Delhi Electricity Regulatory Commission (Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations, 2012
Regulations made under THE ELECTRICITY ACT 2003
- Made under: THE ELECTRICITY ACT 2003
This text is shown as one document.
Full text
Tr-441 R t.9,c4.-33002/99
GOVERNMENT OF INDIA
REGISTERED No. D.L.-33002/99
Pethi Octexette
3TITTUTITIT
EXTRAORDINARY
Wir417
PUBLISHED BY AUTHORITY
14. 41 ra 8, tiwcw, araTor 1, 2012/3TI 9, 1934
No. 41 DELHI, MONDAY, OCTOBER 1, 2012/ASVINA 9, 1934
[TE.Tr.u.O.k. R. 151
1 N.C.T.D. No. 151
PART—Ill
Ilte24AtiT4 iT74 01., turn? titchlt
GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI
qtni rrQrllIHch 317113T
afanr
r~rrll, 1 31-4Tp-T, 2012
1t€19' q1;4414-10 &RN' (iclictro kl Th-Z1 41Rlca t -I 019 el .t/u1 PriToP:ff WT- tfilT FP1M-14
ititicn)idit44-r, 2012
"crug. 3( 292 )/iThFrataTTLI:172010-11/3026,--Na- ST, 2003 t. 61, 62 (1), 66, 86
(1)p.) atl-R- 181 i cl6cl SICcci Vitzli 3Tlz 7t •(-1 ' rR 49T4 'gra- *flit 3T-1 qrf)+-ZII Th7 Wittird"
Th7a 301t35-a.sicioffacilit-A- f4EFfeit9cn 31-Rhrr wc saki -t4lictNufie4 crg, 7R1?-4- 47 et mruflq
thy' ell1L ctrO)
1. Tifaird9Tri 74- TIFt4T:
(1) ttla. z114-10 awitfr cr-N zi ct,q cif ccatYR- ricilcNullq
eliv4).0)?4,5p)ftr4zTIT, 2012 ct)6I ‘TII I
(2) ffif4zP:11 k flute 1,1011310 4)$:1M44133i* 0115 4 I
(3)k f4f4zPi*ti 3Tiz11 Tr ' lR.=13TI4wIrl e -4 tff en6P
3759 D692012
(I)
DELHI GAZETTE:EXTRAORDINARY
2. tthirrE07-4-1:
(i) =N. 4, .31.54 co l*R1--Qt 3TRy2rr 3TEreid- t",
) "3641444" 4 3T1tTPT tgff Sf, 2003 (42003 MT a TE. 36) 30 4+ti S 4 Ng 4 1%7
Trc4struff (4e-Pek) t;
R30 "dipiM alq-" 4 sitsrrN 49- (0) 4 t, fir tR.11 1c,r4/144- fN-M'r &Fr
qftir t;
To "711-fira pcno (kIte4 ektil" TT artt ci aim arziftsa -Atiiciell 2005 t 3(2) 4 Thlfrfk-a-
rszrr +lei; t;
El) "fl- aitliwpir" 4 arftwrizr «l arfirr 4 tt--4ku &PM qki ftk t-4ra Itgo- fdPzwicn anNirr
(icflctrollei -141cppillq vp-fiuNi col 91-41c11 307 \J) Witt c0t) fkiE19-
QT f)
fe4ZPI, 2010 t cl6c1 trR.fflwritNT,Ieu
ankir" attfArN 3441k44 76 uct-- 4,s (1) 4 \I (Qv, x_q No
&Orr 4 t;
N-) "sviluittm" 4 31ftrrzr zr3TRim-Rurfxl<I f -ecifftd- cre0Nr34 t 394R ath t*; fop. Hcr) &Rh
(-icilcou1141 \I'm? lq ricilcrrollq \3) ‘3.101 cot) RT-4 W4)
o fvr̀ftd- crrNtrmi cl6c1t*T 344M-R7 qkf v1111. -Icnctr<ufkl ■tull crwor
Bo "auzilTr" 4 airrtr 0\4 S zaz t ucr-tis (1)4 \IR-eiRgo it-A-147 qPdipict) &Orr t;
Frotearl" 4 aftrgRr .awkrtii-41- 4 t1=-41 4*I 31-1 -N4 trft9Trfirff 3TqA arra t4)-9-
uTitff-d-rat f4-q-A.*1. 3111:a cbt) f4-dur Rout. m-r vtulem 3th \3*Icni •<(5•<(51c1 cive) qviritrt--a• f --zrr TrNT
ef;
ef) "icl-ciAgYR rate 4 3TRTSTfzf trkur awgr firMUtrcil, t14- 914-m1 t, #12T -icntonti anvlf
us-ti tt4prtzit4ctrt
) "Rifiwr fkr4Eu fir" 4 *RN *pie.1-\t-H4 tARK-r 1 iffitp RP4iNict) (1clicNunq thvl
dc-41<1 eull ‘31.31 Tht 3Tk crN.) fki119. QT) ftf4Nrr, 2010
3FIRTRP:13TROF qMfktfrika.W-dITIWTRt;
"lif4buld l =km" 4 attrwr tHe4-*Hq f4-gd- 19cf) 31-12M (.1 ctN ■30-11‹
cfro 3rd \R) 7rt1 ct,t) Ritit ffi0-1"9" 7"4" .[4) fti:444, 2010 *5 3W1T?
lZi 3utTr f'f~f13 \trick-Kr t
a.) "93u7-4" 4 Nitric 91F3t1R- \tm itAim24, 4R-d*Ncak t;
PART -
DELHI GAZE I lb:EXTRAORDINARY .3
3) "MUM% ci744irlinir 3tifti3TRT Vrta RM'aft aq MT-4r 4 fir 141, R:11-fi=rff \ILH.Thict)01 3e17
qr. cue)ucr(4-1-q-dr (3479- T404 tTzgrt t N4/1W flq1;q9I cI6cl -IcfIct)4z4 03/4 3/4Tr3/474 msr rffr
cry -1-4‘911-8 TRIT t;
"trci t1 zw44-err oiltrff i4cr4.9 *--tigr-fif 4 aftrgrzr ucrtr4tfWr 3I1zhir saki arm t'irt
gftwgro trn(341 -4A-4-) m-Ta-r4ddi atkrrtThm.PTuaT4a1-in R73IA cm') aTcr4 Nite
fk-d-or 7r-4-449-rftzilt. 3Tfofcarf+-4f aFa- v;rrth 4 MA41- $`'r arriit ct) *14);
ur) "urfesic< 4 co14*crt 3feTqTP419 f3/4-CaT 3i2.rar pia sTewr v:rittrim-r ffi-t-rzr, t4I, 3/4 firfir-d-ol ar2T-o-r
31-4-4rttrrlitrw.arit zrrf4a.
