Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2010 (all amendments upto 31.05.2017)
Regulations made under THE ELECTRICITY ACT, 2003
- Made under: THE ELECTRICITY ACT, 2003
This text is shown as one document.
Full text
1
REGISTERED NO. PT-40
27 KARTIK (S)
(No. PATNA 753) PATNA, THURSDAY, 18TH NOVEMBER 2010
BIHAR ELECTRICITY REGULATORY COMMISSION
Bihar Electricity Regulatory Commission (Renewable Purchase Obligation,
its Compliance and REC Framework Implementation) Regulations, 2010
NOTIFICATION
The 16th November, 2010
BERC-Regl-01/10–05– In exercise of powers conferred under sections 61, 66,
86(1)(e) and 181 of the Electricity Act, 2003 and all other powers enabling it in
this behalf, and after previous publication, the Bihar Electricity Regulatory
Commission (hereinafter referred to as 'BERC' or 'Commission') hereby makes the
following regulations namely:
1. Short Title and Commencement
1.1 These regulations may be called the Bihar Electricity Regulatory
Commission (Renewable Purchase Obligation, its Compliance and REC
Framework Implementation) Regulations, 2010.
1.2 These regulations shall come into force from the date of their publication
in the Bihar Gazette.
1.3 These Regulations shall extend to the whole of the State of Bihar.
2. Definitions and Interpretation:
2.1 In these regulations, unless the context otherwise requires,
2
a) ‘Act’ means the Electricity Act, 2003 (Act No.36 of 2003) and
subsequent amendment thereof;
b) 'Area of Supply' means the area within which the distribution
licensee is authorized to supply electricity;
c) ‘Central Agency’ means the agency operating the National Load
Dispatch Centre or such other agency as the Central Commission
may designate from time to time;
d) ‘Central Commission’ means the Central Electricity Regulatory
Commission referred to in sub section (1) of section 76 of the Act;
e) ‘Certificate’ means the renewable energy certificate issued by the
Central Agency in accordance with the procedures prescribed by it
and under the provisions specified in the Central Electricity
Regulatory Commission (Terms and Conditions for recognition and
issuance of Renewable Energy Certificate for Renewable Energy
Generation) Regulations, 2010;
f) ‘Commission’ means the Bihar Electricity Regulatory Commission;
g) 'Distribution Licensee' means a licensee authorized to operate and
maintain a distribution system for supplying electricity to the
consumers in his area of supply;
h) ‘Floor Price’ means the minimum price as determined by the
Commission in accordance with these regulations at and above
which the certificate can be dealt in the power exchange;
i) ‘Forbearance Price’ means the ceiling price as determined by the
Central Commission in accordance with the Central Electricity
Regulatory Commission (Terms and Conditions for recognition and
issuance of Renewable energy Certificate for Renewable Energy
Generation) Regulations 2010 as amended from time to time, within
which only the Certificate can be dealt in power exchange;
j) ‘MNRE’ means the Ministry of New and Renewable Energy;
Government of India;
k) ‘Obligated Entity’ means the distribution licensee, consumer owning
the captive power plants and open access consumer in the state of
Bihar which is mandated to fulfill renewable purchase obligation
under these Regulations;
l) 'Person' shall include any company or body corporate or association
or body of individuals, whether incorporate or not, or artificial
juridical person;
3
m) ‘Power Exchange’ means any exchange operating as the power
exchange for electricity in terms of the orders issued by the Central
Commission;
n) ‘Preferential Tariff’ means the tariff fixed by the Appropriate
Commission for sale of energy from a generating station based on
renewable energy sources to a distribution licensee;
o) 'Quantum of Purchase' means percentage share of total purchase of
electricity from renewable energy sources as specified in these
Regulations. The quantum would be the sum of all direct purchases
from generating stations based on renewable energy sources and
purchase from any other licensee, which would arise from
renewable energy sources;
p) ‘Renewable Energy Sources’ means non-conventional, renewable
electricity generating sources such as small/mini/micro/hydel,
wind, solar, biomass including husk and bagasse based
cogeneration, urban/municipal solid waste, or such other sources,
(which are generally inexhaustible and can be replenished in a
short period of time) as approved by the Ministry of New and
Renewable Energy, Government of India or by the state of Bihar;]
q) 'State' means the state of Bihar;
r) ‘State Agency’ means the agency in the State of Bihar as may be
designated by the Commission to act as the agency for accreditation
and recommending the renewable energy projects for registration
and to undertake functions under these regulations;
s) 'Supply', in relation to electricity, means the sale of electricity to a
licensee or a consumer;
t) ‘Year’ means a financial year.
