1 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
Uttar Pradesh Electricity Regulatory Commission
(Terms and Conditions of Generation tariff) Regulation, 2024
No.-UPERC/SECY/Generation Regulations/2025-010, dated: 09.04.2025
In exercise of powers conferred under Section 181 read with Section 61 of the Electricity Act,
2003, and all other powers enabling in this behalf, the Uttar Pradesh Electricity Regulatory Commission
hereby makes the following Regulation, namely:
CHAPTER-1
GENERAL
1. Short title, scope and extent of application and commencement:
(1) These Regulations may be called the Uttar Pradesh Electricity Regulatory Commission
(Terms and Conditions of Generation tariff) Regulation, 2024.
(2) These Regulations shall be applicable for the period from 01.04.2024 to 31.03.2029.
(3) Words and expressions used in these Regulations and not defined herein but defined in the
Act shall have the meaning assigned to them under the Act.
(4) In case of dispute in interpretation between English and Hindi version of these Regulations,
the English version shall prevail.
(5) The Regulation namely “Uttar Pradesh Electricity Regulatory Commission (Terms and
Conditions for determination of Generation tariff) Regulation, 2019” notified on 11/09/2019 and read
with all amendments thereto, as applicable to the subject matter of these Regulations are hereby repealed
from the date of applicability of these regulations.
(6) These Regulations shall apply in all cases where tariff for a generating station or a Unit
thereof is required to be determined by the Commission under Section 62 of the Act read with Section 86
thereof.
(7) These Regulations shall not apply for determination of tariff in case of the following:-
a. generating station whose tariff has been discovered through tariff based Competitive
Bidding in accordance with the Guidelines issued by the Central Government and adopted by the
Commission under Section 63 of the Act;
b. generating station based on Renewable Sources of Energy whose tariff is determined in
accordance with the UPERC (Captive and Renewable Energy Generating Plants) Regulation,
2019 as amended from time to time or any subsequent enactment thereof.
(8) The generating company may adopt Clean Development Mechanism, for generating
stations approved and commissioned on or after 1.4.2024, and the proceeds of carbon credit from
approved CDM project shall be shared in the following manner, namely:-
a. 100% of the gross proceeds on account of CDM to be retained by the Project Developer
in the first year after the date of commercial operation of the generating station;
b. In the second year, the share of the Beneficiaries shall be 10% which shall be
progressively increased by 10% every year till it reaches 50%, where after the proceeds shall be
shared in equal proportion, by the generating company and the Beneficiaries.
(9) In case of any conflict between provisions of these Regulations and a Power Purchase
Agreement signed between a generating company and Distribution Licensee(s)/Beneficiary(ies), the
provisions of these Regulations shall prevail.
(10) Availability Based tariff (ABT) in respect of projects whose tariff is determined by the
Commission shall be implemented as per Regulation 39 of these Regulations.
(11) Yearly energy audits for each generating Unit defined for a generating station shall be
compulsory under Section 61(c) of the Act read with Schedule of the Energy Conservation Act 2001, the
National Electricity Policy 2005, and Energy Policy 2009, of Go UP, as amended from time to time. The
Energy Audit result shall be declared in the manner provided under the Energy Conservation (form and
manner and time for furnishing information with regard to energy consumed and action taken on
recommendations of accredited energy auditor) Rules, 2008 as amended from time to time.
2 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(12) The generating company shall submit timely Report to the Commission under Section 10(3)
(a) of the Act in the format given in Appendix - I to these Regulations.
(13) The generating station, under Section 10(3)(b) of the Act, shall co-ordinate with the State
Transmission Utility for Transmission of electricity generated by it according to the provisions made in
the Grid Code.
(14) The generating station/company shall abide by the Provisions of the Act, Rules, Codes,
Regulation, Orders and Directions of the appropriate Authority/Commission issued from time to time
regarding Generation and Evacuation of electricity.
2. Definitions:
Unless the context otherwise requires, for the purpose of this Chapter,–
(i) ‘Act’ means the Electricity Act, 2003 as amended from time to time alongwith
UP Electricity Reforms Act, 1999, so far as it is not inconsistent with the Electricity Act, 2003;
(ii) ‘Additional Capitalization’ means the Capital Expenditure incurred, or projected to
be incurred after the date of commercial operation of the Project and admitted by the
Commission after prudence check, in accordance with provisions of these Regulations;
(iii) 'Admitted capital cost' means the capital cost which has been allowed by the
Commission for servicing through tariff after due prudence check in accordance with the
relevant tariff Regulations;
(iv) ‘Auditor’ means an Auditor appointed by a generating company in accordance with
the provisions of Sections 224, 233B and 619 of the Companies Act, 1956 (1 of 1956)], as
amended from time to time or Chapter X of the Companies Act, 2013 (18 of 2013) or any other
Law for the time being in force;
(v) ‘Authority’ means Central Electricity Authority referred to in Section 70 of the Act;
(vi) ‘Auxiliary Energy Consumption’ or ‘AUX’ in relation to a period in case of a
generating station means the quantum of energy consumed by auxiliary equipment of the
generating station, such as the equipment being used for the purpose of operating station and
machinery including Sewage Treatment Plant, Tertiary Treatment Plant, Coal Handling Plant and
Switchyard of the generating station and the Transformer Losses within the generating station,
expressed as a percentage of the sum of gross energy generated at the generator terminals of all
the Units of the generating station:
Provided that Auxiliary Energy Consumption shall not include energy consumed for supply of
power to housing colony and other facilities at the generating station and the power consumed for
construction works at the generating station;
Provided further that auxiliary energy consumption for compliance with revised emission
standards shall be considered separately.
(vii) Auxiliary Energy Consumption for emission control system (AUXe) in relation to
a period in the case of coal or lignite based thermal generating station means the quantum of
energy consumed by auxiliary equipment of the emission control system of the coal or lignite
based thermal generating station in addition to the auxiliary energy consumption under Clause
(6) of this Regulation;
(viii) ‘Availability’ in relation to a thermal generating station for any period means the
average of the daily average Declared Capacities (DCs) for all the days during that period
expressed as a percentage of the Contracted Capacity (CC) of the generating station minus
normative Auxiliary Consumption in MW and auxiliary energy consumption for emission
control system as per these Regulations and shall be computed in accordance with the following
formula:
N
Availability (%) = 10000 x DCi / {N x CC x (100-AUXn-AUXen}%
i=1
Where,–
CC = Contracted Capacity in the generating station,
DCi = Average Declared Capacity for the ith day of the period(inMW),
N = Number of days during the period, and
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 3
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
AUXn= Normative Auxiliary Energy Consumption as a percentage of gross generation.
AUXen = Normative Auxiliary Energy Consumption for emission control system as a
percentage of gross generation
(ix) ‘Bank Rate’ means one-year Marginal Cost of funds-based Lending Rate (MCLR) of
the State Bank of India issued from time to time, or any replacement thereof for the time being in
effect, plus 350 basis points;
(x) ‘Beneficiary’ in relation to a generating station covered under Clauses (a) and (b) of
Sub- Section 1 of Section 86 of the Act, means a Distribution Licensee who is purchasing
electricity generated at such generating station through a Power Purchase Agreement either
directly or through a Trading Licensee on payment of fixed charges and by scheduling in
accordance with the Grid Code:
Provided that where the Distribution Licensee is procuring power through a Trading Licensee,
the arrangement should be secured through back-to-back Power Purchase Agreement and Power Sale
Agreement.
(xi) 'Capital Cost' means the capital cost as determined under these Regulations in
respect of generating station;
(xii) ‘Change in law’ means occurrence of any of the following events:
a. Bringing into effect or promulgation of any new Indian law or Indian enactment;
b. adoption, amendment, modification, repeal or re-enactment of any existing Indian
law; or
c. change in interpretation or application of any Indian law by a competent Court,
Tribunal or Indian Governmental Instrumentality which is the final authority under law for
such interpretation or application;
d. change by any competent statutory authority, in any condition or covenant of any
consent or clearances or approval or License available or obtained for the project; or
e. coming into force or change in any bilateral or multilateral agreement/treaty
between the Government of India and any other Sovereign Government having implication
for the generating station regulated under these Regulations.