"incix w1v4ui" 3Tf Arta &O FT NI W11- 31Tbl" (3in) 3T-gwf:47t t 41a< 74\e , .<,4 4
cm.l clic) ft01- cr-ocr-7. 61411;
"aA91-44 aRto" aftrgrzr aTrf* Trezrarzlitt-41-31-t-t-r-49- s 13rrfk'ft4R cfre) GIN
.thus TO-MA- ffi7 arrtrr tit:if elms;
q) "ter* t Tim" 31f gra 4-Rzr-er-4 ttr41R T2fr 61 1 slw-4 f v11 cl la 141st) t,.,IS T1-d1 ft- t \it!
ftRz4 4 6191, RRe#N-II k 3T94- WC au°+rl=r 1 HfMr-dur 5 wi 4 alto f45zir Tim t Izro- 1i111 --Icilc001)41
thvl Ttrdit ailtrry \10-IN-1 4)-q ) -51) 4 f -circ Faft -wok - 14cZ14i. stv-4 m-r Tot ‘711., 5)411
T) "-Icfignufici .iivtixaci" 4 ar -R114)011?-1 Ttr-di 411* ffiga-, cil% 4f, 1971t73/4\916ct)ei
Riftd- 7:1MIT Trkt-9-4 Qiffika"t, ‘ 15-\1041q--1, sf 3r2rar 3161-1 31rfft EKTPA dtri
3T-" Tticif 7179-3T17t 1-1I-eici I 31VIT A1171- t;
1) "-icligroliki W4T g1@ca (alb" Rk 3TRITITTI IClCnrUIl thwI WR)- 1 d1 R31-41" f7 WSTWIt-
S-4-4trfiTerr 6q t d‘s 86 5 \14-d5 (1) $2t crcritylg.) ci lia RP LA at-4-J -ItfrR-d-
aff4-40-dr tit;
1:0"Thri arlirmor" 4 N-141A-rir vrtIrzr trr-dt \,(i) t ffiRk **1 arrthrr 9N1 W3/4. faP4,4-4
05d yvflt o! cht) Tarr wpal col err cN.) gq Eft:I'm-TA' col 3TritrtifW cl I 3i4F
tIft7 tt `Mel Th*gqffirift71PRII
r6)"Ilvei" 4 31-friffizr R1-r Trarrt gti f t;
) "af' arlifcrrzr R-44 citi t
qrR7-4- 31-ftrarftzfr, f9-m-rI49IRA?-14-4 urreFr fszrr 'RH ttrR- fk;t- . Tfi- RN9I 4 trfoliftffrigi far
ICI t, f afrch gm wt. Sr aterg-r P Rgi}114f LIN Act i Tarr r gbll 3Tfluiu arerqr qrJ 3re1
6 aretq ara afrztrr .1-14i aTf r=r aTarq RN.r).
4
DELHI GAZETTE:EXTRAORDINARY
[PART III
3.114 4cif :
ff4441;4-icid ewo F1:
(i)R-rttzr7r-Atir41- 4)--ift4, 1- 4 col <1).) 41cffiuialit;
(ii) e-4 41 41=4a" \i44dicool 4r-a-
t;
(iii) 4-4 iftrqa" Err zcrwl-cd-r (31.174 7-444 cot 4-1 ,0 -1: a vd ~wf 1d
*1-1-47- Rk 3TftW tiracPicr 1:117*
1 4Trrare &lilt rlira.-TV51
ch<ufl1T S41
4. tic lm'u Ozf ci c4:
(i)11?-4Th'kfszEat Thcfit/TR:24T tei 4)4 M1:4?q" 06i To 31:111'17T ffitlif*?1Wf mot S
ffi-c ichcooflq Tht 4 fka (Wqr.itici 1-41tTf1 14r 1*41i c11f10I 4 f@ii t, v1l f 1)C 1 l cl6c1
ff 6) 411
lik 1 cPI 1 —3K4 311141. .1 4)1u ti \vlf 14 cI. (It4tilteT i 119cpat Tel
■tmi * &TM) *WI' (laxIonf It SAtfinci rticim RTIT
qt1
(1 ) (2) (3)
2012-13 0.15% 3.40%
2013-14 0.20% 4.80%
2014-15 0.25% 620%
2015-16 0.30% 7.60%
2016-17 0.35% 9.00%
9Ye-1
L11-11 7(1) 5 a6cl -41 a (1R 46 Wqrzf T-aft itC414 1'47. 311.0 ftdRur
t) tg thvit, f -fr4 4,{ awl iii s-rrfrra- t, T &I-- 734-Fal-R 4 t Tr-4 thvile
g)ei crwid 3T£ , iI \3ccf53ric r <oli 01,10 tftEu #161.*'fr I
t2
vi6i no c2414)410 ucp4-t--dr34 allizff ricilcoonzi i:rtrrtf4-g- \Jc-Lii<-1 co qq)icti Rmtrrt 0q-
cWrdl11/c0P{ 5NI SI*1-T TEbtil Th-f #41.T t, li 1TER* t 3tifffc.OGIN411 Virra S *tow] wart \Jr-liqii
arrtrreo.161-116-1 N aril"11Ik1 ctre) q1.4 RT41 TER-44791 R-wr % 41 i 611
zit ilscri Tat t{41. &Mt \iwp-idiWfactii5-11. e3.11t-ci chitTt-t-re- q-rtttfr
#
DELHI GAZETTE:EXTRAORDINARY
5
44111 R*91 k ai-dim- wrrferd- Tcyi afriFfAs \3(-414-1 T,44itu *ft kftrd1-1=4-dRurmr400e4-
wet Zridati1121T4- k 10 vedtff 3T r t, c Z 3Tptrr lb 3T 15 fps -ErztrTrldc41C.149-Tur4-1-ff7R. fo-dm
aairft41 3TREf1311 411 k)- ct) *NV I t
4-4-0f ale thuil ricflq-Nu1l4 fk a-red-kr cnicriii 2 4 ffildftd. fk4r 1R11 t ti 4m1
3trzuftff \30414-1 4-ft to ft4T \YIN;
Wr4
Zae t f -Altont' ag.4 iftr - 44fird- 4rtzrkill- kEr4'ri4mT NI ETTA t 370 %7
ter:t ricilcouN4 dTV1S l4- WI- wok rsnu, eIR c01$ TTPN- 61.11,
4`41.4 Z1 lit ft- ftur .a-r44-pwrtt (rtITR21-1) q Er-0 4 tr *14—, ath argitit ffitid- ctg-1
CNN (CtM) c16c-I rIcnctrOng \tArli TM' tr R-g- kr cm z9-a 4-d4F bur rico 'War \AIM 411, T•111" ct)N
(cr) ) *mid- Tei axa ffitfrftd- llfc1sic10H 03tf i1
(2) ckr .W.W---it Th-citRtrRAT 3-74 R- zi i \304 gki 3T2MT (or-400trThl)r (ldi) 4
