1
Chhattisgarh State Electricity Regulatory Commission
Irrigation Colony, Shanti Nagar, Raipur
Raipur, Dated March 04, 2011
No. 35/CSERC/2011- In exercise of powers conferred by section (30), 39 (2)
(d), 40 (c), 42 (2, 3), 86 (1)(c) read with Section 181 (1) of the Electricity Act,
2003, the Chhattisgarh State Electricity Regulatory Commission hereby makes
the following Regulations related to Intra-State Open Access in Chhattisgarh. On
commencement of these Regulations, the Chhattisgarh Electricity Regulatory
Commission (Intra-State Open Access in Chhattisgarh) Regulations, 2005 and
amendments notified shall stand repealed.
Øekad Øekad Øekad Øekad 66662222] jk;iqj]] jk;iqj]] jk;iqj]] jk;iqj]] 'kqØokj]'kqØokj]'kqØokj]'kqØokj] fnukad fnukad fnukad fnukad 4 ekpZ 20114 ekpZ 20114 ekpZ 20114 ekpZ 2011 & & & & QkYxqu 13] 'kd 1932QkYxqu 13] 'kd 1932QkYxqu 13] 'kd 1932QkYxqu 13] 'kd 1932
"~ ~ ~ ~ mcfi
~ ~ ~ ~ ( far-:rr ~
Wni) ~ m ih! ~. ~
~- 2~22-m-17~-Fi~ •1'i!Z/38 fu. it
f~, ~ 30--5~2001."
-~~
·'<Ji17fl•l~~/09/2010-20'12."
3ffifHl<"p ~1'114?1
( m:rf~l~UI )
~ * !A ch I~ I a _
2
CHHATTISGARH STATE ELECTRICITY REGULATORY COMMISSION
(CONNECTIVITY AND INTRA-STATE OPEN ACCESS)
REGULATIONS, 2011
PART 1
PRELIMINARY
1. Short Title and Commencement
(1) These regulations shall be called the Chhattisgarh State Electricity
Regulatory Commission (Connectivity and Intra-State Open Access)
Regulations, 2011.
(2) These regulations shall come into force from the first day of the calendar
month coming after the date of their publication in Chhattisgarh Rajpatra.
2. Extent of Application
These regulations shall apply to open access customers for use of intra-
State transmission system and/or the distribution systems of licensees in
the State, including such system when it is used in conjunction with inter-
State transmission system.
3. Definitions
(1) In these regulations, unless the context otherwise requires:
a. “Act” means the Electricity Act, 2003 (36 of 2003);
b. “Applicant” means a generating station including a captive
generating plant, a bulk consumer, a captive user, an electricity
trader or a distribution licensee, in respect of long-term open
access or medium-term open access or short-term open access, as
the case may be;
c. “Allotted Capacity” means the power transfer in MW between the
specified point(s) of injection and point(s) of drawal allowed to a
long-term/medium-term open access customer on the intra-State
transmission system and the expression "allotment of capacity"
shall be construed accordingly;
d. “Bulk consumer” means a consumer who avails supply at voltage
of 33 KV and above;
3
e. “Bilateral transaction” means a transaction for exchange of
energy (MWh) between a specified buyer and a specified seller,
directly or through a trading licensee or discovered at power
exchange through anonymous bidding, from a specified point of
injection to a specified point of drawl for a fixed or varying quantum
of power (MW) for any time period.
f. “Central Commission” means the Central Electricity Regulatory
Commission referred to in Section 76 of the Act
g. “Commission” means the Chhattisgarh State Electricity Regulatory
Commission referred to in sub-section (1) of section 82 of the Act;
h. “Connectivity” for a generating station, including a captive
generating plant, a bulk consumer, a captive user, distribution
licensee or an transmission licensee means the state of getting
connected to the intra-State transmission system and/or
distribution system;
i. “Day” means the day starting at 00.00 hours and ending at 24.00
hours;
j. “Detailed procedure” means the procedure approved by the
Commission.
k. “IEGC” means Indian Electricity Grid Code Specified by Central
Electricity Regulatory Commission under Regulation (h) of sub-
section (1) of section 79 of the A ct, and as amended from time to
time;
l. “Intra-State entity” means a person whose metering, scheduling
and energy accounting is done at the State level;
m. “Intra-State requester” means a person such as generating
company including captive generating plant or a transmission
licensee (excluding Central Transmission Utility and State
Transmission Utility) or distribution licensee or bulk consumer or
captive user who is seeking connection of its new or expanded
electrical plant to the State grid at voltage level 33 KV and above;
4
n. “Intra-State user” means a person such as a generating company
including captive generating plant or transmission licensee (other
than CTU and STU) or distribution licensee or bulk consumer
including captive user whose electrical plant is connected to the
State grid at voltage level of 33 KV and above,
o. “Interface meters” means meters installed at interface point in
accordance with the Central Electricity Authority (Installation and
Operation of Meters) Regulations, 2006, specified by the Central
Electricity Authority and amended from time to time;
p. “Inter-connection point “means a sub-station or switchyard or
any other point at which the interconnection is established between
the intra-state requester and State grid.
q. “Long-term open access” means the right to use the intra-State
transmission system and/or distribution system for a period
exceeding 12 years but not exceeding 25 years;
r. “Long-term open access customer” means a person who has
been granted long-term open access;
s. “Medium-term open access” means the right to use the intra-
State transmission system and/or distribution system for a period
exceeding 1 year but not exceeding 7 years;
t. “Medium-term open access customer” means an open access
customer who has been granted medium-term open access
u. “Month” means a calendar month as per the British calendar;
v. “Nodal agency” means the State Transmission Utility or
transmission licensee or SLDC or distribution licensee referred to in
table-1 and regulation 12(3) thereof;
w. “Open access customer” means a consumer permitted to receive
supply of electricity from a person other than the distribution
licensee of his area of supply, or a generating company (including
captive generating plant) or a licensee or a captive user who has
availed of or intends to avail of long-term open access or medium-
term open access or short-term open access, as the case may be;
5
x. “Reserve capacity’ means the power transfer (in MW or MU) for
bilateral transaction and collective transaction allowed to a short-
term open access customer on the intra-State transmission system
and/or distribution system depending on availability of transmission
capacity and/or capacity of distribution system and expression
"reservation of capacity" shall be construed accordingly;
y. “Short-term open access” means open access for a period up to
one (1) month at one time
z. “Short-term open access customer” means an open access
customer who has been granted short-term open access;
aa. “SLDC” means the State Load Dispatch Centre established under
subsection (1) of section 31 of the Act;
bb. “State grid” means the intra-State transmission system owned by
the State Transmission Utility, transmission licensee and/or the
network of any other person who has been granted licence by the
Commission to establish or operate distribution lines within the
State;
cc. “State Grid Code” means the State Grid Code specified by the
Commission under Regulation (h) of sub-section (1) of section 86 of
the Act;
dd. “Stranded capacity” means the transmission capacity in the
intra-State transmission system and/or distribution system which is
likely to remain unutilized due to relinquishment of access rights by
a long-term open access customer in accordance with regulation
20.
ee. “time block” means 15 minutes time period specified in the Grid
Code for the purposes of scheduling and despatch;
(2) Words and expressions used in these regulations and not defined herein
but defined in the Act or the State Grid Code or any other regulations
specified by the Commission shall, unless the context otherwise requires,
have the meanings assigned to them under the Act or the State Grid Code
or other regulations specified by the Commission, as the case may be.
6
PART 2
GENERAL PROVISIONS
4. Scope
These Regulations, after they come into force, shall be applicable to the
grant of connectivity to the State grid, use of intra-State transmission
system and/or distribution system including such system when it is used
in conjunction with inter-state transmission system for long-term open
access, medium-term open access and short-term open access,
Provided that a generating station, including captive generating plant or a
bulk consumer or a captive user who is not connected to State grid
cannot apply for long-term open access or medium-term open access
without applying for connectivity:
Provided further that a person may apply for connectivity and long-term
open access or medium-term open access simultaneously.
5. Eligibility for open access
(1) Subject to the provisions of these regulations, intra-State users or an
applicant seeking open access for one MW and above shall be eligible for
open access to the intra-state transmission system of the STU and/or any
other transmission licensee and / or distribution system of distribution
licensee.
(2) Such open access shall be available for use by an open access customer
on payment of such charges as may be determined by the Commission
from time to time.
(3) An intra-State user or an applicant having been declared insolvent or
bankrupt or having outstanding dues against him of transmission or
distribution licensee or fees and charges of SLDC shall not be eligible for
open access. The nodal agency shall not grant open access to the intra-
State user or applicant, who had defaulted in payment of Unscheduled
Interchange charges, transmission charges, wheeling charges, reactive
energy charges, congestion charges etc-and fees and other charges of
SLDC for a period exceeding one month from the due date of bill.
7
(4) If the applicant is an electricity trader, it must submit a copy of valid
trading license issued by Central Commission or Commission, as
applicable.
(5) Open access shall be permissible to the intra-State users having
connectivity through a dedicated feeder emanating from a grid sub-station
of licensee with online data communication facilities to SLDC.
Provided further that the bulk consumers who are not connected through
dedicated feeders shall be allowed open access subject to conditions that
they have on line data communication facilities to SLDC and agree to load
restrictions, if any, imposed by the licensee on the feeders serving them.
