Bihar Electricity Grid Code, 2010 (No Amendment)
Regulations made under THE ELECTRICITY ACT, 2003
- Made under: THE ELECTRICITY ACT, 2003
This text is shown as one document.
Full text
The Bihar GazetteThe Bihar GazetteThe Bihar GazetteThe Bihar Gazette
EXTRA ORDI
PUBLISHED BY AUTHORIT
(NO.PATNA 511) PATNA,
BIHAR ELECTRICITY REGULATORY COMMISSION
No. BERC/Regl-1/2009
Section 181 read with Clause (h) Sub
Act, 2003 and all powers enabling it on that behalf, the Bihar Electricity
Regulatory Commission hereby specif
Bihar Electricity Grid Code 2010 which shall come into force from the date of
notification. This Grid Code is applicable for the grids in the State of Bihar only.
1.1 Introduction
(1) The Grid Code lays down the rules
followed by all Users of Grid in the State of Bihar to plan, develop, operate
and maintain the power system in the State in the most efficient, reliable,
economic and secure manner in integration with the Eastern Regional
Grid as per the provisions of Indian Electricity Grid Code (IEGC) notified
by the Central Electricity Regulatory Commission (CERC) from time to
time.
(2) In terms of section 39(1) of the Electricity Act 2003, the State Government
is required to notify the B
Transmission Utility (STU). State Government has notified the Bihar State
Electricity Board (BSEB) as the State Transmission Utility (STU) which is
a deemed licensee at present in terms of section 172 of the Electricit
2003.
REGISTERED NO. PT.
The Bihar GazetteThe Bihar GazetteThe Bihar GazetteThe Bihar Gazette
XTRA ORDINARY
UBLISHED BY AUTHORITY
1 SHRAVANA (S)
PATNA, FRIDAY, 23RD JULY 2010
BIHAR ELECTRICITY REGULATORY COMMISSION
Bihar Electricity Grid Code
NOTIFICATION
——————
The 20th July, 2010
1/2009–02–238—In exercise of power conferred under
Section 181 read with Clause (h) Sub-section (1) of Section 86 of the Electricity
Act, 2003 and all powers enabling it on that behalf, the Bihar Electricity
Regulatory Commission hereby specifies the following Grid Code to be known as
Bihar Electricity Grid Code 2010 which shall come into force from the date of
notification. This Grid Code is applicable for the grids in the State of Bihar only.
The Grid Code lays down the rules, guidelines and standards to be
followed by all Users of Grid in the State of Bihar to plan, develop, operate
and maintain the power system in the State in the most efficient, reliable,
economic and secure manner in integration with the Eastern Regional
rid as per the provisions of Indian Electricity Grid Code (IEGC) notified
by the Central Electricity Regulatory Commission (CERC) from time to
In terms of section 39(1) of the Electricity Act 2003, the State Government
is required to notify the Board or a Government Company as State
Transmission Utility (STU). State Government has notified the Bihar State
Electricity Board (BSEB) as the State Transmission Utility (STU) which is
a deemed licensee at present in terms of section 172 of the Electricit
REGISTERED NO. PT.-40
The Bihar GazetteThe Bihar GazetteThe Bihar GazetteThe Bihar Gazette
In exercise of power conferred under
section (1) of Section 86 of the Electricity
Act, 2003 and all powers enabling it on that behalf, the Bihar Electricity
ies the following Grid Code to be known as
Bihar Electricity Grid Code 2010 which shall come into force from the date of
notification. This Grid Code is applicable for the grids in the State of Bihar only.
, guidelines and standards to be
followed by all Users of Grid in the State of Bihar to plan, develop, operate
and maintain the power system in the State in the most efficient, reliable,
economic and secure manner in integration with the Eastern Regional
rid as per the provisions of Indian Electricity Grid Code (IEGC) notified
by the Central Electricity Regulatory Commission (CERC) from time to
In terms of section 39(1) of the Electricity Act 2003, the State Government
oard or a Government Company as State
Transmission Utility (STU). State Government has notified the Bihar State
Electricity Board (BSEB) as the State Transmission Utility (STU) which is
a deemed licensee at present in terms of section 172 of the Electricity Act,
2 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
(3) As per section 39(2) of the Electricity Act, 2003 the functions of State
Transmission Utility are as follows :–
a) to undertake transmission of energy through the Intra-State
Transmission System
b) to discharge all functions of planning and coordination relating to
intra-state transmission system with
(i) Central Transmission Utility;
(ii) State Governments;
(iii) Generating Companies;
(iv) Regional Power Committee;
(v) Authority;
(vi) Licensees;
(vii) Any other person notified by the State Government in this
behalf
c) to ensure development of an efficient, coordinated and economical
system of intra-state transmission lines for smooth flow of electricity
from a generating station to load centres;
d) to provide non-discriminatory open access to its transmission
system for use by –
(i) any licensee or generating company on payment of the
transmission charges;
(ii) any consumer as and when such open access is provided by
the State Commission under sub section (2) of section 42, on
payment of the transmission charges and a surcharge thereon,
as may be specified by the State Commission.
(4) STU shall not engage in the business of trading of electricity.
(5) As per the section 31of Electricity Act, 2003, the State Government shall
establish a centre to be known as the State Load Despatch Centre
(SLDC) and the State Load Despatch Centre shall be operated by a
Government company or any authority or corporation established or
constituted by or under any State Act, as may be notified by the State
Government. Until a Government company or any authority or corporation
is notified by the State Government, the State Transmission Utility shall
operate the State Load Despatch Centre, which shall:
a) be responsible for optimum scheduling and despatch of electricity
within a State, in accordance with the contracts entered into with
the licensees or the generating companies operating in that State;
b) monitor the grid operations;
c) keep accounts for the quantity of electricity transmitted through the
State grid;
d) exercise supervision and control over the intra state transmission
system;
e) be responsible for carrying out real time operations for grid control
and despatch of electricity within the State through secure and
economic operation of the State grid in accordance with the Grid
Standards and the State Grid Code.
(6) The SLDC and licensees shall comply with; the directions of Regional
Load Despatch Centre in connection with integrated grid operation of the
3
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
power system or in regard to matter which may affect the operation of the
Inter State Transmission System.
(7) SLDC shall not engage in the business of trading of electricity.
1.2 Objective
The Grid Code is designed to facilitate the development, operation
maintenance and planning of an efficient, coordinated and economical
power grid by specifying principles and procedures for STU and all the
Users connected to that system. It seeks to be non-discriminatory and
ensures that interfaces are not areas of weakness in the supply chain.
1.3 Structure of the Grid Code
The Grid Code comprises of following chapters:
I. General Code
General Code includes sections on:
(a) Management: intended to ensure that all other sections of the Grid
Code work together in the management of the Grid Code
(b) Review Principles: specify a procedure for review of Grid Code to cater
to inadvertent omissions and any modifications needed from time to time.
II. Planning Code
Planning Code includes sections on:
(a) System Planning: specifies the procedures to be applied by STU in the
planning and development of the State Transmission System and by other
Users connected or seeking Connection to the State Transmission
System.
(b) Principles: specify procedures to be followed by STU in the
development of the State Transmission System in the long term taking into
account the requirements for new connection of generation and demand.
(c) Connection conditions: specifies the technical requirements and
standards to be complied with by STU and other Users connected or
seeking connection to the State Transmission System.
III. System Operation Code
System Operation Code includes sections on:
(a) System Operation: Specifies the conditions under which STU shall
operate the State Transmission System, the Generating Companies shall
operate their Power Stations and the Distribution Licensees shall operate
their Distribution Systems in so far as necessary to ensure the security
and quality of supply and safe operation of the State Transmission System
under both normal and abnormal operating conditions.
(b) Outage Planning: Specifies the procedures relating to the co-ordination
of outages for scheduled maintenance of the State Transmission System,
Generating Units, embedded within the State system and not classified as
regional utilities, Captive Power Plant (CPP) and Distribution System that
will use the State Transmission System.
4 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
The Generating stations based on non-conventional/renewable energy
sources with generating power capacity of above 10 MW will also come
under this purview.
IV. Schedule and Despatch Code
Schedule and Despatch: —Specifies the procedures relating to the
scheduling and despatch of Generating Units and drawal by Distribution
Licensees / Open Access Customers to meet state demand and drawal
allocation.
V. Protection Code
Protection Code specifies the co-ordination responsibility and minimum
standards of protection that are required to be installed by Users of the
State Transmission System.
VI Metering Code
Metering Code specifies the minimum operational and commercial
metering to be provided for each User. It also sets out the requirement
and procedures for metering.
VII Data Registration Code
This contains the details of all the data required by STU, which is to be
provided by the Users and vice versa.
1.4 Scope of Grid Code
1. Grid Code defines the boundary between STU and Users and
establishes the procedures for operation of facilities connected to the
State Grid.
2. All Users that connect with and/or utilize the State Grid are required to
abide
by the principles and procedures as laid down in the Grid Code in so
far as they apply to that User.
3. The Grid Code shall be enforced by STU. Users must provide STU
reasonable rights of access, service and facilities necessary to
discharge its responsibilities in the users premises and to comply with
instructions as issued by STU to implement and enforce the Grid code.
1.5 Non - Compliance
1. If any User fails to comply with any provision of the Grid Code, the
User shall inform the SLDC and Grid Code Review Panel without delay
the reason for its non-compliance and shall remedy its non-compliance
promptly.
2. SLDC shall bring the non-compliance to the notice of BERC.
3. Consistent failure to comply with the Grid Code provisions may lead to
disconnection of the User’s plant and /or facilities.
5
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
1.6 Code Responsibilities
1. In discharging its duties under the Grid Code, STU has to rely on
information which Users shall supply regarding their requirements and
intentions.
2. STU shall not be held responsible for any consequences that arise
from its reasonable and prudent actions on the basis of such
information.
