Joint Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2010
Regulations made under Electricity Act 2003
- Made under: Electricity Act 2003
This text is shown as one document.
Full text
1
No.: JERC-11/2010:- In exercise of power conferred by Section 181 (1) and 181 (2) read
with Section 50 and 43 (1), Section 44, Section 46, Section 47 (4) Section 56 of Electricity
Act, 2003 (36 of 2003) and all powers enabling it in this behalf and also in compliance of the
Ministry or Power, Govt. of India’s (i) notification no. SO 790 (E) dated 8th June 2005 issuing
“Electricity (Removal of difficulties) Order 2005” for “Inclusions of measures to control theft of
electricity in Electricity Supply Code”, and (ii) notification no. SO 798 (E) dated 9th June,
2005 issuing Electricity (Removal of Difficulties) Eight Order, 2005 for obtaining supply of
electricity at single point from the distribution licensee by the Cooperative Group Housing
Societies or by any person for their members or employees residing in the same premises,
the Joint Electricity Regulatory Commission for the State of Goa and Union Territories
hereby makes the following Regulations on Electricity Supply Code governing supply of
electricity by the licensees and procedure thereof, the powers, functions, and obligations of
the licensees and the rights and obligations of the consumers and other matters connected
therewith and incidental thereto.
CHAPTER – 1:
GENERAL
1.1 Short Title, Extent and Commencement
(1) These Regulations may be called the “Joint Electricity Regulatory Commission
(Electricity Supply Code) Regulations, 2010”.
(2) These Regulations shall come into force from the date of its publication in the
official gazette.
(3) These Regulations shall extend to the whole State of Goa and Union Territories
of Andaman & Nicobar Islands, Chandigarh, Dadra & Nagar Haveli, Daman &
Diu, Puducherry and Lakshadweep.
2
(4) These Regulations shall apply to all distribution licensees and the consumers of
electricity.
1.2 Definitions
In these Regulations, unless the context otherwise requires:
(a) ‘Act’ means The Electricity Act, 2003 (No. 36 of 2003) as amended from time to
time.
(b) ‘Agreement’ with its grammatical and cognate expressions means an agreement
entered between the licensee and the consumer under these Regulations.
(c) ‘Apparatus’ means, electrical apparatus and includes all machines, fittings,
accessories and appliances.
(d) ‘Area of Supply’ means, the area within which a distribution licensee is
authorized by his license to supply electricity.
(e) ‘Authorized officer’ means, the officer of the licensee authorized in this behalf by
the Appropriate Government or any other Administrative Authority under section
135 (2) of the Act.
(f) ‘Breakdown’ means, an occurrence relating to the equipment for supply of the
electric energy including electrical line that prevents its normal functioning.
(g) ‘Electricity Supply Code’ means, the Electricity Supply Code specified under
section 50 of the Act.
(h) ‘Commission’ means, the Joint Electricity Regulatory Commission for the State
of Goa and Union Territories.
(i) ‘Conductor’ means, any wire, cable, bar, tube, rail or plate used for conducting
electrical energy and so arranged as to be electrically connected to a system.
(j) ‘Connected Load’ means, aggregate of the manufacturer’s rating of all energy
consuming devices, in the consumer’s premises, which can be simultaneously
used. This shall be expressed in kW, kVA or HP units and shall be determined as
per the procedure laid down in these Regulations.
(k) ‘Consumer’ means, any person who is supplied with electricity for his own use by
a licensee engaged in the business of supplying electricity to the public under the
Act or any other law for the time being in force and includes any person whose
premises are for the time being connected for the purpose of receiving electricity
with the works of a licensee, and covers such other person, as the case may be;
(i) ‘Low Tension Consumer (LT Consumer)’ if he obtains supply from the
licensee at low voltage.
3
(ii) ‘High Tension Consumer (HT Consumer)’ if he obtains supply from the
licensee at High Voltage.
(iii) ‘Extra High Tension Consumer (EHT Consumer)’ if he obtains supply
from the licensee at Extra High Voltage.
(l) ‘Consumer’s installation’ means, any composite electrical unit including electric
wires, fittings, motors and apparatus, portable and stationary, erected and wired
by or on behalf of the consumer at the consumer’s premises.
(m) ‘Contract demand’ means, the Load in kW, kVA or HP, as the case may be,
agreed to be supplied by the licensee and contracted by the consumer and
specified in the agreement (where 1HP = 0.746 KWh).
(n) ‘Contracted Load’ means, the connected load which the consumer requires and
as specified in the agreement or in the sanction accorded for the service.
