1
REGISTERED NO. PT-40
7 VAISHAKHA 1929 (S)
(NO. PATNA 426) PATNA, FRIDAY 27TH APRIL 2007
BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA
TERMS AND CONDITIONS FOR DETERMINATION OF TARIFF
NOTIFICATION
The 24th April 2007
No. BERC/Regl-10/06-2/2007 – In exercise of the powers conferred under
section 181 read with sections 45(2), 61 and 62 of the Electricity Act, 2003 (36 of
2003) and all powers enabling it in that behalf, the Bihar Electricity Regulatory
Commission hereby makes the following regulations for prescribing the terms and
conditions for determination of Tariff, namely:
Chapter 1
General
1. Short title and commencement
(1) These regulations shall be called the Bihar Electricity Regulatory
Commission (Terms and conditions for determination of Tariff)
Regulations, 2007.
(2) These regulations shall come into force from the date of publication in
the official gazette.
2. Scope and extent of application
(1) Where tariff for generation and transmission has been determined
through transparent process of bidding in accordance with the guidelines
issued by the Central Government, the Commission shall adopt such
tariff in accordance with the provisions of the Act.
2
(2) These regulations shall be applicable in all other cases.
Provided that the Commission may prescribe the relaxed norms of
operation, including the norms of target availability and Plant Load
Factor as well as lower return on equity, than those contained in these
regulations for a generating station, transmission system and
distribution system under the control of an integrated utility or a
generating company or transmission licensee or distribution licensee, for
determination of tariff.
3. Definitions
(1) In these regulations unless the context otherwise requires:-
(i) ‘Act’ means Electricity Act 2003 (36 of 2003) as amended from time
to time;
(ii) ‘Authority’ means Central Electricity Authority constituted under
Section 70 of the Electricity Act 2003;
(iii) ‘Combined average unit cost of supply’ means the total Revenue
Requirement for the year adjusted by the revenue gaps of the
previous years divided by the total energy sold during the year;
(iv) ‘Commission’ means Bihar Electricity Regulatory Commission
constituted by the State Government (under section 82 of the Act);
(v) ‘Control Period’ means the period before which the long term tariff
principles for distribution entities takes effect.
(vi) ‘Current year’ means the year in which petition for determination
of tariff is filed;
(vii) ‘Force Majeure Event’ means event beyond the control of the
integrated utility or generating company or the licensee, including
and not limited to, earthquake, cyclone, flood, storm, war, terrorist
attack, civil commotion or similar other such occurrence that may
lead to any act that would involve a breach of relevant provisions in
laws or regulations;
(viii) ‘FPPCA’ means Fuel and Power Purchase Cost Adjustment;]
(ix) ‘Integrated utility’ means the Bihar State Electricity Board in its
present form or the successor entity of the Board performing one or
more of the functions of generation, transmission, distribution and
trading after restructuring of the Board;
1[
1. Sl.Nos. "(viii), (xiii), (xiv)" of Regulation 3(1) are inserted by the BERC (Terms
and Conditions for Determination of Tariff) [1st Amendment] Regulations, 2012 vide
Bihar Gazette No. 452 dated 3rd September, 2012 (w.e.f. 03.09.2012)
3
(x) ‘Licensee’ means a person who has been granted a license under
section 14 of the Act;
(xi) ‘Regulations’ means Regulations for determination of Tariff notified
by the Bihar Electricity Regulatory Commission contained in these
Regulations.
(xii) ‘State Government’ means Government of Bihar;
(xiii) ‘Schedule’ refers to the schedule appended to these Regulations;]
(xiv) ‘Secretary’ means Secretary of the Bihar Electricity Regulatory
Commission;]
(xv) ‘Tariff’ means schedule of charges for generation, transmission,
distribution and trading of electricity as well as various charges for
providing open access of electricity, as determined by the
Commission from time to time;
(xvi) ‘Year’ means financial year;
(2) The words and expressions, specifically applicable to various functions
such as generation, transmission, distribution etc have been defined in
the respective chapters detailed hereunder;
(3) Words and expressions not defined in these regulations but defined in
the Act shall have the meaning assigned to them under the Act.
4. Guidelines for determination of tariffs:
The Commission shall be guided in determination of tariff by the following:
(1) The principles and guidelines specified by the Central Electricity
Regulatory Commission for determination of tariff applicable to an
integrated utility or generating company or transmission licensee from
time to time.
(2) National Electricity Policy and Tariff Policy as laid down by the
Government of India.
(3) Guidelines laid down in Section 61 of the Electricity Act, 2003.
5. Application for determination of tariff
(1) An integrated utility or a generating company or a transmission licensee,
or a distribution licensee, as the case may be, may make an application
before the Commission for determination of tariff in respect of completed
units of the generating stations, the lines / sub stations of the
transmission system or for the areas of supply for the distribution
system.
(2) In the case of existing generating station or the existing transmission
system, the integrated utility or generating company or the transmission
1[
1[
4
licensee, as the case may be shall make an application for determination
of tariff as per the formats given in Appendices A to C to these
Regulations. For distribution licensee, these shall be as per the ARR
formats given in Appendix D to these Regulations. The Commission may
make appropriate modifications from time to time in the formats, as it
deems fit.
(3) (a) In case of a generating station or a transmission system or part
thereof declared under commercial operation on or after the notified date
of these Regulations an application for determination of tariff shall made
in two stages, namely:
Stage I: An integrated utility or a generating company or a transmission
licensee may make an application as per the formats specified by the
Commission for determination of provisional tariff in advance of the
anticipated date of completion of the project based on the capital
expenditure actually incurred upto the end of the month preceeding to
the date of making of the application, accompanied by annual accounts
of the financial year ending prior to the date of application duly audited
and certified by the statutory auditors, and the provisional tariff shall be
charged from the date of commercial operation of the respective unit of
the generating station or the transmission system.
Stage II: An integrated utility or a generating company or a
transmission licensee shall make a fresh application in the same format,
as above, for determination of final tariff based on the actual capital
expenditure incurred upto the date of commercial operation of the
generating station or the transmission system, duly audited and certified
by the statutory auditors.
(b) An integrated utility or a distribution licensee shall file the Annual
Revenue Requirement (ARR) only once in a year before the Commission
during the control period.
6. Procedure for filing application
(1) An application shall be filed before the Commission in the prescribed
formats for determination of tariff by:
(i) the integrated utility or generating company as in Appendices A and B.
(ii) the integrated utility or transmission licensee as in Appendix C.
(iii) the integrated utility or distribution licensee in Annual Revenue
Requirement format in *Appendix D.
* All 34 Formats of Appendix D have been deleted and appended to BERC (Multi Year
Distribution Tariff) Regulations, 2015 notified vide Bihar Gazette No. 1046 dt.
15.09.20151 (w.e.f. 15.09.2015)
5
(2) Each application shall be accompanied by such fee as may be prescribed
by the Commission from time to time.
(3) The application shall be sent by registered post Ack due or by Hand
delivery.
(4) The application shall be supported with an affidavit by an authorised
person or a person, who is acquainted with all facts, stated in the
application
(5) The applicant shall publish the application in such abridged form and
manner as may be specified by the Commission, inviting
suggestions/objections/comments thereon from general public and
stakeholders in at least two daily newspapers, one in English and
another in Hindi language having wide circulation in the area of supply
on the dates specified by the Commission. The applicant shall also
submit within 7 days of publication of the notice an affidavit to the
Commission with details of the notice and also file copies of the
newspapers wherein the notice has been published.
(6) All suggestions / objections in response to the public notice shall be sent
to the Secretary of the Commission at its headquarters office with a copy
to the applicant.
(7) The applicant shall file his comments / remarks on the suggestions /
objections received, if any, within 10 days from the last date of receipt of
such suggestions/objections.
(8) The distribution licensee shall file ARR along with date in prescribed
formats as given in Appendix-D of these Regulations for each financial
year by 15th November of proceeding year.
7. Core business
For the purpose of these regulations, core business means the regulated
activities of generation or any regulated business as per section 12 of the Act
and does not include any other business or activity of an integrated utility or a
generating company or a transmission licensee or a distribution licensee.
8. Tariff determination
(1) Tariff in respect of a generating station under these regulations shall be
determined stage – wise, unit – wise or for the whole generating station
and tariff for the transmission shall be determined line – wise, unit –
wise, sub station – wise and system – wise, as the case may be, and
these may be aggregated to stage – level tariff. For distribution licensee,
the tariff shall be set for the entire licensed area on an aggregated basis
for each class of consumer.
6
(2) For the purpose of determination of tariff, the capital cost of generation /
transmission project shall be broken up into stages and by distinct units
forming part of the project. Where the stage – wise, unit – wise, line –
wise or substation –wise breakup of the capital cost of the project is not
available and in case of on – going projects, common facilities shall be
apportioned on the basis of the installed capacity of the units and lines
or sub stations. In the case of multi – purpose hydro – electric projects
with irrigation, flood control etc, the power component of the project only
shall be considered for determination of tariff.
Note: The term “Project” includes a generating station and/or the
transmission system.
9. Norms of operation
The norms of operation specified in these regulations shall be the norms to be
made applicable and these shall not preclude the integrated utility or
generating company or the transmission licensee or distribution licensee, as the
case may be, and the beneficiaries from agreeing to improved norms of
operation and in case the improved norms are agreed to, such improved norms
shall be applicable for the determination of tariff.
(1) The Commission may decide to defer from the normative parameters or
extend the deadline of the implementation of the given normative
parameters on a case to case basis for existing plants due to mix of
vintage, size, technology (eg. old technology, CFBC technology etc) fuel
grades, site specific conditions etc that might have a bearing on the
efficiency of the unit. The Commission shall review the past operations in
detail while providing any relaxation. The Commission shall provide the
relaxation on a time bound basis provided the unit can outline a road map
to boost its efficiency.
