64 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
IN pursuance of the provisions of clause (3) of Article 348 of the Constitution, the Governor is
pleased to order the publication of the following English translation of notification no.624/I-13-2016-
5ka(25)-2013, Dated November 23 , 2016.
No. 624/1-13-2016-5Ka(25)-2013
Dated, Lucknow: November 23, 2016
WHEREAS the draft rules, namely "The Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement (Uttar Pradesh) Rules, 2015" were published as required
Under section 112. of the Right to Fair Compensation and Transparency in Land Acquisition,
Rehabilitation and Resettlement Act, 2013 (Act no.30 of 2013), vide Government notification no.368/1-
13-2015-5Ka(25)-2013, dated May 12, 2015 for inviting objections and suggestions from all persons likely
to be affected there by within the stipulated time;
AND WHEREAS the objections and suggestions received within the stipulated time have been
considered by the State Government;
Now, THEREFORE, in exércise of the powers conferred by sub-section (2) of section 109 of the
Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act,
2013 (Act no.30 of 2013), the Governor is pleased to make the following rules :-
THE RIGHT TO FAIR COMPENSATION AND TRANSPARENCY IN LAND
ACQUISITION, REHABILITATION AND RESETTLEMENT (UTTAR PRADESH)
RULES, 2016. :
CHAPTER-I
GENERAL
Short title, extent 1. (1) These rules may be called the Right to Fair Compensation and
and Transparency in Land Acquisition, Rehabilitation and Resettlement (Uttar Pradesh)
Rules, 2016.
(2) They shall extend to the whole of the State of Uttar Pradesh.
(3) They shall come into force on the date of their publication in the Gazette.
Definition 2. (1) In these rules, unless the context otherwise requires,—
(a) "Act" means the Right to Fair Compensation and Transparency in
Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act no. 30
of 2013);
(b)"Agency" means an agency appointed by the State Government for
doing the Social Impact Assessment Process and Preparing the Social
Impact Management Plan;
(c) "Collector" means the Additional Collector (Land Acquisition),
Special Land Acquisition Officer and Deputy Land Acquisition Officer and
other Officer and other such Officer appointed by the State Government
under clause (g) of section 3;
(d) "District Collector" means the Collector of revenue district;
(e) "Form" means a Form appended to these rules;
(f) "Government" means the state Government of Uttar Pradesh;
(g) “Local body" or "Local Authority" shall include rural local bodies
namely Gram Sabha, Gram Panchayat, Zila Panchayat and urban local
authorities namely Nagar Nigam, Nagar Panchayat or Nagar Palika
Parishad constituted or established under their respective Acts;
(h)"Scheme" means the Rehabilitation and Resettlement Scheme
prepared by an Administrator according to sub-section (2) of section 16 of
the Act;
(i) "Social Impact Assessment” (SIA) means an assessment being
made under section 4 of the Act ;
(j) “Social Impact Assessment Plan"(SIMP) means the Plan prepared
as part of Social Impact Assessment Process under sub-section (6) of
Section 4 of the Act; 5
(k)"State Monitoring Committee" means committee constituted by the
State Government for reviewing and monitoring the implementation of
Rehabilitation and Resettlement schemes or plans under the Act, as
provided in sub section (1) of section 50 of the Act.
(2) Words and expressions used but not defined in these rules, but defined in
the Act, shall have the same meanings respectively assigned to them in the Act.
commencement
innit SOS BPE Nlscaraccalle Ranisn 2 --नन-न्नन_--+नत््नननननन व नन-मी---+-त++ _-_-.-++० di | i 5
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 65
CHAPTER-II
SOCIAL IMPACT ASSESSMENT
3. (1) After getting the final proposal for acquisition, the State Government, for
the purpose of the Act, shall issue a notification for carrying out Social Impact
Assessment in accordance with Section 4(1) of the Act, in the form-1 regarding the
commencement of Social Impact Assessment. It shall notify the name of the Social
Impact Assessment agency assigned with the task of carrying out Social Impact
Assessment Study.
(2) The notification shall be made available in the local language to the Gram
Panchayat, Nagar Nigam/Nagar Panchayat/Nagar Palika Parishad, in the offices of the
District Collector, the Sub-Divisional Magistrate, Office of concerned Land Acquisition
Officer, Administrator, Tehsildar. It shall also be published in two daily newspapers
circulating in the affected area of which at least one shall be in the regional language ,
and also by way of a public notice by affixing it at some conspicuous places in the
affected areas and shall be uploaded on the website of the district or the Government.
(3) Such notification shall be issued within thirty days after the deposit of the
processing fee for carrying Social Impact Assessment by the requiring body.
(4) No such notification of the commencement of the Social Impact Assessment
Study shall be issued if the requiring body has not deposited the advance amount as
prescribed under the relevant rule of these rules.
(5) The Social Impact Assessment study shall be conducted in consultation with
concerned local authority at Town/Village level or ward level in the affected areas, for
the purposes of section. ;
4. (1) The State Government or Collector, as the case may be, shall identify or
establish an independent outsourced district Social Impact Assessment agency,
hereinafter referred to as Agency, which shall be responsible for ensuring that social
impact assessment study is conducted by such person other than the requiring body, for
all the cases of land acquisition provided under the Act. The State Government may also
nominate Planning department of the government for the purpose of selecting Social
Impact Assessment agency. It shall complete the work described in sub-rule (3).
(2) For this purpose, the State Government or the Collector or the planning
department , as the case may be, shall invite an application from the department of social
work of the recognized Universities and Colleges, faculties, NGO'S and professionals,
who shall be responsible for conducting the Social Impact Assessment as per the Act.
(3) The State Government , the Collector or the planning department, as the case
may be, shall draw out a list of such accredited people of the department of social work
of the universities and colleges, faculties, NGO’S and professionals, After assessing their
capacity through an interview and the experienced accredit to them to evaluate the Social
impact assessment study for the project, shall constitute an experts group and the name
of the agency shall be notified as per the provision given under sub-rule (2) of rule 3 of
these rules. :
(4) The requiring body shall not be involved in any way in the appointment of
the Agency being appointed to carry out the Social Impact Assessment in the project
area. ;
(5) The size and selection criteria for the Agency shall be as per the project-
specific terms of reference.
(6) In those areas, where Agencies with such capacities are not available or
where engagement of such agencies is infeasible in cost-benefit terms, then the state
Government may go ahead with the Social Impact Assessment study process through its
own employees or officers. For this purpose, State Government may nominate Chief
development officer or other district level officer, not below the rank of Additional
district magistrate, as nodal officer who shall be responsible to monitor the process.
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
Social Impact
Assessment
study
Institutional
support and
facilitation for
social impact
Assessment
66 उत्तर प्रदेश असाधांरण गजट, 23 नवम्बर, 2016
Project specified
terms of reference
(TOR) processing
fee for the social
impact assessment
Processing of
conducting the
social impacts
Assessment
(7) The selected agency conducting the Social Impact Assessment shall
appoint a group leader to liaison with the Collector and other members of Social
Impact Assessment agency throughout the assessment period, who shall be
responsible for carrying out the required activities within the given time frame.
(8) While selecting the agency, it is to be ensured that there is no conflict of
interest involving the team members appointed to assess the concerned project.
(9) If at any stage, it is found that any team member or any family member
of the team member has directly or indirectly received any benefit from the
requiring body or any other stakeholder in the project, the said member shall be
disqualified and the State Government shall terminates his/her services.
5. (1) The Collector shall finalise the terms of reference for the Social Impact
Assessment in consultation with the Agency selected for carrying out the Social
Impact Assessment in the form -2. :
(2) Once the State Government / Collector and Agency arrived at mutually
agreeable workable rates, the District Collector shall approve terms of reference, if
he is an appropriate government for the project. In other projects, the Collector shall
forward the proposal to the concern administrative department of State Government
with the recommendation for approval.
(3) If acquisition of land for any project area falls under the jurisdiction of
more than one district, then the appropriate government or the Collector shall send
the proposal to the State Government, for the necessary approval. The decision of
the State Government shall be final.
(4) The estimated Social Impact Assessment fee shall be deposited to the
Collector, by the requiring body. Out of which, Ten per cent of the Social Impact
Assessment fee shall be allocated to administrative expenses for preparing the
Terms of Reference and be deposited to the State Government in appropriate head
by the Collector.
(5) Remaining ninety per cent of Social Impact Assessment fee shall be
deposited in the deposited Account of the Collector in the concerned treasury. This
amount shall be spent with the approval of Collector for expenses related to Social
Impact Assessment as per terms of reference.
6. (1) The Collector or any officer specially authorized by the Collector and
the requiring body shall as far as possible furnish the information requisitioned by
the Agency throughout the Social Impact Assessment process. Any request for
information from agency shall be met at the date, but not exceeding fifteen days
from the date of such request.
(2) The Agency shall collect and analyse a range of quantitative and
qualitative data, undertake detailed site visits, use participatory methods such as
focused group discussions, participatory rural appraisal techniques and informant
interviews in preparing the Social Impact Assessment report. Detailed assessment
based on a thorough analysis of all relevant land records and data, field verification,
review and comparison with similar projects shall be conducted by the Social
Impact Assessment team. The assessment shall determine the following, namely:-
(a) Area of impact under the proposed project, including both land to
be acquired and areas that will be affected by environmental, social or other
impacts of the project;
(b) Quantity and location of land proposed to be acquired for the
project;
(c) The land proposed for acquisition is the bare minimum required the
land proposed for acquisition is the bare minimum required;
(d) Possible alternative sites for the project and their feasibility;
(e)Whether, the land proposed for acquisition in Scheduled Area as
defined in Schedule 5 or 6 of Indian Constitution, is a demonstrable last
resort:
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 67
Provided that, in projects where resettlement is required, the identified
resettlement sites shall be visited and a brief socio-economic profile of the land
and its current resident population shall be indicated.
