THE UTTAR PRADESH LIFTS AND ESCALATORS RULES, 2024
Rules made under THE UTTAR PRADESH LIFTS AND ESCALATORS ACT, 2024
- Made under: THE UTTAR PRADESH LIFTS AND ESCALATORS ACT, 2024
This text is shown as one document.
Full text
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Uttar Pradesh Shasan
Urja Anubhag-3
In pursuance of the provisions of clause (3) of Article 348 of the
Constitution of India, the Governor is pleased to order the publication the
following English translation of Notification no. 10/2024/590/24-P-3-2024 dated 18
July, 2024 :
Notification
No. 10/2024/590/24-P-3-2024-113 Vivdh/2018
Lucknow ; Dated: 18 July, 2024
In exercise of the powers under section 19 of the Uttar Pradesh Lifts and
Escalators Act, 2024, the Governor is pleased to make the following rules with a
view to provide for the registration and regulation of the construction, installation,
maintenance and safe working of lifts and escalators and all machinery and
apparatus pertaining thereto in the State of Uttar Pradesh and for matters
connected therewith and incidental thereto:
THE UTTAR PRADESH LIFTS AND ESCALATORS RULES, 2024
Short title and
commencement
1(1) These rules may be called the Uttar Pradesh Lifts and
Escalators Rules, 2024.
(2) They shall come into the force at once.
Definitions 2(1) In these rules , unless the context otherwise requires,—
(a) " Act " means the Uttar Pradesh Lifts and Escalators Act,
2024;
(b) " Annexure " means an Annexure appended to these rules;
(c) " OEM " means the Original Equipment Manufacturer ;
(d) " Inspector " means Electrical Inspector nominated by the
Government of Uttar Pradesh.
(2) Words and expressions used herein but not defined shall
have the same meaning as respectively assigned to them in
the Act.
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Registration by
owner to erect
lift or escalator
3 (1) Every owner of a place intending to install a lift or an
escalator in any premise shall make an application in the
form as mentioned in Annexure-1 to these rules giving full
details or information as specified .
(2) This application shall be submitted to the local Assistant
Director, Electrical Safety having jurisdiction.
Intimation on
completion of
commissioning
and before use
of lift or
escalator
4 (1) The owner, who has registered to install a lift or escalator
under section 3 of the Act, shall submit the report of
completion of commissioning, before use of lift or escalator,
in a form as mentioned in Annexure-2 to these rules.
(2) This completion of commissioning intimation report will be
accompanied by an installation completion report from the
installation agency as given in section 11 of the Act. The
installation agency shall give an undertaking that all safety
features as enumerated in the Act and rules have been built
in the lift or escalator.
(3) The owner or his authorized agent shall submit an affidavit
to the effect that he shall comply with all provisions of the
Act and rules during day-to-day operation of lift or escalator
and cooperate with the authorities as and when required.
(4) A fee of Rs 5,000 for each lift or escalator shall be deposited
along with the completion of commissioning intimation
report.
(5) This report shall be submitted to the local Assistant Director,
Electrical Safety having jurisdiction.
Disabled
friendly lifts
5. There shall compulsorily be at least one lift in any public
premise which shall be disabled friendly and it shall be compliant
of all codes and directives in this regard.
Maintenance of
lift or escalator
in public
premises
6(1) The owner shall compulsorily take comprehensive AMC
from the OEM or his authorized service provider. He shall
submit every year a copy of the AMC for his lift or escalator
or any other arrangement made for the maintenance of lifts
and escalators commissioned in public premise to the local
Assistant Director, Electrical Safety having jurisdiction on a
prescribed form as mentioned in Annexure-3 to these rules.
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
(2) A logbook of periodic maintenance shall be maintained on
a prescribed form as mentioned in Annexure-4 to these rules
and it shall be displayed near lift or escalator installed in
public premise and the same shall be produced when asked
by the local Assistant Director, Electrical Safety having
jurisdiction or any other Electrical Inspector having
jurisdiction or local District Magistrate or local Sub -
Divisional Magistrate or any Executive Magistrate
authorized by local District Magistrate.
(3) The owner shall appoint operators to operate the lift or
escalator in public premises mandatorily. The name and
mobile number of the operators on duty shall be displayed
prominently. These operators shall be duly trained to
operate the lift or escalator or attend to any emergencies
including entrapment. In case any operator is changed, the
new person shall be trained before he joins his duty as
operator.
