Jammu and Kashmir Single Window (Industrial Investments and Business Facilitation) Act, 2018
Ladakh Act
- Act 10 of 2018
- Enacted: 2018-09-24
- Ministry: NO MINISTRY
- Department: Industries and Commerce
- Status: no repeal is recorded
This text is shown as one document.
Full text
Jammu and Kashmir Single Window (Industrial Investments
and Business Facilitation) Act, 2018
(Act No. 10 of 2018)
jk351
[Dated 24th September, 2018]
Enacted by the Governor in the Sixty-ninth Year of the Republic of India.
An Act to provide for speedy process of issuance of various licenses, clearances, registrations and/or no
objection certificates and their renewals required for setting up and operation of industrial and business
enterprises in the State of Jammu and Kashmir with the aim of providing for an investor and business friendly
environment in the State and matters connected therewith or incidental thereto.
In exercise of the powers vested under Proclamation No. P-1/18 of 2018 dated 20th June, 2018, the Governor
is pleased to enact as follows :-
CHAPTER I
Preliminary
1. Short title and commencement. - (1) This Act may be called the Jammu and Kashmir Single Window
(Industrial Investments and Business Facilitation) Act, 2018.
(2) It shall come into force at once.
2. Definitions. - In this Act, unless the context, otherwise requires,-
(1) "Act" means the Jammu and Kashmir Single Window (Industrial Investments and Business Facilitation)
Act, 2018 ;
(2) "Apex Project Clearance Committee" means the Committee constituted under section 5 ;
(3) "Applicant" means a person including an entrepreneur, who himself or on behalf of a legal ent ity, on
being so authorised, makes an e-application for grant of requisite clearances o r renewal thereo f for
setting up or operation of an industrial enterprise, a business or its expansion ;
(4) "Application" means e-application submitted on CAF by the applicant through online s ingle window
portal of Jammu and Kashmir ;
(5) "Clearances" mean grant or issue of no objection certif icate, allotments, consents, approvals,
permissions, registrations, memorandum, enrolments, licenses and renewals thereof , by any
Competent Authority or authorities designated to grant such clearances in connection with the sett ing
up of an enterprise in the State under the relevant laws and shall include all such clearances required
by an enterprise for its establishment and operation ;
(6) "CAF" means the prescribed Common Application Form required to be f illed in by the
applicant/entrepreneur on single window web portal of the State for requisite clearances ;
(7) "Committee" means the Apex Level Clearance Committee/ Divisional Level Committee/ Dist rict Level
Committee ;
(8) "Competent Authority" means any department, corporation, statutory body or agency of the Central o r
State Government, Halqa Panchayat, Municipality or other Local Body, entrusted with the powers and
responsibilities of granting or issuance of clearances under any law for the time being in force ;
(9) "Department" means any department or agency of the Government of Jammu and Kashmir ;
(10) "District Level Single Window Clearance Committee" means the Committee constituted under section
3 ;
(11) "Divisional Level Single Window Clearance Committee" means the Committee constituted under
section 4 ;
(12) "Departmental Nodal Officer" means the officer appointed under section 14 ;
(13) "Director" means the Director of Industries and Commerce Department, of the respective division ;
(14) "Ease of Doing Business" means the Ease of Doing Business initiative of the Department of Industrial
Policy and Promotion, Government of India ;
(15) "Enterprise" means a commercial unit engaged in manufacturing or processing or both, or in providing
of any service as def ined f rom time to time under the Micro, Small and Medium Enterprises
Development Act, 2006 (Central Act No. 27 of 2006) ;
(16) "Government" means Government of Jammu and Kashmir ;
(17) "Industrial/Service Unit" means Industrial/Service Unit as defined by the Ministry of Commerce an d
Industries, Government of India from time to time ;
(18) "Investment Promotion and Facilitation Cell" means a cell as constituted under section 9 of this Act ;
(19) "Prescribed" means prescribed by rules made under this Act ;
(20) "Relevant laws" means Act, rules or regulations as may be prescribed ;
(21) "Single Window Nodal Officer" means an officer appointed under section 14 of this Act ;
(22) "Single Window Nodal Department" means Industries and Commerce Department of Government o f
Jammu and Kashmir ;
(23) "State" means State of Jammu and Kashmir ;
(24) "Online Single Window Portal" or "Web Portal" means a web portal set up under section 13 of this Act
; and
(25) "Time line" means timelines as prescribed for granting specified clearance(s) under the Jammu and
Kashmir Public Service Guarantee Act, 2011 or as may be prescribed under any law for the time being
in force.
