UPERC (MYT for Transmission) Regulations, 2025
1
UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION
(MULTI YEAR TARIFF FOR TRANSMISSION) REGULATIONS, 2025
CONTENTS
1. Short title, Extent, Applicability and Commencement 4
2. Definitions 5
CHAPTER 1 13
TARIFF PETITION AND PROCEDURE FOR DETERMINATION OF TARIFF 13
3. General Principles 13
4. Method for Determination of Tariff for augmentation/strengthening
works executed by TBCB Transmission Licensee 18
5. Controllable and Uncontrollable Factors 19
6. Treatment of Gains or Losses on account of Uncontrollable Factors
19
7. Treatment of Gains or Losses on account of Controllable Factors20
CHAPTER 2 21
DELAY IN COMMERCIAL OPERATION 21
8. Procedure for Delay in Commercial Operation 21
9. Commercial Settlement in case of Mismatch in Date of Commercial
Operation 22
CHAPTER 3 24
FINANCIAL PRINCIPLES 24
10. Financial Prudence 24
11. Capital Expenditure/ Cost and Capital Structure 25
12. Additional Capitalisation 27
13. Operation and Maintenance Expenses 30
14. Debt-Equity 33
15. Depreciation 34
16. Return on Equity 35
17. Interest on Long- Term Loan 36
18. Banking and Finance Charges 37
19. Interest During Construction (IDC)/Incidental Expenditure During
Construction (IEDC) 37
20. Hedging Cost of Foreign Exchange Rate Variation (FERV) 39
21. Interest on Working Capital 39
UPERC (MYT for Transmission) Regulations, 2025
2
22. Tax on Return on Equity 40
23. Non-Tariff Income 41
24. Income from Other Business 42
25. Rebate, Incentive, Penalties and Miscellaneous 43
CHAPTER 4 44
OPERATIONAL PRINCIPLES 44
26. Components of Tariff 44
27. Capital Investment Plan 47
CHAPTER 5 49
NORMS OF OPERATION 49
28. Norms of Operation 49
CHAPTER 6 51
INTRA-STATE TRANSMISSION TARIFF AND SHARING OF TTSC 51
29. Determination of Intra-State Transmission Tariff 51
CHAPTER 7 55
RECOVERY OF INTRA-STATE TRANSMISSION CHARGES 55
30. Billing and Payment of the InSTS Charges 55
31. Treatment of Rebate on intra-State Transmission Charges 56
32. Transmission Pricing Framework 57
33. Transmission Losses 57
CHAPTER 8 58
GRANT OF SUBSIDIES BY STATE GOVERNMENT 58
34. Manner of grant of subsidy by State Government 58
CHAPTER 9 59
MISCELLANEOUS 59
35. Saving of Inherent Powers of the Commission 59
36. Repeal and Saving 59
37. Power to remove difficulties 59
38. Power to Amend 59
39. Power to Relax 59
Annexure-A 60
UPERC (MYT for Transmission) Regulations, 2025
3
Depreciation Schedule for Existing Assets Capitalised on or before
31.03.2025 60
Annexure-B 61
Depreciation Schedule for Existing Assets Capitalised After 31.03.2025 62
Annexure-C 63
Procedure for calculation of Transmission System Availability Factor for a
Month 64
UPERC (MYT for Transmission) Regulations, 2025
4
UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION
(MULTI YEAR TARIFF FOR TRANSMISSION) REGULATIONS, 2025
Regulation No.: UPERC/D(T)/JD(Transmission)/156-012
Lucknow, Dated: 06.06.2025
In exercise of the powers conferred Section 181 read with the Section 36,
Section 39, Section 40, Section 41, Section 61, Section 62, Section 64, Section
65, Section 86 of the Electricity Act, 2003 (36 of 2003) and all other powers
enabling it in that behalf, the Uttar Pradesh Electricity Regulatory Commission
hereby makes the following Regulations. These Regulations shall supersede the
Uttar Pradesh Electricity Regulatory Commission (Multi Year Tariff for
Distribution and Transmission) Regulations, 2019 and its amendments for
determination of Transmission Tariff and all aspects given thereto related to
Transmission.
1. Short title, Extent, Applicability and Commencement
(1) These Regulations shall be called the Uttar Pradesh Electricity Regulatory
Commission (Multi Year Tariff for Transmission) Regulations, 2025.
(2) These Regulations shall extend to the whole of the State of Uttar Pradesh.
(3) These Regulations shall be applicable to State Transmission Utility (STU) &
Transmission Licensees whose Tariff is to be determined under Section 62
of the Act for determination of Aggregate Revenue Requirement (ARR),
Annual Performance Review (APR), Tariff, True-Up and associated matters
as covered under these Regulations:
Provided that clause 4 of these Regulations shall be applicable on TBCB
Transmission Licensee and clause 8 and clause 9 of these Regulations shall
also be applicable on TBCB Transmission Licensee and Generating
Companies in absence of co-terminus provisions in the TSA/
connection/implementation agreement or in any other agreement executed
between the parties:
Provided further that the tariff of Dedicated Transmission Line/system of
an existing generator may be determined as per the principles underlined
in these Regulations, wherever applicable, as per the methodology adopted
by the Commission in its Orders issued from time to time.
UPERC (MYT for Transmission) Regulations, 2025
5
(4) These Regulations shall come into force from April 01,2025 and unless
reviewed earlier or extended by the Commission, shall remain in force for
a period of five years:
Provided that for all purposes, the issues relating to the determination of
ARR, APR, Tariff, True-Up and other associated matters, including review
matters, for respective Financial Years shall be governed by the respective
Tariff Regulations applicable for that specific year.
2. Definitions
(1) In these Regulations, unless the context otherwise requires:
(a) “Accounting Statement” means for each financial year the following
statements, namely: -
i. Audited Balance sheet, prepared in accordance with the form
contained in Part I of Schedule 3 to the Companies Act 2013, as
amended from time to time;
ii. Audited Profit and loss accounts, complying with the requirements
contained in Part II of Schedule 3 to the Companies Act 2013, as
amended from time to time;
iii. Audited Cash flow statement, prepared in accordance with the
Accounting Standard on cash flow Statement (IND AS-3) of the
Institute of Chartered Accountants of India, as amended from time
to time.;
iv. Report of statutory auditors of the Licensee;
v. Cost records if any, prescribed by the Central Government under
Section 148 of the Companies Act 2013, as amended from time to
time;
vi. Together with notes thereto, and such other supporting statements
and information as the Commission may direct from time to time;
vii. Trial Balance for the year matching the accounts with Financial
Statements.
(b) “Act” means the Electricity Act, 2003 (36 of 2003), as amended from time
to time;
(c) ‘Additional Capitalization’ means the capital expenditure incurred or
projected to be incurred, after the date of commercial operation of the
UPERC (MYT for Transmission) Regulations, 2025
6
project, admitted by the Commission after prudence check, subject to the
provisions of these Regulations;
(d) “Aggregate Revenue Requirement” or “ARR” means the costs
pertaining to the licensed business which are permitted, in accordance
with these Regulations, to be recovered from the Tariffs determined by
the Commission;
(e) “Allocation Statement” means for each Financial Year, statements in
respect of each of the businesses of the Transmission Licensee for
optimum utilization of its assets, showing the amounts of any revenue,
cost, asset, liability, reserve or provision etc., which has been either:
i. Determined by apportionment or allocation between different
Businesses of the Licensee, including the Licensed business, together
with a description of the basis of the apportionment or allocation; or
ii. Charged from or to each such Other Business together with a
description of the basis of that charge.
(f) “Availability” in relation to a Transmission System for a given period
means the time in hours during that period for which the Transmission
System is capable of transmitting electricity at its rated voltage,
expressed in percentage of total hours in the given period, and shall be
computed as provided in Annexure-C of these Regulations;
(g) “Base Year” means the Financial Year immediately preceding first year
of the Control Period and used for the purpose of these Regulations i.e FY
2024-25;
(h) “Bank Rate” shall mean the Bank Rate as declared by the Reserve Bank
of India from time to time;
(i) “Bulk Power Transmission Agreement” means executed agreement
that contains the terms and conditions under which a Transmission
System User is entitled to access to an Intra-State Transmission System
of a Transmission Licensee;
(j) “Competitive Bidding” means a transparent process for procurement of
equipment, services and works in which bids are invited by the project
developer by open advertisement covering the scope and specifications of
UPERC (MYT for Transmission) Regulations, 2025
7
the equipment, services and works required for the project, and the terms
and conditions of the proposed contract as well as the criteria by which
bids shall be evaluated, and shall include domestic competitive bidding
and international competitive bidding;
(k) "Change in Law" means occurrence of any of the following events:
i. enactment, bringing into effect or promulgation of any new Indian
law; or
ii. adoption, amendment, modification, repeal or re-enactment of any
existing Indian law; or
iii. judicial pronouncements, Orders of Central Government and/ or
State Government; or
iv. change in interpretation or application of any Indian law by a
competent court, Tribunal or Indian Governmental Instrumentality,
which is the final authority under law for such interpretation or
application; or
v. change in condition or covenant by any competent statutory
authority in relation to any consent or clearances or approval or
License available or obtained for the Project; or
vi. coming into force or change in any bilateral or multilateral agreement
or treaty between the Government of India and any other Sovereign
Government having implications for the Transmission System
regulated under these Regulations;
vii. Any change in taxes or duties, or introduction of any taxes or duties
levied by the Central or any State Government, unless specified
otherwise in this Regulation.