(4) There shall be at least one operator at any point of time
during operation for all the lifts installed in proximity as a
cluster, and, there shall be at least one operator for all the
escalators in a public premise.
(5) The owner may reduce the number of operators during night
hours (from 10 pm to 6 am next day) depending on the
operational load of the lifts or escalators.
(6) The operator shall reduce in writing in Part-C of the logbook
as in Annexure-4 to these rules, any issues or any other
problems he faced in operation during his duty hours. The
owner shall get them attended to and resolved without any
delay.
Registration of
manufacturer,
commissioning
and installing
agencies
7(1) All manufacturers, commissioning and installing agencies
shall get them registered with Director, Electrical Safety.
(2) The manufacturers shall apply on a prescribed form as
mentioned in Annexure-5 to these rules. They shall apply
along with a fee of Rs 25,000. This registration will be valid
for a period of five years and shall be renewed thereafter.
Similar fee shall be paid for each renewal.
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
(3) The desired qualifications for manufacturers shall be as
follows:
a. the manufacturer shall be responsible for supply,
installation, testing and commissioning (SITC);
b. the manufacturer must have adequate number of
competent, qualified and trained technical team for
supply, installation, testing and commissioning
(SITC);
c. the manufacturer must sell the equipment in his own
brand name ;
d. the manufacturer must have indicated a suggestive
useful life of operation of the equipment he has
supplied, installed and commissioned and it shall not
be less than 20 years;
e. a comprehensive AMC must be compulsorily
provided by OEM to the owner, either itself or
through its authorized service provider, till the useful
life of the lift or escalator and there must be
uninterrupted supply of spare parts during the useful
life of the lift or escalator;
f. the purchaser/consumer must be given suggestions in
writing by manufacturer as to what to do when the
equipment has lived its life as indicated by
manufacturer;
g. there must be a site visit by the manufacturer on
expiry of the time period of suggestive life or 15 years
of commissioning, whichever is earlier and a report
of suggestions must be given in writing to the
purchaser/ consumer so as to ensure safe travel in the
lift or escalator;
h. the details of “Dos and Don’ts” and emergency
contact numbers or any toll-free number within the
equipment must be placed by Commissioning Team
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
of manufacturer so that it is within the reach of the
user or any operator;
i. the owner and his operating staff must be trained by
the Commissioning Team of manufacturer about the
rescue operations during emergency.
Registration of
agency involved
in AMC
8(1) All agencies involved for AMC shall get them registered
with Director, Electrical Safety.
(2) The agencies involved for AMC shall apply on a prescribed
form as mentioned in Annexure-6 to these rules . They shall
apply along with a fee of Rs 25,000. This registration shall
be valid for a period of one year from the date of registration.
Similar fee shall be paid for each renewal.
(3) The desired qualifications for agencies involved for AMC
will be as below:
a. Save as otherwise provided in the Act, the relevant
code of practice with respect to building in which the
lift or escalator has been installed, the lift and
escalator itself, any other electrical or mechanical
apparatus and installations and any other code of
relevance, shall be adhered to by the agency
undertaking AMC ;
b. it shall offer Comprehensive/Semi-Comprehensive /
Non-Comprehensive AMC and it shall brief the
consumer about the kind of services included in these
plans ;
c. there must be maintained an adequate number of
competent, qualified and trained technical manpower
for AMC. It shall include ITI trained Technician in
fitter or electrical trades, Diploma Holders and
Engineers in Electrical or Mechanical or Electronics
Engineering or Technology, Team Leaders, Group
Leaders etc. The training period of the fresh recruits
shall be of minimum six months ;
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
d. there shall be enough number of technical teams
depending upon the area and number of consumers
being catered to such that it shall offer minimum
response time to attend to any complaint ;
e. the response time within 50 km radius of the service
station shall not be beyond 4 hours and it shall not be
more than 12 hours for the cases between 50 to 100
km radius and 24 hours for the cases beyond 100 kms.
In case of any emergency, the team must reach the site
of emergency as soon as possible, leaving routine
work behind ;
f. AMC must have maintained adequate inventory to
ensure to rectify minor repairs within 48 hours and
major repairs within 15 days;
g. agency must ensure at least one preventive visit to the
site of the machine within a month. It may be more if
need arises. The senior most member of the team
visiting the site shall record his findings
/observation/suggestions, if any in the logbook kept
at the site.
h. the team visiting site shall ensure that all the rescue
devices are intact and in working conditions and if it
is found that they are not working, it shall be ensured
that they have become functional within minimum
time; and if the owner does not cooperate in such
cases, the matter shall be reported to the local District
Magistrate and local Assistant Director, Electrical
Safety having jurisdiction without any delay ;
i. Whenever there is any upgradation in technology as
far as security features are concerned, the owner shall
be advised in writing about the same by the agency
responsible for AMC.