(xiii) ‘Commission’ means the Uttar Pradesh Electricity Regulatory Commission as per
Section 82 of the Act;
(xiv) ‘Competitive Bidding’ means a transparent process for procurement of equipment,
services and works in which bids are invited by the project developer by open advertisement
covering the scope and specifications of the equipment, services and works required for the
project, and the terms and conditions of the proposed contract as well as the criteria by which
bids shall be evaluated, and shall include domestic competitive bidding and international
competitive bidding;
(xv) ‘Contracted Capacity’ or ‘CC’ means the capacity of power (in MW) contracted
between the Seller and the Procurer(s) at the Interconnection Point as provided in the Power
Purchase Agreement (PPA);
(xvi) ‘Cut-off Date’ means the last day of the calendar month after thirty-six months from
the actual date of commercial operation of the project or date of commercial operation of the
project as approved by the Commission, whichever is earlier;
(xvii) ‘Date of Commercial Operation’ or ‘COD’ in respect of a thermal generating
station or hydro generating station shall have the same meaning as defined in the Grid Code;
(xviii) 'Date of Operation' or 'ODe': In respect of an emission control system means
putting the emission control system into use after meeting all applicable technical and MOEF &
CC environmental standards and requisite certification(s)and the Management Certificate duly
signed by an authorized person, not below the level of Director of the generating company;
4 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(xix) ‘Day’ means a calendar day consisting of 24 hours period starting at 00:00 hour;
(xx) ‘De-capitalisation’ for the purpose of the tariff under these Regulations, means
reduction in Gross Fixed Assets of the project as admitted by the Commission corresponding to
inter-Unit transfer of assets or the assets taken out from service;
(xxi) 'De-commissioning' means removal from service of a generating station or a Unit
thereof after it is certified by the Central Electricity Authority or any other authorized agency,
either on its own or on an application made by the project developer or the beneficiaries or both,
that the project can not be operated due to non performance of the assets on account of
technological obsolescence or uneconomic operation or due to environmental concerns or safety
issues or a combination of these factors;
(xxii) ‘Declared Capacity’ or ‘DC’ means the capability of the generating station to
deliver ex-bus electricity in MW declared by such generating station in relation to any time
block of the day or whole of the day as per Grid Code duly taking into account the availability of
fuel or water, as the case may be;
(xxiii) 'Design Energy' means the quantum of energy which can be generated in a 90%
dependable year with 95% installed capacity of the hydro generating station;
(xxiv) Emission Control System means a set of equipment or devices required to be
installed in a coal or lignite based thermal generating station or Unit thereof to meet revised
emission standards;
(xxv) ‘Existing Project’ means a project declared under commercial operation from a date
prior to 01.04.2024;
(xxvi) Expansion Project shall include any addition of new capacity to the existing
generating station in accordance with UPERC (Modalities of Tariff Determination) Regulations
2023 as amended from time to time.
(xxvii) ‘Expenditure incurred’ means the fund, whether the equity or debt or both,
actually deployed and paid in cash or cash equivalent, for creation or acquisition of a useful asset
and does not include commitments or liabilities for which no payment has been released;
(xxviii) ‘Extended Life’ means the life of a generating station or Unit thereof beyond the
period of useful life, as may be determined by the Commission on case-to-case basis;
(xxix) ‘Force Majeure’ for the purpose of these Regulations means the event or
circumstance or combination of events or circumstances including those stated below which
partly or fully prevents the generating company to complete the project within the time specified
in the Investment Approval, and only if such events or circumstances are not within the control
the generating company and could not have been avoided, had the generating company taken
reasonable care or complied with prudent utility practices;
a. Act of God including lightning, drought, fire and explosion, earthquake, volcanic
eruption, landslide, flood, cyclone, typhoon, tornado, geological surprises, or exceptionally
adverse weather conditions which are in excess of the statistical measures for the last
hundred years; or
b. Any act of war, invasion, armed conflict or act of foreign enemy, blockade,
embargo, revolution, riot, insurrection, terrorist or military action; or
c. Industry wide strikes and labour disturbances having a nationwide impact in India;
d. Delay in obtaining statutory approval for the project except where the delay is
attributable to project developer including its contractors/ suppliers/ agents;
(xxx) ‘generating station’ shall have the same meaning as defined under sub-Section 30
of Section 2 of the Act and for the purpose of these Regulations shall also include stages or Units
of a generating station;
(xxxi) ‘generating Unit’ or ‘Unit’ in relation to a thermal generating station (other than
combined cycle thermal generating station) means steam generator, turbine-generator and
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 5
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
auxiliaries, or in relation to a combined cycle thermal generating station, means turbine
generator and auxiliaries or combustion turbine-generator, associated waste heat recovery boiler,
connected steam turbine-generator and auxiliaries, and in relation to a hydro generating station
means turbine-generator and its auxiliaries;
(xxxii) ‘Grid Code’ means the Uttar Pradesh Electricity Grid Code, 2007 and Indian
Electricity Grid Code Regulations, 2023 as amended from time to time or subsequent re-
enactment thereof;
(xxxiii) ‘Gross Calorific Value’ or ‘GCV’ in relation to a thermal power generating
station means the heat produced in kCal by complete combustion of one kilogram of solid fuel or
one litre of liquid fuel as the case may be;
(xxxiv) ‘GCV as received’ means the GCV of coal as measured at the unloading point of
the thermal generating station through collection, preparation and testing of samples from the
loaded wagons, trucks, ropeways, Merry-Go-Round (MGR), belt conveyors and ships in
accordance with the IS 436 (Part-1/ Section 1)- 1964:
Provided that the measurement of coal shall be carried out through sampling by third party to be
appointed by the generating companies in accordance with the guidelines, if any, issued by Central
Government:
Provided further that samples of coal shall be collected either manually or through hydraulic
augur or through any other method considered suitable keeping in view the safety of personnel and
equipment:
Provided also that the generating companies may adopt any advance technology for collection,
preparation and testing of samples for measurement of GCV in a fair and transparent manner;
(xxxv) ‘Gross Station Heat Rate’ or ‘GSHR’ means the heat energy input in kCal
required to generate one kWh of electrical energy at generator terminals of a thermal generating
station;
(xxxvi) ‘Indian Government Instrumentality’ means any ministry, department, board,
authority, agency, corporation and commission under direct or indirect control of the
Government of India or the State Government (s) or both or Appropriate Commission (s) or
tribunal or judicial or quasi-judicial body;
(xxxvii) ‘Infirm Power’ means electricity generated for injection into the grid prior to
commercial operation of the Unit of a generating station;
(xxxviii) ‘Installed Capacity’ or ‘IC’ means the summation of the name plate capacities
of all the Units of the generating station or the capacity of the generating station (reckoned at the
generator terminals) as may be approved by the Commission from time to time;
(xxxix) ‘Interconnection Point’ the interconnection point shall be as per UPERC
Connectivity Regulations, 2009 and its amendment from time to time;
(xl) ‘Investment Approval’ means approval by the Board of the generating company or
any other competent authority conveying administrative sanction for the project including
funding of the project and the timeline for the implementation of the project:
Provided that the date of Investment Approval shall reckon from the date of the resolution
of the Board of the generating company where the Board is competent to accord such approval and from
the date of sanction letter of competent authority in other cases;
(xli) ‘Kilowatt-Hour’ or ‘kWh’ means a Unit of electrical energy, measured in one
kilowatt or one thousand watts of power produced or consumed over a period of one hour;
(xlii) ‘Landed Fuel Cost’ means the total cost of coal (including biomass in case of
cofiring), lignite or the gas delivered at the unloading point of the generating station and shall
include the base price, washery charges wherever applicable, transportation cost (overseas or
inland or both) and handling cost, charges for third party sampling and applicable statutory
charges;
6 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(xliii) ‘Maximum Continuous Rating’ or ‘MCR’ in relation to a Unit of the thermal
power generating station means the maximum continuous output at the generator terminals,
guaranteed by the manufacturer at rated parameters, and in relation to a Unit of a combined cycle
thermal power generating station means the maximum continuous output at the generator
terminals, guaranteed by the manufacturer with water/steam injection (if applicable) and
corrected to 50 Hz grid frequency and specified site conditions;
(xliv) ‘New Project’ means the project achieving COD or anticipated to be achieving
COD on or after 01.04.2024;
(xlv) ‘Operation and Maintenance Expenses’ or ‘O&M Expenses’ means the
expenditure incurred for operation and maintenance of the Project or part thereof, and includes
the expenditure on manpower, repairs and maintenance spares, other spares of capital nature
valuing up to Rs. 10 lakhs, additional capital expenditure of an individual asset costing less than
Rs. 50 lakhs, consumables, insurance and overheads and fuel other than used for generation of
electricity;
(xlvi) ‘Original Project Cost’ means the capital expenditure incurred by the generating
company within the original scope of the project, up to the cut-off date, as admitted by the
Commission;
(xlvii) ‘Plant/station Load Factor’ or ‘PLF’ for a given period, means the total sent out
energy corresponding to scheduled generation during the period, expressed as a percentage of
sent out energy corresponding to Contracted Capacity (CC) in that period and shall be computed
in accordance with the following formula:
N
PLF(%) =10000 xSGi / {N x CC x (100-AUXn–AUXen)}%
i=1
where,
CC = Contracted Capacity in the generating station,
SGi= Scheduled Generation in MW for the ith time block of the period,
N = Number of time blocks during the period, and
AUXn= Normative Auxiliary Energy Consumption as a percentage of gross generation;
AUXen=Normative Auxiliary Energy Consumption for emission control system as a percentage
of gross energy generation, wherever applicable.
(xlviii) ‘Power Purchase Agreement’ or ‘PPA’ means the agreement to be entered into
between the Procurer(s) and the Seller pursuant to which the Seller shall supply power to the
Procurer (s) as per the terms and conditions specified therein.
(xlix) ‘Project’ means:
a. in case of thermal generating station, all components of the thermal generating
station not including mining (if it is a pit head project) and dedicated captive coal mine but
includes biomass pellet handling system, and effluent treatment plant, as may be required.
b. in case of hydro generating station, all components of the hydro generating station
and includes dam, intake water conductor system, power generating station, as apportioned
to power generation.
