Standards of Performance of Distribution Licensee Regulations, 2006 (all amendments upto 31.05.2017)
Regulations made under THE ELECTRICITY ACT, 2003
- Made under: THE ELECTRICITY ACT, 2003
This text is shown as one document.
Full text
REGISTERED NO. PT-40
The Bihar Gazette
E X T R A O R D I N A R Y
PUBLISHED BY AUTHORITY
2ND MAGHA 1928(S)
(No. PATNA 83) PATNA, MONDAY, 22ND JANUARY 2007
BIHAR ELECTRICITY REGULATORY COMMISSION
STANDARDS OF PERFORMANCE OF DISTRIBUTION LICENSEE
NOTIFICATION NO. 1/2007
Dated the 18th January, 2007
No. BERC/Regl-9/2006 –In exercise of powers conferred under section 181
(1) and 181 (2) (za) read with sections 57,58 and 59 of the Electricity Act, 2003 (36
of 2003) and all other powers enabling it in this behalf, the Bihar Electricity
Regulatory Commission hereby makes the following Regulations:-
Chapter 1
Preliminary and General Matters
1. Short Title, Extent, Applicability, and Commencement
(1) These Regulations shall be called the “Bihar Electricity Regulatory
Commission (Standards of Performance of Distribution Licensee)
Regulations, 2006”.
(2) These Regulations extend to the whole state of Bihar.
(3) These Regulations shall be applicable to all distribution licensees in their
respective licensed areas in the State of Bihar.
2
(4) These Regulations shall come into force after three months from the date of
their publication in the official gazette.
2. Definitions
(1) In these Regulations, unless the context otherwise requires:-
a) “Act” means the Electricity Act, 2003 (36 of 2003).
b) “Area of Supply” means the area within which a licensee is authorised
by his licence to distribute and supply electricity.
c) “Commission” means the Bihar Electricity Regulatory Commission.
d) “Consumer” means any person who is supplied with electricity for his
own use by a licensee or the Government or by any other person
engaged in the business of supplying electricity to the public under the
Act or any other law for the time being in force and includes any
person whose premises are for the time being connected for the
purpose of receiving electricity.
e) “Danger” means danger to the health or life or any part of the body
from shock, burn or other injury to person or to property originating
from the electricity distribution or utilization system and includes
danger from electricity originated from fire or explosion in distribution
and utilization systems.
f) “Emergency Periods” means the periods declared such by the
Government due to war, mutiny, strikes, natural calamities, severe
drought, heavy floods and similar abnormal periods.
g) “Extra High Tension / Extra High Voltage” means the voltage
exceeding 33000 volts under normal conditions.
h) “High Tension or High Voltage” means the voltage exceeding 440
volts but not exceeding 33000 volts under normal conditions.
i) “Licensee” means the Distribution Licensee who has been granted
licence by the Commission under section 14 of the Act including a
deemed Licensee.
j) “Low Tension or Low Voltage” means the voltage that does not
exceed 230/440 volts (phase to neutral and phase to phase
respectively) under normal conditions.
k) “Period of Load Shedding” means a period during which the power
has to be switched off to certain feeders to match the demand and
supply as per the instructions of the respective load despatch centres.
l) “Period of Scheduled Outage” means a period wherein certain
equipment and lines are under pre-arranged shut-down for
3
maintenance during which it may or may not be possible to make
alternative arrangements for maintaining supply to consumers.
m) “Period of Forced Outage” means a period wherein certain equipment
or a line breaks down during which alternative arrangements by using
standby equipment for maintaining supply to consumers may or may
not be possible.
n) “Rural Areas” means areas covered by Gram Panchayats.
o) “Urban Areas” means cities, towns, cantonments, industrial estates,
and areas covered by municipalities, municipal corporations, urban
development authorities, and cantonment authorities.
(2) Words and expressions used but not defined herein but defined in the Act
shall have the meaning assigned to them in the Act. The terms defined
neither here nor in the Act shall have the meaning as used in electricity
industry and electrical engineering practice.
3. Interpretation
In the interpretation of these Regulations, unless the context otherwise
requires.
i) words in the singular or plural term, as the case may be, shall also be
deemed to include the plural or the singular terms.
ii) references herein to these Regulations shall be construed as references
to these Regulations as amended or modified by the Commission from
time to time in accordance with the applicable Act and rules made
thereunder.
iii) the headings inserted in these Regulations are for convenience only.
iv) references to the statutes, Regulations or guidelines shall be construed
as including all provisions consolidated, amended or replaced by such
other statutes, Regulations or guidelines as the case may be from time
to time.
4. Other Statutes
These Regulations shall be read with, relevant provisions of the Act and also
the Electricity Supply Code notified by the Commission, as may be amended
from time to time.
5. Legal Provision
i) The Commission in pursuance to provisions of section 57 read with
section 86 (1) (i) of the Act is specifying these standards for
Distribution Licensees in the State of Bihar. The standards of
performance specified herein are intended to serve as guidelines for
4
Distribution Licensees to operate their distribution and supply
business for providing quality, continuity and reliability of service.
ii) The sub-section (1) of section 57 of the Act stipulates that the
Commission after consultation with Licensees and persons likely to
be affected shall specify standards of performance of a Licensee or a
class of Licensees.
iii) The sub-section (2) of section 57 of the Act provides that if a Licensee
fails to meet the standards specified under sub-section (1), without
prejudice to any penalty, which may be imposed, or prosecution be
initiated, he shall be liable to pay such compensation to a person
affected as may be determined by the Appropriate Commission;
Provided that before determination of compensation, the concerned
Licensee shall be given reasonable opportunity of being heard.
iv) Under the provisions of section 86 (1) (i) of the Act, the Commission
is required to specify and enforce standards with respect to quality,
continuity and reliability of service by the Licensees.
v) In terms of stipulations made in Section 59 of the Act, provision has
been made in Regulation 30 (1) for furnishing information with
respect to level of performance and quarterly report on performance
standards and publication of Annual Report.
vi) The penal provision for imposition of penalty on the licensee for any
shortfall or deviation from overall standards prescribed under
Chapter 7 & 8 of the Regulation and non payment of compensation to
aggrieved consumer has been made in terms of provisions of Section
142 of the Act.
6. Information to the consumers
The licensee shall always keep in his office adequate number of printed
copies of Standards of Performance and shall on demand, sell such copies
to any applicant at a price fixed on cost basis. The salient features of
Standards of Performance shall also be displayed on notice board in offices
of Licensee which are frequently visited by the consumers.
7. Cooperation from Consumers
The licensee shall inform the consumers through media like television and
radio about action to be taken by them during abnormal circumstances to
prevent total collapse of the system or those deviations there being if
standards of supply are minimal (Eg:- reduction of load when generating
units trip).