2.2 The words and expressions used and not defined in these regulations but
defined in the Act shall have meanings assigned to them in the Act.
Expression used herein but not specifically defined in these Regulations or
in the Act but defined in any other regulations issued by the Bihar
Electricity Regulatory Commission shall have the same meaning assigned
to them.
1[
1. Substituted Regulation 2(1)(p) by the BERC (Renewable Purchase Obligation, its
Compliance and REC Framework Implementation) [2nd Amendment] Regulations, 2017
vide Bihar Gazette No. 253 dated 30th March, 2017 (w.e.f. 30.03.2017).
4
3. Applicability of Renewable Purchase Obligation
3.1 These regulations shall be applicable to :
(i) Distribution licensee
(ii) Any other person consuming electricity (a) generated from
conventional Captive Generating Plant having capacity of 1MW and
above for his own use (b) cogeneration from sources other than
renewable sources (c) procured from conventional generation
through open access and third party sale.]
4. Renewable Purchase Obligation
[4.1 Every obligated entity shall purchase not less than 1.5%, 2.5%, 4%, 4.5%
and 5% of its total energy consumption (total energy input minus T&D
losses) during 2010-11, 2011-12, 2012-13, 2013-14 and 2014-15
respectively from renewable energy sources under the Renewable
Purchase Obligation or until reviewed by the Commission.
Every Obligated Entity shall at-least purchase source wise energy from
Renewable Sources as specified below:-
Minimum quantum of electricity to be procured from Renewable Sources
by Obligated Entity as percentage of total consumption
From Renewable Sources 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Renewable Power Purchase
obligation (RPO)
6.50% 7.75% 9.25% 11.50% 14.25% 17.00%
%share of solar power in
RPO of total energy
consumption
1.50% 2.25% 3.25% 4.75% 6.75% 8.00%
%share of non-solar power
in RPO
5.00% 5.50% 6.00% 6.75% 7.50% 9.00%
The Obligation will be on total consumption of electricity by an
obligated entity, excluding consumption met from hydro sources of power
from FY 2019-20 onwards.
Provided that Renewable Energy purchased through bundled power
shall qualify for Renewable Purchase Obligation compliance to the extent
of Renewable Energy content in the bundled power.
3
5
2[
2. Substituted Regulation 3.1(ii) by the BERC (Renewable Purchase Obligation, its
Compliance and REC Framework Implementation) [2nd Amendment] Regulations,
2017 vide Bihar Gazette No. 253 dated 30th March, 2017 (w.e.f. 30.03.2017)
3. Substituted first proviso of clause 4.1 by the BERC (Renewable Purchase
Obligation, its Compliance and REC Framework Implementation) [1st Amendment]
Regulations, 2012 vide Bihar Gazette No. 467 dated 10th September, 2012 (w.e.f.
10.09.2012). Subsequently, the first proviso of clause 4.1 substituted again by the
BERC (Renewable Purchase Obligation, its Compliance and REC Framework
Implementation) [2nd Amendment] Regulations, 2017 vide Bihar Gazette No. 253
dated 30th March, 2017 (w.e.f. 30.03.2017)
5
Provided further that Distribution Licensee shall compulsorily
procure 100% power generated from waste to Energy plants in the state.]
Provided further, such obligation to purchase renewable energy
shall be inclusive of the purchases, if any, from renewable energy sources
already being made by concerned obligated entity.
Provided also that the power purchases under the power purchase
agreements for the purchase of renewable energy sources already entered
into by the distribution licensees and consented to by the Commission
shall continue to be made till their present validity, even if the total
purchases under such agreements exceed the percentage as specified
hereinabove.
4.2 The Licensee shall generally source the mandatory percentage purchase
from renewable sources within the State. If, however, they are not able to
meet the purchase obligation from such sources located in the State, they
shall have the option of purchase, the shortfall from outside the State. The
energy generated from renewable sources in the State which is used by
generator itself or sold to third party under open access, the same will be
considered under the mandatory minimum percentage of power purchase.