(l) ‘Prudence Check’ means scrutiny of reasonableness of capital expenditure incurred,
financing plan, use of efficient technology, cost and time over-run and such other factors as may be
considered appropriate by the Commission for determination of tariff. While carrying out the Prudence
Check, the Commission shall look into whether the generating company has been careful in its
judgments and decisions for executing the project or has been careful and vigilant in executing the
project;
(li) 'Pumped Storage Hydro Generating Station' means a hydro generating station which
generates power through energy stored in the form of water energy, pumped from a lower elevation
reservoir to a higher elevation reservoir;
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 7
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(lii) ‘Run-of-river power station’ means a hydroelectric power generating station which has no
upstream pondage;
(liii) ‘Run-of-river power station with pondage’ means a hydroelectric power generating
station with sufficient pondage for meeting the diurnal variation of power demand;
(liv) ‘Scheduled Commercial Operation Date, or ‘SCOD’ shall mean the date(s) of
commercial operation of a generating station or generating Unit thereof as indicated in the
Investment Approval or as agreed in Power Purchase Agreement whichever is earlier;
(lv) ‘Scheduled Generation’ or ‘SG’ at any time or for any period or time block means
ex-bus generation schedule in MW given by the State Load Despatch Centre;
(lvi) ‘Start Date or Zero Date’ means the date indicated in the Investment Approval for
commencement of implementation of the project and where no date has been indicated, the date
of investment approval shall be deemed to be Start Date or Zero Date;
(lvii) ‘Thermal generating station’ means a generating station or a Unit thereof that
generates electricity using fossil fuels such as coal, gas, liquid fuel, bio-pellets or combination of
these as its primary source of energy;
(lviii) ‘Trial Run’ or ‘Trial Operation’ in relation to a generating station shall have the
same meaning as specified in Grid Code;
(lix) ‘Unloading Point’ means the point within the premises of the coal or lignite based
thermal generating station where the coal or lignite is unloaded from the rake or truck or any
other mode of transport;
(lx) 'Useful life’ in relation to a Unit of a coal/lignite based generating station from the
COD shall be for 25 years and in relation to a Unit of a Hydro generating station shall mean 40
years from COD:
Provided that in the case of coal/lignite based thermal generating stations and hydro generating
stations, the Operational Life may go up to 35 years and 50 years, respectively.
(lxi) ‘Year’ means a financial year starting from 1st April of a year to 31st March of the next
year.
3. Operational norms to be ceiling norms:
The operational norms specified under these Regulations are the ceiling norms and this shall not
preclude the generating company and Distribution Licensee or any other person, as the case may be, from
agreeing to improved Norms of operation. In case the improved Norms are agreed to, such Norms shall be
applicable for determination of tariff.
4. Deviation from ceiling tariff:
Tariff for sale of electricity by a generating company may also be determined by the Commission
in deviation of the norms specified in these Regulations subject to the conditions that:
a. The levelized tariff of electricity over the useful life of the Project, calculated on the
basis of the norms in deviation does not exceed the per Unit tariff calculated on the basis of the
norms specified in these Regulations duly corroborated by generator’s submission containing
complete workings along with assumptions at the time of filing of the tariff Application;
b. Any such deviation shall come into effect only after approval by the Commission.
Explanation: For the purpose of calculating the levelized tariff referred to in Sub Clause(a), the
discounting factor shall be as notified by the CERC from time to time.
5. Core Business:
For the purpose of these Regulations, Core Business means the regulated activity of Generation
of electricity only and does not include any other business or activity of the generating company.
6. Tax on Income:
(1) The rate of return on equity as allowed by the Commission under Regulation 25(3)(a) of
these regulations shall be grossed up with the effective tax rate (hereinafter referred to as ‘t’) of the
respective financial year. The effective tax rate shall be calculated at the beginning of every financial year
based on the estimated profit and tax to be paid estimated in line with the provisions of the relevant
8 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
Finance Act applicable for that financial year to the concerned generating company by excluding the
income other than from Core business and the corresponding tax thereon:
Provided that in case a generating company is paying Minimum Alternate Tax (MAT) under
Section 115JB of the Income Tax Act, 1961, the effective tax rate shall be the MAT rate, including
surcharge and cess:
Provided further that in case a generating company has opted for Section 115BAA, the effective
tax rate shall be tax rate including surcharge and cess as specified under Section 115BAA of the Income
Tax Act, 1961:
Provided further that Income-Tax allocated to the Beneficiaries shall be recovered in the
proportion of Annual Fixed Charges in the case of thermal generating stations and in the proportion of
Annual Capacity Charges in case of Hydro generating station.
(2) The rate of return on equity shall be rounded off to three decimal places and shall be
computed as per the formula given below:
Rate of pre-tax return on equity = Base rate / (1-t)
(3) The generating company shall true up the effective tax rate for every financial year based
on actual tax paid together with any additional tax demand including interest thereon duly adjusted for
any refund of tax including interest received from the income tax authorities pertaining to the tariff period
2024-29 on actual gross income of any financial year. Further, any penalty arising on account of delay in
deposit or short deposit of tax amount shall not be considered while computing the actual tax paid for the
generating company:
Provided that in case a generating company is paying Minimum Alternate Tax (MAT) under
Section 115JB, the generating company shall true up the grossed-up rate of return on equity at the end of
every financial year with the applicable MAT rate including surcharge and cess:
Provided that in case a generating company is paying tax under Section 115BAA, the generating
company shall true up the grossed-up rate of return on equity at the end of every financial year with the
tax rate including surcharge and cess as specified under Section 115BAA:
Provided that any under-recovery or over recovery of grossed up rate on return on equity after
truing up, shall be recovered or refunded to beneficiaries as the case may be, on a year-to-year basis.
7. Tax Escrow Account:
There shall be an account in a scheduled Bank called Tax Escrow Account to be maintained by
the Licensee or any person, hereinafter referred to as Beneficiary, who has purchased the capacity from a
generating station. Such Licensee shall maintain in this account a deposit equivalent to two months Tax
liability as informed to them by the generating company prior to commencement of the Year.
The generating company shall be authorized to withdraw the amount for settling the tax liability
on presentation to the Escrow holder, a certificate from Company’s Statutory Auditor, that such amounts
are immediately due to be paid to the Tax authorities. Such generating Companies shall pay back any
refund received from tax authority to such Tax Escrow Account.
8. Hedging of Foreign Exchange Rate Variation (FERV):
The generating company may hedge foreign exchange exposure in respect of the interest on
foreign currency loan and repayment of foreign currency loan taken for the generating station.
9. Recovery of Income-tax and hedging cost of FERV:
Recovery of Income-tax and cost of hedging only towards FERV shall be done directly by the
generating company from the Beneficiaries without making any application before the Commission:
Provided that in case of any objections by the Beneficiaries to the amounts claimed on account
of Income- tax or cost of hedging towards FERV, the generating company may make an appropriate
application before the Commission for its decision.
10. Power to Remove Difficulties:
If any difficulty arises in giving effect to these Regulations, the Commission may, of its own
motion or otherwise, by an Order and after giving a reasonable opportunity to those likely to be affected
by such Order, make such Provisions, not inconsistent with these Regulations, as may appear to be
necessary for removing the difficulty.
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 9
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
11. Power to Relax:
The Commission, for reasons to be recorded in writing, may vary any of the Provisions of these
Regulations on its own motion or on an application made before it by an interested person by an order.
10 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
CHAPTER 2
Commercial Operation
12. Date of Commercial Operation:
(1) Date of commercial operation in case of
a. a generating Unit of the thermal generating station shall mean the date declared by the
generating company after demonstrating the Unit capacity corresponding to its Maximum
Continuous Rating (MCR) or the Installed Capacity (IC), through a successful trial run after
getting clearance from the respective RLDC or SLDC, as the case may be, and in case of the
generating station as a whole, the date of commercial operation of the last Unit of the generating
station;
b. a generating Unit of hydro generating station including pumped storage hydro
generating station shall mean the date declared by the generating company after demonstrating
peaking capability corresponding to the Installed Capacity of the generating station,through a
successful trial run after getting clearance from the respective RLDC or SLDC, as the case may
be and in case of the generating station as a whole, the date of commercial operation of the last
Unit of the generating station:
Provided that
(i) Where the beneficiaries / long term customers have been tied up for purchasing power from
the generating station, the trial run shall commence after a notice of not less than one month by the
generating company to the beneficiaries/ long term customers and concerned RLDC or SLDC, as the case
may be and the scheduling shall start from 00:00 hrs after completion of the trial run.
(ii) Where the beneficiaries / long term customers have not been tied up for purchasing power
from the generating station, the trial run shall commence after a notice of not less than seven days by the
generating company to the concerned RLDC or SLDC, as the case may be and the scheduling shall start
from 00:00 hrs after completion of the trial run.
(iii) The generating company shall certify that:
(a) The generating station meets the relevant requirements and provisions of the technical
standards of Central Electricity Authority (Technical Standards for Construction of Electrical
Stations and Electric Lines) Regulation, 2010 as amended from time to time and the Grid Code:
(b) In case of a thermal generating station, the main plant equipment and auxiliary
systems including Balance of station, such as Fuel Oil System, Coal Handling Station, DM plant,
pre-treatment plant, fire-fighting system, Ash Disposal system and any other site-specific system
have been commissioned and are capable of full load operation of the Units of the generating
station on sustained basis; and
In case of hydro generating station, the main plant equipment and auxiliary systems including
Drainage Dewatering system, Primary and Secondary cooling system, LP and HP air compressor,
Firefighting system, etc. have been commissioned and are capable for full load operation of Units on
sustained basis.
(c) Permanent electric supply system including emergency supplies and all necessary
instrumentation, control and protection systems and auto loops for full load operation of Unit
have been put in service.
(iv) The certificates as required under Clause (iii) above shall be signed by the CMD/CEO/MD
of the generating company subsequent to its approval by the Board of Director(s) and a copy of the
certificate shall be submitted to the Member Secretary of the concerned Regional Power Committee and
the concerned RLDC / SLDC before declaration of COD.