(l) “Commission” means the Uttar Pradesh Electricity Regulatory
Commission (UPERC);
(m) “Conduct of Business Regulations” means the Uttar Pradesh Electricity
Regulatory Commission (Conduct of Business) Regulations, 2019 and its
subsequent amendments / addendum / re-enactment subsequent to its
repeal;
UPERC (MYT for Transmission) Regulations, 2025
8
(n) “Control Period” means the period comprising of five financial years from
April 1, 2025 to March 31, 2030, and unless extended by the Commission;
(o) “Connection Agreement” means the agreement defined in UPERC
(Grant of Connectivity to Intra-State System) Regulation, 2010 as
amended from time to time;
(p) “Cut-off Date” shall mean the last day of the financial year closing after
Twelve months from the date of commercial operation of the project;
(q) “Date of Commercial Operation” (COD) shall mean the date declared
by the Transmission Licensee from 00:00 hour of which element of the
Transmission System is in regular service after successful charging and
trial operation for transmitting electricity and communication signal from
sending end to receiving end:
Provided that where the transmission line or substation is dedicated for
evacuation of power from a particular generating station, the Generating
Company and Transmission Licensee shall endeavour to commission the
generating station and the Transmission System simultaneously as far as
practicable and shall ensure the same through appropriate
Implementation Agreement:
Provided further that in case a Transmission System or an element thereof
is prevented from regular service for reasons not attributable to the
Transmission Licensee or its supplier or its contractors but is on account
of the delay in commissioning of the concerned generating station or in
commissioning of the upstream or downstream, the Transmission
Licensee shall approach the Commission through an appropriate
application for approval of the date of commercial operation of such
Transmission System or an element thereof:
Provided also that in case of an existing Transmission Licensee, such
request may be included as part of its Aggregate Revenue Requirement
Petition or Annual Performance Review Petition or True-Up Petition to be
filed under these Regulations;
(r) "Distribution Licensee" means a person who has been granted a
License under sub-section (b) of Section 14 of the Act and shall include a
deemed Licensee;
UPERC (MYT for Transmission) Regulations, 2025
9
(s) “Force Majeure” for the purpose of these Regulations means the event
or circumstance or combination of events or circumstances including but
not limited to those stated below that wholly or partly prevents or
unavoidably delays the Transmission Licensee from completing the project
within the time specified in the Capital Investment Approval/ contract
agreement, and only if such events or circumstances are not within the
control of the Transmission Licensee and could not have been avoided,
had the Transmission Licensee taken reasonable care or complied with
prudent utility practices:
i. Act of God including but not limited to lightning, drought, fire and
explosion, earthquake, volcanic eruption, landslide, flood, cyclone,
typhoon, tornado, geological surprises; or
ii. Any act of war, invasion, armed conflict or act of a foreign enemy,
blockade, embargo, revolution, riot, insurrection, terrorist or
military action; or
iii. Industry wide strikes and labour disturbances having a nationwide
impact in India;
iv. Delay in obtaining statutory approvals for the projects where the
delay is not attributable to Licensee;
v. Delay in land acquisition for the projects where the delay is not
attributable to Licensee;
(t) “Implementation Agreement” means any multi-party agreement or
covenant entered among the Generating Company and/ or the
Transmission Licensee(s) of the interconnected/associated transmission
system for the execution of generation and transmission projects in a
coordinated manner, laying down the project implementation schedule
and mechanism for monitoring the progress of the projects;
(u) "Indian Government Instrumentality" means any ministry
department, board, authority, agency, corporation and commission under
direct or indirect control of the Government of India or the State
Government(s) or both or Appropriate Commission (s) or tribunal or
judicial or quasi-judicial body;
UPERC (MYT for Transmission) Regulations, 2025
10
(v) "License" means a license granted under Section 14 of the Act;
(w) “Licensed Business” means the functions and activities for which the
Licensee is required to undertake in terms of the license granted by the
Commission or on account of being a deemed Licensee under the Act;
(x) “Long-term Transmission customer” means a person as defined in
UPERC (Terms & Conditions of Open Access) Regulation, 2019 as
amended from time to time;
(y) “Medium-term Transmission customer” means a person as defined in
UPERC (Terms & Conditions of Open Access) Regulation, 2019 as
amended from time to time;
(z) “Other Business” means any business of the Licensee for optimum
utilization of its assets within the meaning of Section 41 of the Act;
(aa) “Open Access Customer” means as defined in UPERC (Terms &
Conditions of Open Access) Regulation, 2019 as amended from time to
time;
(bb) “Project” means all components and elements of the Transmission
system including communication system;
(cc) “Rated voltage” means the manufacturer's design voltage at which the
Transmission System is designed to operate and includes such lower
voltage at which Transmission line is charged or for the time being
charged, in consultation with long- term Transmission customers;
(dd) “Short term Transmission Customer” means a person as defined in
UPERC (Terms & Conditions of Open Access) Regulation, 2019 as
amended from time to time;
(ee) “Tariff Based Competitive Bidding (TBCB) Transmission Licensee”
means Transmission Licensee, whose tariff is discovered through
competitive bidding and adopted by the Commission under Section 63 of
the Act;
(ff) “Transmission Service Agreement (TSA)” means the Agreement,
Contract, Memorandum of Understanding, or any such covenant, entered
into between the Transmission Licensees and the long-term Transmission
customer for the operational phase of the Transmission system;
UPERC (MYT for Transmission) Regulations, 2025
11
(gg) “Transmission System” means a line or a group of lines together with
or without associated Sub- Stations, and includes equipment associated
with Transmission lines and Sub- Stations;
(hh) “Transmission System Users (TSU’s)” for the purpose of these
Regulations means the Open Access Customers which includes distribution
licensee using Intra State Transmission System;
(ii) “Transmission Capacity Rights (TCR)” means the right of a
Transmission System User to transfer power in MW, under normal
circumstances, between such points of injection and drawal;
(jj) “Transmission Licensee” means a person who has been granted a
License under sub-section (a) of Section 14 of the Act;
(kk) “Total Transmission System Cost (TTSC)” means as provided under
clause 29(1) of these Regulations;
(ll) “Year” means the financial year ending on 31st March;
i. “Current Year” means the year in which the statement of annual
accounts or application for determination of Tariff is filed;
ii. “Ensuing Year” means the year next following the current year;
iii. “Previous Year” means the year immediately preceding the current
year.
(2) The words and expressions used in these Regulations and not defined
herein, but defined in the Act, shall bear the same meaning as in the
Electricity Act, 2003 or any other Regulations of the Commission, as
amended from time to time. Expressions used herein but not specifically
defined in these Regulations or in the Electricity Act, 2003 but defined under
any law passed by a competent legislature and applicable to the electricity
industry in the State shall have the meaning assigned to them in such law.
Expressions used herein but not specifically defined in these Regulations or
in the Act or any law passed by a competent legislature shall have the
meaning as is generally assigned in the electricity industry.
(3) The words “Application” or “Petition” shall be used interchangeably.
UPERC (MYT for Transmission) Regulations, 2025
12
(4) In the interpretation of these Regulations, unless the context otherwise
requires:
(a) words in the singular or plural term, as the case may be, shall also be
deemed to include the plural or the singular term, respectively;
(b) references herein to the “Regulations” shall be construed as a
reference to these Regulations as amended or modified by the
Commission from time to time in accordance with the applicable laws
in force;
(c) the headings are inserted for convenience and may not be taken into
account for the purpose of interpretation of these Regulations;
(d) references to the Statutes, Regulations or Guidelines shall be
construed as including all statutory provisions consolidating,
amending or replacing such Statutes, Regulations or Guidelines, as
the case may be;
(e) in case of dispute in interpretation between English and Hindi version
of these Regulations, the English version shall prevail.
UPERC (MYT for Transmission) Regulations, 2025
13
CHAPTER 1
TARIFF PETITION AND PROCEDURE FOR DETERMINATION OF
TARIFF
3. General Principles
(1) The Commission shall determine the Intra-State Transmission Tariff every
year during five-year control period under a Multi-Year Tariff framework
based upon the principles specified in these Regulations.
(2) The Transmission Licensee shall file an annual petition complete in all
respect every year during control period for True-up of ARR for previous
year, APR of current year and ARR / Tariff of ensuing year in such form and
in such manner as specified in these Regulations along with relevant
formats, duly supported with detailed computations, by 30th November of
each year as per table below:
Table 1: Details of Petitions to be filed under the Control Period
Filing date True- Up APR ARR / Tariff
30.11.2024 FY 2023-24* FY2024-25* FY 2025-26**
30.11.2025 FY 2024-25*** FY 2025-26 FY 2026-27
30.11.2026 FY 2025-26 FY 2026-27 FY 2027-28
30.11.2027 FY 2026-27 FY 2027-28 FY 2028-29
30.11.2028 FY 2027-28 FY 2028-29 FY 2029-30
*The Petitions have already been filed as per UPERC (Multi-Year Tariff for
Distribution & Transmission Tariff) Regulation, 2019.
**As per the directions of the Commission, the Petitions have already
been filed. Further submissions will be sought as per these Regulations for
determination of ARR for FY 2025-26.
***The filings shall be as per UPERC (Multi-Year Tariff for Distribution &
Transmission Tariff) Regulation, 2019, however, filings have to be made
on 30th November of the respective year as per these Regulations.
UPERC (MYT for Transmission) Regulations, 2025
14
Provided that True-up of ARR of Transmission Licensee for those years
falling under past control period shall be filed by Transmission Licensee in
such form and in such manner as specified in UPERC (Multi- Year Tariff for
Distribution & Transmission Tariff) Regulations, 2019.
(3) STU shall file the annual Petition for True-up of TTSC (Total Transmission
System Cost) for previous year, APR of current year and TTSC of ensuing
year for determination of Intra State Transmission Tariff in such form and
in such manner as specified in these Regulations along with relevant
formats, duly supported with detailed computations, by 30th November of
each year:
Provided that Uttar Pradesh Power Transmission Corporation Ltd. in the
capacity of State Transmission Utility shall file a single Petition for
compliance of clause 2 and clause 3 of these Regulations till functions of
STU are assigned to a separate entity.
(4) The Transmission Licensee shall file the True-Up/ APR/ ARR Petition, in
accordance with the guidelines and formats as may be prescribed by the
Commission, electronically on e-filing portal of the Commission, after due
authorization by the Board of Directors or by any Committee/person
authorised by the Board in this regard, digitally signed by the authorized
representative:
Provided that the Capital Investments of Transmission Licensee without
prior approval of the Commission shall not be included in the ARR Petition.
(5) Hard copies of the Petition shall also be filed as provided for in the UPERC
(Conduct of Business) Regulations, 2019, as amended from time to time,
accompanied with applicable fees as per the UPERC (Fee and Fines)
Regulations, 2010 as amended from time to time:
Provided that the fees for filing Petition under these Regulations by STU
shall be exempted till functions of STU are assigned to a separate entity.