(6) Such generating company or captive generating plant or seller which has
entered into a power purchase agreement for sale of electricity to a
licensee or consumer shall not, in case of pre‐mature termination of the
agreement, be eligible for using State grid for transmission and wheeling
of electricity for a period of three years from the date of termination of
such agreement or till the scheduled date of expiry of power purchase
agreement whichever is earlier, if any order or ruling is found to have
been passed by an Appropriate Commission or a competent court against
the generating company for material breach of the terms and conditions of
the said power purchase agreement.
6. Provisions for Existing Entities
The persons using the intra-state transmission system and / or
distribution system in the State on the date of coming into force of these
regulations, under an existing agreement / contract shall be entitled to
continue to avail such open access to the transmission and distribution
system on the same terms and conditions, of existing agreement /
contract.
7. Criteria for allowing open access
(1) Before awarding long-term open access, the State Transmission Utility
and / or distribution licensee shall give due regard to the augmentation of
8
intra-State transmission system and / or distribution system proposed
under the business plan approved by the Commission.
(2) Medium-term open access shall be granted if the resultant power flow can
be accommodated in the existing intra-state transmission system and/or
distribution system.
Provided that no augmentation shall be carried out to the intra-State
transmission system and/or distribution system only for the purpose of
granting medium-term open access:
(3) The short-term open access customer shall be eligible for short-term open
access for the surplus capacity available on the intra-State transmission
system and/or distribution system after use by the long-term open access
customer and the medium-term open access customer, by virtue of-
(a) inherent design margins;
(b) margins available due to variation in power flows; and
(c) Margins available due to in-built spare transmission capacity and/or
distribution capacity created to cater to future load growth or
generation addition.
(4) Construction of a dedicated transmission line shall not be construed as
augmentation of the transmission system and/or distribution system for
the purpose of this regulation.
8. Relative allotment priority
(1) A distribution licensee shall have the highest priority in the allotment of
open access capacity whether in the long-term or medium term or short-
term open access.
(2) The applicant seeking long-term open access shall have priority over the
applicant seeking medium-term open access for use of the intra-State
transmission system and/or distribution system
(3) The applicant seeking long-term open access and the medium-term open
access shall have priority over the short-term open access for use of the
intra-State transmission system and/or distribution system.
9
(4) Applications for long-term open access or medium-term open access shall
be processed on first-come-first-served basis separately for each of the
aforesaid types of access:
Provided that applications received for long term open access and medium
term open access during a calendar month shall be construed to have
arrived concurrently;
Provided further that while processing applications for medium-term open
access received during a month, the application seeking open access for a
longer duration shall have higher priority;
Provided also that in the case of applications for long-term open access
requiring planning or augmentation of transmission system, such planning
or augmentation, as the case may be, shall be considered on 30th of June
and 31st of December in each year in order to develop a coordinated
transmission plan, in accordance with the perspective transmission plans
approved by the Commission.
9. Interface Meters
(1) Interface meters (main meter) shall be installed and maintained by the
State Transmission Utility or transmission licensee or distribution licensee
for and at the cost of the intra-State requester seeking connectivity at
STU or transmission licensee or distribution licensee system as the case
may be.
(2) Interface meters (main meter) shall be installed and maintained by the
State Transmission Utility or transmission licensee or distribution licensee
for and at the cost of the intra-state user connected to STU or
transmission licensee or distribution licensee as the case may be.
(3) The check meters having separate metering equipments shall be installed
owned and maintained by the STU/transmission licensee/distribution
licensee as the case may be.
(4) The intra-state requester or intra-State user or applicant shall provide
necessary facilities for voice and data communication and transfer of
online operational data such as voltage, frequency, load flow, etc. The
State Transmission Utility or transmission licensee as the case may be
10
shall install such infrastructure facilities for and at the cost of the intra-
State requester or intra-State user or applicant.
(5) The metering at the inter-connection point for main meters and check
meters shall be as ABT compatible meters. All matters and arrangements
relating to metering shall be governed by CEA (Installation and Operation
of meter), Regulation, 2006 and as per the provisions of Chhattisgarh
State Grid Code, 2007, as amended time to time. The interface meters for
measuring the quantum of energy injected into the grid by generator or
captive generating plant shall be installed at the grid sub-station of
licensee. For bulk consumers availing power through open access, the
interface meter for measurement of energy drawal shall be installed in
consumers premises.
(6) The main and check meters shall always be maintained in good condition
and periodically tested and calibrated by the concerned licensee in the
presence of the open access customer. The meters shall be sealed in the
presence of both parties. Defective meters shall be replaced immediately.
(7) Reading of the main and check meters shall be taken periodically, on
appointed date and hour, by an officer of the concerned licensee
authorized for the purpose, and the open access customer or his
representative, as the case may be. Meter reading shall be communicated
to the nodal agency and the open access customer, as the case may be,
by the licensee, within 24 hours of such reading.
(8) If in any month the readings of main and check meter differs from the
reading of corresponding check meter beyond permissible accuracy limit,
as prescribed, the main and check meters shall be tested in turn and
errors at various levels as per standard procedure would be determined
and billing shall be done accordingly.
(9) When main meter is found to be defective or has stopped, reading of the
check meter shall be considered for billing purpose subject to condition
that the check meter has been found working properly.
(10) In case of outage of both the main and check meters, if any energy is
interchanged in the intervening period the assessment has to be done on
the basis of reading recorded in generator’s sending end meter if found
11
working properly by considering average of previous 3 months
percentage line loss when both interface meter and generators meter
were found working properly.
(11) In case of outage of both the main meters and check meters so also
generator’s sending end meters, the energy injected into the State grid
may be assessed on the basis of average of previous three months energy
loss calculated of the respective sub-station of licensee when main/check
meters were working properly.
(12) In case the meter installed in the premises of bulk consumer who is
availing open access becomes defective, the assessment of energy drawl
is to be done as per the provisions specified for consumers in Chhattisgarh
State Electricity Supply Code as amended from time to time.
12
PART 3
CONNECTIVITY
10. Grant of Connectivity
(1) The voltage level for injection of power by a generating station/captive
generating plant to the intra-state transmission system and distribution
system with reference to quantum of injected power shall be as specified
in the State Grid Code.
(2) The voltage level for drawl of power by a consumer from the intra-state
transmission system and distribution system (i.e. sum of quantum of open
access power and contract demand with licensee shall be as specified in
the Supply Code.
(3) Application procedure for Connectivity
(i) Connectivity to STU system
a. The Application shall be accompanied by a non-refundable fee
specified in Table-1 of these regulations.
b. The application for connectivity shall be submitted to nodal agency in
prescribed format which shall contain details such as, proposed
geographical location of the intra-State requester, quantum of
maximum power to be interchanged, that is the quantum of
maximum power to be injected and quantum of maximum power to
be drawn with the intra-State transmission system and such other
details as may be laid down in the detail procedure.
c. Provided that in cases where once an application has been filed and
thereafter there has been any material change in the location of the
intra-State requester or change in the quantum of maximum power
to be interchanged with the intra-State transmission system, the
intra-State requester shall have to make a fresh application, which
shall be considered in accordance with these regulations.
d. On receipt of the application, the nodal agency, in consultation and
through coordination with other agencies involved in bilateral
transaction, shall process the application and carry out the necessary
interconnection study as specified in the Central Electricity Authority
13
(Technical Standards for Connectivity to the Grid) Regulations, 2007
or as amended from time to time.
e. When a generating station including captive generating plant or
licensee is an intra-State requester the interconnection point shall be
the substation of the licensee and the cost of interconnection shall be
borne by the intra-State requester (other than State distribution
licensee). While granting connectivity, the nodal agency shall specify
the name of the sub-station or pooling station or switchyard where
connectivity is to be granted. The nodal agency shall intimate the
timeframe for completion of the dedicated transmission line, if it is to
be executed by licensee. In case the line work is to be executed by
intra state requester the broad design features of the dedicated
transmission line and other technical specifications can be provided
by nodal agency on payment of necessary charges.
f. The intra-State requester and the State Transmission Utility shall
comply with the provisions of Central Electricity Authority (Technical
Standards for Connectivity to the Grid) Regulations, 2007 or as
amended from time to time.
g. Every connection of the intra-state requester system to the State
Transmission Utility system shall be covered by a connection
agreement between the intra-State requester and State Transmission
Utility. The intra-state requester granted connectivity will be
required to sign “Connection Agreement” with STU prior to the
physical inter-connection
(ii) Connectivity to system of intra-state transmission licensee
(other than STU)
a. This Regulation 3(ii) shall be applicable if the power is proposed to be
injected and/or drawn from intra-state transmission licensee (other
than STU) system and if there is no involvement of STU system in
proposed transaction. The procedure specified in Regulation (3)(i)
above shall, mutatis mutandis, apply to cases of intra-State requester
seeking connectivity to intra-State licensees system (other than STU)
However, every connection of the intra-state requester system to the
intra-State transmission system (other than STU) shall be covered by
14
a connection agreement between the intra-State requester and
transmission licensee and the State transmission utility (tri-partie
agreement).
(iii) Connectivity to distribution licensee
a. The procedure specified in Regulation (3)(i) above shall, mutatis
mutandis, apply to cases of intra-State requester seeking connectivity
to distribution licensees system.
b. Every connection of the intra-state requester system to the
distribution licensees system shall be covered by a connection
agreement between the intra-State requester and distribution
licensee.
(4) The grant of connectivity shall not entitle an intra-State requester to
interchange any power with the grid unless it obtains long-term open
access, medium-term open access or short-term open access.