10. Deviation from norms
The tariff for sale of electricity by an integrated utility or a generating company
may also be fixed in deviation of the norms specified in these regulations
subject to the conditions that:
(i) The overall unit tariff rate over the entire life of the asset, calculated on the
basis of the norms in deviation, does not exceed the tariff per unit
calculated on the basis of the norms specified in these regulations; and
(ii) Any such deviation shall come into effect from the date of approval by the
Commission.
7
11. Multi year Tariff principles and guidelines
(1) The Commission may adopt multiyear tariff principles for matters relating
to calculation of revenue requirements and tariff determination of the
integrated utility / generating company and licensees including extent of
investment, reduction of loss levels, other efficiency gains, revision in
charges, changes in tariff structure and such other matters as the
Commission may by general or special order direct.
The Commission shall fix, as and when it considers appropriate, a
date for adoption of the MYT principles.
(2) The Commission may, as and when it considers appropriate, issue
guidelines for filing Revenue Requirement and Tariff Proposals for a period
in excess of a financial year and unless waived by the Commission, an
integrated utility / a generating company shall follow such guidelines
issued by the Commission.
12. Charging of permissible tariff
An integrated utility / a generating company or a licensee shall not charge tariff
in excess of the tariff fixed by the Commission. If any integrated utility or a
generating company or a licensee recovers a price or charge exceeding the tariff
determined by the Commission, the excess amount shall be recoverable by the
person who has paid such price or charge along with interest equivalent to the
Bank rate without prejudice to any other liability incurred by the integrated
utility or generating company or licensee.
13. Excess or under recovery with respect to norms / targets
(1) The generating company or the licensee, as the case may be, shall retain
the entire gain arising from over achievement of the norms / targets laid
down by the Commission from time to time.
(2) The generating company or the licensee, as the case may be, shall bear the
entire loss an account of its failure to achieve the norms / targets laid
down by the Commission from time to time.
14. Cross Subsidy
(1) The cross subsidy for a consumer category means the difference between
the average per unit rate based on tariff schedule of the Commission for
that category and the combined average cost of supply per unit expressed
in percentage terms as a portion of the combined average cost of supply.
(2) In the first phase, the Commission shall determine the tariff so that it
progressively reflects the combined average cost of supply of electricity and
also reduce and eliminate cross subsidies within a reasonable period. In
8
the second phase, the Commission shall consider moving towards category
– wise cost of supply as a basis for determination of tariff.
15. Subsidy
(1) The State Government may, at any time as it considers appropriate,
propose
any subsidy to any consumer or classes of consumers in the tariff
determined or to be determined by the Commission under Section 62 of
the Act, the State Government shall, notwithstanding any direction which
may be given under Section 108 of the Act, pay, in advance and in such
manner as may be specified, the amount to compensate the licensee
affected by the grant of subsidy in the manner and terms and conditions
for such payment of subsidy as the Commission may direct. The State
Government shall send a proposal for this purpose to the Commission.
(2) If the payment of subsidy is not made by the State Government in
accordance with the provisions contained in section 65 of the Act, the
amount, which the State Government has failed to pay, shall be added in
the tariff and charged to the concerned class or classes of consumers.
(3) The Distribution licensee shall furnish the required information to the
Commission that the subsidy amount received by it from the State
Government has been duly accounted for and utilised for the purpose for
which the subsidy is received.
16. Tax on income
(1) Tax on income of an integrated utility or a generating company or the
transmission licensee or the distribution licensee, as the case may be,
from its core business, shall be computed as an expense and shall be
recovered from the beneficiaries or consumers.
(2) Under – recovery or over – recovery of any amount from the beneficiaries or
the consumers on account of such tax, having been passed on to them
shall be adjusted every year on the basis of income-tax assessment under
Income Tax Act, 1961, as certified by the statutory auditors. An integrated
utility or the generating company or the transmission licensee /
distribution licensee, as the case may be, may make such adjustments
directly.
Provided that
(i) tax on any income, other than core business, shall not constitute a
pass through component in tariff and the tax on such other income
shall be borne by the integrated utility or generating company or the
transmission / distribution licensee, as the case may be.
9
(ii) the generating station–wise profit before tax in the case of integrated
utility or the generating company, and the area of supply–wise profit
before tax for the transmission and distribution licensee respectively
estimated for a year in advance shall constitute the basis for
distribution of the corporate tax liability to all the generating stations
and the transmission and distribution licensees respectively.
(iii) the benefit of tax – holiday as applicable in accordance with
provisions of Income Tax Act, 1961 shall be passed on to the
beneficiaries.
(iv) in the absence of any equitable basis, the credit for carry forward
losses and unabsorbed depreciation shall be given in the proportion
as provided in sub clause (ii) above.
(v) income – tax allocated to the thermal generating station shall be
charged to the beneficiaries in the same proportion as annual fixed
charges; income tax allocated to the hydro – generating station shall
be charged to the beneficiaries in the same proportion as annual
capacity charges and in the case of intra-state transmission, the
sharing of income – tax shall be in the same proportion as annual
transmission charges.
17. Extra Rupee Liability
Extra rupee liability towards interest payment and loan repayment
corresponding to the normative foreign debt and actual foreign debt, as the case
may be, in the relevant year shall be permissible provided it arises directly due
to Foreign Exchange Rate Variation. The integrated utility or the generating
company or the transmission license / or distribution licensee shall recover the
foreign exchange rate variation on a year to year basis as income or expense for
the period in which it arises.
18. Decision of the Commission
The Commission shall, after considering the suggestions / objections received
in response to the public notice, and the comments / remarks of the applicant
thereon.
(i) issue a tariff order accepting the application with such modification or
such conditions as it may consider appropriate after giving an
opportunity of hearing to the applicant, the beneficiary or any person
who has filed objections / suggestion or any one or more of them, if so
required, before issue of tariff order.
(ii) reject the application for reasons to be recorded in writing, if the
application is not in accordance with these regulations, or the Act, the
10
rules and regulations made thereunder or a provision of any other law in
force. The applicant shall be given an opportunity of being heard before
rejecting the application.
19. Hearing and communication of decision of the Commission on Tariff
The Commission shall initiate a proceeding on the revenue calculations and
tariff proposals given by the Transmission or Distribution licensee and hold
public hearing(s) to decide on such revenue calculations and tariff proposals.
Considering the proceedings of the hearing(s) as well as suggestions/objections
received in response to the public notice, the Commission shall issue an order
communicating its decision on the revenue calculations and Tariff proposals to
the Transmission or Distribution licensee, as the case may be. The Commission
shall forward within 7 days of making the order, a copy of the order to the State
Government, the Central Electricity Authority, the concerned licensees and
other authorities, as may be necessary.
20. Tariff publication
(1) While issuing an order as above or at any time thereafter, the Commission
shall direct the Licensee for the publication of tariff determined by it,
which the Transmission or Distribution Licensee shall charge from the
different consumers/customers or categories thereof in the ensuing period
determined by it.
(2) The Transmission/Distribution licensee shall publish the tariff, approved
by the Commission in the newspapers at least in two newspapers on in
English and other in Hindi language having wide circulation in its area of
supply in the form and manner as directed by the Commission.
(3) The tariff as determined shall take effect from the date as given in the
order of the Commission.
21. Periodicity of tariff determination and revision thereof
(1) No tariff or any part thereof shall ordinarily be amended more frequently
than once in any financial year, except in respect of any charges expressly
permitted under the terms of the Fuel and Power Purchase Cost Adjustment
formula as specified in the Schedule appended to these Regulations.]
(2) The orders, which the Commission may issue to give effect to the subsidy
which the State Government may grant from time to time, shall not be
construed as amendment to tariff. The Distribution licensee shall make
appropriate adjustments for the subsidy amount as the Commission may
direct.
2[
2. Substituted Regulation 21(1) by the BERC (Terms and Conditions for
Determination of Tariff) [1st Amendment] Regulations, 2012 vide Bihar Gazette No. 452
dated 3rd September, 2012 (w.e.f. 03.09.2012)
11
22. Review and Truing up
(1) The Commission shall undertake a review along with next Tariff Order, of
the expenses and revenues approved by the Commission in the current
year Tariff Order. While doing so, the Commission shall consider
variations between approvals and revised estimates / pre-actuals of the
sale of electricity, income and expenditure for the relevant year and
permit necessary adjustments / changes in case such variations are for
adequate and justifiable reasons. Such an exercise shall be called
‘Review’.
(2) After audited accounts of the year are made available, the Commission
shall undertake a similar exercise as in sub-clause (1) above based on
the final actual figures as per the audited accounts. This exercise based
on the audited accounts shall be called ‘Truing up’.
The truing up exercise for any year shall not ordinarily be considered
after more than one year gap after ‘Review’.
(3) The Revenue gap of next year shall be adjusted as a result of Review and
Truing up exercises.
(4) While approving adjustments towards revenue / expenses in future
years, arising out of Review / Truing up exercises, the Commission may
allow the carrying costs as determined by the Commission of such
expenses / revenues, Carrying costs shall be limited to the interest rate
approved for working capital borrowings.
(5) For any revision of approvals, the licensee shall satisfy the Commission
that the revision is necessary for the reasons beyond its control. In case
additional supply is required to be made to any particular category, the
licensee may, at any time during the year, make an application to the
Commission for its approval, duly explaining the need for such change of
consumer mix and additional supply of power and also indicating the
manner in which the licensee proposes to meet the cost for such change
of consumer mix and additional supply of power.
The Commission may consider according approval to such proposals
provided the cost of additional supply of power is met by the beneficiary
category.
23. Objection for recovery of income – tax and foreign exchange rate variation
In case of any objection from the beneficiaries or the consumers for the recovery
/ adjustment as in Regulation 16(2)(i) above, the integrated utility or generating
company or the transmission / distribution licensee, as the case may be, may
make an application to the Commission for a decision.