(3) Based on the land assessment, land records and field verification, the agency
shall provide an accurate estimate of the number of affected families and the number of
displaced families among them and ensure that, as far as possible, the Social Impact
Assessment team shall enumerate all affected families.
(4) Socio-economic and cultural profile of the affected area must be prepared,
based on:available data and statistics, field visits and consultations.
(5) The Social Impact Assessment Report shall be submitted in the given form-3
to the state Government within a period of two months from the date of its
commencement and shall include the views of the affected families recorded in writing.
However the State Government may extend this period up to six months. (including the
period already given).
(6) The Social Impact Management Plan (SIMP) will present the ameliorative
measures to be undertaken to address the social impacts identified in the course of the
assessment. The Social Impact Assessment team must assess the viability of impact:
mitigation and management strategies with clear indication of costs and timelines. It
shall be prepared as per the provisions given under sub-section (5) of section 4 of the
Act.
(7) The Social Impact management plan must provide a conclusive assessment
of the balance and distribution of the adverse social impacts and social costs and benefits
of the proposed project and land acquisition, including the mitigation measures, and
provide an assessment as to whether the benefits from the proposed project exceeds the
social costs and adverse social impacts that are likely to be experienced by the affected
families or even after the proposed mitigation measures, the affected families remained at
risk of being economically or socially worse, as a result of the said land acquisition and
resettlement, Format for Social Impact Management Plan in being given as form-4.
(8) Wherever environment impact assessment is carried out, a copy of the Social
Impact Assessment report shall be made available to the Impact Assessment Agency
authorized by the State Government. *
(9) The Agency shall also provide summaries of the feasibility/project impact
report and Social Impact Management Plan.
7. (1) Soon after completion of Social Impact Assessment Study Report and
Social Impact Management Plan, a public hearing shall be conducted by the state
Government, in the affected area by giving notice to be published in two daily
newspapers circulating in the affected area of which at least one shall be in the regional
language, and also by way of a public notice by affixing it at some conspicuous places in
the affected areas not less than seven days before the public hearing indicating its time,
place and date and other necessary details. This notice shall also be uploaded on the
website of the concern district or the State Government.
(2) The public hearings shall be conducted in the concern Gram Panchayat
offices or urban local bodies offices, as the case may be, any public place or convenient
place in the affected area. The State Government may take decision to conduct hearing at
some conspicuous place other than the affected areas within the concern district by
giving the justification for it and duly published in a notice.
(3) The State Government may appoint any Revenue officer of the rank of
Deputy Collector, Tehsildar or Block Development Officer to conduct the hearings.
(4) A member or members, as the case may be, of the Social Impact Assessment
agency shall facilitate the public hearing which shall be organized through the local
administration with the designated Government officers of appropriate level.
(5) Public hearings generally are held in the affected areas to bring out the main
findings of the Social Impact Assessment, seeking feedback on the findings and to seek
additional information and views for incorporating the same in the final documents.
\WATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
‘Manner of
conducting
public hearing
on Social
Impact
Assessment
report and
Social Impact
Management
Plan
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
Publication of final
social impact -
Assessment Report
and Social impact
Assessment plan
Submission of
Social Impact
Assessment Report
and Social Impact
Management Plan
(6) Public hearings shall be conducted in all Gram Sabha where more than
twenty per cent of the members are directly or indirectly affected by the acquisition
of the land. :
(7) The draft of Social Impact Assessment report and: Social Impact
Management Plan shall be published for inspection of general public in the office of
the Collector for the purpose of land acquisition not less than seven days before the
public hearing. |
(8) The requiring body may also be served with a copy of the draft report.
Adequate copies of the report and summaries shall be made available to the public
on the day of the public hearing by the agency.
(9) All the proceedings Shall be held in the local language to ensure that all
the participants can understand and express their views.
(10) Representatives from the requiring body shall also attend the public
hearing and address the questions and any issue raised by the affected parties.
(11) The proceedings of the public hearing will be video recorded and
transcribed accordingly. The said recording and transcription shall be submitted to
the Collector along with the final Social Impact Assessment report and Social
Impact Management Plan
(12) After the conclusion of the public hearings, the Social Impact
Assessment team shall analyse the entire feedback received and information
gathered in the public hearing and incorporate the same along with their analysis, in
the revised Social Impact Assessment report accordingly.
(13) Every objection raised in the public hearing shall be recorded and the
Social Impact Assessment agency shall ensure that the every objection shall be
considered in the Social Impact Assessment report.
(14) No public re-hearing shall be conducted if the public hearing is
disturbed by misbehavior of the miscreant's presents, leading to disturbance of
public peace and law and order. In case of any disturbance, the next public hearing
shall be treated as conclusive. In such circumstances, seven days shall be provided
to file claims, objections/suggestions.
8. After completion of public hearing, the final Social Impact Assessment
Report and Social Impact Management Plan shall be prepared and made available to
the Collector or State Government, as the case may be, for publication at the level of
Gram Panchayat, Nagar Nigam/Nagar Panchayat/Nagar Palika Parishad, in the
offices of the Collector, the Sub-Divisional Magistrate, Office of concerned Land
Acquisition Officer, Administrator, Tehsildar, It shall also be published in two daily
newspapers circulating in the affected area of which at least one shall be in the
regional language, and also by way of a public notice by affixing it at some
conspicuous places in the affected areas and uploaded on the website of the district
or State Government. A copy of the final Social Impact Assessment report and
Social Impact Management Plan shall also be given to the concerning requiring
body. न
9. (1) With all the relevant information and analysis in a single document, the
Social Impact Assessment Report and Social Impact Management Plan shall be
submitted to the Collector or State Government, as the case may be, by the agency.
. (2) It shall then forward the Social Impact Assessment report and Social
Impact Management plan with his recommendations within two weeks of
submission by the agency to the Multi-disciplinary Expert group for appraisal.
(3) Before forwarding the Social Impact Assessment report and Social
Impact Management plan, an opportunity shall be given to the Requiring Body to
make objections and suggestions on the draft of Social Impact Assessment Report
and Social Impact Management Plan as well as on the claims and objections raised
in the public hearing conducted. The Requiring Body shall submit such objections
and suggestions within a period of ten days after receiving a draft. If no such
suggestions are received within a period of ten days then it shall, be presumed that
the Requiring Body has accepted the draft Scheme. Then the Collector or the State
Government, as the case may be, shall forward the Social Impact Assessment Report
and Social Impact Management Plan, with his recommendations and all such
documents which require to be sent, to the Multi-disciplinary Expert group for
appraisal.
\NDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa: eng-2016.doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 69
10. (1) The State Government shall constitute a Multi-disciplinary Expert
Group as provided under sub-section (1) of section 7 of the Act. The Expert Group shall
consist of-
(a) Two non-official social scientists to be nominated by the state
Government;
Appointment of
Multi-
disciplinary
Expert group for
Appraisal of
Social Impact
Assessment
(0) Two representatives of Panchayats, Grams Sabha, Municipality or Report
Municipal Corporation, as the case may;
(c) Two experts on rehabilitation, and;
(d) A technical expert in the subject relating to the project.
Provided that, the State Government may authorise the planning
department for the empanelment of such members to exercise the powers given
under the provisions of the Act.
(2) The Expert Group shall evaluate the Social Impact Assessment report in
preview of conditions given under sub- sections (4) and (5) of section 7 of the Act and
shall make its recommendations to that effect within a period of two months from the
date of its submission:
Provided that, if Expert Group in its opinion recommends that the project shall
be abandoned forthwith and no further steps to acquire the land will be initiated, then
such recommendations shall be recorded in writing by the expert group giving the
details and reasons for such decisions. But if the Expert Group is agrees then it shall
make specific recommendations whether the extent of the land proposed to-be acquired
is the absolute bare minimum extent needed for the project and whether there are no
other less displacing options available. A copy of such recommendation shall be sent to
the State Government and another copy to the Collector for publication.
(3) The Collector shall make arrangements to publish the recommendations of
the. Multi-disciplinary Expert Group and the same shall be made available in the local
language at the level of Gram Panchayat, Nagar Nigam/Nagar Panchayat/Nagar Palika
Parishad, in the offices of the Collector, the Sub-Divisional Magistrate, Office of
concemed Land Acquisition Officer, Administrator/ Tehsildar. It shall also be published
in two daily newspapers circulating in the affected area of which at least one shall be in
the regional language, and also by way of a public notice by affixing it at some
conspicuous places in the affected areas and uploaded on the website of the district or
the State Government.
11. (1) Decision on Social Impact Assessment and Social Impact Management
plan shall be taken by State Government as per the norms given under section 8 of the
Act.
(2) The State Government shall examine the recommendations of the Multi-
disciplinary Expert Group, report of the Collector, if any, and make its final
recommendations for such area for acquisition which would ensure minimum
displacement of people, minimum disturbance to the infrastructure, ecology and
minimum adverse impact on the individuals affected in its evaluation process. The State
Government shall also comply with the directions given under sub section (1) of
section 8 of the Act.