(6) The Petitioner shall furnish to the Commission all such books and records
(or certified true copies thereof), including the audited/ provisional
Accounting Statements, operational, cost and Performance related data as
may be required by it. The Petition filed by the Transmission Licensee/ STU,
UPERC (MYT for Transmission) Regulations, 2025
15
as the case may be, shall comprise and be accompanied by the requisite
information, which shall include but not limited to the following information:
(i) ARR/Tariff Filling
(a) The Transmission System or network usage forecast for the year,
Projected Transmission Capacity, Circuit line length, Number of Sub-
Stations, Capital Investment Plan, Financing Plan and Physical targets,
Equity, Grants, etc.
(b) Projected list of Schemes as approved under STU Transmission Plan
that will be Capitalised during the year by the Transmission Licensee;
(c) Proposal(s) for transmission charges including the transmission losses
for the year supported by adequate justification;
(d) Expected Revenue from the Licensed Business, Non-Tariff Income and
income from Other Business and other matters considered appropriate
by the Transmission Licensee.
(ii) Annual Performance Review
(a) The Actual (as on date of filing of Petition) vs Projected Transmission
Capacity, Circuit line length, Number of Sub-Stations, Capital
Investment Plan, Financing Plan and Physical targets, Equity, Grants,
etc.
(b) Details of Capital expenditure and additional capital expenditure
incurred during the period under review along with supporting
documents.
(c) Provisional Statement of Accounts and trial balance for six months for
the current financial year.
(iii) True Up
(a) Actual vs Projected Transmission Capacity, Circuit line length, Number
of Sub-Stations, Capital Investment, Financing Plan and Physical
targets, Equity, Grants, etc.
(b) Details of scheme wise capitalisation viz á viz with approval obtained
from the Commission;
(c) Year wise asset register indicating capitalisation and depreciation;
(d) Statement of source of financing including equity infusion;
UPERC (MYT for Transmission) Regulations, 2025
16
(e) Loan utilisation certificate for all the loans availed by the Transmission
Licensee during the relevant year duly reconciled with Statutory books
of accounts including;
i. Capital Expenditure
ii. Capital work in Progress
iii. Working Capital
(f) Gain/loss sharing with respect to controllable parameters;
(g) Audited Statement of Accounts and trial balance;
Any other detail in as specified in these Regulations or as required by
the Commission from time to time.
Provided that if the true-up petition is not submitted within timelines as
stipulated in these Regulations, no carrying cost for the period of delay shall
be allowed for the gap arrived for the true-up year. However, in case of
surplus, the same with carrying cost shall be recovered:
Provided also that the Transmission Licensee shall submit a yearly
statement on the status of compliance to Directives, issued by the
Commission in the previous Tariff Order, along with the Petition.
(7) The Commission shall conduct a Technical Validation before admission of
the Petition. On completion of the required proceedings and submissions
made to the satisfaction of the Commission, the Commission will admit the
Petition and shall issue an Admittance Order.
(8) The Petitioner shall within three working days of the issuance of the
Admittance Order, publish a Public Notice in at least two English and two
Hindi daily newspapers having wide circulation in its license area, outlining
the True-Up/APR/ARR, proposed Tariff and such other matters as may be
directed by the Commission, inviting suggestions and objections from the
stakeholders and public at large:
Provided that the Petitioner shall also provide on its website the Petition
filed before the Commission along with all regulatory filings, detailed
computations, particulars and documents, in text-searchable format or in
downloadable spreadsheet format in the manner stipulated by the
Commission:
UPERC (MYT for Transmission) Regulations, 2025
17
Provided also that the web link to the information mentioned in the first
proviso to this Regulation should be easily accessible, archived for
downloading and be prominently displayed on the Petitioner’s website:
Provided also that Petitioner shall intimate its stakeholders about filing of
such Petition, period of public consultation, date of Public Hearing etc.
through appropriate notice on its website and newspapers:
Provided further that the Petitioner may be exempted by the Commission
from providing any such information, particulars or documents considered
confidential in nature.
(9) The Commission shall, within one hundred and twenty days from
admittance, after considering all suggestions and objections received from
the stakeholders and public at large and in accordance with the provisions
contained in these Regulations:
(a) Issue an Order for True-Up/APR/ARR & Tariff accepting the Petition
with such modifications or such conditions as may be specified in that
Order; or
(b) Reject the Petition for reasons to be recorded in writing if such Petition
is not in accordance with the provisions of the Act, Rules and
Regulations made there under or any other provisions of law, after
giving the Petitioner a reasonable opportunity of being heard.
(10) The State Transmission Utility shall publish the Intra State Transmission
Tariff within three working days approved by the Commission in at least
two English and two Hindi daily newspapers having wide circulation in its
license area and shall upload the approved Tariff on its internet website
both in English and Hindi.
(11) The Tariff so published shall be in force from the date stipulated in the
Order and shall, unless amended or revised, continue to be in force for such
period as may be stipulated therein.
(12) The Commission shall carry out Truing-Up exercise stipulated in the
provisions of these Regulations. True-Up of Expenses and Revenue shall be
on the basis of approved and actual expenses, revenue, etc., based on the
UPERC (MYT for Transmission) Regulations, 2025
18
prudence check of Accounting Statements of the Transmission Licensee for
the Financial Year.
4. Method for Determination of Tariff for augmentation/strengthening
works executed by TBCB Transmission Licensee
(1) Implementation of augmentation/strengthening works at the intra-State
transmission sub-station and /or line being part of the STU Transmission
Plan shall be carried out by the respective TBCB Transmission Licensee in
whose premises work is to be carried out:
Provided that the cost of the works, as approved by the Commission, shall
be transferred by UPPTCL to the respective TBCB Transmission Licensee,
which shall be passed on in the ARR of UPPTCL in accordance with these
Regulations:
Provided further that Regulation 7.2 of UPERC (Modalities of Tariff)
Regulations, 2023 shall stand superseded to the extent specified in these
Regulations.
(2) UPPTCL shall take prior approval of these schemes/works and the
Commission may approve the scheme along with such terms and conditions
as considered appropriate.
(3) The Operation and Maintenance of such works shall be carried out by the
respective developer for which Normative Repair & Maintenance expenses
shall be transferred by UPPTCL to the respective developer/Transmission
Licensee in whose premises work is to be carried out, as per tariff order
issued by the Commission for the respective year.
(4) UPPTCL shall submit a procedure for finalisation of cost of works, bid
process to be conducted by TBCB Transmission Licensee and its finalisation,
transfer of funds for carrying out the works, funds for operation &
maintenance requirements etc. within three months of the notification of
these Regulations for approval of the Commission.
(5) The Commission through its Orders may issue directive to TBCB
Transmission Licensee and may call for compliance status.
UPERC (MYT for Transmission) Regulations, 2025
19
5. Controllable and Uncontrollable Factors
(1) The “Uncontrollable Factors” shall comprise the following factors, which
were beyond the control of, and could not be mitigated by the Transmission
Licensee, as determined by the Commission:
(a) Force Majeure events;
(b) Change in Law;
(c) Variations in interest rates for Long term loan subject to prudence
check;
(d) Any other expenses allowed by the Commission.
(2) The “Controllable Factors” shall include, but shall not be limited to the
following:
(a) Variations in Capital Expenditure on account of time and/ or cost
overruns/ efficiencies in the implementation of capital expenditure
project not attributable to an approved change in scope of such project
or change in statutory levies or force majeure events, and due to delay
in execution of the project on account of contractor, supplier or agency
of the Transmission Licensee;
(b) Provision for Write-off of Bad and Doubtful debts;
(c) Variation in performance parameters and standards specified;
(d) Variation in interest on working capital;
(e) Variation in Intra-State Transmission losses;
(f) Variation in expenses under any component(s) of Operation &
Maintenance expenses;
(g) Variation in availability of transmission system.
6. Treatment of Gains or Losses on account of Uncontrollable Factors
(1) The approved gain or loss to the Transmission Licensee on account of
Uncontrollable Factors shall be adjusted in the ARR or Tariff of the
Transmission Licensee, as stipulated in these Regulations and as may be
determined in the Order of the Commission passed under these
Regulations.
(2) The Transmission Licensee shall submit such details of the variation on
account of Uncontrollable factors along with the detailed computations and
UPERC (MYT for Transmission) Regulations, 2025
20
supporting documents as may be required for verification by the
Commission.
7. Treatment of Gains or Losses on account of Controllable Factors
(1) The financial gain or loss shall be computed with respect to each component
of Operation & Maintenance expenses.
(2) The approved gain to the Transmission Licensee, as per clause 7 (1), shall
be dealt with in the following manner:
(a) Two-third of the amount of such gain shall be passed on in Tariff/ARR
over such period as may be stipulated in the Order of the Commission;
(b) The balance amount of such gain shall be utilised at the discretion of
the Transmission Licensee.
(3) The approved loss to the Transmission Licensee, as per clause 7 (1), shall
be dealt with in the following manner:
(a) One-third of the amount of such loss shall be passed on in Tariff/ARR
over such period as may be stipulated in the Order of the Commission;
(b) The balance amount of such loss shall be absorbed by the
Transmission Licensee.
UPERC (MYT for Transmission) Regulations, 2025
21
CHAPTER 2
DELAY IN COMMERCIAL OPERATION
8. Procedure for Delay in Commercial Operation
(1) The Transmission Licensee(s) and/ or the Generating Company shall
necessarily enter into an “implementation agreement” for the execution of
transmission projects including interconnection facilities in a timely and
coordinated manner to avoid any mismatch of commercial operation date.
(2) The date of commercial operation of a transmission system or element
thereof and associated communication system shall be in accordance with
the provisions of the Grid Code.
(3) In case the transmission system or element thereof executed by a
Transmission Licensee is ready for commercial operation but the
interconnected generating station or the transmission system of other
Transmission Licensee, as per the agreed scheduled date of commissioning,
is not ready for commercial operation, the Transmission Licensee may file
a petition before the Commission for approval of the date of commercial
operation of such transmission system or element thereof or proceed in
terms of TSA approved by the Commission:
Provided that the Transmission Licensee seeking approval of the date of
commercial operation under this clause shall give prior notice of at least
one month, to the Generating Company and/ or the other Transmission
Licensee and the long-term customers of its transmission system, as the
case may be, regarding the date of commercial operation:
Provided further that the Transmission Licensee seeking the approval of the
date of commercial operation of the transmission system under this clause
shall be required to submit the following documents along with the petition:
(a) Clearance for Energisation issued by the Electrical Inspector;
(b) Trial operation certificate issued by the SLDC for charging element
with or without electrical load;
(c) Implementation Agreement, Connection agreement, executed by the
parties;
UPERC (MYT for Transmission) Regulations, 2025
22
(d) Notice issued by the Transmission Licensee as per the first proviso
under this clause and the response;
(e) Certificate of the Competent Authority of the company regarding the
completion of the transmission system including associated
communication system in all respects;
(4) The Commission shall, on consideration of the submissions of the
Transmission Licensee as aforesaid, shall pass such orders or give such
directions as may be necessary.