fiza k 3j2wricntonzi (1491u14) arap-r \3,-rd ftm-eicil 4 0 WI- It ~ftT1~T=f
sa 1r1 aTE1-4 3TT-4-34 col 171- mtiti cnli 111 fta- kR-R aflzhrr 3T 7R t fkErr
tt 71711T1
(3)(i) Li6 arptiT fta- c i crm . (dl117) co di-Erf-• cqq614d1 ftk-Fai arrzin Trq-47
31-T449- 1141-9- 4,) ,11 I
(3)(ii) fk01-.-N-NrE q Eiti-rd- airMk t161e4c1r3TIMI13iitrt-T-49- kftel 3ffik 311.0ff ftw
5PLI dind (711n) cr -I td- q1=h7qE1- 3TRIRrff *cid: 392t-49- 12+-Trr JIII
(4) 174-4-fftIlt 3N# 3T11-0- 43-1q (at) 4 dci-iiticodi qpd \Lcizi •r2,1M- AN) 41-A" 3T21-41?-d- urn k cl c1
th*EIV col 4-41 ‘311-) \thvii 4 f ca 4-F-d-r arrR- sty-4 TI-EtT It Z*1 arRhri
ep- i 85-91. wit -REM PR7- ath 34Er41 4-40w. 111 fi1'11/cna I
5. 3TRIIIT*WkWil*Cieri
(1) n RI;tHi1 k f*a- fk4ET9. 74sic11 c1601, ---41ZT124cd Rf;e1Hci) aTptir cmu \_+,31 .1c414i
'1CflcfrU \31\31 114-11u14,1 cb) I k4L4 \A v cN.) R:itft Th4) .ftrdZET, 2010 *5 0150
cfro e4 thvi Thai f 1R3E-41T4 qrszrm-rtr -Tri=4-c11RiTarr311 Pre4Rci
el-41d Sul cnl tiRr cot) k b0rtri. all I
4sil ft 4rarkrtr LIR wituima sm qki ri coo zi st>el kR RA- t, al9-41k-prett4
thug v1a- c i •ot-i =1 tiR thvri t afrtulta \30414-1 4 f47-dt ple4 41firra- col 4Kiel ,e& *5 snza qm et EF
i*zir er r t thvif areditT-d- 9-4kR44 X11 & arrzuRd- \30414i1 f f471 crx-I TRreq.
111-11u1441 sPLI 9N1 g11:711ZIT 1- •e140c11 t 1
3759 c7//2 —2.
6
DELHI GAZETTE:EXTRAORDINARY
(2) *.ti am* 5Ni \Hi-RI-797 ER' 1'47vili ulrl ffite/T i 39-P1R 4R-4-tit 'Thu1-41/-0TP-if, T1" 14N9ll 31sT cr
I~lcrNullq spq4TRIC4- EiRT t*I fc T fl 349114 Ut..‹ RtOT 4 .--dVu Rs-d- RAzw-fcr) afrzkit
(-1,11crpolli \th -1,11cpv114 41-11u14,1Q1-1(reICII CP' TOtirstd Cr411;4441)
Rfika#, 2010 t 3TTTR Thi4 Th--7/174 1 1
(3) Fl fr4zw# arr(R. vRzim-r-tr Ere'quItTR2Tra# qki REF t. fafz4i-i uttk 117 PTIFF191 1@LI tt-rt2:1
311*War qki ikoNaErren-ar arrRwrart-rt turrgiffiRttRwraiiqm 31rdrEr vE-11c-tMel1 v1N411
6. 3Tfirm-iut
(1) 415 arrerEr ci6c11-1 cool Th-74 Wm-F.4T 311t' Th< c uflt4.fiw1uf.ulmiiarl Cnl
auftStivzidi athR7171-ftt#F6- Rwrarfirt-Rurtt)ti #it-0131-Ftwur col ffizi-qd- cr) ,11
(2) 46- aftwur *,(-1 &ROT qm \TO ffitc41, i aTTTR 4)0 *if atIR' Th-44 METTfaeil9c &Ott
(-icfkoof1=4 3.).711 \30-11-1 \t‘yli 3117 \A 7R1 cot) Rt0-ft rj Mffizi'D'
f4ffizitr, 2010 5 Cl6c1 r aTik-t7ur era f ffitfrita- Eritzffalsr:rnztrli 3t ii 4)14
11 1
(3) q6 RT1' 31ftr-Th-Ruf Tho t.>lI \1041<-1 4)4 4R-4Th-ft Th4P4Z1-114T31):, v).1 fl a
arrft 1,4) ftfk-- Th-dsf f4gftra. 3litth r1 cr)1 crN. \34qctri Aelcriim Irf tr c3 a 3th ter
4itzrm-t $-Erf -r3# athEfra# 744 . 31TITF-1' 4Pcnct-i tf'7 WtRp-d-r m-r *item cr. I
(4) Tal' 31ftr- ut M 94R-4-Thrt murfAzIVPRauti fluoping \31\11 WW1 'MT alit:WI 3T-IERF9' Th7
artthur Tezt- #w #-441- &raw ui 3TE0 Tura -q41t9' 317* qv Er- fTh--zrr
(5) 6t1 RT9-r cRz)T Anr-t-rt *ErtRtferr NI 3iftilif-S tftEff *'e err ariSit itzrrftir Tam" tr
cbpJ \tnyi - C-16c1 ittrrTrzrr -Rficoollai \tm?crrcrur S 6l III
(6)416 vwt attr-t-RETA-Rzr-t-ttlaiirkfzir3iiqm coo spq d2Ra ar-Trr-d9- R.4.201. 4 TT 374-Er 9Ni
-WO-a 314r tw 3th Effple afrihrr Ohl wed- Wit Tejo. m-3Err 3th ,44 soq 11:474-
si-lcrra-9T2t 31-RtRr 33-rquit garrth-, 7-rq Ift 9 I I
(7) TO. 3ilz[l'ff 3TMTTIli Thl 3444 Thizil Th7 c-tA ffi7 EITik3TftiT ark WITIt Thl" 11i-14-‘94-14 ER 1-1`79'
Stn R:fRQTrail ciAA441.“172-Tra414 '9"-+71- q-+09.- t wcnir
(8) ziR 31-011' t -1*R-rr aftm-Rur 3R4m-Rit tioltwirict) 'too tr cry(4 431-4R t, 4E- 31-rku
qi.(1,3thmthuh:1- facd- 4q.31 cpt)k.sin ,<Nti aftiTh-Wr 4 Thiel cot) 3T T \it-tTm RO4t .4-1 -Totr
4o,( ,6001 t
PART III]
DELHI GAZETTE :EXTRAORDINARY 7
7. idol cii*1 :
(1) . Ac w-44-etTrt ant qki
(cafRal-R.) 31-r1 - autrrt qist cou
if!