CHAPTER II
Constitution, Powers and Functions of District Level Single Window Clearance
Committee, Divisional Level Single Window Clearance Committee and the Apex
Project Clearance Committee
3. District Level Single Window Clearance Committee. - (1) The Government may constitute a District Level
Single Window Clearance Committee for each district which shall consist of,-
S. No. Officer to be member of the District Level Single Window
Clearance Committee
Designation
1 2 3
1. General Manager, District Industries Sector (DID) concerned Chairman
2. Superintending Engineer, EM&RE Wing, Power
Development Department concerned
Member
3. District Representative of State Pollution Control Board Member
4. Estate Manager, SIDCO/SICOP as the case may be Member-
Secretary
(2) The District Level Single Window Clearance Committee shall exercise the following powers and functions : -
(i) to receive application(s) for clearance(s) for setting up industrial/ service unit with proposed investment
as may be notified by the Government from time to time ;
(ii) to meet at such time and places at least once in a month as the Chairman of the Committee may
decide and shall transact business as per the procedure as may be prescribed ;
(iii) to issue the required clearance(s) on behalf of dif ferent Competent Authorities in respect of the
applications received on Online Single Window Portal within the time lines subject to compliance(s) by
the entrepreneur of the provisions of applicable laws and the rules made thereunder ;
(iv) to review all applications pending beyond timelines pending applications may be procured f rom the
Online Single Window Portal ;
(v) to direct the concerned District Level Competent Authorities for taking decision on applications pending
beyond the prescribed timelines ;
(vi) to scrutinize cases where delay has occurred and if found wilful, the Divisional Level Sing le Window
Clearance Committee may recommend appropriate disciplinary action against the concerned
Competent Authority ;
(vii) to take all necessary steps to facilitate industrial investments in the district which inc ludes rev iew o f
Investment Intentions and shall send report to the Apex Project Clearance Committee through
Investment Promotion and Facilitation Cell ;
(viii) to recommend policy level suggestions to the Divisional Level Single Window Clearance Committee to
improve the investment atmosphere of the State ;
(ix) to review and monitor the processing of applications by the District Level Competent Authorities ;
(x) to inform an applicant of the receipt of the application by a Competent Authority and convey the date on
which such application has been approved or rejected ;
(xi) to invite Competent Authorities or experts, who are not members of the Committee, as special invitees
at any meeting of the District Level Single Window Clearance Committee as desired by the Chairman or
the Member-Secretary of the Committee ;
(xii) a Member of the District Level Single Window Clearance Committee shall attend the meeting
convened under clause (ii) personally and in case he is unable to attend the meeting, he may depute a
senior level officer with a written authorization to take appropriate decision in the meeting ;
(xiii) the District Level Single Window Clearance Committee may suo motu or on a reference, examine an
order passed by a Competent Authority, rejecting any clearance or approving it with modification, and if
the Committee considers that there are valid grounds for a change in such dec is ion, i t shall forward
such case to the Divisional Level Single Window Clearance Committee with remarks and relevant
documents for a decision ; and
(xiv) such other powers and functions as may be prescribed.
4. Divisional Level Single Window Clearance Committee. - (1) The Government may constitute a Divisional
Level Single Window Clearance Committee for each district which shall consist of,-
S. No Officer to be member of the Divisional Level Single
Window Clearance Committee
Designation
1 2 3
1. Director, Industries and Commerce, concerned Chairman
2. Chief Engineer, EM&RE Wing Power Development
Department concerned
Member
3. Representative of State Pollution Control Board Member
4. Managing Director, SIDCO Member
5. Managing Director, SICOP Member
6. Representative of the Industrial Association concerned Member
7. General Manager of the DIC concerned Member-
Secretary.