1.7 Confidentiality
1. Under the terms of the Grid Code, STU will receive information from
Users relating to their intentions in respect of their Generation or
Supply businesses.
2. STU shall not, other than as required by the Grid Code, disclose such
information to any person other than Central or State Government and
BERC without the prior written consent of the provider of the
information.
1.8 Dispute Settlement Procedures
1. In the event of any dispute regarding interpretation of any part/section
of the Grid Code provision between any User and STU, the matter may
be referred to the Commission for its decision. The Commission’s
decision shall be final and binding.
2. In the event of any conflict between any provision of the Grid Code and
any contract or agreement between STU and Users, the provision(s) of
the Grid Code will prevail.
1.9 Directive
State Government may issue policy directives in certain matters as per
section 37 of the Electricity Act 2003. STU shall promptly inform the
Commission and all Users of the requirement of such directives.
1.10 Compatibility with Indian Electricity Grid Code
This Grid Code is consistent/compatible with the IEGC. However, in
matters relating to inter-State transmission, if any provision of the State
Electricity Grid Code are inconsistent with the provisions of the IEGC, then
the provisions of IEGC as notified by CERC shall prevail.
1.11 The Board functioning as integrated Utility
The functions of STU, SLDC, generating stations, Distribution Licensees
shall be performed by the concerned officers authorised by the Board as
long as it continues to function as an integrated Utility. Till such time the
Board is functioning as an integrated utility, Ringfencing of SLDC shall be
done separating manpower and accounts for SLDC functions.
1.12 Exemptions
Any exemption from the provisions of the Grid Code shall be effective only
after the approval of the BERC for which the agencies will have to file a
petition in advance.
6 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
Section - 2: Glossary and Definition
In the Grid Code the following words and expressions shall, unless the
subject matter or context otherwise requires or is inconsistent therewith, bear the
following meanings:
ABT Availability Based Tariff
Act The Electricity Act, 2003 (Act No. 36 of 2003)
Active Energy The electrical energy produced, flowing or supplied by an
electric circuit during a time interval, being the integral with
respect to time of the instantaneous power, measured in
units of watt-hours or standard multiples thereof,
Active Power The product of voltage and the in phase component of
alternating current measured in units of watts and standard
multiples thereof,
Apparatus All the electrical apparatus like machines, fittings,
accessories and appliances in which electrical conductors
are used.
Apparent Power The product of voltage and alternating current measured in
unit of volt-amperes and standard multiples thereof,
Area of Supply Area within which a Distribution Licensee is authorized by
his license to supply electricity.
Automatic
Voltage
Regulatory (AVR)
A continuously acting automatic excitation system to control
a Generating Unit terminal voltage.
Authority Central Electricity Authority (CEA)
Auxiliaries All the plant and machinery required for the generating
unit’s functional operation that do not form part of the
generating unit.
Availability
Bulk Power
Transmission
Agreement
“Fully Available” shall mean that the Generating Unit is
available to its contracted capacity. In respect of the
Transmission System, “Availability “ shall mean the time in
hours the Transmission System is capable of transmitting
electricity at its rated voltage from the supply point to the
delivery point and expressed as a percentage of Annual
Availability.
Agreements made between the STU and its H.T customers
and between the Board and CTU.
Backing Down Reduction of generation on instructions from SLDC /
ERLDC by a generating unit under abnormal conditions.
Black start
procedure
The procedure necessary to recover from partial or total
blackout.
Black start
capability
An ability in respect of a Black Start Station, for at least one
of its generating units or CCGT units to start up from shut
7
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
down and to energize a part of the system and be
synchronized to the system upon instruction from the State
Load Dispatch Centre, within two hours, without any
external supply.
Black start
stations
Generating stations having Black Start Capability.
Captive Power
Plant (CPP)
A Power Plant set up by any person to generate electricity
primarily for his own use and includes a power plant set up
by any co-operative society or association of persons for
generating electricity primarily for use of members of such
co-operative society or association.
CEA Central Electricity Authority
Central
Transmission
Utility (CTU)
Any Government Company which the Central Government
may notify under sub section (1) of section 38 of the
Electricity Act, 2003.
CERC Central Electricity Regulatory Commission.
Connection The electric power lines and electrical equipment used to
effect a connection of a user’s system to the Transmission
System.
Connection
conditions
Those conditions mentioned in Section 5 (“connection
conditions”) which have to be fulfilled before the User’s
System is connected to the State Grid
Connection point An electrical point of connection between the Transmission
System and the User’s System.
Consumer Any person who is supplied with electricity for his own use
by a licensee or the Government or by any other person
engaged in the business of supplying electricity to public
under the Electricity Act 2003 or any other law for the time
being in force and includes any person whose premises are
for the time being connected for the purpose of receiving
electricity with the works of a licensee, the Government or
such other person, as case may be and shall include a
person whose electricity supply has been disconnected.
Demand The demand of Active Power in MW and Reactive Power in
MVAR of electricity unless otherwise stated.
Demand control Any of the following methods of achieving a load reduction:
(a) Consumer Load Management initiated by Users.
(b) Consumer Load reduction by Disconnection initiated by
Users (other than following an instruction from Load
Despatch Centre).
(c) Consumer Load reduction instructed by the Load
Despatch Centre
(d) Automatic under Frequency Load Disconnection
(e) Emergency manual Load Disconnection
Despatch Operation control of an integrated electricity system
involving operations such as:
(a) Assignment of levels of output to specific Generating
Plant or Load control devices to effect the most reliable and
economical supply as the load vary.
8 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
(b) The control of the operation of Extra High Voltage lines,
associated sub stations and equipment.
(c) The scheduling of various types of transactions with the
electric utilities over the interconnecting Transmission Lines.
De-synchronize The act of taking a generating unit off a system to which it
has been synchronized.
Disconnection The physical separation of Users or Consumers from the
system.
Discrimination The quality where a relay or protective system is enabled to
pick out and cause to be disconnected only the faulty
apparatus.
Distribution
Licensees
A licensee authorized under section 14 of the Act to operate
and maintain a distribution system for supplying electricity to
the consumers in his area of supply.
Distribution
system
The system of wires and associated facilities between the
delivery points on the transmission lines or the generating
station connection and the point of connection to the
installation of the consumers.
Drawal The import / export of electrical energy from / to the grid
Earthing Connecting the conducting parts of an equipment or
machinery with the general mass of earth, in such a manner
ensuring at all times an immediate discharge of energy
without danger, by maintaining the same efficiently at
earth’s potential.
Earthing device A means of providing connection between a conductor and
earth being of adequate strength and capability.
EHV Extra High Voltage equal to and greater than 66 kV
Frequency The number of alternating current cycles per second
(expressed in Hertz) at which the system is operating.
Generating
company
Any company or body corporate or association or body of
individuals, whether incorporated or not, or artificial juridical
person, which owns or operates or maintains a generating
station.
Generating
station
Any station for generating electricity, including any building
and plant with step-up transformer, switchyard, switch gear,
cables or other appurtenant equipment, if any used for that
purpose and the site thereof, a site intended to be used for
a generating station, and any building used for housing the
operating staff of a generating station and where electricity
is generated by water – power, includes, penstocks, head
and tail works, main and regulatory reservoirs, dams and
other hydraulic works, but does not in any case include any
sub station.
Generating unit The combination of an electric power generator and its
prime mover and all of its associated equipment, which
together constitutes a single generating machine.
Generating
schedule
The despatch schedule of a generating station
BERC Bihar Electricity Regulatory Commission
9
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
Grid High Voltage backbone system of inter-connected
Transmission Lines, Sub Stations and Generating Stations.
Grid Code “ Bihar Electricity Grid Code”, a document describing the
procedures and the responsibilities for planning and
operation of Bihar Grid.
Grid Code
Review Panel or
“Panel”
The Panel with the functions set out in the Grid Code.
High Voltage or
HV
Voltage greater than 440 V and lower than 33 kV.
IEGC Indian Electricity Grid Code, a document describing the
philosophy and the responsibilities for planning and
operation of Indian Power System specified by the Central
Electricity Regulatory Commission (CERC) in accordance
with sub section 1 (h) of section 79 of the Act.
Indian Standards
(“IS”)
Those Standards and specifications approved by the
Bureau of Indian Standards.
Inter-State
Transmission
System (ISTS)
Inter-State Transmission System includes :
(a) Any system for the conveyance of electricity by means
of a main Transmission Line from the territory of one State
to another State;
(b) the conveyance of electricity across the territory of an
intervening State as well as conveyance within a State,
which is incidental to such inter-state transmission of
electricity.
(c) The transmission of electricity within the territory of a
State built, owned, operated maintained or controlled by the
Central Transmission Utility.
Interconnecting
Transformer (ICT)
Transformer connecting EHV lines of different voltage
systems.
Independent
Power Producer
(IPP)
Power Station within the State owned by a generator who is
not part of BSEB.
Intertripping (a) The tripping of circuit – breaker(s) by commands
initiated from protection at a remote location independent of
the state of local protection; or
(b) Operational intertripping.
Intra–State
Transmission
System
Any system for transmission of electricity other than an Inter
- State Transmission System.
Isolation The disconnection of EHV / HV Apparatus from the
remainder of the System in which that EHV / HV Apparatus
is situated.
Lean Period That period in a day for a few hours when the electrical
power demand remains less than the average demand.
Licence Any license granted by BERC under provisions of the
relevant laws in force
Load The Active, Reactive or Apparent power as the context
requires, generated, transmitted or distributed.
10 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
Load Factor Load Factor is the ratio of the average power to the
maximum demand. The load factor depends on the interval
of time of the maximum demand and the period over which
the average is taken.