4.3 The Licensee or its successor entities shall submit half yearly progress
report on the capacity addition, purchase of electricity from such projects
and the energy generated from renewable sources in the State which is
used by generator itself or sold to third party under open access to the
Commission and also post them on their website.
4.4 The Commission may, suo-motu or at the request of licensee, revise the
percentage targets for a year as per clause 4.1 of these Regulations
keeping in view supply constraints or other factors beyond the control of
the licensee.
5. Certificates under the Regulations of the Central Commission
5.1 Subject to the terms and conditions contained in these regulations the
Certificates issued under the Central Electricity Regulatory Commission
(Terms and Conditions for recognition and issuance of Renewable Energy
Certificate for Renewable Energy Generation) Regulations, 2010 shall be
the valid instruments for the discharge of the mandatory obligations set
out in these regulations for the obligated entities to purchase electricity
from renewable energy sources.
Provided that in the event of the obligated entity fulfilling the
renewable purchase obligation by purchase of certificates, the obligation
6
to purchase electricity from generation based on renewable energy other
than solar sources can be fulfilled by purchase of non-solar certificates
and the obligation to purchase electricity from generation based on solar
as renewable energy sources can be fulfilled by purchase of solar
certificates only. If solar certificates are not available in a particular year,
then in such cases, additional non-solar certificate shall be purchased for
fulfillment of the Renewable Purchase Obligation (RPO).
5.2 Subject to such direction as the Commission may give from time to time,
the obligated entity shall act consistent with the Central Electricity
Regulatory Commission (Terms and Conditions for recognition and
issuance of Renewable Energy Certificate for Renewable Energy
Generation) Regulations, 2010 notified by the Central Commission in
regard to the procurement of the certificates for fulfillment of the
Renewable Purchase Obligation under these regulations.
5.3 The Certificates purchased by the obligated entities from the power
exchange in terms of the regulation of the Central Commission mentioned
in clause (5.1) of this Regulation shall be deposited by the obligated
entities to the Commission within a month of the purchase of the
certificate.
6. State Agency
6.1 The Commission shall designate an agency as the State Agency for
accreditation and recommending the renewable energy projects for
registration and to undertake functions under these regulations.
6.2 The State Agency shall function in accordance with the directions issued
by the Commission and shall act in consistent with the procedures/rules
laid by Central Agency for discharge of its functions under the Central
Electricity Regulatory Commission (Terms and Conditions for recognition
and issuance of Renewable Energy Certificate for Renewable Energy
Generation) Regulations, 2010.
6.3 The State Agency shall submit quarterly status to the Commission in
respect of compliance of renewable purchase obligation by the obligated
entities in the format as stipulated by the Commission and may suggest
appropriate action to the Commission if required for compliance of the
renewable purchase obligation.
6.4 If the Commission is satisfied that the State Agency is not able to
discharge its functions satisfactorily7, it may by general or special order,
7
and by recording reasons in writing, designate any other agency to
function as State Agency as it considers appropriate.
7. Distribution Licensee
7.1 Each distribution licensee shall indicate, along with sufficient proof
thereof, the estimated quantum of purchase from renewable energy
sources for the ensuing year in tariff/annual performance review petition
in accordance with Regulations notified by the Commission. The estimated
quantum of purchase shall be in accordance with clause 4.1 of these
Regulations. If the distribution licensee is unable to fulfill the obligation,
the shortfall of the specified quantum of that year would be added to the
specified quantum for the next year. However, credit for excess purchase
from renewable energy sources would not be adjusted in the ensuing year.
7.2 Despite availability of renewable energy sources, if distribution licensee
fails to fulfill the minimum quantum of purchase from renewable energy
sources, it shall be liable to pay compensation as per clause 9 of these
Regulations.
8. Captive and Open Access User(s) / Consumer(s)
8.1 The quantum of RPO mentioned in clause 4.1 shall be applicable to
captive and open access user(s) / consumer(s) also.
8.2 Every Captive and Open access consumer(s) / user(s) shall have to submit
necessary details regarding total consumption of electricity and purchase
of energy from renewable sources for fulfillment of RPO on yearly basis on
or before 30th April to the State Agency.