(3) When it appears that land is required or likely to be required in any area for
any public purpose, then the final recommendation shall be made available to the
Collector to take further steps for acquisition. These recommendations shall also be
made available in local language to the Gram Panchayat, Nagar Nigam/Nagar
Panchayat/Nagar Palika Parishad, in the offices of the Collector, the Sub-Divisional
Magistrate, Office of concerned Land Acquisition Officer, Administrator, Tehsildar. It
shall also be published in two daily newspapers circulating in the affected area of which
at least one shall be in the regional language, and also by way of a public notice by
affixing it at some conspicuous places in the affected areas and uploaded on the website
of the district or the State Government
\WDATA-S\Data 8_D1595 RPH Niyamawali- Rajswa. eng-2016 doc
Consideration of
the Social
Impact
Assessment
report,
recommendation
s of the Expert
Group by the
State
Government
70 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
Web-based Work
Flow and
Management
information System
(MIS) for land
Acquisition
Rehabilitation and
Resettlement
Inventory of Waste,
Barren and
Unutilized Land
Requirement and
procedure to obtain
12. The State Government shall create a dedicated, user-friendly website at
state and district level that may serve as a public platform on which the entire work
flow of each acquisition case will be hosted beginning with the notification of the
Social Impact Assessment and tracking each step of decision-making,
implementation and audit.
13. To ensure acquisition of minimum amount of land and to facilitate the
utilization of unutilized public lands, the State Government, by way of notification,
shall make necessary arrangements to authorise any department to prepare a district-
level inventory report of waste, barren and unutilized public land. If it is requested
or required then the land available in the State Government land bank and shall be
made available to the Social Impact Assessment team and Expert group. The
inventory report shall be updated from time to time.
CHAPTER III
CONSENT
14. In case land is sought to be acquired for the purposes as specified under
sub-section (2) of section 2, the prior consent of the affected land owners as per
provisions of sub-section (2) of section 2 shall be obtained by the Collector
concerned in form-5, along with the Social Impact Assessment study. Some of the
principles to obtain consent given as under:—
(a) The Collector may constitute a team of revenue officers or depute
any other officers under his control to assist him in the process of obtaining
the prior consent.
(b) The Collector and Sub Divisional Officer exercising the powers of
District Collector shall take steps to resolve outstanding issues of land rights,
land title and land records in the affected areas, so that all the land owners
can be correctly identified before initiating consent procedures.
(c) The Collector shall also undertake a special drive for the purpose
and complete the said exercise within a period of sixty days from the date of
issuance of preliminary notification.
(d) The Collector shall, after completion of the aforesaid exercise of
correcting and updating the land records shall draw out a list, of all affected
land owners from whom consent must be sought, after considering the list
. prepared by the Social Impact Assessment Agency.
(e) The list shall be made available in the affected area by displaying
the list in conspicuous places of the affected areas for at least ten days before
obtaining consent.
(f) The Collector shall in consultation with the representatives of Gram
Panchayat or Nagar Panchayat or Nagar Palika Parishad or Municipal
Corporation, as the case may be, notify the date, time and venue at least two
weeks in advance, for holding the affected land owners meetings at the
concern village or ward level. It shall also be published in two daily
newspapers circulating in the affected area of which at least one shall be in
the regional language. के
(g) The Requiring Body or its representative shall be present at all such
affected land owners meetings and respond to the queries raised by the
affected land owners. The terms and conditions of the project, Rehabilitation
and Resettlement, Compensation and other measures committed by the
Requiring Body shall be explained to the members in the local language and
signatures of the members as well as the representative of Requiring Body
shall be obtained on such terms and conditions.
(h) The proposed terms and conditions agreed by the Requiring Body
shall also be made available in local language to each and every affected
land owner, at least one week in advance.
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 71
(i) The land owner shall give his individual consent to the authorized
officer. ;
(Gj) The land owner shall give his written consent having his photograph
affixed on it in the format attached and the digital impression of his thumb
along with his signature (if he can make it) shall be printed on his affidavit.
(k) The authorized representative of the Requiring Body shall sign on the
prescribed consent Form and shall put the seal of the Requiring Body towards
its commitment to the consented terms and conditions.
(1) Any member of Gram panchayat, or Zila Panchayat, Lekhpal, Gram
Vikas Adhikari or any Government servant may sign on the affidavit as a
witness thereof that he recognizes the person who has given consent.
(m) The prescribed consent form shall be countersigned by the officer
authorised by the Collector.
(n) The form of consent and declaration so obtained shal! be made
available to the land acquisition officer in original, who will then prepare a list
of all such land owners and shall provide it to the requiring body. One copy of
this list shall also be attached with acquisition proposal, before issuing the
preliminary notification under section 1 1(1) of the Act.
(o) All the individual consent taking procedure shall be video recorded.
(p) All persons interested in the same land can give consent on a single
form.
(q) Single forms shall be used for giving consent by a same person for
his different lands under acquisition.
(r) No land owner can withdraw his consent once given in the above
manner.
(s) In case of a land situated in the Scheduled Area mentioned in the
Fifth Schedule appended to the Constitution of India, the consent of the Gram
Sabha shall be sought prior to the consent of the land owners.
(t) The consent taking process shall be concluded before issuing the
Preliminary Notification under sub-section (1) of section 11.
(u) Every objection raised during the process of taking consent meeting
shall be recorded and shall be considered by the requiring body.
(v) During the process of obtaining consent, those land owners, who
were absent and not given his /her consent and also has not raised any
objections before issuing of preliminary notification under section 11(1) of the
Act, shall be considered as they have no objection for the on-going proposed
acquisition.
15. (1) In case of acquisition of land in a Scheduled Areas mentioned in the
Fifth Schedule of the Constitution of India, the consent of Gram Sabha shall be obtained
by the Collector in form-6. He shall in consultation with the representatives of the Gram
Panchayat notify the date, timing and venue for holding special Gram Sabha meeting in
the affected areas two weeks in advance and conduct public awareness campaigns to
motivate members of the Gram Sabha to participate in the Gram Sabha.
(2) The procedure to be followed to obtain the prior consent of the Gram Sabha
shall be same as prescribed under rule 14.
(3) The quorum shall be the same as defined under the U. P. Panchayat Raj Act
Provided that, one third of the total women members of the Gram Sabha
shall also be present in the Gram Sabha meeting.
(4) No Gram Sabha can withdraw its consent once given in the above manner.
Consent of the
Gram Sabha in
Scheduled Area
Fe. उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
CHAPTER
REQUEST FOR LAND ACQUISITION
Request for 16. The Collector shall facilitate and assist to the requiring body in the
Acquisition of Land
Action by Collector
on receiving request
process to initiate acquisition. Request for land acquisition shall be submitted by the
Requiring Body to the Collector or authorized officer for the purpose of acquisition
of land in the district, in the form appended to these rules, along with the following
documents, as the case may be —
(a) Request for acquisition in form-7 duly signed by the competent
officers of the requiring body bearing the seal, name and designation of the
concerned officers;
(b) Detailed Project Report in form-8 with the Schedule of land
proposed for acquisition specifying the name of the village, pargana, tehsil,
Plot/khasra number with their areas and purpose for which the land is
proposed to be acquired;
(c) A certificate to the effect that administrative sanction for the project
for which the land is proposed to be acquired has been obtained from the
competent authority;
(d) A certificate by the requiring body in form-9 (Part A) certifying
that the land proposed for acquisition is absolutely bare minimum for the
purpose of the project and there is no other less displacing option available;
(e) As required in form-9 (Part A),certificate of satisfaction of
requiring body shall also be furnished indicating that the said project fulfils
the definition of public purpose as defined under section 2 of the Act;
(f) A certificate to the effect that sufficient provisions of funds in
respect to cost of compensation, estimated values of assets and
rehabilitation and resettlement of the affected people have been made in the
budget with the estimated cost of the project and status of dues in form-10 (a)
and form-10(b) ;
(g) A sketch map of the land which is contemplated under acquisition,
drawn on the village map (shajra map) demarcating and showing the areas of
banzar or uncultivated land lying within that village;
(h) A detail list of structures, buildings, wells/ tube wells, trees etc. in
form-11 including the estimated compensation which may be paid for each
item;
(i) Certificate of non existence of temples, mosques, graveyards etc. on
the land proposed for acquisition in form-12;
(j) Requiring body shall also put up certified copies of the khasra and
khatauni of the proposed land issued by the revenue authority verified by
Tehsildar / Revenue Inspector certifying that the proposed land is private in
nature. If the concerned village is. under the record operations or
consolidation, then relevant record of title, duly signed by the concerned
Assistant Record officer/Settlement officer Chakbandi /Consolidation officer
shall be submitted;
(k) Any other document or information required by the Collector.
17. (1) The Collector shall make an enquiry whether the proposed acquisition
is consistent with the provisions contained in section.10 of the Act.
(2) The Collector shall call upon an enquiry reports from revenue
authorities, as follows :-
(i) Certificate regarding no such land belonging to State Government,
Central Government or any other local authority, gram sabha land, land
defined under section 77 of the Uttar Pradesh Revenue Code 2006, has been
included in the land proposed for acquisition in form-13;
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 73
(ii) Certificate regarding, no such ceiling land has been included in the
land proposed for acquisition in form-14;
(3) The Collector shall also prepare such records and make an enquiry in
respect of land proposed for acquisition, as under:-
(i) ). Preliminary enquiry in form-15;
(ii) Khasra and Khatauni in form-16 (a) and -16(b);
(iii) Spot inspection and verification of assets submitted by the requiring
body mentioned in form-11;
(iv) Make an observation on the report submitted in form-9 (Part b) by
the requiring body:
Provided that, all such records and reports prepared by the revenue
officers shall be duly signed by the Tehsildar, Revenue inspector and Iekhpal,
Naib Tehsildar/land acquisition Amin. In cases of villages, which are under
record operations or consolidations, the same shall be signed by the concerned
Assistant Record officer/ Settlement officer Chakbandi /Consolidation officer.
The copy of such records and reports shall be kept in the office records. .