(v) Trial run shall be carried out in accordance with Regulation 12(2) of these Regulations.
(vi) In case a hydro generating station with pondage or storage is not able to demonstrate the
peaking capability corresponding to the installed capacity for the reasons of insufficient reservoir or pond
level, the date of commercial operation of the last Unit of the generating station shall be considered as the
date of commercial operation of the generating station as a whole, and it will be mandatory for such hydro
generating station to demonstrate peaking capability equivalent to installed capacity of the generating
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 11
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
station or Unit thereof as the case may be, as and when such reservoir/pond level is achieved. In case of
failure to demonstrate the peaking capacity, the Unit capacity shall be de-rated to the capacity
demonstrated with effect from the COD.
(vii) If a run-of-river hydro generating station or a Unit thereof is declared under commercial
operation during lean inflow period when the water inflow is insufficient for such demonstration of
peaking capability, it shall be mandatory for such hydro generating station or Unit thereof to demonstrate
peaking capability equivalent to installed capacity as and when sufficient water inflow is available. In
case of failure to demonstrate the peaking capacity, the Unit capacity shall be de-rated to the capacity
demonstrated with effect from the COD.
(2) Trial Run or Trial Operation: Trial Run or Trial Operation in relation to a thermal
generating station or a Unit thereof shall mean successful running of the generating station or Unit thereof
on designated fuel at Maximum Continuous Rating or Installed Capacity for a continuous period of 72
hours and in case of a hydro generating station or a Unit thereof for a continuous period of 12 hours:
Provided that Units of thermal and hydro generating stations shall also demonstrate capability to
raise load up to 105% or 110% of the Maximum Continuous Rating or Installed Capacity.
12 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
CHAPTER 3
Tariff Determination
13. Determination of tariff:
(1) The tariff in respect of a generating station under these Regulations shall be determined
Stage-wise, Unit-wise or for the whole generating station, as the case may be. However, on completion of
projects the tariff may be determined for the whole station.
(2) For the purpose of tariff, the Capital Cost of the Project shall be broken up into Stages and
by distinct Units (in case part of Units are functional) forming part of the generating station. Where the
Stage-wise, Unit-wise, breakup of the Capital Cost is not available and in case of on-going projects, the
common facilities shall be apportioned on the basis of the installed capacity of the Units.
(3) In case of expansion of the existing generating station, the tariff shall be determined for the
expanded capacity in accordance with these Regulations.
(4) In relation to Multi- Purpose Hydroelectric generating stations, with irrigation, flood
control and power components, the Capital Cost chargeable to the Power component of the generating
station shall only be considered for determination of tariff.
(5) Assets installed for implementation of the revised emission standards shall form part of the
existing generation project, and the tariff thereof shall be determined separately in accordance with the
application filed under the Clause (5) of Regulation 14 of these Regulations.
14. Application for determination of tariff:
A. For new projects
(1) The generating company shall make an application for fixation of tariff in respect of the
completed Units of the generating station in such forms and such manners as prescribed in these
Regulations and Uttar Pradesh Electricity Regulatory Commission (Conduct of Business) Regulation,
2019 as amended from time to time or any statutory reenactment thereof:
Provided that the applications for determination of tariff shall be filed covering the period
for which the terms and conditions of tariff shall remain in force.
(2) In case of a generating station declared under commercial operation on or after the date of
commencement of these Regulations, an Application for fixation of tariff shall be made as per
Appendix - II to these Regulations, for determination of Provisional tariff within 180 days prior to the
anticipated date of commercial operation based on the Capital Expenditure actually incurred up to the
date of making of the Application or a date prior to making of the Application, duly audited and certified
by the Statutory Auditors, and the provisional tariff shall be charged from the date of commercial
operation of the respective Unit of the generating station.
Provided that where application for determination of provisional tariff of a new project has been
filed before the Commission in accordance with Clause 14 (2) of these Regulations, the Commission may
consider granting provisional tariff up to 90% of the Annual Fixed Cost of the project claimed in the
application subject to adjustment as per proviso to Clause 14(2) of these Regulations after the final tariff
order has been issued.
(3) The generating company shall make a fresh Application for final tariff in prescribed format
as per Appendix - II to these Regulations, within 90 days of date of the audited accounts of the year of
Project’s COD or within 180 days of determination of its Project’s Capital Cost, by the Commission,
whichever is later, failing which the rate of return on equity shall be reduced by 0.25% per month subject
to a minimum base rate of 10% return on equity:
Provided that the reduction in rate of return on equity can be waived or reduced by the
Commission, in case such delay is beyond the control of applicant and is justified with sufficient material/
documentation:
Provided further that over or under recovery of charges by the generating company on account of
Provisional tariff shall be subject to retrospective adjustment on the basis of final tariff determined by the
Commission. The generating company, on the basis of such final tariff, shall calculate the amount of
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 13
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
under or over recovery of charges and bill such amount to be recovered or paid by it from or to the
beneficiary (ies), for the period the Provisional tariff remained effective, within six months of
determination of final tariff, along with simple interest calculated at rate equal to Bank Rate as on 1st
April of the relevant year in which such under/over recovery was made:
Provide further that such interest that determined as per 2nd proviso of Clause (3) of this
Regulation shall be payable till the date of issuance of the Order and no interest shall be allowed or levied
during the period of six-monthly instalments.
(4) The generating company shall file an application for determination of supplementary tariff
for the emission control system installed in coal based thermal generating station in accordance with these
Regulations not later than 90 days from the date of start of operation of such emission control system.
B. For existing Projects
(5) In case of an existing generating station or Unit thereof, the application for the next tariff
control period shall be made by the generating company within 3 months of the notification of these
Regulations, based on admitted capital cost as on 31.03.2024 including additional capital expenditure
already incurred upto 31.03.2024 and estimated additional capital expenditure for the respective years of
the tariff period 2024-29.The capital cost admitted as on 31.03.2024 based on the truing up shall form the
basis of the opening capital cost as on 01.04.2024 for the tariff determination for the period 2024-29.
(6) In case an emission control system is installed in the existing generating station or Unit
thereof to meet the revised emission standards, an application shall be made in accordance with these
Regulations within 90 days from the start date of operation of such emission control system for
determination of supplementary tariff (capacity charges or energy charge or both) based on the actual
capital expenditure duly certified by the Auditor.
(7) In case of delay in filing of complete application in hard and soft copy by the generating
companies as per the timelines specified in clause (3), (4), and (6) of this Regulation, carrying cost shall
be allowed as given below:
Specific
Case
Carrying cost to be allowed
from the date of
Applicable Rate
N
ew
P
ro
je
c
ts
Filing of
Final
Tariff
Application filed before due
date
Bank Rate from COD
Application filed after due
date
Bank Rate from Date of
application filing
N
ew
P
ro
je
c
ts
a
n
d
E
x
is
ti
n
g
P
ro
je
c
ts
Emission
Control
System
Application filed before due
date
SBI MCLR+ 100 base points from
COD
Application filed after due
date
SBI MCLR+ 100 base points from
Date of application filing
Provided further that any consequences as specified in Clause (1) to (6) of this Regulation which
are related with non-adherence of timelines are without prejudice to any other fine, which the generator
may be liable under Electricity Act, 2003 and any other Regulations of the Commission including but not
limited to UPERC (Fees & Fines) Regulations, 2010, as amended from time to time.
15. In-principle approval in specific circumstances:
The generating company, undertaking any additional capitalization on account of change in law
events or force majeure conditions or for additional capitalization beyond original scope of work as
specified in Regulation 21(4) may file petition for in-principle approval for incurring such expenditure on
scheme(s), after prior notice to the beneficiaries, along with underlying assumptions, estimates and
justification for such expenditure(s), if the estimated expenditure(s)on aggregate basis exceeds 20% of the
admitted capital cost of the project or Rs. 300 Crore, whichever is lower.
16. Truing up of tariff for the period 2024-29:
(1) The trueup petition for the period 2024-29 in accordance with the UPERC (Term sand
Conditions of Generation Tariff) Regulations, 2024, shall be filed along with the tariff petition for the
14 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
period 2029-34. The capital cost admitted as on 31.03.2029 based on the truing up shall form the basis of
the opening capital cost as on 01.04.2029 for the tariff determination for the period 2029-34.