(5) A generating station, including captive generating plant which has been
granted connectivity to the State grid shall be allowed to undertake
testing including full load testing by injecting its infirm power into the grid
before being put into commercial operation, even before availing any type
of open access, after obtaining permission of the State Load Despatch
Centre, which shall keep grid security in view while granting such
permission. The charges for testing and tariff of this infirm power from a
generating station or its unit thereof, shall be as determined by the
Commission from time to time. Before injecting infirm power, the
generating station including captive generating plant, shall have
agreement with distribution licensee to supply infirm power otherwise it
may not entitled for payment of such infirm power.
(6) The intra-State user already connected to State grid or for which
connectivity is already granted under the present arrangement, shall not
be required to apply for connectivity for the same capacity. However, in
case of extension of capacity of generator including captive generating
plant or increase in power requirement of bulk consumer, including
captive user it shall be required to make fresh application for modification
in connectivity arrangement as per the provisions of Regulations and
15
detail procedure and shall be treated as an intra-State requester. The
existing intra-State user shall however be required to execute a
connection agreement with the licensee.
(7) An intra-state requester will have option to construct dedicated line upto
the inter-connection point to enable connectivity to the grid.
If an intra-State user is a generating station or captive generating plant it
can operate and maintain its dedicated transmission line.
Table-1 Connectivity
S
No
Licensees
system where
Connectivity
required
Nodal
agency
Applicant Max. Quantum of Power
to be injected / offtaken
into / from intra-state
transmission system
and / or distribution
system
Applicati
on fee
(Rs in
lakhs)
Time frame for processing of
application and execution of
work
1 STU STU Generating
company
or captive
generating
plant
1 MW and above and up
to 50 MW
2 1. Informing feasibility after
receipt of the application-30
working days.
2.Issue of demand note of
estimate charges after issue
of notice of feasibility -60
working days ie Maximum
90 working days for
processing application from
date of receipt of complete
application
3. Time frame for execution
of connectivity shall be as
specified in supply code for
EHT connection
More than 50 MW and
up to 250 MW
4
More than 250 MW and
up to 1000 MW
6
More than 1000 MW 9
Bulk
Consumer,
captive
user
1 MW and above and up
to 50 MW
2
As above
More than 50 MW 4
Licensees To be specified in detailed procedure
2.
Transmission
licensee other
than STU
Transmis
sion
licensee
Generating
company
or captive
generating
plant
1 MW and above and up
to 50 MW
2
Same as for STU More than 50 MW and
up to 250 MW
4
More than 250 MW 6
Bulk
Consumer,
captive
user
1 MW and above and up
to 50 MW
2
Same as for STU
More than 50 MW 4
Licensees To be specified in detailed procedure
3
Distribution
licensee
Distribu
tion
licensee
Generating
company
or captive
generating
plant
15 MW and below 2
As per the provision in supply
code for HT connection
Bulk
Consumer,
captive
user
1 MW to 9 MW 2
As per the provision in supply
code for HT connection
16
Part-4
Procedure for availing open access
11. Categories of Open Access Customer
The procedure for application, application fee payable and the time frame
for processing request of applicant seeking open access shall be based on
the following criteria:
(1) Inter-se location of drawl and injection points:
(i) Inter-se location of injection and drawl point is at State
Transmission System (STU) system
(ii) Inter-se location of injection and drawl point is at intra-state
transmission licensee (other than STU) network and there is no
involvement of STU network for conveyance of electricity.
(iii) Inter-se location of injection and drawl point is at STU network and
intra-state transmission licensee (other than STU) network or vice
versa, i.e. network of both licensees are used for conveyance of
electricity.
(iv) Inter-se location of injection and drawl point is at intra-state
transmission system (STU/transmission licensee) and distribution
licensees system respectively.
(v) Inter-se location of injection and drawl point is at distribution
licensees system and intra-state transmission system (STU /
transmission licensee) respectively.
(vi) Inter-se location of injection and drawl point is at same distribution
licensee system and there is no involvement of intra-state
transmission system for conveyance of electricity.
(vii) Inter-se location of injection and drawl point is at same distribution
licensee system and there is involvement of intra-state
transmission system for conveyance of electricity.
(viii) Inter-se location of injection and drawl point is within the same
State but in areas of different distribution licensees.
17
(ix) Inter-se location of injection and drawl point is in different State
(inter-State open access).
(2) Duration of Open Access
(i) Long term open access
(ii) Medium-term open access
(iii) Short-term open access
12. Application procedure for Open Access
(1) All applications for long-term open access, medium-term open access and
short-term open access shall be made in the prescribed form as approved
in the detailed procedure and submitted to the Nodal agency in
accordance with these regulations.
(2) All applicants seeking open access shall submit an undertaking or
declaration of not having entered into PPA or any other bilateral
agreement for the capacity (quantum of power) for which open access is
sought.
Provided further that in case where bilateral agreement exists between
applicants and the licensee or buyer or seller as the case may be, for the
proposed capacity for open access, “no objection” may be obtained by the
applicant from the concerned licensee, buyer or seller as the case may be
for the period of open access sought. The applicant shall submit such no
objection certificate to the nodal agency while submitting application for
open access.
(3) The Nodal agency, Application fee, Documents to accompany the
application and time frame for disposal of application shall be as specified
in the following Tables :
18
Table-2
Long-term open access
S.
No
.
Inter-se location of
drawal and injection
point
Nodal
agency
Application
fee (Rs. in
lakhs)
Documents to
accompany the
application
Time frame for disposal
of application (days from
the receipt of application)
1 Both in the network of
STU
STU 2 Proof of payment of
Application fee, Bank
Guarantee, PPA or Sale-
purchase agreement of
power, In case of
generating station or
consumer not already
connected to grid,
documentary evidence
for completion of the
connectivity showing that
the same shall be
completed before
intending date of LTOA.
Declaration that there is
no existing agreement
for the capacity(quantum
of power) for which open
access is sought
90 working days .
Disposal of application
shall mean sanction of
LTOA.
2
Both in the network of
intra-state transmission
licensee network (other
than STU) and there is
no involvement of STU
network for conveyance
of electricity.
Concerned
Transmissio
n licensee
2 As above As above
3 The injection and drawl
point is located at STU
network and intra-state
transmission licensee
(other than STU)
network or vice versa.
STU 4 As above. Additional
requirement of consent
of transmission licensee
90 working days
4
The injection and drawl
point is at intra-state
transmission system and
distribution licensees
system respectively
STU 4 Same as above.
Additional requirement of
consent of distribution
licensee
-do-
5
The injection and drawl
point is at distribution
licensees system and
intra-state transmission
system respectively.
STU 4 Same as above.
Additional requirement of
consent of distribution
licensee
-do-
6 Both within the same
Distribution licensee and
there is no involvement
of state transmission
network
Concerned
Distribution
Licensee
2 As above -do-
7
Both within the same
Distribution licensee but
there is involvement of
state transmission
network in conveyance of
electricity
STU 4 Same as above.
Additional requirement of
consent of distribution
licensee
As above
8 Both within the same
State but different
Distribution Licensees
STU 4 Same as above.
Additional requirement of
consent of distribution
licensee
As above
19
Table-2
Long-term open access
S.
No
.
Inter-se location of
drawal and injection
point
Nodal
agency
Application
fee (Rs. in
lakhs)
Documents to
accompany the
application
Time frame for disposal
of application (days from
the receipt of application)
9 In different States
(inter-State open access)
CTU As per
Central
Commission’s
Regulation
Proof of payment of
Application fee, PPA or
Sale-purchase
agreement of power, In
case of generating
station not already
connected to grid,
documentary evidence
for completion of the
connectivity showing that
the same shall be
completed before
intending date of LTOA,
Consent from concerned
SLDCs and Distribution
licensees as applicable.
Declaration that there is
no existing agreement
for the capacity for which
open access is sought.
Other documents as
specified by Central
Commission.
As per Central
Commission’s Regulation
Note: The application fee for consent from transmission licensee
/distribution licensee shall be Rs 2 lakhs
Table-3
Medium-term open access
S.
No
.
Inter-se location of
drawal and injection point
Nodal agency Application
fee (Rs. In
lakhs)
Documents to
accompany the
application
Time frame for disposal of
application (days from the
receipt of application)
1 Both in the network of
STU
STU 1 Proof of payment of
Application fee, Bank
Guarantee, PPA or Sale-
purchase agreement of
power, In case of
generating station or
consumer not already
connected to grid,
documentary evidence
for completion of the
connectivity showing
that the same shall be
completed before
intending date of MTOA.
Declaration that there is
no existing agreement
for the capacity for
which open access is
sought
30 working days
2 Both in the network of
intra-state transmission
licensee (other than STU)
network and there is no
involvement of STU
network for conveyance
of electricity.
Concerned
Transmission
licensee
1 As above As above
20
Table-3
Medium-term open access
S.
No
.
Inter-se location of
drawal and injection point
Nodal agency Application
fee (Rs. In
lakhs)
Documents to
accompany the
application
Time frame for disposal of
application (days from the
receipt of application)
3 The injection and drawl
point is located at STU
network and intra-state
transmission licensee
(other than STU) network
or vice versa .
STU 2 As above .Additional
requirement of consent
of transmission licensee.
40 working days
4
The injection and drawl
point is at intra-state
transmission system and
distribution licensees
system respectively
STU 2 Same as above.
Additional requirement
of consent of distribution
licensee
30 working days.
5
The injection and drawl
point is at distribution
licensees system and
intra-state transmission
system respectively.
STU 2 Same as above.
Additional requirement
of consent of distribution
licensee
30 working days.
