1
THE ANDHRA PRADESH METROPOLITAN REGION AND URBAN
DEVELOPMENT AUTHORITIES ACT, 2016
ARRANGEMENT OF SECTIONS
(ACT No.5 of 2016)
(19th January, 2016)
SECTIONS
CHAPTER I
PRELIMINARY
1. Short title, extent and commencement
2. Definitions
CHAPTER II
DECLARATION OF DEVELOPMENT AREA AND CONSTITUTION OF
THE AUTHORITY
3. Declaration of Development Area
4. Constitution of the Development Authority
5. Powers and functions of the Authority
6. Powers and Functions of the Executive Committee
7. Powers and Functions of the Metropolitan Commissioner / Vice-
Chairperson
8. Officers & staff and Constitution of the ‘Andhra Pradesh
Metropolitan Region and Urban Development Authorities Service’
CHAPTER III
UNIFIED TRANSPORT AUTHORITY
9. Constitution of Unified Transport Authority
10. Powers and functions of the Transport Authority
CHAPTER IV
DEVELOPMENT PLANS
11. Preparation and Content of Development Plans
12. Submission of plans to the Government for sanction
13. Sanction of plans by the Government
2
14. Power to undertake preparation of area development plan or action
plan or Zonal Development plan.
15. Modification to the sanctioned plans
16. Enforcement of the sanctioned plans
CHAPTER V
DEVELOPMENT SCHEMES
(i) Types and details of Development Schemes
17. Development Schemes
(4) Types of Development Schemes
(5) Power of the Government to require the authority to make a
development scheme
18. Provisions of the development scheme
19. Contents of the development scheme
20. Infrastructure and amenities to be provided
21. Cost of the development scheme
22. Reconstitution of plots
23. Restrictions on the use and development of land after publication
of draft development scheme
24. Disputed ownership
25. Registration of document, plan or map in connection with
development scheme not required.
(ii) Land Pooling Scheme
26. Land Pooling Scheme
27. Reservation and allotment of land for various purposes in land
pooling scheme
28. Role of developer entity
29. Declaration to take up the land pooling scheme and Suggestions
and objections to the notification of intention
30. Preparation and notification of Draft Land Pooling Scheme
31. Publication of final Land pooling scheme and issue of the LPOC
32. Implementation of Final Land Pooling Scheme
33. Completion of final land pooling scheme
34. Maintenance of the common infrastructure & facilities after issue
of completion certificate
(iii) Town Planning Scheme
35. Town Planning Scheme
36. Declaration of intention to make a Town Planning Scheme
37. Making and publication of draft Town Planning Scheme
3
38. Objections to draft Town Planning Scheme to be considered
39. Power of Government to sanction draft Town Planning Scheme
40. Vesting of land in the Authority
41. Appointment of Planning Officer
42. Duties of Planning Officer
43. Contents of preliminary and final scheme
44. Certain decisions of Planning Officers to be final
45. Appeal
46. Constitution of Board of Appeal
47. Planning Officer to assist Board in advisory capacity
48. Place where Board may sit
49. Decision of questions of law and other questions
50. Powers of Board to decide matter finally
51. Board not to be a court
52. Remuneration of assessors and payment of incidental expenses of
Board to be added to costs of scheme
53. Decision of Planning Officer to be final in certain matters and
variation of scheme in view of decision in Appeal
54. Power to split up sanctioned draft scheme into separate sections
55. Submission of preliminary scheme and final scheme to Government
56. Power of Government to sanction or refuse to sanction the scheme
and effect of sanction
57. Withdrawal of scheme
58. Effect of preliminary scheme
59. Power of authority to evict summarily
60. Power to enforce the scheme
61. Power to vary scheme on ground of error, irregularity or informality
62. Variation of Town Planning Scheme for land allotted for public
purpose
63. Variation of Town Planning Scheme by another scheme
64. Amendment of regulations
65. Compensation when scheme is varied
66. Appointment of costs of scheme with drawn not sanctioned
67. Right to appear by recognized Agent
68. Powers of civil courts in respect of certain matters
69. Costs of Town Planning Scheme
70. Calculation of increment
71. Contribution towards costs of scheme
72. Certain amounts to be added to or deducted from contribution to
be levied from person
73. Transfer of right from original to final plot or extinction of such
right
74. Compensation in respect of property or right injuriously affected by
scheme
75. Exclusion of compensation in certain cases
76. Provision for cases in which amount payable to owners exceeds
amount due from him
4
77. Provision for cases in which value of developed plots is less than
amount payable by owners
78. Payment of adjustment of account
79. Payment of net amount due to the authority
80. Power of authority to make agreement
81. Recovery of arrears
CHAPTER VI
DEVELOPMENT PROMOTION
82. Development permission mandatory
83. Use and development of land and buildings to be in conformity
with plans of the authority
84. Application for development permission
85. Lapse of development permission
86. Deviations during development
87. Revoking of Development Permission
88. Penalty for unauthorized development or for use otherwise than in
conformity with sanctioned plans
89. Power to require removal of unauthorized development
90. Power to stop unauthorized development
91. Recovery of expenses incurred
92. Constitution of Building Tribunal
CHAPTER VII
ACQUISITION, ASSEMBLY AND DISPOSAL OF LANDS
93. Acquisition of Property by the Authority
94. Acquisition of Land by Negotiated Settlement
95. Power to Acquire Land under Act No.30 of 2013
96. Creation and Management of Land Development Bank
97. Transfer of Government Land to the Authority
98. Acquisition of Land by Transferable Development Rights
99. Disposal of Land and Other Property by the Authority
CHAPTER VIII
DEVELOPMENT FEE AND CHARGES
100. Levy of Development Charges
101. Assessment and Recovery of Development Charges
102. Levy of user charges
103. To levy specific cess for capital infrastructure projects
104. To levy betterment charge or impact fee to capture value
105. Recovery of Arrears
5
CHAPTER IX
FINANCE, ACCOUNTS, BUDGET AND AUDIT
106. Development Fund
(3) Revolving Fund
107. Development Fund and its application
108. Budget of the Authority
(3) Audit
109. Annual Plan and Report
110. Power of investment
111. Pension and Provident Fund
CHAPTER X
MISCELLANEOUS
112. Power of entry and power to demarcate and survey
113. Certain plans already prepared and sanctioned are deemed to
have been prepared and sanctioned under the Act
114. Effect of other laws
115. Power to delegate
116. Power to make Rules
117. Power to make regulations
118. Power of Government to issue directions
119. Returns and Information
120. Service of Notice
121. Notices to fix reasonable time
122. Public Notice how to be made known
123. Obstructing officers of the Authority
124. Prosecution, Magistrate’s power etc
125. Exclusion of liability for errors or omissions in information
supplied
126. Offence by body corporate
127. Powers and duties of Police Officers
128. Fines to be paid to the Authority
129. Compounding offences
130. Exemption
131. Confidentiality and intellectual property rights
132. Interpretation of the Act
133. Bar of Legal proceedings
134. Members, Officers and Servants of the Authority and Tribunal to
be public servants
135. Ex-gratia payments
136. Gifts
137. Boundary to be out of jurisdiction and cessation of powers of local
authorities in the development area
6
138. Periphery area of the development area
139. Dissolution of the authority by the Government
140. Dissolution of existing Authority
(2) Transfer of assets and liabilities
(3) Existing Agreements etc
(4) Pending legal proceedings
(5) Nil
(6) Pending Proposals, Plans and Projects
(7) Continuation of contracts, documents etc
(8) Nil
(9) Nil
(10) Transfer of employees of former Authority
(c) Conditions of service
(d) Nil
(e) Pension benefits
(f) Nil
(g) Continuation and completion of disciplinary
proceedings
(h) Nil
(i) Nil
(j) Misconduct or neglect of duty by employee before
transfer
141. Proceedings of the Authority, acting Chair person or Metropolitan
Commissioner / Vice-Chairperson
(2) Vacation of office of member
(3) Disqualification from membership
(4) (a) Member’s interest to be made known
(5) (a) Meetings of the Authority
(6) Validity of acts of members
142. Repealing of Andhra Pradesh Urban Areas (Development) Act,
1975 (Act No.1 of 1975) and Savings
7
THE ANDHRA PRADESH METROPOLITAN REGION AND URBAN
DEVELOPMENT AUTHORITIES ACT, 2016
(ACT No.5 of 2016)
(21st January, 2016)
AN ACT TO REVISE THE LAW RELATING TO THE REGULATION OF RENT
AND TO BALANCE THE RIGHTS AND DUTIES OF LANDLORDS AND
TENANTS TO RESIDENTIAL AND NON- RESIDENTIAL PREMISES IN THE
URBAN AND OTHER AREAS AND TO PROVIDE FOR QUICK RESOLUTION OF
DISPUTES AND MATTERS CONNECTED THEREWITH OR INCIDENTAL
THERETO.
Be it enacted by the Legislature of the State of Andhra Pradesh in the
Sixty-eighth Year of the Republic of India as follows:
CHAPTER I
PRELIMINARY
1. Short title, extent and commencement -
(1) This Act may be called the Andhra Pradesh Metropolitan Region and
Urban Development Authorities Act, 2016.
(2) It extends to the whole of the State of Andhra Pradesh.
(3) It shall come into force on such date as the State Government may,
by notification in the Andhra Pradesh Gazette appoint.