18. The Collector shall cause the estimated cost of acquisition of the land to be Cost of :
calculated with due care and diligence, so that abnormal differences at the time of final *क्णञआाणा
award can be avoided. He shall also cause the administrative cost to be calculated and
the same shall be deposited by the requiring body before proceedings initiated under
section 11 of the Act. Cost of conducting the Social Impact Assessment shall be such as
may be fixed according to the project from time to time by the State
Government/Collector.
19. (1) The estimated cost of acquisition and administrative costs specified | Manner of
under sub-clause(i) to (vi) of clause (i) of section 3 of the Act, shall be deposited by the ae
requiring body at the time of proceedings initiated under section 11 of the Act. by Requiring
(2) The requiring body shall deposit in advance the estimated cost of body
acquisition. Such amount be deposited by way of different modes acceptable as per
extent of bank practices.
(3) The Collector shall thereafier deposit the advance amount forwarded
against cost of acquisition and administrative cost in the specified land revenue head
through challan.
(4) The State Government shall provide requisite budget under admissible
heads of administrative costs for the purpose of acquisition separately through regular
budget.
; (5) It shall be mandatory upon the requiring body to deposit any remaining
amount after final estimates have been prepared, expenses required for conducting
Social impact assessment study and also any excess amount, if awarded by the
Authority or a competent court under relevant provisions of the Act, in the same
manner. :
CHAPTER V
PRELIMINARY NOTIFICATION FOR LAND ACQUISITION AND REHABILITATION AND
RESETTLEMENT SCHEME
20. (1) Once the consent process has been completed and the necessary Preliminary
approval of Social Impact Assessment report and Social Impact Management plan has पा
been given, the Collector will make scrutiny of the proposal and the documents and
conduct such preliminary enquiry as he may think necessary. He shall then record his
observation for issuing preliminary notification in form-17.
(2) After the scrutiny of the proposal the preliminary notification for
acquisition shall be issued by the State Government or the Collector, as the case may
be, in form-18, applying the provisions of section 15 of the Act for filing objections.
The notification must contain name of village, pargana, Tehsil, district, particulars of
khasra/gatas numbers with respective areas of acquisition and the purpose for which the
land is to be acquired.
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa_eng-2016.doc -
74 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
Updating of land
records :
Preliminary survey
of land
Hearing of
objections
*
(3) The Collector shall however, not issue a notification under section 11 of
the Act, if;
(i) The acquisition is for the purpose of the Union;
(ii) The provisions of section 40 of the Act are to be applied and the
application of section 15 is waived. In such cases he shall forward the record
of the proceedings conducted by him and the report containing his
recommendations on objections to the State Government. The State
Government shall take the final decision.
(4) The preliminary notification shall be published and informed in the
manner provided in sub-section (1) and (2) of séction 11 of the Act. It shall also be
published in two daily newspapers circulating in the affected area of which at least
one shall be in the regional language. :
(5) The proceedings of an acquisition shall start from publication of
preliminary notification in Government Official Gazette, after its issuance by the
Collector or State government, and shall complete at the stage of last publication of
the notification as prescribed under sub-section (1) of Section 11 ofthe Act:
Provided that, in computing the period of twelve months, referred in
sub-section (7) of section 19 of the Act, shall be count from the last date of
such publication:
Provided further that, the proceedings for publication of notification
shall be completed within thirty days from the date of publication of
notification in Government Official Gazette.
(6)A copy of the notification shall be affixed at some conspicuous places in
the affected areas. ;
(7) No person shall make any transaction of land specified in the preliminary
notification or create any encumbrances on such land from the date of publication in
the Government’s Official Gazette, till such time as the proceedings under the
chapter IV of the Act are completed:
Provided that, the Collector may on the application made by the
owner of the land so notified, exempt in special circumstances to be recorded
in writing, such owner from the operation of the rule:
Provided further that, any loss or injury suffered by any person due to
his willfull violation of this provision shall not be made up by Collector.
(8) The copy of the preliminary notification issued shall be made available to
concern Tehsildar, Assistant Record. Officer/Settlement Officer Chakbandi/
Consolidation Officer , Executive Officer, Municipal Commissioner of concerned
Local Authority as the case may be, to take necessary steps in compliance to the
preceding rules. It shall also be made available to the concern Registration
officer/Sub Registrar to take necessary steps in compliance to the rules.
21. After issuing the notice under sub-section (1) of section 11, the Collector
shall update the land records within a period of two months from the date of
preliminary notification issued, and take such necessary action to rectify and mutate
the relevant entries in the revenue records, as required.
22. When a notification is issued under sub-section (1) of section 11 of the
Act, the Collector shall take necessary steps for preliminary survey of the land
notified in the manner provided in section 12 of the Act.
23. (1) The intimation of Public hearing shall be conducted by giving notice
in two daily newspapers circulating in the affected area of which at least one shall be
in the regional language, and also by way of a public notice by affixing it at some
conspicuous places in the affected areas, indicating its time, place of the office for
hearing (preferably at the office of land acquisition officer) and the date there-in.
(2) Hearing of objections under sub-section (2) of section 15 should be
performed by the Collector for the purpose of acquisition, in person and not be
delegated.
—
\DATA-8\Data 8_D\595 RPH Niyamawali- Rajswa_ eng-2016.doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016:
(3) When the Collector receives, within the prescribed period, a written
objection from a person interested in the land, he should cause a notice to be served on
the objector to appear before him in person or by a duly authorised representative or by
an authorised pleader on a specified date, time and place to produce the evidence, if any,
_ on which he relies. Notice of the hearing and enquiry should also be given to the
requiring body; the latter, if he desires to be heard or to adduce evidence in support of
the proposed acquisition, should be permitted to do so either in person or through an
authorised representative. हे :
(4) On the application of either party the Collector may exercise his powers
under section 35 of the Act.
(5) The hearing may be adjourned by the Collector from time to time, if
necessary.
(6) The enquiries must be completed most expeditiously in view of first
proviso to section 19, whereby time limit of one year has been prescribed from the date
of publication of preliminary notification under sub-section (1) of section 11 to
publication of declaration under section 19 of the Act:
Provided that the State Government shall have the powers to extend the
period of hearing objections if in opinion circumstances exist justifying the
same:
recorded in writing and the same shall be notified and be uploaded on the
website of authority concerned. ;
(7) The Collector after hearing all the objections and recording a memorandum
of the evidence produced in support thereof or in support of the proposal to acquire the
land and after making further enquiry if he thinks necessary, he shall submit the case for
decision of the State Government containing his recommendations on the objections,
together with the record of proceedings held by him along with a separate report giving
therein the approximate cost of land acquisition, particulars as to the number of affected
families likely to be resettled, for the decision of the Government, at the time of sending
proposal of declaration under section 19 of the Act:
Provided that, the State Government or District Collector as Case may be
shall take decision on such recommendations for the project. The decision of
the State Government /District Collector shall be final:
Provided further that, If acquisition of land for any project area falls
under the jurisdiction’ of more than one district, then the district State
Government or the District Collector, as the case may be, shall send the
proposal to the concerned administrative department at Government level, for
the necessary approval. The decision of the administrative department shall be
final.
:
CHAPTER
PREPARATION OF REHABILITATION AND RESETTLEMENT SCHEME AND PUBLIC
HEARING
24. (1) On publication of the Preliminary Notification under sub-section(1) of
section 11 by the Collector, the Administrator for Rehabilitation and Resettlement shall
conduct a survey and undertake a census of the affected families , in a manner provided
under sub-section (1) of section 16 of the Act, within a period of three months from the
date of publication of Preliminary Notification under section 11 (1) of the Act.
(2) In the survey conducted and the census of the affected families so
undertaken by the Administrator, he shall collect the data of Social Impact Assessment
study report. है
(3) He shall verify that data by door visit of the affected families and by paying
site visits in case of an infrastructure in the affected area.
WDATA-S\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
Provided further that any such decisions to extend the period shall be
75
Preparation of
Rehabilitation
and Resettlement
Scheme by the
Administrator
76 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
(4) On the basis of the survey , the Draft of Rehabilitation and Resettlement
Scheme shall be prepared by the Administrator, in addition to the particulars
mentioned in sub-section (2) of section 16 of the Act, contain the following:-
(a) List of likely to be displaced families;
(b) List of infrastructure in the affected area;
(c) List of land holdings in the affected area;
(d) List of businessmen in the affected area;
(e) List of landless people in the affected area;
(f) List of disadvantage groups like persons belonging to Scheduled
Castes or Scheduled Tribes, Handicapped Persons, in the affected area;
(g) List of landless agricultural labourers in the affected area.
(5) The Administrator shall as far as possible try to prepare comprehensive
and detailed draft Scheme in order. to reduce future objections.
(6) The Administrator shall by way of a public notice to be published in two
daily newspapers circulating in the affected area of which at least one.shall be in the
regional language, inform the people about the draft Scheme as prepared by him
under sub-section (2) of section 16 of the Act. The copy of the draft shall be made
available and discussed in concern Gram Panchayat, Municipality or Municipal
Corporation, as the case may be.
(7) The Administrator or an officer designated by him shall conduct a public
hearing in the affected areas on such a date as he thinks suitable, before publication
of the Scheme as .prepared by him under sub-section (2) of section 16. The
provisions of the rule 23 relating to public hearing shall, mutatis mutandis, apply to
the public hearing to be conducted as per the provisions of sub-section (5) of
section 16.
(8) The Administrator shall on completion of public hearing submit the draft
scheme for Rehabilitation and Resettlement along with the specific report on the
claims and objections raised in the public hearing to the Collector.
(9) The Collector shall follow the process for review of the Rehabilitation and
Resettlement prescribed under sub section (1) and sub-section (2) of section 17 of the
Act.