(2) The Commission shall carry out the truing up exercise for the period 2024-29, along with
the tariff petition filed for the next tariff period, for the following:-
a. the capital expenditure, including additional capital expenditure in curred upto
31.03.2029 as admitted by the Commission after prudence check;
b. the capital expenditure, including additional capital expenditure in curred upto
31.03.2029 on account of Force Majeure and Change in Law as admitted by the Commission;
c. the additional capital expenditure in curred upto 31.03.2029 on account of the Emission
Control System as admitted by the Commission:
Provided that in case of truing up application along with requisite documents is not submitted
within timeline i.e., by 30.11.2029; no carrying cost / interest for the period of delay shall be allowed to
the generating company for the under-recovered amount during the True-up period. However, in case of
over recovered amount during the True-up period and delayed filing of True-up application along with
requisite documents, the surplus amount with carrying cost / interest shall be recovered in terms of
Regulation 16(e) along with surplus amount:
Provided further that the above proviso is without prejudice to any other fine or penalty, which
may be liable under Electricity Act, 2003 and any other Regulation of the Commission including but not
limited to UPERC (Fees & Fines) Regulation, 2010, as amended from time to time.
d. The generating company shall submit, for the purpose of Truing up, details of Capital
Expenditure and additional capital expenditure incurred duly audited and certified by the
Auditors:
Provided the Commission may appoint a separate independent auditor who, under the
supervision of the Commission, shall undertake technical and financial audit of the generating station at
any time.
e. Where after the Truing up, if the tariff recovered exceeds the tariff approved by the
Commission under these Regulations, the generating company shall refund to the beneficiaries,
the excess amount so recovered along with simple interest at the rate equal to the Bank Rate
prevailing as on 1st April of the relevant Year in which such over recovery was made.
f. Where after the Truing up, if the tariff recovered is less than the tariff approved by the
Commission under these Regulations, the generating company shall recover from the
Beneficiaries, the under-recovered amount along with simple interest at the rate equal to the
Bank Rate, prevailing as on 1st April of the relevant Year in which such under recovery was
made.
g. The amount under-recovered or over-recovered, along with simple interest at the rate
equal to the Bank Rate as on 1st April of the relevant Year, shall be recovered or refunded by the
generating company, in six equal monthly instalments starting within three months from the date
of the tariff Order issued by the Commission after the truing up exercise:
Provide further that such interest that determined as per Clause (2)(g) of this Regulation shall be
payable till the date of issuance of the Order and no interest shall be allowed or levied during the period
of six-monthly instalments.
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 15
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
CHAPTER-4
Capital Cost and Structure
17. Capital Cost:
(1) Subject to prudence check by the Commission, the actual expenditure incurred on
completion of the project shall form the basis for determination of final tariff for new and existing
projects.
(2) The final tariff for a new project including expansion project shall be determined based on
the admitted capital cost which shall include:-
a. the expenditure actually incurred up to the date of commercial operation of the project;
b. Interest during construction and financing charges, on the loans (i) being equal to 70%
of the funds deployed, in the event of the actual equity in excess of 30% of the funds deployed,
by treating the excess equity as normative loan, or (ii) being equal to the actual amount of loan in
the event of the actual equity less than 30% of the funds deployed;
c. Increase in cost in contract packages as approved by the Commission;
d. Interest during construction and incidental expenditure during construction as computed
in accordance with these Regulations;
e. Capitalised initial spares subject to ceiling norms of 4% (as a percentage of the station
and Machinery cost) up to cut-off date (excluding IDC, IEDC, Land Cost and cost of civil
works):
Provided that where the benchmark norms for initial spares have been published as part of the
benchmark norms for capital cost by the Central Electricity Regulatory Commission and are adopted by
the Commission for prudence check, such norms shall apply to the exclusion of the norms specified
above:
Provided where the generating station has any transmission equipment forming part of the
generation project, the ceiling norms for initial spares for such equipment shall be as per the ceiling
norms specified by the Commission for transmission system from time to time.
f. Expenditure on account of additional capitalization and de-capitalization determined in
accordance with these Regulations;
g. Adjustment of revenue due to sale of infirm power in excess of fuel cost prior to COD
as specified under these Regulations;
h. Capital expenditure on account of ash disposal and utilization including handling and
transportation facility;
i. Capital expenditure incurred towards the development of the dedicated transmission
line:
Provided that tariff in respect of such dedicated transmission line shall be determined in
accordance with the UPERC (Multi Year Tariff for Transmission) Regulation, 2025 as and when notified
and as amended from time to time.
j. Capital expenditure incurred towards railway infrastructure and its augmentation for
transportation of coal up to the receiving end of the generating station but does not include the
transportation cost and any other appurtenant cost paid to the railway;
k. Capital expenditure on account of biomass handling equipment and facilities for
co-firing;
l. Capital expenditure on account of emission control system necessary to meet the
revised emission standards and sewage treatment plant;
m. Expenditure on account of the fulfilment of any conditions for obtaining environmental
clearance for the project;
n. Expenditure on account of change in law and force majeure events;
o. Expenditure required to enable flexible operation of the generating station in
accordance with Grid Code.
p. Capital cost incurred or projected to be incurred by a thermal generating station, on
account of implementation of the norms under Perform, Achieve and Trade (PAT) scheme of
Government of India shall be considered by the Commission subject to sharing of benefits
accrued under the PAT scheme with the beneficiaries:
16 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
Provided that for all MoU route projects which are under PPA, the agreed ceiling capital cost
between the generating company and the beneficiary shall be brought to the Commission for approval and
the approved cost shall be a part of PPA. The actual capital cost, if it is equal to the approved ceiling
capital cost, shall form the basis for prudence check and determination of tariff by the Commission. If the
actual cost is lower, then the lower cost would be taken subject to prudence check and if it is higher, then
the additional cost would first be verified and agreed between the generating company and the beneficiary
only then it shall be taken up by the Commission for consideration and approval subject to prudence
check.
(3) The final tariff for an existing project shall be determined based on the admitted capital cost
which shall include:-
a. The capital cost admitted by the Commission prior to 01.04.2024 duly trued up by
excluding liability, if any, as on 01.04.2024;
b. Additional capitalization and de-capitalization for the relevant year of tariff as
determined in accordance with these Regulations;
c. Expenditure on account of Renovation and Modernization as admitted by this
Commission in accordance with these Regulations;
d. Capital expenditure on account of ash disposal and utilization including handling and
transportation facility;
e. Capital expenditure incurred towards railway infrastructure and its augmentation for
transportation of coal up to the receiving end of generating station but does not include the
transportation cost and any other appurtenant cost paid to the railway;
f. Capital expenditure on account of biomass handling equipment and facilities for co-
firing;
g. Capital expenditure on account of emission control system necessary to meet the
revised emission standards and sewage treatment plant;
h. Expenditure required to enable flexible operation of the generating station in
accordance with Grid Code;
i. Expenditure on account of change in law and force majeure events;
j. Capital cost incurred or projected to be incurred by a thermal generating station, on
account of implementation of the norms under Perform, Achieve and Trade (PAT) scheme of
Government of India shall be considered by the Commission subject to sharing of benefits
accrued under the PAT scheme with the beneficiaries.
(4) The tariff, based on capital cost admitted by the Commission, in respect of existing
dedicated transmission line shall be determined in accordance with the terms, parameters and norms of
the MYT transmission regulations of the respective control period.
(5) The capital cost in case of existing or new hydro generating station shall also include cost
of approved Rehabilitation and Resettlement (R&R) plan of the project in conformity with National R&R
Policy and R&R package as approved.
(6) The following shall be excluded or removed from the capital cost of the existing and new
projects:
a. The assets forming part of the project, but not in use;
b. De-capitalised Assets after the date of commercial operation on account of replacement
or removal on account of obsolescence or shifting from one project to another project:
Provided further that unless shifting of an asset from one project to another is of permanent
nature, there shall be no de-capitalization of the concerned assets.
c. In case of hydro generating stations, any expenditure incurred or committed to be
incurred by a project developer for getting the project site allotted by the State Government by
following a transparent process;
d. The proportionate cost of land which is being used for generating power from
generating station based on renewable energy;
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 17
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
e. Any grant received from the Central or State Government or any statutory body or
authority for the execution of the project which does not carry any liability of repayment.
(7) Prudence Check of Capital Cost: The following principles shall be adopted for prudence
check of capital cost of the existing or new projects:
a. Prudence check of capital cost shall be carried out by the Commission in terms of these
Regulations and the Commission may take into consideration the benchmark norms specified/to
be specified by the Central Electricity Regulatory Commission from time to time:
Provided that, Prudence check shall include scrutiny of the capital expenditure, financing plan,
interest during construction, incidental expenditure during construction for its reasonableness, use of
efficient technology, cost over-run and time over-run, competitive bidding for procurement and such other
matters as may be considered appropriate by the Commission for determination of tariff. While carrying
out the Prudence Check, the Commission shall look into whether the generating company has been
careful in its decisions for executing the project or has been careful and vigilant in executing the project:
Provided that any capital expenditure incurred on the project through any related parties, as
defined in the Companies Act, 2013, without prior approval of the procurer shall be excluded from the
Capital cost:
Provided further that the generating company shall submit the reasons for exceeding the capital
cost from benchmark norms to the satisfaction of the Commission for allowing cost above benchmark
norms.
b. The Commission may issue new guidelines or adopt the guidelines prescribed by the
Central Electricity Regulatory Commission for vetting of capital cost of projects by an
independent agency or an expert and in that event the capital cost as vetted by such agency or
expert may be considered by the Commission while determining the tariff for the generating
station.
c. The Commission may issue new guidelines or adopt the guidelines prescribed by the
Central Electricity Regulatory Commission for scrutiny and approval of commissioning schedule
of the projects which shall be considered for prudence check.
d. Where the Power Purchase Agreement entered into between the generating company
and the beneficiaries provides for ceiling of actual capital expenditure, the Commission shall
take into consideration such ceiling for determination of tariff for prudence check of capital cost.
e. The generating company shall furnish the capital cost for execution of the existing and
new projects as per Appendix -II to these Regulations along with tariff petition for the purpose
of creating a database of benchmark capital cost of various components.
18. Interest during Construction (IDC), Incidental Expenditure during Construction
(IEDC):
(1) Interest during construction (IDC) shall be computed considering the actual loan and
normative loan after taking into account the prudent phasing of funds up to actual COD:
Provided that IDC on a normative loan corresponding to excess equity over 30% of funds
deployed shall be allowed only in cases where the actual infusion of equity on a pari-passu basis is more
than 30% of total funds deployed and shall be computed on a quarterly basis:
Provided further that in case IDC on normative loan is to be allowed prior to infusion of
actual loan, rate of interest for computing such IDC shall be equal to 1-year SBI MCLR as prevailing on
1st April of the respective year:
Provided further that IDC on normative loan, post infusion of actual loan shall be computed
based on Weightage Average Rate of Interest (WAROI) for that respective quarter.