2. Definitions –
In this Act, unless the context otherwise requires,-
(1) ‘agriculture’ includes farming, raising of crops, fruits, vegetables,
flowers, grass, trees, horticulture, floriculture, poultry, fishing, livestock
breeding, bee keeping, upkeep of an orchard and the use of land ancillary
and accessory to cultivation or any agriculture purpose; but does not
include the use of any land as a garden which is an appendage to a building
and the expression ‘Agricultural’ shall be construed accordingly;
(2) ‘amenity’ includes roads, streets, open spaces, parks, landscaping,
playgrounds, recreational grounds, tourist spots, water and electric supply,
street lighting, sewerage, drainage, public works and other utility services
and conveniences as the Government may specify by notification to be an
amenity for the purposes of the Act;
8
(3) ‘area development plans’ means the plans prepared under the
provisions of this Act;
(4) ‘authority’ means the Development Authority constituted under
sub-section (1) of section 4 of this Act;
(5) ‘building’ includes any structure or erection or part of a structure
or erection which is intended to be used for residential, industrial,
commercial or any other purposes, whether in actual use or not;
(6) ‘building operations’, includes,-
(a) erection or re-erection of a building or any part thereof;
(b) roofing or re-roofing of a building or any part of a building or
any open space;
(c) any material or structural alteration or addition of a building as
is likely to affect the alteration of its drainage or sanitary
arrangement or to materially affect its security, or the
construction of a door opening on any street or land not
belonging to the owner;
(7) ‘company’ means a body corporate registered under the Companies
Act, 2013 (Central Act No. 18/2013) and includes a firm or association of
individuals;
(8) ‘development’ with its grammatical variations means the carrying
out of building, engineering, mining or other operations in, on, over, or
under, land or the making of any material change, in any building or land or
both, or in the use of any building or land or any material or structural
change in any heritage building or its precinct, and includes demolition of
any existing building, structure or erection and redevelopment, reclamation
of land, conservation of environment, forming of layouts and sub-division of
any land into plots, and development of amenities and the words “to
develop” shall be construed accordingly;
(9) ‘development area’ means the area or group of areas declared to be
a development area under sub-section (1) section 3 of this Act;
(10) ‘developer entity’ means and includes an individual, company or
association or body of individuals whether incorporated or not, a cooperative
society, a corporate body, or an agency national or international to whom a
license is given to undertake development works/Scheme within the
framework of a plan or development scheme duly approved under this Act;
(11) ‘development fund’ means a fund created under this Act;
9
(12) ‘development plan’ means a comprehensive plan for the
development or redevelopment or improvement of the area within the
jurisdiction of the Authority covering the whole or part thereof and includes
revision of a development plan and proposals for development of land within
its jurisdiction conceived within the framework of the Perspective
Plan/Master Plan/Infrastructure development plan/area development
plan/zonal development plan/or any other plan or scheme prepared under
the Act by what so ever name known;
(13) ‘development project or project’ refers to the plans conceived
within the framework of a Perspective Plan [PP] or Master Plan [MP] or
Infrastructure Development Plan [IDP] or any other Plans, integrated with
that of the Development Area containing detailed working layouts with all
supporting infrastructure and documents including cost of development,
source of finance and recovery instruments for their execution;
(14) ‘engineering operations’ includes the formation or laying of
streets, roads, drainage, sewerage, water supply, electricity, gas, cables or
telephone lines, irrigation works, and development of such other amenities;
(15) ‘final plot’ means a plot or land reconstituted from an original plot
or land and allotted in development scheme as a final plot;
(16) ‘former authority’ means the authority or organization
constituted under any other Act or under this Act existing / defunct /
dissolved before the Authority presently constituted under this Act for the
whole or part of the development area;
(17) ‘government’ means the State Government of Andhra Pradesh;
(18) ‘government company’ means a government company or
corporation registered under the Companies Act, 2013 (Central Act No.
18/2013) which has one of its objects shall be the development of an area;
(19)‘heritage building’ means a building/premises or any part thereof
or structure or artifact possessing architectural, aesthetic, historic or
cultural values or ecological or environmental importance and requires
conservation or preservation and which is declared as heritage building by
the Authority in whose jurisdiction such building is situated;
(20) ‘heritage precinct’ means an area comprising heritage building or
buildings and precincts thereof or related places as declared by the
Authority;
(21) ‘Infrastructure Development Plan [IDP]’ means the set of plans,
projects and estimates for the development of the infrastructure such as
water supply, storm water drainage, sewerage, streets and roads including
ring/radial/grid roads connecting all settlements, electricity and street
lighting, parks and playgrounds, solid waste disposal and management
10
system, communication network and related facilities such as roads,
railways, metro ways, airports and the like and any other amenity as
decided by the Authority for the Development Area or Zone or Special Area
or part of the Development Area prepared and sanctioned under the
provisions of the Act;
(22) ‘land’ includes benefits arising out of land and things attached to
the earth or permanently fastened to anything attached to the earth;
(23) ‘land use’ means the principal use of land for which a plot of land
or building thereon is used or intended to be used. For the purpose of
classification of a plot according to the land uses, a land use shall be
deemed to include subsidiary land uses which are contingent upon it;
(24) ‘Land Pooling Scheme’ means a scheme as provided in sub-
section (1) of section 26 of this Act;
(25) ‘Land Pooling Ownership Certificate [LPOC]’in the context of a
Land Pooling Scheme means a certificate issued by the Authority under sub-
section (4) of section 31 of this Act to each land owner participating in the
Land Pooling Scheme certifying the details of the reconstituted plot / land /
final plot allotted to him;
(26) ‘local authority’ means:
(a) a Municipal Corporation constituted under the respective Act; or
(b) a Municipality or a Nagar Panchayat constituted under the
Andhra Pradesh Municipalities Act, 1965; or
(c) a Gram Panchayat constituted under the Andhra Pradesh
Panchayat Raj Act, 1994; or
(d) any other body or authority constituted under the relevant Act to
govern the urban services;
(27) ‘Master Plan [MP]’ means the set of plans for the promotion and
development of the Development Area or Zone or Special Area or part of the
development area prepared and sanctioned under the provisions of the Act;
(28) ‘metropolitan area’ means an area having a population of a
million or more, comprised in one or more districts and consisting of two or
more Municipalities or Panchayats or other contiguous area or an urban
agglomeration area with a population of million and above as per the Census
of India, specified by public notification to be a metropolitan area;
(29) ‘metropolitan commissioner’ means the Metropolitan
Commissioner appointed by the Government under sub-Clause (d) of clause
(i) of sub-section (3) of section 4;
11
(30) ‘metropolitan region’ means the metropolitan area as whole and
its primary commuter areas, typically formed around the metropolitan area
proper with a large concentration of people or a region as notified by the
Government;
(31) ‘notification’ means a notification published in the following
manner and the word ‘notified’ shall be construed accordingly;
(a) (i) in the Andhra Pradesh Gazette or District Gazette;
(ii) in two daily newspapers circulating in the locality of such area
of which one shall be in the regional language;
(iii) in the local language in the Gram Panchayat, Municipality or
Municipal Corporation, as the case may be and in the offices of the
District Collector, the Revenue Divisional Officer, the Tahsildar, the
District Registrar and Sub-Registrar of Stamps & Registration
department;
(iv) uploaded on the website of the Authority;
or
(a) as may be decided by the Authority;
(32) ‘occupier’ includes,-
(a) any person including a firm or other body of individuals
whether incorporated or not, who for the time being is paying
or is liable to pay to the owner the rent of the land or building
in respect of which such rent is paid or is payable;
(b) an owner living in or otherwise using his land or building;
(c) a rent free tenant;
(d) a licensee in occupation of any land or building;
(e) any person who is liable to pay to the owner damages or
compensation for the use and occupation of any land or
building;
(33) ‘operational construction’ means any construction whether
temporary or permanent, which is necessary for the operation, maintenance,
development, or execution of any of the following services, namely:-
(a) railways;
(b) national highways, state highways, other important roads;
(c) waterways;
(d) ports;
(e) airways and aerodromes;
(f) postal, telecom, wireless, broadcasting and other like forms of
communication;
(g) electricity;
(h) defence;
(i) ONGC, GAIL;
12
(j) works undertaken by the Authority or any Local Authority;
(k) any other service which the Government may, if it is of the
opinion that the operation, maintenance, development or
execution of such service is essential to the life of the
community, by notification, declare to be a service for the
purposes of this clause.