(o) ‘Cut-out’ means any appliance for automatically interrupting the supply or flow of
electrical energy through any conductor when the current rises above a
predetermined quantum, and shall also include fusible cut-out.
(p) ‘Date of commencement of supply’ means the date immediately following the
date of expiry of a period of three months from the date of intimation to an
intending consumer of the availability of power or the date of actual availing of
supply by such consumer, whichever is earlier.
(q) ‘Demand Charge’ for a billing period means a charge levied on the consumer
based on the contract demand or maximum demand calculated as per the
procedure provided in the Tariff Order of the Commission.
(r) ‘Distribution main’ means the portion of any main with which a service line is, or
is intended to be connected.
(s) ‘Distribution System’ means the system of wires and associated facilities
between the delivery points on the transmission lines or the generating station
connection and the point of connection to the installation of the consumers;
(t) ‘Earthed’ or ‘connected with earth’ means connected with the general mass of
earth in such manner as to ensure at all times an immediate discharge of energy
without danger.
(u) ‘Electric line’ means any line which is used for carrying electricity for any
purpose and includes –
(i) any support for any such line, that is to say, any structure, tower, pole or other
thing in, on, by or from which any such line is, or may be, supported, carried
or suspended; and
(ii) any apparatus connected to any such line for the purpose of carrying
electricity;
4
(v) ‘Electrical Inspector’ or ‘Inspector’ means an Electrical Inspector appointed
under sub-section 1 of section 162 of the Electricity Act, 2003 (36 of 2003), by the
Appropriate Government or any other Administrative Authority.
(w) ‘Electricity’ means, Electrical Energy –
(i) Generated, transmitted or supplied for any purpose, or
(ii) Used for any purpose except the transmission of a message.
(x) ‘Energy charge’ means a charge levied on the consumer based on the quantity
of electricity (units in kWh or kVAh as per tariff) supplied.
(y) ‘Extra High Voltage (EHV)’ or ‘Extra High Tension (EHT)’ means the voltage,
which exceeds 33,000 volts, alternating current, 50 HZ frequency, conditions
subject, however, to the percentage variation allowed under the Indian Electricity
Rules, 1956.
(z) ‘Group User’ means and include Cooperative Group Housing Society, registered
under Cooperative Societies Act or a person representing his employees.
(aa) ‘High Voltage (HV)’ or ‘High Tension (HT)’ means the voltage higher than 400
volts, AC, 50 HZ, but which does not exceed 33,000 volts, Alternating current
50 HZ under normal conditions subject, however, to the percentage variation
allowed under the Indian Electricity Rules, 1956.
(bb) “Indian Electricity Rules” or “I.E. Rules” means the Indian Electricity Rules,
1956, to the extent saved by the Act or the rules made under the Act there after.
(cc) ‘Initial period of agreement’ means the period of one year in case of LT supply
and two years in case of HT supply starting from the date of commencement of
supply as per agreement. The initial period of agreement shall continue till the
end of the month, in which the end date of the one/two year’s period expires.
(dd) ‘Installation’ means any composite electrical unit used for the purpose of
generating, transforming, transmitting, converting, distributing or utilizing
electrical energy.
(ee) “Licensee” means a person who has been granted a license under section 14
of the Act.
(ff) ‘Licensed Electrical Contractor’ means a contractor licensed under rule 45 of
the Indian Electricity Rules 1956.
(gg)‘Low Voltage (LV)’ or ‘Low Tension (LT)’ means the voltage, which does not
exceed 230 volts at single phase and 400 Volts at three phase, Alternating
Current 50 HZ under normal conditions subject, however, to the percentage
variation allowed under the Indian Electricity Rules, 1956.
(hh)‘Maximum demand’ in each month shall be the highest load measured in KVA
or KW by maximum demand indicater of the meter that may be required to be
installed as per CEA’s regulations on metering.
5
(ii) ‘Meter’ means an equipment used for measuring electrical quantities like energy
in kWh or kVAh, maximum demand in kW or kVA, reactive energy in kVARh
etc. including accessories like Current Transformers (CT) and Potential
Transformers (PT), including cables, where used in conjunction with such meter
and any enclosure used for housing or fixing such meter or its accessories and
any devices like switches or MCB/ load limiter or fuses used for protection and
testing purposes.
(jj) ‘Month’ means, the calendar month or the period between meter reading date
in a particular month and the corresponding meter reading date of the
immediately succeeding month.
(kk) ‘Occupier’ means the owner or person in occupation of the premises where
electrical energy is used or proposed to be used.