RP=44-1 argrrR- tftwizlite m)veci 3Tra-d-1
q mq tt Ni i Tht dLiTto wrialieeffiffrff
(2) '147- snq co•q . 31-2M"ft-cja- •9- 34,4-qr ,euzi cfrt if -141ct) ufq thvl #-
\3,Q1?S \II-le-16E4d] ftdvot al-OR:rat thkif i=r1d14 sm affb-wr 9111 m-tvl crpo)
tMq-uti creThil t at--TTRum-c<RFttrif I
8. 41 ZIPM-dT ORM 401) 4777140- 311-41-1-49T (8TIriff cotrix):
(1) PT.-4- 1M- um-11-q-m ath Tqd- 4 um4-qm 3rRefte4 vr c r c c Tet ucr'hIr 3tk
TIsEd'i 4 thuti TR3r4a 4-411. 31Mq itqw mfg &RIR rfV•R9T-- 30 3Taa"Thl" 3TP-M7 370 LT-0
mpg aTftrt-vul m137-÷7- c0411
(2) *id' um-117qm stk ?a- tr-0- 741-qm 4-4 faP=491 4-AA 4(1) 4 \3 cet divN iclicNufki \5,vit
*mew \twil Utrkiii 3P-Matcr4 tc4 31:ritirr 9-cnctr<unq fRTI:1?
VW -116d cr4-45, i3.1i1U1.l? . 61N t atwchtlwilw4r4f4---R ftzur vIITH qR aff 3P-11-49Tai k TIT]. cfr
3m-11-4Trr 49- fake-11 1 term 4(1) 4 \IRreiR50 4-11-1s m1 Lg<i cot) 4 31-442.1- •<6c11 cirri \31 11 317117
ata- Hill evil gqq1;qpicnir4Fm-rigtrm4c01 61iii
9. icnctr< .inur wr
(1) me11 314f k,' -cmcOr 414 -I ct-Nu \Inv' 1 1:;r4-i- fq--rci- I 6 , 31T-thli1Tfl
3.41dPlcA Th-Prt tfttFidkH14 ittlita- tftuff ffittfTtr tk-r4-11 31tf919-1, WIT '‘LI Re1)QI'll na- lta
t ffitturtg 347441a-z1gurr-dla att:rmm
(2) 38tFIT1 titcff itt---o:r Th7 tiq-1 cnt) 4Fdt qftdluril3fl col fq-tja- cM cNN er thrar th cico 341
*IT te'Ll ffilttRur tR-G-11 Th-1T-41V-€19T 61411
(3) tit' 9-4t9- lcnctionq .3-nril LIN vh-ii ft-dRur MtORTZTT# 3Ter4T tr-0- 3171#Cffl, 44P41414--dr tr MEP
cpei ervcN-) 4 mac \39TI-0 11-KrfttirRur ail mr zl?-4-1 3Icr4t Lltk ct #Thtt t I
(4) ri ct)u 7;h-di 4- ftwArt mgr c.t) 3744-T, 317871- 11<1Vilizr-\99q ftrffc criiti-
R4t TIN 3rRicii311 et R-419-1 (torero- l l I fir, T47 TIM 217 4 ricrictrollq
attcp q.--'441tTrRI-eqtrr umortr 4)014 wctlit
8 DELHI GAZETTE:EXTRAORDINARY [PART III
9td. 1- 31-Freft ctrO04 thvI1 1-V4Sc uf1 I1 wfgd- cr).) 41c1 ar End-4 94-a.: lb-4r ath
-i Ere. Th-T r Wror crw11 * 1,111r1-1 31.4ffi WI'EA.9112f nit lErdT 2u, th-dRUr
"ftfrd V-1 tt 8-1e1)10 ere Om a N-r-4-41 Th-F trei MT. f91r um evw Tr7
7r:r 544r9- 611
9Ye 2- "itET 044 tizilrAd *tie Rieda 3thidt141E1 1,0'1 t f TurftdRur 'Frei-€vt R:Ptrc u14(at4
ar-Kr-ar \t i1 aircr--d&( Tra. coil 4 •-c4-R:1-A-4 4* Mind, Ifs ci 46t,Rzfou ts14'kdi fez):
T~lcn~ti0z1 q'r--d'r efm-Po. auck-Mm-Fr \HP-Aci l 1 t
3- ---417:r artzrifr*& 3T4R-fff-ti --1-41cno1141 thvl pi EN. (urrpr LIA 6 -q,-iO4-1 3t IFT,m--1 3T-err
Itktiftu ctroktiv R41:14-TP:RE ER ta 31-13.1 3th th-sR2713.4Eff '20-Cd 4 ctr< tict)(11 t
10. tic i4 tprradtrt—dr:
(1) arltscarRa- wrd-r arm- fv R-11 thv1S 4 f4-A-41- R:0-ff cot) q-rt Scr-41-Rtf2rr tt ft--01
mr4tutTr 4*TOEfor w114t aT2wr ftdRur murrdt 3P2T41 thrr 9-11,1 t, c1U ?-0" tt 3th tri.