Explanation: - For the removal of doubts, it is hereby declared that the
construction of,-
(i) new residential buildings (other than lodges, quarters for limited
essential operational staff and the like), roads and drains in railway
colonies, hotels, clubs, institutes and schools, in the case of railways;
and
(ii) a new building, new structure or new installation or any extension
thereof, in the case of any other service,
shall not be deemed to be construction within the meaning of this
clause;
(34) ‘original plot’ in the context of Development Scheme means the
parcel of land extent vesting with the land owner as per revenue records or
in possession as on the day of notification of Declaration of Intention of the
Development Scheme, whichever is less. While undertaking the preparation
and sanction of the Development Scheme, the tenure and encumbrances on
the plot remain unaffected;
(35) ‘owner’ in relation to any property, includes any person who is,
for the time being receiving or entitled to receive, whether on his own
account or on account of or on behalf of, or for the benefit of, any other
person or as an agent, trustee, guardian, manager or receiver for any other
person or for any religious or charitable institution, the rents or profits of
the property; and also includes a mortgagee in possession thereof; and also
includes a person, Company, Trust, Institute, Registered Body, State or
Central Government and its attached subordinate departments,
undertakings and the like, in whose name the property stands registered in
the Revenue Records;
(36) ‘periphery area’ means the outer area of the development area
declared as such under section 13 of this Act;
(37) ‘plan’ includes a map or maps indicating proposals, and/or sets
of documents, and/or statements and policies and development briefs for
securing, promoting and regulating development in the region or for any
area and also includes all the sanctioned development plans prepared and
sanctioned under the provisions of this Act;
(38) ‘prescribed’ means prescribed by rules and regulations made
under the Act;
13
(39) ‘reconstituted plot’ means a final plot / land which is in any way
altered by the making of a development scheme;
(40) ‘regulation’ means a regulation made under the Act and zoning
and other regulations made as part of the Plans prepared under the Act;
(41) ‘residence’ includes the use of any land or building or part thereof
for human habitation, and the expression ‘Residential use’ shall be
construed accordingly;
(42) ‘revolving fund’ means the fund required for the purpose of
performing its functions under the Act and for developing amenities and
infrastructure facilities in the development area;
(43) ‘rule’ means a rule made under the Act by the government for
enforcement;
(44) ‘scheme’ means a scheme or policy or directives or guidelines
prepared under the Act; and also includes a scheme prepared under any
other Act prevailing in the State for securing the planned development of
any area or constituent of the Development Area;
(45) ‘Town Planning Scheme [TPS]’ means the scheme prepared under
the Act for achieving the planned development as envisaged in the
sanctioned development plan;
(46) ‘urban area’ means
(a) the area comprised within the Municipal Corporation constituted
under the respective Act or within the Municipality or a Nagar
Panchayat constituted under the Andhra Pradesh Municipalities
Act, 1965 and any such area in the vicinity as the Government
may, having regard to the extent of, and the scope for the
urbanization of that area or other relevant considerations, specify
in this behalf by notification or an area specified as urban as per
the Census of India;
and
(b) such other area as the Government may, by notification, declare
to be an urban area, which in the opinion of the Government, is
likely to be urbanized;
(47) ‘urban region’ means the urban area as whole and the
surrounding urban and rural areas and also the primary commuter areas
typically formed around the urban area proper with a large concentration of
people or a region as notified by the Government;
(48) ‘Vice-Chairperson’ means the Vice-Chairperson of the Authority
appointed by the Government under sub- clause (b) of clause (ii) of sub-
section (3) of section 4;
14
(49) ‘Zonal Development Plan [ZDP]’ means the set of plans for the
promotion and development of a zone or part of a zone or a local authority of
the development area prepared and sanctioned under the provisions of the
Act;
(50) ‘zone’ means any one of the divisions in which a development area
may be divided for the purpose of securing, promoting and regulating
development and for providing the urban services under the Act, and the
words ‘Zoning Regulations’ shall be construed accordingly;
(51) Words used but not defined in the Act shall have the same
meanings as assigned under the respective Acts.
CHAPTER II
DECLARATION OF DEVELOPMENT AREA AND
CONSTITUTION OF THE AUTHORITY
3. Declaration of Development Area -
(1) As soon as may be, after the commencement of this Act, the State
Government may, by notification in the Andhra Pradesh Gazette declare the
‘Development Area’ consisting of such metropolitan region or urban region as
a ‘development area’ for the purposes of this Act with effect from such date as
may be specified therein.
(2) Every such notification shall define the limits of the development
area to which it relates.
(3) The State Government may, by notification, in the Andhra Pradesh
Gazette and in accordance with such rules as may be made in this behalf,--
(a) exclude from the development area any area comprised
therein; or
(b) include in the development area any other area.
(4) The existing Gram Panchayats, Municipalities and Corporations
within the Development Area shall remain functional within their respective
jurisdictions based on the prevailing rules, made under the respective laws.
4. Constitution of the ‘Development Authority’ -
(1) As soon as may be, after the date of commencement of this Act, the
State Government may, by notification, in the Andhra Pradesh Gazette,
constitute the ‘Metropolitan Region Development Authority’ [MRDA] for any
metropolitan region or ‘Urban Development Authority’ [UDA] for any urban
15
region, herein after called as the ‘Authority’ for the development area notified
under section 3.
(2) The Authority constituted under sub-section (1) shall be a body
corporate by the name of the development area for which it is constituted
having perpetual succession and a common seal, with power to acquire, hold
and dispose of property, both movable and immovable and to contract and by
the said name sue and be sued.
(3) (i) The Metropolitan Region Development Authority shall have the
following members, namely,—
(a) the Chairperson to be appointed by the Government;
(b) Principal Secretary to Government, Municipal Administration
& Urban Development Department – Deputy Chairperson;
(c) Principal Secretary to Government, Finance Department -
Member;
(d) ‘Metropolitan Commissioner’ who is a government officer to be
appointed by the Government, shall be the whole time Chief
Executive Officer of the Authority and shall be the Member-
Convener;
(e) Officers not more than six, dealing with Transportation,
Roads & Buildings, Energy, Environment or such other
departments as may be deemed necessary by the Government
- Members;
(f) District Collectors of the development area - Members;
(g) Director of Town & Country Planning – Member; and
(h) Three experts of national or international repute who possess
knowledge in urban governance, urban planning,
conservation, environment and transportation to be appointed
by the Government – Members.
(ii) The Urban Development Authority shall have the following
members, namely,—
(a) the Chairperson to be appointed by the Government;
(b) the ‘Vice-Chairperson’ who is a government officer to be
appointed by the Government, shall be the whole time
Chief Executive Officer of the Authority and shall be the
Member-Convener;
16
(c) Joint Secretary to Government, Municipal Administration
& Urban Development Department or his nominee who
shall be not less than Deputy Secretary in cadre or as
deemed necessary by the Government - Member;
(d) Joint Secretary to Government, Finance Department or
his nominee who shall not be less than Deputy Secretary
in cadre or as deemed necessary by the Government -
Member;
(e) Officers not more than four, dealing with Transportation,
Roads & Buildings, Energy, Environment or such other
departments as may be deemed necessary by the
Government - Members;
(f) District Collectors of the development area - Members;
(g) Director of Town & Country Planning or his nominee –
Member; and
(h) Three experts of national or international repute who
possess knowledge in urban governance, urban planning,
conservation, environment and transportation to be
appointed by the Government – Members.
(4) Any other officer or expert whom the Government thinks
necessary may be invited to the meetings of the authority as special invitee.
(5) There shall be an Executive Committee of the Authority consisting
of the following members, namely,-
(a) (i) In case of Metropolitan Region Development Authority, the
Principal Secretary to Government, Municipal Administration
& Urban Development Department shall be Chairperson of
the Executive Committee, and the Metropolitan Commissioner
shall be a member-convener of the Executive Committee.
(ii) In case of Urban Development Authority, the Vice-
Chairperson of Urban Development Authority shall be the
Chairperson of the Executive Committee;
(b) Joint Secretary to Government, Finance Department or his
nominee as deemed necessary by the Government - Member;
(c) Joint Secretary to Government Municipal Administration &
Urban Development Department or his nominee as deemed
necessary by the Government - Member;
(d) Officers or Heads of Government Departments or the
Authority not exceeding five in number - Members;
17
(e) Secretary of the Authority to be the Member-Convener of the
Executive Committee of Urban Development Authority;
(f) Any other officer or expert as appointed by the Government.
(6) The Chairperson of the Executive Committee may invite any of the
heads of the departments of Government or the Authority or experts as
special invitees to the meetings of the Executive Committee.
(7) The members nominated by the Government to the Authority and
Executive Committee shall hold office as may be prescribed by the
Government and shall be eligible for re-appointment on such conditions as
may be prescribed.
(8) The Government may, by notification, omit any member of the
Authority or Executive Committee.
(9) Subject to the general superintendence and control of the Authority,
the management and administration of the affairs of the Authority shall vest
in the Executive Committee.
(10) The Government shall frame rules with regard to the functioning
and conducting of meetings and any other matters relating to the powers and
functions of the Authority and the Executive Committee.
(11) The term of office and conditions of service of the staff of the
Authority, the procedure to be followed by the Executive Committee and all
such other matters relating to the Executive Committee shall be as may be
prescribed by rules.
(12) The Authority may,--
(a) from time to time appoint one or more Functional Committees
for the discharge of its functions. The functional committees
shall report and discharge their responsibilities under the
instructions and directions of the Authority.
(b)every Committee appointed under clause (a) of sub-section
(12) shall conform to any instructions that may, from time to
time, be given to it by the Authority and the Authority may at
any time alter the constitution of any Committee so appointed
or rescind any such appointment. The Authority shall
nominate one of the members as the Chairman of every such
Committee.
(c) consult or associate with such persons or organizations whose
assistance or advice it may desire. Such advisor or
consultant shall be paid such fees as may be determined by
the Authority.
18
(d) constitute as many area level functional units or sub-
regional units or offices as it deems fit and assign
responsibilities and functions to such units.
(e) create Special Purpose Vehicles (SPVs) with the approval of
the Government for various purposes, including but not
limited to, design and construction of buildings related to
large infrastructure projects, provision of utility services,
provision of urban services, design and execution of social
infrastructure projects, and land acquisition and
augmentation of financial resources. The Authority, as a
representative of the Government could participate in such
SPVs as an equity or debt holder, and also have specified
members of the Authority as members of the Board of such
SPVs.
(f) The Authority may delegate any of its powers or functions to
the Executive Committee or the Metropolitan Commissioner
/ Vice-Chairperson subject to its revision and to such
conditions and limitations if any, as it may think fit to
impose.
5. Powers and functions of the Authority -
Subject to the provisions of the Act, the functions of the Authority shall
be;-
(1) Administration:-
(a) to monitor, supervise or ensure adequate supervision over the
execution of any development plan or project or scheme, the
expenses of which in whole or in part are to be met from the
Development Fund;
(b) to co-ordinate with the Andhra Pradesh Transmission
Corporation, the Southern Power Distribution Company Ltd,
the Andhra Pradesh Industrial Infrastructure Corporation, the
Andhra Pradesh State Road Transport Corporation, Roads &
Buildings department, Housing Corporation, Housing Board,
Infrastructure Corporation of Andhra Pradesh Ltd and such
other bodies / departments of the Government to facilitate
infrastructure development in the development area;
(c) to delegate the powers of the Authority to the Executive
Committee or specific members of the Executive Committee or
the Metropolitan Commissioner / Vice-Chairperson with the
responsibility for execution of specific projects of the
Authority.