5
8. Maintenance of Records
(1) The licensee shall maintain consumer-wise record regarding Guaranteed
Standards of Performance in order to give a fair treatment to all
consumers and avoid any dispute regarding violation of standard.
(2) The system of maintaining records, correspondence with consumers and
applicants for new service connection, monitoring and recording system
conditions especially at inter-connection points, recording weather
conditions and recording law and order situations shall be maintained
by the licensee to provide accurate data without delay.
(3) Beside other registers/records as required, the licensee shall also
maintain the following registers/records, at the local offices.
(a) Separate register of application for new service connection,
enhancement of load, temporary supply, reduction of load,
change of name, etc.
(b) Service connection register
(c) Security Deposit register
(d) Connection charges collection register
(e) Fuse call register
(f) Interruption in power supply register
(g) Disconnection and Reconnection of service connection register
(h) Meter replacement register
(i) Distribution transformer register with load details
(j) Estimates register
(k) Work order register
(4) Whenever delay occurs in respect of any action to be taken by the
licensee the reason for delay must be recorded clearly on the relevant
papers and registers. The employees of the licensee must be trained and
instructed to fulfil this obligation.
(5) The parameters at the interface points between the distribution system
and the transmission system and between the distribution system and
small generating station shall be noted down and recorded continuously.
These data shall be preserved for reasonable periods.
9. Stand Alone Systems, Non-conventional Energy Systems and Local
Distribution Systems in Rural Areas
(1) Since persons/ organizations owning such Distribution system such as
Stand Alone System and Non-conventional Energy System are governed
by section 4 of the Act, these Regulations shall not be applicable to
6
them. However system owner shall formulate his own standards and
obtain approval of the Commission.
(2) (a) These Regulations do not apply immediately also to local
distribution systems in rural areas managed by Panchayat
Institutions, user’s associations, cooperative societies, non-
governmental organisations on establishment.
(b) The organization owning or managing such rural distribution
systems shall prepare their own standards and obtain approval of
the Commission.
(c) Such organizations shall gradually improve their operating
standards and move towards the standards of performance
prescribed in these Regulations. After a period of five years from the
date of coming into being, these standards shall also be applicable
to such rural distribution systems.
Chapter 2
Safety
10.(1) Safety Standards to be complied with by the Licensee.
i) The licensee shall carry out construction, operation and maintenance of
the distribution lines strictly in accordance with the Indian Electricity
Rules 1956 (IER 1956) except those parts of IER 1956 which have been
superseded by the safety Regulations notified by the Central Electricity
Authority (CEA) under Section 53 of the Act. On subjects and areas
(segments of power system) on which CEA’s Regulations do not exist,
the licensees shall follow IER 1956. In respect of matters not covered
by IER 1956 or CEA’s Regulations, the licensee shall develop his own
written rules and procedures and communicate them to his officers and
staff after getting approved by the Commission. No relaxation or
exemption shall be allowed by the licensee to his officers / employees in
complying with the safety rules in force. When CEA’s Regulations or
Rules on safety of any part of power system are notified, the procedures
of the licensee to the extent of those notified will stand superseded.
ii) The grounding provided for the equipment and lines and earthing grid
for sub-stations shall be in accordance with latest version of IS:3043-
Code of Practice for Earthing.
7
iii) The Licensee shall erect and maintain earthing systems by following
best standards and connect all those points of the system which are
required to be connected to earth.
iv) The earthing connections shall be maintained in a sound and healthy
state at all times. The licensee shall take all necessary steps for testing
the same and maintain the record of each test in accordance with the
provisions under relevant rules of IER 1956.
v) The Licensee shall follow provisions of IER 1956 and would ensure that
no live parts of any overhead line or distribution transformer are so
exposed as to cause danger. The Licensee shall also adhere with the
provisions under relevant rules of IER 1956 regarding clearances in the
construction of overhead lines, erection of transformers, sub-stations
and other equipment and guarding must be provided for the lines
where necessary.
vi) The licensee shall adopt prescribed mechanical factor for safety of
components of overhead lines and must provide guys and stays where
necessary. The structures and overhead lines must be capable to
withstand the storms, wind and rain that occur every year in his area.
vii) At places of high density population and wherever heavy traffic exists
the licensee shall maintain higher degree of safety by insulating live
parts and by providing adequate guarding although the clearances may
be adequate.
viii) Leakage current means the difference between phase current and
return path. The Licensee shall take necessary steps to measure
leakage current at various points in the system.
ix) The earth wires and earth electrodes provided in the Distribution
System shall be maintained in good condition to ensure instantaneous
operation of the protective equipment, either a fuse or a circuit breaker
as the case may be, in case of accidental snapping of a conductor. In
case of failure in the operation of the protective system during any
accidental snapping of conductors, the circuit shall be de-energised
manually, immediately after it comes to the notice of the concerned
employee of the Distribution Licensee. A detailed investigation shall be
done to determine cause for non-operation of the protective system and
remedial measures should be taken promptly by the Licensee.
x) The Licensee must instal lightning arresters at appropriate points of the
system to protect the system from lightning.
8
xi) The Licensee shall fix danger warning boards and display voltage level
at appropriate points of the system.
xii) The safety precautions to be followed in respect of the licensee’s
installations in the consumer’s premises at the point of supply and for
the system part downstream and adjacent to the point of supply i.e. in
the consumer’s system shall be conveyed by the Licensee to the
consumer both in writing and verbally at the time of release of supply to
a new service connection.
xiii) The Licensee shall take all necessary action to spread awareness among
the consumers for safe usage of the electricity.
xiv) The licensee shall educate the public through press notifications
regarding precautions to be taken and methods to protect themselves
when an overhead line conductor snaps or when a pole falls or when a
structure collapses and other similar events occur.
xv) The Licensee may disconnect supply to such consumer, in the event of
consumer's non compliance even after due notice, of any specific
condition or direction if such non compliance can reasonably be
expected to affect system operations and safety. In cases of emergency,
disconnection may be effected immediately in the interest of system
operation and safety. The connection should be immediately restored as
soon as the cause(s) leading to the disconnection are removed or
rectified.
(2) Electrocution Accidents
i) Departmental / Non-Departmental fatal electrocution accidents to
human or animal life shall be reported by the Area Distribution
Engineer to Chief Electrical Inspector (CEI) and to all concerned officials
of the State Government / Licensee within 24 hours and confirmed by a
post copy within 48 hours.
ii) The records of all the fatal electrocution accidents shall be maintained
along with the investigation report of the CEI. A copy of the action taken
on report of CEI alongwith safety measures taken for avoiding
recurrence of such accidents shall be submitted to the Commission
every six months i.e. by 31st October and 30th April of each financial
year.