9. Commercial Settlement in case of Mismatch in Date of Commercial
Operation
(1) In case of mismatch of the date of commercial operation of the Generating
Station or Transmission Licensee(s) with the transmission system of TBCB
developer, the liability for the transmission charges of TBCB Transmission
licensee shall be determined as under: -
(a) Where the generating station has not achieved the commercial
operation as on the date of commercial operation of the associated
transmission system (which is not before the SCOD of the generating
station), the Generating Company shall be liable to pay the
transmission charges of the associated transmission system as
approved by the Commission to the TBCB Transmission Licensee till
the generating station or unit thereof achieves commercial operation;
(b) Where the transmission system of the Transmission Licensee(s) has
not achieved the commercial operation as on the date of commercial
operation of the interconnected transmission system of TBCB
Transmission Licensee (which is not before the SCOD of the
transmission system), the said Transmission Licensee shall be liable
to pay the transmission charges of such interconnected transmission
system to the TBCB Transmission Licensee as approved by the
Commission till the transmission system achieves the commercial
operation.
Provided that in case of default by more than one entity, the liability for the
transmission charges of TBCB Transmission Licensee shall be shared in
equal ratio by the defaulting entities until the default is rectified by any of
UPERC (MYT for Transmission) Regulations, 2025
23
the entity. Upon rectification of the default by any entity, the entire liability
shall be equally shared amongst the remaining defaulting entity/ies again
in equal ratio among the defaulting parties until there remains only one
defaulting party in which case entire liability of transmission charges shall
be on the same defaulting party till it cures its default.
(2) The Commission shall, on consideration of the submissions of the
Transmission Licensee as aforesaid, pass such orders or give such
directions as may be necessary.
UPERC (MYT for Transmission) Regulations, 2025
24
CHAPTER 3
FINANCIAL PRINCIPLES
10. Financial Prudence
(1) The Transmission Licensee shall manage its finances in an optimum and
prudent manner.
(2) In determining the ARR and Tariff of the Transmission Licensee, the
Commission shall assess the financial prudence with regard to the following
factors:
(a) Whether projected capital expenditure and capitalisation is based on
realistic estimates, and adequate justification has been provided for
any anomalous increase in capital expenditure and capitalisation
projected by the Transmission Licensee;
(b) Mechanism put in place for monitoring the physical progress of
projects with respect to their original schedule;
(c) Optimum drawal of loans in accordance with the physical progress of
the capital expenditure schemes, and efficient utilisation of such
loans;
(d) In case the actual capital expenditure and capitalisation during the
year varies more than 10% of that approved under STU Transmission
Plan by the Commission, the Transmission Licensee shall submit a
detailed justification for such variation along with its True-Up Petition;
(e) In case any scheme has not been commenced during the year despite
the Commission's approval, detailed justification shall be submitted
along with the Petition for True-Up;
(f) Creation of assets in accordance with Capex Plan approved by the
Commission along with their retirement, replacement or
deletion/adjustments;
(g) Procurement of Goods and Services in competitive and transparent
manner;
(h) Proper recording of assets in Fixed Asset Register;
UPERC (MYT for Transmission) Regulations, 2025
25
(i) Whether the procured asset, such as land, has actually been put to
use;
(j) Mechanism put in place for monitoring adherence to the approved
expenditure, including schedule of interest payments for long-term
loans and working capital.
11. Capital Expenditure/ Cost and Capital Structure
(1) Capital cost for a Capital investment project shall include:
(a) The expenditure incurred or projected to be incurred, including
interest during construction and financing charges, as admitted by the
Commission after prudence check;
(b) Capitalised initial spares subject to the ceiling rates stipulated in these
Regulations;
(c) Expenses incurred by the Transmission Licensee on obtaining right of
way, as admitted by the Commission after prudence check;
(d) Additional capital expenditure determined under clause 12 of these
Regulations;
(e) Incidental expenditure during construction including apportioned
expenditure on relevant components of O&M;
(f) Any gain or loss on account of foreign exchange risk variation
pertaining to the loan amount availed up to the date of commercial
operation, as admitted by the Commission after prudence check:
Provided that any gain or loss on account of foreign exchange risk
variation pertaining to the loan amount availed up to the date of
commercial operation shall be adjusted only against the debt
component of the capital cost:
Provided further that the capital cost of the assets forming part of the
Project but not put to use or not in use, shall be excluded from the
capital cost:
Provided also that the Transmission Licensee shall submit
documentary evidence in support of its claim of assets being put to
use.
UPERC (MYT for Transmission) Regulations, 2025
26
(2) The capital cost admitted by the Commission after prudence check shall
form the basis for determination of Tariff.
(3) The actual capital expenditure on a Project as on COD for the original scope
of work based on audited accounts of the Transmission Licensee, as the
case may be, shall be considered subject to prudence check by the
Commission.
(4) Capital cost to be allowed by the Commission for the purpose of
determination of Tariff will be based on the Transmission Plan prepared by
the STU under Modalities of Tariff Determination Regulation, 2023 and
Annual Capital Investment Plan approved by the Commission.
(5) The capital cost may include initial spares capitalised as a percentage of
the Plant and Machinery cost up to the cut-off date, subject to the following
ceiling norms:
(a) Transmission System
i. Transmission Line: 1.0 %
ii. Transmission Sub-Station (AIS):
Green field 4.0 %
Brown field 6.0 %
iii. Gas Insulated/Hybrid Sub-Station
(GIS/HGIS):
Green field 5.0 %
Brown field 7.0 %
iv. Series compensation devices and
HVDC Sub-Station
4.0 %
v. Static Synchronous
Compensator:
6.0 %
vi. Communication System: 3.5 %
(b) Battery Energy Storage System: 1.0 %
(6) The impact of revaluation of assets shall be permitted provided it does not
result in increase in Tariff of the Transmission Licensee:
UPERC (MYT for Transmission) Regulations, 2025
27
Provided that any benefit from such revaluation shall be passed on to long-
term Intra-State Open Access Customers of the Transmission Licensee, at
the time of ARR / Tariff determination or Truing-Up, as the case may be.
(7) Any expenditure on replacement, Renovation and Modernisation or
extension of life of old fixed assets, as applicable to Transmission Licensees,
shall be considered after writing off the net value of such replaced assets
from the original capital cost, and shall be computed as follows:
Net Value of Replaced Assets = OCRA – AD;
Where;
OCRA: Original Capital Cost of Replaced Assets:
AD: Accumulated depreciation pertaining to the Replaced Assets
Provided that in case the original capital cost of the replaced asset is not
available for any reason, it shall be considered by the Commission on a
case to case basis:
Provided further that the amount of insurance proceeds received, if any,
towards damage to any asset requiring its replacement shall be first
adjusted towards outstanding actual or normative loan; and the balance
amount, if any, shall be utilised to reduce the capital cost of such replaced
asset, and any further balance amount shall be considered as Non-Tariff
Income.
12. Additional Capitalisation
A. Additional Capitalisation within the original scope and up to the
cut-off date
(1) The additional capital expenditure in respect of a new project or an existing
project, on the following counts within the original scope of work as per
Detailed Project Report (DPR), actually incurred after the date of
commercial operation and up to the cutoff date may be admitted by the
Commission, subject to prudence check:
a. Deferred liabilities;
b. Works deferred for execution;
UPERC (MYT for Transmission) Regulations, 2025
28
c. Procurement of initial capital spares in the original scope of work,
subject to ceiling specified in these Regulations;
d. Payment against the award of arbitration or for compliance of the
directions or order of any statutory authority or order or decree of a
Court;
e. On account of change in law or compliance with any existing law which
is not provided for in the original scope of work;
f. Force majeure events:
Provided that original scope of work along with estimates of expenditure
shall be submitted along with the application for provisional and final tariff:
Provided that in case of any replacement of the assets, the additional
capitalization shall be worked out after adjusting the gross fixed assets and
cumulative depreciation of the assets replaced on account of de-
capitalization:
Provided further that a list of the deferred liabilities to be payable at a future
date and works deferred for execution shall be submitted along with the
application for final tariff after the date of commercial operation.
B. Additional Capitalisation within the original scope and after the
cut-off date
(1) The additional capital expenditure actually incurred in respect of an existing
project or a new project on the following counts within the original scope
of work and after the cut-off date may be admitted by the Commission,
subject to prudence check:
a. Payment made against award of arbitration or for compliance of the
directions or order of any statutory authority, or order or decree of a
Court;
b. Change in Law or compliance with any existing law which has not been
provided for in the original scope of work;
c. Force majeure events;
d. Payment made towards liability admitted for works within the original
scope executed prior to the cut-off date;
UPERC (MYT for Transmission) Regulations, 2025
29
e. Works within original scope executed after the cut-off date and
admitted by the Commission, to the extent of actual payments made.
(2) In case of replacement of assets deployed under the original scope of the
existing project after the cut-off date, the additional capitalization may be
admitted by the Commission after making necessary adjustments in the
gross fixed assets and the cumulative depreciation, subject to prudence
check on following grounds:
a. Assets whose useful life is not commensurate with the useful life of the
project and such assets have been fully depreciated in accordance with
the provisions of these Regulations;
b. The replacement of the asset or equipment is necessary on account of
a change in law or Force Majeure conditions; or
c. The replacement of such asset or equipment is necessary on account of
obsolescence of technology; or
d. The replacement of such asset or equipment has otherwise been
allowed by the Commission:
C. Additional Capitalisation beyond the original scope
(1) The capital expenditure, in respect of the existing transmission project
incurred on the following counts beyond the original scope, may be
admitted by the Commission, subject to prudence check:
a. Payment made against award of arbitration or for compliance of order or
directions of any statutory authority, or order or decree of any court of
law;
b. Change in law or compliance of any existing law;
c. Force Majeure events;
d. Need for higher security and safety of the project as advised or directed
by appropriate Indian Government Instrumentality or statutory
authorities responsible for national or internal security:
Provided also that if any expenditure has been claimed under Renovation
and Modernisation (R&M) or repairs and maintenance under O&M
expenses, the same shall not be claimed under this Regulation;
UPERC (MYT for Transmission) Regulations, 2025
30
13. Operation and Maintenance Expenses
(1) The Operation and Maintenance (O&M) expenses for the Transmission
Licensee shall be computed for three components i.e (i) Employee
Expenses, (ii) Repair and Maintenance (R&M) Expenses, and (iii)
Administrative and General Expenses.