Load
Factor
= Units consumed in a given period
Maximum demand X No. of hours in the
period
Low Voltage or
LV
Voltage not exceeding 440 volts
Main protection Protection equipment or system expected to have priority in
initiating either a fault clearance or an action to terminate an
abnormal condition in a power system.
NTPC National Thermal Power Corporation Limited
Operating Margin Aggregate available capacity of generating station in the
system on real time basis, which is over and above the
operating level to the maximum capacity of the generating
units limited by technical parameters for short duration.
Operation A scheduled or planned action relating to the operation of a
system.
Operational
procedure
Management instructions and procedures, both for the
safety rules and for the local and remote operation of plant
and apparatus, issued in connection with the actual
operation of plant and/or apparatus at or from a connecting
site.
Open Access The non-discriminatory provision for the use of transmission
lines or distribution system or associated facilities with such
lines or system by any licensee or consumer or a person
engaged in generation in accordance with the regulations
specified by the Commission.
Outage A total or partial regulation in availability due to repair and
maintenance of the Transmission or Distribution or
Generation facility or defect in Auxiliary System.
Part Load The condition of a generating station which is loaded but is
not running at its declared availability.
Partial shutdown A shutdown of a part of the system resulting in failure of
power supply, either from external connections or from the
healthy part of the system.
Peak period That period in a day when the electrical power demand is
highest.
Person Any company or body corporate or association or body of
individuals, whether incorporated or not, or artificial juridical
person.
PGCIL Power Grid Corporation of India Limited
Planned outage An outage of generating plant or part of the Transmission
system, or part of a User’s System co-ordinated by SLDC.
Power factor The ratio of Active Power (kW) to Apparent Power (KVA)
Protection The scheme and Apparatus for detecting abnormal
conditions on a system and initiating fault clearance or
11
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
actuating signals or indications.
Rated MW The “rating plate” MW output of a Generating Unit, being
that output up to which the generating unit is designed to
operate.
Reactive Power The product of voltage and current and the sine of the
phase angle between them measured in units of volt-
amperes reactive and standard multiples thereof;
Regulating
Margin
The system voltage and frequency beyond which the
system should not be operated.
Re-
Synchronization
The bringing of parts of the system which has gone out of
synchronism with each other, back into synchronism.
Safety – Rules The rules framed by the Users and the transmission
licensee to ensure safety to persons working on plant /
apparatus.
SLDC State Load Despatch Centre
Standing
Instructions
An instruction issued by SLDC to a generating company
whereby, in specified circumstances, the generating
company should take specified action, as though a valid
dispatch instruction has been issued by SLDC.
Start – Up The action of bringing a generating unit from shutdown to
synchronous speed.
State
Transmission
Utility (STU)
The utility notified by the Government under sub section (1)
of section 39 of the Electricity Act, 2003 and whose
functions have been outlined under sub section (2) of
section 39 of the Electricity Act 2003.
Station
Transformer
A transformer supplying electrical power to the auxiliaries of
a generating station, which is not directly connected to a
generating unit terminal.
Sub station Station for transforming or converting electricity for the
transmission or distribution thereof and includes
transformers, converters, switchgears, capacitors,
synchronous condensers, structures, cable and other
appurtenant equipment and any buildings used for that
purpose and the site thereof.
Supervisory
Control and Data
Acquisition or
(SCADA)
The communication links and data processing systems,
which provide information to enable implementation of
requisite supervisory and control actions.
Synchronized Those conditions where an incoming generating unit or
system is connected to the bus bars of another system so
that the frequencies and phase relationships of that
generating unit or system as the case may be, and the
system to which it is connected are identical.
System Any transmission and distribution system and / or
transmission system, as the case may be.
Total system The transmission system and all user systems in Bihar.
Transmission
licensee
A licensee authorized to establish and operate transmission
lines
12 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
Transmission
lines
All high pressure cables and overhead lines (not being an
essential part of the distribution system of a licensee)
transmitting electricity from a generating station to another
generating station or a sub station, together with any step-
up and step-down transformers, switch-gear and other
works necessary to and used for the control of such cables
or overhead lines, and such buildings or part thereof as may
be required to accommodate such transformers, switch-
gear and other works.
Transmission
system
The system consisting of high pressure cables and
overhead lines of transmission licensee for transmission of
electrical power from the generating station upto connection
point / interface point with the distribution system. This shall
not include any part of the distribution system.
Under Frequency
Relay
An electrical measuring relay intended to operate when its
characteristic quantity reaches the relay settings by
decrease in frequency.
User A term utilized in various sections of Grid Code to refer to
the persons using the Bihar Grid, as more particularly
identified in each section of the Grid Code. In the general
conditions the term means any person to whom the Grid
Code applies.
Words and expressions used and not defined in this code but defined in the Acts
shall have the meanings assigned to them in the said Acts. Expressions used
herein but not specifically defined in this Code or in the said Acts but defined
under any law passed by a competent legislature and applicable to the electricity
industry in the state shall have the meaning assigned to them in such law.
Subject to the above, expressions used herein but not specifically defined in this
Code or in the Acts or any law passed by a competent legislature shall have the
meaning as is generally assigned in the electricity industry.
13
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
Section –3: Management of Grid Code
3.1 Introduction
1. The State Transmission Utility (STU) is required to implement and
comply with the Bihar Electricity Grid Code and to carry out periodic
review and amendments of the same with the approval of Bihar
Electricity Regulatory Commission (BERC). A Review Panel shall be
constituted by STU, as required in this section, comprising of the
representatives of the Users of the Transmission System.
2. No change in this Grid Code, however small or large, shall be made
without being deliberated and agreed by the Grid Code Review Panel
and thereafter approved by BERC. However, in an unusual situation
where normal day to day operation is not possible without revision of
some clauses of Grid Code, a provisional revision may be
implemented before approval of BERC is received, but only after
discussion at a special Review Panel Meeting convened on emergency
basis. BERC should promptly be intimated about the provisional
revision. BERC may issue directions requiring STU to revise the Grid
Code accordingly as may be specified in those directions and STU
shall promptly comply with any such direction.
3.2 Objective
The objective of this section is to define the method of management of
Grid Code documents, implementing any changes / modifications required
and the responsibilities of the constituents (Users) to effect the change.
3.3 Grid Code Review Panel
1. The Chairperson of the Grid Code Review Panel shall be an Engineer
of the STU not below the rank of Chief Engineer. The Member
Secretary of the Panel shall also be nominated by STU. The Grid Code
Review Panel shall consist of the following members in addition to
above on the recommendations of the heads of the respective
organizations:
(a) One member from SLDC (head of SLDC)
(b) One Chief Engineer (Generation) of Bihar State Electricity Board.
(c) One member from Transmission licensee in the State other than
STU
(d) One representative at senior executive level from system
operation from National Thermal Power Corporation Limited
(NTPC),
(e) One member at senior level from ERPC Secretariat
(f) One representative at senior executive level from Eastern Regional
Load Despatch Centre (ERLDC)
(g) One representative at senior executive level from Distribution
Licensee.
(h) One representative at senior executive level from each of the
generating companies feeding not less than 50 MW to the Grid in
the State.
14 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
(i) One representative from all Captive Power Plants (CPPs), which
are in parallel operation with Bihar State Grid, on rotation basis.
(j) One representative from all the generating companies of small
generating stations of less than 50 MW capacity on rotation basis.
2. Any other member can be co-opted as a member of the panel when
directed by BERC.
3. The functioning of the Committee shall be co-ordinated by STU. The
Member Secretary nominated by STU shall be the convener.
4. STU shall inform all the Users, the names and addresses of the
Review Panel, Chairperson and the Member Secretary at least 15
days before the first Review Panel meeting. Any subsequent changes
shall also be informed to all the Users by STU. Similarly, each user
shall inform the names and designations of their representatives to the
Member secretary of the Review Panel, at least three days before the
first Review Panel meeting, and shall also inform the Member
Secretary in writing regarding any subsequent changes.
3.4 Functions of the Review Panel
The functions of the Review Panel are as follows:
(a) Review and Maintenance of the Grid Code and its working.
(b) Consideration of all requests for review made by any user and make
recommendations for changes in the Grid Code together with reasons
for such changes.
(c) Provide guidance on interpretation and implementation of the Grid
Code.
(d) Examination of the problems raised by any user as well as resolution
of the problems.
(e) Ensuring that the changes / modifications proposed in the Grid Code
are consistent and compatible with Indian Electricity Grid Code (IEGC).
The Review Panel may hold any number of meetings as required
subject to the condition that at least one meeting shall be held in every
three months. Sub-meetings may be held by STU with the Users to
discuss individual requirements and with groups of Users to prepare
proposals for Co-ordination Committee’s consideration.
3.5 Review and Revisions
1. The Users seeking any amendment to the Grid Code shall send written
requests to the Member Secretary of the Review Panel. If the request
is sent to BERC directly, the same shall be forwarded to STU. STU
shall examine the proposed changes / modifications in line with IEGC
stipulations and circulate the same along with its comments to all
Review Panel members for their written comments within a reasonable
time frame. Whenever it is observed that a certain clause of Grid Code
is not consistent with the IEGC, then the same will be discussed in the
Review Panel and the clause will be revised to make it consistent with
IEGC.
2. All the comments received shall be scrutinized and compiled by STU.
These along with STU’s comments shall be sent to all the members for
15
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
their response for the proposed change / modification. If necessary,
STU shall convene a meeting of the Review Panel for deliberations.
The Member Secretary shall present all the proposed revisions of the
Grid Code to the Review Panel for its consideration.
3. Based on the response received, STU shall finalise its
recommendation regarding the proposed modification / amendment
and submit the same along with all the related correspondence to
BERC for approval.
4. STU shall send the following reports to the BERC at the conclusion of
each review meeting of the Committee:
(a) Report on the outcome of such review.
(b) Any proposed revision to the Grid Code.
(c) All written representations and objections submitted by the Users at
the time of review.