(2) The Committee shall exercise the following powers and functions :-
(i) to receive application(s) for clearance(s) for setting up industrial/ service unit with proposed investment
as may be notified by the Government from time to time ;
(ii) to meet at such time and place at least once in a month as the Chairman of the Committee may decide
and shall transact its business as per such procedure as may be prescribed ;
(iii) to monitor and review the progress of granting required clearances, the status of sanctioned projec ts ,
dif ficulties being faced in granting clearance(s), the functioning of Online Single Window Portal and
working of Investment Promotion and Facilitation Cell ;
(iv) to inform an applicant of the date on which the application was received by the Competent Authority
and the date on which such application has been approved or rejected ;
(v) to invite Competent Authorities or experts, who are not members of the Committee as special inv itees
at any meeting of the State Committee as desired by the Chairman or the Member-Secretary of the
Committee ;
(vi) to review all applications and grievances pending beyond the time l ines and give d irect ions to the
Competent Authority to take necessary action ;
(vii) to ask for reasons of delay and call for necessary information and personal appearance of the
Competent Authority where applications and grievances are pending beyond the prescribed timelines ;
(viii) af ter performing necessary inquiry, may recommend action against the Competent Authority i f the
Committee is of the opinion that there is wilful default in delaying the approval process of applications
and grievances ;
(ix) to appoint a senior of f icer to inquire into the reasons of delay in disposal of applications by the
Competent Authority or the grievances raised by the applicant ;
(x) a Member of the Divisional Level Single Window Clearance Committee shall attend the meeting
convened under clause (ii) personally and in case he is unable to attend the meeting, he may depute a
senior level officer with a written authorization to take appropriate decision in the meeting ;
(xi) the Divisional Level Single Window Clearance Committee shall examine all cases referred to it by the
District Level Single Window Clearance Committee and pass appropriate o rders :
Provided that the cases which are beyond the competence of Divisional Level Single Window Clearance
Committee shall be referred to Apex Project Clearance Committee for decision ;
(xii) the Divisional Level Single Window Clearance Committee may, either suo motu or on a reference,
examine an order passed by a Competent Authority, rejecting any clearance or approving it with
modification or the grievances relating to technical, procedural or other issues relat ing to disposal of
any application, and if the Divisional Level Single Window Clearance Committee considers that there
are valid grounds for a change in such decision, it shall forward such case to the Apex Project
Clearance Committee with remarks and relevant documents for a decision ; and
(xiii) such other powers and functions as may be prescribed.
5. Apex Project Clearance Committee. - (1) The Government may constitute a Apex Project Clearance
Committee for each district which shall consist of,-
S. No Officer to be member of the Apex Project Clearance
Committee
Designation
1. Chief Secretary, Jammu and Kashmir Chairman
2. Administrative Secretary, Industries and Commerce
Department
Member
3. Administrative Secretary, Power Development Department Member
4. Administrative Secretary, Forest Department Member
5. Administrative Secretary, Housing and Urban Development
Department
Member
6. Chairman, J&K Pollution Control Board Member
7. Director, Industries and Commerce, concerned Member
8. Managing Director, JKDFC Member
9. Managing Director, J&K, SIDCO Member-
Secretary
10. Representative of Industrial Association concerned Member
(2) The Apex Project Clearance Committee shall exercise the following powers and perform the following
functions, namely :-
(i) to receive application(s) for clearance(s) for setting up industrial/ service unit with proposed investment
value as may be notified by the Government from time to time ;
(ii) to meet at such time and place at least once in a month as the Chairman of the Committee may decide
and shall transact its business as per such procedure as may be prescribed ;
(iii) to review and monitor the processing of applications by the Competent Authorities, the Divisional Level
Single Window Clearance Committee and the District Level Single Window Clearance Committee ;
(iv) to invite Competent Authorities or experts, who are not members of the Committee as special inv itees
at any meeting of the State Committee as desired by the Chairman or the Member -Secretary of the
Committee ;
(v) to review applications and grievances pending beyond the timelines and give direction to the
Competent Authority to take necessary action ;
(vi) to ask for reasons of delay and may call for necessary information and personal appearance of
Competent Authority where applications and grievances are pending beyond the prescribed timelines ;
(vii) af ter performing necessary inquiry, recommend action against the Competent Authority if the
Committee is of the opinion that there is wilful default in delaying the approval process of applications
and grievances ;
(viii) to appoint a senior of f icer to inquire into the reasons of delay in disposal of applications by the
Competent Authority or the grievances raised by the applicant ;
(ix) to review the industrial investment of the State and make necessary recommendations to the
Investment Promotion and Facilitation Cell ;
(x) a Member of the Apex Project Clearance Committee shall attend the meeting convened under c lause
(ii) personally and in case he is unable to attend the meeting, he may depute a senior level officer with
a written authorization to take appropriate decision in the meeting ;
(xi) the decision taken by the Apex Project Clearance Committee shall be binding on the District/Divisional
Level Single Window Clearance Committee and the Competent Authorities ;
(xii) to examine all cases referred to it by the Divisional Level Single Window Clearance Commit tee and
pass appropriate orders ;
(xiii) the orders passed by the Apex Project Clearance Committee shall be f inal and binding on the
Divisional Level Single Window Clearance Committee, the District Level Single Window Clearanc e
Committee and the Competent Authorities ;
(xiv) the Apex Project Clearance Committee may suo motu or on a reference, examine any order passed
by the Divisional Level Single Window Clearance Committee or the District Level Single Window
Clearance Committee and pass an appropriate order as it deems fit and such order shall be final ; and
(xv) such other powers and functions as may be prescribed.