(10) The process for approval of Rehabilitation and Resettlement scheme and
its publication shall be followed as per the manner provided under section 18 of the
Act and sub-rule (3) of rule 11.
Powers, duties and 25. The Administrator shall exercise the powers and perform the duties, and
का पक have responsibilities as follows:-
(a) To conduct a survey and undertake a census of the affected families
in the manner and within the time as provided in the rules;
(b) To prepare a draft Rehabilitation and Resettlement scheme;
(c) To make known to the people about the draft Rehabilitation and
Resettlement Scheme by the mode as provided in the rules;
(d) To make available the draft Rehabilitation and Resettlement
Scheme to the concerned persons and authorities;
(e) To issue and publish notices for public hearings on the draft
Rehabilitation and Resettlement Scheme in the affected areas;
(f} To conduct public hearings on the draft Rehabilitation and
Resettlement Scheme in the affected areas;-
(g) To give an opportunity to the Requiring Body Make to suggestions
and comments on the draft Rehabilitation and Resettlement Scheme;
(h) To submit the draft Rehabilitation and Resettlement Scheme and
to the Collector;
(i) To publish the approved Rehabilitation and Resettlement Scheme
and in the affected area;
(j) To help and assist the Collector in preparing the Rehabilitation and
Resettlement award;
(k) To monitor and supervise the progress in Rehabilitation and
Resettlement study;
(1) To assist in post implementation audit of Rehabilitation and
Resettlement; and |
(m) Any other work required to be done or assigned for Rehabilitation
and Resettlement.
\DATA-8\Data 8_D\5S95 RPH Niyamawali- Rajswa. eng-2016.doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 77
26. (1) The Commissioner of Rehabilitation and Resettlement shall by way of
a public notice in two newspapers circulating in the affected areas of which one at
least shall be in the regional language and also by way of public notice by affixing it at
conspicuous places in the affected areas and shall be uploaded on the website of the
district or Government to inform the people about the approved Rehabilitation and
Resettlement Scheme as finalized by him under section 18 of the Act. :
(2) The copies of approved Scheme shall be made available in the offices of.
Gram Panchayat, Nagar Nigam/Nagar Panchayat/Nagar Palika Parishad, in the offices
of the Collector, the Sub-Divisional Magistrate, Office of concerned Land Acquisition
Officer, Administrator, Tehsildar.
27. (1) The State Government shall issue a declaration under sub-section (1)
of section 19 along with the summary of the Rehabilitation and Resettlement Scheme
and the land identified as settlement area for the displaced families, if any, in the
manner prescribed under section 19 of the Act in form-19.
(2) No such declaration shall be made unless the Requiring Body has
deposited rest of amount in, as prescribed in sub rule (4) of rule 19.
(3) Such declaration shall be published in the manner provided under
sub-section (4) of section 1 of the Act and the relevant rules.
(4) The date of last publication shall be the date of publication of declaration
under sub-section (1) of section 19. :
28. When a declaration is issued under section 19 of the Act, the officials
authorised shall-proceed to marked out and measured the land, unless, it has been
already marked out under section 12 of the Act. In case of discrepancy between the.
area computed in the khasra and that notified. under notification or declaration of
acquisition, a date should be fixed by the Collector , on which the deputed officer of
revenue department, requiring body and Amin of Land Acquisition Office should go
and take the measurements as well as the verification from revenue records. If any
error is found then this should be immediately brought to the knowledge of Collector,
so that it can be rectified. If the area notified is proved to be materially less than the
area intended to be acquired, then the matter should be reported, through Collector, to
the Government for the issue to be resolved.
29. After the measurements being settled, the Collector shall cause to issue:
general notice as per the provision of the Act in form-20 (a) and 20 (b), requiring the
persons interested to file claims and objections within a period mentioned in the public
notice. The notice should also be communicated to the record officer, i. e., Tehsildar,
Consolidation Officer or Assistant Record Officer as ‘the case may be. Intimation of
this notice shall also be posted in the village at some conspicuous public place.
CHAPTER -VII
AWARD COMPENSATION AND POSSESSION OF ACQUIRED LAND
30. (1) The Collector after making enquiry. into and disposal of the objections,
if any, raised by the interested persons in pursuance of the public notice published and
given under the preceding rules, shall proceed to make land acquisition Award under
section 23 of the Act. For the award for compensation, the Collector shall ensure the
following steps to be taken - r
(a) Separate map of the land demarcated in each village should be
prepared on the scale of the village map for record with the proceedings,
which should be conducted in the villages;
(b) For each village, a khasra will be prepared in form-16(a), showing
the nature, area of each plot and numbers and quantity of the trees, crops,
structures or other assets situated upon it. The entries of the form should be
checked personally by the Amin of the Land acquisition office. This khasra
should be countersigned by the concerned revenue officers and the land
acquisition officer;
(c) While the khasra being prepared, such details should be collected as
may be necessary to determine the market value from the office of registrar
of registration department regarding Sale deeds registered during the period of
three years just prior to the last such publication of preliminary notification
under section 11 (1) of the Act in the form-21. The date for determining the
market value shall be the date on which the preliminary notification has been
issued under section 11 of the Act;
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
Publication of
Approved
Rehabilitation and
Resettlement
Scheme
Publication of
Declaration and
summery of
Rehabilitation and
Resettlement
Demarcation of
land
Notice to person
interested
Enquiry by
Collector for
making Award
78 उत्त्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
(9) The simultaneous process shall take place for valuation of assets,
such as trees, tube well, structures and other things situated thereupon on
acquired land shall be done by the concerned department as provided in the
section 29 of the Act .The Land acquisition officer may request to the
District Collector to direct the concern department for the valuation of the
assets. The valuation report will be prepared on annexed as form-22 .The cut
of date for valuation of these assets would be the date when the preliminary
notification has been issued under section || of the Act:
(e) A khatauni in form-16(b) will be prepared from the revenue
records of the concerned village kept at the office of Tehsildar, consolidation
or Assistant record officer. Respective land revenue of the acquired land
shall be worked out at the time of preparation of khatauni; E
(f) There shall be a detailed valuation report for each item of property
to be acquired and shall be made in form-22 in accordance with the market
value on the date of publication of preliminary notification.
(2) The Land acquisition officer, if it is not District Collector, may consult
the District Collector and take his order as to what he considers to be the fair
estimates of the amount of compensation to be paid and the revenue to be deducted.
For this, the District Collector may appoint such officers to examine the feasibility
of fair compensation. न
(3) On the date specified in the notice, the Collector shall explain the grounds
on which the compensation has been estimated, which will ordinarily be the figure
contained in the aggregate statement of compensation payable in form-23 and shall
make an award in form-24.
(4) Any variation in estimated compensation shall be informed to the
requiring body. The requiring body shall on demand deposit the amount within the
period of one month. If the requiring body makes any objection in consequence of
the excess cost or denies depositing the amount, further proceedings shall be
dropped. In such cases where proceedings have been stopped, the State Government
can deduct such an amount, which it may think fit, by way of Government order.
(5) The Collector may adjourn the proceedings on the request of any party or
otherwise. He shall carefully and expeditiously decide all the objections raised by
the parties.
(6) The Collector on the date fixed for hearing, shall proceed to enquire into
the claims and objections, if any, made by interested persons, whether to the
measurements of the land, the amount of compensation, the person to whom it is
payable, or the apportionment of compensation among the person interested and
shall prepare an award regarding each of the matter referred in section 23 of the Act.
(7) Under the provision of section 23 of the Act, the financial limit for
declaration of the award will be as fixed by the State Government.
(8) The award shall include all the items which are described under
section 28, 29 and 30 of the Act. Each award shall be announced or communicated
to the parties as soon as possible, when it is made.
(9) If after making an award a clerical or arithmetical mistake comes to the
notice of Collector or is brought to his notice, he can correct the same within six
months of announcement of award or before making a reference to the Authority
under section 64 of the Act.
(10) If the land proposed for acquisition is situated in the rural areas, then the
market value calculated as per sub-section (1) of section 26 of the Act, shall be
multiplied by a factor notified by the State Government.
(11) Before invoking urgency clause to any land acquisition proceedings the
Collector shall take the prior sanction of the State Government.
WDATA-S\Data 8_D\595 RPH Niyamawali- Rajswa_eng-2016 doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 79
(12) If after the payment of compensation as per the award, it transpires that
the owner/ claimant/claimants is /are not exclusively entitled or such or entire amount
of compensation awarded by the Collector and the Government is required to pay any
compensation to any other persons, then the claimant/claimants shall on demand
refund to the Collector the entire amount of money received by him/them or such
amount as may be determined by the Collector as refundable by him/them to the
Government and shall also indemnify (jointly or separately) the Government against
any claim or compensation or part thereof by any other person and against all
proceedings and liabilities of any loss or damage suffers or any costs, charges or
expenses incurred by Government by reason of the payment to him/them and the
claimant/claimants shall pay the interests at the rate of 9% on the amount so
refundable for the first year and at the rate of 15 % for the subsequent years.
(13) If the claimant/claimants fail to refund to the Government the amount
mentioned in the previous sub-rule, the Government shall recover the same as arrears
of land revenue or proceed under any law in force for recovery of such amount.
(14) Without prejudice to any other remedy for the enforcement of any refund
or indemnity, the Government may recover any sum determined and certified by the
land acquisition officer concern to be due and payable by the claimants to the
Government by way of refund or otherwise as arrear of land revenue.
(15) The Government dues/loans of public financial institutions, if any, falls
against the awardees are payable by the claimants or person interested, the same shall
be deducted from the said compensation amount that may be awarded.