5. All revisions to the Grid Code require the approval of BERC. STU shall
publish revisions to the Grid Code, after the approval of BERC. STU
may submit proposals for relaxation in such cases where Users have
difficulties in meeting the requirements of the Grid Code.
6. Any change from the previous version shall be clearly marked in the
margin. In addition, a revision sheet shall be placed at the front of the
revised version noting the number of every changed sub section,
together with reasons for such change.
7. STU shall maintain copies of the Grid Code with the latest
amendments and shall make it available at a reasonable cost to any
person requiring it. This may also be made available on the website.
The STU shall keep an up to date list of recipients of all the copies of
the Grid Code, if found necessary to ensure that the latest version of
Grid Code is reached to all the relevant recipients.
8. The Commission, may, on the application of the Users or otherwise,
call the emergency meeting of the Review Panel as and when the
situation so dictates and make such alterations or amendments in the
Grid Code as it thinks fit.
16 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
CHAPTER– 2: PLANNING CODE
Section –4: System Planning
4.1 Introduction
1. This section specifies the methods for data submission by Users to
STU for planning and development of the State Transmission System.
This section also specifies the procedures to be adopted by STU in the
planning and development of the State Transmission System.
2. Requirement for reinforcement or extension of the State Transmission
system arise due to many reasons of which a few are mentioned
below:
i) Development on a User’s system already connected to the State
Transmission System.
ii) Introduction of a new connection point between the User’s system
and the State Transmission System.
iii) Evacuation system for generating stations within or outside State
iv) Reactive compensation.
v) A general increase in system capacity due to addition of
generation or system load.
vi) Transient or steady state stability considerations
vii) Cumulative effect of any of the above
3. The reinforcement or extension of the State Transmission System may
involve work at an entry or exit point (connection point) of a User to the
State Transmission System. Since development of all User’s systems
must be planned well in advance to ensure consents and way leaves
to be obtained and detailed engineering design / construction work to
be completed, STU will require information from Users and vice versa.
To this effect, the planning code imposes time scale for exchange of
necessary information between STU and Users.
4.2 Objective
This section formulates the procedures for the ‘System Planning’ to enable
STU in consultation with the Users, to evolve an efficient, coordinated,
secure and economical State Transmission System to satisfy
requirements of future demand.
4.3 Planning Policy
1. STU would develop a perspective transmission plan for next 10 years
for the State Transmission System. These plans shall be updated
every year to take care of the revisions in load projections and
generation capacity additions. The perspective plans shall be
submitted to the Commission for approval.
2. STU shall carryout network studies and review fault levels for planning
system strengthening and augmentation.
3. STU shall follow the following steps in planning:
i) Forecast the demand for power within the area of supply based on
the forecasts provided by Distribution Licensees. These shall
17
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
include details of demand forecasts, data methodology and
assumptions on which forecasts are based. These forecasts would
be annually reviewed and updated, and also whenever major
changes are made in the existing system.
ii) Prepare a proposal for the requirement of generation for the state
to meet the load demand as per the forecast taking into account the
existing contracted generation resources.
iii) Prepare a transmission plan for the State Transmission System
compatible with the above load forecast and generation plan. VAR
compensation needed will also be included.
iv) Necessary load flow studies shall be carried out for short circuit and
transient stability study and relay coordination study for
transmission system planning.
v) STU shall be responsible to prepare and submit a long term (10
years) plan to BERC for generation expansion and transmission
system expansion to fully meet both energy and peak demand.
vi) STU shall extend support to Central Transmission Utility (CTU) to
finalise the annual planning. corresponding to a 5 years forward
term for identification of major inter-state transmission system
including inter - regional schemes which shall fit in with the long
term plan developed by CEA.
4. All Users shall supply to STU, the planning data prescribed in
Appendix A and Appendix B of Data Registration Code within 3 months
from the effective date of the Grid Code and thereafter such data shall
be furnished by 31st March every year to enable STU to formulate/
finalise the updated plan by 30th September each year for the next 5
years.
4.4 Planning Criterion
1. The planning criterion shall be based on the security philosophy on
which both Inter State Transmission System (ISTS) and the State
Transmission System (STS) have been planned. The security
philosophy shall be as per the Transmission Planning criteria and
guidelines as given by Central Electricity Authority (CEA).
2. The State Transmission System planning and generation expansion
planning shall be in accordance with the provisions of the planning
criterion as per IEGC Clause 3.5.
4.5 Planning responsibility
1. The primary responsibility of load forecasting within distribution
licensee’s area of supply rests with the respective Distribution
Licensee. The Distribution Licensee shall determine peak load and
energy forecast of their areas for each category of loads for each of the
succeeding 5 years and submit the same annually by 31st March to
STU along with details of demand forecasts, data, methodology and
assumptions on which forecasts are based along with their proposals
for transmission system augmentation. The load forecasts shall be
made for each of the prevalent as well as proposed inter connection
points between STU and Distribution Licensees and shall include
annual peak load and energy projections.
18 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
2. Generating stations shall provide their generation capacity to STU for
evacuating power from their power stations for each of the succeeding
5 years along with their proposals for augmentation of transmission
proposals and submit the same annually by 31st March to STU.
3. The planning for strengthening the State Transmission System for
evacuation of power from outside state stations shall be initiated by
STU.
4.6 Planning data
1. To enable STU to conduct system studies and prepare perspective
plans for electricity demand, generation and transmission, the Users
shall furnish data to STU from time to time as detailed under Data
Registration section as under:
(a) Standard Planning Data (Generation) / Standard Planning Data
(Distribution) as per Appendix A.
(b) Detailed Planning Data (Generation) / Detailed Planning Data
(Distribution) as per Appendix B.
2. To enable the Users to co-ordinate planning design and operation of
their plants and systems with the State Transmission System, they
may seek certain data of transmission system as applicable to them,
which the STU shall supply from time to time as detailed under Data
Registration Section categorized as;
(a) Standard Planning Data (Transmission) as per Appendix A.
(b) Detailed Planning Data (Transmission) as per Appendix B.
4.7 Implementation
The actual programme of implementation of transmission lines, inter –
connecting transformers, reactors/capacitors and other transmission
elements will be determined by STU in consultation with the concerned
Users. The completion of these works in the required time frame shall be
ensured by STU through the concerned users. STU/SLDC may
periodically inform RLDC of their plans as well as stages of
implementation.
19
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
Section – 5: Connection Conditions
5.1 Introduction
This section specifies the technical, design and operational criteria which
shall be complied with by every User connected or seeking connection to
the State Transmission System.
Any user seeking connection to or connected with the intra-state system
shall comply with the CEA Regulations 2007 “Technical Standards for
connectivity to the Grid”.
This applies to all users seeking connection or connected to the intra-state
system.
5.2 Objective
The objective of this section is to ensure the following:
i) All Users or prospective Users are treated in a non-discriminatory
manner
ii) Any new or modified connection when established shall neither suffer
unacceptable effects due to its connection to State Transmission
System nor impose any unacceptable effect on the system of existing
Users and new connection shall not suffer adversely due to existing
Users.
iii) A system of acceptable quality is ensured by specifying the required
minimum standards for the design and operational criteria to assist the
Users in their requirement to comply with the licence obligations.
iv) The ownership and responsibility for all equipments is clearly specified
in the “Site Responsibility Schedule” for every site, where a connection
is made.
5.3 Procedure for application for connection to Transmission System
The procedure for any new connection or modification of an existing
connection with the State Transmission System shall consist of following:
1. The User shall meet all necessary conditions as specified in the State
Grid Code and submit the application to STU containing all the
information as may be specified.
2. STU shall make a formal offer within 60 days of the receipt of the
application. The offer shall specify and take into account any work
required for the extension or reinforcement of the State Transmission
System necessitated by the applicant’s proposal and for obtaining any
consent necessary for the purpose. STU shall process the application
in accordance with the CEA regulations on Grid Connectivity
3. If the specified time limit for making the offer against any application is
not adequate, STU shall make a preliminary offer within the specified
time indicating the extent of further time required for detailed analysis.
4. Any offer made by STU shall remain valid for a period of 60 days and
unless accepted before the expiry of such period, shall lapse
thereafter.
5. In the event of offer becoming invalid or not accepted by the applicant,
STU shall not be bound to consider any further application from the
same applicant within 12 months unless the new application is
substantially different from the original application.
6. The applicant shall furnish the Detailed Planning Data as per
Appendix-B.
20 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
5.4 Rejection of application
STU shall be entitled to reject any application for connection to or use of
the State Transmission System due to the following reasons apart from
others as considered reasonable:
(i) If such proposed connection is likely to cause breach of any
provision of its Licence or any provision of the Grid Code or any
provision of IEGC or any criteria or covenants or deeds or
regulations by which STU is bound.
(ii) If the applicant does not undertake to be bound, in so far as
applicable, by the terms of the Grid Code.
(iii) If the applicant fails to give confirmation and undertakings
according to this section.
(iv) The reason for rejection of connection to or use of the state
transmission system will be communicated to the applicant by STU
within 60 days of the receipt of application.
5.5 Connection Agreement
1. A connection agreement, or the offer for a connection agreement shall
include (but not limited) within its terms and conditions the following:
(i) A condition requiring both agencies to comply with the Grid Code.
(ii) Details of connection technical requirements and commercial
arrangements
(iii) Details of any capital related payments arising from necessary
reinforcement or extension of the system, data communication, RTU
etc and demarcation of the same between the concerned parties.
(iv) A Site Responsibility Schedule (Appendix-D).
(v) General Philosophy, Guidelines etc on protection and telemetry
2. Model Connection agreement :- This shall be prepared by STU and
submitted to the Commission for approval.