12
24. Regulatory Asset
In extraordinary circumstances, the Commission may allow creation of
regulatory Asset in case the Revenue gap is very substantial and is on account
of one-time factor beyond the control of the integrated utility or generating
company or the licensee and its full recovery in a single year will result in tariff
shock to consumers. The Regulatory Asset so created along with carrying cost
shall be liquidated in a maximum of 3 years’ period immediately following the
year in which it is created.
25. Tariff of Electricity Trader
(1) The Commission shall approve the tariff for Power Purchase and
procurement by the Distribution licensee from the Electricity Trader. On
such approval by the Commission, the Electricity Trader shall be entitled
to sell electricity to the Distribution licensee subject to the terms and
conditions of the Power Purchase Agreement approved by the
Commission.
(2) The Commission shall, from time to time, fix the trading margin of the
Electricity Trader for intra – state trading in electricity in the State of
Bihar. The sale of electricity by the Electricity Trader shall be subject to
such further terms and conditions as may be laid down by the
Commission for the purpose from time to time.
26. Generation Tariff
(1) The Commission may approve the tariff for the power purchase except
central sector and procurement by the Distribution licensee from the
integrated utility or a generating company. On such approval by the
Commission, the integrated utility or the generating company shall be
entitled to sell the energy to a Distribution licensee as per the tariff and
the terms and conditions contained in the Power Purchase Agreement
approved by the Commission.
(2) In cases, other than those covered under clause (1) above, the integrated
utility or a generating company may file an application before the
Commission for determination of tariff for electricity generated by it for
the sale of electricity in the State of Bihar giving details of the fixed and
variable costs associated with the generation.
(3) The application by an integrated utility or a generating company under
clause (2) above may be filed for determination of tariff for sale of
electricity to any specific purchaser, including Distribution Licensee or to
more than one purchaser or for general sale who may desire to purchase
from it.
13
(4) The Commission may determine the tariff for sale of electricity by an
integrated utility or generating company, which may thereafter enter into
agreements for the sale based on the tariff determined and subject to the
terms and conditions laid down by the Commission.
(5) The determination of tariff for generation, under this regulation shall not
entitle an integrated utility or the generating company to sell energy to
the Distribution licensee on long term or on short term basis except in
accordance with the Power Purchase Agreement or procurement to be
finalised by the Distribution licensee subject to the terms and conditions
which the Commission may lay down for the purpose from time to time.
27. Right to vary terms and conditions
The terms and conditions for determination of tariff specified in these
regulations are in the nature of general framework on the basis of which the
tariff shall be determined. The Commission reserves its right to vary these
terms and conditions, as and when deems fit.
28. Power to remove difficulties
If any difficulty arises in giving effect to these regulations, the Commission may,
suo-motu or otherwise, by an order make such provisions, not inconsistent
with these regulations, as it may consider appropriate for removing such
difficulties.
29. Limitation of Power of Commission
Nothing in these regulations shall be deemed to limit the powers of the
Commission to deal with any matter or exercise any power under the relevant
Acts for which no regulations have been made / framed and to make such
orders as it may consider appropriate to meet the ends of justice in any case.
30. Powers to amend
The Commission may, at any time as it deems fit, amend, after or modify these
regulations to remove any defect or error noticed by it in performance of its
functions.
Chapter 2
Thermal Power Generating Station
31. Definitions
Unless the context otherwise requires for the purposes of this chapter:
(i) ‘Additional Capitalisation’ means the capital expenditure actually
incurred after the date of commercial operation of a generating station
and admitted by the Commission after prudent check subject to the
provisions of Regulation 35;
14
(ii) ‘Auxiliary Energy Consumption’ or ‘Aux’ in relation to a period means
the quantum of energy consumed by the auxiliary equipment of the
generating station and transformer losses within the generating station
which shall be expressed as a percentage of the sum of gross electrical
energy generated at generator terminals of all the units of the generating
station.
(iii) ‘Availability’ in relation to a generating station for any period means the
average of the daily declared capacities (DCs) for all the days during the
period expressed as a percentage of the installed capacity of the station
minus normative auxiliary power consumption in MW and shall be
computed in accordance with the following formula:
Availability =
where:
IC = installed capacity of the generating station in MW
DCi = Averaged declared capacity for the i th day of the period in MW
N = No. of days during the period; and
Aux n = Normative Auxiliary Energy Consumption as a percentage of the
gross generation.
(iv) ‘Beneficiary’ in relation to generating station means the person buying
the power generated at such a generating station on payment of Annual
Fixed Charges.
(v) ‘Block’ in relation to a combined cycle thermal generating station
includes combustion turbine generator (s), associated waste heat
recovery boiler (s), connected steam turbine – generator and auxiliaries;
(vi) ‘Cut off date’ means date of the first financial year closing after one year
of the date of commercial operation of the generating station.
(vii) ‘Date of Commercial Operation’ or ‘COD’, in relation to a unit, means
the date declared by the integrated utility or generating company after
demonstrating the “Maximum Continuous Rating” (MCR) or Installed
Capacity (IC) through a successful trail run after notice to the
beneficiaries; and in relation to the generating station, the date of
commercial operation means the date of commercial operation of the last
unit or block of the generation station.
(viii) ‘Declared Capacity’ or ‘DC’ means the capability of the generating
station to deliver ex-bus electricity in MW declared by such generating
N
10000 x ∑DCi NxICx(100 – Aux n) %
i =1
15
station in relation to any period of the day or whole of the day, duly
taking into account the availability of the fuel.
Note: In case of a gas turbine generating station or a combined cycle
generating station, the generating station shall declare the capacity of
the units and modules on gas fuel and liquid fuel separately and these
shall be scheduled separately. Total declared capacity and the total
scheduled generation for the generating station shall be the sum of the
declared capacity and the scheduled generation for gas fuel and liquid
fuel for the purpose of computation of availability and Plant Load Factor
respectively.
(ix) ‘Existing Generating Station’ means a generating station declared
under Commercial Operation from a date prior to the notified date of the
Tariff Regulations as per Regulation 1(2).
(x) ‘Gross Calorific Value’ or GCV in relation to a thermal power generation
means the heat produced in k -Cal by complete combustion of one
kilogram of solid fuel or one litre of liquid fuel or one standard cubic
metre of gaseous fuel, as the case may be.
(xi) ‘Gross Station Heat Rate’ or ‘GHR’ means the heat energy input in
k/Cal required to generate one kWh of electrical energy at generator
terminal.
(xii) ‘Infirm Power’ means electricity generated prior to commercial operation
of the generating unit or a generating station.
(xiii) ‘Installed Capacity ‘ or “IC” means the summation of the name plate
capacities of all units of a generating station or the capacity of a
generating station (reckoned at the generator terminals) as approved by
the Commission from time to time.
(xiv) ‘Maximum Continuous Rating’ or ‘MCR’ in relation to a unit of a
thermal power generating station means the maximum continuous out
put at the generator terminals, guaranteed by the manufacturer at rated
parameters; and in relation to a unit or a block of combined cycle
thermal power generating station means the maximum continuous
output at the generator terminals, guaranteed by the manufacturer with
water / steam injection (if applicable) and corrected to 50 Hz grid
frequency and specified site conditions.
(xv) ‘Operation and Maintenance Expenses’ or ‘O&M Expenses’ means the
expenditure incurred on operation and maintenance of the generating
station and includes expenditure on manpower, repairs, spares,
consumables, utility expenses, insurance, overheads etc.
16
(xvi) ‘Original Project Cost’ means the actual expenditure incurred by the
integrated utility / generating company as per original scope of the
project upto the first financial year closing, after one year from the date
of commercial operation of the last unit, as admitted by the Commission
for the determination of generation tariff;
(xvii) ‘Plant Load Factor’ or ‘PLF’ for a given period means the total sent out
energy corresponding to scheduled generation during the period,
expressed as a percentage of sent-out energy in relation to installed
capacity in that period and shall be computed in accordance with the
following formula:
where
IC= installed capacity of the generating station in MW
SGi= Scheduled generation in MW for the i th time block of the period
N = No. of time blocks during the period; and
Auxn =Normative Auxiliary Energy Consumption as a percentage of the
gross generation.
(xviii) ‘Project’ means generating station
(xix) ‘Scheduled generation’ or ‘SG’ at any time or for any period or time
block means schedule of generation in MW ex-bus given by the State
Load Despatch Centre.
Note: For the gas turbine generating station or a combined cycle
generating station if the average frequency for any time block is below
49.52 Hz but not below 49.02 Hz and the scheduled generation is more
than 98.5% of the declared capacity, the scheduled generation shall be
deemed to have been reduced to 98.5% of the declared capacity and if
the average frequency for any time block is below 49.02 Hz and the
scheduled generation is more than 96.5% of the declared capacity, the
scheduled generation shall be deemed to have been reduced to 96.5% of
the declared capacity.
(xx) ‘Small Gas Turbine Power Generating Station’ means and includes gas
turbine / combined cycle generating stations with gas turbine in the
capacity range of 50 MW and below.
(xxi) ‘Unit’ in relation to a thermal power generating station means steam –
generator, turbine generator and auxiliaries or in relation to a combined
N
PLF= 10000X ∑SGi
i = 1
i=I
NxICx(100-Auxn) %
i=I
17
cycle thermal power generating station means turbine generator and
auxiliaries.
32. Components of tariffs
(1) Tariff for sale of electricity from a thermal power generating station shall
comprise of two parts, namely, the recovery of annual capacity (fixed)
charges and energy (variable) charges.
(2) The annual capacity (fixed) charges shall consist of:
(a) interest on capital
(b) Depreciation, including Advance Against Depreciation
(c) Return on equity
(d) Operation and Maintenance expenses, and
(e) Interest on working capital
(3) The energy (variable) charges shall cover fuel cost
(4) Where the existing Power Purchase Agreement (including any changes, in
the norms or parameters, made in the Power Purchase Agreement following
renegotiation between the integrated utility and concerned generating
company) lay down different parameters, such parameters shall continue to
govern the parties for the term of the contract, but not for any renewal of the
contract or any extension of the term of the contract subsequent to
commencement of these regulations. Upon expiry of the existing term of PPA
the parties shall be governed by the provisions contained in these
regulations as amended from time to time.