Accident
Logbook
9. A separate logbook of accidental history as mentioned
in Annexure-7 to these rules shall be maintained and
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
displayed near lift or escalator installed in Public Premise
and the same shall be produced when asked by the local
Assistant Director, Electrical Safety having jurisdiction or
any other Electrical Inspector having jurisdiction or local
District Magistrate or local Sub Divisional Magistrate or any
Executive Magistrate authorized by local District
Magistrate.
Late Fees 10. A late fee, in the following manner, shall be charged to the
owner in case he violates any timeline specified under the Act or
rules made thereunder:-
(a) if the delay is of 07 days or less, a late fee of Rs 100 per
day shall be charged;
(b) if the delay is of more than 07 days and upto15 days, a late
fee of Rs 200 per day shall be charged for the entire period;
(c) if the delay is of more than 15 days and upto 30 days, a late
fee of Rs 500 per day shall be charged for the entire period;
(d) if the delay is of more than 30 days the operation of lift or
escalator shall be stopped immediately and it can be
restarted only after the compliance of the provision along
with a late fee of Rs 10,000.
By order,
(Narendra Bhooshan)
Principal Secretary .
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Annexure-1
(see rule 3)
Application to install new lift or escalator/for making additions or alternations to the
installed lift or escalator
(To be submitted to the local Assistant Director, Electrical Safety)
1 Details of the owner
(a) Name
(b) Local address
(c) Permanent address
(d) Mobile number
(e) Mail-id
2 Details of the authorized agent of
the owner
(a) Name
(b) Local address
(c) Permanent address
(d) Mobile number
(e) Mail-id
3 Whether it is registration of a new
lift or escalator
4 The address of the premise where
lift or escalator is to be
commissioned
5 Whether it is a ‘Private Premise’ or
‘Public Premise’
7
Whether it is a case of the lift or
escalator being modified or altered
(a) registration number of existing
lift or escalator
(b) the address of the premise
where it is commissioned
8 In case the lift or escalator is being
shifted
(a) registration number of existing
lift or escalator
(b) the address of the premise
where it was commissioned
earlier
(c) the address of the new premise
where it is to be commissioned
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
9 Whether building map has been
approved by competent authority
10 If yes, name of approving authority,
approval number and date
11 Type and make of lift or escalator
12
Details of the manufacturer of the
lift or escalator
(a) name
(b) address
(c) registration number of the
manufacturer
(d) Name, contact details, and
address of local authorized
representative of the
manufacturer
13 Details of the commissioning/
modifying/altering/shifting agency
(a) name
(b) address
(c) registration number of the
commissioning/modifying/
altering/shifting agency
(d) Name, contact details, and
address of local authorized
representative of the
commissioning/modifying/
altering/shifting agency
14 Proposed date of commencement of
commissioning
15 Proposed date of completion of the
commissioning
16 Details of annexures
(a) Approved building plan
(b) Drawing details of the lift or
escalator
(c) Affidavit of the manufacturer
that the lift or escalator is BIS
compliant and is as per norms
of National and/or State
Building Codes
(d) Technical details of the lift or
escalator as provided by the
manufacturer
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
(e) Safety features of the lift or
escalator as provided by the
manufacturer
(f) Separate declarations on
notarized affidavit by the three
undersignees that the
information provided with
respect to them as above is true
to their knowledge and nothing
has been concealed.
Signature of the
authorized representative
of manufacturer with date
Signature of the authorized
representative of
commissioning/modifying/
altering/shifting agency with date
Signature of the
owner/his authorized
agent with date
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Annexure-2
{see rule 4(1)}
Completion of commissioning intimation report to install lift or for making
additions or alternations to the installed lift or escalator
(To be submitted to the local Assistant Director, Electrical Safety)
1 Registration Number
2 The actual date of commissioning of the lift
or escalator
3 Details of annexures
(a) A self-declaration on notarized
affidavit to the effect that
i. the lift or escalator
commissioned is of the same
make and manufacturer as
declared at the time of
registration,
ii. the place of commissioning of
the lift or escalator is same as
declared at the time of
registration,
iii. the commissioning agency is
same as declared at the time
of registration.
