” means an establishment wholly or partly
engaged in wholesale trade and manufacture, wholesale outlets, including
related storage facilities, warehouses and establishments engaged in truck
transport, including truck transport booking agencies.
Types of buildings based on design, height, and other features:
(l) “Detached Building” includes a building with walls and roofs
independent of any other building and with open spaces (defined as per
these byelaws) on all sides within the same plot.
(m) “Multi-Storeyed Building or High-rise Building” means building
above four storeys, and/or a building exceeding 15 meters or more in
height (without stilt) and 17.5 meters (including stilt).
(n) “Semi-detached Building” means building detached on three sides
with open space as specified in these regulations.
(o) "Group Housing" include group of residential buildings or multi-
storey buildings having one or more independent residential units on each
10
Sl. Item Definition
floor and in which there is sharing and co-ownership of land and services,
open space, and transportation routes.
(p) “Multiplex” means a group or conglomeration of two or more than two
cinema halls (or as prescribed by State Tax Department) within same
premises with commercial, cultural and other entertainment related
facilities.
“Miniplex” means a two cinema halls/screens, licensed for cinematograph
exhibition or exhibitions through digital projection system in a permanent
building with seating capacity not exceeding 250 with commercial activities
(or as prescribed by State Tax Department) within the same premises.
“Cinemas” means the entire place licensed for Cinematograph exhibition
and exhibitions through digital projection system and includes all
appurtenances, plant and apparatus located therein; and includes Single
Screen, Miniplex and Multiplex.
(q) “Special Building” includes all buildings like assembly, industrial,
buildings used for wholesale establishments, hotels, hostels, hazardous,
critical, mixed occupancies with any of the aforesaid occupancies and
centrally air-conditioned buildings having total built up area exceeding 500
sq m., as defined in the National Building Code as amended from time to
time.
(r) “Multi Level Car parking” means a building partly below ground
level having two or more basements or above ground level, primarily to be
used for parking of cars, scooters, or any other type of light motorized
vehicle.
(s) “Stand-alone factory” refers to a manufacturing unit that operates
independently, with its own facilities and processes, rather than being part
of a larger industrial complex or park. As per the Factories Act, 1948,
means any premises where ten or more workers are working, or were
working on any day of the preceding twelve months, and in any part of
which a manufacturing process is being carried on with the aid of power.
(t) “Flatted factory” means a multi-story industrial building (non-
polluting in nature) designed to accommodate several businesses, each
occupying a separate unit, for activities like manufacturing, assembly, and
storage. Flatted factories are developed to encourage industrial growth and
make land usage more efficient.
(u) “Single-Unit” refers to residential building having one independent
residential unit on one floor or combination of floors with three or less
storeys and height not exceeding 15-meters.
(v) “Multi-Unit” refers to residential building having one or more
independent residential units on one floor with four or less storeys and
height not exceeding 17.5-meters (including mandatory stilts).
(w) “Other Buildings” means any other building which is not covered in
the above.
17 Building Height “Building Height” or “Height of building” means the vertical distance
measured (i) In the case of flat roofs above average level of the front road
and continuance to the highest point of the building, (ii) In case of pitched
roofs up to the point where the external surface of the outer wall intersects
the finished surface of the sloping roof and (iii) In the case of gables facing
the road midpoint between the eaves level and the ridge. Architectural
features serving no other function except that of decoration shall be
excluded for the purpose of measuring heights. The height of the building
shall be taken up to the terrace level for the purpose of fire safety
requirement.
11
Sl. Item Definition
18 Building Envelope “Building Envelope” means the horizontal spatial limits up to which a
building may be permitted to be constructed on a plot. It is the residual
area after leaving the setbacks prescribed for a plot, within which
construction is permissible as per rules.
19 Building Line “Building Line” means the line up to which the plinth of building
adjoining a street or an extension of a street or on a future street may
lawfully extend and includes the lines prescribed, if any, in any scheme
and/or layout plan. The building line may change from time-to-time as
decided by the Authority.
20 Built-up area
(Master Plan)
“Built up area (Master Plan)” in the context of Master Plan means such
densely populated area situated within the development area, most of
which has been developed as commercial, industrial, residential, or other
areas. Here, all the necessary facilities like roads, water supply, sewerage,
electricity supply etc. are available and have been demarcated as built-up
area by the authority under its master plan.
21 Built-up area
(Building)
“Built-up area (Building)” in the context of building construction refers
to the total covered area on all floors of an immovable property or
building.
22 Canopy “Canopy” shall mean a cantilevered projection from the face of the wall
over an entry to the building at the lintel or slab level provided that: (i) It
shall not project beyond the plot line, (ii) It shall not be lower than 2.3
meters when measured from the ground, and (iii) There shall be no
structure on it and the top shall remain open to sky.
23 Carpet Area “Carpet Area” means the net usable floor area of an apartment, excluding
the area covered by the external walls, areas under services shafts,
exclusive balcony or verandah area and exclusive open terrace area, but
includes the area covered by the internal partition walls of the apartment.
24 Construction "Construction" means any erection of a structure or a building, including
any addition or extension thereto either vertically or horizontally, but does
not include, any reconstruction, repair and renovation of an existing
structure or building, or, construction, maintenance and cleansing of drains
and drainage works and of public latrines, urinals and similar
conveniences, or, the construction and maintenance of works meant for
providing supply of water for public, or, the construction or maintenance,
extension, management for supply and distribution of electricity to the
public; or provision for similar facilities for publicity.
25 Convenience Shop “Convenience Shop” means a small retail shop or a corner shop that
carries a limited selection of basic items and is open long hours for the
convenience of local residents or shoppers.
26 Covered Area “Covered area” means the covered floor area above the plinth level over
which a building is constructed. The following structures shall not be
included under the covered area: (a) Garden, rockery, well and any
structure related to a well, plant nursery, water pool, uncovered swimming
pool, platform around a tree, tank, fountain, bench, open platform. (b)
Drainage culvert, catch-pit, gully pit, chamber, gutter, etc. (c) Compound
wall, entrance gate, floorless porch and portico canopy, slide, swing,
uncovered stairs, uncovered ramp etc. (d) Watchman booth, pump-house,
garbage shaft, electrical cabin/sub-station and such other utilities structures
related to various services.
27 Development “Development” - ‘Development’ with grammatical variations means the
carrying out of building, engineering, mining, or other operations, in, or
over, or under land or water, on the making of any material change, in any
building or land, or in the use of any building, land, and includes re-
12
Sl. Item Definition
development and layout and subdivision of any land and ‘to develop’ shall
be construed accordingly.
28 Drain “Drain”- A conduit or channel for the carriage of storm water, sewage,
wastewater, or other waterborne wastes in a building drainage system.
29 Drainage System “Drainage system” - A system or a line of pipes, with their fittings and
accessories, such as manholes, inspection chambers, traps, gullies, floor
traps used for drainage of building or yards appurtenant to the buildings
within the same cartilage; and includes an open channel for conveying
surface water or a system for the removal of any wastewater.
30 Dwelling Unit “Dwelling Unit”- A building or a portion thereof which is designed or
used wholly or principally for residential purposes for one family.