6 Both within the same
Distribution licensee and
there is no involvement of
state transmission
network
Concerned
Distribution
Licensee
1 As above 30 working days.
7 Both within the same
Distribution licensee but
there is involvement of
state transmission
network in conveyance of
electricity
STU 2 Same as above.
Additional requirement
of consent of distribution
licensee
30 working days.
8 Both within the same
State but different
Distribution Licensees
STU 2 Same as above.
Additional requirement
of consent of both
distribution licensees.
30 working days.
9 In different States
i.e. inter State
CTU As per
Central
Commission
Regulation.
Proof of payment of
Application fee, PPA or
Sale-purchase
agreement of power, In
case of generating
station not already
connected to grid,
documentary evidence
for completion of the
connectivity showing
that the same shall be
completed before
intending date of MTOA,
Consent from concerned
SLDCs and Distribution
licensees as applicable.
Declaration that there is
no existing agreement
for the capacity for
which open access is
sought. Other
documents as specified
by Central Commission.
As per Central
Commission’s Regulation
Note: The application fee for consent from transmission licensee /
distribution licensee shall be Rs 1 lakhs.
21
Table-4
Short-term open access
S.
No.
Inter-se location of
drawal and injection
point
Nodal
agency
Application
fee (Rs.)
Documents to
accompany the
application
Time frame for disposal
of application (days
from the receipt of
application)
1 Both in the network of
STU
SLDC 2500 Proof of payment of
Application fee.
Declaration that there
is no existing
agreement for the
capacity for which
open access is sought
10 working days in
case STOA applied for
first time.
7 working days on
subsequent STOA
applications.
2 working days for
informing deficiency or
defect in application.
2 Both in the network of
intra-state
transmission licensee
(other than STU)
network and there is
no involvement of STU
network for
conveyance of
electricity.
Concerned
Transmissi
on licensee
2500 As above · As above
3 The injection and
drawl point is located
at STU network and
intra-state
transmission licensee
(other than STU)
network or vice versa
SLDC 5000 As above. Additional
requirement of
consent of
transmission licensee
As above
4 The injection and
drawl point is at
intra-state
transmission system
and distribution
licensees system
respectively
SLDC 5000 Same as above.
Additional
requirement of
consent of
distribution licensee
As above
5 The injection and
drawl point is at
distribution licensees
system and intra-
state transmission
system respectively.
SLDC 5000 Same as above.
Additional
requirement of
consent of
distribution licensee
As above
6 Both within the same
Distribution licensee
and there is no
involvement of state
transmission network
Concerned
Distributio
n Licensee
2500 As above As above
7 Both within the same
Distribution licensee
but there is
involvement of state
transmission network
SLDC 5000 Same as above.
Additional
requirement of
consent of
distribution licensee
As above
8
Both within the same
State but different
Distribution Licensees
SLDC 5000 Same as above.
Additional
requirement of co
sent of distribution
licensee
As above
9 In different States RLDC of
the region
where
consumer
is located
As per
Central
Commission’
s Regulation
Consent from
concerned SLDCs and
Distribution licensees
as applicable, Proof
of payment of
Application fee,
Declaration that
As per Central
Commission’s
Regulation
22
Table-4
Short-term open access
S.
No.
Inter-se location of
drawal and injection
point
Nodal
agency
Application
fee (Rs.)
Documents to
accompany the
application
Time frame for disposal
of application (days
from the receipt of
application)
there is no existing
agreement for the
capacity for which
open access is
sought. Other
documents as
specified by Central
Commission.
Note: The application fee for consent from transmission licensee /
distribution licensee shall be Rs 2500.
13. Consent of STU / SLDC /transmission licensee (other than STU)/
Distribution Licensee
(1) Inter-State open access : STU in the case of application for grant of
long-term open access and SLDC in the case of grant of medium-term
open access and short-term open access shall convey its consent or
otherwise as per the provisions of Central Electricity Regulatory
Commission (Grant of Connectivity, Long-term Access and Medium-term
Open Access in inter-State Transmission and related matters) Regulations,
2009 and Central Electricity Regulatory Commission (Open Access in inter-
State Transmission) Regulations, 2008, respectively or their statutory re-
enactments, as amended from time to time.
Provided that in respect of a generating station or consumer connected to
a transmission licensee (other than STU) /distribution licensee and
intending to seek open access, the STU/SLDC before giving its consent to
the CTU/RLDC as required under the Central Commission’s regulations,
shall require the generating company or consumer to submit the consent
of the distribution licensee concerned.
(2) Intra-State Open Access:
(i) Where the proposed bilateral transaction involves a transmission
licensee (other than STU) or distribution licensee, concurrence of
the transmission licensee or distribution licensee as the case may
be shall be obtained in advance by the applicant and be submitted
along with the application to the nodal agency. However, for short-
23
term open access, the concurrence of the licensee shall be required
only for first time. For subsequent short-term open access in
continuation the applicant shall file application directly to the nodal
agency. In case of break in continuation, the concurrence of
licensee shall be again required.
(ii) In case the licensee finds that the application for consent is
incomplete or defective in any respect, it shall communicate the
deficiency or defect to the applicant by e-mail or fax or by any
other usually recognized mode of communication, within following
time frame from days of receipt of the application:
� Long-term open access-7 working days
� Medium-term open access-7 working days
� Short-term open access-2 working days
(iii) While processing the application for medium-term and short-term
open access the licensee shall ensure that the applicant fulfills
eligibility criteria specified in Regulation 5 and on being satisfied
that the requirements specified under Regulation 7(2) or Regulation
7(3) as the case may be are fulfilled, the licensee shall verify the
following, -
a) Existence of infrastructure necessary for time-block-wise
energy metering, accounting and data communication facility
in accordance with the provisions of the State Grid Code in
force, and
b) Availability of capacity in the licensees network.
(iv) On being satisfied that all conditions are fulfilled, the licensee shall
convey its consent to the applicant by e-mail or fax or by any other
usually recognized mode of communication, within following time
frame from day of receipt of the application.
� Long-term open access-30 working days
� Medium-term open access-30 working days
� Short-term open access-10 working days
24
(v) In case the application has been found to be in order but the
licensee refuses to give consent on the grounds of non-fulfillment of
eligibility criteria or non-existence of necessary infrastructure or
unavailability of surplus capacity in the licensees network, such
refusal shall be communicated to the applicant by e-mail or fax or
by any other usually recognized mode of communication, within the
following time from the date of receipt of the application, along with
reasons for such refusal:
� Long-term open access-30 working days
� Medium-term open access-30 working days
� Short-term open access-10 working days
(vi) Where the licensee has not communicated any deficiency or defect
in the application within time period referred in Regulation (ii)
above from the date of receipt of application, or refusal or consent
within the specified period as mentioned in Regulation (iv) and (v)
above from the date of receipt of the application consent shall be
deemed to have been granted.
(vii) Provided further that where concurrence or ‘no objection’ or prior
standing clearance, as the case may be, is deemed to have been
granted by the concerned licensee, the applicant while making
application shall submit to the nodal agency an affidavit (in the
format provided in the detailed procedure), duly notarized,
declaring that –
a) The licensee has failed to convey any deficiency or defect in
the application or its refusal or concurrence or ‘no objection’
or prior standing clearance, as the case may be, within the
specified time,
b) Applicant fulfills eligibility criteria and necessary
infrastructure for time-block-wise energy metering and
accounting, data communication etc-in accordance with the
provisions of the Grid Code in force, is available in place. The
following document shall be submitted by the applicant with
affidavit –
25
� A copy of the complete application after removal of deficiency
or rectification of defects, if any communicated, made to the
transmission licensee / distribution licensee for seeking
concurrence or ‘no objection’ or prior standing clearance, as
the case may be,
o A copy of the acknowledgement, if any, by transmission
licensee/distribution licensee, or any other evidence in
support of delivery of the application to the transmission
licensee/distribution licensee and
o An undertaking that there is no bilateral agreement with any
licensee, buyer or seller for the proposed quantum of power
for bilateral transaction.
26
PART 5
Procedure to avail long-term open access
14. Application for long-term open access
(1) The application for grant of long-term open access shall contain details
such as name of the entity or entities to whom electricity is proposed to
be supplied or from whom electricity is proposed to be procured along
with the quantum of power and such other details as may specified by the
Commission in detailed procedure.
Provided that in the case where augmentation of transmission system
and/or distribution system is required for granting open access, if the
quantum of power has not been firmed up in respect of the person to
whom electricity is to be supplied or the source from which electricity is to
be procured, the applicant shall indicate the quantum of power along with
name of the area in which this electricity is proposed to be interchanged
(buy or sell as the case may be) using the intra-State transmission
system and/or distribution system;
Provided further that in case augmentation of intra-State transmission
system and/or distribution system is required, the applicant shall have to
bear the transmission charges and/or wheeling charges and other
applicable charges for the same as per these regulations, even if the
source of supply or off-take is not identified;
Provided also that the exact source of supply or destination of off-take, as
the case may be, shall have to be firmed up and accordingly notified to
the nodal agency at least 3 years prior to the intended date of availing
long-term open access, or such time period estimated by State
Transmission Utility and/or distribution licensee for augmentation of the
transmission system and/or distribution system, whichever is lesser, to
facilitate such augmentation. The applicant shall submit an undertaking
stating that they have a valid contract with seller / buyer as the case may
be with a copy of the contract.