33. Norms of Operation
The norms of operation as given here under shall apply:
(1) Target availability for recovery of full capacity (fixed) charges:
(a) Tariff availability for all thermal power generating stations: 80%
(b) Recovery of capacity (fixed) charges below the level of target availability
shall be on pro rata basis. At zero availability, no capacity charges shall be
payable.
(2) Target Plant Load Factor for incentive:
(a) Tariff load factor for all thermal power generation stations: 80%
(b) Where the existing Power Purchase Agreement (including any changes, in
the norms of parameters, made in the Power Purchase Agreement following
renegotiation between the integrated utility and the concerned generating
company) lay down a different parameter of PLF for the recovery of full fixed
charges, such a parameter shall continue to govern the parties for the term
of the contract, but not for any renewals of the contract or any extension of
the term of the contract subsequent to the commencement of these
18
Regulations. Upon expiry of the term of the PPA, the parties shall be
governed by the provisions of these Regulations as amended from time to
time.
(3) Gross Station Heat rate:
(a) Coal based thermal power generating stations; other than those
covered under sub-clause (b) and (c) below:
200/210/250 MW
sets
500 MW and
above sets
During stabilization period 2600 K Cal / kWh 2550 K Cal / kWh
Subsequent period 2500 K Cal / kWh 2450 K Cal / kWh
(i) In respect of 500 MW and above units where the boiler feed
pumps are electrically operated, the gross station heat rate shall
be 40 K Cal / kWh lower than the station heat rate indicated
above.
(ii) For generating stations having combination of 200/210/250 MW
sets and 500 MW and above sets, the normative gross station heat
rate shall be the weighted average station heat rate.
For coal unit sizes smaller than 210 MW, the Commission may
allow a different normative heat rate based on scrutiny of past
operational performance.
(iii) Where existing Power Purchase Agreement (including any
changes, in the norms of parameters, made in the Power Purchase
Agreement following renegotiation between the integrated utility
and the concerned generating company) lay down a different
parameter of Heat Rate, such a parameter shall govern the parties
for the term of the contract, but not for any renewals of the
contract or any extension of the term of the contract. Upon expiry
of the term of the PPA, the parties shall be governed by the
provisions of these Regulations as amended from time to time.
(b) Lignite – fired power generating stations:
For lignite – fired generating stations, gross heat rates specified under
sub-clause (a) above for coal based thermal power generating stations
shall be completed, using multiplying factors as given below:
(i) for lignite having 50% moisture Multiplying factor of 1.10
(ii) for lignite having 40% moisture Multiplying factor of 1.07
(iii) for lignite having 30% moisture Multiplying factor of 1.04
19
(iv) for other values of moisture content, the multiplying factor shall
be pro – rated for moisture content between 30-40 and 40-50
depending upon the rated values of multiplying factor for the
respective range given under sub-clauses (i) to (iii) above
(c) Gas Turbine / combined cycle generating stations:
(i) Existing generating stations
The normative heat rates shall be specified by the Commission duly
studying the past performance and the performance of similar
technology / size machines owned by other utilities outside the
State, including Central Power Sector Units, Private Power
Institutions, State Electricity Boards etc. Till the completion of the
study, the normative heat rate shall be 2100 K Cal / kWh under
closed cycle operation.
(ii) Generating Stations declared under commercial operation:
Advance class
Machines
E/EA/FC/E Class
Machine
Open cycle 2685 K Cal / kWh 2830 K Cal / kWh
Combined cycle 1850 K Cal / kWh 1950 K Cal / kWh
(iii) Small Gas Turbine Power Generating Station: The normative heat
rates shall be as specified by the Commission. For setting the
normative heat rates, the Commission shall study the past
performance and the performance of similar technology / size
machines owned by other utilities outside the State, including
Central Power Sector Units, Private Power Institutions, State
Electricity Boards etc.
(4) Secondary fuel oil consumption
During stabilization
period
Subsequent
period
Coal based thermal
power generating
stations
4.5.ml / kWh 2.0 ml / kWh
Lignite fired
generating stations
5.0 ml / kWh 3.0 ml / kWh
Note: Where the existing Power Purchase Agreement (including any
changes, in the norms of parameters, made in the Power Purchase
Agreement following renegotiation between the integrated utility and
the concerned generating company) lay down a different parameter
for secondary fuel consumption, such a parameter shall govern the
parties for the term of the contract but not for any renewal of
20
contract or any extension of the term of the contract subsequent to
the commencement of these Regulations. Upon expiry of the term of
the existing PPA, the parties shall be governed by the provisions of
these Regulations as amended from time to time.
(5) Auxiliary Energy Consumption:
With cooling
tower
Without
cooling tower
(a) Coal based
generating stations
(i) 200 MW services
(ii) 500 MW services
steam driven boiler feed
pumps
Electrically driven feed
pumps
9%
7.5%
9.0%
8.5%
7.0%
8.5%
(b) Gas turbine / combined cycle generating stations:
(i) Combined cycle
(ii) Open cycle
3.0%
1.0%
(c) Lignite – fired
power generating
station
The auxiliary energy consumption norms
shall be 0.5% more than the above
auxiliary energy consumption norms of
coal – based generating stations.
1) During the stabilization period, the normative auxiliary
consumption shall be reckoned at 0.5% more than the norms
indicated at (a), (b) and (c) above.
2) The normative auxiliary energy consumption rates for units
smaller than 210 MW shall be specified by the Commission. The
Commission may study the past performance and the performance of
similar technology / size machines owned by other utilities outside
the state, including CPSUs, IPPs, SEBs etc.
3) Where the existing Power Purchase Agreement (including any
changes, in the norms of parameters, made in the PPA following
renegotiation between the integrated utility and the concerned
generating company) lay down a different parameter for auxiliary
consumption, such a parameter shall govern the parties for the term
of the contract but not for any renewal of contract or any extension
of the term of the contract subsequent to the commencement of
these Regulations. Upon expiry of the term of the PPA, the parties
shall be governed by the provisions of these Regulations as amended
from time to time.
(6) Stabilization period: In relation to a generation unit, the
stabilization period shall be reckoned commencing from the date of
commercial operation of that unit, as follows, namely:
21
(a) Coal based and lignite fired generating stations 180 days
(b) Gas turbine / combined cycle generating stations 90 days
34. Capital Cost
Subject to prudent check by the Commission, the actual expenditure incurred
on completion of the project shall form the basis for the determination of final
tariff. The final tariff shall be based on the admitted capital expenditure actually
incurred upto the date of commercial operation of the generating station and
shall include capitalised initial spares subject to following ceiling norms as a
percentage of the original project cost as on the cut off date:
(i) Coal based / lignite fixed generating station 2.5%
(ii) Gas turbine / combined cycle generating station 4.0%
Provided :
(i) where the Power Purchase Agreement entered into between the
generating company and the beneficiaries provides a ceiling of actual
expenditure, the capital expenditure shall not exceed such a ceiling for
determination of tariff.
(ii) in case of existing generating station, the capital cost admitted by the
Commission prior to the notified date of these regulations as per
Regulation 1(2) of these Regulations shall form the basis for
determination of tariff. The capital cost of the unbundled generating
stations shall be the asset value as per the opening balance sheet.
(iii) The Commission shall scrutiny the project cost estimates by limiting to
the reasonableness of the capital cost, financial plan, interest during
construction, use of efficient technology and such other matters for
determination of tariffs.
(iv) An application for the review of the capital cost may be forwarded to the
Commission along with a copy of the detailed Project Report by the
Project Sponsor’s technical advisers.
35. Additional Capitalization
(1) The following actual capital expenditure incurred after the date of
commercial operation and upto the cut off date, which is within the
original scope of work, may be admitted by the commission subject to
prudent check:
(i) deferred liabilities;
(ii) works deferred for execution;
(iii) procurement of initial capital spares in the original scope of work
subject to the ceiling specified under Regulation 34;
22
(iv) liabilities to implement award of arbitration or for compliance of the
order or decree of a court of law; and
(v) on account of change in law.
Provided that:
(i) the original scope of work along with the estimates of expenditure
shall be submitted along with the application for determination of
provisional tariff;
(ii) a list of deferred liabilities and works deferred for execution shall be
submitted along with the application for final tariff after the date of
commercial operation of the generating station.
(2) Subject to the provisions of clause (3), below the capital expenditure of the
following nature actually incurred after the cut off date may be admitted
by the Commission after prudent check:
(i) deferred liabilities relating to works / services within the original
scope of work;
(ii) liabilities to implement award of arbitration or compliance of the
order or decree of a court.
(iii) on account of change of law;
(iv) any additional work or services which have become necessary for
efficient and successful operation of generating station but not
included in the original project cost.
(v) Deferred work relating to ash pond or ash handling system in the
original project cost.
(3) Any other expenditure on minor items / assets like normal tools and
tackles, personal computers, furniture, air – conditioners, voltage stabilizers,
refrigerators, fans, coolers, TV, washing machines, heat converters, carpets,
mattresses etc, bought after cut off date shall not be considered for
additional Capitalisation for determination of tariff with effect from the date
of notification of these regulations by the Commission.
Note: The above list is only illustrative but not exhaustive.
(4) Impact of additional Capitalisation in tariff revision may be considered by
the Commission twice in a tariff period, including revision of tariff after cut
off date.
Note: (1) Any expenditure admitted on account of committed liabilities
within the original scope of work and the expenditure deferred on techno –
economic grounds but falling within the scope of original work shall be
serviced in the normative debt-equity ratio specified in Regulation 37.
23
(2) Any expenditure on replacement of old assets shall be considered after
writing off the gross value of the original assets from the project cost except
such items as are listed under clause (3) above
(3) Any expenditure admitted by the Commission for determination of tariff
on account of new works not in the original scope of work shall be serviced
in the normative debt – equity ratio specified in Regulation 37.