31 Encroachment “Encroachment”- means an act to enter into the possession or rights
either of permanent or temporary nature on a land or built-up property of
local body/authority or state/ central Government.
32 Enclosed Staircase “Enclosed Staircase”- means a staircase separated by fire resistant walls
and doors from the rest of the building.
33 Existing Building “Existing Building”- A building or structure existing in authorized
manner with the approval of the Authority before the commencement of
these Byelaws.
34 Existing Use “Existing Use”- Use of a building or structure existing in authorized
manner with the approval of the Authority before the commencement of
these Byelaws.
35 Exit “Exit”- A passage channel or means of egress from the building, its storey
or floor to a street or, other open space of safety; whether horizontal,
outside, and vertical exits meaning as under: - (i) Horizontal exit means an
exit, which is a protected opening through or around a fire well or bridge
connecting two or more buildings. (ii) Outside exit mean an exit from
building to a public way to an open area leading to a public way or to an
enclosed fire-resistant passage leading to a public way. (iii) Vertical exit
means an exit used for ascending or descending between two or more
levels including stairway, fire towers, ramps, and fire escapes.
36 External Wall “External Wall” means an outer wall of a building not being a party wall
even though adjoining to a wall of another building and also means a wall
abutting on an interior open space of any building.
37 Floor “Floor” means the lower surface in a storey on which one normally walks
in a building and does not include a mezzanine floor. The floor at ground
level with direct access to a street or open space shall be called the ground
floor; the floor above it shall be termed as floor-1, with the next higher
floor being termed as floor- 2, and so on upwards.
38 Floor Area “Floor area” means the area covered on any floor of a building.
39 Floor Area Ratio “Floor Area Ratio (FAR)” means the quotient obtained by dividing the
combined covered area (plinth area) of all floors, excepting areas
specifically exempted under these regulations, by the total area of the plot,
viz.: - Floor Area Ratio (FAR) = Total covered area on all floors/ Plot
Area.
(a) “Compensatory FAR” means the additional FAR allowed on the plot
up to the specified limit to compensate for the land being transferred free
of cost by the landowner from the private plot to the Authority for right-of-
way/road expansion or public facilities. or The FAR received by the owner
from the Authority as a compensation for surrender of land to the
government body without any monetary compensation and free from
encumbrances.
13
Sl. Item Definition
(b) “Basic FAR” or “BFAR” means the FAR which is permissible without
any fee as per the applicable Building Byelaws.
(c) “Purchasable FAR” or “PFAR” means the additional FAR
permissible to the extent specified over the basic FAR in the Master Plan /
Regional Plan / Building Construction and Development Byelaws, which
can be purchased by the applicant on payment of prescribed fee as per
Chapter-9 of the byelaws.
(d) “Premium purchasable FAR” or “PPFAR” means the additional
FAR permissible to the extent specified over the purchasable FAR in the
Master Plan/ Regional Plan/ Building Construction and Development
Byelaws, as per Chapter-9 of the byelaws.
(e) “Maximum Permissible FAR (MFAR)” means the sum of Base FAR
(BFAR), Purchasable FAR (PFAR) and, Premium Purchasable FAR
(PPFAR) as per Chapter-9 of the byelaws.
40 Fire Lift “Fire Lift”- Means a special lift designed for the use of fire service
personnel in the event of fire or another emergency.
41 Footing “Footing”- A foundation unit constructed in brickwork, stone masonry, or
concrete under the base of a wall or column for the purpose of distributing
the load over a larger area.
42 Foundation “Foundation”- A substructure supporting an arrangement of columns or
walls in a row or rows transmitting the loads to the soil
43 Gallery “Gal1ery"- An intermediate floor or platform projecting from a wall of an
auditorium or a hall providing extra floor area, and/additional seating
accommodation and includes the structures provided for seating in stadia.
44 Green Building “Green building” means a building which has less water usage, proper
energy efficiency, conservation of natural resources, minimum generation
of waste and provides healthy environment to the occupants as compared
to conventional building.
45 Ground Floor “Ground Floor”- shall mean storey, which has its floor surface nearest to
the ground around the building. A building may have more than one
ground floor:
“Upper Ground Floor” refers to a floor that is situated above the ground
level but is not considered a full first floor or higher. It can be slightly
elevated compared to the standard ground floor and is usually used in
buildings where the terrain or design requires a split-level approach.
“Lower Ground Floor” refers to a floor which has more than half of its
height above the mean ground level and rest of the height below the mean
ground level.
46 Habitable Room “Habitable Room” means a room occupied or designed for occupancy by
one or more persons for study, living, sleeping, eating, kitchen if it is used
as a living room, but not including bathrooms, water-closet compartments,
laundries, serving and store pantries, corridors, cellars, attics, and spaces
that are not used frequently or during extended periods.
47 Land Use “Land Use” means the use of Land for which land or building is used or
intended to be used as per the provisions of Master Plan or the Zonal
Development Plan or the Layout Plan.
“Mixed Land Use” means mixing / planning of two or more compatible
uses horizontally or vertically on a land parcel in accordance with the
Zoning regulations.
48 Layout plan/ Sub-
division plan
“Lay-out plan/sub-division plan” means sub-dividing of any land or part
thereof into more than one plot for sale or otherwise, in which the
configuration of roads, measurement of plots along with set-back lines and
method of development (e.g. row-housing, semi-detached detached group
14
Sl. Item Definition
housing) should be shown and details of size, use, area of all the plots
should be given."
49 Licensed Technical
Professional
“Licensed Technical Person (LTP)” means a qualified professional
(Architect/ Town Planner/ Engineer/ Supervisor) who is registered under
the building construction and development byelaws or registered under any
body constituted under any Act under which the said profession is
governed. The qualifications and competence requirements for registration
of professionals as ‘Licensed Technical Person’ or LTP, shall be as per
Chapter-14 of the byelaws.
50 Lift “Lift”- An appliance designed to transport persons or materials between
two or more levels in a vertical or substantially vertical direction by means
of a guided car or platform. The word ‘elevator’ is also synonymously
used for ‘lift’.
51 Lobby “Lobby”- means a covered space in which all the adjoining rooms open.
52 Loft “Loft” means an intermediate floor between two floors or a residual space
in a pitched roof above normal level constructed for storage with
maximum clear height of 1.5 meters.
53 Master Plan “Master Plan” means a Master Plan formulated under the UP Urban
Planning and Development Act, 1973 or the Uttar Pradesh Special Area
Development Authorities Act, 1986 or any other Act for any town,
approved and notified by the State Government.
54 Means of Escape “Means of Escape”- An escape route provided in a building for safe
evacuation of occupants.
55 MCLR “MCLR, or Marginal Cost of Funds-Based Lending Rate”, is the
minimum interest rate below which banks cannot lend, determined by the
Reserve Bank of India (RBI) based on the bank's cost of funds and other
factors.
56 Mezzanine Floor “Mezzanine Floor” means an intermediate floor between two floors of
any storey forming an integral part of floor below.
57 Mumty or stair cover “Mumty or Stair Cover”- A structure with a covering roof over a
staircase and its landing built to enclose only the stairs for the purpose of
providing protection from weather and not used for human habitation.
58 Non-Built-up area "Non-Built-up area" is the area other than Built-up area (Master Plan)
defined above.