Provided also that in cases where there is any material change in location
of the applicant or change in the quantum of power to be interchanged
(injection or drawl as the case may be) using the intra-State transmission
27
system and/or distribution system or change in the area from which
electricity is to be procured or to when supplied, a fresh application shall
be made, which shall be considered in accordance with these regulations.
(2) The applicant shall submit any other information sought by the nodal
agency including the basis for assessment of power to be interchanged
(injection or drawl as the case may be ) using the intra-State transmission
system and/or distribution system and power to be transmitted to or from
various entities or regions to enable the nodal agency to plan the intra-
State transmission system and/or distribution system in a holistic manner.
(3) The application shall be accompanied by a bank guarantee of Rs 10,000/-
(ten thousand) per MW of the total power to be transmitted. The bank
guarantee shall be in favour of the nodal agency, in the manner laid down
under the detailed procedure.
(4) The bank guarantee of Rs. 10,000 /- (ten thousand) per MW shall be kept
valid and subsisting till the execution of the long-term open access
agreement, in the case when augmentation of transmission system and/or
distribution system is required, and till operationalization of long-term
open access when augmentation of transmission system and/or
distribution system is not required.
(5) The bank guarantee may be encashed by the nodal agency, if the
application is withdrawn by the applicant or the long-term open access
rights are relinquished prior to the operationalization of such rights when
augmentation of transmission system is not required.
(6) The aforesaid bank guarantee will stand discharged with the submission of
bank guarantee required to be given by the applicant to the State
Transmission Utility and/or distribution licensee as the case may be during
construction phase when augmentation of transmission system and/or
distribution system is required, in accordance with the provisions in the
detailed procedure.
15. System Studies by the Nodal Agency
(1) On receipt of the application, the nodal agency shall, in consultation and
through coordination with other agencies involved in bilateral transaction,
28
process the application and carry out the necessary system studies as
expeditiously as possible so as to ensure that the decision to grant long-
term open access is arrived at within the timeframe specified in regulation
Provided that in case the nodal agency faces any difficulty in the process
of consultation or coordination, it may approach the Commission for
appropriate directions.
(2) Based on the system studies, the nodal agency shall specify the intra
State transmission system and/or distribution system that would be
required to give long-term open access. In case augmentation to the
existing intra-State transmission system and/or distribution system is
required, the same will be intimated to the applicant.
16. Communication of estimated open access charges, etc. to the
applicant
While granting long-term open access, the nodal agency shall
communicate to the applicant, the probable date from which long-term
open access can be granted and an estimate of the applicable charges (in
kind and in cash) likely to be payable based on the prevailing rate, as
specified by the Commission.
17. Execution of Long-term Open Access Agreement
(1) The applicant shall sign an agreement for long-term open access with the:
(a) State Transmission Utility in case long-term open access is granted
by the State Transmission Utility for open access mentioned in S No 1
of table-2 of these regulations, in accordance with the provision as
specified in the detailed procedure.
(b) Intra-state transmission licensee (other than STU) in case long-term
open access is granted by intra-state transmission licensee (other
than STU) for open access mentioned in S No 2 of table-2 of these
regulations, in accordance with the provision as specified in the
detailed procedure
(c) A tripartie agreement for long-term open access with the State
Transmission utility and intra-state transmission licensee in case
29
long-term open access is granted by the STU for open access
mentioned in S No 3 of table-2 of these regulations.
(d) A tripartie agreement for long-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 4 of table-2 of these regulations
(e) A tripartie agreement for long-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 5 of table-2 of these regulations.
(f) Distribution licensee in case long-term open access is granted by the
distribution licensee for open access mentioned in S No 6 of table-2
of these regulations.
(g) A tripartie agreement for long-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 7 of table-2 of these regulations.
(h) A quadra partie agreement for long-term open access with the State
Transmission utility and both the distribution licensees in case long-
term open access is granted by the STU for open access mentioned in
S No 8 of table-2 of these regulations.
(i) Agreement for long-term inter-state open access S No 9 of table-2 of
these regulations shall be the as per the provisions specified by
Central Commission.
(2) The long–term open access agreement shall contain the date of
commencement of long-term open access, the point of injection of power
into the State grid and point of drawl from the State grid and the details
of dedicated transmission lines required, if any. In case augmentation of
transmission system and/or distribution system is required, the long-term
open access agreement shall contain the time period for construction of
the facilities for the applicant by the transmission licensee and/or
distribution licensee, the bank guarantee required to be given by the
applicant and other details in accordance with the detailed procedure.
30
18. Information to SLDC
Immediately after grant of long-term open access, the nodal agency shall
inform the SLDC so that they can consider the same while processing the
requests for grant of future short-term open access, received under these
Regulations.
19. Renewal of term for long-term open access
On the expiry of the period of long-term open access, the long-term open
access shall stand extended on a written request provided by the long-
term open access customer in this regard to the nodal agency mentioning
the period for extension that is required:
Provided that such a written request shall be submitted by the long term
open access customer to the nodal agency at least six months prior to the
date of expiry of the long-term open access;
Provided further that in case no written request is received from the long-
term open access customer within the time period specified above, the
said long-term open access shall stand withdrawn after completion of
open access period so granted.
20. Relinquishment of open access rights
(1) A long-term open access customer may relinquish the long-term open
access rights fully or partly before the expiry of the full term of long-term
open access, by making payment of compensation for stranded capacity
as follows:-
(a) Long-term open access customer who has availed open
access rights for at least 12 years
(i) Notice of minimum one (1) year – If such a customer
submits an application to the nodal agency at least 1 (one)
year prior to the date from which such customer desires to
relinquish the access rights, there shall be no charges.
(ii) Notice of less than one (1) year – If such a customer
submits an application to the nodal agency at any time lesser
than a period of 1 (one) year prior to the date from which
31
such customer desires to relinquish the access rights, such
customer shall pay an amount equal to 66% of the estimated
transmission charges (net present value) and/or wheeling
charges (net present value) for the stranded capacity for the
period falling short of a notice period of one (1) year.
(b) Long-term open access customer who has not availed open
access rights for at least 12(twelve ) years – such customer
shall pay an amount equal to 66% of the estimated transmission
charges (net present value) and/or wheeling charges for the
stranded capacity for the period falling short of twelve years of
access rights:
Provided that such a customer shall submit an application to the
nodal agency at least 1 (one) year prior to the date from which
such customer desires to relinquish the access rights;
Provided further that in case a customer submits an application for
relinquishment of long-term open access rights at any time at a
notice period of less than one year, then such customer shall pay
an amount equal to 66% of the estimated transmission charges
(net present value) and/or wheeling charges for the period falling
short of a notice period of one (1) year, in addition to 66% of the
estimated transmission charges (net present value) and/or
wheeling charges (net present value) for the stranded capacity for
the period falling short of 12(twelve) years of open access rights.
(2) The discount rate that shall be applicable for computing the net present
value as referred to in sub-Regulation (a) and (b) of Regulation (1) above
shall be the discount rate to be used for bid evaluation in the Central
Commission’s Notification issued from time to time in accordance with the
Guidelines for Determination of Tariff by Bidding Process for Procurement
of Power by Distribution Licensees issued by the Ministry of Power.
(3) The compensation paid by the long-term open access customer for the
stranded capacity shall be used for reducing transmission charges and/or
wheeling charges payable by other long-term open access customers and
medium-term open access customers in the year in which such
32
compensation payment is due in the ratio of transmission charges payable
for that year by such long-term open access customers and medium-term
open access customers.
21. Inter-State open access: The procedure for using the State grid in
conjunction with the inter-state transmission system shall be governed by
the procedure for inter-State long-term open access as specified in Central
Electricity Regulatory Commission (Grant of Connectivity, Long-term
Access and Medium-term Open Access in inter-State Transmission and
related matters) Regulations, 2009 or its statutory re-enactment as
amended from time to time:
Provided that in respect of a generating station or consumer connected to
a transmission licensee(other than STU)/distribution licensee and seeking
inter-State long-term open access, the SLDC, before giving its consent to
the RLDC as required under the Central Commission’s regulations, shall
require the generating company or consumer to submit the consent of the
distribution licensee concerned.
Provided further that all applicants intending to use the State grid for
long-term inter-State open access shall be required to fulfill the eligibility
criteria as specified under regulation 5 of these Regulation and while
submitting application for inter-State open access shall follow Regulation
12(2) of these Regulation.
33
PART 6
Procedure to avail medium-term open access
22. Application for medium-term open access
(1) The application for grant of medium-term open access shall contain such
details as may be laid down under the detailed procedure and shall, in
particular, include the point of injection into the State grid, point of drawal
from the State grid and the quantum of power for which medium-term
open access has been applied for.
(2) The start date of the medium-term open access shall not be earlier than 5
months and not later than 1 year from the last day of the month in which
application has been made.
(3) On receipt of the application, the nodal agency shall, in consultation and
through coordination with other agencies involved in bilateral transactions,
process the application and carry out the necessary system studies as
expeditiously as possible so as to ensure that the decision to grant or
refuse medium-term open access is made within the timeframe specified
in table-3 of regulation 12.
Provided that in case the nodal agency faces any difficulty in the process
of consultation or coordination, it may approach the Commission for
appropriate directions.
23. Grant of medium-term open access
(1) On being satisfied that the requirements specified under Regulation 5 and
Regulation (2) of regulation 7 are met, the nodal agency shall grant
medium-term open access for the period stated in the application:
Provided that for reasons to be stated in writing, the nodal agency may
grant medium-term open access for a period less than that sought for by
the open access customer;
(2) The applicant shall submit an undertaking stating that they have a valid
contract with seller / buyer as the case may be along with a copy of the
contract.