qifaiRn.ict) wukt-r 61.) It \yid cicil #114 R*Trr, 3jU: RciteT 74a61
ct-PM211 I,
(2) 3i7: RT-Eq- at Al 1113qam 394 wRIP:r ftsa f 5ttivti 01.5 r1 ID4-124415 ff
14cD2 4r9-4.m-r 347-r-o-ff -Rb-zrr viN4ii
11. vm-Tqfkurr4:
(1) iR 4Tzzim-r# ttrti0Tur Mr4zritr 4 fkq- Trq- lcficwo ei cm arlI1rca r f #1 5'lo-r ft4-n ctN
wt. t aft- up- rits1 51\ciatth.3112triTszr-t-t it Trcol Tar- fkfir r ftkzr '
* 41 3frt11rr 5NI itc ¶ tfrtr TFAff 3fR itzfr \TUTU; 3rptir 31-Rcf1311 1zfizi 4 311t 4)41
3th tai 3TP* ffie4Itsujar licre4 3trzTR Wr R-rftr rfkzfRtir ct), *Km t:
4.44 f'S**1;cm-Fe-Au r4ft uzzh-ri 3I-Rta*114t atwaTewr thAl 4r-d1
authrr qki fe.cw -ftke
4QTAR-11-f1it3TROF, faS=tRTfr144,7ffi-e-414-4-69.431ft4) '6N1414.41t1314fafff•t-ItsLII
itcp- fd*Fr4R01-q-m--4-kfm7R-r aftrT-Pir f ft 3rfirt-r0 col &RIF' qv{ ticmi
f7
.4T4 f Eft- Rfful" 7TeiT11-101311zhrl 9ki c 'Rift ct)), 14-kff ft7 15 fd-9- itr-d7vl9I crm
aiwrcet 86c1116 3Tcrt.a-rt44 srdim-r \iceitm crwil 1
PART ml DELHI GAZE :EXTRAORDINARY 9
(2) ,m6i 4rsziet1 *-4-411-#Rwr ricflizoolTh thvi Thth R:1- 04 e Nerram 3m-4r cfro \in,31
wzrrirr 411. col ut-.4- dtw r f4e4 ct).) aRTEFFTe-dt t a'r 46 Tq 31fiTikalT tff 142 k cl6c1 34*
44F tiff I
4sik4f.crlirm-tT9- (1P-Ilul 441) *1" 3TT171,4aT 5 MTRui -400 st-g4 .r.ftiw-taiwrra44c1N-c-ifacomThit 3TT4
qY 4ftzret *9-4MR:24-r 31-Rr'rir 3T-fr1a4 3T' A" 41t ct*) 3Trn-g Rrtdt t I Tun-,
\i3i1 1k \111-114 3470- 44*14-11?-4)10 rigiftzu \YINill I
MIA fk 74 3rptir 4 3T-1-4179' 3T1444M-71 3T 4$ crN e•Trota. fkrizr4 ereil
11(1) .1741.TF 3T2T4T 4\9 31N1ffizirf k Riff 142 TIT4UT9-Th-Tucizn-Tr W(iT ANAII;
(3) TA' 41 t "th-crtRiTalT itdRuf 71-447uift t, *1- 31T-414 5 kl 41Vit7tr ttF4t/tTP-TT 0411q <,5 wrl ‘99=1
•d■teci 31-14McOdltrizzrrr 419IK1'l>;lf54TTvtlyll I
12. 391:11F9' ritraf0 a -IMF*:
(1) ziT 3rrztr4 3TTIT79.-e wiu 31'1R- Rqsrt Thk t19e1-R144 urtrue ef4g-ar
cry ticodi *I zi61441W0fal-PIIttcrriki 11(1)t (16d Rif7U$tlffiftrm-11v9iPid Itr*Tr
(2) 416 1-1•Ni 1-1t. 31‘247r Lt 4o4 ftRT4 f4-ea 312141" 3t1R- \A11;q41 Oft.
7U4 clic) wet 6P
13. IF tt
q6 34Z1FT, 311-kff 5k1, MR:174 ft" Tt %-7 V11 CI I Th-N* q, alk-cr4Trou 41c Th-T 31.4TR
1' wl4 3174 t44 1 cc114 3r2wr f-R-ft aft 5NIT:r. 1941- Arld" 311449. 31T4R f4r4491k ft.+11-
crgar-f'1},gr, k ticodi t
a *NM 'et $T11:
4I6 3T04 wfi- 111flrr4 41+-14I-R9-44 4Z ,1 treced4, f4&-49, 3TR4tT4, RitT9- 31.2141
ffiTfF TR. tIcPclit I
15. cratii*tii ctn.) $1- :
(1) itffizg f+-Tit crr4t1T4 msr cN,) =13T1k 41t ftRit T18-9-rt liTrA =1416 afROr, airkw qm,
M-awr-a-r-40-€9-11t, 4ftrau4144-d-r, 301147 4-0 744Y-4-a-r col uftd- cot) t f \34Tt11
Mzi t, 3ritif444 C11 4%1T91 37E75 e, sTrztrr cr'1 4 Tht *19 ILti cot) t
f 3TF4s414) 31.2,14-Fol146Pc0 Irdtj 6 A' I
.s-41 t)(1)12
10
DELHI GAZETTE:EXTRAORDINARY
[PART Ill
(2) c0)$ Th-rft, 11-d-RDT 71-44FEITt1, Rt 311114W111, Tr 31:11NW 4,c1-1 &OFT 4 31T3/444
7t RiL111I c0) c1i1M-R4 4 374 cn itt Ted9 m-sr (19141 cot) ft.q• uiziwd" 3TrkZ1110-c1 Th7
VITat 1
16. AIM:
(1) idILII-1 ti k44 ct*) 31"4qT 3fru11T *1 3:rfkrr k5 gicrtnTr zumo
44lwis 10ttr3fitzi 3TR*TF VT Stf4a- 31.2T-4-rzrelTTreffttt
(2).3TP:117970 St WrEr trftft2f4 Famt *1- Oft t 4-19vR- 3tkffittid- tit. \ Ai 4IClwail
411:a. 3Ter4r TrFre 4uf1 tRTharrOTt cot) tg 3T1-0qch 3Tewr anci6iRot11-1*101 ttwi.ft'Azrit. 4
s) 4\11 3TR:hTT Th"). ftp- S 2003 (44 2003 TT 36) 1,11ciwri) 39-4TR ;11"P:if,
fM:r0 1*-4- 371-4%119- 4 ftini el, 3TENT4 4 nit arra 1
(3) ftikErril 4 \ T-65. t arrzhrr wzi- 4 arum ata-g-ft-d ty 4 itt 47:0- lI4 c0 t)
312141 itg.31M441T 2003 (c1 2003 TT 36) t 060 f$At ¶T 3c0/1 cot) 4 fllTaTT-dtt, 1 icw cr)
ffi.r4zirflz117 ftc P 3T z.15 3I12t4 TWA', Zfitz14, Ti*T 14r qe TR.