9
Chapter 3
Handling of Complaints
11. Handling of Consumer's Complaints
(1) The Licensee shall register every complaint made by a consumer, either
verbally or in writing, regarding failure/interruption of power supply,
quality of power supply, meters/meter boxes/metering system's service line,
payment of bills and other services relating to power supply, in a register in
a format appended at Appendix A to these Regulations to be maintained for
this purpose. A unique number shall be allotted to each complaint. This
complaint number shall be conveyed to the consumer except in the case of
postal complaints received. However the consumer may, subsequent to the
delivery of postal complaint, inquire regarding the complaint number /
status telephonically or in person. The number shall be communicated by
the Licensee to the complainant in such a case. In case of major failure of
supply due to tripping of EHV or failure of upstream power systems, the
reason needs to be communicated to the consumer in addition to the likely
restoration time. In such case, such complaints shall be recorded separately
under single complaint number. The licensee shall ensure redressal of all
complaints promptly.
(2) Complaints in respect of supply of electricity covering metering, billing and
payment, shall be made at specified offices of the Licensee. The Licensee
shall convey information of the name of office(s), address(s) with the
electricity bills and also display it at the sub-division offices or equivalent
distribution unit designated by whatever name. If the phone services for
recording complaints, if outsourced by the licensee, the phone numbers of
such call center shall be displayed in electricity bills and sub-divisional
offices. The licensee shall also endeavour to publicise these contact details
through local newspapers/TV/Radio.
(3) The office, where a complaint is registered, shall dispose it of, and if any
instruction / sanction is to be obtained from a higher authority, it shall be
obtained by the complaint registering office. The complainant is not
required to approach such higher authority. Similarly, in case an
outsourced phone service is engaged, such center itself shall forward the
complaints to the concerned officer. The licensee shall ensure proper
compliance by the outsourced service by arranging visits of its officers to
such centers to streamline responses.
10
(4) Grievances regarding non-registration of complaints and failure to perform
within the time limits and / or meet the performance targets, as specified in
these Regulations, shall be made to the concerned officer in-charge of the
division or to equivalent distribution unit designated by any other name. In
case of unsatisfactory disposal of grievance, complaint should be made to
the officer in-charge of the circle or equivalent similar functionary by
whatever name designated.
(5) The Licensee shall also compile the complaints classification-wise in a
separate register(s) in a format appended at Appendix B to these
Regulations.
Chapter 4
Quality of Power and System Reliability
12. Power Quality Standards
(a) Voltage Variation:
The licensee shall maintain voltages at the point of commencement of
supply to consumer within the limits stipulated hereunder with
reference to declared voltage.
(i) Low tension / Low Voltage + 6% and – 6%
(ii) High tension / High Voltage + 6% and – 9%, and
(iii) Extra High Tension/Extra High Voltage + 10% and – 12.5%
The above voltage standards are applicable subject to voltage
availability at transmission-distribution interfaces within specified
limit.
Whenever an EHT consumer complain that abnormal voltage prevails
in his premises, the distribution licensee shall convey the complaint
to the SLDC and the transmission licensee concerned and request
them to restore the voltage to normal range.
(b) Frequency variation:
The frequency variation shall be governed by the Indian Electricity
Grid Code (IEGC) / State Grid Code. IEGC stipulates operating
frequency range between 49.0 Hz and 50.5 Hz. The transmission
utility, transmission licensee and the state load despatch centre shall
jointly maintain the operating frequency between 49.0 and 50.5 Hz.
The distribution licensee shall cooperate with the State load despatch
centre and the transmission utility/ transmission licensee by
reducing load whenever requisitioned.
11
(c) Harmonics:
(1) Harmonics generated by one consumer may affect the normal
operation of another consumer. Therefore on receipt of a complaint
from a consumer who cannot carry out normal operations due to large
harmonics, the licensee shall investigate the cause and eliminate or
reduce the harmonics even before the Commission stipulates limits.
This may involve identification of harmonic generating consumers and
serving notices on them to instal filters. Harmonics may cause
temporary over voltages and ferro-resonance. These harmonics may
cause large neutral current.
(2) The Licensee shall monitor the voltage harmonics and submit the field
data to the Commission. The Licensee shall measure the current
harmonics drawn by various consumers having the following loads
and its records maintained:-
(a) Salient Pole synchronous generators
(b) Power Transformers of more than 15 years old
(c) Rolling Mills
(d) Induction Furnaces
(e) Welding Equipment
(f) Static Power Loads
(g) Inverters / power rectifiers
(h) Railway Traction Load
13. System Reliability
(1) It shall be the endeavour of the licensee to maintain uninterrupted supply
to consumers and minimize breakdowns and interruptions.
(2) The consumers shall be given advance intimation regarding interruptions in
supply due to pre-arranged shut downs through media. The maximum
duration of interruption per day shall not exceed ten hours and supply shall
be restored invariably before 6.00 p.m.
(3) Adequate data shall be recorded to calculate the following reliability indices.
The licensee shall calculate the values of these indices as per the formula
and methodology specified below :
a) System Average Interruption Frequency Index (SAIFI)
Nt
n
i=1
(A i * N i)
SAIFI =
12
Where
A i = total number of sustained interruptions (each longer than
5 minutes) on ith feeder for the month
N i = connected load of ith feeder in kW affected due to each
interruption
N t = total connected load at 11 kV in kW in the distribution
licensee’s supply areas.
n = number of 11 kV feeders in the licensed area of supply
(excluding those serving predominantly agricultural loads)
b) System Average Interruption Duration Index (SAIDI)
Nt
Where
B i = total duration of all sustained interruptions on ith feeder
for the month
N i = connected load of ith feeder in kW affected due to each
interruption
N t = total connected load at 11 kV in kW in the distribution
licensee’s supply areas.
n = number of 11 kV feeders in the licensed area of supply
(excluding those serving predominantly agricultural loads)
c) Momentary Average Interruption Frequency Index (MAIFI)
Nt
Where
C i = total number of momentary interruptions, each less than
or equal to 5 minutes on ith feeder for the month.
N i = connected load of ith feeder in kW affected due to each
interruption
N t = total connected load at 11 kV in kW in the distribution
licensee’s supply areas.
n = number of 11 kV feeders in the licensed area of supply
(excluding those serving predominantly agricultural loads)
n
i=1
(B i * N i) SAIDI=
n
i=1 (C i * N i)
MAIFI=
13
(4) The indices shall be calculated by the licensee separately for Urban and
Rural feeders and submitted to the Commission every quarter. After three
years (from the date these Regulations come into force) the Commission will
fix the target leveles of the reliability indices annually based on the
information provided by the licensees.