(d) to fast track and facilitate issues such as project delays,
issues related to Development Fund, inter-departmental
coordination as raised by the Executive Committee;
19
(e) to enter into contracts, agreements or arrangements with any
person, body or organization as the Authority may deem
necessary for the performance of its functions;
(f) to perform any other function or exercise powers as are
supplemental, incidental or consequential to any of the
foregoing duties and powers, and/or take up such matters as
the Government may direct in this regard;
(g) to sanction and recruit officers and staff required for the
Authority to perform functions of the Authority with the
approval of the Government.
(h) to meet at least once in three months and at such intervals,
at such place and such time as the Chairperson may
decide.
(i) in case of Metropolitan Region Development Authority,
(i) to review, revise and approve proposed projects above
Rs. 10.00 crores and up to Rs. 100.00 crores in total
contract value and approval of the Government shall be
obtained in respect of projects worth more than Rs.
100.00 crores;
(ii) to review, revise and approve all funding, financing and
investment plans above Rs. 10.00 crores and up to Rs.
100.00 crores in total contract value and approval of
the Government shall be obtained in respect of funding,
financing and investment plans worth more than Rs.
100.00 crores;
(iii) to accord approval for all tenders / e-procurement for
the projects exceeding Rs. 10.00 crores and up to
Rs. 100.00 crores in total contract value and approval
of the Government shall be obtained in respect of
tenders / e-procurement for the projects exceeding Rs.
100.00 crores;
(j) in case of Urban Development Authority,
(i) to review, revise and approve proposed projects above
Rs. 5.00 crores and up to Rs. 50.00 crores in total
contract value and approval of the Government shall be
obtained in respect of projects worth more than Rs.
50.00 crores;
(ii) to review, revise and approve all funding, financing and
investment plans above Rs. 5.00 crores and up to Rs.
50.00 crores in total contract value and approval of the
20
Government shall be obtained in respect of funding,
financing and investment plans worth more than Rs.
50.00 crores;
(iii) to accord approval for all tenders / e-procurement for
the projects exceeding Rs. 5.00 crores and up to Rs.
50.00 crores in total contract value and approval of the
Government shall be obtained in respect of tenders / e-
procurement for the projects exceeding Rs. 50.00 crores
in total contract value;
(2) Development and Regulation:
(a) to undertake execution of the projects and schemes as per
the sanctioned Plans and/or through Development Plans,
Action Plans for any Sector or Zone or Development Area;
(b) to undertake by itself or jointly with a developer entity or
through any agency or any local authority, the
implementation of the area level plans, execution of works
relating to infrastructure development, public amenities,
conservation of the environment;
(c) to promote the development activities in accordance with the
sanctioned development plans and to bring aesthetics,
efficiency, and economy in the process of development;
(d) to approve, co-ordinate and execute all transportation
related interventions in the development area so as to
promote planned development of traffic and transportation
system and transit-oriented development;
(e) to undertake and approve action plans of various
departments and agencies and ensure implementation of the
traffic and transportation plans for the development of
modern, integrated and effective public transport systems
such as BRTS, MMTS, MRTS and to introduce Intelligent
Transport Systems for traffic management to make the
development area most liveable in the world;
(f) to formulate and monitor the implementation of affordable
housing policies;
(g) to formulate and implement economic development plans for
the overall economic growth of the development area and to
create new livelihood opportunities.
(h) to regulate the development of the periphery area of the
development area;
21
(i) to undertake, manage and supervise the urban amenities
and to make environment friendly, modern and SMART
metropolitan / urban region either directly or through
outsourced entities by delegating powers to collect user
charges;
(j) to raise finance for any development project or scheme and
to extend assistance to the local authorities for the execution
of such project or scheme;
(k) to entrust to any local authority the work of execution of any
development plan or scheme.
(l) to make recommendations or submit proposals to the
Government or any person or statutory body for the
preservation and protection of any monument and land of
historic, traditional, archaeological, architectural or
aesthetic interest;
(3) Finance:
(a) to promote environmental friendly investments in the
development area;
(b) to review, revise and approve annual financial budget for the
Authority and for carrying out the provisions of the Act;
(c) to levy and collect such fees for the execution of works as
referred above and for provision of other services and
amenities as may be prescribed by regulations;
(d) to levy and collect such scrutiny fees for scrutiny of
documents submitted to the Authority for permission for
development as may be prescribed by regulations;
(e) to levy and collect the development charges as may be
prescribed by regulations;
(f) to levy and collect the user charges for various services
delivered in the development area as may be prescribed by
regulations;
(g) to levy and collect the Impact Fee, Urban Infrastructure Fee,
Cess, or any other fee as may be prescribed by regulations;
(h) to maintain and manage the Development Fund and allocate
finances based on the plans and programmes of the
functional departments or line agencies for undertaking
development of amenities and infrastructure facilities and to
monitor and exercise financial control over the budgetary
allocations concerning development works made through it
to the various public agencies, line agencies and other
agencies;
22
(4) Land development:
(a) to acquire any immovable property through the Right to Fair
Compensation and Transparency in Land Acquisition,
Rehabilitation and Resettlement Act, 2013 (Act No. 30 of
2013)or purchase, exchange, gift, lease, mortgage, negotiated
settlement, or by any other means permissible under any
other law;
(b) to approve the land development schemes or proposals of the
functional departments, other departments and functional
agencies in the development area;
(c) to undertake Land Pooling Schemes and other Town Planning
Schemes;
(d) to prepare and undertake implementation of schemes for
providing alternative areas for rehabilitation of persons
displaced by projects and schemes which provide for such
requirements;
(e) to create and manage the Land Development Bank and take
up land acquisition as may be necessary for various public
uses, civic center, office complexes, township development,
infrastructure development, etc.; allocation of lands to
functional departments and various agencies upon such
terms and conditions for undertaking development of
amenities and infrastructure facilities.
(5) Planning:
(a) to prepare and revise the Perspective Plan [PP], Master Plan
[MP], Infrastructure Development Plan [IDP] or Area
Development Plan or Zonal Development Plan duly carrying
out surveys in order to achieve ecological balance for
sustainable development and for providing other facilities for
liveable environment;
(b) to formulate zoning regulations, building and energy codes,
and any other development control norms for the development
area so as to ensure the compact, transit-oriented, and
environmentally sustainable development;
(c) to prepare, review and revise the development control norms
and rules or regulations, and all other related and similar
norms governing the building and development in the
development area and submit to the Government for approval;
23
6. Powers and Functions of the Executive Committee -
Subject to the provisions of the Act, Rules and Regulations, the
functions of the Executive Committee shall be as follows:
(1) Administration:
(a) to approve appointment/re-appointment of experts, including
experts in the matters relating to urban planning, urban
management, urban infrastructure and urban transportation,
subject to such conditions as may be prescribed;
(b) to review performance of special functional units (such as
Special Purpose Vehicles, Area Level Committees) for carrying
out specific functions including execution of projects;
(c) to consult or associate with such persons or organizations,
public or private, whose assistance or advice it may require.
Such advisor or consultant shall be paid such fees as may be
determined by the Executive Committee;
(d) to recruit professional service providers and competent
experts in accordance with the provisions of the Act to
implement the activities of the Authority as may be
prescribed;
(e) to meet at least once in two months or as often as decided by
the Chairperson of the Executive Committee.
(f) In case of Metropolitan Region Development Authority,
(i) to scrutinize, revise and approve proposed projects
above Rs. One crore and up to Rs.10.00 crores;
(ii) to review, revise and approve all funding, financing
and investment plans above Rs. One crore and up to
Rs.10.00 crores;
(iii) to scrutinize and accord approval for all tenders / e-
procurement for execution of various categories of
works with a value above Rs. One crore and up to
Rs.10.00 crores;
(g) in case of Urban Development Authority,
(i) to scrutinize, revise and approve proposed projects
above Rs. 0.50 crore and up to Rs. 5.00 crores;
24
(ii) to review, revise and approve all funding, financing
and investment plans above Rs. 0.50 crore and up to
Rs. 5.00 crores;
(iii) to scrutinize and accord approval for all tenders / e-
procurement for execution of various categories of
works with a value above Rs. 0.50 crore and up to Rs.
5.00 crores;
(2) Finance:
(a) to prepare the Annual Budget and place the same before the
Authority for approval;
(b) to prepare the schedule of various categories of fees and
development charges and submit them to the Authority for
approval;
(c) to study and approve the matters such as related to
Development Fund but not limited to special financial
structures, investment plans to be met from the Development
Fund, and loan repayment schedules.
(3) Land development:
(a) to undertake the scrutiny of the Land Pooling Scheme or
Town Planning Scheme or any other Development Scheme
proposals and submit the same to the Authority for approval;
(b) to undertake the scrutiny of the land acquisition proposals
and submit the same to the Authority for approval.
(4) Planning:
(a) to undertake the preparation of the Perspective Plan [PP],
Master Plan [MP] and Infrastructure Development Plan [IDP]
or Area Development Plan or Zonal Development Plan under
the Act and the revision of the said Plans as and when
required and submit the same to the Government through
the Authority for sanction;
(b) to undertake the preparation of zoning regulations,
development promotion norms and rules, including
setbacks, open spaces and all other related and similar
norms governing building and development in the
Development Area and submit the same to the Authority and
the Government for approval.