59 Occupancy “Occupancy or use”- The principal occupancy/ use for which a building
or a part of a building is intended to be used. For the purposes of
classification of a building according to occupancy, an occupancy shall be
deemed to include the subsidiary occupancies which are contingent upon
it. “Mixed occupancy” buildings being those in which more than one
occupancy is present in different portions of the buildings.
60 Open to sky (OTS) “Open to sky” means an area forming an integral part of a building left
open to the sky.
61 Owner “Owner” means a person who has legal rights over any land or building or
receives rent or is entitled to receive rent in case the premises are on rent
and will also include the following: (1) Any agent or person who receives
rent on behalf of the owner, (2) Any agent or person who receives rent or
is entrusted with the management of any land or building for religious or
charitable purposes, (3) Any receiver or manager appointed by a court of
competent authority who has been given the charge/authority of exercising
the rights of the owner in the premises.
62 Parapet “Parapet”- A low wall or railing built along the edge of a roof or a floor.
15
Sl. Item Definition
63 Park and Open space “Park and open space” means a space which is open and un-built, or
which has been laid out and developed as a public park or garden.”
64 Parking Space “Parking space”- An enclosed or unenclosed covered or open area
sufficient in size to park vehicles. Parking spaces shall be served by a
driveway connecting them with a street or alley and permitting ingress and
egress of vehicles.
65 Partition Wall “Partition Wall” includes (i) A wall forming part of a building and being
used or constructed to be used in any part of the height or length of such
wall for separation of adjoining buildings belonging to different owners or
constructed or adopted to be occupied by different persons; or (ii) A wall
forming part of a building and standing in any part of the length of such
wall, to a greater extent than the projection of the footing on one side or
ground of different owners.
66 Permission or Permit “Permission or Permit”- A valid permission or authorization in writing
by the competent Authority to carryout development or a work regulated
by the Byelaws.
67 Plinth “Plinth” means the portion of a structure between the surface of the
surrounding ground surface of the floor immediately above the ground.
68 Plinth Area “Plinth Area” means the built-up covered area measured at the floor level
of the basement or of any storey.
69 Plot/ Site “Plot/ Site” means a parcel or piece of land enclosed by definite
boundaries.
“Corner plot” means a plot which is situated on two or more intersecting/
meeting roads.
“Island Plot” means plot surrounded by roads on all four sides.
70 Plotted Development “Plotted Development” – Type of layout wherein a stretch of developed
land is divided into regular sized plots for uniform controlled building
volumes.
71 Podium Parking “Podium Parking” means the floor/floors from the floor above the
ground level to the bottom surface of the beam for parking purposes under
the building envelope line in which there should be provision of ramp for
entry and exit of vehicles and in case of mechanized parking, there should
be provision of entry and exit as per the actual design.
72 Porch “Porch”- A covered surface supported on pillars or otherwise for the
purpose of a pedestrian or vehicular approach to a building.
73 Prohibited Area “Prohibited area” means any area specified or declared to be a prohibited
area under section 20A of the Ancient Monuments and Archaeological
Sites and Remains Act, 2010 (AMASR Act, 2010), and as defined under
other relevant acts
74 Protected Monument “Protected monument” means an ancient monument which is declared to
be of national importance by or under the AMASR Act, 2010.
75 Redevelopment “Redevelopment” refers to rehabilitating or constructing new
infrastructure on a site by renovating or replacing existing uses with new
development or construction, following an approved layout plan
76 Regulated Area “Regulated area” means any area specified or declared under section 20B
under the AMASR Act, 2010.
77 Refuge Area “Refuge Area” means an unenclosed area within the building for a
temporary use during egress. It generally serves as a staging area which is
protected from the effect of fire and smoke.
78 Road/ Street “Road/Street”- Any highway, street, lane, pathway, alley, stairway,
passageway carriageway, footway, square, place or bridge whether a
16
Sl. Item Definition
thorough-fare or over which the public have a right of passage or access or
have passed and have access uninterruptedly for specified period, whether
existing or proposed in any scheme and includes all bends, channels,
ditches, storm water drains, culverts sidewalks, traffic islands, roadside
trees and hedges, retaining walls fences, barriers and railing, street
furniture within the street lines, which shall be a part of Right of Way
79 Road/ Street Level or
Grade
“Road/Street Level or Grade” means the officially established elevation
or grade of the centerline of street upon which a plot fronts, and if there is
no officially established grade, the existing grade of street at its mid-point.
80 Road/ Street Line “Road/Street Line” means the line defining the side limits of a road/
street.
81 Road Width “Road Width or Width of Road/Street” means the overall width of the
road or right-of-way or the whole extent of space within the boundaries of
a road when applied to a new road/street as laid down in the city survey or
development plan or prescribed road lines by any act of law and measured
at right angles to the course or intended course of direction of such road.
82 Row Housing “Row Housing” -A row of houses with only front, rear, and interior open
spaces.
83 Room Height “Room Height”- The vertical distance measured from the finished floor
surface to the finished ceiling surface. Where a finished ceiling is not
provided, the underside of the joists or beams or tie beams shall determine
the upper point of measurement for determining the head room.
84 Service Road/Lane “Service Road/Lane” means a road that runs parallel to a main road,
providing access for local traffic to properties along the main road,
minimizing disruption to through traffic.
85 Service Floor “Service floor” means a floor up to a maximum height of 2.10 meters
from floor to beam between any two floors which is used only for pipes,
service ducts etc. related to the building.
86 Service Apartment “Service Apartment” means a fully furnished & self-contained apartment
having cooking facilities (cooking/kitchen) and used for short-term stay.
87 Setback Line “Set-back Line” means a line usually parallel to the plot boundaries or
center line of a road (as specified in building construction & development
byelaws) and laid down in each case by the Authority or as per
recommendations of Master/Zonal Plan, beyond which nothing can be
constructed towards the plot boundaries excepting with the permission of
the Authority.
88 Shelter Fee “Shelter Fee” refers to a charge levied on private developers in lieu of
non-construction of EWS & LIG houses in a residential project, the area of
which is less than 4 ha (refer para 4.3.1 and 4.3.11).
89 Special Amenity “Special Amenity” includes projects of vital importance such as mass
rapid transit system (metro rail, light rail, regional rapid rail, bus rapid
transit system, ropeway, etc.), freeways (elevated roads, etc.), urban
revitalization projects (river front development, etc.) or any other major
infrastructure project which may be notified to be as such by the State
Government.
90 Plot Depth “Site Depth” or “Plot Depth” means the mean horizontal distance between
the front and rear site boundaries.
91 Site Plan “Site Plan” – A detailed Plan showing the proposed placement of
structures, parking areas, open space, landscaping, and other development
features, on a parcel of land, as required by specific sections of the
development code.
17
Sl. Item Definition
92 Spiral Staircase “Spiral Staircase”- A staircase forming continuous winding curve round a
central point or axis provided in an open space having tread without risers.
93 Stilt Floor “Stilt Floor” means a structure built on a plinth on pillars which is
intended for the purpose of parking.
94 Storey “Storey”- The portion of a building included between the surface of any
floor and the surface of the floor next above it, or if there be no floor above
it, then the space between any floor and the ceiling next above it.