14. Interruptions and Restoration of Supply to Essential Services
(1) The licensee shall endeavour to maintain uninterrupted supply for railway
traction, water supply and hospitals. Whenever there is an interruption,
supply shall be restored on top priority and the rectification work carried
out on round the clock basis. During periods of generation shortage,
traction loads may be exempted from load relief and power cut.
(2) The licensee shall maintain uninterrupted power supply to process
industries. When interruptions occur to process industries, restoration
shall be done on top priority and rectification work shall be carried out on
round the clock basis. However at the time of release of supply such
consumers shall be advised to avail alternate supply from an independent
source and also to install captive generators as a standby.
Chapter 5
New Service Connection / Additional Load and Other Service
Connection Related Matters
15. New Service Connection
(1) It shall be the duty of the licensee to extend the supply of electricity to any
applicant in the area of Licence.
(2) For release of supply to new service connection the relevant provisions of
the Electricity Supply Code shall apply.
(3) Where distribution mains have been laid down, the licensee, shall, on an
application by the owner or occupier of any premises, located in the area of
supply, give supply of electricity to such premises, within one month after
receipt of completed application and requisite charges.
(4) Where extension works are to be carried out by the licensee, the time frame
for different tasks is given below.
(A) L.T. Connection:
(a) Intimation regarding acceptance of
application from the date of receipt of
application
– 5 days
14
(b) Intimation of estimated charges and
amount of security deposite from date of
acceptance of application involving
extension of dist. network and addition /
enhancement of distribution transformers
– 20 days
(c) For providing service connection after
payment of charges involving extension of
dist. network and addition / enhancement
of distribution transformers
– 30 days
(B) H.T. Connection:
(e) The Licensee may approach Commission for extension of time
specified above in cases where the magnitude of work requires
(a) Issue of feasibility certificate from the date
of receipt of application
– 10 days
(b) Intimation of estimated charges and
amount of security deposite payable by the
applicant for providing new connection
– Involving erection of new 33 KV sub
station (S/S), lines etc. up to Contract
Demand of 7500 KVA
– 45 days
– Involving erection of EHT S/S, lines etc.
for Contract Demand above 7500 KVA
– 60 days
(c) Completion of works from payment of
Service Line / Development Charges,
security deposit and execution of
agreement
– Involving erection of new 11 kV line _ 45 days
– Involving erection of new 33 KV line – 75 days
–
_
Involving erection of new EHT line
Involving augmentation or addition of
transformers (33/11 or 132/33 KV)
–
_
150 days
30 days
additional
(d) Release of supply from the date of
furnishing of Chief Electrical Inspector's
approval
–
–
–
11 KV & 33 KV loads
132 KV loads
–
–
15 days
30 days
15
more time with furnishing details and justification in support of
such request for extension. Such request shall be made within 5
days from the preparation of the estimate.
(f) The Licensee shall however, not be held responsible for delay in
providing connection, if the same is on account of special
circumstance such as right of way, acquisition of land, delay in
permission for road cutting, over which Licensee has no
reasonable control provided that the reason for expected delay are
communicated to the applicant within the period specified for.
Additional period required on account of special circumstances
mentioned above, shall be added to the normal period as specified
under Regulation 15(4) i.e. the period within which the licensee
has to release new service connection.
(g) The time limit shall be extended by the period which the
consumer delays in fulfilling the following tasks beyond the due
date intimated by the licensee:-
(i) Payment of service connection charges and security deposit
(ii) Certificate that the internal wiring/consumer’s electrical
system including machinery, equipment and appliances are
in good condition, comply with the standards including
safety standards and the insulation resistance of the
system.
(iii) Signing of Agreement between the licensee and the
consumer.
(iv) Filing ownership certificate of the premises.
(v) Settlement of dues if the applicant had availed supply of
electricity earlier.
(vi) Providing of space for installation of transformer or metering
equipment, if required.
16. Temporary Supply / Connection
(a) Consumers shall requisition for temporary supply for
construction and other purposes in the prescribed application
form.
(b) The licensee shall collect the cost for effecting temporary service
connection and the cost towards expected energy consumption
as per tariff order in force.
16
(c) The licensee shall release supply on the date required by the
consumer in case where distribution lines are laid down.
(d) Where extension of distribution main is required, the time
schedule as mentioned in Regulation 15(4) shall apply.
(e) The licensee shall refund the balance deposit, if any within one
month from the date of dismantling the temporary service
connection, after adjustment of the dues payable by the
consumer
17. Enhancement of Load of Existing Consumer
(a) On receipt of an application in the prescribed form for
enhancement of the contract demand, the licensee's engineer
shall inspect the premises within seven (7) days of receipt of
application and shall allow the enhancement of load within
twenty (20) days if no extension and alteration of distribution
network is required.
(b) If extension and alteration of distribution network is required,
the time schedule under Regulation 15(4) shall apply for allowing
load enhancement.
Other Service Connection Related Matters
18. Shifting of Service Wire, Line and Equipment
(1) On receipt of an application for shifting a service wire, line, pole,
underground cable (U.G.) or transformer, the licensee shall ensure that the
desired new position does not violate any statute and does not encroach on
the land of a third party.
(2) The time period for preparation of estimate and intimation of charges to be
paid by the consumer after receipt of application in each case is specified
below :
(i) Shifting of Meter or service line 7 days
(ii) Shifting of LT line 15 days
(iii) Shifting of 11 kV line 30 days
(iv) Shifting of 33 kV line 45 days
(v) Shifting of U.G. cable 45 days
(vi) Shifting of Distribution Transformer 30 days
(3) On receipt of payment from the consumer the licensee shall complete the
work within the following time periods: -
(a) Shifting of meter/service wire 15 days
(b) Shifting of pole, LT or HT Line 60 days
17
(c) Shifting of underground Cable 45 days
(d) Shifting of Distribution Transformer alongwith the
structure
90 days
(4) The additional expenditure shall be recovered from the consumer or the
balance deposit shall be refunded as the case may be, within three (3)
months from the time of completion of the work.
19. Reduction of Load of Existing Consumer
On receipt of application in prescribed form for reduction of load by a
consumer, the licensee shall inspect the premises within the notice period
as specified in the Electricity Supply Code and if the load is actually
reduced by the consumer, the licensee shall effect the reduction of load from
next calendar month of the notice period.
Provided the consumer has completed the period of compulsory availing of
supply as specified in the Electricity Supply Code (ESC) and has executed
fresh agreement on reduced load.
20. Change of Tariff
(1) If the consumer wishes to use electricity for a different purpose which falls
in a different category and therefore different tariff, the consumer shall
apply for the same in the prescribed form.
(2) The licensee shall inspect and prepare a revised test report.
(3) The licensee shall effect the change of tariff within seven (7) days from the
date of application, if the change is from lower tariff to higher tariff.