25
7. Powers and Functions of the Metropolitan Commissioner / Vice-
Chairperson - Subject to the provisions of the Act, the functions of the
Metropolitan Commissioner / Vice-Chairperson who is a government officer
to be appointed by the Government shall be as follows:-
(1) Administration,-
(a) to act as whole-time Chief Executive Officer of the Authority and
shall be the Chairperson of the Executive Committee;
(b) to execute all projects approved by Authority or Executive
Committee and take all day to day decisions necessary for
execution of projects;
(c) to prepare the agenda for the meetings of Executive Committee
and Authority;
(d) to prepare and scrutinize projects and investment plans for any
value and submit them for approval in accordance with the
provisions of the Act;
(e) to conduct periodic review meetings of the activities of the
Authority;
(f) to review the operational progress of various departments
against project deliverables and initiatives taken periodically;
(g) to arrange for delegation of the powers of the Authority or
Executive Committee as vested under the Act to the respective
Local Authorities and the officers working in the Authority duly
obtaining the approval of the Authority or Executive Committee;
(h) be competent to delegate the powers as vested in him under the
Act to the local authority or any of the officers working in the
Local Authority or in the Authority;
(i) be competent to give directions to a body or department or
functional agency or person with regard to the implementation
of any development project or scheme financed under the Act, or
land development conditions approved under the Act, or under
taking survey, demarcation and development of roads, right-of-
way for facilities, protection of open spaces or amenities, as he
deems fit, and any such Authority or person shall be bound to
comply with such directions;
(j) notwithstanding anything contained in any other law for the
time being in force, every such direction shall be complied with
26
by the body or department or functional agency or person to
whom it is issued:
Provided if such body or department or functional agency or
person fails to carry out the directions, it shall be competent to
take necessary action to carry out the directions issued and
recover expenses, if any, incurred therefore from the body
concerned;
(k) In case of Metropolitan Region Development Authority, the
Metropolitan Commissioner may,-
(i) prepare, scrutinize, approve, revise and execute the projects
up to Rs. One crore;
(ii) prepare, scrutinize, revise and submit the proposed projects
above Rs. One crore and up to Rs.10.00 crores in total
contract value to the Executive Committee for approval and
above Rs.10.00 crores and up to Rs.100.00 crores in total
contract value to the Authority through the Executive
Committee for approval;
(iii) prepare, scrutinize, approve, revise and sanction all
funding, financing and investment plans up to Rs. One
Crore;
(iv) prepare, scrutinize, revise and submit all funding, financing
and investment plans above Rs. One crore and up to
Rs.10.00 crores in total contract value to the Executive
Committee for approval and above Rs.10.00 crores and up
to Rs.100.00 crores in total contract value to the Authority
through the Executive Committee for approval;
(v) prepare, scrutinize, approve, revise and sanction all tenders
/ e-procurement for execution of various categories of works
with a value up to Rs. One crore;
(vi) scrutinize and submit all tenders / e-procurement for
execution of various categories of works with a value above
Rs. One crore and up to Rs.10.00 crores in total contract
value to the Executive Committee for approval and above
Rs.10.00 crores and up to Rs.100.00 crores in total contract
value to the Authority through the Executive Committee for
approval;
(l) In case of Urban Development Authority, the Vice-Chairperson
may,-
27
(i) prepare, scrutinize, approve, revise and execute the projects
up to Rs. 0.50 crore ;
(ii) prepare, scrutinize, revise and submit the proposed
projects above Rs. 0.50 crore and up to Rs. 5.00 crores in
total contract value to the Executive Committee for
approval and above Rs. 5.00 crores and up to Rs. 50.00
crores in total contract value to the Authority through the
Executive Committee for approval;
(iii) prepare, scrutinize, approve, revise and sanction all
funding, financing and investment plans up to Rs. 0.50
crore;
(iv) prepare, scrutinize, revise and submit all funding,
financing and investment plans with a value above Rs.
0.50 crore and up to Rs.5.00 crores in total contract value
to the Executive Committee for approval and above
Rs.5.00 crores and up to Rs. 50.00 crores in total contract
value to the Authority through the Executive Committee
for approval;
(v) prepare, scrutinize, approve, revise and sanction all
tenders / e-procurement for execution of various
categories of works with a value up to Rs.0.50 crore;
(vi) scrutinize and submit all tenders / e-procurement for
execution of various categories of works with a value
above Rs. 0.50 crore and up to Rs.5.00 crores in total
contract value to the Executive Committee for approval
and above Rs.5.00 crores and up to Rs.50.00 crores in
total contract value to the Authority through the Executive
Committee for approval;
(2) Finance:
(a) to arrange for the preparation of the annual budget for the
Authority and for placing the same before the Executive
committee for further action;
(b) to arrange for the preparation of the schedule of development
charges and various categories of fee and place it before the
Executive Committee for further action;
(c) to administer Development Fund in accordance with the
provisions of the Act.
(3) Land development:
28
to arrange for preparation of the Land Acquisition proposals or
Land Pooling Scheme or Town Planning Scheme and arrange for
implementation of the same after approval.
(4) Planning:
(a) to arrange for preparation of the Perspective Plan [PP], Master
Plan [MP] and a separate Infrastructure Development Plan [IDP]
or Area Development Plan or Zonal Development Plan and to
arrange for implementation and supervision of the same after
sanction;
(b) to review and ensure compliance of local authorities within the
Development Area regarding the sanctioned development plans
and also development promotion and control with regard to
land use or Land Pooling Scheme or Town Planning Scheme.
8. Officers & staff and constitution of the ‘Andhra Pradesh Metropolitan
Region and Urban Development Authorities Service’ –
(1) Notwithstanding anything in this Act or the rules made there
under, the Government may after consulting all the Authorities constituted
under this Act, by notification constitute any class of officers or employees
of the said Authorities into the ‘Andhra Pradesh Metropolitan Region and
Urban Development Authorities Service’ for the State.
(2) Upon the issue of the notification under sub-section (1), the
Government shall have power to make rules to regulate the classification,
methods of recruitment, conditions of service, pay and allowances,
discipline, and conduct of the officers and employees of the Development
Authorities Service thereby constituted and such rules may vest jurisdiction
in relation to such service in the Government or in such other Authority or
Authorities as may be prescribed therein.
(3) The Metropolitan Commissioner / Vice-Chairperson shall assess
and prepare the staffing pattern required for the Authority and place the
same before the Authority for approval. After obtaining the approval of the
Authority, the same shall be submitted to the Government to obtain prior
sanction.
(4) The Authority may, subject to approval of the Government,
appoint suitable persons as heads of various departments of the Authority
and they shall work under the overall control of the Metropolitan
Commissioner / Vice-Chairperson. They shall be entitled to receive from the
funds of the Authority such salaries and such allowances and shall be
29
governed by such conditions of services, as may be determined by rules
made in this behalf.
(5) Subject to such control and restrictions as may be prescribed,
the Authority may appoint such members or other officers and employees
including the professional service providers and competent team of experts
as may be necessary for the efficient performance of its functions and guide
the Authority in implementation of the Act and may determine their
designations, grades, scales of pay and allowances.
(6) The technical cadre of Town Planning wing and Engineering /
Development wing of the Authority shall be filled up on deputation from the
respective government departments. The services of the existing staff of the
former Authorities shall be properly safeguarded.
(7) The Authority may utilize the services of the departmental staff
in the State, Central Government Services and Public Sector undertakings
for various cadres other than those mentioned in sub-section (6).
(8) The Authority may appoint external consultants, advisors and
experts as per the need, may be at such rates and such works to be
assigned and determined as may be prescribed.
(9) The Authority shall have the power to hire the services of private
agencies and recruit people with expertise so as to meet any deficiencies in
professional expertise required for the execution of its responsibilities as
may be prescribed.
(10) The Authority may identify, recruit, surrender, remove, re-
appoint and appraise the performance of Heads of Departments, officers and
other employees as may be prescribed.
30
CHAPTER III
UNIFIED TRANSPORT AUTHORITY
9. Constitution of Unified Transport Authority –
(1) As soon as may be, the Government may constitute ‘Unified
Metropolitan Transport Authority [UMTA]’ for the development area of
Metropolitan Region Development Authority or ‘Unified Transport Authority
[UTA]’ for the development area of Urban Development Authority, herein after
called as “Transport Authority” with the following members, namely—
(a) Metropolitan Commissioner / Vice-Chairperson of the Authority
or any other person to be the Chairperson of the Transport
Authority as nominated by the Government.
In case the Chairperson is other than the Metropolitan
Commissioner / Vice-Chairperson of the Authority, the
Metropolitan Commissioner / Vice-Chairperson shall be the
member-convener.
(b) Six members of heads of the departments of Government or
officers connected with traffic and transportation as nominated by
the Government.
(c) District Collectors of the development area;
(d) Commissioners of the Local Authorities of the development area;
(e) Officers from Police, Transco, Roads & Buildings, MRTS, BRTS,
Railways, Municipal Administration & Urban Development
Department and Road Transport Corporation in the development
area as nominated by the Government;
(f) Three experts in the field of traffic and transportation.
(2) The term of the members nominated under clause (e) and (f) of
subsection (1) shall hold office as may be prescribed by the Government.
(3) The Government may, by notification, omit any member of the
Transport Authority.
(4) The Transport Authority constituted under sub section (1) shall
ensure effective implementation and coordination of the various traffic and
31
transportation measures under taken by the functional departments and
public agencies in the development area.
(5) The Transport Authority may co-opt any expert for dealing with
specific traffic and transportation issues;
(6) The Transport Authority may constitute sub-groups for specific
traffic and transportation issues of the development area.