31. (1) The Collector shall also make Rehabilitation and Resettlement Award
for each affected family in accordance with the Second Schedule of the Act or as per
. the negotiated agreement reached with the affected families where consent is involved
and hand over family wise Awards to each affected family in the form-25.
(2) The affected families of the Projects where preliminary notification under
sub-section (1) of section 11 of the Act is issued are entitled for receiving elements of
rehabilitation and resettlement as per the Second and Third Schedules of the Act.
(3) While offering twenty per cent of the developed land, when the land is
acquired for urbanization purposes, then in that case the land used for components of
infrastructure amenities shall not be taken into account for the calculation of twenty
per cent of developed land. हि
(4) In case of a Project involving land acquisition on behalf of a Requiring
Body which involves involuntary displacement of the Scheduled Castes and Scheduled
Tribes families in scheduled areas, a development Plan shall be prepared by the State
Government in consultation with the concerned Social Welfare Department of the
State and the Gram Panchayats or urban local bodies in that area. The said Plan shall
be read out and discussed at the time of obtaining the consent of the Gram Sabha or
the panchayat or the urban local bodies, as the case may be.
(5) Under the provision of section 31 of the Act, the Rehabilitation and
Resettlement Award shall be made by the Collector. The Collector shal! seek the prior
approval of the Divisional Commissioner/ Commissioner Rehabilitation and
Resettlement before making the award of any amount.
(6) The financial limit authorized for declaration of Rehabilitation and
Resettlement award will be as fixed by the State Government,
(7) If after the payment of Rehabilitation and Resettlement entitlements as
per the award, it transpires that the claimant/claimants is‘/are not exclusively entitled
for such or entire amount of entitlements awarded by the Collector and the
Government is required to pay any benefits to any other persons, then the
claimant/claimants shall on demand refund to the Collector the entire amount of
money or the entitlements, as the case may be, received by him/them or such amount
as may be determined by the Collector as refundable by him/them to the Government
and ‘shall also indemnify (jointly or separately) the Government against any claim or
entitlements or part thereof by any other person and against all proceedings and
liabilities of any loss or damage suffers or any costs, charges or expenses incurred by
Government by reason of the payment to him/them and the claimant/claimants shall
pay the interests at the rate of 9% on the amount so refundable for the first year and at
the rate of 15 % for the subsequent years.
WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
Rehabilitation and
Resettlement
80 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
(8) If the claimant/claimants fail/fails to refund to the Government the
amount or entitlements, as the case may be, mentioned in the previous sub-rule, the
Government shall recover the same as arrears of land revenue or proceed under any
_ law in force for recovery of such amount.
(9) The Collector shall issue orders for provision of infrastructure facilities
and basic minimum amenities specified in the third schedule of the Act for every
resettlement area in the form-26.
(10) In case of a project involving land acquisition on behalf of a requiring
body which involves involuntary displacement of the Scheduled Castes or
Scheduled Tribes families in scheduled areas, a Development Plan shall be prepared
by the Collector in consultation with the affected family in the manner provided
under section 41(4) of the Act. The said plan shall be read out and discussed during —
the public hearing of Rehabilitation and Resettlement schemes. While making the
award of Rehabilitation and Resettlement entitlements, the Collector shall passed an
orders in form-27.
(11) The provisions relating to Rehabilitation and Resettlement under these
rules shall apply in the cases where any person other than a specified person is
purchasing land through private negotiations, for an area equal to or more than the
limit notified by the State Government.
Compensation 32. (1) The compensation shall be calculated as per the provisions laid down
under section 26 to section 30 read with the First Schedule of the Act and paid to all
the affected families, as defined under sub-section (c) of section 3 of the Act. The
statement of the entire project affected persons who have been paid compensation
and Rehabilitation and Resettlement entitlements shall be kept in form-28.
(2) While determining the amount of compensation as required under section
28 of the Act, the Collector can settle down the terms and conditions and rates of the
land with the land owners and also consider mutual consent award to minimize the
possibilities of litigations, which is in the best interest of equity, justice and
beneficial to the affected families and requiring body.
(3) The proportion of Compensation as per the first schedule of the Act,
which is to be given to the affected families referred to in sub-clause (ii) of
clause (c) of section 3 of the Act, shall be determined by the State Government.
(4) The payment of compensation shall be made within a period of 90 days
from the date of award as per the procedure prescribed in Government order no.
A-1-961/X-2012-10(28)/2011, dated 31-1-2013 of Finance (Account) Section-1 by
way of E-Payment or any other mode of payment as may be prescribed by the
Finance Department of State Government from time to time
(5) The date of determination of the market value shall be the date on which
the preliminary notification has been issued under section 11 of the Act.
(6) In all cases of land acquisition, the market value per hectare will be
finalised by the acquisition authorities as per the guidelines issued by the State
Government,
Taking possession 33. (1) The Collector shall cause the possession of the land acquired after
of tee tend satisfying the conditions provided under section 38 of the Act. The Collector may
appoint any subordinate officer to take possession of the land formally on behalf of
the Government and then hand over to the person appointed on behalf of requiring
body. The possession memo shall be made at the time of taking possession on behalf
of Government and requiring body as well.
(2) In certain cases of urgency the Collector may be empowered by the
Government to take possession under sub-section (1) of section 40 of the Act in
anticipation of the award. Before taking possession under urgency cases, other than
the terms specified under the section, the conditions mentioned in. sub-section (3)
_ and (5) of section 40 of the Act must be fulfilled. In such cases the requiring body
should be asked to specify the land urgently required.
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doe
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 81
(3) Unless possession is taken by the written agreement of the parties
concerned, the mode of taking possession obviously would be for the authority to go
upon the land and to do some act which would indicate that the authority has taken
possession of the land. It may be in the form of a declaration by beat of drum or
otherwise or by hanging a written declaration on the spot that the authority has taken
possession of the land, The presence of the owner or the occupant of the land to
effectuate the taking of possession is not necessary; however signatures of the
independent witnesses present at the time of taking possession shall be taken on the
possession memo.
(4) No hard and fast rule can be laid down as +9 what act would constitute
taking of possession of the acquired land. However, some of the principles laid down
for taking the possession of the land are—
(i) If the acquired land is vacant, the act of the concerned State
authority to go to the spot and prepare a possession memo, along with the
signatures of the villagers/representatives of land management committee,
will ordinarily be treated as sufficient to constitute taking of possession;
(ii) If crop is standing on the acquired land or building/structure exists,
mere going on the spot by the concerned authority will, by itself, be not
sufficient for taking possession. Ordinarily, in such cases, the congerned
Authority will have to give prior notice to the occupier of the
building/structure or the person who has cultivated the land and take
possession in the Presence of independent witnesses and get their signatures
on the possession memo. Of course, refusal of the owner of the land or
building/structure may not lead to an inference that the possession of the
Acquired land has not been taken; ५
(iii) If beneficiary of the acquisition is an agency/institution of the State
and condition has been fulfilled in terms of sub-section (3) and sub-section
(5) of section 40 and substantial portion of the acquired land has been utilized
in furtherance of the particular public purpose, then it may reasonably be
presumed that possession of the acquired land has been taken.
34. (1) In the case of an Irrigation Project, while conducting the survey, the
Administrator shall consider the possibility of sufficient land in the command area of
the Project. The assessment for the requisition of land shall be as per the request
submitted by the affected families for giving land in lieu of compensation. .
(2) In consultation with the officers of the concerned department or the
project officer, as the case may be, if the Administrator is satisfied that sufficient land
in the command area is available, then he shall finalise and put forward with all the
details of finalised land to the concerned Collector to take necessary steps to make
available of finalised land. Preferably land management committee land can be the
best option while selecting the land for the purpose. If he finds that sufficient land is
not available then he shall request to Collector to take necessary steps for it.
(3) Each affected family , who's land has been acquired or who has as the
consequences of the acquisition of land been reduced to the status of the marginal
farmer or landless, shall be given notice by the Collector, that in lieu of the
compensation to be paid for land acquired, the eligible area for the grant of land in
command area and the cost of the land alongwith the proportionate administrative cost
for the acquisition of land, the amount to be deposited with the Collector towards the
occupancy price of the land at the time of payment of such compensation of such
affected persons. :
(4) After receiving the Notice, an affected person, eligible for the grant of
land shall give in writing to the Collector that, he is willing to accept the land for land
in lieu of compensation for the land acquired.
\\DATA-8\Data DES eo Sagmeist
er SRR SARE GR oi
Re Re Fae atleas
t f
RPH Niyamawali- Rajswa eng-2016.doc
Procedure to be
followed in case
of land offered in
lieu of
compensation
82 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
Choice of annuity
Rehabilitation and
Resettlement
Monitoring
Committee
Constitution of State
Monitoring
Committee
(5) Request of all such persons who has given willingness to accept the land
shall be maintained in the Register for this purpose by the Collector. Signature of
the Project Affected Persons shall be taken on the said Register. The register shall
also contain names of all such affected persons who are eligible for the grant of land
but not willing to accept the land for land.
(6) Only after receiving such willingness in writing, the affected pérson shall
be paid the amount of compensation for the land acquired and no further request
from him or his heirs regarding land for land shall be considered at later stage.
35. (1) The option for onetime payment in lieu of employment shall be given
to all affected families, as per the directions issued by the State Government for the
projects.
(2) It is in the interest of the affected families in the acquisition affected areas
that the Requiring Body makes necessary arrangements for training facilities for
development of entrepreneurs, technical and professional skills for self-employment
of the affected persons, so as to enable such persons to get the opportunity to find
suitable jobs. :
(3) In the case of the Irrigation Project the permission for land submergence
shall not be given to the requiring body unless infrastructural facilities and basic
minimum amenities as per the Third Schedule appended to the Act are completed
and transferred to the Local Bodies and land for land is allotted to the eligible and
willing Project Affected Persons.