95 Tot-lot “Tot-lot” means a park or playground situated in a residential area and
planned for the use of small children.
96 Unauthorised
Construction
“Un-authorized Construction” means erection or re-erection, addition or
alternations which is not approved or sanctioned by the Authority or in
violation of Uttar Pradesh Urban Planning and Development Act, 1973.
97 Underground/
Overhead Tank
“Underground/Overhead Tank”- An installation constructed or placed
for storage of water.
98 Ventilation “Ventilation”- Supply of outside air into, or the removal of inside air from
an enclosed space. (a). Natural Ventilation - Supply of outside air into a
building through window or other openings due to wind outside and
convection effects arising from temperature or vapour pressure differences (or
both) between inside and outside of the building. (b). Positive Ventilation -
the supply of outside air by means of a mechanical device, such as a fan. (c).
Mechanical Ventilation - Supply of outside air either by positive ventilation
or by infiltration by reduction of pressure inside due to exhaust of air, or by a
combination of positive ventilation and exhaust of air.
99 Verandah “Verandah” — A covered area with at least one side open to the outside
except for one-meter-high parapet on the upper floors to be provided on
the open side.
100 Water Closet “Water Closet (W.C)”- A water flushed plumbing fixture designed to
receive human excrement directly from the user of the fixture. The term is
used sometimes to designate the room or compartment in which the fixture
is placed.
101 Window “Window”- An opening to the outside other than a door, which provides
all or part of the required natural light or ventilation or both to an interior
space and not used as a means of egress/ingress.
102 Zonal Development
Plan
“Zonal Development Plan” means a Plan formulated under Section 9 of
the UP Urban Planning and Development Act, 1973 for development of
zones which are part of the development area under the jurisdiction of
Authority.
Note: Words or expressions used but not defined in these byelaws shall have the same meaning as
assigned to them in the Master Plan/Zonal Plan/Zoning Regulations/Byelaws/Act/National Building
Code.
1.3 Applicability of byelaws
(i) These building byelaws shall be applicable to all building activities and read in conjunction with
the master plan/development plan/regional plan/any other statutory plan in force, if any, and
notifications, if any, with regard to the same and as amended from time to time. Till such time
the revised byelaws are notified, these building byelaws will continue to be in force.
(ii) These byelaws shall be applicable to the entire plot/building or the self-contained part, as the case
may be, in case of development, redevelopment, sub-division or construction, reconstruction of
building or alteration of a plot of land, to the remaining part after demolition and in case of land
use change, to the entire part of the affected plot/building.
18
(iii) Regarding such requirements/provisions related to development and construction which are not
contained herein, the provisions of National Building Code and IS/BIS Code, as applicable, may
be followed.
(iv) For layouts approved or developed by the erstwhile improvement trusts, societies or prescribed
authority, or any other competent authority under the respective Acts, eg. Regulation of Building
Operations (RBO) Act, 1958, UP Improvement Trusts Act, etc the provisions of these byelaws
shall be applicable. However, the provisions of these byelaws shall be applicable to the layouts/
improvement trust lands/ nazul lands/ government grant lands/ rajakiya asthan/ any other land
allotted or acquired by the government for any specific purpose, subject to the confirmity with
lease conditions or any other condition prescribed before allotment of such lands.
(v) The provisions of Real Estate Regulatory Authority (RERA) Act, UP Apartment Ownership Act,
shall be applicable.
1.4 Difficulty Removal
In case of any clarification regarding any term or omission or contradiction or interpretation of any
provisions and difficulty removal, a committee shall be constituted under the chairmanship of Principal
Secretary, Housing and Urban Planning Department, whose decision shall be final. The Committee
shall include Housing Commissioner, Director, Awas Bandhu, Vice Chairmen of any two Development
Authorities nominated by the Chairman, and Chief Town and Country Planner (CTCP), who shall be
the Member Convenor.
In case of any discrepancy in interpretation of the Hindi and English versions of these byelaws, the
provisions of the latter shall prevail.
1.5 Effect on relevant Government Orders
From the date of coming into force of these byelaws, relevant clauses of the government orders,
byelaws, etc., listed in Appendix-1 shall be considered to have been amended to that extent as per the
provisions of these byelaws. In case of any discrepancy between the provisions of the government
orders, policies, rules, byelaws, etc., listed in Appendix-1 and these byelaws, the provisions of the latter
shall prevail.
1.6 Sectoral Policies
Provisions of various sectoral policies notified by the State Government from time to time which are at
variance with these Byelaws shall prevail. Specific provisions in sectoral policies in relation to
parameters like FAR, building height, Ancillary/ Mixed uses, if prescribed beyond the permissible
limits of these byelaws, shall be valid. An indicative list of these policies is given below:
• Uttar Pradesh Warehousing & Logistics Policy 2022
• IT & ITeS Policy of Uttar Pradesh, 2022
• Uttar Pradesh Data centre Policy 2021
• Uttar Pradesh Tourism Policy 2022 (incl. Homestay/ Heritage Hotels)
• Uttar Pradesh Micro Small and Medium Enterprises Policy 2022 & Pledge Park
• Uttar Pradesh State Bio-Energy Policy 2022
• Uttar Pradesh Solar Energy Policy 2022
• Uttar Pradesh Textile and Garmenting Policy 2022
• The Indian Telegraph Right-of-way (Amendment) Rules, 2022
• The Uttar Pradesh Energy Conservation Building Code (UPECBC), 2018
19
2 Permission for Land Development and Building Construction
2.1 Land Development and Building Construction Permission
2.1.1 Development Permission
No person shall carry out any development or redevelopment on any plot or land (including sub-
division) or cause to be done without obtaining a prior Development Permission of the Authority. No
such permission shall be in contravention of the Master Plan/ Zonal Development Plan.
2.1.2 Building Permission
No person shall erect, re-erect, or make addition/ alterations/ revisions in any plot/building or cause the
same to be done without obtaining a prior building permission from the Authority.
(i) No piece of land shall be used as a site for the construction of a building, and no building shall
be constructed or reconstructed, and no addition or alteration shall be made to an existing building
without the self certification based declarations or the required approval in the manner specified
herein, relating to the use of building sites or the construction or reconstruction of buildings. To
facilitate regulated and faster construction permits, risk-based classification of residential and
non-residential buildings along with a fast track approval system shall be followed. For this
purpose,
a. Plots of size up to 100 square meters for residential purpose and plots of size up to 30
square meters for commercial purpose in approved layouts shall be classified under
low-risk category. Building permissions in such plots shall be as per sl. no. (ii) below.
b. Plots of size upto 500 square meters for residential purpose (except multi-unit) and
plots of size up to 200 square meters for commercial purpose, where the plans are
prepared by a licensed technical person and certified that the proposed construction/
reconstruction is as per the master plan and building bye-laws, shall be classified under
medium-risk category. Building permissions in such plots shall be as per sl. no. (iii)
and (iv) below.
c. Plots of size more than 100 square meters and commercial plots of size more than 30
square meters which are not part of approved layouts, residential plots of size over 500
square meters and commercial plots of size over 200 square meters which are part of
approved layouts, all types of High Rise Buildings, Group Housing, Multiplexes,
Community Facilties, Industrial buildings, and all other categories, etc., shall be
classified under high-risk category. Building permissions in such plots shall be as per
sl. no. (v) below.