(b) In case there is any change in the
make and manufacturer of the lift or
escalator and/or place of
commissioning and/or
commissioning agency, the owner
shall update the details as declared in
the format as in Annexure-1
(c) A self-declaration on notarized
affidavit to the effect that he shall
comply with all provisions of the Act and
Rules during day-to-day operation of lift or
escalator and cooperate with the authorities
as and when required.
(d) Affidavit of the manufacturer on
notarized affidavit that the lift or
escalator commissioned is BIS
compliant and also compliant of the
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
provisions of the UP Lift and
Escalators Act, 2024 especially all the
safety features as enumerated in the
Act and Rules.
(e) Affidavit of the commissioning
agency on notarized affidavit that the
lift or escalator has been
commissioned properly as per
manufacturer guidelines and in
compliance of prevailing National
and/or State Building Codes and that
all safety features as enumerated in the Act
and Rules have been built in the lift or
escalator.
(f) Details of Fee Payment as desired in
the Rules.
(g) Separate declarations on notarized
affidavit by the three undersignees
that the information provided with
respect to them as above is true to
their knowledge and nothing has been
concealed.
4 Suggestive useful life of the operation of
the lift or escalator
5 Whether the owner/operator of the lift or
escalator has been duly trained by the
manufacturer/Commissioning/modifying/
altering/shifting agency to operate the
machine especially its rescue systems
Signature of the
authorized representative
of manufacturer with date
Signature of the authorized
representative of commissioning
/modifying/altering/shifting agency
with date
Signature of the
owner/his authorized
agent with date
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Annexure-3
{see rule 6(1)}
AMC details for the lift or escalator installed in public premises
(To be submitted to the local Assistant Director, Electrical Safety)
1 Registration Number
2 The date of commissioning of the lift or
escalator
3 The date on which the lift or escalator came
into operation
4 If it is a new lift or escalator, the date till which
free maintenance service by manufacturer or
commissioning/modifying/ altering/shifting
agency will be available
5 Name, address and registration number of the
agency responsible for AMC
6 Whether agency responsible for AMC is an
authorized vendor of OEM
7 Date of commencement of the AMC
8 Date on which AMC expires
9 Type of AMC
(a) Comprehensive
(b) Semi Comprehensive
(c) Non Comprehensive
10 A copy of the AMC shall be shared
11 Separate declarations on notarized affidavit by
the two undersignees that the information
provided with respect to them as above is true
to their knowledge and nothing has been
concealed.
Signature of the authorized
agent of the agency responsible
for AMC with date
Signature of the owner/his
authorized agent with date
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Annexure-4
{see rule 6(2) & 6(6)}
Logbook details for maintenance of the lift or escalator installed in public premises
(To be kept near the lift or escalator installed)
Part-A To be printed on page-1 of the logbook
1 Registration Number
2 The date of commissioning of the lift or
escalator
3 The date on which the lift or escalator came
into operation
4 If it is a new lift or escalator, the date till which
free maintenance service by manufacturer or
commissioning/modifying/ altering/shifting
agency will be available
5 Name, address and registration number of the
agency responsible for AMC
6 Whether agency responsible for AMC is an
authorized vendor of OEM
7 Date of commencement of the AMC
8 Date on which AMC expires
9 Type of AMC
(a) Comprehensive
(b) Semi Comprehensive
(c) Non Comprehensive
Part-B To be printed on subsequent pages
Sl
No
Date and
Time of
visit of
AMC
Team
Name of
the Team
Leader
Works
attended by
AMC Team
Any suggestion for
the owner for
corrective measure
for smooth
operation of lift or
escalator
Date on
which the
suggestion
has been
complied
with
The date
when
next visit
of AMC
Team is
due
Signature
of the
Team
Leader of
AMC
Team
Part-C To be printed on separate set of subsequent pages
Sl
No
Name of the
operator
Problems faced by
him in operation
during his duty
hours
Date and Time
of the entry of
the operator
Whether the
problem has been
attended to or
resolved? If yes,
date and time?