(2) The Norms for each component of O&M Expenses shall be determined as
per these Regulations. Thereafter O&M Expenses for each year of the
Control Period shall be computed based on the formula shown below:
O&Mn = EMPn + R&Mn + A&Gn
Where:
O&Mn – O&M expenses for nth year
EMPn - Employee expenses for nth year
R&Mn - R&M expenses for nth year
A&Gn - A&G expenses for nth year
(3) At the time of Truing-Up, gains or losses for each component of Operation
and Maintenance Expenses shall be shared as per clause 7 of these
Regulations.
(4) The impact of Pay Revision, change in Pension Scheme etc., shall be
allowed by the Commission over and above normative Expenses of the
respective component after prudence check. However, one-time expenses
such as payment of Arears due to impact of pay revision, change in pension
scheme etc., shall not be considered for the determination of norm of the
respective component.
(5) In case data required for establishing the norms is not available, the
Transmission Licensee shall propose O&M norms with justification. The
Commission shall approve the norms for the Transmission Licensee after
prudence check which shall be applicable for the remaining Control Period.
(6) Employee Cost
(a) The Employee Cost shall be derived on the basis of the average of the
values in the Audited Accounts for the last five (5) financial years
ending March 31, 2025 subject to prudence check by the Commission.
However, if Audited Accounts are not available for FY 2024-25,
UPERC (MYT for Transmission) Regulations, 2025
31
Audited Accounts available for the last five (5) years will be considered
and subsequently when the same are available the base year value
(i.e. FY 2024-25) will be recomputed.
(b) The average of such Employee Cost shall be considered as Employee
Cost for the middle year of the previous Control Period (01.04.2020
to 31.03.2025) and shall be escalated year on year with the escalation
factor considering CPI of respective years, for subsequent years up to
FY 2024-25:
Provided that impact of one time expenses such as Arears due to
impact of pay revision, change in pension scheme etc. shall be
removed from the base Employee Cost.
After arriving the figure of FY 2024-25, the normative employee
expenses shall be computed as per formula below:
EMPn = EMPn-1 X (1+ CPI inflation) X (1+ Gn)
Where:
EMPn: Employee expense for the nth year;
EMPn-1: Employee expense for the (n-1)th year;
For the purpose of ARR, CPI inflation is the average of Consumer
Price Index (CPI) for Industrial Workers (All India) as per Labour
Bureau, Government of India for the immediately preceding three
Financial Years.
For the purpose of True-Up, CPI inflation is the actual point to point
inflation for the concerned Financial Year.
Gn is a growth factor for the nth year and it may be greater than or
less than zero based on the actual performance. Value of Gn shall be
determined by the Commission in the Tariff Order for meeting the
additional manpower requirement based on the Licensees’ filing,
benchmarking or any other factor that the Commission feels
appropriate.
UPERC (MYT for Transmission) Regulations, 2025
32
(7) Repairs and Maintenance Expense
The normative Repair and Maintenance expense for first year of Control
period shall be allowed at the rate of 2% of the opening GFA of the year as
approved by the Commission. The normative Repair and Maintenance
expense for subsequent years of the control period, shall be allowed at 2%
of the incremental GFA of the respective year in addition to the normative
R&M value of previous year along with an annual escalation based on the
Wholesale Price Index (WPI) inflation:
Provided that the normative R&M expense determined as per the above
stipulation shall be inclusive of any impact of change in applicable taxes or
duties.
For the purpose of ARR, WPI inflation is the average of Wholesale Price
Index (WPI) for immediately preceding three Financial Years as per the
Office of Economic Advisor of Government of India.
For the purpose of True-Up, WPI inflation is the actual point to point
inflation for the concerned Financial Year.
(8) Administrative and General Expenses
(a) The normative A&G Expenses shall be derived on the basis of the
average of the values in the Audited Accounts for the last five (5)
financial years ending March 31,2025 subject to prudence check by
the Commission. However, if Audited Accounts are not available for FY
2024-25, Audited Accounts available for the last five (5) financial
years of previous Control Period (01.04.2020 to 31.03.2025) will be
considered and subsequently when the same are available the base
year value (i.e. FY 2024-25) will be recomputed.
(b) The average of such A&G Expenses shall be considered as A&G
Expenses for the middle year and shall be escalated year on year with
the escalation factor considering WPI of respective years, for
subsequent years up to FY 2024-25.
(c) A&G expense shall be computed as per the following formula escalated
by wholesale price index (WPI) and adjusted by provisions for
confirmed initiatives (IT etc. initiatives as proposed by the
Transmission Licensee and validated by the Commission) or other
UPERC (MYT for Transmission) Regulations, 2025
33
expected one-time expenses:
After arriving the figure of FY 2024-25, the normative A&G expenses
shall be computed as per formula below:
A&Gn= A&G n-1 (1+ WPI inflation) + Provision
Where:
A&Gn: A&G expense for the nth year;
A&Gn-1: A&G expense for the (n-1)th year;
For the purpose of ARR, WPI inflation is the average of Wholesale Price
Index (WPI) for immediately preceding three Financial Years as per the
Office of Economic Advisor of Government of India:
For the purpose of True-Up, WPI inflation is the actual point to point
inflation for the concerned Financial Year.
Provision: Cost for initiatives which entail conversion of Capex projects
into Totex or Opex mode or are undertaken to ensure compliance of any
directives of the Commission or any other Expense as may be allowed
by the Commission on the proposal of Transmission Licensee.
14. Debt-Equity
(1) Closing balance of Equity as on 31.03.2025 approved by the Commission
shall be taken as the opening Equity for Financial Year 2025-26.
(2) For a capital investment scheme declared under commercial operation on
or after April 1, 2025, debt-equity ratio as on the date of commercial
operation shall be 70:30 of the amount of capital cost approved by the
Commission under clause 11 of these Regulations after making appropriate
adjustment of Assets funded by Consumer Contribution/ Deposit Works/
Capital Subsidies/ Grant, subject to prudence check for determination of
Tariff:
Provided that if the equity actually deployed is more than 30% of the capital
cost, equity in excess of 30% shall be treated as normative loan for the
Transmission Licensee for determination of Tariff:
UPERC (MYT for Transmission) Regulations, 2025
34
Provided further that the Transmission Licensee shall submit documentary
evidence for the actual deployment of equity and explain the source of
funds for the equity:
Provided also that where equity actually deployed is less than 30% of the
capital cost of the capitalised asset, the actual equity shall be considered
for determination of Tariff:
Provided also that the equity invested in foreign currency shall be
designated in Indian Rupees on the date of each investment:
Provided that in case of retirement or replacement or de-capitalisation or
deletion/adjustment of the assets, the equity capital approved as
mentioned above, shall be reduced to the extent of 30% (or actual equity
component based on documentary evidence, if it is lower than 30%) of the
original cost of such assets:
Provided further that in case of retirement or replacement or deletion/
adjustment or de-capitalisation of the assets, the debt capital approved as
mentioned above, shall be reduced to the extent of the outstanding debt
component based on documentary evidence, or the normative loan
component, as the case may be, of the original cost of such assets.
15. Depreciation
(1) The Transmission Licensee, shall be permitted to recover Depreciation on
the value of fixed assets used in their respective businesses, computed in
the following manner:
(a) The approved original cost of the fixed assets shall be the value base
for the calculation of Depreciation:
Provided that the Depreciation shall be allowed on the entire
capitalised amount of the new assets after reducing the approved
original cost of the retired or replaced or de-capitalised assets.
(b) Depreciation shall be allowed annually based on the Straight- Line
Method at the rates stipulated in the Annexure- A for existing Assets
(capitalised on or before 31.03.2025) and at the rates stipulated in
Annexure- B for Assets capitalised during the Control Period:
UPERC (MYT for Transmission) Regulations, 2025
35
Provided that the Licensee shall ensure that once individual asset is
depreciated to the extent of seventy percent, the remaining
depreciable value as on 31st March of the year closing shall be spread
over the balance Useful Life of the assets including the Extended Life,
as per submission of the Licensee and approval by the Commission.
(c) The salvage value of the asset shall be considered at 10% of the
allowable capital cost and Depreciation shall be allowed up to a
maximum of 90% of the allowable capital cost of the asset:
Provided that land owned shall not be treated as a Depreciable asset
and shall be excluded from the capital cost while computing
Depreciation:
Provided further that Depreciation shall be chargeable from the first
year of commercial operation:
Provided that the salvage value of the IT equipment, software and
underground cable shall be considered as nil and value of such assets
shall be considered 100% depreciable.
(d) Depreciation shall not be allowed on assets funded by Consumer
Contributions or Subsidies/ Grants/ Deposit works.
(2) In case of existing assets, for the purpose of computation of depreciation,
the opening value of GFA shall be taken as the closing value as on March
31, 2025 as approved by the Commission in its Tariff Order.
(3) In case of projected commercial operation of the assets for part of the year,
depreciation shall be computed based on the average of opening and
closing value of assets:
Provided that the depreciation shall be re-computed for assets capitalised
at the time of Truing-Up, based on Accounting Statements and
documentary evidence of assets capitalised by the Petitioner, subject to
prudence check of the Commission.
16. Return on Equity
Return on equity shall be computed in ₹ terms on equity base at the rate
of 14.5% post-tax per annum (hereinafter referred to as ‘Base Rate’) for
UPERC (MYT for Transmission) Regulations, 2025
36
the Transmission Licensee as determined in accordance with clause 14 of
these Regulations:
Provided that assets funded by Consumer Contribution / Deposit works,
Capital Subsidies / Grants and corresponding Depreciation shall not form
part of the Capital Cost.