(4) Any expenditure admitted by the Commission for determination of tariffs
on renovation and modernisation and life extension shall be serviced on
normative debt – equity ratio specified in Regulation 37 after writing off the
original amount from the original project cost, if any replacement of existing
assets is involved.
36. Sale of Infirm Power
Any revenue (other than the recovery of fuel cost) earned by the integrated
utility / generating company from sale of infirm power, shall be taken as a
reduction in capital cost and shall not be treated as revenue.
37. Debt – equity ratio
(1) In case of all generating stations, the debt – equity ratio as on the date of
commercial operation shall be 70:30 for determination of tariff. The
Commission may in appropriate cases consider equity higher than 30% for
purpose of determination of tariff, where the integrated utility / generating
company is able to establish to the satisfaction of the Commission that the
deployment of equity more than 30% is in the interest of general public.
Provided that
(i) in case of a generating station, where actual equity employed is less
than 30%, the actual debt and equity shall be considered for
determination of tariff
(ii) in case of existing projects the actual debt: equity ratio shall be used
for tariff determination. However any expansion shall be governed by
clause (1) above.
(2) The debt and equity amount arrived at in accordance with clause (1) shall
be used for calculation of interest on loan, return on equity, Advance
Against Depreciation and foreign exchange rate variation.
38. Computation of capacity (Fixed) charges
The capacity (fixed) charges shall be computed on the following basis and their
recovery shall be related to target availability:
(1) Interest on Capital
(a) Interest on loan capital shall be computed loan – wise on the loans
indicated in Regulation 37.
24
(b) In the case of existing projects, the actual debt-equity ratio shall be
used for tariff determination and interest on loans shall be paid at
actuals. However any expansion shall be governed as per Regulation
37.
(c) The integrated utility / generating company shall make every effort to
refinance the loan as long as it results in net benefit to the
beneficiaries. The costs associated with such refinancing shall be
borne by the beneficiaries.
(d) The changes to the loan terms and conditions shall be effected from
the date of such swapping and benefit passed on to the beneficiaries.
(e) In case of any dispute, any of the parties may approach the
Commission with proper application. However, pending receipt of the
orders of the Commission on the application, the beneficiaries shall
not withhold any payment of the integrated utility / generating
company during the pendency of any dispute relating to the swapping
of the loan.
(f) In case any moratorium period is availed by the integrated utility /
generating company, depreciation provided in the tariff during the
period of moratorium shall be treated as repayment during those
years and interest on loan capital shall be calculated accordingly.
(g) The integrated utility / generating company shall not make any profit
on account of refinancing of loan and interest thereon.
(h) The integrated utility / generating company , at its descretion, swap
loans having floating rate of interest with loans having fixed rate of
interest, or vice versa at its own cost and gains or losses as a result of
such swapping shall accrue to the generating company.
Provided that the beneficiaries shall be liable to pay interest for loan
initially contracted, whether on floating or fixed rate of interest.
(2) Depreciation, including Advance Against Depreciation
(a) Depreciation
For purpose of tariff, depreciation shall be computed in the following
manner:
(i) The value base for the purpose of depreciation shall be the
historicalcost of the asset.
(ii) Depreciation shall be calculated annually, based on the
straight-line method over the useful life of the asset and at
rates prescribed by the Central Electricity Regulatory
Commission.
25
The residual value of the asset shall be considered as 10% and
the depreciation shall be allowed upto a maximum of 90% of
the historical capital cost of the asset. The land is not a
depreciable asset and its cost shall be excluded from the
capital cost while computing 90% of the historical cost of the
asset. The historical capital cost of the asset shall include
Additional Capitalisation on account of Foreign Exchange Rate
Variation as allowed by the Central Government / Central
Electricity Regulatory Commission
(iii) On repayment of entire loan, the remaining depreciable value
of the asset shall be spread over the balance useful life of the
asset.
(iv) Depreciation shall be chargeable from the first year of
operation of the asset. For part of the year, depreciation shall
be charged on pro rata basis.
Note: Where existing Power Purchase Agreement (including any
change in the norms or parameters, made in the Power
Purchase Agreement following renegotiation between the
integrated utility and concerned generating company) lay
down a different parameter of depreciation such a
parameter shall continue to govern as per the terms of the
contract, but not for any renewal of contract or any
extension of the term of the contract. Upon expiry of the
term of the existing Power Purchase Agreement, the parties
shall be governed by the provisions of these regulations as
amended from time to time.
(b) Advance Against Depreciation (AAD)
In addition to permissible depreciation, the integrated utility /
generating company shall be entitled to Advance Against
Depreciation, computed in the manner indicated below:
AAD= Loan repayment as per Regulation 38(1) subject to a ceiling of
1/10th of the loan amount as per Regulation 37 minus depreciation
upto that year.
Note:
(i) The Advance Against Depreciation shall be permitted only if the
cumulative repayment upto a particular year exceeds the cumulative
depreciation upto that year.
26
(ii) The Advance Against Depreciation shall be restricted to the extent
of the difference between the cumulative repayment and cumulative
depreciation upto that year.
All efforts shall be made for aligning the tenure of the long term debt
with permissible rate of depreciation to reduce front loading of tariff
through various mechanisms including resorting to take out finance
to elongate debt repayment period so that there will be no need for
any Advance Against Depreciation.
(3) Return on Equity
(a) The return on equity shall be computed on the equity base
determined in accordance with Regulation 37 @ 14% per annum.
(b) In the case of existing projects, the actual debt equity shall be used
for tariff determination. However, any expansion shall be governed by
Regulation 37.
(c) Equity invested in foreign currency shall be allowed a return upto the
prescribed limit in the same currency and the repayment on this
account shall be made in Indian Rupee based on the exchange rate
prevailing on the due date of billing.
(d) The premium raised by the integrated utility / generating company,
while issuing share capital and investment of internal resources
created out of its free reserve, if any, for funding the project, shall
also be reckoned as a paid up capital for the purpose of computing
return on equity, provided such premium amount and internal
resources are actually utilised for meeting the capital expenditure of
the generating station and forms part of approved financial package.
The definition of equity thus would involve all net worth deployed in
the capital works of the unit.
(e) Where existing Power Purchase Agreement (including any changes, in
the norms or parameters made in the Power Purchase Agreement
following renegotiation between the integrated utility and the
concerned generating company) lay down a different parameter of
Return on Equity, such a parameter shall continue to govern the
parties for the existing term of the agreement but not for any renewal
of the contract or any extension of the contract. On expiry of the
period of agreement, the parties shall be governed by the provisions
of these regulations, as amended from time to time.
27
(4) Operation and Maintenance Expenses
The normative operation and maintenance expenses shall be as follows:
(a) The Commission shall, for the purpose of fixing normative rates of
operation and maintenance expenses, study the past performance
and the performance of similar technology / size machines owned by
other utilities outside the State including Public State Units, Private
Power Institutions, State Electricity Boards etc.
(b) The normative rates shall be fixed as under.
(1) Coal based generating station:
(i) For generating stations having a combination of
200/210/250 MW sets and 500 MW sets and above, the
weighted average value of operation and maintenance
expenses shall be adopted.
(ii) For smaller units less than 210 MW, the Commission shall
specify rates to be adopted by the generating station on
completion of the study as indicated under clause (a) above.
(2) For Gas Turbine / combined cycle generating stations (other than
small gas turbine generating stations): The Commission shall fix
separate rates based on weighted average of the operation and
maintenance expenses separately.
(a) For the stations having warranty spares
(b) For those stations which are not having warranty spares.
(i) For small gas turbine power generating stations the
Commission shall fix separate rates which are having
spares without warranty.
(ii) For lignite – fired generating stations, the Commission
shall fix separate rates.
In respect of small gas turbine power generating stations / lignite fired
generating stations (without warranty spares) the Commission shall fix
separate rates.
(c) The operation and maintenance expenses include employee costs,
Repair and Maintenance (R&M) and Administrative and General
(A&G) expenses.
(5) Interest on Working capital
(a) Working capital for purposes of calculation of interest shall be:
(I) For Coal based / Lignite fired generating stations:
(i) cost of coal or lignite for one and half months for pit – head
28
generating stations and two months for non pit – head
generating stations, corresponding to the target availability;
(ii) Cost of secondary fuel oil for two months corresponding to
target Availability;
(iii) Operation and Maintenance expenses for one month;
(iv) Maintenance spares at 1% of the historical cost escalated at
6% per annum from the date of commercial operation; and
(v) Receivables equivalent to two months of fixed and variable
charges for sale of electricity calculated on the target
availability.
(II) Gas Turbine / Combined cycle generating stations:
(i) Fuel cost for one month corresponding to the target
availability duly taking into account the mode of operation
of the generating station on gas and liquid fuel.
(ii) Liquid fuel stock for ½ month
(iii) Operation and maintenance expenses for one month
(iv) Maintenance spares at 1% of the historical cost escalated at
6% per annum from the date of commercial operation.
(v) Receivables equivalent to two months of fixed and variable
charges for sale of electricity calculated on target
availability.
(b) Rate of interest on working capital: The rate of interest on working
capital shall be equal to the short – term Prime Landing Rate of State
Bank of India on 1st April of the year in which the generating station
or a unit there of is declared under commercial operation. Interest on
working capital shall be payable on normative basis not withstanding
that the integrated utility or generating company has not taken
working capital loan from any outside agency.
Note: Where existing Power Purchase Agreement (including any changes
in the norms or parameters made in the PPA following renegotiation
between the integrated utility and the generating company) lay down a
different rate of parameter of O&M rates, such a parameter shall
continue to govern the parties for the period of agreement but not for any
renewal or extension of the terms of agreement. On expiry of the existing
period of PPA, the parties shall be governed by the provisions of these
regulations as amended from time to time.