(ll) ‘Overhead line’ means, any electric supply-line, which is placed above ground
and in the open air but excluding live rails of traction system.
(mm) ‘Power Factor’ means, the average monthly power factor and shall be the ratio
expressed as a percentage of the total kilowatt hours to the total kilovolt
ampere hours supplied during the month; the ratio being rounded off to two
decimal figures.
(nn)‘Premises’ includes any land, building or structure.
(oo)‘Service-line’ means, any electric supply-line through which electrical energy is,
or is intended to be, supplied
(a) to a single consumer either from a distribution main or immediately from the
supplier’s premises, or
(b) from a distribution main to a group of consumers in the same premises or in
adjoining premises supplied from the same point of the distribution main. The
distribution main shall ordinarily mean the Low Tension distribution unless
otherwise specified.
(pp) ‘System’ means an electrical system in which all the conductors and apparatus
are electrically connected to a common source of electric supply.
(qq) “Standards of Performance of Distribution Licensee Regulations” means
the Joint Electricity Regulatory Commission (Standards of Performance)
Regulations, 2009.
(rr) ‘Tariff Order’ means the Tariff Order (s) of the Commission as may be
applicable in a particular case.
(ss) ’Theft of Electricity’ has the meaning assigned to it under section 135 of the
Electricity Act, 2003.
6
All other expressions used herein although not specifically defined herein, but
defined in the Act, shall have the meaning assigned to them in the Act. The other
expressions used herein but not specifically defined in these Regulations or in the
Act but defined under any law passed by the Parliament applicable to electricity
industry shall have the meaning assigned to them in such law.
Subject to the above, the expressions used herein but not specifically defined in
these Regulations or in the Act or any law passed by the Parliament shall have the
meaning as is generally assigned in the electricity industry.
In case of any inconsistency between these Regulations and the Terms & Conditions
existing on the notified date, the provisions and meanings contained in these
regulations shall prevail.
1.3 Review of the Electricity Supply Code
(1) The Commission shall constitute an Electricity Supply Code Review Committee
(hereinafter called review committee) to review this Code on a periodic basis.
The review committee shall consist of such number of members from the State of
Goa and Union Territories, as the Commission may consider necessary including
persons representing the following interests;
(a) Each Distribution Licensee of the State of Goa and Union Territories;
(b) LT consumers, HT consumers, EHT consumers, their associations and
interested groups;
(c) Generating company (by rotation if more than one);
(d) Any other person or interested group or organization as the Commission may
think fit.
(2) The Commission shall appoint one of members as Chairman of the review
committee. The Commission shall also nominate an officer from the Commission
to act as Member-Secretary to the review committee. The Commission shall
provide all the required assistance to the review Committee.
(3) All members of the review committee shall be appointed for a period of two
years.
(4) The review committee shall meet at least once every six (6) months. The
Member Secretary of review committee shall convene meetings with the
approval of the Chairman. He shall send meeting notice along with agenda to all
members ten days in advance.
7
(5) The Chairman, Member-Secretary and all Members shall be part-time members
of the review committee. They shall draw their salaries, allowances and
perquisites from their respective parent organizations.
(6) The Member Secretary of the review committee shall send the proceedings of
the meetings to all the members of the review committee and to the Commission
within 15 days from the date of the meetings.
(7) Any Licensee, generating company, consumer, industry or any interested parties
or business organization may send their suggestions in writing for revision of
these regulations to the Member–Secretary of the review committee, explaining
the difficulties experienced in implementation of these regulations may also be
communicated to the review committee. All these representations shall be
recorded and discussed in the review committee meetings. The Member-
Secretary shall maintain the entire correspondence relating to the review
committee.
(8) The Commission may amend these regulations suo-motu or on the
recommendations of the review committee. However, before any amendment is
issued to these regulations, procedure as specified in the Joint Electricity
Regulatory Commission (Conduct of Business) Regulations, 2009 of the
Commission shall be followed.
(9) A notice of the gist of amendments made in these regulations shall be published
by the Licensees in at least two newspapers having wide circulation in the areas
/ regions of supply stating that copies of the amended Electricity Supply Code
are available for purchase in the offices mentioned in sub-regulation -10) below.
(10)Copies of these regulations as duly amended from time to time shall be kept at
area offices, regional offices, circle offices, division and subdivision offices,
distribution centres of the licensees and such other offices as may be specified
by the Commission. The licensee shall also place it on their website.
8
CHAPTER-2:
SYSTEM OF SUPPLY AND CLASSIFICATION OF CONSUMERS
2.1 System of Supply
(1) The declared frequency of the alternating current (AC) shall be 50 HZ. The
Licensee shall as far as possible supply and maintain uninterrupted power supply
in a frequency band between 49.00 Hz to 50.5 Hz.