17. Interest on Long- Term Loan
(1) The long- term loans arrived at in the manner indicated in these Regulations
on the assets put to use shall be considered as gross normative loan for
calculation of interest on loan:
Provided that in case of retirement or replacement or de-capitalisation or
deletion/adjustment of the assets in the balance sheet, the loan capital
approved as mentioned above shall be reduced to the extent of outstanding
loan component of the original cost of such assets based on documentary
evidence.
(2) The closing normative long- term loan outstanding as on March 31, 2025,
shall be taken as the opening normative long term loan outstanding for the
financial year 2025-26.
(3) The repayment of long-term loans for each year shall be deemed to be
equal to the depreciation allowed for that year.
(4) Notwithstanding any moratorium period availed, the repayment of loan
shall be considered from the first year of commercial operation of the asset.
(5) The rate of interest for ensuing year shall be the weighted average rate of
interest computed on the basis of the actual long- term loan portfolio of
previous year:
Provided that if there is no actual long- term loan for a particular year but
the normative loan is still outstanding, then the rate of interest for the
purpose of allowing the interest on the normative long- term loan shall be
the weighted average of SBI MCLR (1 year) prevailing during the previous
year plus 100 basis points.
(6) At the time of Truing-Up, the weighted average rate of interest of the actual
long- term loan portfolio during the concerned year shall be considered as
the rate of interest:
UPERC (MYT for Transmission) Regulations, 2025
37
Provided that if there is no actual long-term loan for a particular year but
the normative loan is still outstanding, then the rate of interest for the
purpose of allowing the interest on the normative long-term loan shall be
the weighted average of SBI MCLR (1 year) prevailing during the concerned
year plus 100 basis points.
(7) The interest on long- term loan shall be computed on the normative
average long- term loan of the year by applying the weighted average rate
of interest:
Provided that at the time of Truing-Up, the normative average loan of the
concerned year shall be considered on the basis of the actual asset
capitalisation approved by the Commission for the year.
18. Banking and Finance Charges
The Banking & Finance charges shall be allowed as per actuals in Truing-
Up, subject to prudence check by the Commission:
Provided that the Banking and Finance charges shall be allowed in ARR as
per the approval given by the Commission for the latest True-Up year.
19. Interest During Construction (IDC)/Incidental Expenditure
During Construction (IEDC)
(1) Interest during construction (IDC) shall be computed considering the actual
loan and normative loan after taking into account the prudent phasing of
funds up to actual COD:
Provided also that IDC on a normative loan corresponding to excess equity
over 30% of funds deployed shall be allowed only in cases where the actual
infusion of equity on a pari-passu basis is more than 30% of total funds
deployed and shall be computed on a quarterly basis:
Provided further that in case IDC on normative loan is to be allowed prior
to infusion of actual loan, rate of interest for computing such IDC shall be
equal to 1-year SBI MCLR as prevailing on 1st April of the respective year:
Provided further that IDC on normative loan, post infusion of actual loan
shall be computed based on weighted average rate of interest (WAROI) for
that respective quarter:
UPERC (MYT for Transmission) Regulations, 2025
38
Provided further that the IDC on normative loan shall be allowed only when
it can be demonstrated by the Licensee that the capital cost arrived after
IDC on normative loan is to the benefit of consumers.
(2) Incidental expenditure during construction (IEDC) shall be computed from
the zero date, taking into account pre-operative expenses up to actual
COD:
Provided that any revenue earned during the construction period up to
actual COD on account of interest on deposits or advances or any other
receipts shall be taken into account for reduction in incidental expenditure
during construction.
(3) In case of additional costs on account of IDC and IEDC due to delay in
achieving the COD, the Transmission Licensee shall be required to furnish
detailed justifications with supporting documents for such delay, including
prudent phasing of funds in the case of IDC and details of IEDC during the
period of delay and liquidated damages recovered or recoverable
corresponding to the delay.
(4) If the delay in achieving the COD is not attributable to the Transmission
Licensee, such additional IDC and IEDC may be allowed after prudence
check, and the liquidated damages, if any, recovered from the contractor
or supplier or agency shall be adjusted to the capital cost of the
transmission system.
(5) If the delay in achieving the COD is attributable either in entirety or in part
to the Transmission Licensee or its contractor or supplier or agency, in such
cases, IDC and IEDC due to such delay may be disallowed after prudence
check, either in entirety or on a pro-rata basis corresponding to the period
of delay not condoned vis-à-vis total implementation period, and the
liquidated damages, if any, recovered from the contractor or supplier or
agency shall be retained by the Transmission Licensee, in the proportion of
delay not condoned vis-à-vis total implementation period.
Provided that in cases where delay in achieving COD is beyond six months
from SCOD on account of delay in obtaining approval of any of the following
activities namely, i) forest clearance, ii) NHAI clearance, or iii) Railways
UPERC (MYT for Transmission) Regulations, 2025
39
permission, a time overrun maximum up to 95% shall be allowed after
prudence check.
(6) For the purpose of sub-clauses (4) and (5) of clause 19 of these
Regulations, IDC on actual loan and normative loan shall be considered in
accordance with the normative debt-equity ratio specified under sub-
clause (2) of clause 14 of these Regulations.
20. Hedging Cost of Foreign Exchange Rate Variation (FERV)
(1) The Transmission Licensee may hedge foreign exchange exposure in
respect of the interest on foreign currency loan and repayment of foreign
loan acquired, in part or in full, at the discretion of the Transmission
Licensee.
(2) The Transmission Licensee shall recover the cost of hedging and foreign
exchange rate variation on a year-to-year basis as income or expense in
the period in which it arises. However, the same shall be allowed subject
to prudence check by the Commission at the time of True-Up.
21. Interest on Working Capital
(1) The working capital requirement of the Transmission Licensee shall cover:
(a) Operation and Maintenance expenses for one month;
(b) Maintenance spares at 40% of the R&M expenses for two months; and
(c) One-and-a-half-month equivalent of the expected revenue from
transmission charges at the prevailing Tariff;
minus
(d) Amount held as security deposits, if any, from Transmission System
Users;
Provided that if the working capital, determined based on the above
formula, is positive, it shall be reduced by the amount of revenue surplus
(if any) as of 31st March of the previous year so approved by the
Commission:
Provided further that for the purpose of Truing- Up for any year, the
working capital requirement shall be re-computed on the basis of the values
UPERC (MYT for Transmission) Regulations, 2025
40
of components of working capital approved by the Commission in the
Truing- Up.
(2) Rate of interest on working capital for ensuing year shall be simple interest
and shall be equal to the SBI MCLR (1-year) as on date on which Petition
for determination of Tariff is filed plus 200 basis points:
Provided that for the purpose of Truing- Up for any year, simple interest on
working capital shall be allowed at a rate equal to the weighted average
SBI MCLR (1-year) prevailing during the concerned year plus 200 basis
points.
22. Tax on Return on Equity
(1) The rate of return on equity as allowed by the Commission under clause 16
of these Regulations shall be grossed up with the effective tax rate
(hereinafter referred to as ‘t’) of the respective financial year. The effective
tax rate shall be calculated at the beginning of every financial year based
on the estimated profit and tax to be paid estimated in line with the
provisions of the relevant Finance Act applicable for that financial year to
the concerned Transmission Licensee by excluding the income of other
business and the corresponding tax thereon:
Provided that tax on any income other than that through its Licensed
Business shall not be pass through and it shall be payable by the Licensee
itself:
Provided that in case a Transmission Licensee is paying Minimum Alternate
Tax (MAT) under Section 115JB of the Income Tax Act, 1961, the effective
tax rate shall be the MAT rate, including surcharge and cess:
Provided further that in case a Transmission Licensee has opted for Section
115BAA, the effective tax rate shall be the tax rate including surcharge and
cess as specified under Section 115BAA of the Income Tax Act, 1961.
(2) The rate of return on equity shall be rounded off to three decimal places
and shall be computed as per the formula given below.
Rate of pre-tax return on equity = Base rate / (1-t)
(3) The Transmission Licensee shall true up the effective tax rate for every
Financial Year based on the actual tax paid together with any additional tax
UPERC (MYT for Transmission) Regulations, 2025
41
demand, including interest thereon, duly adjusted for any refund of tax
including interest received from the income tax authorities pertaining to the
Tariff period covered under these Regulations on actual gross income of
any Financial Year. Further, any penalty arising on account of delay in
deposit or short deposit of tax amount shall not be considered while
computing the actual tax paid by the Transmission Licensee:
Provided that in case a Transmission Licensee is paying Minimum Alternate
Tax (MAT) under Section 115JB, the Transmission Licensee shall true up
the grossed up rate of return on equity at the end of every Financial Year
with the applicable MAT rate including surcharge and cess:
Provided that in case a Transmission Licensee is paying tax under Section
115BAA, the Transmission Licensee shall true up the grossed up rate of
return on equity at the end of every Financial Year with the tax rate
including surcharge and cess as specified under Section 115BAA:
Provided that any under-recovery or over recovery of grossed up rate on
return on equity after truing-up, shall be recovered or refunded, on a year
to year basis.
23. Non-Tariff Income
(1) The amount of Non-Tariff income relating to the Transmission Business as
approved by the Commission shall be deducted from the ARR in
determining the Annual Transmission Charges of the Transmission
Licensee:
Provided that the Transmission Licensee shall submit full details of its
forecast of Non-Tariff income to the Commission in such form as may be
stipulated by the Commission.
(2) The Non-Tariff Income shall include:
a) Income from rent of land or buildings;
b) Income from sale of scrap;
c) Income from investments;
Provided that income arising from investment of shareholder’s funds,
if any, shall not be included in Non-Tariff Income subject to prudence
check of requisite detailed information submitted by the Transmission
Licensee before the Commission.
UPERC (MYT for Transmission) Regulations, 2025
42
d) Interest income on advances to suppliers/contractors;
e) Interest income on loans / advances to employees;
f) Income from rental from staff quarters;
g) Income from rental from contractors;
h) Income from hire charges from contactors and others;
i) Income from Supervision Charge
j) Income from advertisements;
k) Income from sale of tender documents;
l) Excess found on physical verification;
m) Income from Insurance Claim;
n) Prior Period Income;
o) Miscellaneous receipts; and
p) Any other Non-Tariff Incomes:
(3) The Non-Tariff income under item (j) above (income from advertisements)
shall be shared between the Transmission Licensee and the consumers in
the ratio of 30% and 70% respectively:
Provided that the Transmission Licensee shall undertake asset monetisation
study within six months from the date of notification of these Regulations.