CHAPTER III
Single Window Nodal Officer, Departmental Nodal Officer and their Functions
6. Single Window Nodal Officer. - The Director of Industries, Kashmir/Jammu shall be the Single Window
Nodal Of ficer as the case may be. The Government shall also appoint or designate any other officer(s), not
below the rank of the Joint Director, to assist the Single Window Nodal Officer for discharging the functions as
specified in this Act. The Single Window Nodal Officer and other officers appointed or designated under this
section shall undertake the investment promotional activities and render necessary guidance and assistance to
the entrepreneurs to set up industrial/service unit in the State.
7. Functions of the Single Window Nodal Officer. - The powers and functions of the Single Window Nodal
Of f icer shall be-
(1) to receive e-application and forward the same to the Departmental Nodal Officer o f the Department
concerned for approval by the Competent Authority ;
(2) to place all the proposals before the appropriate Committee constituted under the Act for setting up of
new industrial/service unit or expansion of the existing unit for decision ;
(3) to co-ordinate with all the Departmental Nodal Officers in accordance with the procedure prescribed to
obtain required clearances ;
(4) to provide all necessary assistance to the applicant(s) to set up industrial/service unit in the State ;
(5) to co-ordinate all efforts for promoting investments and other related activities in the State ;
(6) to act as a Competent Authority to sign all documents, approvals, sanctions or instructions required to
be issued to the entrepreneur ;
(7) to monitor investments in various projects for which the approval has been granted by the app ropriate
Committee constituted under the Act ;
(8) to prepare and submit yearly progress reports to the State Government ; and
(9) to perform any other job assigned by Apex Project Clearance Committee or the Government, as the
case may be.
8. Departmental Nodal Officer. - (1) The Administrative Secretary of concerned department(s) shall designate
Departmental Nodal Officer for Single Window Clearance Committee(s) at Divisional and District levels.
(2) The Departmental Nodal Officer shall be the single point of contact for the Investment Promotion and
Facilitation Cell for granting clearance(s).
(3) The Departmental Nodal Officers as members representing various Competent Authorities shall proceed to
issue the required clearance within the timeline subject to compliance of various provisions of the applicable
Central or State Acts and the rules made thereunder, by the entrepreneur.
(4) For the purpose of this Act, the Departmental Nodal Officer shall work under the supervision of the Single
Window Nodal Officer.
CHAPTER IV
Common Application Form, Single Window Web Portal and Self-Certification
9. Common Application Form. - (1) The Common Application Form shall be used to file e-applications, along
with fees, as shall be prescribed, in lieu of existing multiple forms being used under various laws. All concerned
Competent Authorities shall accept such e-applications for processing and granting requisite clearances.
(2) The Common Application Form shall be in a format as prescribed from time to time.
(3) Non-refundable processing fees of the Common Application Form shall be prescribed based on the
quantum of investment. These charges may be revised by the Government from time to time. The charges so
collected shall be accrued in an account, to be maintained and operated by the Investment Promotion and
Facilitation Centre and shall be used for meeting all such expenses as are required to implement the Act.
(4) Collected fee shall be deposited online with the concerned Department/ Board to the extent prescribed.
(5) All Departments or Competent Authorities concerned shall accept such application forms for processing and
issue of required clearance.
10. Investment, Promotion and Facilitation Cell. - The Investment, Promotion and Facilitation Cell shall
maintain and operate a web portal for filing of e-applications, for grant of clearances and for setting up an
industrial/ service unit in the State under various applicable laws. All the Competent Authorities shall be
connected online enabling them to sanction the clearances online.