(ii) For plots of size upto 100 square meters for residential purpose and plots of size up to 30 square
meters for commercial purpose, classified as low-risk buildings, will not require any permission,
except in the mela area declared under the Uttar Pradesh Melas Act, 1938 and plots in
unauthoritized layouts/ colonies.
Provided the restriction shall be that all provisions of master plan, zonal plan and building
byelaws, have been followed. The applicant however needs to register online with a token amount
of Rs.1/- and duly self certifying his title, the size of the plot and floors, and details mentioned in
table below. A completion certificate will not be required in such cases. Any plot bigger than
100 square meters cannot be split for this purpose or this provision cannot be misused for taking
up constructions in government or prohibited or disputed land. An online mechanism shall be
developed for submission of a self-declaration in a prescribed format and an affidavit. A
certificate of acceptance shall be generated automatically on submission, which shall serve as a
certification from the Authority. The onus to ensure authenticity of self-certification and
compliance with the self-certification lies with the applicant, who shall be held personally
accountable and liable in case of false declaration and action shall be initiated against the said
20
person, as specified.
a. Land use of the plot as per Master Plan
b. The location of plot along with existing roads with their width.
c. Plan showing dimension within plots/premises along with setback.
d. Include floor plans of all floors together with the covered area clearly indicating sizes of
rooms and the position and width of staircases, and other exits
e. Height of proposed building
f. Details of parking spaces provided (If plot size is more than 50 sqm)
(iii) For plots of size upto 300 square meters for residential purpose (only single unit): (a) where the
approach road is of the required width and is built by any government department/ agency/
authority/ corporation, even if not marked in the master plan, and (b) in such areas outside the
approved layouts as may be identified by the Authority, and where plans are prepared by a
licensed technical person and certified that the proposed construction/ reconstruction is as per the
master plan and building bye-laws, the applicant upon furnishing all required information/details
and payment of fees, shall get instant online approval. The onus to ensure authenticity of self-
declaration and compliance with the Self-Certification lies on the Owner, Applicant and Licensed
Technical Personnel, who shall all be held personally responsible and accountable in case of false
declaration, and the Owner, Applicant and the Licensed Technical Personnel, will be liable for
action as per law.
(iv) For Plots in layouts approved or developed by the Authority: For plots of size upto 500 square
meters for residential purpose (except multi-unit) and plots of size up to 200 square meters for
commercial purpose, where the plans are prepared by a licensed technical person and certified
that the proposed construction/ reconstruction is as per the master plan and building bye-laws,
classified as medium-risk buildings, the applicant upon furnishing all required
information/details and payment of fees, shall get instant online approval. The onus to ensure
authenticity of self-declaration and compliance with the Self-Certification lies on the Owner,
Applicant and Licensed Technical Personnel, who shall all be held personally responsible and
accountable in case of false declaration, and the Owner, Applicant and the Licensed Technical
Personnel, will be liable for action as per law.
(v) For categories of plots other than (ii) and (iii): For residential plots of size more than 100 square
meters and commercial plots of size more than 30 square meters which are not part of approved
layouts, residential plots of size over 500 square meters and commercial plots of size over 200
square meters which are part of approved layouts, all types of High Rise Buildings, Group
Housing, Multiplexes, Community Facilties, Industrial buildings, and all other categories, etc.,
classified as high-risk buildings, one common application form shall be submitted through web
based online system as prescribed.
(vi) The permission issued under (ii) and (iii) can be revoked by the Authority within 30 days from
the date of approval. However, such limitation of 30 days shall not be applicable if it is found
that approval has been obtained by mis-representation of the facts or false statements, and/or
against the building byelaws and Master Plan land use provisions.
(vii) Other exemptions from taking building permit are specified in paragraph 2.5.1. Provided that the
Government may exempt certain buildings from taking building permission under this section,
as per section 53 of Uttar Pradesh Urban Planning and Development Act, 1973.
21
2.1.3 Pre-issued Permissions and provisions for plots allotted by Authority.
2.1.3.1 Where any development/building permit has been issued by the Authority prior to the
commencement of these byelaws
(i) If land development/building construction is in progress and the work has not been completed
within the validity or extended validity period of such permit, the said development/construction
shall be governed by sanctioned map.
(ii) If the validity of the permit has expired and development/construction has not commenced, fresh
permit shall be obtained as per the provisions of these building byelaws.
2.1.3.2 Where the plot/land has been allotted through allotment/ public auction with specific
restrictions on ground coverage, FAR, setbacks, building height, lease/sale conditions, etc.
(i) In such plots where construction has not been done, any benefit accruing to the owner/developer
due to relaxation in development/ construction parameters (which were restricted during
auctioning) on application of these byelaws, shall be chargeable.
(ii) In such plots (except group housing) where construction has been done, but the owner/developer
intends to take benefits accruing out of these byelaws, due to relaxation in development/
construction parameters (which were restricted during auctioning) on application of these
byelaws, shall also be chargeable.
(iii) The benefit accruing out of the application of these byelaws shall not be applicable to those group
housing projects where completion/ occupancy certificate has been issued. However, if any legal
entity competent under the Uttar Pradesh Apartment Ownership Act, 2010, intends to take such
benefits on chargeable basis, the Board of the Authority is competent to take a decision keeping
in mind the adequacy of infrastructure provisions, subject to the compliance of relevant statutory
provisions.
(iv) For plots, which had been allotted/auctioned as plotted-residential development (prior to coming
into effect of these byelaws), no extra charges shall be levied for availing the benefit of increased
basic FAR. For calculation of charges for plots allotted/auctioned as non-residential plots and
group housing plots the cumulative benefit due to the allottee because of changes in Ground
Coverage, Setbacks, Height relaxations, etc. shall be charged through FAR only, in the form of
Differential FAR Benefit Charges (DFBC. Such charges shall be payable on the difference of the
FAR that is proposed to be availed and the base FAR prevailing at the time of allotment/auction.
The charges are calculated using the formula of purchasable FAR applicable to that particular
plot use. Refer Appendix-16.
(v) In plots where construction has been done beyond the permissible limits of previous byelaws, but
is within permissible limits as per these byelaws, the variation of extra ground coverage, FAR or
any other parameter, shall be charged as per compounding provisions in chatper-16. This shall
be in addtion to the amount payable as per paragraph (iv) above.
(vi) Before sanction of the map, necessary changes shall be made in the lease/sale deed by the
competent authority.
(vii) Certain areas which were earmarked as Developed Areas and Un-developed areas by Authorities
in the Master Plans, will now be a part of Non-built-up area. Situations may arise where the base
FAR for Non-built-up-area as prescribed in these byelaws will be higher than the base FAR for
Developed Areas. In such cases, the Differential FAR Benefit Charge shall be due, but it shall
be calculated using the formula of purchasable FAR, irrespective of whether the area falls in a
layout developed/approved by the Authority or not.
22
2.2 Procedure for obtaining Development and/or Building Permission
2.2.1 Application/Notice
(i) Every person who intends to carry out any development or redevelopment including sub-division
on any plot or land or to erect, re-erect or make alternation in any place in a building shall give
application/notice in writing to the Authority of his intention in the prescribed form (See
Appendix-2 of these bye-laws for development permission and See Appendix-5 for building
permission).