24. Income from Other Business
(1) Where the Transmission Licensee has engaged in any Other Business under
Section 41 of the Act for optimum utilisation of its assets, the income from
such business will be deducted from the ARR in calculating the revenue
requirement of the Transmission Licensee in the manner and in proportion
as may be stipulated by the Commission. The proportion of revenue from
Other Business that shall be utilized in the Transmission business shall be
as stipulated in UPERC (Treatment of Income of Other Business of
Transmission Licensees and Distribution Licensees) Regulations, 2004 or
any subsequent amendment thereof:
Provided that the Transmission Licensee shall follow a reasonable basis for
allocation of all joint and common costs between the Transmission Business
and the Other Business and shall submit the Allocation Statement, duly
certified by the Board of Directors, to the Commission along with its Petition
for determination of ARR:
UPERC (MYT for Transmission) Regulations, 2025
43
Provided further that where the sum total of the direct and indirect costs of
such Other Business exceeds the revenues from such Other Business,
income from such other business shall be taken as zero.
25. Rebate, Incentive, Penalties and Miscellaneous
(1) All rebates or incentives earned by the Transmission Licensee shall be
considered under its Non-Tariff Income, while all rebates or incentives
given by the Transmission Licensee, as approved by the Commission, shall
be allowed as an expense for the Transmission Licensee.
(2) The timeline and percentage rebate for payment of bills of transmission
charges and late payment surcharge shall be as per the Tariff Order issued
by the Commission from time to time.
(3) Penalties paid by the Transmission Licensee shall not be allowed as an
expense for the Transmission Licensee:
Provided that penalties / compensation levied on the Transmission Licensee
due to the reasons beyond its reasonable control, as corroborated by it with
appropriate justification and supporting documents to satisfy the
Commission, shall be allowed subject to prudence check.
(4) Carrying cost for the ARR gap of the Transmission Licensee will be provided
by the Commission after prudence check at the interest rates as provided
for working capital in these Regulations.
(5) The revenue surplus of the Transmission Licensee shall be first adjusted
towards working capital requirement for the year and balance revenue
surplus amount, if any, shall be eligible for carrying cost as per weighted
average of bank rate published by RBI net of applicable tax rate for the
relevant year:
Provided that the Transmission Licensee shall invest the revenue surplus
amount in risk-free securities such as RBI bonds, Government Securities or
fixed deposit receipts of scheduled banks only.
UPERC (MYT for Transmission) Regulations, 2025
44
CHAPTER 4
OPERATIONAL PRINCIPLES
26. Components of Tariff
(1) The Transmission Charges for access to and use of the Intra- State
Transmission System shall comprise any of the following components or a
combination of the following components:
(a) Transmission System access charges;
(b) Annual Transmission charges;
(c) Per unit charges for energy transmitted;
(d) Reactive energy charges:
Provided that the Reactive energy charges would be determined as per
Uttar Pradesh Electricity Regulatory Commission Grid Code 2007 as
amended from time to time or any Order issued by the Commission.
(2) Any person who is eligible to apply for access to the Intra- State
Transmission System shall be entitled to obtain such access in accordance
with the Regulations and Orders of the Commission governing Transmission
Open Access and shall be liable to pay the charges for obtaining such access
as stipulated in these Regulations and Orders.
(3) Where the access of the intending Transmission System User to the Intra-
State Transmission System entails works of transmission lines or other
transmission assets dedicated to such user, the Transmission Licensee shall
be entitled to recover, through transmission system access charges, all
expenses reasonably incurred on such works for providing access to such
intending Transmission System User.
(4) Where the access of the intending Transmission System User entails other
works, not covered under clause 26(3) of these Regulations relating to the
Intra-State Transmission System, the Transmission Licensee shall recover
the expenses relating to such works through annual transmission charges,
in accordance with clause 26(10) under these Regulations.
(5) Where any works for obtaining access have been carried out by the
intending Transmission System User, the Transmission Licensee shall be
entitled to recover supervision charges at the rate of 15% of the cost of
labour employed, cost of material, material handling and storage/inventory
UPERC (MYT for Transmission) Regulations, 2025
45
but excluding the establishment costs, for carrying out such works and shall
not be entitled to recover any other expenses with regard to such works:
Provided that such supervision charges shall form part of the Non-Tariff
Income of the respective Transmission Licensee and shall also be treated
as O&M expense incurred by the intending Transmission System users,
which shall be capitalised in the respective year of asset capitalisation.
(6) The works for providing access to the Intra-State Transmission System
shall be maintained by the Transmission Licensee for the duration of the
Bulk Power Transmission Agreement between the Transmission Licensee
and the Transmission System User.
(7) Where the Transmission System User has paid for the works carried out to
provide it access to the Intra-State Transmission System, the Transmission
System User shall be entitled to the depreciated value (as per Companies
Act 2013 and its amendments) of such works paid for by it upon termination
of the Bulk Power Transmission Agreement:
Provided that where the Transmission System User has carried out the
works to provide it access to the Intra-State Transmission System of the
Transmission Licensee, the Transmission System User may be entitled to
retain such works upon termination of the Bulk Power Transmission
Agreement.
(8) The Transmission System access charges may be recovered by any one of
the following methods, in accordance with the terms of the Bulk Power
Transmission Agreement:
(a) As a one-time payment by the Transmission System User at the time
of obtaining access; or
(b) As a series of payments over the duration of the Bulk Power
Transmission Agreement; or
(c) As any combination of (a) and (b) above.
(9) Any dispute between the Transmission Licensee and the intending
Transmission System User with regard to the works to be carried out to
give access to the intending Transmission System User or with regard to
the Transmission System access charges shall be referred to the
UPERC (MYT for Transmission) Regulations, 2025
46
Commission for adjudication or to such other forum as may be stipulated
by the Commission.
(10) The ARR of the Transmission Licensee, shall comprise the following
components:
(a) Operation and maintenance expenses;
(b) Depreciation;
(c) Interest on Loan Capital;
(d) Interest on Working Capital;
(e) Banking & Finance charges;
(f) Return on Equity;
(g) Tax on Return on Equity;
Minus:
(h) Non-Tariff Income;
(i) Income from other Business
Provided that Depreciation, Interest on Loan Capital, Interest on Working
Capital, Return on Equity, and Income Tax for Transmission Licensees shall
be allowed in accordance with the provisions stipulated in Chapter 3 of
these Regulations:
Provided further that the components of the ARR, corresponding to the
transmission lines owned by the Transmission Licensee but conveying
electricity to other States, being recovered in accordance with the
Regulations and Orders of the Central Electricity Regulatory Commission,
shall not be recovered from the Tariff determined under these Regulations:
Provided also that in case any such components have already been
recovered through the Intra-State Transmission Tariff, then such excess
recovery shall be deducted from the ARR of the Transmission Licensee for
the future years, along with associated carrying cost, as applicable:
Provided also that prior period income/expenses shall be allowed by the
Commission at the time of Truing- Up based on audited accounts, on a case
to case basis, if the income/expenses in that prior period have been allowed
on actual basis, subject to prudence check:
UPERC (MYT for Transmission) Regulations, 2025
47
Provided also that all penalties and compensation payable by the
Transmission Licensee to any party for failure to meet any Standards of
Performance or for damages, as a consequence of the Orders of the
Commission-or Competent Courts, Authorities etc., shall not be allowed to
be recovered through the ARR:
Provided also that the Transmission Licensee shall maintain separate details
of such penalties and compensation paid or payable by the Transmission
Licensee, if any, and shall submit them to the Commission along with its
Petition.
(11) The Annual Transmission Charges along with Intra State Transmission
Tariff shall be determined by the Commission on the basis of a Petition for
determination of Tariff as stipulated in these Regulations.
27. Capital Investment Plan
(1) The Transmission Licensee shall submit a detailed projected capital
expenditure schemes being part of STU Transmission Plan, financing plan
and physical targets for the ensuing year for strengthening and
augmentation of the Intra-State Transmission System of the Transmission
Licensee, meeting the requirement of load growth, improvement in quality
of supply, reliability, metering, reduction in congestion, etc., along with the
Tariff Petition before the Commission.
(2) The Capital Investment Plan shall be a least cost plan for undertaking
investments:
Provided that all capital expenditure projects of capital expenditure of value
exceeding ₹ Twenty Crore must have prior approval of the Commission and
shall be subject to prudence check:
Provided that the Capital Investment Schemes/Projects proposed by the
Transmission licensee shall be for Intra- State transmission network
including if any associated upstream/downstream works, and the Schemes/
Projects shall not be submitted in parts:
Provided further that any capital expenditure scheme/project based on the
specific requirement of a Distribution Licensee shall be substantiated with
necessary documentary evidence in the form of request for the same.
UPERC (MYT for Transmission) Regulations, 2025
48
(3) The Transmission Licensee is required to undertake approval of all
transmission schemes/projects with a capital expenditure of ₹ 20 Cr. and
above. The Transmission Licensee is required to submit all such schemes
qualifying the criteria through a separate petition on a quarterly basis for
the prior approval of the Commission.
(4) The Capital Expenditure Scheme(s)/Project(s) submitted for prior approval
of the Commission shall be accompanied by such information, particulars
and documents as may be required including but not limited to the
information such as number of bays, name, configuration and location of
grid substations, substation capacity (MVA), transmission line length
(circuit kilometres) showing the need for the proposed investments,
alternatives considered, cost/benefit analysis and other aspects that may
have a bearing on the transmission charges.
(5) The Transmission Licensee shall submit the list of capital expenditure
schemes/Projects after the asset is put to use along with actual capital
expenditure incurred, capitalisation and details of time overrun and cost
overrun on a quarterly basis:
Provided that the Transmission Licensee shall submit the details of the
scheme/project-wise asset capitalisation along with receipt of the Electrical
Inspector certificate and other documents as may be prescribed by the
Commission from time to time, at the end of each quarter.
(6) The Commission shall review actual capital expenditure incurred and
capitalisation vis-à-vis the approved capital expenditure and capitalisation
after the completion of scheme. The quarterly capitalization approved by
the Commission shall form the basis for truing-up at the end of each year.