(2) The declared voltage of AC supply shall be as follows:
(a) Low Tension (LT)
(i) Single Phase: 230 volts between, a phase and neutral.
(ii) Three Phase: 400 volts between any two phases.
(b) High Tension (HT) - Three Phase: 11 kV, 22 kV, 33 kV between phases.
(c) Extra High Tension (EHT) - Three Phase: 66 KV,110 kV, 132 kV, 220 kV
between phases.
(3) The licensee shall design and operate the distribution system in conjunction with
the transmission systems. The licensee shall maintain voltage at the point of
commencement of supply to the consumer within the limits with reference to the
declared voltage as stipulated hereunder;
(a) Low voltage: (+) 6%; and (–) 6%;
(b) High voltage: (+) 6% and (–) 9%
(c) Extra high voltage: (+) 10% and (–) 10%
These are subject to change as and when deemed necessary by the Competent
Authority
2.2 Voltage of Supply to Consumers
The supply voltage for different contract demand or contract load shall be as
specified in the Tariff order.
Provided that, depending on system availability or condition, the licensee, at its
discretion, may supply a consumer at a voltage other than one specified above
recording justification for such deviation with prior intimation to the consumer and to
the Commission.
2.3 Classification of Consumers
(1) The classification of consumers, tariff and conditions of supply shall be as fixed
by the Commission from time to time in the tariff order or otherwise.
(2) Where a consumer has been classified under a particular category and is billed
accordingly and if it is subsequently found that the classification is not correct, the
consumer shall be informed through a notice, of the proposed reclassification,
9
duly giving him an opportunity to file any objection within a period of fifteen days.
The licensee shall finalize the classification with the approval of the Commission,
after due consideration of the consumer's submissions.
(3) No additional category other than that approved by the Commission shall be
created by the Licensee.
10
CHAPTER 3:
NEW SERVICE CONNECTION
3.1 Licensee’s obligation to supply of electricity on request
(1) The Licensee shall on an application by the owner or occupier of any premises,
located in its area of supply, give supply of electricity to such premises within one
month after receipt of application and on payment of requisite charges.
Provided where such supply requires extension of distribution mains, or
commissioning of new sub-station, the distribution Licensee shall supply the
electricity (including enhancement of load) to such premises immediately after
completion of such extension or commissioning of sub-station or within such period
as specified in Regulation 3.7 below.
Provided also in case of application for supply from a village or hamlet or area
wherein no provision for supply of electricity exists, the Commission shall extend the
period as specified under Regulation 3.7 on a case-to-case basis:
3.2 Exceptions from duty to supply of electricity
(a) Where a distribution licensee has to provide electric plant or electric line for giving
supply to the premises specified above under section 43 of the Act, no person
shall be entitled to demand or receive from licensee supply of electricity for any
premises having separate supply unless he has agreed with the licensee to pay
him such price and charges as specified by the Commission.
(b) Nothing contained under Regulation 3.1 above shall be taken as requiring a
distribution licensee to supply electricity to any premises, if it is prevented from
doing so by cyclone, floods, storm and other occurrences beyond its control.
3.3 Licensee’s obligation to extend the Distribution System
(1) The Licensee shall have obligation for ensuring that its distribution system is
upgraded, extended and strengthened to meet the demand for electricity in its
area of supply. Wherever the existing transformation capacity is loaded upto
80% of its capacity, the licensee shall prepare a scheme for augmentation of
such transformation capacity.
(2) The Licensee shall meet the cost for strengthening / upgradation of the
distribution system to meet the demand of the existing consumers as well as
future growth in demand through its annual revenues or funds arranged by
the licensee and this cost shall be allowed to be recovered from the
consumers through tariff by the Commission subject to prudence check.
11
(3) In all cases of new connections, the consumer shall bear the Service
Connection Charges that is the cost of service connection from the
Distribution Mains to the point of supply as approved by the Commission from
time to time.
(4) For uniformity and simplification in calculating the actual cost of extension, the
licensee shall prepare a ready reckoner to show the per-unit material cost of
LT line, HT line, substation of different capacities etc. The licensee shall
update the ready reckoner every year, under intimation to the Commission.
(5) In case the connected / contracted load of any new connection is projected to
be 60 kW or more, a separate transformer of adequate capacity shall be
installed at consumer’s cost. The space /room with required for housing the
transformer, sub station, switch gears, meters and panels shall be provided
by the consumer, free of cost, which is easily accessible to the licensee.