(2) Incidental expenditure during construction (IEDC) shall be computed from the zero date
and after taking into account pre-operative expenses upto COD:
Provided that any revenue earned during construction period up to COD on account of
interest on deposits or advances, or any other receipts may be taken into account for reduction in
incidental expenditure during construction.
18 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(3) In case of additional costs on account of IDC and IEDC due to delay in achieving the COD,
the generating company shall be required to furnish detailed justifications with supporting documents for
such delay including prudent phasing of funds in case of IDC and details of IEDC during the period of
delay and liquidated damages recovered or recoverable corresponding to the delay:
Provided that if the delay in achieving the COD is not attributable to the generating company
and is due to uncontrollable factors as specified in these Regulations, IDC and IEDC beyond SCOD may
be allowed after due prudence check and the liquidated damages, if any, recovered or recoverable from
the contractor or supplier or agency shall be adjusted in the capital cost of the generating station:
Provided further that only IDC on actual loan may be allowed beyond the SCOD, to the extent
the delay is found beyond the control of generating company after due prudence and taking into account
prudent phasing of funds.
(4) In case of delay in achieving the COD is attributable to the generating company or its
contractor or supplier or agency, in such cases, IDC and IEDC beyond SCOD may be disallowed after
prudence check on pro-rata basis corresponding to the period of delay not condoned and the liquidated
damages, if any, recovered or recoverable from the contractor or supplier or agency shall be taken into
account for computation of capital cost.
(5) For the purposes of Clause (3) and (4) of this Regulation, IDC on actual and normative loan
shall be considered in accordance with the normative debt-equity ratio specified under Clause(1) of
Regulation 23 of these Regulations.
19. Controllable and Uncontrollable factors:
The following shall be considered as controllable and uncontrollable factors leading to time
over- run, cost escalation impacting Contract Prices, IDC and IEDC of the project:
(1) The "Controllable factors" shall include but shall not be limited to the following:
a. Efficiency in the implementation of the project not involving approved change in scope
of such project, change in statutory levies or change in Law or force majeure events; and
b. Delay in execution of the project on account of contractor, supplier or agency of the
generating company.
(2) The “Uncontrollable factors” shall include but shall not be limited to the following:
a. Force Majeure events; and
b. Change in law.
c. Land acquisition except where the delay is attributable to the generating company:
Provided that in the event of mismatch of SCOD between generating station and associated
transmission system the matter shall be dealt in accordance with the provisions of the UPERC (Multi Year
Tariff for Transmission) Regulation, 2025 as and when notified and as amended from time to time.
20. Initial Spares: Initial spares may be capitalised as a percentage of the Plant and Machinery
cost, subject to the following ceiling norms:
a. Coal-based/lignite-fired thermal generating stations - 4.0%
b.
Gas Turbine/Combined Cycle thermal generating-Stations 4.0%
c. Hydro generating stations including pumped storage hydro
generating station
4.0%
Provided that:
Plant and Machinery cost shall be considered as the original project cost excluding IDC,IEDC,
Land Cost and Cost of Civil Works. The generating company, for the purpose of estimating Plant and
Machinery Costs, shall submit the break-up of head-wise IDC and IEDC in its tariff application;
Where the emission control system is installed, the norms of initial spares specified in these
Regulations for coal based thermal generating stations, as the case may be, shall apply.
21. Additional capitalization:
A. Additional Capitalisation within the original scope and up to the cut-off date
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 19
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(1) The additional capital expenditure in respect of a new project or an existing project, on the
following counts within the original scope of work as per Detailed Project Report (DPR), actually
incurred after the date of commercial operation and up to the cutoff date may be admitted by the
Commission, subject to prudence check:
a. Deferred liabilities;
b. Works deferred for execution;
c. Procurement of initial capital spares in the original scope of work, subject to ceiling
specified in these Regulations;
d. Payment against the award of arbitration or for compliance of the directions or order of
any statutory authority or order or decree of a Court;
e. On account of change in law or compliance with any existing law which is not provided
for in the original scope of work;
f. Force majeure events:
Provided that original scope of work along with estimates of expenditure shall be submitted
along with the application for provisional and final tariff:
Provided that in case of any replacement of the assets, the additional capitalization shall be
worked out after adjusting the gross fixed assets and cumulative depreciation of the assets replaced on
account of de-capitalization:
Provided further that a list of the deferred liabilities to be payable at a future date and works
deferred for execution shall be submitted along with the application for final tariff after the date of
commercial operation of the generating station.
B. Additional Capitalisation within the original scope and after the cut-off date
(2) The additional capital expenditure actually incurred in respect of an existing project or a
new project on the following counts within the original scope of work and after the cut-off date may be
admitted by the Commission, subject to prudence check:
a. Payment made against award of arbitration or for compliance of the directions or order
of any statutory authority, or order or decree of a Court;
b. Change in Law or compliance with any existing law which has not been provided for in
the original scope of work;
c. Force majeure events;
d. Deferred works relating to ash pond or ash handling system or raising of ash dyke as a
part of ash disposal system in the original scope of work;
e. Payment made towards liability admitted for works within the original scope executed
prior to the cut-off date;
f. Works within original scope executed after the cut-off date and admitted by the
Commission, to the extent of actual payments made.
(3) In case of replacement of assets deployed under the originals cope of the existing project
after the cut-off date, the additional capitalization may be admitted by the Commission after making
necessary adjustments in the gross fixed assets and the cumulative depreciation, subject to prudence
check on following grounds:
a. Assets whose useful life is not commensurate with the useful life of the project and
such assets have been fully depreciated in accordance with the provisions of these Regulations;
b. The replacement of the asset or equipment is necessary on account of a change in law or
Force Majeure conditions; or
c. The replacement of such asset or equipment is necessary on account of obsolescence of
technology; or
d. The replacement of such asset or equipment has otherwise been allowed by the
Commission.
Provided that any claim of additional capitalisation with respect to the replacement of assets
under the original scope, if less than Rs. 50lakhs, shall not be considered as part of Capital co stand shall
be met through normative O & M expenses.
20 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
C. Additional Capitalisation beyond the original scope
(4) The capital expenditure, in respect of the existing generating station incurred on the
following counts beyond the original scope, may be admitted by the Commission, subject to prudence
check:
a. Payment made against award of arbitration or for compliance of order or directions of
any statutory authority, or order or decree of any court of law;
b. Change in law or compliance of any existing law;
c. Force Majeure events;
d. Need for higher security and safety of the plant as advised or directed by appropriate
Indian Government Instrumentality or statutory authorities responsible for national or internal
security;
e. Deferred works relating to ash pond or ash handling system or raising of ash dyke in
addition to the original scope of work, on case-to-case basis:
Provided also that if any expenditure has been claimed under Renovation and Modernisation
(R&M) or repairs and maintenance under O&M expenses, the same shall not be claimed under this
Regulation;
f. Usage of water from the sewage treatment plant in the thermal generating station.
g. Works required towards biomass handling system to enable biomass co-firing and
towards enabling flexible operation of the generating station as may be required.
h. Works pertaining to Railway Infrastructure and its augmentation for transportation of
coal up to the receiving end of the generating station (excluding any transportation cost and any
other appurtenant cost paid to railways) that are not covered under Regulation 21(1), 21(2) and
21(7) but shall result in better fuel management and can lead to a reduction in operation costs, or
shall have other tangible benefits:
Provided that the generating company shall have to mandatorily seek prior approval of the
Commission before implementing such works based on a detailed cost-benefit analysis of such schemes;
(5) Any claim of additional capitalisation less than Rs. 50 lakhs shall not be considered under
Clause (4) of this Regulation and shall be met through normative O & M expenses.
(6) In case of de-capitalisation of assets of a generating company the original cost of such asset
as on the date of de-capitalisation shall be deducted from the value of gross fixed asset and corresponding
loan as well as equity shall be deducted from outstanding loan and the equity respectively in the year such
de-capitalisation takes place with corresponding adjustments in cumulative depreciation and cumulative
repayment of loan, duly taking into consideration the year in which it was capitalised :
Provided that in cases where an asset forming part of a scheme is de-capitalised and wherein the
historical value of such asset is not available, the value of de-capitalisation shall be computed by de-
escalating the value of the new asset by depreciation rate of the new asset as specified in Appendix - III
or by 5% per if depreciation rate of the asset is not specified in Appendix - III until the year of
capitalisation of the old asset subject to a minimum of 10% of the replacement cost of the asset.
Provided that the additional capital expenditure incurred towards implementing above works as
detailed under Clause 21(1), 21(2) and 21(4) shall be subject to prudence check by the Commission at the
time of True up and the generating company shall provide detailed justification, applicable regulatory
provisions and cost benefit analysis of such scheme.
Note 1:
Any expenditure admitted on account of committed liabilities within the original scope of work
and the expenditure deferred on techno-economic grounds but falling within the original scope of work
shall be serviced in the normative debt-equity ratio specified in these Regulations.
Note 2:
Any expenditure admitted by the Commission for determination of tariff on account of new
works not provided in the original scope of work shall be serviced in the normative debt-equity ratio
specified in these Regulations.