(3) While granting medium-term open access, the nodal agency shall
communicate to the applicant, an estimate of the applicable charges (in
34
kind and in cash) likely to be payable based on the prevailing rate, as
specified by the Commission.
24. Execution of medium-term open access agreement
The applicant shall sign an agreement for medium-term open access with
the
(a) State Transmission Utility in case medium-term open access is
granted by the State Transmission Utility for open access
mentioned in S No 1 of table-3 of these regulations, in accordance
with the provision as specified in the detailed procedure.
(b) Intra-state transmission licensee(other than STU) in case medium-
term open access is granted by intra-state transmission licensee
(other than STU) for open access mentioned in S No 2 of table-3 of
these regulations, in accordance with the provision as specified in
the detailed procedure
(c) A tripartie agreement for medium-term open access with the State
Transmission utility and intra-state transmission licensee in case
long-term is granted by the STU for open access mentioned in S No
3 of table-3 of these regulations.
(d) A tripartie agreement for medium-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 4 of table-3 of these regulations.
(e) A tripartie agreement for medium-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 5 of table-3 of these regulations.
(f) Distribution licensee in case medium-term open access is granted
by the distribution licensee for open access mentioned in S No 6 of
table-3 of these regulations.
(g) A tripartie agreement for medium-term open access with the State
Transmission utility and distribution licensee in case long-term
35
transmission and distribution open access is granted by the STU for
open access mentioned in S No 7 of table-3 of these regulations.
(h) A quadra partie agreement for medium-term open access with the
State Transmission utility and both the distribution licensees in case
long-term open access is granted by the STU for open access
mentioned in S No 8 of table-3 of these regulations.
(i) Agreement for medium-term inter-state open access S No 9 of
table-3 of these regulations shall be as per the provisions specified
by Central Commission.
(2) The medium–term open access agreement shall contain the date of
commencement and end of medium-term open access, the point of
injection of power into the State grid and point of drawal from the State
grid, the details of dedicated transmission lines required, if any, the bank
guarantee required to be given by the open access customer and other
details in accordance with the detailed procedure.
(3) Immediately after grant of medium-term open access, the nodal agency
shall inform the State Load Despatch Centre about the
modalities,quantum of power to be interchanged and terms of conditions
of such open access approval etc- so that they can consider the same
while processing requests for future short- term open access received
under these Regulations.
25. No overriding preference
On the expiry of period of the medium-term open access, the medium-
term open access customer shall not be entitled to any overriding
preference for renewal of the term.
26. Exit option for medium-term open access customers
A medium-term open access customer may relinquish rights, fully or
partly, by giving at least 90 days prior notice to the nodal agency:
Provided that the medium-term open access customer relinquishing its
rights shall pay applicable transmission charges and / or wheeling charges
36
and other applicable charges for the period of relinquishment or 90 days
which ever is lesser.
27. Inter-State open access: The procedure for using the State grid in
conjunction with the inter-state transmission system shall be governed by
the procedure for inter-State medium-term open access as specified in
Central Electricity Regulatory Commission (Grant of Connectivity, Long-
term Access and Medium-term Open Access in inter-State Transmission
and related matters) Regulations, 2009 or its statutory re-enactment as
amended from time to time:
Provided that in respect of a generating station or consumer connected to
a distribution system seeking inter-State medium-term open access, the
SLDC, before giving its consent to the RLDC as required under the Central
Commission’s regulations, shall require the generating company or
consumer to submit the consent of the distribution licensee concerned.
Provided further that all applicants intending to use the State grid for
medium-term inter-State open access shall be required to fulfill the
eligibility criteria as specified under Regulation 5 of these Regulation and
while submitting application for inter-State open access shall follow
Regulation 12(2) of these Regulation.
37
PART 7
Procedure to avail short-term open access
28. Application for short-term open access
(1) The application for grant of short-term open access shall contain details
which include the point of injection into the State grid, point of drawal
from the State grid, the quantum of power for which short-term open
access has been applied for, duration of availing open access, and other
information as may be required by the Nodal agency
(2) The start date of the short-term open access shall not be earlier than 30
days and not later than 60 days from the date application has been
made.
Eg. application for grant of open access commencing from 1st July shall be
received from 1st May and up to 31th day of May.
(3) An application made for each bilateral transaction and/or collective
transaction shall be accompanied by a non-refundable fee as decided by
the Commission from time to time.
Provided that the fee for bilateral transaction or collective transaction shall
be deposited on the day of the application or within three working days of
submission of the application.
(4) A consumer of distribution licensee intending to avail open access shall
also furnish a copy of his application to the distribution licensee of his area
of supply.
(5) The Nodal agency shall acknowledge receipt of the application by
indicating time and date on “ACKNOWLEDGEMENT” to the applicant.
(6) Based on the type of transactions, the nodal agency shall take a decision
on the applications for short-term open access.
(i) All applications received under Regulation 28(2) above shall be
processed as per allotment priority criteria specified under
Regulation 8 on first-come first serve basis.
38
(ii) Nodal agency shall check transaction for congestion of any element
(line and transformer) of transmission and distribution system
involved in transaction.
(iii) Nodal agency shall convey grant of open access or otherwise in
format specified in detailed procedure along with schedule of
payments to the applicant.
(iv) Nodal agency shall assign specific reasons if open access is denied.
(7) While processing the application for short-term open access, the nodal
agency shall ensure that the applicant fulfills eligibility criteria specified in
Regulation 5 of these Regulation and verify the following, namely-
(i) Existence of infrastructure necessary for time-block-wise energy
metering and accounting, data communication etc in accordance
with the provisions of the Grid Code in force, and
(ii) Availability of surplus capacity in the State grid.
(8) In case the nodal agency finds that the application for short-term open
access is incomplete or defective in any respect, it shall communicate the
deficiency or defect to the applicant by e-mail or fax, in addition to any
other usually recognized mode of communication, within time frame
specified in table 4.
Provided that in cases where the nodal agency has communicated any
deficiency or defect in the application, the date of receipt of application
shall be the date on which the application has been received duly
completed, after removing the deficiency or rectifying the defects, as the
case may be.
(9) After the feasibility for existence of necessary infrastructure and
availability of surplus capacity in the State grid has been established the
nodal agency shall convey its approval of short-term open access to the
applicant by e-mail or fax, in addition to any other usually recognized
mode of communication, within time frame specified in table 4.
(10) In case the application has been found to be in order but the nodal agency
refuses to give approval, on the grounds of non-existence of necessary
39
infrastructure or unavailability of surplus capacity in the State grid or non-
fulfillment of eligibility criteria, such refusal shall be communicated to the
applicant by e-mail or fax, in addition to any other usually recognized
mode of communication, within time frame specified in table 4, along with
reasons for such refusal:
Provided that where the nodal agency has not communicated any
deficiency or defect in the application or refusal or approval as the case
may be, within the specified time period from the date of receipt of the
application, the applicant may approach the Commission for intra-State
open access.
29. Day ahead transactions:
(1) Day ahead transactions shall be permitted ,in case there is availability of
surplus capacity in the licensee system, which has been expressly
surrendered whole or part thereof, or not in use for more than three days
in past.
An application for grant of such open access may be submitted to SLDC
within three days prior to the date of scheduling but not later than 1300
hrs of the day immediately preceding the day of scheduling for day ahead
transaction.
For example, application for day-ahead transaction on 25th day of July
shall be received on 22nd day or 23rd day or up to 1300 hours on 24th
day of that month.
(2) Nodal agency shall check for congestion and convey grant of approval or
otherwise, in the format as approved in detailed procedure. All other
provisions of application for short-term open access shall apply.
30. Payment of open access charges
Advance payment for one month or period of open access, whichever
period is less, shall be made within three working days of grant of open
access. The SLDC shall schedule power for bilateral transaction only after
receiving payment from the applicant.
40
31. No overriding preference
On the expiry of period of the short-term open access, the short-term
open access customer shall not be entitled to any overriding preference
for renewal of the term.
32. Inter-State open access
Notwithstanding anything contained in above Regulations, procedure for
inter-State short- term Open Access shall be as per Central Electricity
Regulatory Commission (Open Access in inter-State Transmission)
Regulations, 2008, or its statutory re-enactments, as amended from time
to time.
Provided further that all applicants intending to use the State grid for
short-term inter-State open access shall be required to fulfill the eligibility
criteria as specified under Regulation 5 of these Regulation and while
submitting application for short-term inter-State open access shall follow
Regulation 12(2) of these Regulation.
41
PART 8
Charges for using State grid
33. Open access charges
The licensee/SLDC providing open access shall levy only such fees and/or
charges as specified by the Commission from time to time. The principles
of determination of the charges shall be as under.
(1) Transmission Charges –
The transmission charges for use of the transmission system of the STU/
transmission licensee for intra-state transmission shall be regulated as
under:
(a) The transmission charges for use of the intra-State transmission
system shall be recovered from the long-term open access customers
and the medium-term open access customers in accordance with
terms and conditions of tariff specified by the Commission from time
to time. These charges shall be as determined by the Commission
under section 62(1)(b) of the Act, and shall be applicable as per the
tariff order issued by the Commission from time to time. These
charges shall be shared by the long-term open access customers and
medium-term open access customers as per allotted capacity
proportionately.
Illustration: The basis for sharing of transmission charges shall be
the maximum demand in MW served by the intra-state transmission
system of the transmission licensee in the previous financial year ..