(4) Tariff change from higher rate to lower rate shall be done only after
completion of compulsory period of availing of supply.
(5) Tariff change from any LT category to Agricultural category shall not be
permissible.
21. Change of name of Service Connection
On receipt of application in the prescribed form along with the requisite fee
for change of service connection from one person to another person, the
licensee shall intimate within seven (7) days from the date of receipt of
application, to deposit the security money against the new name and
execute the agreement.
Within seven (7) days from the date of deposit of security amount and
execution of agreement the name shall be changed in the record of the
licensee.
22. Defective Meters
(1) On intimation by the consumer or meter reader, any staff/officer or the
Licensee that a meter is defective, the licensee shall arrange for inspection
18
and site testing for its accuracy within seven (7) days in urban areas and
within fifteen (15) days in rural areas.
(2) If the meter has failed due to causes attributable to the distribution system
like high voltage, loose contacts and ageing, the meter shall be replaced by
the licensee at his cost within seven (7) days.
(3) If the meter has failed due to lapse on part of the consumer like over
loading, exposure to water or tampering, the licensee shall serve a notice to
deposit the cost for new meter or to deposit a meter of appropriate capacity
alongwith testing fees within seven (7) days. The Licensee shall replace the
meter within fourteen (14) days of receiving payment /meter as the case
may be from the consumer.
(4) If the Meter's seals have been tampered, the licensee shall investigate and
take necessary action under sections 126, 135 and 138 of the Act.
(5) Energy bills shall not be raised on erroneous reading of the meter. The bills
in such case may be raised on the basis of the energy consumption for the
last six (6) months or if provided otherwise, in the Tariff Order in force, the
later shall prevail.
23. Erroneous Bills
(1) If an error in the bill is brought to the notice of the licensee by the
consumer and no additional information is required for revision, the
revised bill shall be issued within twenty four (24) working hours of
receipt of complaint.
(2) If additional information or inspection of meter, load etc. is required,
the revised bill shall be issued within seven (7) working days of
receipt of complain in case of LT consumer and within fifteen (15)
days of receipt of complain in case of HT consumers.
(3) If the original bill is correct the fact shall be explained to the
consumer.
24.(a) Reconnection of Service
(1) Where a service connection has been disconnected for non payment of bills
and the consumer pays all dues including reconnection charges, the
licensee shall arrange reconnection same day and for unavoidable reasons,
the next day. The consumer may also produce proof of payment to the local
area Engineer of the licensee for speedy reconnection of electric line.
(2) If service connection is disconnected for malpractice like pilferage, the
service connection shall be restored after the case is settled and consumer
19
pays the entire assessment amount. In such cases the licensee shall not pay
any compensation for delay in reconnection.
(b) Permanent disconnection on request of consumer
If a consumer desires to get his service connection disconnected
permanently, he shall give prior notice as specified in the Electricity
Supply Code (ESC) or as otherwise provided in the Tariff Order which is
in force. The Licensee shall serve final bill along with disconnection
charges and after payment of the final bill the service connection shall
be disconnected and the agreement shall be terminated.
Chapter 6
Overall Standard of Performance and Level of Performance
25.(1) The overall standard of performance to be achieved by the Distribution
Licensee shall be as specified below:
a) Normal Fuse off Calls:
The licensee shall ensure rectification of fuse-off calls within the time
limits as specified in schedule in Chapter 7. The licensee shall achieve
this standard of performance in atleast 95% of the cases.
b) Line Breakdowns:
In case of line breakdowns, the licensee shall ensure restoration of
power supply within the time period as specified in schedule in Chapter
7. The licensee shall achieve such standard of performance in atleast
95% of the cases
c) Distribution Transformer Failure:
The licensee shall maintain the percentage of distribution transformers
replacement within the time period as specified in schedule in Chapter
7 in atleast 95% of the cases.
d) Period of Scheduled Outages:
Interruptions in power supply due to scheduled outages have to be
notified in advance and shall not exceed such number of hours in a day
as specified in schedule in Chapter 7 and the licensee shall ensure that
the supply is restored by such time as specified in the schedule. The
licensee shall achieve both of these standards of performance in atleast
95% of the cases.
e) Street Lights:
The licensee shall as soon as possible, attend to complaints relating to
non working of street lights or not operating properly, to the extent the
20
matter lies within the purview of the licensee. Atleast 90% of the cases
shall be attended and resolved within the time limit as specified in
schedule in chapter 7.
f) Billing Mistakes:
Billing mistakes shall not exceed 1% of the total bills prepared. 99% of
the cases related to billing mistakes should be resolved within the time
period as specified in schedule in Chapter 7.
g) Faulty Meters:
The licensee shall maintain the percentage of faulty Meters not greater
than 3% of the total number of meters in service. 99% of the cases in
urban areas and 98% of the cases in rural areas shall be resolved
within the time period as specified in schedule in Chapter 7.
h) Voltage Unbalance:
The licensee shall ensure that the voltage unbalance does not exceed
3% at the point of commencement of supply.
Atleast 98% of the cases related to voltage unbalance shall be resolved
within the time period as specified in schedule in Chapter 7.
j) Release of new connections/Additional Load / Temporary
Connection :
All cases (100%) of release of new connection, additional load and
temporary connection on application by the applicant / consumer
should be resolved within specified time limits.
k) Transfer of Ownership and Conversion of Service :
At least 98% of the cases related to transfer of ownership and
conversion of service should be resolved within specified time limits.
(2) The summary of overall performance standards is as follows:
Service area Overall standard of
performance
a Normal fuse – off calls At least 95% calls received
should be rectified within
prescribed time limits.
b Line Breakdowns At least 95% of cases should be
resolved within prescribed time
limits.
c Distribution Transformer (DTR)
failure
At least 95% of DTRs to be
replaced within prescribed time
limits.
d Period of scheduled outage
Maximum duration in a single
stretch
At least 95% of cases resolved
within time limit
Restoration of supply by 6:00 PM
21
Service Area Overall Standard of
performance
e Street Light Faults
Rectification of line faults At least 90% of cases resolved
within time limits Replacement of fused / defective
unit
f Billing mistakes Not exceeding 1%
g Faulty meters Not exceeding 3%
h Voltage unbalance Maximum of 3% at the point of
commencement of supply
i Release of new connection /
additional load/Temporary
connection
100% cases within specified time
limits.
k Transfer of Ownership and
Conversion of Service
At least 98% of cases within
specified time limits.
Chapter 7
Guaranteed Standards of Performance
and Compensation for under performance
26. Guaranteed Standards of Performance
The standards of performance specified in the Schedule mentioned
hereinafter, shall be the Guaranteed Standards of Performance being the
minimum standards of service that a Distribution Licensee shall achieve in
discharge of his obligations as a Distribution Licensee.