t
trfc-q, 4F-9a
PART
DELHI GAZETTE :EXTRAORDINARY 11
DELHI ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
Delhi, the 1st October, 2012
DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND
RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2012
No. F. 3(292)/Tariff/DERC/2010-11/3026.— In exercise of powers conferred under sections 61,
62(1), 66, 86(1)(e) and 181 of the Electricity Act, 2003 and all other powers enabling it in this behalf,
and after previous publication, the Delhi Electricity Regulatory ComMission hereby makes the
following regulations for the . Renewable Purchase Obligation and Renewable Energy Certificate
Framework Implementation:
1. Short Title and Commencement:
(1) These regulations may be called the Delhi Electricity Regulatory Commission (Renewable
Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations,
2012.
(2) These regulations shall come into force from the date of their publication in the Delhi Gazette
(3) These Regulations shall extend to all the areas under jurisdiction of the Commission.
2. Definitions and Interpretation:
(i). In these regulations, unless the context otherwise requires,
a) "Act" means the Electricity Act, 2003 (Act No. 36 of 2003) and subsequent amendment(s) thereof;
b) "Area of Supply" means the area(s) within which the distribution licensee is authorized to supply
electricity;
c) "Captive user" shall have same meaning as defined in rule 3(2) of Electricity Rules 2005;
d) "Central Agency" means the agency, as the Central Commission may designate from time to time,
under Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance
of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010;
e) "Central Commission" means the Central Electricity Regulatory Commission referred to in
sub-section (1) of section 76 of the Act;
f) "Certificate" means the Renewable Energy Certificate (REC) issued by the Central Agency in
accordance with the procedures prescribed by it and under the provisions specified in the Central
12
Electricity Regulatory Commission (Terms and Conditions for recognition and issu jance of Renewable
Energy Certificate for Renewable Energy Generation) Regulations, 2010;
g) "Commission"
means the Delhi Electricity Regulatory Commission as referred in subsection (1) of
section 82 of the Act;
h) "Distribution Licensee"
means a licensee authorized to operate and maintain a distribution
system for supplying electricity to the consumers in his area of supply as defined in the Act;
i) "Inter-connection point
"shall mean the interface point of the Renewable Energy Project with the
transmission system or distribution system as the case may be;
j) "Floor price"
means the minimum price as determined by the Central Commission in accordance
with Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of
Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010, as amended
from time to time;
k) "Forbearance Price"
means the ceiling price as determined by the Central Commission in
accordance with the Central Electricity Regulatory Commission (Terms and Conditions for recognition
and issuance of Renewable energy Certificate for Renewable Energy Generation) Regulations 2010 as
amended from time to time;
I) "MNRE" means the Ministry of New and Renewable Energy, Government of India;
m) "Obligated Entity" means the distribution licensee(s), Captive user(s) and Open Access
Consumer(s) in the National Capital Territory of Delhi, which is mandated to fulfill Renewable
Purchase Obligation under these Regulations;
n) "Open access consumer"
means a consumer permitted by the Commission to receive supply of
electricity from a person, other than distribution licensee of his area of supply, who has availed of or
intends to avail of open access;
o) "Person"
shall include any company or body corporate or association or body of individuals,
whether incorporate or not, or artificial juridical person;
p) "Power Exchange"
means any exchange operating as the power exchange for electricity in terms
of the order(s) issued by the Central Commission;
q) "Preferential Tariff"
means the tariff fixed by the Commission for generation from various
renewable energy sources after considering capital subsidies/GBI/Carbon Credits, etc.;
r) "Quantum of Purchase" means the share of electricity from renewable energy sources required to
be purchased by obligated entity/entities, expressed as a percentage of its total consumption, as
specified in these regulations. The quantum would be the sum of all direct purchase from generating
station(s) based on renewable energy sources.
s) "Renewable Energy Sources"
means renewable sources such as small hydro, wind, solar including
its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and
such other sources as recognized or approved by MNRE;
DELHI GAZE 1 1 E : EXTRAORDINARY I PART III
PART Ill]
DELHI GAZE! : EXTRAORDINARY
13
t) "Renewable Purchase Obligation (RPO)" means the requirement as specified under these
Regulations under clause (e) of sub-section (1) of section 86 of the Act for the obligated entity to
purchase electricity from renewable energy sources;
u) "State Agency" means the agency in the National Capital Territory of Delhi, as may be designated
by the Commission to act as the agency for accreditation and recommending the renewable energy
projects, for registration and to undertake functions under these regulations;
v) "State" means the National Capital Territory of Delhi.
w) "Year" means a financial year.
(ii). Words and expressions used in these Regulations and not defined herein but defined in the
Act or the regulations issued by the Commission, shall have the same meaning assigned to them
respectively in the Act or such regulations issued by the Commission.
3. Applicability:
These Regulations shall apply to:
(i) Distribution Licensee(s) operating in the National Capital Territory of Delhi;
(ii) Any Captive user, using other than renewable energy sources exceeding 1 MW; and,
(Hi) Any Open Access Consumer with a contract Demand exceeding 1 MW from sources other than
renewable sources of energy.
4. Renewable Purchase Obligation:
(1) Every obligated entity shall purchase electricity (in kWh) from renewable sources for fulfillment of
a defined minimum percentage of the total quantum/consumption under the Renewable Purchase
Obligation as specified in the Table below subject to Note 1:
Table -Defined Minimum Quantum of Purchase (in
%age) from Renewable Energy Sources (in terms of
energy equivalent in kWh) of Total Consumption
Year
Solar Total
(1) (2) (3)
2012-13 0.15% 3.40%
2013-14 0.20% 4.80%
2014-15 0.25% 6.20%
2015-16 0.30% 7.60%
2016-17 0.35% 9.00%
[PART III
14
Note-1
Purchase of renewable energy including solar shall not exceed the total cost of renewable energy as
given in ARR under Regulation 7(1) for the obligated entity (if it is a distribution licensee supplying
power in the GoNCT of Delhi). Any cost in excess of the above shall not be a pass through in tariff.