Suppose, the maximum demand in previous financial year i,e 2009-10
is 3000 MW.
The capacity contracted by long-term open access customer is 50 MW.
The capacity contracted by medium-term open access customer is 20
MW.
The capacity served for distribution licensee shall be 3000-50-
20=2930 MW
42
Suppose if annual estimated and approved transmission charge for
2010-11 is Rs 300 crores, then monthly transmission charges for year
2010-11 shall be shared as follows:
Distribution licensee= (300 x 2930) /(3000 x 12) = Rs 24.4166 crores
Long-term open access customer= (300 x 50)/(3000 x 12) = Rs
0.4166 crores
Medium-term open access customer=(300 x 20)/(3000 x 12) = Rs
0.1666 crores
(b) The transmission charges shall be payable by the short-term open
access customer for the energy approved /contracted for bilateral
transaction at the point or points of injection. The energy approved
shall be computed by considering the reserved capacity for bilateral
transaction. The transmission charges payable by a short-term open
access customer for the use of intrastate transmission system shall be
calculated in accordance with the following methodology:
ST_RATE = TSC / Net annual estimated energy input to the
transmission system of STU/transmission licensee for the relevant
year,
Where:
ST_RATE is the rate for short-term open access customer in Rs per
kwh or in Rs/MWh
"TSC" means the annual transmission charges or annual revenue
requirement on account of the transmission system as determined by
the Commission.
The transmission charges for use of intra-state transmission system
for all type of transactions (bilateral or collective inter-State
transactions through exchanges) shall be the same.
Illustration: Suppose if annual estimated and approved transmission
charge for the year 2010-11 is Rs 300 crores, and net annual
estimated energy input to the transmission system of STU for the year
2010-11 is 15000 MU.
43
ST_RATE = 300/15000= 20 paise per kwh
Or ST_RATE=Rs 200/MWh
(c) The revenue thus earned from the short-term open access customers
by the STU/transmission licensee for bilateral transaction and
collective transction in a month shall be directly disbursed to the long
term and medium term customers to reduce the transmission
charges of the long-term and medium term open access customers
for the successive months in proportion to monthly charges payable
to them. The STU/ transmission licensee shall maintain separate
account for the revenue earned from short-term customers and shall
submit it to the Commission.
(2) Wheeling Charges–
The Wheeling charges for use of the distribution system of a licensee shall
be regulated as under: -
(a) The wheeling charges for use of the distribution system shall be
recovered from the long-term open access customers, medium-
term open access customers and short-term open access customers
in accordance with terms and conditions of tariff specified by the
Commission from time to time. These charges shall be as
determined by the Commission under section 62(1)(c) of the Act,
and shall be applicable as per the tariff order issued by the
Commission from time to time. The wheeling charges shall be
payable by the long-term open access customers , medium-term
open access customers and short-term open access customer for
the energy approved/contracted for bilateral transaction at the
point or points of injection. The energy approved shall be computed
by considering the reserved capacity for bilateral transaction
(b) The wheeling charges payable by a long-term open access
customers, medium-term open access customers and short-term
customer for the use of distribution system shall be same.
(c) The revenue thus earned from the open access customers in a year
shall be utilized to reduce the wheeling charges of licensee for the
44
successive years. The distribution licensee shall maintain separate
account for the revenue earned from open access customers.
(3) Fees and Charges of SLDC –
An open access customers shall pay to the SLDC, the scheduling and
system operation charges as determined by the Commission in
accordance with the regulation as may be framed for levy and collection of
fees and charges of SLDC.
(4) Unscheduled Interchange (UI) charges
(a) The mismatch between the scheduled and the actual drawal at
drawal point(s) and scheduled and the actual injection at injection
point(s) shall be met from the grid and shall be governed by the
CERC (UI charges and related matters), Regulation, 2009 till the
notification of CSERC (Intra-State ABT, Unscheduled Interchange
charges and related matters) Regulations and thereafter it will be
as per the regulations to be notified and amendments, if any.
(b) A separate bill for UI charges shall be issued to open access
customers.
(c) The billing, collection and disbursement of the Unscheduled Inter-
change charges shall be governed by the CERC (UI charges and
related matters) Regulation 2009 till the notification of CSERC
(Intra-State ABT, Unscheduled Interchange charges and related
matters) Regulations and thereafter it will be as per the regulations
to be notified and amendments, if any.
(d) The payment of UI charges shall have a high priority and the
concerned constituent (including distribution licensee and all other
open access customers) shall pay the indicated amounts within
stipulated period as specified in CERC (UI charges and related
matters), Regulation, 2009 till the notification of CSERC (Intra-
State ABT, Unscheduled Interchange charges and related matters)
Regulations and as amended from time to time
(5) Reactive Energy Charges -
The billing and payment of the reactive energy charges by the open
access customers shall be as approved by the Commission from time to
time.
45
(6) Cross subsidy Surcharge –
(a) The Commission may specify cross subsidy surcharge voltage
wise/slab wise /individual categories of consumers separately.
(b) The principle and procedure for determining cross-subsidy
surcharge shall be as under:
(i) Every consumer requiring supply of electricity through open
access in accordance with these Regulations shall be liable to
pay the cross-subsidy surcharge, as may be specified.
Provided that such surcharge shall not be leviable in case
open access is provided to a person who has established a
captive generating plant, for carrying the electricity to the
destination of its own use.
The cross subsidy surcharge shall be payable by the open
access customer for the actual energy received through open
access at the point of drawl.
(ii) Cross subsidy surcharge shall also be payable by such
consumer who receive supply of electricity from a person
other than the distribution licensee in whose area supply is
located, irrespective of whether it avails such supply through
transmission/ distribution network of the licensee or not.
(iii) Such surcharge shall be based on the current level of cross-
subsidy of the tariff category / tariff slab and / or voltage
level to which such consumer, belong or are connected to, as
the case may be. It is to be calculated based on the average
cost method by taking the difference between the average
tariff for such supply voltage for the consumer of subsidizing
category and the average cost of supply for the licensee.
(iv) For consumers procuring power through open access in first
control period of MYT regime, the cross subsidy surcharge
shall be levied at 90% of cross subsidy surcharge determined
by the Commission for that year. The cross subsidy
surcharge for subsequent control period shall be as decided
by the Commission from time to time.
Illustration: Suppose the cross subsidy surcharge worked out
for 2011-12 is 75 paise per kwh. Then applicable cross
46
subsidy surcharge for consumers procuring power through
open access shall be 90% of 75 paise i.e. 67.5 paise
(rounded of to 68 paise) per unit for the year 2011-12.
Suppose the cross subsidy surcharge worked out for 2012-13
is 70 paise per kwh. Then applicable cross subsidy surcharge
for consumers procuring power through open access shall be
90% of 70 paise i.e. 63 paise per unit for 2012-13,
(v) For consumers procuring power through renewable energy
based power generating plant, the cross subsidy surcharge
shall be 50% of the cross subsidy surcharge determined for
that year.
Illustration: Suppose the cross subsidy surcharge worked out
for 2011-12 is 75 paise per kWh and the cross subsidy
surcharge worked out for 2012-13 is 70 paise per kWh. For
consumers procuring power through renewable energy based
power generating stations, the cross subsidy surcharge shall
be 38 paise per unit and 35 paise per unit for the year 2011-
12 and 2012-13 respectively.
(7) Additional Surcharge –
The Commission shall determine the additional surcharge as required
under Section 42(4) of the Act .The additional surcharge shall become
applicable only if it is conclusively demonstrated that the obligation of a
licensee, in terms of existing power purchase commitments, has been and
continues to be stranded, or there is an unavoidable obligation and
incidence to bear fixed costs consequent to such a contract. The fixed
costs related to network assets would be recovered through wheeling
charges.
Provided that such surcharge shall not be leviable in case open access is
provided to a person who has established a captive generating plant, for
carrying the electricity to a destination of its own use.
Provided further that the additional surcharge shall be decided by the
Commission on case to case basis after due regulatory process.
(8) Connectivity Charges –
47
Charges related to connectivity as specified by the Commission shall be
payable by the intra-State requester for getting connected with the State
grid.
(9) Any other charges, in cash or kind as may be specified by the Commission
shall be payable by the open access customer.
(10) In case the open access customer uses inter-state transmission system
and services of Regional Load Dispatch Centre and State Load Dispatch
Centre of any other state, the transmission charges of CTU and STU of the
other State and service charges of Regional Load Dispatch Centre and
State Load dispatch Centre of other state shall be payable by such
customer in addition to the charges provided under these Regulations.
(11) In case of outages of generator supplying to a consumer through open
access, standby arrangements should be provided by the distribution
licensee on the payment of charges as specified by the Commission. In
case of outages of captive generating plant supplying to a captive user
and/or consumer on open access, standby arrangements should be
provided by the distribution licensee on the payment of charges as
specified by the Commission. The generating company or captive
generating plant selling directly or through any licensee shall inform the
SLDC and the buyer about their outage of plants through email or fax,
along with probable date of resuming injection of electricity into the grid.
For drawl of power up to the contracted capacity of open access, the tariff
for availing stand by support from the distribution licensee shall be 1.5
times of the per unit average tariff of HT and EHT consumers as decided
by the Commission in tariff order from time to time.
For drawl of power in excess of the contracted capacity of open access,
the tariff for availing stand by support from the distribution licensee shall
be two times of the per unit average tariff of HT and EHT consumers as
decided by the Commission in tariff order from time to time.