11. Self-Certification by the Applicants. - (1) In order to comply with the provisions of the relevant laws,
every applicant shall furnish requisite information with self-certification, in such form as shall be prescribed, at
the time of submitting the e-application.
(2) The self -certification furnished as per sub-section (1) by the applicants shall be accepted by the Competent
Authority for the purpose of granting of clearances and giving other benefits to the applicants.
CHAPTER V
Investment, Promotion and Facilitation Cell, its Role and Functions
12. Investment Promotion and Facilitation Cell. - (1) The Government shall set up an Investment Promotion
and Facilitation Cell in the Directorate of Industries to provide support to various Single Window Clearances
Committee constituted under the Act. The Cell will also act as a centre, for handholding and supporting the
applicants or budding entrepreneurs.
(2) The General Managers of the concerned District Industries Centre of Department of Industries and
Commerce at the district and local level will act as local nodes of Investment Promotion and Facilitation Cell for
disposing of all investment proposals in the State received through the Common Application Form. The Cell
shall work with the Officers of the Industries Department across the State to establish a State wide hub which
will address business concerns and issues collectively.
13. Role and Functions of Investment Promotion and Facilitation Cell. - (1) The Investment Promotion and
Facilitation Cell will be responsible for receiving the e-applications, their subsequent processing as per the
procedure laid down in this Act and take the proposals to the Apex Project Clearance Committee or the
Divisional Level Single Window Clearance Committee or the District Level Single Window Clearance
Committee, as the case may be.
(2) The Investment Promotion and Facilitation Cell will function as a project approval, monitoring and
implementation group, which will act as a single focal point of interface between applicants and the
Government Departments for facilitating the new investment proposal(s), providing necessary assistance for
setting of the projects approved by Apex Project Clearance Committee or the Divisional Level Single Window
Clearance Committee or the District Level Single Window Clearance Committee assisting the applicants in
obtaining required clearances from the Departments concerned, in a time bound manner.
(3) The Investment Promotion and Facilitation Cell will co-ordinate with all Departments through concerned
Departmental Nodal Officer or with the officers of the Competent Authority deputed with the Cell to help in
implementation of the projects on ground.
(4) The Investment Promotion and Facilitation Cell will also provide handholding support to the
industrial/service units in resolving any functional difficulties throughout their life cycle.
(5) The Investment Promotion and Facilitation Cell may set up and maintain a help-line number and grievance
redressal mechanism to facilitate entrepreneurs and redress their grievances.
(6) The Investment Promotion and Facilitation Cell will issue Incentive Eligibility Certificate, wherever required,
and help the applicants in applying for admissible incentives, concessions and facilities thereof.
(7) The Investment Promotion and Facilitation Cell shall facilitate the functioning of industrial/service unit
established in the State and present yearly report to Apex Project Clearance Committee and the Divisional
Level Single Window Clearance Committee.
(8) The Investment Promotion and Facilitation Cell will maintain an integrated web portal for providing relevant
online sectoral information as well as approvals to the potential investors such as Land-Banks, the State
Policies, Incentives, etc.
(9) The Investment Promotion and Facilitation Cell may organize workshops, seminars, investment promotion
activities outside the State or abroad, to promote investment in the State.
(10) The Investment Promotion and Facilitation Cell will exercise all or any specific powers or functions
assigned by Apex Project Clearance Committee or the State Government from time to time.