Note-2
In case of any schemes introduced by GoNCTD for promotion of Off Grid renewable use/power
generation by individual consumers, all installations seeking to. avail the benefits of one time
capital subsidy or generation based incentive under such schemes shall need to register
themselves with the State Nodal Agency who will issue clearance for their availing any such
subsidies/incentives.
In case the total off grid usage/generation capacity established under such schemes exceeds 10
Percent of the total RPO obligation of Delhi Distribution Licensees in the relevant category, the
Commission may re-fix the RPO obligations of the distribution licensees taking into consideration
such off grid usage/generation capacity.
Provided that the Renewable Purchase Obligation from solar as specified in column 2 of Table 1 shall
be fulfilled from the generation based on solar sources only;
Provided further, such obligation to purchase renewable energy shall be inclusive of the purchases, if
any, from renewable energy sources already being made by concerned obligated entity;
Provided further that the power purchase from renewable energy sources under the power purchase
agreement(s) already entered into by the distribution licensee(s) and consented to by the
Commission, shall continue to be made till their present validity, even if the total purchase under
such agreement(s) exceeds the percentage as specified herein above.
(2) Every obligated entity shall meet its RPO target by way of its own generation or by way of
purchase from other licensee(s)/source(s) or by way of purchase of Renewable Energy Certificate(s)
or by way of combination of any of the above options. Any Long term Power Purchase arrangements
shall be made only with the prior approval of the Commission.
(3)(i) The Commission shall approve long term PPAs on case to case basis.
(3)(ii) There shall be automatic approval on year to year basis if tariff considering capital
subsidies/GBI/Carbon credits etc. is < Average Power Purchase Cost (APPC) during a particular year.
(4) The Licensee(s) shall submit half yearly progress report to the Commission,, on the capacity
addition, generation and purchase of electricity from renewable energy sources in their area(s) of
DELHI GAZETTE:EXTRAORDINARY
••
PART 1111
DELHI GAZETTE : EXTRAORDINARY
15
supply, which is used by generator itself or sold to the third party under open access, and also post
them on their website.
5. Certificates under the Regulations of the Central Commission:
(1) Subject to the terms and conditions contained in these regulations, the Certificates issued under
the Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of
Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 shall be the valid,
instruments for the discharge of the mandatory obligations set out in these regulations for the
obligated entities to purchase electricity from renewable energy sources.
Provided that in the event of the obligated entity fulfilling the renewable purchase obligation by
purchase of certificates, the obligation to purchase electricity from generation based on solar as
renewable energy source can be fulfilled by purchase of solar certificates only, and the obligation to
purchase electricity from generation based on renewable energy other than solar can be fulfilled by
purchase of non solar certificates.
(2) Subject to such direction as the Commission may give from time to time, the obligated entity shall
act consistent with the Central Electricity Regulatory Commission (Terms and Conditions for
recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation)
Regulations, 2010 in regard to the procurement of the certificates for fulfillment of the Renewable
Purchase Obligation under these regulations.
(3) The Certificates purchased by the obligated entities from the power exchange in terms of these
regulation shall be deposited by the obligated entities to the Commission in accordance with the
procedure prescribed by the Central Agency.
6. State Agency:
(1) The Commission shall designate an agency, as the State Agency, for accreditation and
recommending the renewable energy projects for registration and to undertake functions under
these regulations.
(2) The State Agency shall function in accordance with the directions issued by the Commission and
shall act in consistent with the procedures/rules laid by Central Agency for discharge of its functions
under the Central Electricity Regulatory Commission (Terms and Conditions for recognition and
issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010.
16
(3)
The State Agency shall develop suitable protocol for collection of information from various
sources such as renewable energy generating companies, obligated entities, SLDC, chief electrical
inspector etc., on regular basis and compile such information to compute the compliance of RPO
target by such obligated entities.
(4)
The summary statement of renewable energy procurement and RPO compliance by different
obligated entities shall be published by the State Agency on a cumulative basis every month by 10th
day of the next month on its website.
(5)
The information shall cover renewable energy procurement by each obligated entity comprising
renewable energy procurement under preferential tariff route as well as renewable energy
procurement through REC mechanism.
(6)
The State Agency shall submit quarterly progress report to the Commission in respect of
compliance of renewable purchase obligation by the obligated entities in the format and within the
period as stipulated by the Commission and may suggest appropriate action to the Commission, if
required, for compliance of the Renewable Purchase Obligation.
kt
(7)
The Commission may from time to time fix the remuneration and charges payable to the State
Agency for discharge of its functions and the same shall be recovered from the accredited entities
and the obligated entities.
(8)
If the Commission is satisfied that the State Agency is not able to discharge its functions
satisfactorily, it may by Order, and after recording reasons in writing, designate another agency to
function as State Agency, as it considers appropriate.
7. Distribution Licensee(s):
(1)
Each distribution licensee shall indicate along with sufficient proof thereof, the estimated
quantum of purchase from renewable sources for the ensuing year in tariff/annual revenue
requirement (ARR) petition in accordance with the regulations notified by the Commission.
(2)
Despite availability of energy from renewable energy sources under the Power Purchase
Agreements or the power exchange mechanism or from its own renewable sources, if the
distribution licensee fails to fulfill the minimum quantum of purchase from renewable energy
sources, it shall be liable as per clause 11 of these regulations.
DELHI GAZETTE : EXTRAORDINARY
(PART III
4
PART 1111
DELHI GAZEI IE:EXTRAORDINARY 17
8. Captive User(s) and Open Access Consumer(s):
(1) Every Captive User and Open Access Consumer shall submit necessary details regarding total
consumption of electricity and purchase of energy from renewable sources for fulfillment of RPG-ori
yearly basis on or before 30th April to the State Agency.
(2) Captive User(s) and Open Access Consumer(s) shall purchase renewable energy and/or
Renewable Energy Certificate(s) as stated in clause 4(1) of these Regulations or generate renewable
energy for its own consumption, which shall be considered for RPO purposes only after certification
by the State Nodal Agency. If the Captive user(s) and Open Access consumer(s) are'unable to fulfill,
the criteria as specified in clause 4(1) of these Regulations, the shortfall of the targeted quantum
would attract payment of regulatory charge as per clausell.