(ii) Such application/notice shall be submitted online through a portal that the Government of Uttar
Pradesh may notify from time to time for this purpose, accompanied by relevant plans and
statements. The formats for submission of such plans may be revised from time to time.
2.2.2 Details/Information Accompanying Application/Notice
(i) In case of development permission, the application/notice shall be accompanied by the key plan,
location plan, site plan, layout/sub-division plan, indicating setback lines, and services plan/
infrastructure plan, landscape plan and specifications and other documents as prescribed by the
Authority.
(ii) In case of building construction, the application/notice shall be accompanied by the location plan,
site plan, subdivision / layout plan, building plan, services plan, specifications and certificate of
supervision, ownership title and other documents as prescribed by the Authority.
2.2.3 Documents
(i) Application for development permit or building permit shall be accompanied by the following
documents:
a. Ownership Documents-lease-deed/sale-deed etc. duly accompanied by a declaration
along with the site plan; giving the details of the plot/property,
b. Copy of possession letter and deed, in case of land development in the schemes of
Authority, and
c. No objection certificate from the Authority/lessor, in such cases where lease deed has
not been executed.
d. Free-hold deed or no-objection certificate from the concerned department, in case the
land belongs to Nazul or Improvement Trust,
e. An affidavit/ undertaking for handing over of the land required for road widening, in
case land requirement for implementation of master plan roads.
f. In non-built-up area, approval of building plan shall also be considered if the approach
road is of the required width and is built by any government department/ agency/
authority/ corporation, even if not marked in the master plan.
(ii) In case of any deviation from the terms and conditions stipulated in the lease deed/ownership
document, necessary clearance from the Authority/ competent Officer shall be obtained and
submitted.
(iii) No objection certificates (NOCs) required to be attached:
The following departments from which NOCs are sought for, for the purpose of obtaining building plan
permit, shall provide the NOC within the number of days mentioned against each of them in the table
below, from the date of application of such NOC.
Sl. Department Applicability Time (days)
1 Development Authority 10
23
Sl. Department Applicability Time (days)
1a Planning Section Planning Section (land use conversion in master
plan area)
1b Acquisition Section Acquisition (All buildings)
1c Nazul Section Nazul - Only for notified villages listed under
Nazul Registers (1862, 1886, 1907)
1d Improvement Trust Improvement Trust – Only for notified
schemes/area
1e Property Section Property section – normally only for leasehold
buildings
1f Urban Ceiling Urban Ceiling - only for notified villages
2 Tehsil Tehsil - all buildings 10
3 Airport Authority of
India
As per Colour-Coded Zoning Maps:
(i) Buildings in Red Zone, and (ii) buildings with
a desired height above the Permissible Top
Elevation of relevant zone
10
4 Army/Airforce As per Ministry of Defence letter
No.F.11026/2/2011/ D (Lands) dated 21.10.2016:
(i) Any construction or repair activity within 10
metres of stations listed in Part A of letter’s
annexure; (ii) Any construction or repair activity
within 100 metres of stations listed in Part B of
letter’s annexure
10
5 Fire Department As per UP Fire & Emergency Services Act, 2022:
(i) Multi-storied buildings above 15 meters height;
(ii) special buildings like educational,
institutional, assembly, business, mercantile,
industrial, storage and hazardous buildings as
defined in National Building Code; (iii) Mixed
occupancies with any of the aforesaid occupancies
having more than 500 square meter covered area
Conditional
(15)
6 Irrigation / Ground
Water Department
"Non-Notified Areas" under UP Ground Water
Act 2019, OR 50 meters
15
7 Metro For complete corridors:
(i) Any building within 11m of either side from
edge of underground structure, (ii) Any building
within 5m of either side from edge of at-
grade/elevated structure
For under-implementation corridors:
Any building within 50m of either side of centre
line of Metro alignment
15
8 Forest Department All buildings requiring tree felling 15
9 Railways Buildings within 30m from railway track 15
10 Power / Electricity Only in respect of Electrical load 5
11 NHAI Only buildings/ layouts proposing direct access
from NHAI
10
12 PWD Where applicable 10
24
Sl. Department Applicability Time (days)
13 ASI, NMA 300m from the precinct of the listed buildings
(protected buildings) as per Act
10
14 Prison In case of buildings within 30 m from perimeter
wall
10
15 Urban Local Bodies
(ULB)
In case of buildings/ layouts proposed on ULB-
owned lands (till the time digital database of
government-owned properties is in place) only
with regard to ownership of land.
10
(iv) Wherever feasible, system level validation based on GIS layering and PM Gati Shakti may be
ensured by relevant departments concerned with issuance of NOC.
(v) If the application is in order with all the requisite particulars and if the concerned department has
neither called for any additional details nor rejected it by an explicit order on substantial grounds
with the reasons recorded in writing for such rejection, the NOC shall be deemed to have been
given on the 30th day (or on expiry of days specified in the table above whichever is earlier) from
the date of such application. The following procedures may be further stipulated for the
implementation of the deemed NOC system:
a. The first scrutiny of the application shall be done by the competent authority of the
concerned department within 7 days from the date of receipt of the application and such
status shall be updated online.
b. All the required additional particulars from the applicant shall be called for within 10
days from the date of receipt of application.
c. The applicant shall be given a time of 10 days to furnish the additional particulars called
for.
d. If the particulars are not received within the stipulated time, the application shall be
summarily rejected on the 30th day (or on the day specified in the table, whichever is
earlier)
e. On the day of considering it as deemed NOC, the concerned Head of Department
(HOD) shall be alerted by the system in his login and via SMS about the deemed NOC.
f. In all cases of deemed NOCs, accountability is to be fixed on the respective official
responsible for issuing such NOC. The concerned HOD shall conduct periodical
reviews with the officials to ensure timely processing of NOCs.
g. The competent authority of the department concerned shall cause inspection for such
developments where Its risk assessment deems it fit for Inspection if need be within 7
days from the date of deemed NOC and raise objections, if any, to the planning
authority concerned.
h. If no objection is raised by the concerned Departments within 7 days of deemed NOC,
the deemed NOC shall be construed as confirmed, under intimation to the concerned
department.
i. The Authority shall ensure that the intimation of deemed NOCs are sent to the
respective departments on the date of granting planning permission based on this
deemed NOC. This process shall be automated and such intimation should reach the
login of the HOD concerned.
j. The permit shall include a clause to specifically mention that the Planning Permission
is being granted based on the deemed NOC.
(vi) Further instructions with regard to certain departments are as follows:
25
a. The building permits which involve the NOC of Defence, Indian Air Force, shall be
issued only after such NOC is received.
b. HT/LT Lines (lines on a pole) passing through the site shall be ascertained by
Development Authority through inspection. Hence there is no need for a separate NOC
from the UP-Power Transmission Corporation Limited.
(vii) If any authority wishes to take NOC from other than any departments listed above, the same may
be done in consultation with the committee constituted in paragraph 1.4 of these byelaws.
(viii) The NOC applications shall be made online on the relevant portal and the entire applications
shall be shared with the departments to enable them to give NOC within prescribed time limits.