10. Powers and functions of the Transport Authority -
(1) The powers and functions of the Transport Authority shall be:-
(a) to assist the Authority with co-ordination and support so as to
ensure the effective implementation of its transportation
projects and policies that seek to enforce the Transportation
Plan of the Development Area;
(b) to oversee and ensure effective coordination and implementation
of various traffic and transportation measures undertaken by
various agencies in the development area;
(c) to ensure that effective public transport systems are in place
for the development area;
(d) to promote and monitor key or major traffic and transportation
projects;
(e) to deliberate and recommend effective transportation strategies
for the development area;
(f) to integrate and consolidate all the action plans of various
departments and agencies and ensure implementation of the
traffic and transportation plans for the development area;
(g) to give directions to different agencies involved in the
implementation of traffic and transportation policies and
measures, including shifting of utilities and services or
amenities;
(h) to integrate various routes of public transport and issues of
combined ticketing, feeder services, etc as suggested by the
Authority;
(i) to expedite financial proposals pending with the Government
related to transportation projects in the Development Area;
(j) to direct the appropriation or subvention of funds from various
departments and agencies of the Government for ensuring
implementation of the traffic and transportation plans and
measures in the development area.
32
(2) The recommendations or instructions of the Transport Authority
shall be binding on all the concerned departments.
(3) The Transport Authority shall hold the meetings at least once in a
quarter.
(4) The technical support staff and secretarial assistance to the
Transport Authority shall be provided by the Authority.
(5) The Transport Authority shall build a detailed data base and carry
out necessary traffic and transportation surveys to update its data base and
also make it available for various studies and to the public.
Explanation: The data base would help in monitoring and understanding the
various traffic and transportation needs in the development area.
(6) The Transport Authority should act as a Centre for technology
transfer and also guide the other agencies for all their technical inputs or
plans in the field of traffic and transportation.
(7) An escrow account shall be maintained in the Transport Authority
in which 2% of estimated cost of all projects of traffic and transportation
undertaken by various departments or functional agencies shall be deposited
in this account. This amount shall be utilized for research, studies and
capacity building in the field of traffic and transportation apart from meeting
the administrative expenses of the Transport Authority.
(8) The Transport Authority shall be governed by such rules and
regulations as shall be made in this regard.
CHAPTER IV
DEVELOPMENT PLANS
11. Preparation and Content of Development Plans -
Subject to the provisions of the Act, the Authority shall,-
(1) Within two years of its constitution or within such time as the
Government may extend, prepare a Perspective Plan [PP] with a long term
time frame preferably not less than thirty years, for the comprehensive
physical, economic and social development of the Development Area, having
due regard to, -
(a) vision for the development area and provide policy framework
and directions of growth and identification of thrust areas for
development;
(b) target population, employment pattern and GDP;
33
(c) strategic land use plans, including green field developments and
regeneration;
(d) strategic transportation and mobility requirements;
(e) environmental sustainability.
(2) Within three years of its constitution or within such time as the
Government may extend, prepare a Master Plan [MP] for the Development
Area or Zone or Special Area with a medium term time frame, preferably not
less than ten years and it shall be in conformity with the Perspective Plan,
having due regard to, –
(a) proposals and policies for promoting growth, securing planned
development in the development area;
(b) proposals for conservation, optimum utilization and development
of resources in the development area;
(c) Land Use Plan indicating the broad areas of development and
general location of residential, commercial, industrial,
agricultural areas and areas for conservation and protection of
ecologically fragile areas, including:--
(i) Proposals for the allotment of land for public purposes and policies
for improvement and development of public amenities and services
such as water supply, electricity, gas, storm water drainage,
sewerage, waste disposal, educational facilities such as schools,
colleges and other educational institutions, medical and public
health institutions, markets, social welfare and cultural
institutions, theatres, auditoriums and places for public
entertainment, public assembly, museums, art galleries, religious
buildings, play grounds, stadia, parks, open spaces, dairies, zoo
parks and for such purposes as may, from time to time, be
specified by the State Government;
(ii) Infrastructure network plan showing existing and proposals of
major infrastructure facilities like circulation network including
ring roads, radial and grid roads connecting all the settlements,
transport, power, water supply, natural drainage, sewerage
system, solid waste disposal and management system,
communications network and related facilities like power plants,
roads, highways, railways, metro ways, airports, and the like;
(iii) Proposals and policies for preservation, conservation and
development of areas of natural beauty and scenic spots, and
areas of historic and archaeological interest and tourism areas and
heritage buildings and heritage precincts;
(iv) Proposals and policies for watershed management, water supply,
water harvesting, recharge of ground water, flood control, and
prevention of air and water pollution;
34
(v) Proposals and policies for riverfront development and/or lake or
water front development;
(vi) Proposals and policies for enhancing greenery and urban landscape
implementation in the development area and individual plots;
(vii) Proposals and policies for promoting urban design and built form
with aesthetics and architectural control for overall development
and individual plots;
(viii) Proposals and policies for promoting housing and community
facilities for all sections of society;
(ix) Proposals and policies for traffic and transportation, transit
oriented developments (TOD) and promoting mass transportation
facilities;
(x) Proposals and policies for industrial development;
(xi) Proposals and policies for major development projects;
(xii) Proposals for the reservation of the land for the purpose of Union,
State, Local Authority or any other authority or body established
by or under any law for the time being in force;
(xiii) Strategies and priorities for implementation of the various
proposals with time frame and programmes;
(xiv) Proposals and policies for promoting development and regulating
uses and activities through Zoning and other Development
Promotion Regulations, conservation and preservation of heritage
buildings and areas;
(xv) Any other matter which may be necessary for the development
area.
(3) The Authority shall prepare and approve a separate Infrastructure
Development Plan [IDP] for the Development Area or Zone or Special Area
within the framework of the sanctioned Perspective Plan or Master Plan or
Area Development Plan or Zonal Development Plan as and when required.
(4) The Authority shall undertake surveys and studies, and the creation
and maintenance of the data base and information system, and collection of
such information and preparation of reports and maps for the development
area; and associate advisors, consultants as may be necessary for the
preparation of the Projects or Plans mentioned above for the development
area.
(5) The Authority shall undertake detailed area level plans for specific
areas, plan programming and phasing of development and enforce special
development regulations for the purpose of securing planned development.
(6) The Authority shall review and revise the Perspective Plan [PP],
Master Plan [MP] and Infrastructure Development Plan [IDP] and other
35
statutory plans either at the end of the time period of the Plan or at fixed
intervals as decided by the Authority or as directed by the Government.
12. Submission of plans to the Government for sanction -
(1) After preparing Perspective Plan or Master Plan or Area Development
Plan or Zonal Development Plan in accordance with section 11, the Authority
shall notify the same in such form and manner as may be prescribed along
with a notice in the prescribed manner, inviting objections or suggestions
from any person or body giving the time period of minimum thirty days or
within such time as the Government may extend, for filing objections or
suggestions.
(2) After considering all objections, suggestions and representations
that may have been received, the Authority may make modifications or
revision to the Plans in such manner as it thinks fit, and submit to the
Government for the sanction of the Perspective Plan [PP], Master Plan [MP] or
Area Development Plan or Zonal Development Plan with draft policies,
development promotion regulations and reports along with remarks on the
objections and suggestions, if any, received.
13. Sanction of plans by the Government –
(1) On receipt of the Plans under section 12, the Government shall
within sixty days examine and sanction the said Perspective Plan [PP] or
Master Plan [MP] or Area Development Plan or Zonal Development Plan with
or without modifications or reject the plans with directions to modify or
prepare revised plans.
(2) The sanction accorded by the Government shall be notified by the
Government in the Andhra Pradesh Gazette and the Perspective Plan [PP] or
Master Plan [MP] or Area Development Plan or Zonal Development Plan shall
come into force from the date of its publication in the Gazette.
14. Power to undertake preparation of area development plan or action
plan or Zonal Development plan –
(1) Subject to overall conformity with the Perspective Plan [PP] or
Master Plan [MP], the Authority or the respective Local Authority under the
guidance of the Authority, may undertake the preparation of Area
Development Plan or Zonal Development Plan as deemed necessary for any of
the provisions as stated at clause (c) of subsection (2) of section 11, and also
for development promotion, execution of projects and schemes for any Sector
or Area or Zone and / or for effective urban services and municipal functions
of their respective jurisdiction in the development area with a time span of
ten years or as prescribed by the Government.
36
(2) The Local Authority shall submit the said Plans prepared for its
jurisdiction along with the resolution to the Authority for approval and
thereafter shall follow the procedure as stated under sections 12 and 13.
15. Modification to the sanctioned plans –
(1) The Authority or the Government may, on a reference from the
Authority or the Local Authority concerned or on an application made by a
land owner to the Authority or Local Authority concerned, as the case may
be, make such modifications to the sanctioned Perspective Plan [PP] or
Master Plan [MP] or Area Development Plan or Zonal Development Plan, as it
thinks fit and which in its opinion are necessary.
(2) The Metropolitan Commissioner / Vice-Chairperson shall prepare a
report together with necessary plans, full particulars of any such modification
and submit to the Government for approval.
(3) Before making any modifications to the Perspective Plan [PP] or
Master Plan [MP] or Area Development Plan or Zonal Development Plan, the
Authority, or as the case may be, the Government shall publish a notification
inviting objections or suggestions from the public so as to reach within a
period of fifteen days and shall consider all objections and suggestions that
may be received by the Authority or Government.
(4) After due consideration of the objections and suggestions received,
the final modification made under the provisions of this section shall be
notified by the Government in the Andhra Pradesh Gazette and the final
modifications shall come into operation from the date of publication of such
notification.
(5) The Authority shall levy such fees and charges including
development charges and conversion charges as applicable and as may be
prescribed in any such modification effected to the sanctioned Perspective
Plan [PP] or Master Plan [MP] or Area Development Plan or Zonal
Development Plan from the land owners at whose instance the modifications
are effected and also form the others who will have the advantage due to such
modifications. These charges shall take into account the benefits that would
accrue to the land owners from the change and shall seek to capture some
share of the increased land value.
16. Enforcement of the sanctioned plans -
(1) The Perspective Plan [PP] or Master Plan [MP] or Area Development
Plan or Zonal Development Plan after the approval of the Authority, shall be
binding on all the local authorities, all other organizations and the citizens in
the development area.