CHAPTER -VIII
CONSTITUTION AND FUNCTIONS OF REHABILITATION AND RESETTLEMENT
COMMITTEE
36. (1) The State Government shall constitute a Rehabilitation and
Resettlement Committee at project: level to monitor and review the progress of
implementation of the Rehabilitation and Resettlement Scheme and to carry out
post-implementation social audits in consultation with the Gram Sabha in rural areas
and Municipal Council in urban areas.
(2) The Committees shall have its first meeting when a draft Rehabilitation
and Resettlement Scheme has been prepared by an Administrator. The Committee
shall discuss the Scheme and make suggestions and recommendations. Thereafter,
in subsequent meetings, the Committee shall meet and discuss the progress of the
Rehabilitation and Resettlement, as required, till the process of resettlement is
concluded. It shall also discuss on different aspects of post-implementation of social
audits.
(3) The members of the Committee shall get traveling allowance at the rate
specified, from time to time, by the State Government for the Government servants.
(4) The Committee may visit the affected area and discuss with the affected
families of the resettlement areas to monitor the resettlement process.
37. (1) The State Government shall constitute a State Monitoring Committee
for reviewing and monitoring the implementation of rehabilitation and resettlement
schemes or plans under the Act.
(2) The State Monitoring Committee shall have its first meeting for
reviewing and monitoring the implementation of Rehabilitation and Resettlement —
Scheme for the Project, as soon as possible, from the approval of the Rehabilitation
and Resettlement Scheme by the Commissioner of Rehabilitation and Resettlement
under section 18 of the Act.
(3) The allowances payable to the experts shall be specified, from time to
time, by the State Government for the Government servants.
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 83
CHAPTER -IX
LAND ACQUISITION, REHABILITATION AND RESETTLEMENT AUTHORITY
38. (1) The State Government shall establish, by notification in the Official
Gazette, the Land Acquisition, Rehabilitation and Resettlement Authorities for the
purpose of providing speedy disposal of disputes relating to land acquisition in the
State.
(2) The State Government may assign duties, powers and procedure of work
to the Authority, by way of notification. The Authority shall exercise the powers and
functions defined under the Act and these rules
(3) The Presiding Officer of an Authority shall be appointed from the
officers of the rank of District Judge (super time scale) by the State Government in
consultation with the Chief Justice of the High Court by issuing notification in the
Official Gazette.
(4) The State Government shall, by notification, appoint an officer from
Uttar Pradesh Judicial Service of the rank of Civil Judge (Junior Division) as
Registrar of the Authority, in consultation with the Chief Justice of the High Court.
Other staff including employees such as reader, senior clerk, stenographer, clerks,
driver, orderly and peons shall be appointed from the different cadres of the
Government servants including the Revenue Department till the creation and posting
of the employees from separate independent cadre of land acquisition authority.
(5) The salaries and allowances of the Registrar and other officers and
employees of the said Authority shall be the same as they were drawing in their
parental Departments and a deputation allowance, which may be determined by the
State Government in consultation with the parental department of an employee. The
conditions of service shall be thereof same as those applicable to them under the State
Government Civil Services Rules.
(6) (a) The Presiding Officer ofthe said Authority shall get the salary, perks
and other allowances, same as they were drawing in their parental Departments and
the deputation allowance, which may be prescribed by the State Government in
consultation with the High court.
(b) The Presiding officer of the said authority shall discharge their function
under the general superintendence of the High Court.
39. The Establishment of Land Acquisition, Rehabilitation and Resettlement
Authority shall have the power of Civil Court in the matters where any rehabilitation
and resettlement benefit have been availed of by making a false claim or through
fraudulent means. The benefits shall be liable to be recovered by the State Government
as an arrear of land revenue, in case of the said benefits have been availed in terms of
money, and by evicting a wrongdoer from the land and houses if the said benefits have
been availed in the terms of land and houses. The land and houses so vacated shall be
used for the rehabilitation and resettlement of the affected persons of the same Project
only and shall not be used for any other purpose.
CHAPTER -X
MISCELLANEOUS MATTERS
40. (1)(a) The Collector shall cause to be recorded in the revenue papers the
area of the portion of each holding which has been ‘acquired and the amount of
rent/revenues as payable for it. He shall also ensure that the area acquired for a
department/requiring body is shown in the revenue records and necessary entries has
been done in favour of concerned department/requiring body.
(b) Soon after the completion of acquisition proceedings the Collector / Land
acquisition officer shall make a request to the District Collector, for mutation of
acquired land in revenue records in form-29, in quadruplicate. The District Collector
shall issue Parwana Amal daramad in form-30 in duplicate to the concern record
officer.
(c) The concern revenue record officer will return one copy to the Collector
land acquisition office, after duly mutated in revenue records.
Land acquisition,
rehabilitation and
resettlement
authority
Powers of
Establishment of
Land Acquisition,
Rehabilitation and
Resettlement
Authority
Entries in revenue
records in respect
of acquired land
84 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
(d) In case of acquisition for private entities or companies, the names of the
tenure holders concern, whose land has been acquired, has to be expunged and
replaced by the concern private entities or companies, whatever ‘be the case. The
company may get its name mutated under the prevailing laws in the state.
(e) Where acquisition has been done, a statement of reduction and remission
in land revenue shall be prepared village wise for every project in form-31.
(f) The monthly statement regarding reduction/ remission in land revenue
shall be submitted in duplicate in the following tabular to the Commissioner and
Secretary Board of Revenue, Uttar Pradesh
Number and date | Amount remitted | Amount reduced
of order
sanctioning
reductions and
remission
Details of
Notification/
Declaration
made for
acquisition
District |
from fasli.........
Capitalized value of
land revenue
Register of
appropriations of land
(2) The capitalized value of land revenue is the aggregate iand revenue for
certain numbers of years, payable by an acquiring body to State Government to
compensate the latter for loss of land revenue, suffered as a result of its reduction in
case of compulsory acquisition. The following instructions shall be followed by the
Collector:— ;
(i) The capitalised value of land revenue shall be calculated by
multiplying the annual land revenue by one hundred and fifty. In cases where
the land is not assessed to land revenue (i.e., villages where record operations
or consolidations proceedings are going on) on the date immediately
preceding the date of compulsory acquisition. It shall be calculated at the
average rate of land revenue per hectare for the entire village;
(ii) The capitalised value of land shall not be charged where land is
compulsory acquired for the non-commercial departments of State
Governments, but the land revenue shall be remitted in favour of such
departments;
(iii) The capitalised value of land revenue shall be charged from all
other commercial departments of the State Government. In such cases land
revenue will also be remitted with effect from the date of acquisition;
(iv) Local bodies or Societies registered under the Societies
Registration Act, 1860, on whose behalf land is compulsory acquired, will
however, have an option either to continue paying the land revenue from the
date of they are given possession of the land or to pay the capitalised value
of the land revenue. In the latter case future land revenue will be remitted;
(v) In cases where land is acquired for the purposes of the Union
Government or Central Government department shall be liable to pay one
hundred times of land revenue as capitalised value.
41. The Collector shall cause to maintain in register of all permanent
appropriations of land for public purposes or for a company. The entries in the
register shall be made chronologically, and not necessary by department wise. They
shall be made in the first instance as soon as the requiring body or department
submit its request for acquisition and the requiring body has been informed of the
cost of the acquisition.
रे NAT S\Data 81595 RPH Nivamawali- Rajswa, eng-2016 400 .7.28हल€ह........3॒॒न्
भ_++_+_+न_ नै ि +_ ैं₹
: \\DATA-8\Data 8 _D\595 RPH Niyamawali- Rajswa,eng-2016.doc
x
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 85
42. Where any land acquired under the Act remains unutilized for a period of Reversion of land
five years from the date of taking over the possession, the same. shall be returned to the
“ original owner or owners or their legal heirs, as the case may be, or to the Land Bank —
of the State Government by issuing a notice to the Requiring Body for whom the land
was acquired and by giving an opportunity of being heard and by passing. the
ecessary written order by thé State Government in this behalf by taking the
possession of acquired land. If the Requiring Body does not hand over the possession
of the land then the Magistrate shall take possession of the land by giving prior notice
to the Requiring Body concerned and hand it over'to the State Government. - jig
CHAPTER XI ५
REMOVAL OF DIFFICULTIES
43. (1) If any difficulty arises in giving effect to the provisions of these rules, - Power to remove
the Government may, by order, make such provisions or give such directions not Sfieaice
inconsistent with the provisions of the Act or these rules ‘as may appear to it to be
necessary or expedient for the removal of the difficulty
Provided that no such power shall be exercised after the expiry of'a period of
two years from the date of commencement of these rules
(2) Every order made under this rule shall be laid, as soon as may be after it
is made before the State Legislature: :
By order,
ARVIND KUMAR,
Pramukh Sachiv.
_ FORMI |
~ |Sub-rule (1) of rule 3]
‘PRELIMINARY NOTIFICATION TO CARRY OUT SOCIAL IMPACT ASSESSMENT
SIA Notification
to original land
The State Government intends to acquire the following-lands in consultation with the concerned
Panchayat / Municipality. / Municipal Corporation, as the case may be, at village / ward level, in the
affected area and carry out a Social Impact Assessment study for public purpose. The study shall be
undertaken as per the provisions of section 4 of The Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act, 2013
+ Name of Requiring body 19118
_* Purpose of proposed acquisition of land: +
“+ Organization to undertake the study:
* Contact details of the Organization: ~~ as ve
_* Land details : हू i :
. District ‘Tehsil - Village < .| * Plot No. _ Area to be acquired
- \-
+ Brief description and benefits arrives from the proposed project:
* - The project area and the affected areas
_» Whether consent of Gram Sabhas and/or land owners is required?