(ix) In case NOCs are received from the department, the authority shall approve/ reject the building
plan according to the conditions laid down in the NOCs and these building byelaws. In case
NOCs are not received from the departments within the prescribed time, the authority shall
approve/ reject the building plan according to these building byelaws.
(x) After the plan is approved/rejected, the same shall be shared with the concerned departments for
their comments through the online portal and the concerned department shall respond with their
comments agreeing or disagreeing with the approved/rejected plan within a timeframe of 15 days
on the portal. In case such comments are not received in the prescribed time period, the building
plan shall be considered to be approved with the NOCs of such department.
2.2.4 Colouring and Notations
The plans shall be coloured as specified in the table below. Further, prints of the plans shall be on
one-side of paper only.
Sl. Item Site Plan Building Plan
Document type White Plan Blueprint /
Ammonia Print
White Plan Blueprint /
Ammonia Print
1 2 3 4 5 6
1 Boundaries Of Plot Thick Black Thick Black Thick Black Thick Black
2 Current Route Green Green
3 Proposed Route If Any Dotted Green Dotted Green
4 Permissible Building
Lines
Thick Dotted
Black
Thick Dotted
Black
5 Open Spaces No Colour No Colour No Colour No Colour
6 Existing work Black (Outline) Black (Outline) Black (Outline) Black (Outline)
7 Proposed compoundable
work
Hatched Yellow Hatched Yellow Hatched
Yellow
Hatched
Yellow
8 Proposed demolition Hatched Red Hatched Red Hatched Red Hatched Red
9 Proposed work (see
Note-1)
Red (Filled) Red Red Red
10 Drainage and Sewerage Dotted Red Dotted Red Dotted Red Dotted Red
11 Water Supply works Thin Black
Dotted
Thin Black
Dotted
Thin Black
Dotted
Thin Black
Dotted
Note:
(1) For entirely new construction this need not be done; for extension of an existing work this shall apply.
(2) For land development, sub-division, layout, suitable colouring notations shall be used which shall be indexed.
(3) The colouring and notation of plans shall be based on formats adopted in online portal, which may be revised
from time to time.
26
2.3 All Plans
2.3.1 Key Plan
A ‘Key Plan’ drawn to a scale of not less than 1: 10,000 shall be submitted along with application/
notice for development permission or building permission, showing boundary and location of the site
(along with north point indicator and scale) with respect of neighbourhood landmarks in areas where
there are no approved layout plans. If site is part of layout plan, then it shall be shown in the layout
plan.
2.3.2 Site Plan for Development Permission
(i) Plot number along with details of neighbouring land shall be given in the Site Plan.
(ii) If proposed land is contiguous with neighbouring land owned by same applicant, and whose
subdivision is already approved, the details of public amenities provided in such land and all
streets within it opening out in the site for which permission is being sought, shall include:
a. The means of access from existing street, distance from it, mentioning name and width
of the street to the site proposed for development.
b. The position of all existing structures and features like high-tension lines, telegraph and
electrical poles, underground pipe lines, trees, buildings and railway lines etc. within a
distance of 30 meters from the boundary of the site.
c. All major physical characteristics of the land proposed to be developed which include
the approximate location and size of any water body, flood affected areas, and contours
at an interval of 0.3 meters in case of a site having a slope of more than 1:20.
d. Location of the site in Master Plan / Sector Plan.
e. North point and scale used.
2.3.3 Layout/ Sub-division Plan for Development Permission
(i) The layout/sub-division plan to be submitted along with the application for development permit
shall be drawn to a scale of 1:500 for plots up to 10 hectares, on a scale of 1:1000 for plots above
10 hectares but less than 50 hectares, and on a scale of 1:2000 for plots more than 50 hectares.
The layout plan shall show the following details:
1 North Point and scale used.
2 The location of all proposed and existing roads with their width.
3 Plan showing dimension within plots/premises along with setback and method of plotted development
like row-housing, semi-detached or detached. In case of group housing/ clustered development, the
distance between blocks and corresponding height of blocks.
4 Services plan showing the location of drains, water supply and sewer networks, electric lines, solid
waste disposal, and other public facilities and services along with their linkage with existing/proposed
facilities.
5 Analysis indicating size, area, and use of all the plots and different premises/uses proposed in the
layout/sub-division plan.
6 A statement indicating the total area of the site, area utilized under roads, open spaces, residential,
commercial, community facilities and other public uses, proposed in the layout/ sub-division plan
along with their percentage with references to the total area of the site.
7 In case of proposed sub-division for plots situated in built-up area, in addition to the details mentioned
above (1) to (6), the means of access to the proposed sub-division from existing street shall also be
shown.
8 Landscape plan (with plantation).
27
9 Sustainability provisions outlined in Chapter-13 shall be ensured by competent authority for
conservation and recharging of ground water.
2.3.4 Specifications for Sub-division of land
The following specifications and details shall be enclosed to obtain permission for the sub-division of
land:
(i) Details of general specification for development works in the proposed area viz., general
specification of roads drains (side drains) and streets along with their slope, and paving provision
for water supply, management and disposal of sewerage and garbage, street lighting, playground
park and community facilities.
(ii) Existing external infrastructure facilities near the site such as sewerage disposal site, drainage
(Nallah etc.) main road, electric supply system, source of water supply etc.
(iii) In case of industrial units, type and quantities of effluents.
2.3.5 Site Plan for Building Permission
The site plan to be sent along with the application for building permit shall be drawn to a scale of 1:100
for plots up to 500 sqm in size, on a scale of 1:500 for plots above 500 sqm in size and on a scale of
1:1000 for plots above 10,000 sqm. The plan shall show the following details:
1. The boundaries of the site and any contiguous land belonging to the owner thereof.
2. The names of the streets on which the building is proposed to be situated, if any.
3. All existing buildings standing on, over or under the site.
4. The position of the site in relation to neighbouring street.
5. The position of the building and of all other buildings, if any, which the applicant intends to erect upon
his contiguous land referred to in (1) in relation to.
a) The boundaries of the site and in case where the site has been partitioned, the boundaries of the
portion; owned by the applicant and of the portions owned by others.
b) All adjacent streets / buildings and premises within 12 meters of the site and of the contiguous
land, if any, referred to in (1); and
c) If there is no street within 12 meters of the site, the nearest existing street.
6. The means of access from the street to the building, and to all other buildings, if any which the
applicant intends to erect upon his contiguous land, referred to in (1).
7. Space to be left around the building to secure un-interrupted ventilation, admission of light and access,
through setbacks (front, rear and sides of the building) and parking spaces.
8. The width of the street, if any, in front, at the sides or rear of building.
9. Any existing physical features such as well, drains, trees, overhead electric supply lines etc.
10. Water supply lines, taps up to discharge point, drainage lines and roof top rainwater harvesting system.
11. The direction of north point relative to the plan of the buildings.
12. The ground area of the whole property and the breakup of covered area on each floor with the
calculation for percentage covered in each floor in terms of the total area of the plot as required under
the Byelaws governing the coverage of the area.
13. Parking plans indicating the parking spaces wherever required.
14. Building number or plot number of the property on which the building is intended to be erected.
28
15. Landscape plan showing plantation of trees while keeping the circulation area free from obstructions as
outlined in Chapter-13 of the byelaws.