(2) The guidelines, policies, specifications and targets regarding the
affordable housing and various other components as proposed in the said
37
sanctioned plans shall be implemented by the Authority / local authorities
within the development area.
(3) The Local Authorities shall be responsible for the implementation of
the sanctioned plans in the development area under the overall control of the
Metropolitan Commissioner / Vice-Chairperson.
CHAPTER V
DEVELOPMENT SCHEMES
(i) Types and details of Development Schemes
17. Development Schemes -
(1) Subject to the provisions of the Act or any other law for the time
being in force, the Authority may, within its jurisdiction, or any part thereof,
for the purpose of achieving planned development and for providing better
infrastructural facilities by implementing the proposals as envisaged in the
sanctioned development plans on its own or authorize any other body or any
Licensed Developer to prepare and implement one or more Development
Schemes in conformity with such plans:
Provided that the scheme is contiguous and approachable by a public road.
(2) Land uses earmarked in the sanctioned development plans for ‘Peri-
urban use, conservation use, agricultural use or any other non-conflicting
use as may be decided by the Authority, shall automatically stand converted
to uses proposed under the development scheme.
Provided that land uses earmarked as ‘bio-conservation use, water
bodies, buffer zone, forest use and all other prohibited uses as may be
decided by the Authority including roads and utilities in the sanctioned
development plans are prohibited for automatic change of land use or
modification.
Provided further that the marginal realignment of road network
proposed in the sanctioned development plans may be considered by the
Authority, if the said realignment is within the Scheme area only and is
essential in the overall interest of the development of the area.
(3) The Authority or the Metropolitan Commissioner / Vice-
Chairperson, as and when required, may by notification invite applications
from any ‘Developer Entity’ to undertake a Development Scheme
independently or jointly with the Authority as specified in accordance with
the provisions of this Act, as per the terms and conditions specified in the
notification and as per the conditions stipulated by the Authority while
according sanction for the Development Scheme.
38
(4) Types of Development Schemes -
The types of development schemes shall be,-
(a) Land Pooling Scheme [LPS],
(b) Town Planning Scheme[TPS],
(c) Any other special development scheme as prescribed.
Power of the Government to require the authority to make a
development scheme -
(5) Notwithstanding anything contained under the Act, the Government
may, after making such inquiry as it deems necessary, by notification, require
the Authority to make Development Scheme in respect of any area within the
development area which conforms to the provisions of the Act.
(6) For the purposes of the provisions of the Act, the requisition made
by the Government through the notification shall be deemed to be the
declaration of intention to make a scheme.
18. Provisions of the development scheme-
The development scheme may make provisions for any of the following
matters, namely,--
(1) the laying out or relaying out of land, either vacant or already
built upon;
(2) for the lands likely to be used for construction of buildings for
residential or commercial or industrial or for any other purposes as decided
by the Authority;
(3) layout of new streets or roads, construction, diversion, extension,
alternation, improvement of streets and communication network;
(4) the allotment of land for roads, spaces for public purposes like
open spaces, gardens, recreation grounds, schools, markets, green belt,
transport facilities, utilities and amenities of all kinds;
(5) drainage inclusive of sewerage, surface or sub-soil drainage and
sewage disposal;
(6) lighting;
(7) water supply;
(8) trunk and other infrastructure required to service the
infrastructure within the development area;
(9) preservation, conservation and protection of all heritage related
objects and also water bodies;
(10) the preservation of objects of historical or national interest or
natural beauty;
(11) any other provisions as may be prescribed.
39
19. Content of the development scheme -
(1) The Development Scheme shall contain the following particulars,
namely,-
(a) survey numbers as in diglot or res-survey register or fair
adangal, survey numbers as in record of rights and adangal,
sub-division sketch from field measurement book of the
original survey number as well as sub-divided survey number,
revenue village, extent of land;
(b) Details of ownership of all parcels of land;
(c) Preparation of the scheme incorporating roads, amenity areas,
land use etc in accordance with the sanctioned plans;
(d) the land use break-up of the scheme;
(e) the re-constituted plots [Final Plot / Land] which would be re-
allotted to the land owners;
(f) method of re-allotment or registration;
(g) original location of the land and location of the developed land;
(h) the plots or lands to be allotted to the Authority or ‘developer
entity’ in lieu of the cost of development towards the
preparation, sanction, provision of infrastructure and
amenities and implementation of the Scheme;
(i) the plots or land to be allotted to the Authority in lieu of the
cost of development towards provision of infrastructure and
amenities and other costs and expenses to be incurred for the
scheme and external trunk infrastructure;
(j) type of the development entitled for each of the plot / land
based on the use of the development;
(k) line estimates for development of the scheme. [level and cost of
infrastructure shall be as per the prescribed standards];
(l) the scheme shall also indicate the area proposed for the
various purposes as may be prescribed;
(m) any other particulars as may be prescribed.
(2) It shall also contain any specific development promotion regulations
to control the developments in the scheme area.
20. Infrastructure and amenities to be provided –
(1) The Authority or the developer entity whoever undertakes the
development scheme shall provide the following infrastructure and amenities
in the development scheme area:-
(a) road development;
(b) electricity lines and street lighting;
40
(c) water supply;
(d) sewerage works – distribution network and sewerage
treatment plant;
(e) storm water drains network;
(f) rain water harvesting system;
(g) telecommunication lines located in exclusive strips of land
over ground or in ducts under the surface;
(h) development of open spaces for parks & play grounds and
avenue plantation without obstructing pedestrian ways or
roads;
(i) any other amenity as may be prescribed.
(2) The responsibility of providing infrastructure within the
reconstituted plot shall lie with the plot owner.
21. Cost of the development scheme –
The cost of the development scheme shall include,-
(1) all sums payable to the Authority under the provisions of the Act;
(2) all sums spent or estimated to be spent to undertake the scheme
including proportionate external and full internal infrastructure cost or
betterment charges;-
(a) in the making of the Scheme;
(b) in the execution of the Scheme;
(c) in the execution of such part of the peripheral and bulk
services as may be considered necessary.
(3) all sums payable to any other Agency or Government under the
provisions of any other relevant Acts;
(4) administrative and legal expenses including risk reserves based on
the future litigations;
(5) the cost of publication charges in the newspapers pertaining to the
scheme;
(6) registration charges, if any;
(7) any other sum payable as may be prescribed.
22. Reconstitution of plots –
(1) The title of the land owners covered under the development scheme
shall be verified with reference to the revenue records and registration
documents and other relevant records of ownership of land by the officer
authorized by the Authority and an order issued under his seal and signature
41
confirming the acceptance or otherwise of the land for the development
scheme.
(2) In the development scheme, the size and shape of every plot shall be
determined, so far as may be, to render it suitable for development and
complying with the provisions of the scheme.
(3) The development scheme may be prepared in sectors with the name
and number of the plots, roads and the developed final plots which shall be
allotted in the development scheme area to the owners in accordance with the
eligibility as may be prescribed.
(4) The Authority may earmark the land allotted to it as a separate
sector or in a group of sectors for specific purposes and the reconstituted plot
/ land to the land owners in separate sector or group of sectors for the
purposes specified in the development scheme.
(5) The development scheme may contain proposals:--
(a) to form reconstituted plot / land by the reconstitution of the
original lands by the alteration of its boundaries and by the
transfer of any adjoining lands if necessary.
(b) for location of the reconstituted plot / land anywhere in the
identified area of the development scheme.
(c) for allotment of reconstituted plot / land shall be by draw of
lots.
(d) to provide with the consent of the owners that the
reconstituted plot / land may be allotted jointly as common
reconstituted plot.
(e) for allotment of a reconstituted plot / land to any owner
dispossessed of land in furtherance of the scheme.
(6) The proportion and extent of eligibility for each land owner shall be
determined before publishing the draft development scheme.
23. Restrictions on the use and development of land after publication of
draft development scheme -
(1) On or after the date on which a draft development scheme is
published, no person shall, within the area included in the scheme, carry out
any development unless such person has applied for and obtained the
necessary permission for doing so from the Metropolitan Commissioner /
Vice-Chairperson in prescribed form and on payment of such scrutiny fees
and charges as may be prescribed by regulations.
(2) Where an application for permission is received by the Metropolitan
Commissioner / Vice-Chairperson, he shall, send to the applicant a written
acknowledgement of its receipt and after making such inquiry as it deems fit
42
and in consultation with the officer authorized by the Metropolitan
Commissioner / Vice-Chairperson, may either grant or refuse such
permission or grant it subject to such conditions as he may think fit to
impose.
(3) If any person contravenes the above provisions or of any conditions
imposed, the Metropolitan Commissioner / Vice-Chairperson may direct such
person by notice in writing to stop any development in progress, and after
making an inquiry in the prescribed manner remove, pull down, or alter any
building or other development or restore the land or building in respect of
which such contravention is made to its original condition.
24. Disputed ownership -
(1) Where there is a disputed claim to the ownership of any piece of
land included in the development scheme area in respect of which a
declaration of intention to make a development scheme has been made and
any entry in the record of rights or mutation relevant to such disputed claim
is inaccurate or inconclusive, an enquiry may be held by an Officer appointed
by the Government in case of any development scheme in the manner as
prescribed or the Planning Officer in case of a Town Planning Scheme, at any
time before the final allotment of the reconstituted plot / land for the
purposes of deciding as to who shall be deemed to be the owner for the
purposes of the Act and pass orders under his seal and signature.
(2) Such decision shall not be subject to appeal but it shall not operate
as a bar to a regular suit in a Court of competent jurisdiction.
25. Registration of document, plan or map in connection with
development scheme not required -
(1) Nothing in the Registration Act, 1908 (Act No.16 of 1908) shall be
deemed to require the registration of any document, plan or map prepared,
made or sanctioned in connection with a Development Scheme implemented
by the Authority which has come into force.