(c) Capacity charges: Full capacity charges shall be recoverable at target
availability specified under Regulation 33(1) . Recovery of capacity
29
(fixed) charges below the level of target availability shall be on prorata
basis. At zero availability, no capacity charges shall be payable.
(d) Payment of capacity charges shall be on monthly basis in proportion
to the allocated capacity.
39. Energy Charges
(1) Generating stations covered under Availability Based Tariff (ABT):
Energy (variable) charges shall cover fuel costs which shall be worked out
based on the ex-bus energy scheduled to be sent out from the generating
station as per the following formula:
Energy charges(Rs.) = Rate of energy charges in Rs/kWh X
Schedule energy (ex-bus) for the month in kWh
corresponding to the scheduled generation.
(2) Generating Stations other than covered under ABT: Energy (variable)
charges shall cover fuel costs and shall be worked out on the basis of ex-
bus energy delivered / sent out from the generating station as per the
following formula:
Energy charges (Rs.) = Rate of energy charges in Rs. / kWh X scheduled
energy delivered (ex-bus) for the month in kWh)
Where, Rate of Energy Charges (REC) shall be the sum of the cost of normative
quantities of primary and secondary fuel for delivering ex-bus one kWh of
energy in Rs. / kWh and shall be computed as under:
REC = 100 (Pp X Qp)n + PsXQs)n (Rs. / kWh)
[100 – (Auxn)
where,
Pp = Price of primary fuel (coal / lignite / gas / liquid fuel) in Rs. / Kg or Rs.
/ cum. Or Rs. / litre, as the case may be.
(Qp)n= Quantity of primary fuel required for generation of one kWh of electricity
at generator terminal in kg or litre or cum, as the case may be, and shall
be computed on the basis of normative Gross Station Heat Rate (less
heat contributed by secondary fuel oil for coal / lignite – based
generating stations) and gross calorific value of coal / lignite / gas /
liquid fuel as fired.
Ps= Price of secondary fuel oil in Rs. / ml.
(Qs)n= Normative quantity of secondary fuel oil in ml / kWh as per Regulation
33 (4),
(Aux)n= Normative Auxiliary Energy Consumption as % of gross generation as
per regulation 33 (5).
30
(3) Adjustment of rate of energy charge (REC) on account of variation in
price or heat rate of fuels:
Initially Gross Calorific value of coal / lignite / gas liquid fuel shall be taken
as per actuals of the preceeding three months. Any variation shall be
adjusted on month to month basis on the basis of gross calorific value of
coal / lignite gas / liquid fuel received and burnt and landed cost incurred
by the integrated utility / generating company for procurement of the coal /
lignite / oil / gas / liquid fuel as the case may be. No separate petition shall
be filed before the Commission for fuel price adjustment. In case of any
dispute, an appropriate application shall be made before the Commission
for its orders.
(4) Landed cost of coal
Subject to Regulation 2(2), the landed cost of coal shall include price of coal
corresponding to the grade / quality of coal inclusive of royalty, taxes and
duties as applicable, transportation cost by rail / road or any other means
and, for the purpose of computation of energy charges, it shall be arrived at
after considering normative transit and handling losses as percentage of
quantity of coal dispatched by the coal supply company during the month
as follows:
Pit heat generating station - 0.3%
Non – pit heat generating station - 0.8%
40. Incentive
Incentive shall be payable to the generation company at a flat rate of 25 paise /
kWh for ex-bus scheduled energy corresponding to schedule generation in
excess of ex-bus energy corresponding to target Plant Load Factor.
41. Unscheduled interchange (UI)
(1) Variation between actual generation or actual drawal and scheduled
generation or scheduled drawal shall be accounted for through unscheduled
Inter-change (UI) charges. UI for a generating station shall be equal to its
actual generation minus its scheduled generation. UI for a beneficiary shall
be equal to its actual total drawal minus its total scheduled drawal. UI shall
be worked out for each 15 minutes block. Charges for all UI transactions
shall be based on average frequency of the time block and the following rates
shall apply:
31
Average frequency of time block (Hz)
Below Not below UI Rate (Paise / kWh)
- 50.50 0.0
50.50 50.48 6.0
50.48 50.46 12.0
49.84 49.82 204.0
49.82 49.80 210.0
49.80 49.78 219.0
49.78 49.76 228.0
49.04 49.02 561.0
49.02 570.0
(Each 0.02 Hz step is equivalent to 6.0 paise / kWh in the 50.5 – 49.8 Hz
frequency range and to 9.0 paise / kWh in the 49.8 – 49.0 Hz frequency
range).
Note: The above frequency range and UI rates are subject to change through
a separate order by the Commission.
(2) (i) Any generation upto 105% of the declared capacity in any time block of
15 minutes and upto 101% of the average declared capacity over a day shall
not be construed as gaming, and the integrated utility or generating
company shall be entitled to UI charges for such excess generation above
the scheduled generation (SG).
(ii) For any generation beyond the prescribed limits, the State Load Despatch
Centre shall investigate so as to ensure that there is no gaming, and if
gaming is found by the State Load Despatch Centre, the corresponding UI
charges due to the generating station on account of such excess generation
shall be reduced to zero and the amount shall be adjusted in UI account of
beneficiaries in the ratio of their capacity share in the generating station.
42. Rebate
For payment of bills for capacity charges and energy charges through a letter of
credit on presentation, a rebate of 2% shall be allowed. If the payments are
made by a mode other than through a letter of credit but within a period of one
month of presentation of bills by the integrated utility / generating company, a
rebate of 1% shall be allowed.
43. Late payment surcharge
In the case of payment of bills for capacity charges and energy charges by the
beneficiary or beneficiaries is delayed beyond a period of one month from the
date of billing, late payment surcharge at the rate of 1.25% per month or part
thereof shall be levied by the integrated utility / generating company.
32
44. Scheduling
The methodology of scheduling and calculation of availability shall be as
follows:
(i) (a) The integrated utility / generating company shall make an advance
declaration of the capability of its generating station which shall be
actually made available to the Transmission Licensee / Distribution
Licensee.
(b) The capability declared, referred to as the declared capability, shall
form the basis for generation scheduling
(ii) The electricity shall be deliverable at ex-bus MW for the next day either
as one figure for the whole day or as different figures for different periods
of the day.
(iii) While declaring or revising its capability, the integrated utility /
generating company shall ensure that the declared capability during
non- peak hours is not less than during other hours. Exception to this
rule shall be allowed in the case of tripping / re-synchronisation of units
as a result of forced outage of units.
(iv) Generation scheduling shall be done according to operation procedure
stipulated in the Indian Electricity Grid Code / State Electricity Grid
Code.
(v) As per the declaration of the integrated utility / generating company, the
state Load Despatch Centre shall communicate their shares to the
beneficiaries against which they can submit their requirements.
(vi) Based on the requirement of the beneficiaries, the State Load Despatch
Centre shall prepare the economically optimal generation schedules and
drawal schedules, taking into account technical limitations on verifying
the generation and transmission system constraints, and communicate
the same to the integrated utility / generating company and also to the
beneficiaries.
The State Load Despatch Centre shall also formulate a procedure for
meeting contingencies both in the long run and in the short run (Daily
scheduling).
(vii) The scheduled generation and actual generation shall be at ex-bus at the
generating station. For the beneficiaries, the scheduled and actual net
deliveries shall be at their respective receiving points.
(viii) For the net drawal schedules of the beneficiaries, the transmission losses
shall be apportioned to their drawal scheduled for the time being. A
refinement may however be suggested by the Commission in future
33
depending on the preparedness of the respective State Load Despatch
Centre.
(ix) In the case of a forced outage of a unit, the State Load Despatch Centre
shall revise the schedules on the basis of revised declared capability. The
revised declared capability and the revised schedules shall be effective
from the fourth time block, counting the time block in which revision is
advised by the integrated utility or generating company to be the first
one.
(x) In the case of any bottle neck in evacuation of power due to any
constraint, outage, failure or limitation the transmission system,
associated switchyard and sub – station owned by the State
Transmission Utility or any other transmission licensee involved in intra–
state transmission (as certified by the State Load despatch Centre)
necessitating in reduced generation, the SLDC shall revise the schedules
which shall become effective from the 4th time block, counting the time
block in which the bottleneck in evacuation of power has taken place to
be the first one. During the first, second and third time blocks of such an
event, the scheduled generation of the generating station shall be deemed
to have been revised to be equal to actual generation and the scheduled
drawals of beneficiaries shall be deemed to have been revised to be equal
to their actual drawls.
(xi) In the case of grid disturbance, the scheduled generation of all the
generating stations and scheduled drawls of all the beneficiaries shall be
deemed to have been revised to be equal to their actual generation /
drawal for all the time blocks affected by the grid disturbance.
Certification of grid disturbance and its duration shall be done by the
SLDC.
(xii) Revision of declared capability by the integrated utility / generating
company / companies and requisition by beneficiary(ies) for the
remaining period of the day shall also be permitted with advance notice.
Revised schedules / declared capability in such cases shall become
effective from the 6th block, counting the time block in which request for
revision has been received in the SLDC to be the first one.
(xiii) If, at any point of time, the SLDC observes that there is need for revision
of the schedules in the interest of better system operation, it may do so
on its own and in such cases, the revised schedules shall come into effect
from the fourth time block, counting the time block in which the revised
schedule is issued by the SLDC to be the first one.
34
(xiv) Generation schedules and drawal schedules issued / revised by the
SLDC shall become effective from the designated time block.
(xv) For any revision of scheduled generation, including post fact deemed
revision, there shall be a corresponding revision of scheduled drawals of
the beneficiaries.
(xvi) A procedure for recording communication of changes to schedules duly
taking into the time factor shall be evolved by the State Transmission
Utility in consultation with the SLDC as well as other stakeholders, and
it shall be to the extent possible in line with the prevailing practices at
the national level.
(xvii) In the case of a generating station, contracting to supply power to two or
more states, the scheduling, metering and energy accounting shall be
carried out by the Regional Load despatch Centre.