16. A copy of approved sub-division plan (if any) of the planning area, and
17. Such other particulars as may be prescribed by the Authority
2.3.6 Building Plan
The plans of the building, elevations and sections accompanying the application/notice with dimensions
shall be drawn to a scale of 1:50 for plots measuring up to 250 sq.m., for plots measuring above 250
sq.m. to a scale of 1:100, and for plots measuring 2000 sq.m. and above to a scale of 1:200 with
following details:
a. Include floor plans of all floors together with the covered area clearly indicating the size and spacing of
all frame members and sizes of rooms and the position and width of staircases, ramps, and other exit
ways, lift ways, lift machine room, and lift pit details.
b. Show the use or occupancy of all parts of the building.
c. Show exact location of essential services, for example toilet, water closet, sink, bath, water supply,
drainage, and connection to soak pit/septic tank or sewer line for sewage disposal.
d. Include sectional drawing clearly showing the sizes of the footings, thickness of basement wall, wall
construction, size and spacing of framing members, floor slabs and roof slabs with their materials. The
section shall indicate the heights of building and rooms and the heights of the parapet and drainage and
the slope of the roof. At least one section shall be taken through the staircase, kitchen, and toilet, bath,
and water closet.
e. Show all elevations for abutting roads.
f. Indicate details of service privy (running water toilets), if any.
g. Give dimensions of the projected portions beyond the permissible building line.
h. Include terrace plan indicating the drainage and the slope of the roof.
i. Give indications of the north point relative to the plan.
j. Details of parking spaces provided.
k. Give indication of all doors, windows and other openings including ventilators
l. Maps shall show the provisions for rainwater harvesting solar water heating, wastewater recycling, and
waste management as outlined in Chapter-13 of the byelaws.
m. Such other particulars as may be required to explain the proposal clearly and as prescribed by the
Authority.
2.3.7 Building Plans for Multi-storeyed/ Special Buildings
(i) For multi-storeyed buildings, which are above 4 storeyed and buildings above 15 meters in height
and for special buildings like assembly, institutional, industrial storage and hazardous
occupancies as defined under paragraph 1.2. 16 (a to k) the following additional information
shall be furnished/ indicated in the building plans in addition to the item (a) to (l) of Building
Bye-Laws paragraph 2.3.6.
a. Access to fire appliances/ vehicles with details of vehicular turning circle/ and clear motorable access
way around the building.
b. Size (width) of main and alternate staircase along with balcony approach, corridor,
ventilated lobby approach.
c. Location and details of lift enclosures.
29
d. Location and size of fire lift.
e. Smoke-stop lobby/ door where provided.
f. Refuse chutes & chamber, services duct (sanitation, electric & telecommunication), if required.
g. Vehicular parking spaces.
h. Refuge area if any.
i. Details of building services-air conditioning system with position of dampers, mechanical ventilation
system, electrical services, boilers, gas pipes etc.
j. Details of exits including provision of ramps, etc. for hospitals and special risks.
k. Location of generator, transformer, and switchgear room.
l. Smoke exhaust system if any.
m. Details of fire alarm system network.
n. Location of centralized control, connecting all fire alarm systems, built-in fire protection arrangements
and public address system, etc.
o. Location and dimension of static water storage tank and pump room.
p. Location and details of fixed fire protection installations such as sprinklers, wet risers, hose reels,
drenchers, CO2 installation etc.
q. Location and details of first aid firefighting equipment/installation.
r. The proper signs/symbols and abbreviation of all fire-fighting systems shall be shown as per the relevant
BIS Codes.
(ii) In addition to those buildings specified in (i), for construction approval of buildings such as
waterworks and overhead tanks, bridges and culverts, power generation centres and power sub-
stations, power towers, photo galleries, auditorium, meeting hall, educational institutions, bus
terminal whose ground coverage is more than 500 square meters (even if their height is less than
15 meters), the presented building plans shall have the full name, signature along with seal of the
landowner/ builder, the registered/licensed technical personnel as well as the structural engineer
who prepared the structural design, along with a certificate of earthquake resistant design as per
format given in Appendix-10. Also, the relevant part of the details mentioned in Appendix-8
“Building Information Schedule” (relating to this drawing) shall be marked on the map in the
form of a table which shall be certified by the Structural Engineer.
2.3.8 Services Plan and Water Supply Provisions
(i) Plans, elevations and sections of private water supply, sewage disposal system and details of
building services, where required by the Authority, shall be made available to a scale not less
than 1: 100.
(ii) Besides the normal drawings, which are submitted for the sanction of any building, a proper
landscape plan, a circulation plan indicating vehicular and pedestrian movement and parking and
an urban design scheme where necessary, shall be submitted for sanction by the Authority.
(iii) Specifications: General specification of the proposed construction giving type and grade of
material proposed to be used in the form given in paragraph 11.1 duly signed by the engaged
Competent Professional for building plan design (as per Chapter-14 of the byelaws) may be
shown accompanying the application/notice as the case may be.
2.4 Signing of Plans
2.4.1 Signing of Layout Plans
All layout plans before submission to the Authority shall be signed by the owner(s) and the Licensed
Technical Person.
2.4.2 Signing of Building Plans
(i) All building plans before submission to the Authority shall be signed by the owner(s) and the
30
Licensed Technical Person (except as given in paragraph 2.5.1 of these byelaws).
(ii) This shall not apply in case of standard designs/ building plans as described in paragraph 2.7.2.1.
2.5 Application/Notice for alteration
When the application/notice is only for an alteration of the building only such plans and statement as
may be necessary, shall accompany the application/notice.
2.5.1 Exemption from Building Permit
(i) No application/application and building permit, is necessary for the following alterations, which
do not otherwise violate any provisions regarding general building requirements, structural
stability and fire safety requirements (as part of National Building Code, 2016) of these Bye-
Laws.
a. Plastering and patch repairs;
b. Re-roofing, or renewals of roof including roof of intermediate floors at the same height;
construction of roof on previously approved covering;
c. Flooring and re-flooring;
d. Opening and closing of windows, ventilators and doors not opening towards other's
properties and / or public road/property;
e. Replacing fallen bricks, stones, pillars, beams etc.
f. Construction or re-construction of sunshade not more than 75cms. in width within one's land
and not overhanging over a public street; construction of portico/porch as per standards
prescribed in building byelaws,
g. Construction or re-construction of parapet or boundary wall as permissible under these
Byelaws.
h. White-washing, painting, etc. including erection of false ceiling in any floor at the
permissible clear height provided the false ceiling in no way can be used as a loft etc;
i. Reconstruction of portions of buildings damaged due to natural disaster, such as storm, rains,
fire, earthquake or any other natural calamity to the same extent and specification as existing
prior to the damage provided the use conforms to provisions of Master Plan/ Zonal Plan;
j. Erection or re-erection of internal partitions provided the same are within the purview of the
Byelaws.
k. Construction work for the purpose of inspection or renovation and repair of sewers, main
streets, pipes, cables, or other plant for the implementation of any services by any
Central/State Government or any local body.
l. Construction of septic tank/soak pit.
m. Installing hand pump
n. Construction of temporary water tank for construction work.
o. Construction of necessary structures (including underground