5.6 Site responsibility schedule
1. For every connection to the State Transmission System for which a
connection agreement is required, STU shall prepare a schedule of
equipment with information supplied by the respective Users. This
schedule, called ‘Site Responsibility Schedule’ shall indicate the
following for each item of equipment installed at the connection site.
i) Ownership of the equipment
ii) Responsibility for control of equipment
iii) Responsibility for maintenance of equipment
iv) Responsibility for operation of equipment
v) Responsibility for all matters relating to safety of persons and site.
vi) Management of the site.
2. The format to be used in the preparation of Site Responsibility
Schedule is given in Appendix – D.
5.7 System Performance
1. All equipment connected to the State Transmission System shall be of
such design and construction that enable STU to meet the requirement
of standards of performance specified by BERC under section 57 of
the Electricity Act, 2003.
21
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
2. Installation of all electrical equipment shall comply with IE Rules, 1956
which are in force for time being and will be replaced by new rules
made under Electricity Act, 2003.
3. For every new / modified connection sought the STU shall specify the
connection point, technical requirements and the voltage to be used,
along with metering, telemetering and protection requirements as
specified in the Metering Code and Protection Code.
4. Insulation coordination of the User’s equipment shall conform to the
applicable values as specified by STU from time to time out of those
applicable as per Indian Standards / Code of Practices. Rupturing
capacity of the switch gear shall not be less than that specified by STU
from time to time.
5. Protection schemes and metering schemes shall be as detailed in the
Protection Code and Metering Code.
6. The State Transmission System rated frequency shall be 50.00 Hz and
shall be regulated by the provisions of IEGC as given below:
Target Range
Upper limit – 50.20 Hz
Lower limit – 49.50 Hz
7. The Users shall be subject to the Grid discipline prescribed by SLDC
and ERLDC.
8. The variation of voltage at the interconnected point should not be more
than voltage range specified below:
Nominal (KV) % limit of
variation
Maximum (KV) Minimum (KV)
400 +5% / - 5% 420 380
220 +/- 10% 245 198
132 +/- 10% 145 122
5.8 Connection Points / Interface points
1. State Generating Stations (SGS)
(i) Voltage may be 220/132/33 KV or as agreed with STU.
(ii) Unless specifically agreed with STU, the Connection point with
generating station shall be the terminal isolator provided just before
the outgoing gantry of the feeders.
(iii) SGS shall operate and maintain all terminals, communication and
protection equipments provided within the generating station.
(iv) The provisions for the metering between generating station and
STU system shall be as per the Metering Code.
(v) Respective Users shall maintain their equipments from the out
going feeders’ gantry onwards emanating from generating station
(vi) All entities embedded within BSEB system and interfacing the
intra/state transmission system shall provide adequate and reliable
communication facility so that SLDC is able to record in its SCADA
system the MW/ MVAR flows, bus voltages at all the interface
points with the intra-state system.
22 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
2. Distribution Licensee
(i) Voltage may be LV side of power transformer i.e. 33 KV or 11 KV
or as agreed with STU. For EHV consumers directly connected to
transmission system, voltage may be 220 KV/ 132 KV
(ii) Unless specifically agreed with Distribution Licensee, the
Connection point with STU shall be the terminal isolator provided
just before the outgoing gantry of the feeder to Distribution
Licensee or individual EHV consumer as the case may be, from
STU sub-station
(iii) STU shall operate and maintain all terminals, communication and
protection equipments provided within its sub-station. The
provisions for the metering between STU and Distribution Licensee
systems shall be as per the Metering Code. Respective Users shall
maintain their equipment beyond the out going gantry of feeders
emanating from STU sub-station onwards.
3. Eastern Regional Transmission System
The Connection, protection scheme, metering scheme and the voltage
shall be in accordance with the provisions of IEGC.
4. Independent Power Producers (IPPs), Captive Power Plants (CPPs),
Extra High Voltage (EHV) Consumers and Open Access Customers
(i) Voltage may be 220/132/33 KV or as agreed with STU.
(ii) When IPPs, CPPs, EHV Consumers or the Open Access
Customers own sub-stations, the Connection point shall be the
terminal isolator provided just before the gantry of
outgoing/incoming feeder in their premises.
23
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
CHAPTER – 3: SYSTEM OPERATION CODE
Section – 6: Operation Planning
6.1 Introduction
This section describes the process by which the SLDC carries out the
operational planning and demand control procedures to permit reduction
in demand for any reason.
6.2 Objective
Operational Planning is aimed at integrated, economic and reliable
operation of the State grid.
Operating Policy:
i) Overall real time operation of the State grid shall be supervised by
the SLDC and the STU in accordance with Grid Code.
ii) Distribution Licensee shall monitor grid operation of its distribution
system and coordinate with the SLDC.
iii) All State entities shall comply with the operation guidelines
specified hereinafter and co-ordinate with each other, for deriving
maximum benefits from the integrated operation and for equitable
sharing of obligations.
iv) A set of detailed internal operating procedures for the State Grid
shall be developed and maintained by the SLDC in consideration
with the entities and same shall be consistent with Grid Code.
The control rooms of the SLDC, Area LDC, generating stations, and
EHV sub-stations and any other control centers of all the entities
shall be manned round the clock by qualified personnel with
adequate training.
6.3 System security
1. All Users shall operate their respective power system and generating
stations in synchronization with each other at all times so that the
whole State Transmission System operates as a synchronized system
as well as integrated part of Eastern Region Gird. STU shall operate
the inter - state links so that inter state transfer of power can be
achieved smoothly when required.
2. No part of the State Transmission System shall be isolated from the
integrated grid except under the following conditions;
i) Emergency situations that may result in total grid collapse.
ii) Isolation of the system to prevent serious damage to
important/costly equipment.
iii) When such isolation is specifically instructed by SLDC.
iv) On operation of under frequency / islanding scheme as approved at
Eastern Region level.
3. Complete synchronization shall be restored as soon as conditions
permit. The restoration process shall be supervised by SLDC.
4. The 132 KV and above transmission lines (except radial lines which do
not affect the operation of the Grid) and the inter connecting power
transformers should not be opened or removed from service without
instruction or prior clearance from the SLDC. Under emergencies
where prior clearance from SLDC is not possible, it should be intimated
24 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
to SLDC at the earliest possible time after the incident and get the
clearance, while bringing back these lines into service.
5. Any tripping, whether manual or automatic of transmission lines by 132
KV and above or power transformers of 132 KV class and above and
50 MVA and above shall be promptly reported to the SLDC at the
earliest along with the reasons for such tripping and the likely time
required for restoration. The information / data including that down
loaded from disturbance recorder, sequential event recorder etc.
required for the purpose of analysis shall be sent to SLDC.
For restoration of tripped equipment / line, SLDC shall be informed and
get its clearance.
6. All generating units of 200 MW and above in case of thermal and 10
MW and above in case of hydro which are synchronized with the grid
irrespective of their ownership shall have their governors in normal
operation at all times. If any generating unit of over 50 MW size is
required to be operated without its governor in normal operation, the
ERLDC through SLDC shall be immediately intimated about the reason
and duration of such operation. The exemption from free governor
mode operation in respect of run of river hydro stations without any
pondage, steam turbine of thermal and gas based power stations not
having free governor mode facility shall be obtained from CERC under
clause 1.6 of IEGC.
7. Facilities available with / in Load limiter, Automatic Turbine Run-up
System (ATRS), Turbine Supervisory Coordinated Control System etc.,
shall not be used to by pass the normal governor action in any manner.
No dead bands and time delays shall be deliberately introduced.
8. All generating units operating in Free Governor Mode Operation
(FGMO) at or upto 100% of their maximum continuous rating shall
normally be capable of (and shall not be prevented from) picking up
5% extra load, more than the declared maximum continuous rating, for
atleast five minutes or within the technical limits specified by the
manufacturers, when the frequency falls due to a system contingency.
In case any generating unit of 50 MW and above size does not meet
this requirement for any period, the generating company should
intimate the same to SLDC along with reasons thereof. Any generating
unit not capable of complying with above provisions either due to not
having requisite facilities or otherwise shall seek exemption from
Central Electricity Regulatory Commission (CERC) under clause 1.6 of
IEGC.
9. In case frequency falls below 49.5 Hz, all partly loaded Generating
Units shall pick up additional load at a faster rate, according to their
capability. SLDC in consultation with ERLDC and Distribution
Licensees shall prepare a plan for automatic load relief during the low
frequency conditions. In case frequency rises to 50.5 Hz or higher,
neither any generating unit shall be synchronized with the Grid nor
shall generation at any generating station (irrespective of type or
ownership) be increased without obtaining approval from SLDC.
10. Except under an emergency, or to prevent an imminent damage to
costly equipment, no User shall suddenly decrease/increase its
25
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
generation without prior intimation to the SLDC. Similarly, no User shall
cause a sudden decrease/increase in its load due to imposition/lifting
of power cuts etc., without prior intimation to and consent of SLDC,
particularly when frequency is deteriorating.
11. All Generating Units shall normally have their Automatic Voltage
Regulators (AVRs) in operation, with appropriate settings. In particular,
if a Generating Unit of over 50 MW capacity is required to be operated
without its AVR in service, the same should be operated only after prior
concurrence of SLDC.
12. Each Generating Unit must be fitted with a turbine speed governor
having an overall droop characteristic within the range of 3% to 6%,
which shall always be in service.
13. State Generating Stations and other generating stations connected to
the Grid shall follow the instructions of SLDC for backing down/boxing
up (ramping-down) and shutting down the generating unit(s). SLDC
shall provide the certificate for the period of the backing down/boxing
up or shutting down for the purpose of computing the deemed
generation, if required.
14. Various steps shall be taken for frequency management and voltage
management so as to ensure system security from these
considerations.
6.4 Demand Estimation
1. The Distribution Licensee shall formulate a short–term demand
forecast considering the previous financial year as base and projecting
the demand for the succeeding 5 years.