The modality of demand and energy accounting during the period of
availing stand by support from distribution licensee shall be as per CSERC
(Intra-State ABT, Unscheduled Interchange charges and related matters)
Regulations to be notified and amendments, if any.
48
Provided also that open access customers would have the option to
arrange stand-by power from any other source other than distribution
licensee.
Provided further that open access customers connected to CTU system
would have the option to avail stand-by power from distribution licensee
of the area on terms and conditions as approved by the Commission. Such
open access customer may approach the Commission for availing stand by
support.
(12) All long-term open access customers and medium-term open access
customers shall pay the charges payable under the open access
agreement from the date of commencement of open access specified in
such agreement, regardless of whether or not such open access is actually
availed from that date, except if the failure to avail open access is due to
the default of the concerned licensee(s) whose network is being used.”
(13) All open access customer must make reasonable endeavor to ensure that
their actual demand or actual sent-out capacity (power), as the case may
be, at an inter-connection point does not exceed the contracted capacity
or reserved capacity.
Provided that for carrying out balancing and settlement of energy and
demand at all entry and exit points relating to open access agreements,
the licensee shall strictly adhere to the provisions of CSERC (Intra-State
ABT, Unscheduled Interchange charges and related matters), Regulations
to be notified by the Commission and its amendments, if any.
Provided further, that till such time the CSERC (Intra-State ABT,
Unscheduled Interchange charges and related matters), Regulations is
notified by the Commission, the terms and conditions for energy and
demand balancing, as set out in the existing agreements shall continue to
apply.
(14) The charges related to transmission and wheeling charges shall be 6% of
the energy input into the system for the consumer using State grid for
procuring power from renewable energy based power generating stations
located in the State. Other than these charges, they shall not be liable to
49
pay any transmission charges or wheeling charges either in cash or kind.
However, surcharge shall be payable where the wheeling of energy is
other than for its own use.
(15) Energy loss-
The open access customer shall bear energy loss of the transmission
system and/ or distribution system as approved by the Commission in its
relevant tariff order passed under section 62 of the Act, from time to time.
The energy losses in the transmission and distribution systems shall be
compensated by additional injection at the injection point
The energy losses shall be calculated on the basis of the energy scheduled
for transaction at the point or points of injection.
Illustration
The applicable transmission and wheeling charges to be levied to
open access customers shall be as follows
Table-5
Applicable Charges and energy Losses
S.
No.
Inter-se location of drawal and
injection point
Injection
Point
Drawal
point
Applicable Charges
1 Both in the network of STU EHV side of
EHV S/s (132
Kv and
above)
EHV side of
EHV S/s
(132 Kv
and above)
1. Transmission
Charges of STU.
2. Transmission loss of
STU
2 Both in the network of intra-state
transmission licensee (other than
STU) network and there is no
involvement of STU network for
conveyance of electricity.
EHV side of
EHV S/s
EHV side of
EHV S/s
1.Transmission
Charges of
transmission licensee.
2.Transmission loss of
transmission licensee
3 The injection and drawl point is located
at intra-state transmission licensees
system and STU network or vice
versa
EHV side of
EHV S/s(132
Kv and
above)
EHV side of
EHV
S/s(132 Kv
and above)
1.Transmission
Charges of STU.
2.Transmission loss of
STU
3.Transmission
Charges of
transmission licensee.
4.Transmission loss of
transmission licensee
50
Table-5
Applicable Charges and energy Losses
S.
No.
Inter-se location of drawal and
injection point
Injection
Point
Drawal
point
Applicable Charges
4 The injection and drawl point is at
intra-state transmission system and
distribution licensees system
respectively.
EHV side of
EHV S/s(132
Kv and
above)
33 KV 1.Transmission
Charges of STU.
2.Transmission loss of
STU
3.Wheeling Charges of
distribution licensee.
4.Distribution loss of
distribution licensee
for that voltage level
5 The injection and drawl point is at
distribution licensees system and
intra-state transmission system
respectively
33 Kv side of
EHV S/s
EHV
side(132
KV and
above)
1.Transmission
Charges of STU.
2.Transmission loss of
STU
3. Wheeling Charges
of distribution
licensee.
33 KV side of
33/11 S/s
EHV
side(132
KV and
above)
1.Transmission
Charges of STU.
2.Transmission loss of
STU
3.Wheeling Charges of
distribution licensee.
4.Distribution loss of
distribution licensee
for that voltage level
6 Both within the same Distribution
licensee and there is no involvement
of state transmission network
33 Kv side of
EHV S/s or
33/11 KV S/s
33 KV
1. Wheeling Charges
2. Distribution losses
7 Both within the same Distribution
licensee but there is involvement of
state transmission network
33 Kv side of
EHV S/s or
33/11 KV S/s
33 KV 1. Transmission
Charges of STU.
2. Transmission loss of
STU
3. Wheeling Charges
of distribution
licensee. 4.Distribution
loss of distribution
licensee
8 Both within the same State but
different Distribution Licensees
33 Kv side of
EHV S/s or
33/11 KV S/s
33 KV 1.Transmission
Charges of STU.
2.Transmission loss of
STU
3.Wheeling Charges of
distribution licensee
no 1.
4.Distribution loss of
distribution licensee
no 1
5.Wheeling Charges of
distribution licensee
no 2.
6.Distribution loss of
51
Table-5
Applicable Charges and energy Losses
S.
No.
Inter-se location of drawal and
injection point
Injection
Point
Drawal
point
Applicable Charges
distribution licensee
no 2
9. In different State
(Inter State open access)
As applicable Out of
State
1.Applicable charges
as per type of
transaction mentioned
above
2.The transmission
charges and/or
wheeling charges and
energy losses of CTU
and STU/licensees of
the other State
34. Billing, Payment, Collection and disbursement of charges
(1) Unless specified otherwise in detailed procedure or in any other order
issued by the Commission, the bills against charges mentioned in
regulation 33 (other than UI charges) shall be prepared by the respective
nodal agency and shall be disbursed to the respective licensee /SLDC
/open access customer as the case may be before the 5th day of the
succeeding calendar month.
(2) The distribution licensee and all other open access customers as the case
may be, shall pay the charges within seven days from the date of issue of
the bill.
(3) The open access Charges for use of State grid and fees and charges of
SLDC shall be disbursed by the nodal agency to the licensee/SLDC
concerned, within 5 working days after completion of the billing cycle on
receiving the same from the open access customers.
(4) If payments against the open access charges are not made within the due
date as mentioned in the bill issued by the nodal agency, the defaulting
open access customers shall have to pay simple interest @ 0.04% for
each day of delay.
52
(5) If the nodal agency does not disburse the payment received from open
access customers to the licensee/SLDC within five working days after
completion of the billing cycle, the nodal agency shall have to pay simple
interest @ 0.04% for each day of delay.
(6) In case any open access customer exclusively uses the facilities of inter-
State transmission system (CTU or other inter-State transmission
licensee) the surcharge shall be collected by CTU or other inter-State
transmission licensee as the case may be and shall be paid to the
distribution licensee in whose area the consumer is located.
35. Security deposit for payment
(1) Long-term open access customers
All long-term open access customers shall be required to open Letter of
Credit (LC) for 105% of estimated applicable average monthly billing for
charges mentioned in Regulation 30 in favour of nodal agency. In addition
to opening of Letter of Credit (LC) the long-term open access customer
would provide security in the form of irrevocable Bank Guarantee (BG), in
favor of nodal agency, equivalent to two months estimated applicable
average monthly billing, three months prior to the scheduled date of
connectivity. Initially the security mechanism shall be valid for a minimum
period of three (3) years and shall be renewed from time to time.
The payment security mechanism for the State distribution licensee using
the network of State Transmission Utility shall be governed by the
transmission service agreement executed between the utilities.
(2) Medium –term open access customers
After signing of the Medium Term Open Access Agreement (MTOA), the
applicant shall submit a Bank Guarantee (BG) to nodal agency equivalent
to estimated applicable charges of two months within 30 days from the
grant of MTOA. The estimated average open access charges would be
reviewed every six months/MTOA period whichever is less and accordingly
the amount of Bank Guarantee would be enhanced/reduced by Medium-
term customers.
53
(3) Payment security for UI charges
The payment security for UI charges shall be governed by the (Intra-State
ABT, Unscheduled Interchange charges and related matters) Regulations
to be notified by the Commission and as amended from time to time.
36. The intra-state user or any intra-state entities using the State grid
including such system when it is used in conjunction with inter-state
transmission system (availing intra-State and/or inter-State open access)
defaults in payment of Unscheduled Interchange charges, the SLDC shall
follow up with concerned open access customer under intimation to State
distribution licensee and shall inform RLDC also in case of inter-State open
access.
The intra-state user or intra-state entity using the State grid including
such system when it is used in conjunction with inter-state transmission
system (availing intra and/or inter-state open access) defaults in payment
of Unscheduled Interchange charges for two weekly billing cycles, the
SLDC, shall not schedule, in case of intra-state open access and withdraw
the consent in case of inter-State open access under intimation to open
access customer and distribution company. In case of inter-State open
access, intimation of withdrawal of consent shall also be given to RLDC,
for taking further necessary action at its end.
In case of prolonged default in payment of the charges specified under
these regulations or UI charges, the licensee or SLDC may, approach the
Commission.
37. If any open access customer or intra-state user using the State grid
including such system when it is used conjunction with inter-state
transmission system defaults in payment of any open access charges due
from him to the licensee or SLDC, the licensee may initiate action such as
disconnection with the State grid or any other suitable action under
provision of Act or State grid code or any other regulations after giving