45. Demonstration of Declared Capability
(1) The integrated utility/generating company shall demonstrate the declared
capability of its generating station as and when asked by the SLDC. In the
event of the generating company failing to do so, the capacity charges due
to the integrated utility/generating company shall be reduced as a measure
of penalty.
(2) The quantum of penalty for the first mis-declaration for any duration /
block in a day shall be the charges corresponding to two days fixed charges.
For the second mis-declaration, the penalty shall be equivalent to fixed
charges for four days and for subsequent mis-declarations, the penalty
shall be multiplied in geometrical progression.
(3) The operating log books of the generating station shall be made available for
review by the SLDC. These books shall contain the record of machine
operation and maintenance.
46. Metering and Accounting
Metering arrangements, including installation, testing and operation and
maintenance of meters and collections, transportation and processing of data
required for accounting of energy exchanges and average frequency on 15
minute time block basis shall be the responsibility of the State Transmission
Utility / State Load Despatch Centres. All the concerned entities (in whose
premises the special energy meters are installed) shall fully cooperate with the
STU / SLDC and extend necessary assistance by taking weekly meter readings
and transmit them to SLDC.
The SLDC shall in turn forward necessary data / schedules to the regional level
in line with the regulations framed by Central Electricity Regulatory
35
Commission. UI accounting procedures within the state shall be governed by
the orders of the Commission.
In case of a generating station, contracting to supply power to two or more
states, the scheduling, metering and energy accounting shall be carried out by
the Regional Load Despatch Centre.
47. Billing and payment of capacity charges
The billing and payment of capacity charges shall be done on a monthly basis
as under:
(i) Each beneficiary shall pay the capacity charges in proportion to its
percentage share in installed capacity of the generating station.
(1) The beneficiaries could be the various distribution licensees or the
Trading Companies.
(2) If the capacity remains unutilised during day-to-day operation, the
SLDC shall advise all beneficiaries in the region or other SLDCs so that
such capacity may be utilized through bilateral arrangements either with
or the concerned generating company or beneficiary(ies) under intimation
to the SLDC.
(3) The information regarding un-requisitioned capacity shall be made
available by the SLDC through their respective websites.
(ii) The capacity charges shall be paid by the beneficiary(ies) to the
generating company every month in accordance with the following
formulae:
(a) Total capacity charges payable to the generating company for
1st Month (1XACC 1) ÷12
2nd Month (2XACC 2 - 1XACC 1) ÷12
3rd Month (3XACC 3 - 2XACC 2 ) ÷12
4th Month (4XACC 4 -3XACC 3 ) ÷12
5th Month (5XACC 5 - 4XACC 4) ÷12
6th Month (6XACC 6 - 5XACC 5) ÷12
7th Month (7XACC 7 - 6XACC 6 ) ÷12
8th Month (8XACC 8 - 7XACC 7 ) ÷12
9th Month (9XACC 9 - 8XACC 8 ) ÷12
10th Month (10XACC 10 - 9XACC 9 ) ÷12
11th Month (11XACC 11 - 10XACC 10 ) ÷12
12th Month (12XACC 12 - 11XACC 11) ÷12
Note: ACC1 to ACC 12 are the amounts of Annual capacity charges
corresponding to availability for the cumulative period upto the end of 1st
to 12th Months each respectively.
(b) Each beneficiary having firm allocation in capacity of generating
station shall pay for
36
1st Month [ACC 1X WB 1] ÷1200
2nd Month [2 ACC 2 X WB 2 – 1 XACC 1 X WB 1] ÷ 1200
3rd Month [3 ACC 3 X WB 3 – 2 XACC 2 X WB 2] ÷ 1200
4th Month [4 ACC 4 X WB 4 – 3 XACC 3 X WB 3 ]÷ 1200
5th Month [5 ACC 5 X WB 5 – 4 XACC 4 X WB 4] ÷1200
6th Month [6 ACC 6 X WB 6 – 5 XACC 5 X WB 5 ]÷ ]1200
7th Month [7 ACC 7 X WB 7 – 6 XACC 6 X WB 6] ÷ 1200
8th Month [8 ACC 8 X WB 8 – 7 XACC 7 X WB 7]÷ 1200
9th Month [9 ACC 9 X WB 9 – 8 XACC 8 X WB 8 ]÷ 1200
10th Month [10 ACC 10 X WB 10 – 1 ACC 9 X WB 9] ÷ 1200
11th Month [11 ACC 11 X WB 11– 10 ACC 10 X WB 10] ÷ 1200
12th Month 12 [ACC 12 X WB 12 – 11 ACC 1 X WB 11] ÷ 1200
Note: WB1 to WB12 are the weighted average of percentage allocated
capacity share of the beneficiary during the cumulative period upto
1st to 12 months each respectively.
Chapter 3
Hydro Power Generating Station
48. Definitions
Unless the context otherwise requires for the purpose of this chapter:
(i) ‘Additional Capitalisation’ means the capital expenditure actually
incurred after the date of commercial operation of the station and
admitted by the Commission after prudent check subject to provisions
of Regulation 51’.
(ii) ‘Auxiliary Energy Consumption’ in relation to a period means the
quantum of energy consumed by auxiliary equipment of the generating
station and shall be expressed at the integrated utility’s or generating
company’s terminals of all units of the generation station;
(iii) ‘Beneficiary’ in relation to generating station means the person buying
power generated at such generating station on payment of Annual Fixed
Charges.
(iv) ‘Capacity Index’ means the average of the daily capacity indices over
one year;
(v) ‘Cut off date’ means the date of first financial year closing after one
year of the date of commercial operation of the generating station.
(vi) ‘Daily Capacity Index’ means the declared capacity expressed as a
percentage of the maximum available capacity for the day and shall be
mathematically expressed as here-under:
Daily Capacity
Index
= Declared Capacity (MW)
Maximum Available Capacity (MW)
X 100
Daily Capacity Index shall be limited to 100%.
37
(vii) ‘Date of commercial operation’ or ‘COD’ in relation to a unit means
the date declared by the integrated utility / generating station after
demonstrating the ‘Maximum Continuous Rating (MCR) or installed
capacity through a successful trial run after notice to the beneficiaries
and in relation to the generating station, the date of commercial
operation of the last unit or block of the generating station.
(viii) ‘Declared Capacity or DC’ means :
(a) for run-of – river power station with pondage and storage type
power stations, the declared capacity means the ex-bus capacity
in MW expected to be available from the generating station during
the peak hours of the next day, as declared by the integrated
utility / generating company, taking into account the availability
of water, optimum use of water and the availability of machines.
For this purpose, the peak hours shall not be less than 3 hours
within a 24 hour period; and
(b) In the case of purely run-of-river power stations, the declared
capacity means the ex-bus capacity in MW expected to be
available from the generating station during the next day, as
declared by the generating station, taking into account the
availability of water, optimum use of water and availability of
machines;
(ix) ‘Deemed Generation’ means the energy which a generating station was
capable of generating but could not generate due to conditions of grid or
power system, beyond the control of the generating station resulting in
spillage of water.
(x) ‘Design Energy’ means the quantum of energy, which could be
generated in a 90% dependable year with 95% installed capacity of the
generating station;
(xi) ‘Existing generating station’ means a generating station declared
under commercial operation from the date prior to the notified date of
tariff Regulations by the Commission as per regulation 1(2).
(xii) ‘Installed Capacity’ or ‘IC’ means the summation of the name plate
capacities of all the units of a generating station or the capacity of a
generating station (received at the generator terminals) as approved by
the Commission from time to time.
(xiii) ‘Infirm Power’ means electricity generated prior to the commercial
operation of the unit of a generating station.
(xiv) ‘Maximum Available Capacity’ means the following:
38
(a) Run–of–river power stations with pondage and storage type power
stations; The maximum capacity in MW, the generating station
can generate with all generating units running, under the
prevailing conditions of water levels and flows, over the peak
hours of the next day.
Explanation: The peak hours for the purpose shall not be less
than 3 hours within a 24 hour period.
(b) Purely run-of-river power stations: The generating station can
generate maximum capacity in MW, with all units running, under
the prevailing conditions of water levels and flows over the next
day.
(xv) ‘Primary Energy’ means the quantum of energy generated upto the
design energy on per year basis at the generating station;
(xvi) ‘Project’ means a generating station and includes the complete hydro
power generating facility covering all components such as dam, intake,
water conductor system, power generating station and generating units
of the scheme as apportioned to power generation;
(xviii) ‘Operation and Maintenance Expenses’ or ‘O&M Expenses’ means the
expenditure incurred on operation and maintenance of the generating
station and includes expenditure on man-power, repairs, spares,
consumables, utility expenses, insurance and overheads.
(xix) ‘Original Project Cost’ means the actual expenditure incurred by the
integrated utility or generating company as per original scope of the
project upto the first financial closing after one year from the date of
commercial operation of the last unit as admitted by the Commission for
the determination of tariff.
(xx) ‘Run-of-river power station with pondage’ means a hydro electric
power station with sufficient pondage for meeting the diurnal variation of
power demand;
(xxi) ‘Storage type power station’ means a hydro electric power generating
station associated with large storage capacity to enable variation of
generation of power according to demand;
(xxii) Saleable Primary Energy means the quantum of primary energy
available for sale (ex-bus);
(xxiii) ‘Secondary Energy’ means the quantum of energy generated in excess
of the design energy on per year basis at the generating station;
(xxiv) ‘Saleable Secondary Energy ’ means the quantum of secondary energy
available for sale (ex-bus);
39
(xxv) ‘Scheduled Energy’ means the quantum of energy to be generated at the
generating station over a 24 hour period, as scheduled by the SLDC;
49. Norms of operation
(1) Normative capacity index for recovery of full capacity charges:
(a) During first year of commercial operation of the generating station:
(i) Purely Run – of – river Power Stations 85%
(ii) Storage type and Run-of-river power stations with pondage 80%
(b) After first year of commercial operation of the generating station
(i) Purely Run – of – river Power Stations 90%
(ii) Storage type and Run-of-river power stations with pondage 85%
(c) There shall be prorata recovery of capacity charges in case the generation
station achieves capacity index below the prescribed normative levels. At
zero capacity index, no capacity charges shall be payable to the
generating station.