27. Compensation for Under Performance
(1) In cases of failure of the licensee to meet standards of performance specified
in these regulations, without prejudice to any penalty, which may be
imposed, the licensee shall be liable to pay such compensation to the
affected consumer(s) as stipulated in the Schedule for Guaranteed
Standards of Performance, pertaining to a particular standard of
performance unless exempted in accordance with Regulation (28) mentioned
hereinafter.
However, if a consumer defaults in making payment of three consecutive
energy bills, he shall not be eligible for payment of compensation, not with
standing the fact that he shall not loose his right In getting the proper
service from the licensee guaranteed under the Standard of Performance
Regulations.
(2) Wherever there is a deviation from the standard of performance by the
Licensee for which compensation is provided in these Regulations, the
affected consumer may claim compensation by sending a written claim
petition along with all details by Registered Post or hand delivery under
1[
1. Substituted by the BERC (Standards of Performance of Distribution Licensee) [1st
Amendment] Regulations, 2012 vide Bihar Gazette No. 666 dated 12th December, 2012
(w.e.f. 12.12.2012)
22
proper receipt to the Divisional Engineer/Electrical Executive Engineer of
the area of supply of the distribution licensee who will decide the amount of
compensation within thirty days of receipt of the claim petition.
The licensee may fix the responsibility on their staff/officers for default in
the service and may realise the amount of compensation from concerned
individual's salary.
The distribution licensee shall issue a format for filing claim for
compensation and shall be available free of cost at each of the billing office
of the licensee.
The manner of payment of compensation shall be guided by Regulation 29
of the SoP Regulation.]
(3) Failure of the Licensee to pay compensation in accordance with Regulation
27 (1) above shall constitute a grievance which shall be dealt with in
accordance with the procedure set out in the Consumer Grievance
Redressal Forum and Electricity Ombudsman Regulation notified by the
Commission.
(4) The amount of penalty and compensation paid by the licensee shall not be
passed through in the annual revenue requirement of the licensee while
determining the tariff.
28. Exemption
(1) The standards of performance specified in these Regulations shall remain
suspended during Force Majeure conditions such as war, mutiny, civil
commotion, riot, flood, cyclone, lightning, earthquake, lockout, fire affecting
the Licensee's installations.
(2) Non-compliance of standard of performance contained in these Regulations
shall not be treated as violation, and the Distribution Licensee shall not be
required to pay any compensation to affected consumer(s), if such violation
is caused due to grid failure, a fault on the Transmission Licensee's network
or on account of instructions given by SLDC, over which the Distribution
Licensee has no reasonable control.
(3) The Commission may, by a general or special order after hearing the
Licensee and affected consumer(s) / consumer groups, exempt the Licensee
from liability to compensate the consumers for any default in the
performance of any standard, if the Commission is satisfied that such
default is for reasons other than those attributable to the Licensee and
further that the Licensee has otherwise made efforts to fulfill his obligation.
23
29. Manner of Payment of Compensation
(1) All payments of compensation shall be made by the Licensee to the affected
consumer by way of adjustment against his current and / or future bills for
supply of electricity, within 90 (ninety) days.
(2) Where it is not possible to pay compensation to the affected consumer by
adjusting electricity bills within 90 (ninety) days considering the likely
amount of the bill or where the person to be compensated is not a consumer
or ceases to be a consumer, the compensation shall be paid by the licensee
to the affected consumer by cash / cheque / demand draft.
24
SCHEDULE
(1/3)
GUARANTEED STANDARDS OF PERFORMANCE AND COMPENSATION TO AFFECTED
CONSUMERS IN CASE OF DEFAULT
Sl
No
Service Area Time Schedule to
complete the work as
specified in
Regulation
Compensation payable to the consumer in case of violation
of Standard
Compensation payable to
individual Consumer if the
event affects a single
Consumer
Compensation payable to
individual Consumer if the
event affects more than one
Consumer
1. Normal Fuse-off
Cities and Towns Within 4 hours Rs. 50 for each day of
default
Rs. 50 to each Consumer
affected for each day of default Rural Areas Within 24 hours
2. Overhead Line / Cable breakdowns
Cities and Towns Within 6 Hours Rs. 50 for each day of
default
Rs. 50 to each Consumer
affected for each day of default Rural Areas Within 36 Hours
3. Underground Cable breakdowns
Cities and Towns Within 24 Hours Rs. 50 for each day of
default
Rs. 50 to each Consumer
affected for each day of default Rural Areas Within 48 Hours
4. Distribution Transformer failure
Cities and Towns Within 24 Hours Rs. 100 for each day of
default
Rs. 50 to each Consumer
affected for each day of default Rural Areas Within 72 Hours
5. Period of Scheduled outage
maximum duration in a
single stretch
Not to exceed 12
hours
Rs. 100 for each day of
default
Rs. 50 to each Consumer
affected for each day of default
Restoration of Supply By not later than 6.00
PM
6. Voltage Fluctuations
No expansion /
enhancement of
network involved
Within 10 days
Rs. 100 for each day of
default
Rs. 50 to each Consumer
affected for each day of default
Up-gradation of
distribution system
required
Within 120 days
Rs. 100 for each day of
default
Rs. 50 to each Consumer
affected for each day of default
Erection of Substation Within the time period
as approved by the
Commission
Rs. 500 for each day of
default
Rs. 250 to each Consumer
affected for each day of default
7. Meter Complaints
Inspection of defective
meter such as slow,
fast / creeping, stuck-
up and burnt Meters
Inspection within 7
days in urban and
towns and within 15
days in rural areas
Rs. 100 for each day of
default
Not Applicable
Replacement of
defective meters if
cause attributable to
Licensee
Within 7 days
Rs. 100 for each day of
default
Not Applicable
Replacement of
defective meter if
cause attributable to
Consumer
i) demand notice to
deposit the cost for
new meter or to
deposit a meter along
with testing fee –
Within 7 days
ii) Replacement within
14 days or receiving
payment / meter as
the case may be from
the consumer
Not Applicable
[2]
2. Substituted by the BERC (Standards of Performance of Distribution Licensee) [1st
Amendment] Regulations, 2012 vide Bihar Gazette No. 666 dated 12th December, 2012
(w.e.f. 12.12.2012)
25
Sl
No
Service Area Time Schedule to
complete the work as
specified in
Regulation
Compensation payable to the consumer in case of violation
of Standard
Compensation payable to
individual Consumer if the
event affects a single
Consumer
Compensation payable to
individual Consumer if the
event affects more than one
Consumer
8. Reconnection of supply following disconnection if due to non-payment of bills/Occupation of a
government accommodation by a new occupant
Cities and Towns Same day on which
payment was
accepted
Rs. 50 for each day of
default
Not Applicable
Rural areas Upto next day of
payment
9. New Service connection / enhancement of load / Temporary Connection where the release of supply is
feasible from existing network
Release of Supply - Within 30 days of
receipt of application
(along with prescribed
charges) and for
temporary connection
as per Regulation
16(c)
Rs. 100 for each day of
default
Not Applicable
10. New Service connection / enhancement of load / Temporary Connection where the release of supply
requires network expansion and enhancement of capacity of line and transformers
Release of supply
where extension of
distribution network
and addition/enhance
ment of distribution
transformer is required
Within 30 days of
receipt of prescribed
charges Rs. 100 for each day of
default
Not Applicable
Release of supply
where extension of 11
KV line is required
Within 60 days of
receipt of prescribed
charges
Rs. 500 for each day of
default
Release of supply
where extension of 33
KV line is required
Within 90 days of
receipt of prescribed
charges
Release of supply
where extension of
Extra High Tension
line is required
Within 180 days of
receipt of prescribed
charges
Release of supply
where erection of
power Sub-Station is
required
Within the time period
approved by the
Commission for
installation of specific
power sub-station
Rs. 1000 for each day of
default
11. Transfer of ownership / Change of category of service / Reduction of load
Title transfer of
ownership
Within 7 days along
with necessary
documents and
prescribed fee, if any Rs. 100 for each day of
default
Not Applicable
Change of Category Within 7 days along
with necessary
documents and
prescribed fee, if any
Reduction of load Within the notice
period after availing
compulsory period of
supply.