2. It shall be the responsibility of all Distribution Licensees to fully
cooperate with STU in preparation of demand forecast for the entire
state.
3. The long term demand estimation / load forecast (for more than 1 year)
shall be done by STU and SLDC shall be provided with a copy of the
same as and when it is finalized.
SLDC shall inform its load projections (both peak and off – peak) in
ERPC forum for three months, to be reviewed every month ahead.
4. The Distribution Licensees shall provide to the STU and SLDC their
estimates of demand for each inter connection point for the next
financial year by 31st January of each year Distribution Licensees shall
also provide daily demand for the month ahead at each inter
connection point by 25th of the month.
5. Based on the data furnished by the Distribution Licensees, STU shall
make monthly peak and lean period demand estimates for year ahead
and daily peak and lean period demand estimates for the month ahead
and furnish the same to SLDC.
6. The Distribution Licensee shall provide to SLDC on day ahead basis,
at 9.00 hrs, each day their estimated demand for each 15 minute block
for the ensuing day. The Distribution Licensee shall also provide to
SLDC estimates of loads that may be shed, when required, in discreet
blocks with details of arrangement of such load shedding.
26 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
7. The SLDC would update demand forecast (in MW as well as kWh) on
quarterly, monthly, weekly and ultimately on daily basis which would be
used in the day – ahead scheduling.
6.5 Demand Control
1. Automatic load shedding shall be resorted to by means of installation
of the Under Frequency Relays at the sub stations of the STU as per
the directions of the SLDC to preserve the overall integrity of the power
system. The number and size of the discrete blocks using Automatic
Under Frequency Relays for Load Shedding shall be determined on
rotational basis in consultation with every Distribution Licensee. The
frequency settings of these relays shall be coordinated in consultation
with the RLDC.
2. Whenever restoration of large portions of the total demand
disconnection effected by the automatic load shedding is not possible
within a reasonable time, the SLDC shall implement additional
disconnection manually, to restore an equivalent amount of demand
disconnected automatically.
Each Distribution Licensee shall help the SLDC in identifying such load
blocks.
Load shed by the operation of automatic load shedding devices shall
not be restored without specific directions from the SLDC.
3. Planned manual disconnections shall be implemented by the SLDC
when there is a shortfall in generation, or constraints in Transmission
System, or reduction of imports through external connection etc.,
requiring demand control to control the over-drawl of power from Inter
State Generating State (ISGS) when the system frequency falls below
49.5 Hz. In such cases a rotational load shedding scheme shall be
adopted to ensure equitable treatment for all consumers as far as
practicable.
4. Emergency Manual Disconnection to deal with unacceptable voltage
and frequency levels etc. shall be implemented by the SLDC when loss
of generation, mismatch of generation with the demand, constraints in
the transmission system, over-drawal from the grid in excess of
respective schedule affecting the frequency of the regional grid below
49 Hz, requiring load shedding at short notice or no notice, to maintain
a regulating margin.
5. These control measures shall not be withdrawn till the system
frequency improves and when the SLDC issues such instructions after
review of the situation.
6.6 Load Crash
1. In the event of load crash in the system due to weather disturbance or
any other reasons, the situation would be controlled by SLDC by the
following methods in descending priorities:
i. Lifting of the load restrictions, if any
ii. Exporting the power to neighbouring regions/ states provided the
same does not endanger the security of the ISTS
iii. Backing down of thermal stations with a time lag of 5-10 minutes for
short period in merit order.
27
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
iv. Closing down of hydel units (subject to non spilling of water and
effect on irrigation) keeping in view the inflow of water into canals
and safety of canals/hydel channels.
2. While implementing the above, the system security aspects should not
be violated as per provisions in section 5.2 of IEGC and Section 6.3 of
the Grid Code.
Section-7: Outage Planning
7.1 Introduction
This section describes the procedure for preparation of outage schedules
for the elements of the State Grid in a coordinated and optimal manner
keeping in view the State Grid operating conditions and the balance of
generation and load.
7.2 Objective
The objective of this section is to define the process which will allow STU
to optimise transmission outages with SGS (other than CPP) and
Distribution Licensees, Outages in co-ordination with outage planning of
regional system while maintaining system security to the extent possible.
7.3 Outage Planning Process
1. Each User shall provide their outage programme for ensuing financial
year to SLDC for preparing an overall outage plan for the State
Transmission System as a whole. SLDC shall be responsible for
analyzing the outage schedules of all Users including SGS, Distribution
Licensees, STU and Transmission Licensee(s) schedules for outage of
Transmission network and preparing a draft annual Outage Plan for
the State Transmission System in coordination with the Outage Plan
prepared for the region by ERLDC. The Users shall furnish the
information to SLDC as per Appendix-C.
2. SLDC is however authorised to defer the outage in case of any of the
following events:
• Major grid disturbance
• System Isolation
• Black out in the State
• Any other event in the system that may have an adverse impact on
system security by the proposed outage
3. Each User shall obtain approval of SLDC, prior to availing the Outage.
SLDC while permitting any circuit for outage shall issue specific code.
Similarly, no inter user boundary circuits shall be connected back to
the State Transmission System without specific code/approval by
SLDC.
This restriction shall however not be applicable to individual
Generating Unit(s) of a CPP.
7.4 Annual Outage Planning
1. Scheduled outage of power stations of capacity 25 MW and above as
notified by SLDC from time to time, will be subject to annual planning.
2. Scheduled outage of power station of 50 MW and above and EHV
lines as notified by ERLDC, will also be subject to annual planning of
ERPC Secretariat in co-ordination with SLDC.
28 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
3. SGS (except CPPs) connected to the State Grid shall furnish their
proposed Outage programme for the next financial year in writing by
15th November each year.
4. SGS Outage programme shall contain details like identification of unit,
reason for outage, generation availability affected due to such outage,
outage start date and duration of outage. SLDC shall review the
outage programme received from SGS on monthly basis to chalk out
the outage of the State Transmission System.
5. SLDC shall also obtain from STU, the proposed outage programme for
Transmission lines, equipments and sub-stations etc. for next financial
year by 15th November each year. STU outage programme shall
contain identification of lines/ substations, reasons for outage, outage
start date and duration of outage.
6. Scheduled outage of power stations and EHV transmission lines
affecting regional power system shall be affected only with the
approval of ERPC in co-ordination with SLDC.
7. Scheduled outage of power stations of capacity 25 MW and above, of
all EHV lines and HV lines forming interconnection between two EHV
substations (and these notified as such by SLDC) shall be approved by
SLDC, 24 hours in advance based on prevalent operating conditions.
8. In respect of scheduled outage referred in this section a calendar shall
be formulated in respect of annual outage planning for the ensuing
financial year. Such outage plan shall be deliberated and finalised in
the meeting of the Operation and Co-ordination Committee (OCC). to
be constituted by SLDC at the State level.
a. SLDC shall submit the proposed annual outage plan of the next
financial year to ERPC Secretariat by 30th November of preceding
year.
b. Final annual outage plan shall be communicated to ERPC
Secretariat by 15th January of each year.
7.5 Availing of shutdowns schedule
SLDC would review on daily basis the outage schedule for the next two
days and in case of any contingency or conditions described in section
5.7.4(g) of the IEGC, defer any planned outage as deemed fit clearly
stating the reasons thereof. The revised dates in such cases would be
finalized in consultation with the User.
29
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
Section-8: Contingency Planning
8.1 Introduction
This section describes the steps in the recovery process to be followed by
all Users in the event of total or partial blackouts of the State Transmission
System or Regional System.
8.2 Objective
The objective of this section is to define the responsibilities of all Users to
achieve the fastest recovery in the event of the State Transmission
System or Regional System blackout, taking into account essential loads,
generator capabilities and system constraints.
8.3 Contingency Planning Procedure
1. SLDC shall be prepared to efficiently handle the following types of
contingencies and restoration of system back to normal:
• Partial system black out in the state due to multiple tripping of the
Transmission lines emanating from power stations/sub-stations
• Total black out in the state/region
• Synchronisation of system islands and system split
2. In case of partial black out in the system/state, priority is to be given for
early restoration of power station units, which have tripped. Start up
power for the power station shall be extended through shortest
possible route and within shortest possible time from adjoining sub-
station/power station where the supply is available. Synchronising
facility at all power stations and 220 kV sub-station having inter-
connection with ISTS shall be available.
3. In case of total regional black out, SLDC In-charge shall co-ordinate and
follow
the instructions of ERLDC for early restoration of the entire grid. Start-
up power to the thermal stations shall be given by the hydel stations or
through interstate supply, if available. All possible efforts shall be made
to extend the hydel supply to the thermal power stations through
shortest transmission network so as to avoid high voltage problem due
to low load conditions. For safe and fast restoration of supply, SLDC
shall formulate the proper sequence of operation for major generating
units, lines, transformers and load within the state in consultation with
ERLDC. The sequence of operation shall include opening,
closing/tripping of circuit breakers, isolators, on-load tap-changers etc.
8.4 Restoration Procedure
1. Detailed procedure for restoration of the State Transmission System
shall be prepared by SLDC for the following contingencies and shall be
in conformity with the System Restoration Procedure of the Eastern
Region prescribed under IEGC.
- Total System Black out
- Partial System Blackout
- Synchronisation of System Islands and System Split
2. The restoration process shall take into account the generator
capabilities and the operational constraints of Regional and the State
Transmission System with the object of achieving normalcy in the
shortest possible time. All Users should be aware of the steps to be
taken during major Grid Disturbance and system restoration process.
30 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
8.5 Special Considerations
1. During restoration process following the State Transmission System or
Regional System blackout conditions, normal standards of voltage and
frequency need not be applied and left to the discretion of the SLDC.