CHAPTER VI
Procedure for Granting Clearances and Deemed Clearances
14. Procedure for granting clearances. - Notwithstanding anything contained in any other law, the following
procedure shall be followed by the applicants and all Departments for granting clearances subject to such
modification as may be notified by Government from time to time for setting up of industrial/service unit(s) in the
State :-
(1) all applicants shall apply through integrated e-applications (CAF) ;
(2) all e-applications shall be assigned a reference number by the system automat ically which shall be
used by the applicants to check the status online ;
(3) the applicants shall be kept informed at all stages of processing of applications by way of Short
Message Service (SMS) or email or both ;
(4) e-applications, complete in all respects, received by the Single Window Nodal Officer shall be initial ly
examined by him at the Investment Promotion and Facilitation Cell ;
(5) the e-applications shall thereafter be forwarded electronically to the concerned Departmental Nodal
Of f icer ;
(6) the Departmental Nodal Officer shall access the e-application through the web portal, the link of which
shall be made available to him by the Investment Promotion and Facilitation Cell ;
(7) the Competent Authority shall also notify the procedure to grant the required clearances and publish
the same in their respective departmental websites ;
(8) the Departmental Nodal Officer shall be assisted by such officials, as shall be provided to him, by his
parent Department ;
(9) the approvals by the Departmental Nodal Of f icer shall be sent electronically to the Single Window
Nodal Of ficer and shall be accessible by the applicants also ;
(10) the observations, if any, by the Departmental Nodal Officer shall be sent electronically to the Sing le
Window Nodal Officer within f ive days of receipt of application on Single Window Portal and shall be
accessible to the applicants on the same day ;
(11) the applicants, in case of observations, shall send their reply to the Single Window Nodal Officer who
shall forward the same to the concerned Departmental Nodal Of f icer. All observations of the
Department shall be conveyed by the Departmental Nodal Of f icer in one go. Any subsequent
clarif ication(s), if found absolutely necessary, shall be obtained and settled within seven working days,
and the f inal decision shall be conveyed to the Single Window Nodal Of f icer within the t ime period
specified ;
(12) while processing and granting clearance, the Competent Authority shall ask for any additional
information from the applicants :
Provided that such additional information shall be sought by the Competent Authority within the period
prescribed for granting such clearance and that any additional information shall be called for only once ;
(13) in case, additional information is sought for clearance(s), e-application shall be disposed of within the
stipulated period, which shall be counted from the date of receipt of the additional information ;
(14) the e-applications shall be disposed of at the earliest and under no circumstances later than such
period, as shall be prescribed ;
(15) in case of rejection of e-application by the Departmental Nodal Officer, the same shall be conveyed
within given time f rame to the Single Window Nodal Officer, by giving detailed reasons of rejection ;
(16) the approval shall be conveyed by the Departmental Nodal Officer electronically to the applicant(s)
and the clearance letter duly signed electronically or manually shall be uploaded on the web portal f or
information and downloading ; and
(17) provision shall also be made in the web portal for verification of clearance(s) for which the applicant(s)
shall be liable to make payments as prescribed from time to time.
15. Deemed Clearances. - (1) In case, the Departmental Nodal Officer or the Competent Authority does not
respond to the application forwarded by the Single Window Nodal Officer or the Investment Promotion and
Facilitation Cell, within the prescribed timeline, the requisite clearances applied for by the applicant shall be
deemed to have been granted and no further objection will be raised :
Provided that if at a later stage it is found that any information submitted by the applicant is false, the deemed
approval shall be revoked.
(2) A Clearance Certif icate under the sub-section (1) shall be issued to the applicant by the concerned
Department through the Departmental Nodal Officer, af ter obtaining the fee as may be prescribed.
(3) The granting of Deemed Clearance under sub-section (1) shall be binding on the concerned Departments.
16. Timelines for granting clearances. - (1) All new proposals or proposals for expansion of existing
industrial/service unit which need clearances under one or more of the applicable laws shall be eligible to apply
under this Act.
(2) For all clearances, the Departmental Nodal Officer shall process such applications, as and when received
by him, within the time line as may be prescribed by the Government in this regard.
CHAPTER VII
Miscellaneous
17. Inspections. - (1) Inspections under the relevant laws or the rules made thereunder by the different
Authorities shall be conducted jointly.
(2) The Department may conduct inspection based on computerized risk assessment prescribed under the
relevant Act or the rules made thereunder. However, the inspection in respect of the complaints may be
conducted under the authorization of the Head of the Department.
(3) Surprise inspections may be conducted with the specific permission of the concerned Department.
18. Protection of action in good faith. - No suit, prosecution or other legal proceedings shall lie against the
Chairperson or the members of the Committees constituted under the Act or any employee of the Government
for an Act done in good faith, under this Act or any rule made thereunder.
19. Confidentiality. - No agency or authority of the Government or, any local authority, including any
functionaries thereunder, shall disclose to any other applicant or to a person not duly authorized, any
information forming the intellectual property of the investor without the consent of such investor :
Provided that all information in respect of the terms and conditions of the investment made in the State and the
facilities, if any, provided to the investor by the Government or Competent Authority shall be notified by the
Government, for information of the public.