Signature of the
Team Leader of
AMC Team
Annexure-5
{see rule 7(2)}
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Application Form for Registration of Manufacture of lift or escalator
(To be submitted to the Director, Electrical Safety, UP)
1 Details of the Manufacturer (OEM)
(a) Name
(b) Legal Status (whether company or
partnership firm or anything else) and
its incorporation details like
registration number with the
competent authority and date thereof
(c) Registered office address
(d) Address of Production Centers in
India
(e) Name and designation of the contact
person
(f) Mobile Number of the contact person
(g) Mail-id of the contact person
(h) GST Number
(i) PAN
(j) Product Range (Please provide the
detailed catalogue)
2 Details of all the local vendors of the OEM
in Uttar Pradesh
(a) Name
(b) Legal Status (whether company or
partnership firm or anything else) and
its incorporation details like
registration number with the
competent authority and date thereof
(c) Registered office address
(d) Local Office Address
(e) Name and designation of the contact
person
(f) Mobile Number of the contact person
(g) Mail-id of the contact person
(h) GST Number
(i) PAN
3 Details of the authorized person making
this application on behalf of the OEM
(a) Name
(b) Address
(c) Name and designation
(d) Mobile Number
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
(e) Mail-id
4 (a) Whether it is first time registration
(b) If yes, the details of fee payment
5 (a) Whether it is renewal of registration
(b) The Registration Number
(c) The date till which the last
registration is valid for
(d) Whether the renewal has been applied
before the previous registration
expires
(e) The details of fee payment
6 A Declaration on notarized affidavit by the
undersignee that the information provided
as above is true to his knowledge and
nothing has been concealed.
Signature of the authorized
person of the OEM with date
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Annexure-6
{see rule 8(2)}
Application Form for Registration of Agencies responsible for AMC of lift or
escalator
(To be submitted to the Director, Electrical Safety, UP)
1 Details of the Agency responsible for
AMC
(a) Name
(b) Legal Status (whether company
or partnership firm or anything
else) and its incorporation details
like registration number with the
competent authority and date
thereof
(c) Registered office address
Nearest operational address
(d) Name and designation of the
contact person
(e) Alternate name and designation
of contact person
(f) Mobile Number of the contact
person
(g) Mobile Number of the alternate
contact person
(h) Toll-free number if any
(i) Mail-id
(j) GST Number
(k) PAN
2 Details of the authorized person
making this application on behalf of the
Agency responsible for AMC
(a) Name
(b) Address
(c) Name and designation
(d) Mobile Number
(e) Mail-id
4 (a) Whether it is first time
registration
(b) If yes, the details of fee payment
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
5 (a) Whether it is renewal of
registration
(b) The Registration Number
(c) The date till which the last
registration is valid for
(d) Whether the renewal has been
applied before the previous
registration expires
(e) The details of fee payment
6 A Declaration on notarized affidavit by
the undersignee that the information
provided as above is true to his
knowledge and nothing has been
concealed.
Signature of the authorized person
of the Agency responsible for
AMC with date
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।
Annexure-7
(see rule 9)
Logbook details for accidents of the lift or escalator installed in public premises
(To be kept near the lift or escalator installed)
A. To be printed on page-1 of the logbook
1 Registration Number
2 The date of commissioning of the lift or
escalator
3 The date on which the lift or escalator came
into operation
4 If it is a new lift or escalator, the date till which
free maintenance service by manufacturer or
commissioning/modifying/ altering/shifting
agency will be available
5 Name, address and registration number of the
agency responsible for AMC
6 Whether agency responsible for AMC is an
authorized vendor of OEM
7 Date of commencement of the AMC
8 Date on which AMC expires
9 Type of AMC
(a) Comprehensive
(b) Semi-Comprehensive
(c) Non-Comprehensive
B. To be printed on subsequent pages
Sl N
o
Date an
d Time
of accid
ent
Details
of the a
ccident
Details
of loss
of or in
jury to
human
or anim
al life
Whether co
mpetent aut
hority as un
der section-
12(1) has be
en informed
by the owne
r or any othe
r person dul
y authorized
by the owne
r. If yes, wh
om and whe
n ?
Date and ti
me on whi
ch some st
ate authori
ty visited t
he acciden
t site first.
Name and
designatio
n of the vi
siting auth
ority?
The date of
the order of
the District
Magistrate
after the in
quiry of the
accident an
d details of
the order as
regards co
mpensation
Whether due
compensatio
n has been di
sbursed by t
he owner
Signature
of the own
er or any
other pers
on duly au
thorized b
y the own
er.
1- यह शासनादेश इलÈेĚािनकली जारȣ Ǒकया गया है, अत: इस पर हè ता¢र कȧ आवæ यकता नहȣ है ।
2- इस शासनादेश कȧ Ĥमाǔणकता वेब साइट http://shasanadesh.up.gov.in स ेस× याǒपत कȧ जा सकती है ।