* The date of completion of SIA
NorE-The details can be had from the office of Collector (for the purpése of acquisition) in all
working days.
By order
State Government/Collector
\WDATA-S\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
86 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
= * - FORM-2
[Sub-rule(1).of rule 5]
‘ Terms of Reference for the Social Impact Assessment
The State SIA Agency will review the proposal for land acquisition sent by the Collector and
prepare a project-specific Terms of Reference (ToR) which shall include the followings:—
(1) A brief description of the project, project area and the extent of lands Proposed for acquisition;
(2) The objectives of the SIA and all the activities that must be carried out by the SIA team;
(3) Sequencing, schedule and deadlines for.deliverables with dates for the SIA process, based on
the size and complexity of the project and land Acquisition and whether consent of Gram Sabhas and/or
land owners is Required to be sought. . ~
(4) The appropriate size and profile of the SIA team required (including field Surveyors if -
needed) to conduct the SIA for the specific project ;
(5) A project-specific budget ‘based on the ToR, with a clear break-up of Costs for each
item/activity
(6) The schedule for the disbursement of funds to the SIA team tied to Clearly ‘defined
deliverables in the SIA process
(7) The processing fee will be determined based on the ToR and budget Developed for each
specific project and will be based on the size and Location of the project and the land proposed for
acquisition. व
, FORM -3 E
[Sub-rule(5) of rule 6],
Format for Social Impact Assessment report
A. List of socio-economic and cultural parameters to be
covered by the SIA
Demographic details of the population in the project area ;
o Age, sex, caste, religion > s
o _ Literacy, health and nutritional status -
Poverty levels
vulnerable groups
o Women, children, the elderly, women-headed households, the differently abled ~
Kinship patterns and women’s role in the family _ —
* Social and cultural organization
Administrative organization
Political organization
Civil society organizations and social movements ~
Land use and livelihood
Agricultural and non-agricultural use
Quality of land-soil, water, trees etc.
Livestock है
Formal and informal work and employment -
Household division of labour and women’s work
Migration ; 5
Household income levels
Livelihood preferences
‘Food security
_____ Local economic activities _
o Formal and informal, local industries
x
४०
०
0०
0७
०
७०
७७
४७
७
०
७
\DATA-SWData 8_D\S95 RPH Niyamawali- Rajswa. eng-2016.doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 87
Acess to credit
०0 Wage rates
Specific liveihood activities women are involved in Factors that contribute to local
livelihoods
Access to natural resources
Common property resources
Private assets
Roads, transportation
Irrigation facilities
Access to markets
Tourist sites
Livelihood promotion programmes
Co-operatives and other livelihood-related associations
Quality of the living environment erceptions, aesthetic qualities, attachments and
aspirations :
Settlement patterns
Houses
Community and civic spaces
Sites of religious and cultural meetings
Physical infrastructure (including water supply, sewage systems etc.)
Public service infrastructure (schools, health facilities, anganawadi centers, public
distribution system)
o Safety, crime, violence
o Social gathering points for women
0
७9
(७
छ
ः
छा
७
७
0७9
7"
0
:
०
60
.
0-
:
0
-
७
09
0.
७
B. Key impact areas.
Impacts on land, livelihoods and income
Level and type of employment
Intra-household employment patterns
Income levels
Food security
Standard of living
Access and control over productive resources
Economiic dependency or vulnerability
Disruption of local economy
impoverishment risks
Women’s access to livelihood alternatives
Impacts on physical resources
Impacts on natural resources, soil, air, water, forests
Pressures on land and common property natural resources for livelihoods
Impacts on private assets, public services and utilities
Health impacts
.
Capacity of existing health and education facilities
Capacity of housing facilities
Pressure on supply of local services
Adequacy of electrical and water supply, roads, sanitation and waste management system
Impact on private assets such as bore wells, temporary sheds etc.
Health impacts due to in-migration
Health impacts due to project activities with a special emphasis on
Impact on women’s health
Impact on the elderly
\WDATA-S\Data 8_D\S95 RPH Niyamawali- Rajswa. eng-2016.doc
88 उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016
Impacts on culture and social cohesion
Transformation of local political structures
Demographic changes
Shifts in the economy-ecology balance
Impacts on the norms, beliefs, values and cultural life
Crime and illicit activities
Stress of dislocation
Impact of disruption of family cohesion
Violence against women
Impacts at different stages of the project cycle
The type, timing, duration, and intensity of social impacts will depend on and relate closely to the stages of ©
the project cycle. Below is an indicative list of impacts
Pre-construction phase
Interruption in the delivery of services
Drop in productive investment
Land speculation
हे Stress of uncertainty
Construction phase
Displacement and relocation
Influx of migrant construction workforce
Health impacts on those who continue to live close to the construction site
Operation phase रू
Reduction in employment opportunities compared to the construction phase
Economic benefits of the project
Benefits on new infrastructure
New patterns of social organization
.De-commissioning phase
Loss of economic opportunities
Environmental degradation and its impact on livelihoods
Direct and indirect impacts
“Direct impacts” will include all impacts that are likely to be
experienced by the affected families :
____“Indirect impacts” will include all impacts that may be experienced by those not directly
affected by the acquisition of land (i.e, Direct land and livelihood losers), but those living in the project
area.
Differential impacts
____ Impact on women, children, the elderly and the different abled
_____ Impacts identified through tools such as Gender Impact Assessment Checklists, and
Vulnerability. and Resilience Mapping
Cumulative impacts
____ Measureable and potential impacts of other projects in the
area along with the identified impacts of the project in
question
____ Impact on those not directly settled. in the project area but
‘based peripherally or even regionally
Table of Contents for SIA Report and Social Impact Management Plan
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016 89
‘TABLE
Chapter Plight yd
Executive Summary Project and public purpose
Location
Size and attributes of land acquisition
Alternatives considered
Social Impacts
Mitigation measures
Assessment of social costs and benefits
Detailed Project Description Background of the project, including developers
background and governance/management structure
Rationale for project including how the project fits
the public purpose criteria listed in*the Right to
Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act,
2013
Details of project size, location, capacity, outputs,
production targets, cost, risks
Examination of alternatives
Phases of project construction
Core design features and size and type of facilities
Need for ancillary infrastructural facilities
Work force requirements (temporary and
permanent)
Details of SIA/EIA if already conducted and any
technical feasibility reports
Applicable legislations and policies
Team composition, approach,
methodology and schedule of
the SIA
List of all team members with qualifications.
Gender experts to be included in team
Description and rationale for the methodology and
tools used to collect information for SIA
Sampling methodology used
Overview of information/data sources used.
Detailed reference must be included separately in
the forms
Schedule of consultations with key stakeholders
and brief description of public hearings conducted.
Details of the public hearings and the specific
feedback incorporated into the Report must be
included in the forms
Land Assessment Describe with the help of the maps, information
from land inventories and primary sources
Entire area of impact under the influence of the
project (not limited to land area for acquisition)
Total land requirement for the project
Present use of any public, unutilized land in the
vicinity of the project area
Land (if any) already purchased, alienated, leased
or acquired, and the intended use for each plot of
\WDATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
90 | SAR प्रदेश असाधारण गजट, 23 नवम्बर, 2016 .
Chapter So ee ee
land required for the project
Quantity and location of land proposed to be
acquired for the project
Nature, present use and classification of land and if
agricultural land, irrigation coverage and cropping
patterns
Size of holdings, ownership patterns, land
distribution, and number of residential houses
Land prices and recent changes in ownership,
transfer and use of lands over the last 3 years
Estimation and enumeration
(where required) of affected
families and assets
Estimation of the following types of families that
are
A family which does not own any land but a
members of such family may be agricultural
labourers, tenents including any form of tenancy or
holding of usufruct rights, share croppers or
artisans or who may be working in the affected
areas for three years prior to the acquisition of the
land, whose primary source of livelihood stand
affected by the acquisition of the land
The Scheduled Tribes and other traditional forest
dwellers who have lost any of their forest rights
Depend on common property resources which will
be ‘affected due to acquisition of land for their
livelihood
Have been assigned land by the State Government
or the Central government under any of its
schemes and such land is under acquisition
Have been residing on any land in the urban areas
for proceeding three years or more~prior to the
acquisition of the land
. Have depended on the land being acquired as a.
primary source of livelihood
hood for three years prior to the acquisition
Indirectly impacted by the project (not affected
directly by the acquisition of own lands)
Inventory of productive assets and significant lands
Socio-economic and cultural
profile (affected area and
resettlement site) Demographic details of the population in the
project area
Income and poverty levels
Vulnerable groups
Land use and livelihood
Local economic activities
Factors that contribute to local livelihoods
Kinship patterns and social and _ cultural
organization
Administrative organization
Political organization
\)DATA-8\Data 8_D\595 RPH Niyamawali- Rajswa. eng-2016.doc
~ \WDATA-8\Data 8_D\S9S RPH Niyamawali- Rajswa. eng-20To. aoc ——— 8_D\S9S RPH Niyamawali- Rajswa. =
उत्तर प्रदेश असाधारण गजट, 23 नवम्बर, 2016. - 91
Chapter er mney en
Community-based and civil society-organisations
Regional dynamics and historical change processes
Quality of the living environment
Social impacts Framework and approach to identifying impacts
Description of impacts at various stages of the
project’ cycle such as impacts on health and
livelihoods and culture. For each type of i