20. Transitional Provisions. - The provisions of this Act shall apply to all investment proposals that are under
consideration of the Government or Competent Authority on the date of commencement of this Act.
21. Appeal. - Any applicant aggrieved by the orders of-
(i) The District Level Clearance Committee constituted under the Act shall file an appeal to Divisional Level
Single Window Clearance Committee within thirty days from the date of the receipt of the order ;
(ii) The Divisional Level Single Window Clearance Committee constituted under the Act shall file an appeal
to Apex Project Clearance Committee within thirty days from the date of the receipt of the order.
22. Act to have an overriding effect. - The provisions of this Act shall have effect notwithstanding anything
inconsistent contained in any other State law, for the time being in force :
Provided that fine, penalty or duty etc., if any, shall be imposed as per provisions of such applicable laws.
23. Bar of Jurisdiction of Civil Court. - No Civil Court shall have jurisdiction to entertain any suit on any
matter relating to clearance of Industrial Investment or against any order issued under the provisions of this
Act.
24. Processing and disposal of applications. - Subject to the provisions of the relevant law for the time being
in force,-
(a) The Government may prescribe the manner of processing and disposal of applications ;
(b) The Competent Authority may ask for additional information before the expiry of the period s tipulated
for the disposal of such clearance through Single Window Nodal Officer with advance copy of the same
to the applicant :
Provided that the Competent Authority shall ensure that all the required information is asked for together in a
single communication for avoiding delay in clearance and unnecessary harassment to the applicant ;
(c) Af ter receipt of the additional information, the Competent Authority shall pass an order on the
application before the expiry of the prescribed time limit from the date of receipt of such additional
information ;
(d) The District Level Single Window Clearance Committee may suo motu or on a reference, examine any
order passed by any Competent Authority, pertaining to this Act rejecting any clearance or approving it
with modification, and if the Committee considers that there are valid grounds for a chang e in such
decision, it shall forward such case to the Divisional Level Single Window Clearance Committee with
remarks and relevant documents for a decision ;
(e) The Divisional Level Single Window Clearance Committee shall examine all cases referred to it by the
District Level Single Window Clearance Committee and pass appropriate orders ;
(f ) The decision taken by the Apex Project Clearance Committee shall be binding on the District/Divisional
Level Single Window Clearance Committee and the Competent Authorities ;
(g) Subject to the provisions of any relevant law for the time being in force, the D ivisional Level Single
Window Clearance Committee may suo motu or on a reference, examine any o rders passed by the
District Committee and pass appropriate orders as it deems fit and such orders shall be final ;
(h) The Divisional Level Single Window Clearance Committee may suo motu or on a reference, examine
any order passed by any Competent Authority, pertaining to this Act rejecting any clearance or
approving it with modification or the grievances relating to technical, procedural or other issues relating
to disposal of any application, and if the Divisional Level Single Window Clearance Committee
considers that there are valid grounds for a change in such decision, it shall forward such case to the
Apex Project Clearance Committee with remarks and relevant documents for a decision ;
(i) The Apex Project Clearance Committee shall examine all cases referred to it by the Div is ional Level
Single Window Clearance Committee and pass an appropriate order.
25. Grievance Redressal Mechanism. - The Government may notify a mechanism for redressal of grievances
arising out of and in relation to Single Window Clearance for industrial investments and business facilitation
under the provisions of this Act.
26. Power to make rules. - (1) The Government may, by notification, make rules for carrying out the purposes
of this Act.
(2) In particular and without prejudice to the generality of the foregoing power, such rules may be made to
provide for all or any of the matters expressly required or allowed by this Act to be prescribed by rules.
(3) All rules made under this section shall be laid before the State Legislature within thirty days and shall be
subject to rescission by the State Legislature or to such modification as the State Legislature may make during
the session in which they are so laid or the session immediately following.
(4) Any rescission or modification so made by the State Legislature shall be published in the Government
Gazette, and shall thereupon take effect.
27. Removal of difficulties. - (1) If any dif ficulty arises in giving effect to the provisions of this Act, the State
Government may, by order, make such provisions as are necessary or expedient for removing the difficulty :
Provided that no such order shall be made under this section after the expiry of three years from the
commencement of this Act.
(2) Every order made under this section shall be laid as soon as may be, af ter it is made, before the State
Legislature.