2. Distribution Licensees with essential loads shall separately identify
non-essential components of such loads, which may be kept off during
system contingencies. They shall also draw up an appropriate
schedule with corresponding load blocks in each case. The non-
essential loads can be put on only when system normalcy is restored,
as advised by SLDC.
3. All Users shall pay special attention to carry out the procedures so that
secondary collapse due to undue haste or inappropriate loading is
avoided.
4. Despite the urgency of the situation, careful, prompt and complete
logging of all operations and operational messages shall be ensured
by all Users to facilitate subsequent investigation into the incident and
the efficiency of the restoration process. Such investigation shall be
conducted promptly after the incident and placed before the Grid Code
Review Panel in its next meeting.
Section-9: Cross Boundary Safety
9.1 Introduction
This section specifies the requirements for safe working practices for
maintenance of equipment associated with cross boundary operations. It
lays down the procedure to be followed when work is required to be
carried out on electrical equipment that is connected to another User's
system.
9.2 Objective
The objective of this section is to achieve an agreement and consistency
on the principles of safety as prescribed in the Indian Electricity Rules
1956 which are in force for time being and will be replaced by the rules
made under Electricity Act, 2003 when working across the inter user
boundary between one User and another User.
9.3 Designated Officers
STU and all Users shall nominate suitable authorized persons to be
responsible for the co-ordination of safety across their boundary. These
persons shall be referred to as Designated Officer(s) (or control person(s).
9.4 Procedure
1. STU shall issue a list of Designated Officers (names, designations and
telephone numbers) to all Users who have a direct inter user boundary
with STU or other Users. This list shall be updated promptly whenever
there is change of name, designation or telephone number.
2. All Users with a direct inter user boundary with STU or other User
system shall issue a similar list of their Designated Officers to STU or
other User(s), which shall be updated promptly whenever there is a
change in the list.
3. Whenever work across a cross boundary / an inter-user boundary is to
be carried, the Designated Officer of the User including STU itself,
wishing to carry out work shall personally contact the other relevant
Designated Officer. If the Permit to Work (PTW) cannot be obtained
31
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
personally, the Designated Officers shall contact through telephone
and exchange Code words to ensure correct identification of both
agencies.
4. Should the work extend over more than one shift, the Designated
Officer shall ensure that the relief Designated Officer is fully briefed on
the nature of the work and the code words in operation.
5. The Designated Officer(s) shall co-operate to establish and maintain
the precautions necessary for the required work to be carried out in a
safe manner. Both the established isolation and the established earth
shall be locked in position, where such facilities exist, and shall be
clearly identified.
6. Work shall not commence until the Designated Officer of the User
including STU itself, wishing to carry out the work, is satisfied that all
the safety precautions have been established. This Designated Officer
shall issue agreed safety documentation (PTW) to the working party to
allow work to commence. The PTW in respect of specified EHV lines
and other interconnections shall be issued with the consent of SLDC.
7. When work is completed and safety precautions are no longer
required, the Designated Officer who has been responsible for the
work being carried out shall make direct contact with the other
Designated Officer to return the PTW and for removal of those safety
precautions. Return of PTW in respect of specified EHV lines and
interconnections shall be informed to SLDC.
8. The equipment shall only be considered as suitable for connecting
back to service when all safety precautions are confirmed as removed,
by direct communication using code word contact between the two
Designated Officers, and after ensuring that the return of agreed safety
documentation (PTW) from the working party has taken place.
9. STU shall develop an agreed written procedure for inter-user boundary
safety and continually update it.
10. Any dispute concerning inter user Boundary Safety shall be resolved at
the level of STU, if STU is not a party. In case STU is a party, the
dispute shall be referred to BERC for resolution of the dispute.
9.5 Special Consideration
1. For inter-user boundary between STU and other User’s circuits, all
Users shall comply with the agreed safety rules, which must be in
accordance with IE Rules or Rules framed under the Act.
2. Each Designated Officer shall maintain a legibly written safety logbook,
in chronological order, of all operations and messages relating to
safety co-ordination sent and received by him. All safety logs shall be
retained for a period of not less than 10 years.
32 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
Section-10: Operational Event/ Accident Reporting
10.1 Introduction
This section describes the reporting procedure of reportable events in the
State Transmission System
This section applies to SLDC, STU and all entities embedded within state
power system that are under the control and supervision of SLDC.
10.2 Objective
The objective of this section is to define the events/ incidents to be
reported, the reporting route to be followed and the information to be
supplied to ensure a consistent approach in reporting of incidents and
accidents in the State Transmission System.
10.3 Reportable Events
Any of the following events that could affect the State Transmission
System requires reporting:
a. Exceptionally high / low system voltage or frequency.
b. Serious equipment problem relating to major circuit breaker,
transformer or bus bar.
c. Loss of major Generating Unit. System split, State Transmission
System breakaway or Black Start.
d. Tripping of Transmission Line, ICT (Inter connecting transformer) and
capacitor banks.
e. Major fire incidents.
f. Force-Majeure condition like flooding or lightening etc.
g. Major failure of protection.
h. Equipment and Transmission Line overload.
i. Accidents-Fatal and Non-Fatal.
j. Load Crash / Loss of Load
k. Excessive Drawal deviations.
l. Minor equipment alarms.
The last two reportable incidents are typical examples of those which are
of lesser consequence, but which still affect the State Transmission
System and can be reasonably classed as minor. They will require
corrective action but may not warrant management reporting until these
are repeated for sufficient time.
10.4 Reporting Procedure
1. Reporting Time for events and accidents
All reportable incidents occurring on lines and equipment of 33 kV and
above and all the lines on which there is the inter user flow affecting
the State Transmission System shall promptly be reported orally by the
User whose equipment has experienced the incident (the reporting
User) to any other significantly affected Users and to SLDC. The
reporting user should submit a written confirmation to SLDC within one
hour of such oral report.
If the reporting incident is of major nature then the Reporting User shall
submit an initial written report within two hours to SLDC. This has to be
further followed up by the submission of a comprehensive report within
48 hours of the submission of the initial written report.
In other cases the Reporting User shall submit a report within 5 (five)
days to SLDC.
33
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
2. SLDC shall call for a report from any User on any reportable incident
affecting other Users and STU, in case the same is not reported by
such User whose equipment might have been source of the reportable
incident.
The above shall not relieve any User from the obligation to report
events in accordance with IE Rules 1956 – (Language used in the
Code to be used). The format of such a report shall be as agreed by
the State Grid Code Review Panel, but will typically contain the
following information:
i. Location of incident.
ii. Date and time of incident.
iii. Plant or equipment involved.
iv. Details of relay indications with nature of fault implications,
Antecedent conditions like line flows, bus voltage, generation and
demand
v. Supplies and quantum interrupted and duration if applicable.
vi. Amount of generation lost if applicable and its duration
vii. Brief description of incident.
viii. Estimate of time to return to service.
ix. Name of Organisation
x. Possibility of alternate arrangement of supply
10.5 Reporting Form
The standard reporting form other than for accidents shall be as agreed
from time to time by the Grid Code Review Panel. A typical form is
attached (APPENDIX-E).
10.6 Major Grid Incidence
(a) Following a major grid incident, SLDC and other Users shall co-
operate to inquire and establish the cause of such failure and make
appropriate recommendations. SLDC shall report the occurrence of
such major grid failure to the Commission in writing as well as
ERLDC immediately for information and shall submit the enquiry
report to the Commission within two months of the incident.
Analysis of major grid disturbance in the Intra State Power System
soon after their occurrence shall be done by a Protection sub-
committee constituted by STU.
(b) Periodic Reports – All distribution licensees shall send a weekly
report to SLDC on the performance of their respective systems
which should cover the following information:
(i) Voltage profile at all S/Stns (66KV) 132KV and above.
(ii) Average, maximum, minimum demand (both MW and MVAR) met
at such S/Stns.
(iii) Quantum and duration of load shed, with reasons
(iv) Outage of major elements
(v) Network constraints
(vi) Daily energy consumed and energy exchanged by the DISCOM
(c) SLDC shall post in its website a monthly performance report of the
State as a whole covering:
34 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
(i) Hourly demand met and generation for peak ay and minimum
demand met day. Also the average daily off-peak and peak
demands met.
(ii) Daily average consumption
(iii) Stationwise daily maximum, minimum and average generation
(MW), together with daily energy generation
(iv) Instances of non-compliance of the State Grid Code
(v) Progress of construction of new generating units, lines and
transformers. Details of generation and transmission outages
during the month.
10.7 Accident Reporting
Report of accidents shall be in accordance with the section 161 of the
Electricity Act, 2003 and the rules framed thereunder. Receipt of accident
and failure of supply or transmission of electricity shall be in the specified
form to the Commission and the Electrical Inspector.
CHAPTER-4: SCHEDULING AND DESPATCH CODE
Section-11: Scheduling and Despatch
11.1 Introduction
This section specifies the procedure to be adopted for the scheduling and
despatch of State Generating Station (SGS) and Inter-State Generating
Station (ISGS) to meet system demand and drawal allocation
requirements of Distribution Licensees.
11.2 Objective
The objective of this section is to detail the actions and responsibilities of
SLDC in preparing and issuing a daily schedule of generation to the SGSs
within its ambit, drawal schedule of various distribution licensees and
other entities utilizing the intra-state transmission system, furnishing
requisition from Eastern Region ISGS to ERLDC, including details of
bilateral transactions to be scheduled with other regional entities.
11.3 General
The following specific points would be taken into consideration while
preparing and finalising the schedules:
1. SLDC will issue despatch instructions required to regulate all
generation and imports from IPPs / CPPs according to the 15-minute
day ahead generation schedule. In the absence of any despatch
instruction by SLDC, SGS shall generate/ export according to the day-
ahead generation schedule.
2. The SLDC shall regulate the overall state generation in such a manner
that generation from following types of power stations shall not be
curtailed except under abnormal operating conditions.