9. Renewable Energy Pricing:
(1) A new renewable energy project commissioned during the operative period shall have an option
of following, either the tariff pricing structure, as may be stipulated in the relevant technology
specific tariff regulations of the Commission, or adopt the REC mechanism for pricing of the
electricity generated from the project.
to (2) Projects which opt for preferential tariff shall have to continue with the same tariff pricing
structure until the validity of Power Purchase Agreement ceases.
(3) Such new renewable energy project shall exercise its choice for selection of appropriate pricing
mechanism prior to execution of the Power Purchase Agreement with the distribution licensee or
with open access consumer, as the case may be.
(4) Open access consumer receiving electricity from renewable energy sources shall be exempted
from the cross-subsidy surcharge determined by the Commission from time to time to the extent of
RPO. However, no banking facility shall be provided for supply of electricity from renewable energy
sources through open access.
Note 1- The REC mechanism entails pricing of two components, namely, electricity component and
renewable energy component representing environmental attributes of renewable energy
generation. For the purpose of the operating period, the effective electricity component price shall
be equivalent to "Pooled Cost of Power Purchase" of the distribution licensee, whereas, the price of
RECs shall be as discovered in the Power Exchange.
Note 2 - "Pooled Cost of Power Purchase" is the weighted average pooled price at which the
distribution licensee has purchased the electricity including cost of self-generation, if any, in the
previous year from all the long-term and short-term energy suppliers, but excluding those based on
renewable energy sources.
'7;7 Dcal /2— C
18
DELHI GAZE II E: EXTRAORDINARY
(PART III
Note 3 - The Central Commission may, in consultation with the Central Agency and the Forum of
Regulators, from time to time prescribe the Floor price and the forbearance price separately for solar
and non-solar Renewable Energy Certificate(s).
10. Priority for Open Access:
(1) An entity generating electricity from renewable energy sources irrespective of installed capacity
shall have open access to any licensee's transmission system or, ,distribution system or grid, as the
case may be, and such a licensee shall' provide appropriate interconnection facilities, as far as
possible, before commercial operation commences.
(2) The interconnection facilities, whenever provided, shall follow the grid connectivity standards as
specified in the Indian Electricity Grid Code/State Grid Code.
11. Effect of default:
(1) If an obligated entity fails to fulfill the Renewable Purchase Obligation as provided in these
regulations during any year and also does not purchase the Certificates, the Commission may direct
the obligated entity to deposit into a separate fund, to be created and maintained in the manner as
directed by the Commission, such amount as the Commission may determine on the basis of the
shortfall in units of RPO and the forbearance price decided by the Central Commission:
Provided that the fund so created shall be utilized, as may be directed by the Commission, for
purchase of the REC and/or promotion of renewable sources of energy;
Provided further that the Commission may empower an officer of the State Agency to procure from
the power exchange the required number of certificates to the extent of the shortfall in the
fulfillment of the obligations, out of the amount in the fund;
Provided further that the distribution licensee shall be in breach of its license condition, if it fails to
deposit the amount directed by the Commission within 15 days of the communication of the
direction;
(2) Where any obligated entity fails to comply with the obligation to purchase the required minimum
quantum of purchase from Renewable Energy Sources or the Renewable Energy Certificate(s), it shall
also be liable for penalty, as may be decided by the Commission, under section 142 of the Act;
Provided that in case of genuine difficulty in complying with the renewable purchase obligation
because of non-availability of Certificate(s), the obligated entity may approach the Commission for
••
PART III]
DELHI GAZE 1 l E : EXTRAORDINARY
19
carry forward of compliance requirement to the next year. However, credit for excess renewable
energy purchase would not be adjusted in the next year.
Provided that where the Commission has consented to the carry forward of compliance requirement,
the provision of clause 11(1) of the Regulation or the provision of section 142 of the Act shall not be
invoked;
(3) The penalty enforced by the Commission on the obligated entity shall not be a pass through in the
Aggregate Revenue Requirement, in case the obligated entity is a Distribution Licensee.
12. Appointment of Compliance Auditors:
(1) The Commission may appoint, from time to time, Compliance Auditors to inquire into and report
on compliance of these Regulations. The Auditor shall also certify the fund created under clause
11(1) of these Regulations.
(2) The Auditor(s) shall be an individual person or a firm having persons with qualification and
experience in Finance or Accounts and Engineering.
13. Power to Relax:
The Commission may, by order, for reasons to be recorded in writing, and after giving an opportunity
of being heard to the parties likely to be affected, may relax any of the provisions of these
regulations on its own motion or on an application made before it by a person.
14. Power to Amend:
The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any
provision of these regulations.
15. Power to Remove Difficulties:
(1) In case of any difficulty in giving effect to any of the provisions of these regulations, the
Commission may by order, issue appropriate directions to any generating company, distribution
licensee, captive user, and open access consumer, to take suitable action, not being inconsistent with
the provisions of the Act, which appear to the Commission to be necessary or expedient for the
purpose of removing the difficulty.
ift
DELHI GAZE! I h : EXTRAORDINARY [PART III
any, distribution licensee, captive user, open access consumer may make an
mission and seek suitable orders to remove any difficulties that may arise in
ese Regulations.
16. Saw..
(1) Nothing in these Regulations shall be deemed to limit or otherwise affect the inherent power of
the Commission to make such orders as may be necessary to meet the ends of justice or to prevent
abuses of the process of the Commission.
(2) Nothing in these Regulations shall bar the Commission from adopting in conformity with the
provisions of the Electricity Act 2003 (36 of 2003) a procedure, which is at variance with any of the
provisions of these Regulations, if the Commission, in view of the special circumstances of a matter
or class of matters and for reasons to be recorded in writing, deems it necessary or expedient for
dealing with such a matter or class of matters.
(3) Nothing in these Regulations shall, expressly or impliedly, bar the Commission dealing with any
matter or exercising any power under the Electricity Act 2003 (36 of 2003) for which no Regulations
have been framed, and the Commission may deal with such matters, powers and functions in a
manner it thinks fit.
SUNITA YADAV, Secy.
Printed by the Manager, Government of In11ia Press, Ring Road, Mayapuri, New Delhi-I10064
and Published by the Controller of Publications, Delhi-110054.
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20