(2) All such documents, plans and maps shall, for the purposes of
Section 48 and 49 of the Registration Act, 1908 be deemed to have been
registered in accordance with the provisions of that Act:
Provided that the documents, plans and maps relating to the sanctioned
scheme shall be accessible to the public in the manner prescribed.
(ii) Land Pooling Scheme
26. Land Pooling Scheme - (1) “Land Pooling Scheme” means the pooling
together of all the lands in an identified area, under different ownerships
voluntarily and redistributing it in a properly reconstituted form after
development and re-allotment of the pre-defined extent of the land to the
Land Owners, after deducting the land required for public open spaces for
parks and play grounds, social housing for economically weaker sections,
43
social amenities such as school, dispensary, other civic amenities etc, road
network and other infrastructure as specified under the Act and duly
retaining a part of the land by the Authority in lieu of the cost of development
towards the provision of infrastructure and amenities and other costs and
expenses to be incurred for the Scheme and external trunk infrastructure.
(2) The land pooling scheme is intended for land owners volunteering to
surrender their land against a guaranteed return of a developed and
reconstituted plot / land.
27. Reservation and allotment of land for various purposes in land
pooling scheme -
(1) The reservation and allotment of land for various purposes in the
Land Pooling Scheme may be as specified below:--
(a) reservation of land to an extent of ten percent of total scheme
area for parks, playgrounds, gardens and open spaces;
(b) allotment of land for roads and utility services to an extent of
thirty percent of total scheme area;
(c) allotment of land to an extent of five percent of total scheme
area for social amenities such as school, dispensary and other
community facilities;
(d) allotment of land to an extent of five percent of total scheme
area for providing affordable housing for the poor;
(e) a share of total area of the scheme specified by the Authority
for reconstituted plots [Final Plot], for re-allotment to the Land
Owners;
(f) a share of total area of the scheme specified by the Authority in
lieu of the cost of development towards the provision of
infrastructure and amenities and other costs and expenses to
be incurred for the Scheme and external trunk infrastructure
for re-allotment to the Authority. The Authority may use this
allotted land for residential or commercial or public or
semipublic or any other purposes as may be approved by the
Authority:
Provided that the percentage of the allotment of land as
specified in Clauses from (b) to (d) may be altered by the
Authority while preparing the Land Pooling Scheme depending
upon the nature of existing and proposed development,
sanctioned development plans and for the reasons to be
recorded in writing.
(2) The area of the Land Pooling Scheme shall be as notified by the
Authority under section 29 of the Act.
44
28. Role of developer entity -
The developer entity intending to undertake Land Pooling Scheme shall
obtain a license from the Metropolitan Commissioner / Vice-Chairperson to
formulate and implement a Land Pooling Scheme containing such particulars
and details as may be prescribed:
Provided that,-
(1) The developer entity shall submit the application to formulate
and implement a Land Pooling Scheme only after the notification
issued as stated at sub-section (3) of section 17 under the Act;
(2) The developer entity shall be responsible for the pooling of the
land under land pooling scheme and all the requirements of the
scheme as may be prescribed under the Act shall be complied
with;
(3) The costs for development of the development scheme shall be
factored into the project before the developer undertakes the
development work;
(4) The developer entity shall obtain all necessary permissions from
the Metropolitan Commissioner / Vice-Chairperson as required
under the Act duly paying the prescribed fees and charges to
undertake the Scheme;
(5) The developer entity shall mortgage a part of the Scheme area as
prescribed in favour of the Authority in order to comply with the
conditions of the development scheme. The same shall be re-
conveyed by the Metropolitan Commissioner / Vice-Chairperson
while issuing the completion certificate of the scheme.
29. Declaration to take up the land pooling scheme and Suggestions and
objections to the notification of intention -
(1) The Competent Authority for land pooling scheme shall be the
Metropolitan Commissioner / Vice-Chairperson or an officer appointed by the
Government and also includes such other officers along with staff, appointed
by Government for the purpose.
(2) The area for the land pooling scheme may be identified by the
Competent Authority either on his own or based on the applications received
from the land owners or developer entity.
(3) The Competent Authority shall obtain the approval of the
Authority and initiate Land Pooling Scheme for the identified area:
Provided that no such approval shall be necessary in case of any area
notified by the Government under sub-sections (5) and (6) of section 17.
(4) The Competent Authority for land pooling scheme shall issue a
notification declaring its intention (hereafter referred to as the ‘declaration of
intention’) to make the land pooling scheme in respect of such an area in the
45
prescribed manner within prescribed time period, calling for objections or
suggestions as well as consent from the Land Owners or interested parties
whose lands are included in the land pooling scheme so as to reach within
thirty days from the date of publication of such notification.
(5) The Competent Authority shall consider and dispose of all such
objections and suggestions within the prescribed time limit and approve the
Land Pooling Scheme area with or without modifications within the
prescribed time period.
(6) The Competent Authority for land pooling scheme within the
prescribed time period shall notify the modified area of the land pooling
scheme for the preparation of draft land pooling scheme.
(7) Verification of the title and extent of consenting land owners shall
be done under sub-section (1) of section 22.
(8) Disputed ownership shall be resolved under section 24.
30. Preparation and notification of Draft Land Pooling Scheme -
(1) The Competent Authority for land pooling scheme shall make a draft
land pooling scheme of the area in accordance with the sanctioned
development plans in consultation with land owners within the time period.
Such consultations shall be related to the provisions made under section 18
of the Act and each such consultation has to be recorded in writing and has
to be signed by the Competent Authority for land pooling or any other
authorized officer on behalf of the Authority.
(2) The Competent Authority shall approve and publish the notification
of draft land pooling scheme within prescribed time period along with the
conditions if any for carrying out the provisions of the scheme, calling for
objections or suggestions from the land owners whose lands are included in
the land pooling scheme giving a time period of thirty days from the date of
publication of the notification.
31. Publication of final Land Pooling scheme and issue of the LPOC –
(1) If any person affected by such scheme communicates in writing, the
Competent Authority shall consider such objections relating to such scheme
and at any time before approving the final land pooling scheme, modify such
scheme as it thinks fit.
(2) The Competent Authority after considering the modifications shall
approve the final land pooling scheme and publish the notification of the final
land pooling scheme.
(3) The notified area under the final land pooling scheme shall vest
absolutely with the Authority or the developer entity, as the case may be, free
from all encumbrances, for reconstituting and implementing the land pooling
scheme.
46
(4) After publication of the Final Land Pooling Scheme, within a
prescribed period of time, the Competent Authority shall issue a Land Pooling
Ownership Certificate [LPOC] to each land owner which shall contain details
of the land owner’s original land and that of the reconstituted Plot / Land,
including its original ownership details, along with a sketch of reconstituted
plots and such Certificate shall be the conclusive evidence of the title of the
property in respect of the reconstituted Plots / Lands and shall be eligible for
transfer of rights of the property in accordance with the provisions of the
Registration Act, 1908 (Act No.16 of 1908).
(5) After notification of the final land pooling scheme, the same shall be
incorporated in the notified sanctioned development plans as the case may
be.
(6) All lands reserved for the parks, play grounds and open spaces, and
all lands allotted for roads, social amenities and affordable housing shall be
deemed to be handed over to the Authority upon the notification of the final
land pooling scheme.
(7) All lands allotted for the Authority or the developer entity, as the
case may be, shall also be deemed to be handed over to the Authority or the
developer entity, as the case may be.
(8) The notified final land pooling scheme shall be a deemed layout
development permission by the Authority.
(9) The owner of the reconstituted plot will be responsible for the
following, namely,--
(a) for providing all the required infrastructure within the
reconstituted plot or land and for obtaining development
permissions as per applicable regulations;
(b) to obtain all permissions and requisite ‘No Objection Certificates’
required for the development of the reconstituted plot; and
(c) to pay necessary fees and charges as per the rules for the
sanction of development permission before commencing any
construction activity on reconstituted plots.
32. Implementation of Final Land Pooling Scheme –
(1) The permission for the final land pooling scheme shall remain valid
for a period as may be prescribed.
(2) The physical demarcation of roads and plots of the final land pooling
scheme shall be commenced immediately on final sanction and shall be
completed within a period as may be prescribed.
47
(3) The Competent Authority for land pooling scheme shall hand over
the reconstituted plots to the land owners after formation of the roads as per
the final land pooling scheme within a period as may be prescribed.
(4) The remaining infrastructure shall be developed in a phased manner
in a period as may be prescribed.
(5) If the works are not completed within a prescribed period, the final
sanction and permission shall be revalidated by the Authority for a maximum
period as may be prescribed.
33. Completion of final land pooling scheme-
(1) The Competent Authority shall, duly furnishing the details of
completion of the works along with the necessary infrastructure plans,
publish a notice of completion of the final land pooling scheme within the
period as may be prescribed.
(2) The Competent Authority shall also publish the details of re-
allotment of reconstituted plots / lands along with land mutation records or
land pooling ownership certificates.
(3) On verification of the details in sub-sections (1) and (2), the
Competent Authority shall issue the Completion Certificate along with layout
of final land pooling scheme.
34. Maintenance of the common infrastructure & facilities after issue of
completion certificate -
(1) The reconstituted plot / land owners shall have to pay for the usage,
consumption and maintenance charges levied by the agencies responsible for
the common infrastructure and respective services including roads, street
lighting, solid waste management, sewerage treatment plant, water supply,
parks and play grounds and other amenities.
(2) The Authority may maintain the common infrastructure and
facilities either on its own or authorize a Local Authority or a resident welfare
association duly collecting the necessary charges for such maintenance.
(iii) Town Planning Scheme
35. Town Planning Scheme - (1) Subject to the provision of this Act or any
other law for the time being in force, the Authority may make