(i) Run of river or canal based hydro stations.
(ii) Storage type hydro-stations when water level is at peak reservoir
level or expected to touch peak reservoir level as per inflows.
(iii) Generation from non-conventional sources like wind, solar that
cannot be stored/ controlled.
3. Despatch instructions to SGS shall be in standard format to be
finalized by SLDC.
35
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
4. The algebraic sum of scheduled drawals from ISGS, long term open
access, and short term open access arrangements shall be the net
drawal schedule for the control area of the utility.
11.4 Generation Scheduling
1) Steps in Scheduling
Step by step procedure for scheduling of ISGS and SGS/IPP/CPP
embedded in the state power system (not having the status of regional
entity shall be as described below:
i. By 9.00 hours every day each SGS shall intimate to SLDC the
station wise ex- power plant MW and MWh capabilities foreseen for
the next day i.e. between 00.00 to 24.00 hrs of the following day, at
15 minutes interval.
ii. By 9.00 hours every day each Distribution Licensees bulk power
consumer shall intimate SLDC the overall requirement in MW and
MWh for the next day at 15 minutes interval.
iii. After receipt of the information in regard to the availability from
different sources, the SLDC shall review aggregate generating
capability of ISGS, SGS and the bilateral interchanges, if any, vis-à-
vis Distribution Licensees requirements.
iv. By 15.00 hrs, SLDC shall finalise (a) generation schedule of SGS
and (b) drawal schedule of each Distribution Licensees. It shall
accordingly advise each Distribution Licensees of their drawal
schedule and will workout and convey to ERLDC for net drawal
schedule in each of the ISGS along with the bilateral exchanges
agreed or intended to be had with the other state / states and the
estimates of demand / availability in the state and additional power
it would like to draw subject to availability.
v. By 1700 hrs, ERLDC shall convey to SLDC the drawal schedule for
Bihar State from each of the ISGS and other short-term bilateral,
medium term and long-term schedules and SLDC shall convey to
SGS the generation schedule and drawal schedule to Distribution
Licensees by 1900 hrs.
vi. SGS and each Distribution Licensees may inform the modifications
/ changes to be made, if any, in the above schedule to SLDC by
21.30 hours.
vii. SLDC after considering the same shall convey revised schedule to
ERLDC by 22.00 hrs.
viii. On receipt of information and after due consultations, the ERLDC
shall issue the final generation and drawal schedule by 23.00 hrs,
and SLDC shall inform the same to all concerned.
2) SLDC shall prepare the day ahead generation schedule keeping in
view the following:
(i) Transmission System constraints from time to time.
(ii) 15 minute load requirements as estimated by SLDC.
(iii) The need to provide operating margins and reserves required to
be maintained.
(iv) The availability of generation from SGS, Central Sector
Generators and others together with any constraint in each
case.
36 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
3) During the day of operation, the generation schedule may be revised
under following conditions:
i. In case of forced outage of a unit of any SGS, SLDC may revise the
generation schedule on the basis of revised declared capability by
the affected SGS.
ii. ERLDC may revise the schedule of drawal from Eastern Region
and consequently SLDC shall enforce the revisions within Bihar.
11.5 Drawal Scheduling
SLDC is responsible for collection, examination and compilation of drawal
Schedule for each Distribution Licensee in prescribed manner and at the
prescribed time. Each Distribution Licensee shall supply to SLDC 15-
minute average demand estimates in MW for the day ahead.
11.6 Generation Despatch
1. SGS and embedded CPP/IPP shall comply promptly with a despatch
instruction issued by SLDC unless this action would compromise the
safety of plant or personnel. SGS and embedded CPP/IPP shall
promptly inform SLDC in the event of any unforeseen difficulties in
carrying out an instruction.
2. Despatch instructions shall be issued by E-Mail /Fax/ telephone,
confirmed by exchange of name of operators sending and receiving
the same and logging the same at each end. All such oral instructions
shall be complied with forthwith and written confirmation shall be
issued promptly by FAX, tele-printer or otherwise
11.7 Responsibilities
1. SLDC shall monitor actual power drawal against scheduled power
drawal and regulate internal generation and demand to maintain this
schedule. SLDC shall also monitor reactive power drawal and
availability of capacitor banks.
2. Generating Stations within the State shall follow the despatch
instructions issued by SLDC.
3. Distribution Licensees and Open Access Customers shall comply with
the instructions of SLDC for managing load & reactive power drawal as
per system requirement.
Section-12: Frequency and Voltage Management
12.1 Introduction
This section describes the method by which all Users of the State
Transmission System shall co-operate with SLDC and STU in contributing
towards effective control of the system frequency and managing the
voltage of the State Transmission System. The State Transmission
System normally operates in synchronism with the Eastern Region Grid
and ERLDC has the overall responsibility of the integrated operation of the
Eastern Regional Power System. The constituents of the Region are
required to follow the instructions of ERLDC for backing down generation,
regulating loads, MVAR drawal etc. to meet the objective.
SLDC shall accordingly instruct Generating Units to regulate
Generation/Export and adhere to active and reactive power generation
within their respective declared parameters. SLDC shall also regulate the
load as may be necessary to meet the objective. The State Transmission
System voltage levels can be affected by Regional operation. The
37
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
STU/SLDC shall optimize voltage management by adjusting transformer
taps (On Line Tap Changers) to the extent available and switching of
circuits/ capacitors/ reactors and other operational steps. SLDC will
instruct SGS to regulate MVAr generation within their declared
parameters. SLDC shall also instruct Distribution Licensees to regulate
demand, if necessary by operating reactors/ capacitor banks nearest to
load point in 33KV system.
12.2 Objective
The objectives of this section are as follows:
(1) To define the responsibilities of all Users in contributing to
frequency and voltage management.
(2) To define the actions required to enable SLDC and STU to
maintain the State Transmission System voltages and frequency
within acceptable levels in accordance with IEGC guidelines as well
as Planning and Security Standards for the State Transmission
System specified by the Commission, if any.
12.3 Frequency Management
1) The rated frequency of the system shall be 50 Hz and shall normally
be regulated within the limits prescribed in IEGC Clause 4.6(b) as also
specified in Connection Conditions. STU and SLDC shall make all
possible efforts to ensure that grid frequency remains within 49.5 Hz–
50.2 Hz band.
2) Falling frequency
Under falling frequency conditions, SLDC shall take appropriate action
to issue instructions, in co-ordination with ERLDC to arrest the falling
frequency and restore frequency within permissible range. Such
instructions may include despatch instruction to SGS and/or instruction
to Distribution Licensees and Open Access Customers to reduce load
demand by appropriate manual and/or automatic load shedding.
3) Rising frequency
Under rising frequency conditions, SLDC shall take appropriate action
to issue instructions to SGS in co-ordination with ERLDC to arrest the
rising frequency and restore frequency within permissible range. SLDC
shall also issue instructions to Distribution Licensees and Open Access
Customers in coordination with ERLDC to lift Load shedding (if exists)
in order to take additional load. In case of Load Crash, SLDC shall take
steps as per Clause 6.6 of the Grid Code.
12.4 Voltage Management
1) Users using the State Transmission System shall make all possible
efforts to ensure that the grid voltage always remains within the limits
specified in IEGC at clause 5.2 (r) and IE Rules 1956 as re-produced
below:
Voltage (KV rms)
Nominal Maximum Minimum
400 420 380
220 245 198
132 145 122
38 BIHAR GAZETTE (EXTRA) 23RD JULY 2010
2) STU and/or SLDC shall carry out load flow studies based on
operational data from time to time to predict where voltage problems
may be encountered and to identify appropriate measures to ensure
that voltages remain within the defined limits. On the basis of these
studies, SLDC shall instruct SGS to maintain specified voltage level at
interconnecting points.
SLDC shall continuously monitor 220/132kV voltage levels at strategic
sub-stations.
3) SLDC shall take appropriate measures to control State Transmission
System voltages, which may include but not be limited to transformer
tap changing, capacitor / reactor switching including capacitor
switching by Distribution Licensees at 66 KV & 33 KV substations,
operation of Hydro unit as synchronous condenser and use of MVAr
reserves with State Generating Stations within technical limits agreed
to between STU and Generators. Generators shall inform SLDC of
their reactive reserve capability promptly on request.
4) Distribution Licensees and Open Access Customers shall participate in
voltage management by providing Local VAR compensation (as far as
possible in low voltage system close to load points) such that they do
not depend upon EHV grid for reactive support.
Section-13: Monitoring of Generation and Drawal
13.1 Introduction
The monitoring of SGS output, active and reactive reserve capacity is
important to evaluate the performance of generation plants.
The monitoring of actual drawal against schedule is important to ensure
that STU and Distribution Licensees contribute towards improving system
performance and observe Grid discipline.
13.2 Objective
The objective of this section is to define the responsibilities of all SGS in
monitoring of Generating Unit reliability and performance, and STU’s/
Discoms’ compliance with the scheduled Drawal to assist SLDC in
managing voltage and frequency.
13.3 Monitoring Procedure
(1) For effective operation of the State Transmission System, it is
important that a SGS’s declared availability is realistic and that any
departures are continually and invariably fed back to the Generator to
help effect improvement.
(2) The SLDC shall continuously monitor Generating Unit outputs and Bus
voltages. More stringent monitoring may be performed at any time
when there is reason to believe that a SGS’s declared availability may
not match the actual availability or declared output does not match the
actual output.
(3) SLDC can ask for putting a generating station to demonstrate the
declared availability by instructing the generating station to come up to
the declared availability within time specified by generators.
39
BIHAR GAZETTE (EXTRA), 23RD JULY 2010
(4) SLDC shall inform SGS, in writing, if the continual monitoring
demonstrates an apparent persistent or material mismatch between
the despatch instructions and the Generating Unit output or breach of
the Connection Conditions. Continued discrepa