(7) Additional capitalisation on account of Renovation and Modernization (R&M)
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 21
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
a. The generating company, for meeting the expenditure on Renovation and Modernization
(R&M) for the purpose of extension of life beyond the useful life of the generating station or a Unit
thereof, shall make an application before the Commission for approval of the proposal with a Detailed
Project Report giving complete scope, justification, cost-benefit analysis, estimated life extension from a
reference date, financial package, phasing of expenditure, schedule of completion, reference price level,
estimated completion cost including foreign exchange component, if any:
Provided that the generating company making the applications for R&M shall not be eligible for
Special Allowance under Regulation 21(8) of these Regulations;
Provided further that the generating company intending to undertake R&M shall seek the
consent of the beneficiaries for such R&M and submit the response of the beneficiaries along with the
Petition.
b. Where the generating company makes an application for approval of its proposal for
R&M, the approval may be granted after due consideration of reasonableness of the proposed
cost estimates, financing plan, schedule of completion, interest during construction, use of
efficient technology, cost-benefit analysis, expected duration of life extension, consent of the
beneficiaries, if obtained, and such other factors as may be considered relevant by the
Commission.
c. After completion of the R&M, the generating company shall file a petition for
determination of tariff. Expenditure incurred or projected to be incurred and admitted by the
Commission after prudence check based on the estimates of R&M expenditure and life
extension, and after deducting the accumulated depreciation already recovered from the original
project cost, shall form the basis for determination of tariff:
d. The provisions specified in Clause (a) shall apply provided the generating company
shall ensure to plan R&M of at least one Unit of each generating station every year for life
extension and improvement in performance, wherever due, after due techno economic studies
and approval from the Commission to facilitate R&M or phase out.
e. Any expenditure admitted by the Commission for determination of tariff on R&M and
life extension shall be serviced on normative debt-equity ratio specified in the Regulation 23
after writing off the original amount of the replaced assets from the original project cost. The
generating company, for the purpose of R&M and life extension of the plant, shall be guided by
the guidelines issued by the Commission from time to time.
(8) Special Allowance for Coal-based Thermal Generating station
a. In case of coal-based thermal generating station, the generating company, instead of
availing R&M, may opt to avail of a 'special allowance' in accordance with the norms specified in this
Regulation, as compensation for meeting the requirement of expenses towards any additional capital
expenditure in Regulations 21(1), 21(2), 21(4), 21(7) except for capital expenditure arising out of change
in law, award of arbitration or for compliance of the directions or order of any statutory authority, or
order or decree of any court of law, and force majeure after completion of 25 years from the date of
Commercial operation of the generating station or a Unit thereof and in such an event, an upward revision
of the capital cost shall not be allowed and the applicable operational norms shall not be relaxed but the
Special Allowance shall be included in the annual fixed cost:
Provided also that such option shall not be available for a generating station or Unit for which
Renovation and Modernization has been undertaken and the expenditure has been admitted by the
Commission before commencement of these Regulations, or for a generating station or Unit which is in a
depleted condition and operating under relaxed operational and performance norms:
Provided further that special allowance shall also be available for a generating station which has
availed the Special Allowance during the previous control periods, as applicable.
b. A generating company, on opting for the alternative, for a coal-based thermal generating
station, shall be allowed special allowance@ Rs. 10.75 lakh /MW/ year for the tariff period
2024-29
Provided that in respect of a Unit in commercial operation for more than 25 years as on
01.04.2024, this allowance shall also be admissible from the year 2024-25.
c. In the event of granting Special Allowance by the Commission, the expenditure in
curred upon or utilized from Special Allowance shall be maintained separately by the generating
22 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
station, and details of the same shall be made available to the Commission as and when directed.
d. The Special Allowance allowed under this Regulation shall be transferred to a separate
fund for utilization towards Renovation & Modernisation and additional capitalisation as per
sub-Clause (b) above, and the expenditure in curred or utilized from the special allowance shall
be made available to the Commission a sand when directed.
(9) Additional Capitalization on account of Revised Emission Standards:
a. A generating company requiring incurring of additional capital expenditure in the
existing generating station for compliance with the revised emissions standards shall share its
proposal with the beneficiaries and file a petition for undertaking such additional capitalization.
b. The proposal under sub-Clause (a) above shall contain details of the proposed
technology as specified by the Central Electricity Authority, scope of work, phasing of
expenditure, schedule of completion, estimated completion cost including foreign exchange
component, if any, detailed computation of indicative impact on tariff to the beneficiaries, and
any other information considered to be relevant by the generating company.
c. Where the generating company makes an application for approval of additional capital
expenditure on account of the implementation of revised emission standards, the Commission
may grant approval after due consideration of the reasonableness of the cost estimates, financing
plan, schedule of completion, interest during construction, use of efficient technology, cost-
benefit analysis, and such other factors as maybe considered relevant by the Commission.
d. After completion of the implementation of revised emission standards, the generating
company shall file a petition for determination of tariff. Any expenditure in curred or projected
to be incurred and admitted by the Commission after prudence check based on the
reasonableness of the cost and impact on operational parameters shall form the basis of the
determination of tariff.
e. Un-discharged liability, if any, on account of the emission control system shall be
allowed as additional capital expenditure during the year it is discharged, subject to prudence
check.
22. Sale of Infirm Power:
Supply of infirm power shall be accounted for deviation in accordance with CERC (Deviation
Settlement Mechanism and Related matters) Regulation, 2024, as amended from time to time till DSM
Regulation of the Commission is notified:
Provided that any revenue earned by the generating company from supply of infirm power after
accounting for the fuel expenses shall be applied in adjusting the capital cost accordingly:
Provided also that the startup power drawn by the generating station from the grid shall be
adjusted with ex-bus energy and such energy shall be billed to its beneficiaries in the proportion of
contracted capacities.
23. Debt-Equity Ratio
In case of all generating stations, debt-equity ratio as on the date of commercial operation shall
be 70:30 for determination of tariff. Where equity employed is more than 30%, the amount of equity for
determination of tariff shall be limited to 30% and the balance amount shall be considered as the
normative loan.
Provided that,-
a. The generating company shall submit the resolution of the Board of the company
regarding infusion of fund from internal resources in support of the utilization made or proposed
to be made to meet the capital expenditure of the generating station.
b. In case of a generating station where actual equity employed is less than 30%, the actual
debt and equity shall be considered for determination of tariff;
c. The equity invested in foreign currency shall be designated in Indian rupees on the date
of each investment;
d. Any grant obtained for the execution of the project shall not be considered as a part of
capital structure for the purpose of debt-equity ratio.
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 23
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
e. The debt and equity amount arrived as above shall be used for calculating interest on
loan and return on equity.
f. Any expenditure incurred for the emission control system during the tariff period as
may be admitted by the Commission as additional capital expenditure for determination of
supplementary tariff shall be serviced in the manner as specified above.
g. Any expenditure incurred on or after 01.04.2024 as may be admitted by the
Commission as additional capital expenditure for determination of tariff, and Renovation and
Modernisation expenditure for life extension shall be serviced in the manner as specified above.
24 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
CHAPTER-5
TARIFF STRUCTURE
24. Components of tariff:
(1) The tariff for supply of electricity from a generating station shall comprise of two parts,
namely, capacity charge (for recovery of annual fixed cost consisting of the components as specified in
the Regulation 24 (3)) and energy charge as specified in the Regulation 30.
(2) The Supplementary tariff consisting of supplementary capacity charges and supplementary
energy charges, on account of the implementation of revised emission standards in existing generating
stations or new generating stations, as the case may be, shall be determined by the Commission
separately.
(3) The Capacity charges shall be derived on the basis of annual fixed cost. The Annual Fixed
Cost (AFC) of a generating station shall consist of the following components:-
a. Return on equity;
b. Interest on loan capital;
c. Depreciation;
d. Interest on working capital and;
e. Operation and maintenance expenses:
Provided that special allowance in lieu of R&M where opted in accordance with these
Regulations, wherever applicable, shall be recovered separately and shall not be considered for
computation of working capital.
(4) Supplementary Capacity Charges: Supplementary capacity charges shall be derived on
the basis of the Annual Fixed Cost for emission control system (AF Ce). The Annual Fixed Cost for the
emission control system shall consist of the components as listed in Sub-Clauses (a) to (e) of Clause 3 of
this Regulation.
(5) The energy (variable) charges of a thermal power generating station shall be derived on the
basis of landed fuel cost and shall constitute the following cost:
a. Landed fuel cost of primary fuel; and
b. Cost of secondary fuel oil;
c. Cost of reagents on account of implementation of revised emission standards:
Provided that any refund of taxes and duties along with any amount received on account of
penalties from fuel supplier shall have to be adjusted in fuel cost:
Provided further that the supplementary energy charges, if any, on account of meeting the
revised emission standards in case of a thermal generating station shall be determined separately by the
Commission as per Regulation 30 (1) (b) of these Regulations.
(6) Landed Fuel Cost of Primary Fuel:
a. The landed fuel cost of primary fuel for any month shall consist of base price of fuel
corresponding to the grade and quality of fuel and shall be inclusive of statutory charges as
applicable, washery charges and transportation cost by rail or road or any other means, loading,
unloading and handling charges:
Provided that procurement of fuel at a price other than Government notified prices may be
considered, if it is based on competitive bidding through transparent process or supplied by Coal India
Limited through Bridge Linkage(s) including premium over the notified price, if any:
Provided further that landed fuel cost of primary fuel shall be worked out based on the actual bill
paid by the generating company including any adjustment on account of quantity and quality:
Provided also that in case of coal-fired based thermal generating station, the Gross Calorific
Value shall be measured by third party sampling and the expenses towards the third-party sampling
facility shall be reimbursed by the beneficiaries.
b. For the purpose of determination of tariff for the existing generating station the landed
fuel cost of primary, secondary fuel and reagents shall be based on actual weighted average cost
of primary fuel and secondary fuel and reagents of the immediately preceding three months to
the start of the tariff control period and in the absence of landed costs for the immediately three
preceding months, latest procurement price of primary fuel, secondary fuel and reagents,in case
of both new and existing generating stations, shall be taken into account.