8.3 Captive and Open Access Consumer(s) / User(s) shall purchase renewable
energy as stated in clause 4.1 of these Regulations. If the Captive user(s)
and Open Access consumer(s) are unable to fulfill the criteria as specified
in clause 7.2 of these Regulations the shortfall of the targeted quantum
would attract payment of regulatory charge as pre clause 9.
8.4 Captive / Open Access consumer(s) / User(s) may fulfill its RPO through
the renewable energy certificate as provided in clause 5 above.
9. Effect of Default
9.1 If an obligated entities does not fulfill the renewable purchase obligation
as provided in these regulations during any year and also does not
purchase the certificates, the Commission may direct the obligated entity
to deposit into a separate fund, to be created and maintained by such
obligated entity, such amount as the Commission may determine on the
8
basis of the shortfall in units of RPO and the forbearance price decided by
the Central Commission:
Provided that the fund so created shall be utilized as may be
directed by the Commission, partly for purchase of the certificates and
partly for development of transmission/sub-transmission infrastructure
for evacuation of power from generating stations based on renewable
energy sources.
Provided further that the obligated entities shall not be authorized
to use the fund created in pursuance of the above, without prior approval
of the Commission.
Provided further that the Commission may empower an officer of
the State Agency to procure from the Power Exchange the required
number of certificates to the extent of the shortfall in the fulfillment of the
obligations, out of the amount in the fund.
Provided further also that if the obligated entities fails to deposit the
amount directed by the Commission within 15 days of the communication
of such direction, the obligated entities shall be in breach of its licence
condition.
9.2 Where any obligated entity fails to comply with the obligation to purchase
the required percentage of power from renewable energy sources or the
renewable energy certificates, it shall also be liable for penalty as may be
decided by the Commission under section 142 of the Act.
Provided that in case of genuine difficulty in complying with the
renewable purchase obligation because of non availability of power in the
State, the obligated entity can approach the Commission for carry forward
of compliance requirement to the next year.
Provided further that where the Commission has consented to carry
forward of compliance requirement, the provision of clause (9.1) of the
Regulation or the provision of section 142 of the Act shall not be invoked.
10. Appointment of Compliance Auditors & Monitoring Committee
10.1 The Commission may appoint from time to time Compliance Auditors to
inquire into and report on compliance of these Regulations. The Auditor
shall also certify the fund operated by the State Agency and created under
Regulation (9.1) of these Regulations.
10.2 The Commission may appoint Monitoring Committee to ensure
compliance of these regulations from time to time.
9
11. Overriding Effect
Notwithstanding anything contained contrary to -
a) the BERC (Terms and Conditions for Determination of Tariff)
Regulations, 2007; and
b) the BERC (Terms and Conditions for Open Access) Regulations.
2006; and
c) the order dated 21st May, 2009 and review order dated 29th June,
2010 in respect of Determination of Tariff for Bagasse based Cogen
Plants and Biomass Power Plants, the terms and conditions stated
therein.
d) the BERC (Terms and Conditions for Tariff Determination from
Solar Energy Sources) Regulations 2010 and any other relevant
regulations notified by the Commission under section 181 of the
Electricity Act 2003; these regulations will have overriding effect.
12. Power to Remove Difficulties
If any difficulty arises in giving effect to any of the provisions of these
regulations, the Commission may, either suo motu or on an application
made to it, by general or special order, direct the licensee/ generator or
any other person to take suitable action, not being inconsistent with the
Act, which appears to the Commission to be necessary or expedient for the
purpose of removing the difficulty.
13. Issue of Orders and Directions
Subject to the provisions of the Act and these regulations, the Commission
may, from time to time, issue orders and practice directions with regard to
the implementation of these regulations and procedure to be followed for
such implementation and matters incidental or ancillary thereto.
14. Saving of Inherent Powers of the Commission
Nothing contained in these Regulations shall limit or otherwise affect the
inherent powers of the Commission to adopt a procedure, which is at
variance with any of the provisions of these regulations, if the
Commission, in view of the special circumstances of the matter or class of
matters and for reasons to be recorded in writing, deems it necessary or
expedient to depart from the procedure specified in these regulations.
15. Power to Amend
The Commission may from time to time add, vary, alter, suspend, modify,
amend or repeal any provision of these regulations.
By the order of the Commission
Sd/-
Secretary