(2) Auxiliary Energy Consumption
(a) Surface hydroelectric power generating
station with rotating exciters mounted on
generator shaft
0.2% of energy
generated
(b) Surface hydroelectric power generating
station with static excitation system
0.5% of energy
generated
(c) Under ground hydro electric power
generating station with rotating exciters
mounted on the generator shaft
0.4% of energy
generated
(d) Under ground hydro electric power
generating station with static excitation
system
0.7% of energy
generated
(3) Transmission losses
From generation voltage to Transmission
Voltage
0.5% of energy
generated
50. Capital Cost
Subject to prudent check by the commission, the actual expenditure incurred
upto completion of the project shall form the basis for the determination of final
tariff. The final tariff shall be based on the admitted capital expenditure actually
incurred upto the date of commercial operation of the generating station and
shall include capitalised initial spares subject to a ceiling norm of 1.5% of the
original project cost as on the cut off date:
Provided :
(i) where the Power Purchase Agreement (PPA) entered into between
integrated utility / the generating company and the beneficiaries
provides a ceiling of actual expenditure, the capital expenditure shall not
exceed such a ceiling for determination of tariff.
40
(ii) in case of existing generating station, the capital cost admitted by the
Commission prior to the notified date of tariff regulations by the
Commission as per Regulation 1(2) shall form the basis for determination
of tariff.
Note: The Commission shall scrutiny the project cost estimates limited to the
reasonableness of the capital cost, financial plan, interest during construction,
use of efficient technology and such other matters for the purpose of
determination of tariffs.
51. Additional Capitalisation
(1) The following actual capital expenditure incurred within the original scope of
work after the date of commercial operation and upto the cut off date
may be admitted by the commission subject to prudent check:
(i) deferred liabilities;
(ii) works deferred for execution;
(iii) procurement of initial capital spares within the original scope of work
subject to the ceiling specified under Regulation 50
(iv) liabilities to meet award of arbitration or for compliance of the order
or decree of a court of law and
(v) on account of change in law.
Provided that:
(i) the original scope of work along with the estimates of expenditure
shall be submitted to the Commission along with the application for
provisional tariff.
(ii) a list of deferred liabilities and works deferred for execution shall be
submitted to the Commission along with the application for final tariff
after the date of commercial operation of the generating station.
(2) Subject to the provisions of clause (3) of this Regulation, the capital
expenditure of the following nature actually incurred after the cut off date
may be admitted by the Commission after prudent check:
(i) deferred liabilities relating to works /services within the original
scope of work
(ii) liabilities to meet award of arbitration or compliance of the order or
decree of a court.
(iii) on account of change of law
(iv) any additional works/services which have become necessary for
efficient and successful operation of the plant but not included in the
original capital cost.
41
(3) Any other expenditure on minor items / assets like tools and tackles,
personal computers, furniture, air – conditioners, voltage stabilizers,
refrigerators, fans, coolers, TV, washing machines, heat convectors, carpets,
mattresses etc, bought after cut off date shall not be considered for
additional Capitalisation for determination of tariff with effect from the
notified date of the tariff regulations by the Commission as per Regulation
1(2).
Note: The above list is illustrative but not exhaustive.
(4) Impact of additional Capitalisation in tariff revision may be considered by
the Commission twice in a tariff period, including revision of tariff after cut
off date.
Note: (1) Any expenditure admitted on account of committed liabilities
within the original scope of work and expenditure deferred on techno –
economic grounds but falling within the scope of original work shall be
serviced in the normative debt-equity ratio specified in Regulation 53.
(2) Any expenditure admitted by the Commission for determination of tariff
on account of new works not in the original scope of work shall be serviced
in the normative debt – equity ratio specified in Regulation 53.
(3) Any expenditure admitted by the Commission for determination of tariffs
on renovation and modernisation and life extension shall be serviced on
normative debt – equity ratio specified in Regulation 53.
(4) Any expenditure on replacement of old assets shall be considered after
writing off the gross value of the original assets from the original capital cost
except such items as are listed in clause (3) above.
52. Sale of Infirm Power
Any revenue earned by the integrated utility / generating company from sale of
infirm power shall be taken as reduction in capital cost and shall not be treated
as revenue. The rate for infirm power shall be the same as the primary energy
rate of the generating station.
53. Debt equity ratio
(1) In case of all generating stations, the debt – equity ratio as on the date of
commercial operation shall be 70:30 for determination of tariffs, provided
that the commission may in appropriate cases consider equity higher than
30% for purpose of determination of tariff, where the generating company is
able to establish to the satisfaction of the Commission that the deployment
of equity more than 30% was in the interest of general public.
Provided that
42
(i) in case of a generating station, the actual equity employed is less
than 30%, the actual debt and equity employed shall be taken for
determination of tariff
(ii) in case of existing projects the actual debt: equity ratio shall be used
for tariff determination. However any expansion shall be governed by
clause (1) above.
(2) The debt and equity amount arrived at in accordance with clause (1) shall be
used for calculation of interest on loan, return on equity, Advance Against
Depreciation and foreign exchange rate variation.
54. Computation of Annual Charges
The two-part tariff for sale of electricity from a hydro power generating station
shall comprise of recovery of capacity charges and primary energy charges:
(i) Capacity charges: The capacity charges shall be computed in accordance
with the following formula:
Capacity charges = (Annual fixed charge – Primary Energy charge)
Note: Recovery through primary energy charge shall not be more than Annual
Fixed Charge.
(ii) Annual Fixed Charges: Annual Fixed charges shall consist of;
(a) Interest on capital
(b) Depreciation, including Advance Against Depreciation
(c) Return on equity
(d) Operation and Maintenance expenses; and
(e) Interest on working capital
55. Computation of annual fixed charges
The annual fixed charges shall be computed on the following basis:
(1) Interest on capital
(i) Interest on loan capital shall be computed loanwise on the loans
arrived at in manner indicated in Regulation 53.
(ii) In the case of existing projects, the actual debt equity ratio shall be
used for tariff determination. However, any expansion shall be
governed by Regulation 53.
(iii) The generating company / integrated utility shall make every effort to
refinance the loan as long as it results in net benefit to the
beneficiaries. The costs associated with such refinancing shall be
borne by the beneficiaries.
(iv) The charges on loan terms and conditions shall be reflected from the
date of such swapping and benefit shall be passed to the
beneficiaries.
43
(v) In case of any dispute, any of the parties may approach the
Commission with proper application. The beneficiaries shall not,
however, withhold payment to the generating company / integrated
utility during pendancy of the dispute, unless the Commission
specifically directs such non-payment, relating to swapping of the
loan.
(vi) In case any moratorium period is availed of by the integrated utility /
generating company, depreciation provided for in the tariffs during
the period of moratorium shall be treated as repayment during those
years and interest on loan capital shall be calculated accordingly.
(vii) The integrated utility or the generating company shall not make any
profit on account of swapping of loan and interest thereon.
(viii) The integrated utility or the generating company, may at its
descretion, swap loans having floating rate of interest with loans
having fixed rate of interest or vice – versa at its own cost and gains
or losses as a result of such swapping shall accrue to the utility /
generating company.
Provided that the beneficiaries shall be liable to pay interest for the loans
initially contracted whether on floating or fixed rate of interest.
(2) Depreciation including Advance Against Depreciation
(a) Depreciation
For purpose of tariff, depreciation shall be computed in the following
manner:
(i) The value base for the purpose of depreciation shall be the historical
cost of the asset.
(ii) Depreciation shall be calculated annually, based on the straight-line
method over the useful life of the asset and at rates prescribed by the
Central Electricity Regulatory Commission
(iii) The residual value of the asset shall be considered as 10% and the
depreciation shall be allowed upto a maximum of 90% of the
historical capital cost of the asset. Land is not a depreciable asset and
its cost shall be excluded from the capital cost for purposes of
depreciation while computing 90% of the historical cost of the asset.
The historical capital cost for purposes of depreciation of the asset
shall include Additional Capitalisation on account of Foreign
Exchange Rate Variation as allowed by the Central Government /
Central Electricity Regulatory Commission
44
(iv) On repayment of entire loan, the remaining depreciable value shall be
spread over the balance useful life of the asset.
(v) Depreciation shall be chargeable from the first year of operation of the
asset. For part of the year, depreciation shall be charged on pro rata
basis.
(b) Advance Against Depreciation (AAD)
In addition to allowable depreciation, the integrated utility / generating
company shall be entitled to Advance Against Depreciation, computed in
the manner detailed below:
AAD= Loan repayment amount as per Regulation 53 subject to a ceiling
of 1/10th of the loan amount as per Regulation 51 minus
depreciation as per schedule.
Provided that:
(i) Advance Against Depreciation shall be allowed only if the
cumulative repayment upto a particular year exceeds the
cumulative depreciation upto that year.
(ii) Advance Against Depreciation in a year shall be restricted to the
extent of depreciation between the cumulative repayment and
cumulative depreciation upto that year.
All efforts shall be made for aligning the tenure of the long term debt with
permissible rate of depreciation to reduce front loading of tariff through
various mechanisms including resort to take out finances to elongate
debt repayment period. In such a case there will be no need for any
Advance Against Depreciation.
(3) Return on Equity
(a) The return on equity shall be computed on the equity base
determined in accordance with Regulation 53 @ 14% per annum.
(b) In the case of existing projects, the actual debt equity shall be used
for tariff determination. However, any expansion shall be governed by
Regulation 53.
(c) Equity invested in foreign currency shall be allowed a return upto the
prescribed limit in the same currency and the repayment on this
accou