Rs. 50 for each day of
default
Not Applicable
12. Shifting of meter, lines and transformer
a) Meter / service wire Within 15 days of
payment of charges Rs. 100 for each day of
default
Not Applicable
b) Pole, line Within 60 days of
payment of charges
(2/3)
26
Sl
No
Service Area Time Schedule to
complete the work as
specified in
Regulation
Compensation payable to the consumer in case of violation
of Standard
Compensation payable to
individual Consumer if the
event affects a single
Consumer
Compensation payable to
individual Consumer if the
event affects more than one
Consumer
c) UG cable Within 45 days of
payment of charges
d) Transformer Within 90 days of
payment of charges
13. Resolution of Complaints on Consumer's bill
If no additional
information is required
Within 24 working
hours of receipt of
complaint
Rs. 50 for each day of
default
Not Applicable
If additional
information is required
Within 7 working days
of receipt of complaint
(3/3)
27
Chapter 8
Miscellaneous
30. Reporting to the Commission
(1) The Licensee shall furnish to the Commission, a quarterly report, and a
consolidated annual report containing following information:
(a) The levels of overall performance standards achieved by the Licensee
with reference to the standards specified in Regulation (25) of these
Regulations in the format given at Appendix C to these Regulations.
(b) The number of consumer complaints, redressed and cases in which
compensation was paid and the aggregate amount of the
compensation payable and amount paid by the Licensee in the
format given at Appendix D to these Regulations.
(c) The number of claims made by the consumers against the Licensee
for failure to meet the guaranteed standards of performance and the
action taken by the Licensee including the reasons for delay in
payment, and non-payment of compensation for such claims, and
(d) The measures taken by the Licensee to improve performance in the
areas covered by guaranteed standards and Licensee’s assessment of
the targets to be fixed for the ensuing year.
(2) The quarterly report under Regulation 30 (1) shall be furnished by the
licensee to the Commission within fifteen days at the end of every quarter
and the annual report within thirty days of the close of the financial year.
(3) The Commission shall at such intervals as it may deem fit, and not
inconsistent with the provisions of the Act, arrange for the publication of the
information furnished by the Licensee under these Regulations.
31. Repeal
i) All orders and directions pertaining to the standards of performance of
distribution licensee issued so far by the Licensee shall stand repealed
from the date of publication of these Regulations.
ii) Notwithstanding such repeal, the action taken under the earlier
Regulations, orders and directions shall remain valid.
32. Savings
Nothing contained in these Regulations shall affect the rights and privileges
of the consumers under or any other law including the Consumer Protection
Act, 1986.
28
33. Power to Remove Difficulties
If any difficulty arises in giving effect to any of the provisions of these
Regulations, the Commission may, by general or special order do or
undertake or direct the Licensee to do things not inconsistent with the
provisions of the Act as may appear to be necessary or expedient for the
purpose of removing the difficulties.
34. Power to Amend.
The Commission may at any time add, vary, alter, modify or amend any
provisions of these Regulations, as it may deem fit.
By Order of the Bihar Electricity Regulatory Commission
Secretary
29
Appendix – A
REGISTER OF COMPLAINTS AT COMPLAINT CENTRES AND OFFICES OF
JUNIOR ENGINEER/ ASSISTANT ENGINEER
[See Regulation 11(1)]
Name of Office __________________________
Sl
No.
Time &
Date
Name,
Address, &
consumer No.
of the
complainant
Unique no.
of
complaint
Complaints
classification
Time &
Date of
redressal
of
grievance
Total time
taken (in
Hrs/mts)
No. of
consumers
affected
Total
duration of
interruptio
n (8x9)=10
(in
hrs./mts)
Whether
redressed within
stipulated time
as per
standards of
performance
(Yes/No.)
nature
of
compla
-int
complaint
classifi-
cation &
its no.
1 2 3 4 5 6 7 8 9 10 11
INSTRUCTIONS :
(i) Separate register shall be maintained for complaints of Type – A & other than Type - A
(ii) Compilation will be made every month. Unattended complaints may be brought forward
after each interval, so that a true picture of the pendency is reflected.
CLASSIFICATION OF COMPLAINTS :
(A) Interruption in power supply
(i) Loose connections from pole
(ii) Interruption due to line breakdown
(iii) Interruption due to failure of transformer
(B) Quality of power supply
(i) Ordinary case, which requires no augmentation.