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 25
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(7) Gross Calorific Value of Primary Fuel:
a. The gross calorific value for computation of energy charges shall be in accordance with
'GCV as Received’;
b. The measurement of GCV of domestic coal shall be done based on third party sampling
through an agency to be appointed by the generating company in accordance with the guidelines,
if any, issued by the Central Government and the generating company shall ensure recovery of
compensation as per Fuel Supply Agreement (s) and pass on the benefits of the same to the
beneficiaries of the generating station:
Provided that in the absence of third-party sampling, computation of the energy charges as per
Regulation 30 of these Regulations shall be done in accordance with' GCV as Billed’:
Provided further that the Commission after carrying out a detailed study may rationalise the
mechanism for arriving at the gross calorific value of domestic coal at the generating station by
considering various factors impacting the calorific value throughout entire value chain from the delivery
of coal to receiving at the generating station.
c. No loss in calorific value between ‘GCV as billed’ and ‘GCV as received' shall be
admissible for generating stations procuring coal through import.
d. The generating company shall provide to the beneficiaries of the generating station the
details in respect of GCV and price of fuel i.e. domestic coal, imported coal, e-auction coal,
lignite, natural gas, RLNG, liquid fuel etc., as per the Form 15 prescribed at Appendix-II to
these Regulations:
Provided that the additional details of the weighted average GCV of the primary fuel on a
received basis used for generation during the period, the blending ratio of the imported coal with
domestic coal, and the proportion of e-auction coal shall be provided, along with the bills of the
respective month:
Provided further copies of the bills and details of parameters of GCV and price of fuel such as
domestic coal, imported coal, e-auction coal, lignite, natural gas, RLNG, liquid fuel, details of blending
ratio of the imported coal with domestic coal, the proportion of e-auction coal shall also be displayed on
the website of the generating company.
(8) Landed Cost of Reagent:
a. Where specific reagents such as Limestone, Sodium Bi-Carbonate, Urea or Anhydrous
Ammonia are used during the operation of an emission control system for meeting revised
emission standards, the landed cost of such reagents shall be determined based on the normative
consumption and the purchase price of the reagent through competitive bidding, applicable
statutory charges and transportation cost.
b. The normative consumption of specific reagents for the various technologies installed
for meeting revised emission standards shall be as specified in Regulation 28 (7) of these
Regulations.
25. Capacity (Fixed) Charge:
(1) The capacity charges of thermal generating stations shall be computed on following basis
and their recovery shall be related to target availability in case of all existing as well as new generating
stations:
Provided full capacity charges shall be recoverable at target availability specified in these
Regulations. Recovery of capacity (fixed) charges below the level of target availability shall be on pro
rata basis. At zero availability, no capacity charges shall be payable:
Provided also that the payment of capacity charges shall be on monthly basis in proportion to the
allocated capacity.
(2) The fixed cost of a hydro generating station shall be computed on annual basis, based on
norms specified under these Regulations, and shall be recovered on monthly basis under capacity charge
(inclusive of incentive), which shall be payable by the beneficiaries in proportion to their respective
26 mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
allocation in the saleable capacity of the generating station i.e. in the capacity excluding the free power to
the home State.
(3) Components of Fixed Charges:
a. Return on Equity:
Return on equity, for existing projects, shall be computed in rupee terms on the equity base
determined in accordance with these Regulations at base rate of 15% post-tax per annum:
Provided that return on equity in respect of additional capitalization beyond the original scope
including additional capitalization on account of emission control system, change in law, and force
majeure, shall be computed at base rate of one-year SBI MCLR +350 basis point as on 1st April of the
year, subject to a ceiling of 14%:
Provided that the rate of return of a new project shall be reduced by upto 1% for such period as
maybe decided by the Commission, if the generating station is found to be declared under commercial
operation without commissioning any of the following:
(a) Restricted Governor Mode Operation (RGMO)
(b) Free Governor Mode Operation (FGMO),
(c) Data telemetry,
(d) Communication system up to load dispatch center
(e) Protection system based on the report submitted by SLDC:
Provided also that as and when any of the above requirements are found lacking in an existing
generating station based on the report submitted by the SLDC, RoE may be reduced by up to 1% for such
period as may be decided by the Commission;
Explanation: The premium raised by the generating company while issuing share capital and
investment of internal resources created out of free reserve of the generating company, if any, for the
funding of the project, shall also be reckoned as paid up capital for the purpose of computing return on
equity, provided such premium amount and internal resources are actually utilized for meeting the capital
expenditure of the generating station and forms part of the approved financial package.
b. Interest on loan capital:
(i) Interest on loan capital shall be computed loan wise on the loans arrived at in the manner
indicated in these Regulations.
(ii) The loan outstanding as on 1st April 2024 shall be worked out as the gross loan as per these
Regulations minus cumulative repayment as admitted by the Commission up to 31st March 2024. The
repayment for any financial year during the tariff Period shall be deemed to be equal to the depreciation
allowed for that financial year.
In case of de-capitalisation of assets, the repayment shall be adjusted by taking into account
cumulative repayment on a pro rata basis and the adjustment should not exceed cumulative depreciation
recovered up to the date of de-capitalisation of such asset.
(iii) The rate of interest shall be the weighted average rate of interest calculated on the basis of
actual loans at the beginning of each financial year and shall be adjusted based on actual loan portfolio
each financial year accordingly.
(iv) If there is no actual loan for a particular financial year but normative loan is still
outstanding, the weighted average rate of interest of the actual loan portfolio of the last control period
shall be considered.
Provided further that if the generating station does not have any actual loan even in the last
control period, then the weighted average rate of interest of the loan portfolio of the generating company
as a whole shall be considered.
Provided that the rate of interest on the loan for the installation of the emission control system
commissioned subsequent to date of commercial operation of the generating station or Unit there of, shall
be the weighted average rate of interest of the actual loan portfolio of the emission control system, and in
the absence of the actual loan portfolio, the weighted average rate of interest of the generating company
as a whole shall be considered, subject to a ceiling of 14%:
Provided further that in both scenarios i.e. for generating station and emission control system, if
the generating company does not have any actual loan portfolio, then the rate of interest for a loan shall
be considered as 1-year MCLR of the State Bank of India as applicable as on April 1st of the relevant
financial year.
mRrj izns'k vlk/kkj.k xtV] 9 vçSy] 2025 27
12 RPH 2025 (Viddut Niyamak Ayog-2025 -ENG. data 1e
(v) The generating company shall make every effort to re-finance the loan as long as it results
in net benefit to the beneficiaries. The costs associated with such re-financing shall be borne by the
beneficiaries and the net savings shall be shared between the beneficiaries and the generating company in
the ratio of 50:50. The above facts shall be certified by statutory Auditor.
(vi) The changes to the loan terms and conditions shall be reflected from the date of such re-
financing and benefit passed on to the beneficiaries.
(vii) In case any moratorium period is availed of by the generating company, Depreciation
provided for in the tariff during the years of moratorium shall be treated as repayment during those years
and interest on loan capital shall be calculated accordingly.
(viii) In case, the generating company has contracted floating/ variable rate of interest on loan
resetting at certain interval of time, the impact of change in rate of interest shall be assessed by the
generating company on account of such resetting duly certified by statutory auditor and the capacity
charge of the relevant financial year shall be adjusted for such impact and billed accordingly to
beneficiary without approaching the Commission for change in tariff on this account:
Provided that in case of dispute between generating company and beneficiary, any party may
approach the Commission with proper application and it shall be ensured that the payment to the
generating company is not withheld during pendency of the dispute:
Provided that the bank and finance charges shall be allowed separately, at the time of True-up,
after prudence check.
c. Depreciation:
For the purpose of tariff, depreciation shall be computed in the following manner, namely:-
(i) Depreciation shall be computed from the date of commercial operation of a generating
station or Unit thereof. In case of tariff of all the Units of a generating station for which a single tariff
needs to be determined, the depreciation shall be computed from the effective date of commercial
operation of the generating station taking into consideration the depreciation of individual Units or
elements thereof:
Provided that effective date of commercial operation shall be worked out by considering the
actual date of commercial operation and installed capacity of all the Units of the generating station for
which single tariff needs to be determined.
(ii) The value base for the purpose of depreciation shall be the capital cost of the asset as
admitted by the Commission. In case of multiple Units of a generating station weighted average life for
the generating station shall be applied. Depreciation shall be chargeable from the first year of operation.
In case of operation of the asset for part of the year, depreciation shall be charged on pro rata basis.
(iii) The salvage value of the asset shall be considered as 10% and depreciation shall be allowed
up to maximum of 90% of the capital cost of the asset. Land other than the land held under lease and the
land for a reservoir, in case of a hydro generating station, shall not be a depreciable asset and its cost
shall be excluded from the capital cost while computing depreciable value of asset:
Provided that in case of hydro generating station, the salvage value shall be as provided in the
agreement signed by the developers with t