(7) The Transmission Licensee shall submit, along with the Petition for
determination of ARR or along with the Petition for Annual Performance
Review, as the case may be, details showing the progress of capital
expenditure projects, together with such other information, particulars or
documents as the Commission may require to assess such progress.
UPERC (MYT for Transmission) Regulations, 2025
49
CHAPTER 5
NORMS OF OPERATION
28. Norms of Operation
(1) Target availability
(a) Normative Annual Transmission System Availability factor (NATSAF)
shall be as under:
i. AC System : 98.00%
ii. HVDC bi-pole links and back-to-back Stations: 95.00%
(2) Auxiliary Energy Consumption in the Sub-station:
(a) AC System
The charges for auxiliary energy consumption in the AC Sub-station for
the purpose of air-conditioning, lightning and consumption in other
equipment shall be borne by the Transmission Licensee and are included
in the normative operation and maintenance expenses.
(b) HVDC Sub-station
For auxiliary energy consumption in HVDC Sub-stations, the Central
Government / State Government may allocate an appropriate share from
one or more ISGS generating station. The charges for such power shall
be borne by the Transmission Licensee and are included in the normative
operation and maintenance expenses.
(3) The transmission charge payable for a calendar month for a
Transmission System shall be:
ARR x (NDM/NDY) x (TAFM/NATSAF)
Where,
ARR = Aggregate Revenue Requirement specified for the year;
NATSAF = Normative annual transmission availability factor, in per cent
stipulated in these Regulations;
NDM = Number of days in the month;
NDY = Number of days in the Year; and
TAFM = Transmission System Availability Factor for the month, in per
cent, computed in accordance with Annexure- C to these Regulations:
UPERC (MYT for Transmission) Regulations, 2025
50
Provided that the Transmission Licensee shall raise the bill for the
transmission charge for a month based on its estimate of TAFM.
Adjustments, if any, shall be made on the basis of the TAFM to be certified
by the SLDC within 30 days from the last day of the relevant month.
UPERC (MYT for Transmission) Regulations, 2025
51
CHAPTER 6
INTRA-STATE TRANSMISSION TARIFF AND SHARING OF TTSC
29. Determination of Intra-State Transmission Tariff
(1) The aggregate of the yearly revenue requirement for all Transmission
Licensees shall form the “Total Transmission System Cost" (TTSC) of the
Intra-State transmission system, to be recovered from the Transmission
System Users (TSUs) for the respective year of the Control Period, in
accordance with the following Formula:
TTSC = ∑ 𝑛 𝑖=1 ARRi + ∑ m j=1 ATSCj + Adjustment for ATSC
Where,
TTSC = Pooled Total Transmission System Cost of year of the Control
Period;
n = Number of Transmission Licensee(s) with projects under Section 62 of
the Act;
m = Number of Transmission Licensee(s) with projects under Section 63 of
the Act;
ARRi = Yearly revenue requirement approved by the Commission for ith
Transmission Licensee for the year of the Control Period as determined by
the Commission under Section 62 of the Act;
ATSCj = Annual Transmission Service Charges (ATSC) of TBCB Projects
adopted by the Commission under Section 63 of the Act;
Adjustment for ATSC (during True-Up) = (Actual ATSC paid by LTTC - ATSC
as adopted by the Commission) or nil whichever is lower.
(2) The Commission shall approve yearly ‘Base Transmission Capacity Rights’
as average of “Yearly average of daily max InSTS drawal” and “Yearly max
InSTS drawal” for Distribution Licensee(s) and Indian Railways as projected
for the respective year of the Control Period, representing the 'Capacity
Utilisation’ of Intra-State transmission system and accordingly determine
‘Intra State Transmission Tariff, in accordance with the following formula:
Base Transmission Capacity Rights
(Base TCR) for the respective year = ∑ n
𝑢=1 ([X + Y]/2)
Where,
UPERC (MYT for Transmission) Regulations, 2025
52
X = Yearly average of daily max InSTS drawal of respective year for each
Distribution Licensee orIndian Railways (u) as the case may be;
Y = Yearly max InSTS drawal of respective year for each Distribution
Licensee or Indian Railways (u) as the case may be;
Note: The X & Y shall reflect drawal of Distribution Licensee(s) (including
drawal of power from Distribution Licensee by part Open Access Consumer)
or Indian Railways, as the case may be, and same shall be exclusive of
drawal of power by Open Access consumers.
(3) The Annual Transmission Charge payable by Distribution Licensees and
Indian Railways shall be computed in accordance with the following
formula:
ATC(u) = TTSC X ([Base TCR(u)] / ∑ 𝑛 𝑢=1 [Base TCR(u)])
Where,
ATC(u) = Annual Transmission Charges to be shared by Distribution
Licensees and Indian Railways (u) for the year;
Provided that the Base Transmission Capacity Rights for Distribution
Licensees and Indian Railways for ensuing year shall be determined based
on the projections of ‘X’ and ‘Y’ after taking into account available data of
past years:
Provided further that projections of Base TCR for the ensuing year, shall be
submitted by the Distribution Licensees and Indian Railways to the STU
latest by last week of August of current year:
Provided that Open Access Customer other than the Distribution Licensee
and Indian Railways shall be billed at ₹/kWh as provided in clause 29(4) of
this Regulation:
Provided further that in case of a Distribution Licensee(s) and Indian
Railways whose monthly ‘X’ and ‘Y’ data is not available for prior 12 months
at the time of determination of Base TCR, the monthly ‘X’ and ‘Y’ data if
available for at least 4 months, or the quantum of Open Access applied by
the Distribution Licensee and Indian Railways for the available period, shall
be considered in lieu of the average monthly ‘X’ and ‘Y’ for calculating the
Base Transmission Capacity Rights:
UPERC (MYT for Transmission) Regulations, 2025
53
Provided further for True-up of respective year of the Control Period of
these Regulations, the Base Transmission Capacity Rights shall be
determined based on the actual data of ‘X’ and ‘Y’ of the Distribution
Licensees and Indian Railways as per the data received by Distribution
Licensee(s)/Indian Railways from SLDC. The said data, after deduction of
drawal of Open Access consumer(s), shall be forwarded by the Distribution
Licensee(s) and Indian Railways to the State Transmission Utility (STU).
(4) The Open Access Customers other than Distribution Licensees and Indian
Railways shall pay Intra State Transmission Tariff (in INR/kWh) in terms of
actual energy consumed which will reduce the TTSC of the Intra-State
transmission system:
Provided that the intra-State transmission tariff for Open Access Customers
other than the Distribution Licensee(s) and Indian Railways during a
particular year of Control Period shall not increase by more than 15% of
the applicable transmission tariff determined by the Commission for the
preceding year.
(5) Intra State Transmission Tariff for each Year shall be determined as ratio
of approved TTSC for Intra-State transmission system and approved ‘Base
Transmission Capacity Rights’ and shall be denominated in terms of
“INR/MW/Year” (for Distribution Licensees) or in terms of “INR/kWh” (for
Open Access Customers other than the Distribution Licensees and Indian
Railways) in accordance with the following formula:
Intra State Transmission Tariff for Distribution Licensees and
Indian Railways:
Intra State Transmission Tariff for Distribution Licensees and Indian
Railways in INR/MW/Year = TTSC / Base TCR
Intra State Transmission Tariff for Open Access Customers other
than Distribution Licensees and Indian Railways:
Intra State Transmission Tariff for Open Access Customers other than
Distribution Licensee and Indian Railways in INR/kWh
= TTSC / E (Total Energy input at State Periphery for the year)
Where,
TTSC = Pooled cost (in INR per Year) for InSTS for year of the Control
Period;
UPERC (MYT for Transmission) Regulations, 2025
54
Provided that the energy units transmitted within the State shall be based
on the energy input requirement at State Periphery, as projected by each
Distribution Licensee as part of its MYT Petition and as approved by the
Commission for the ensuing year. Whereas for True- Up period, the energy
units transmitted within the State shall be based on the actual energy
handled at State Periphery:
(6) The State Transmission Utility shall file the Petition for determination of
Intra-State Transmission Tariff along with True-Up and APR on the basis of
Base Transmission Capacity Rights of Distribution Licensees and Indian
Railways and the summation of the TTSC projected or actual as the case
may be, by the Transmission Licensees/LTTCs in accordance with these
Regulations.
(7) The Distribution Licensees and Indian Railways shall make monthly
payment of Intra State Transmission Tariff as per Base Transmission
Capacity Rights approved by the Commission from time to time.
(8) The charges for Intra State Transmission usage of excess/shortfall drawal
of power shall be treated during true-up in the following manner:
(a) In case of excess drawal of power from the Base Transmission
Capacity Rights approved by the Commission, the charges for excess
power drawal shall be payable by Distribution Licensees and Indian
Railways along with carrying cost at 1-year SBI MCLR, which shall be
adjusted in Total Transmission System Cost of the year:
Provided that in case of drawal of power lower than the Base TCR, the
transmission charges corresponding the projected Base TCR as
approved by the Commission shall be considered.
(9) In case of any variation in projected & Trued-Up TTSC, such
excess/shortfall shall be adjusted in the TTSC of subsequent year along
with carrying cost at weighted average bank rate for the respective year.
UPERC (MYT for Transmission) Regulations, 2025
55
CHAPTER 7
RECOVERY OF INTRA-STATE TRANSMISSION CHARGES
30. Billing and Payment of the InSTS Charges
(1) The STU shall be responsible for monthly billing and collection of Intra State
Transmission Charges from the Transmission System Users as per the Tariff
Order issued by the Commission from time to time.
(2) The amount so collected by the STU on account Intra State Transmission
Charges shall be kept in a separate account maintained and operated by
the STU.
(3) The amount collected on account of Intra State Transmission Charges by
the STU shall be exclusively allocated for the disbursement or adjustment
of the Total Transmission System Cost (TTSC) and any remaining amount
shall be considered by the Commission during the True-Up.
(4) The Monthly transmission charges of TBCB projects implemented under
Section 63 of the Act, shall be adjusted/ credited by the STU to Distribution
Licensee after taking into account the monthly invoice issued by TBCB
Transmission Licensee to LTTCs and corresponding payment made by
LTTCs within five working days from the date of furnishing such information
by LTTCs.
(5) The Monthly transmission charges/cost of TBCB projects under Section 63
of the Act, shall be settled by LTTCs as per the terms and conditions of
Transmission Se