(ii) Where augmentation is required
(C) Meters
(i) Stopped / Defective Meters
(ii) Billing on average basis for more than two bills
(D) Overhead lines
(i) Loose Wires
(ii) Inadequate ground clearance
(E) Bills
(i) For current bills where no additional information is required
(ii) Where additional information is relating to correctness of reading etc. is
required
(F) Service connections (Domestic & Non Domestic)
(i) Where extension of mains is not required
(ii) Where extension of mains is required
(iii) Modification in connected load
(iv) Name of change / reconnection
(G) Refund of amount due in regard to temporary connection
(H) Others
30
Appendix-B
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATION-WISE
[See Regulation 11(5)]
MONTH:
NAME OF OFFICE:
Classification Pending
complai-
nts of
previous
month
Complaints
received
during the
month
Total
Compla
-ints
No. of Complaints redressed during the month Balance
Complaints
to be
redressed
(4) – (9)
In stipulated time Beyond stipulated
time
Total
(5) to
(8) within 50%
of
stipulated
time
Within
stipulated
time
Up to
double the
stipulated
time
More than
double the
stipulated
time
1 2 3 4 5 6 7 8 9 10
A (i)
A (ii)
A (iii)
B (i)
B (ii)
C (i)
C (ii)
D (i)
D (ii)
E (i)
E (ii)
F (i)
F (ii)
F (iii)
F (iv)
G
H
31
Appendix – C
Report on Overall Level of Performance Standards
[See Regulation 30(1)(a)]
Name of the Licensee:
Full office address (HQ) of the Licensee
Report for the (1) quarter ending ……………. for financial year……………
(2) Financial Year ……………………
Sl
No.
Service area No. of
complaints
received
No. of
complaints
attended in
scheduled
time
Overall standard of
performance
Variance
(%)
Achieve
ment
(%)
Target as per
Regulation 25
(%)
1 Normal Fuse-off calls
2 Line Breakdowns
3 Distribution Transformer Failure
4 Period of scheduled outage
Maximum duration in a single
stretch
Restoration of supply by 6.00 P.M.
5 Street Light Faults
Rectification of line faults
Replacement of fused / defective
unit
6 Voltage unbalance
7 Faulty Meters
8 New connection/additional load/
temporary connection
9 Transfer of ownership and
conversion of service
10 Billing Mistakes
11 Others*
(i)
(ii)
(iii)
……………..
* Specify the services
Signature of authorized person
With Seal
[3]
3. Substituted by the BERC (Standards of Performance of Distribution Licensee) [1st
Amendment] Regulations, 2012 vide Bihar Gazette No. 666 dated 12th December, 2012
(w.e.f. 12.12.2012)
32
Appendix – D (1/2)
Report on Consumer Complaints / Compensation
[See Regulation 30(1) (b)]
Name of the Licensee:
Full office address (HQ) of the Licensee
Report for the (1) quarter ending ……………. for financial year……………
(2) Financial Year ……………………
1. Number and type of the consumer complaints received, redressed and balance to be
attended:
S.
N.
Type of complaints
P
e
n
d
in
g
c
o
m
p
la
in
ts
o
f
p
re
v
io
u
s
q
u
a
rt
e
r
C
o
m
p
la
in
ts
r
e
c
e
iv
e
d
d
u
ri
n
g
t
h
e
c
u
rr
e
n
t
q
u
a
rt
e
r
T
o
ta
l
c
o
m
p
la
in
ts
c
u
m
u
la
ti
v
e
No. of complaints
redressed during
the quarter
B
a
la
n
c
e
c
o
m
p
la
in
ts
to
b
e
r
e
d
re
s
s
e
d
W
it
h
in
s
ti
p
u
la
te
d
t
im
e
B
e
y
o
n
d
s
ti
p
u
la
te
d
t
im
e
T
o
ta
l
1 Normal Fuse-off calls
2 Overhead Line/Cable breakdowns
3 Underground Cable breakdowns
4 Distribution Transformer failure
5 Period of scheduled outage
6 Voltage fluctuations
7 Meter complaints
8 Reconnection of supply
9 Release of new service connection /
enhancement of load / temporary connection
where distribution mains already exist
10 Release of new service connection /
enhancement of load / temporary connection
where network expansion require where :
(a) distribution line and distribution
transformers is required
(b) extension of 11KV line is required
(c) extension 33KV line is required
(d) extra high tension is required
(e) erection of power sub station is required
11 Transfer of ownership/change of category of
service / reduction of load
12 Shifting of meter, lines and transformers
13 Resolution of complaints on consumer's bill
14 Unplanned interruptions
15 Other
(i)
(ii)
(iii)
……………..
Planned interruptions in Power supply
1. No. of instances of planned interruptions in power supply in
LT Network –
HT Network –
2. Total duration in hours of planned interruptions in power supply in
LT Network –
HT Network –
[4]
4. Substituted by the BERC (Standards of Performance of Distribution Licensee) [1st
Amendment] Regulations, 2012 vide Bihar Gazette No. 666 dated 12th December, 2012
(w.e.f. 12.12.2012)
33
Appendix – D (2/2)
2. Number and type of the consumer complaints received, redressed and
compensation claimed and paid:
S.
N.
Type of complaints
P
e
n
d
in
g
N
o
.
o
f
c
o
m
p
la
in
ts
o
f
p
re
v
io
u
s
q
u
a
rt
e
r
N
o
.
o
f
C
o
m
p
la
in
ts
r
e
c
e
iv
e
d
d
u
ri
n
g
t
h
e
c
u
rr
e
n
t
N
o
.
o
f
C
o
m
p
la
in
ts
r
e
d
re
s
s
e
d
d
u
ri
n
g
t
h
e
c
u
rr
e
n
t
N
o
.
o
f
c
a
s
e
s
w
h
e
re
c
o
m
p
e
n
s
a
ti
o
n
p
a
y
a
b
le
N
o
.
o
f
c
a
s
e
s
w
h
e
re
c
o
m
p
e
n
s
a
ti
o
n
c
la
im
e
d
N
o
.
o
f
c
a
s
e
s
w
h
e
re
c
o
m
p
e
n
s
a
ti
o
n
p
a
id
d
u
ri
n
g
th
e
q
u
a
rt
e
r
T
o
ta
l
a
m
o
u
n
t
(i
n
R
s
.)
o
f
c
o
m
p
e
n
s
a
ti
o
n
p
a
id
1 2 3 4 5 6 7 8 9
1 Normal Fuse-off calls
2 Overhead Line/Cable breakdowns
3 Underground Cable breakdowns
4 Distribution Transformer failure
5 Period of scheduled outage
6 Voltage fluctuations
7 Meter complaints
8 Reconnection of supply
9 Release of new service connection /
enhancement of load / temporary connection
where distribution mains already exist
10 Release of new service connection /
enhancement of load / temporary connection
where network expansion require where :
(f) distribution line and distribution
transformers is required
(g) extension of 11KV line is required
(h) extension 33KV line is required
(i) extra high tension is required
(j) erection of power sub station is required
11 Transfer of ownership/change of category of
service / reduction of load
12 Shifting of meter, lines and transformers
13 Resolution of complaints on consumer's bill
14 Unplanned interruptions
15 Other
(i)
(ii)
(iii)
……………..
Signature of authorized person
With Seal
[4]
4. Substituted by the BERC (Standards of Performance of Distribution Licensee) [1st
Amendment] Regulations, 2012 vide Bihar Gazette No. 666 dated 12th December, 2012