(6) The service connection/ extension of distribution mains, notwithstanding that it
has been paid for by the consumer, shall be the property of the licensee. The
licensee shall maintain it at its cost and shall also have the right to use the
same service connection/ extension for supply of energy to any other person
but such extension or service connection should not adversely affect the
supply to the consumer who paid for the extension of the distribution supply
network.
(7) When the licensee completes the work of extension of distribution mains and
is ready to give supply, the licensee shall serve a notice on the consumer to
take power supply within one month in case of LT and three months in case of
HT or EHT. If the consumer fails to avail supply within the notice period, the
agreement shall come into force from the day following the end of the notice
period, and thereafter the consumer shall be liable to pay charges as
applicable, as per the agreement.
3.4 Service connection / extension work got done by consumers
(1) The consumer shall have an option to get the work of drawing of service line
from the licensee’s distribution mains upto his premises as per the estimates
and layout approved by the licensee through an appropriate class of licensed
electrical contractor, and the work of extension of EHT and HT line,
distribution or HT substation and LT line through an appropriate class of
licensed electrical contractor as per the estimates and layout approved by the
licensee. In such case the consumer himself shall procure the materials. The
12
material should, conform to relevant BIS specification or its equivalent and
should bear ISI mark wherever applicable. The licensee may ask for
documentary evidence to verify the quality of materials used. The consumer
shall be required to pay the supervision charges as per the rates approved by
the Commission.
(2) The consumer shall get the work done within the timeframe as provided in
Regulation 3.7 and if he needs more time he shall represent to the licensee
with reasonable ground for extension of time and the licensee shall
communicate his approval for the same to the Consumer.
3.5 New Connection
(1) Application for a new connection of electricity supply or for
enhancement/reduction of load shall be made in duplicate in the prescribed
form, copies of which shall be available free of cost from the local office of the
licensee. The licensee shall also post the application forms on its website.
Photocopies of a blank application form or the form downloaded from the
website of the licensee may also be used by the applicant and shall be
accepted by the Licensee. Any assistance or information required in filling up
the form should be given to the consumer by the licensee. The Licensee may
modify the formats if so required to meet any requirement that may arise in
accordance with the provisions of Regulations so that the formats are
consistent with the Act, prevailing Rules, Regulations.
(2) All information relating to procedure, fees, designated officers for releasing
new connection shall be displayed on the notice boards of all the sub offices
and offices of licensee.
(3) The consumer shall furnish, along with the application form, attested true
copies of following documents. The licensee may ask for the following original
documents, from the consumer, if required, for verification.
(a) Proof of ownership of the premises, such as registered sale deed or
partition deed or succession or heir certificate or will of the owner,
OR
Proof of occupancy such as power of attorney or latest rent receipt or lease deed
or rent agreement or copy of allotment order issued by the owner of the property.
In case of supply to agriculture/ irrigation pump set, the copy of Land Revenue
receipt giving the Revenue Plot No. of the field for which the supply is required.
13
In case of tenancy permission of landlord along with proof of ownership of the
premises.
(b) In case of a partnership firm, partnership deed, authorization in the name
of the applicant for signing the requisition form and agreement.
(c) In case of a Public or Private Limited Company, Memorandum and
Articles of Association and Certificate of incorporation together with an
authorization in the name of the applicant for signing the requisition form
and agreement along with permanent address.
(4) The consumer shall also intimate whether the cost of service line and extensions,
if any, will be borne by him or not.
(5) The Licensee shall verify the application and the attached documents at the time
of receipt of application. Written acknowledgement shall be issued on the spot. If
the application is complete, otherwise it should mention the shortcomings, if the
application is incomplete.
(6) No application for the new connection in an electrified area shall be refused
under any circumstances if it complies with statutory requirements and is in
conformity with Act. In case consumer has not been intimated within stipulated
period about any further requirements for release of connection in his application,
the application shall be deemed to have been accepted and necessary action
shall be taken to release the connection.
(7) If any information furnished in application form is found wrong or the installation is
defective or the energisation would be in violation of provision of Act / Electricity
Rules / Tariff Order, the licensee shall reject the application with due notice to the
consumer.
(8) Licensee shall not be responsible if the reasons for delay are on account of right
of way, acquisition of land, technical feasibility and lack of transmission capacity
etc, over which the licensee has no reasonable control, provided the reasons for
the expected delay are communicated to the applicant within the period specified
for energisation.
3.6 Supply to Different Categories of Consumers
(A) LT Supply
(1) The Licensee shall verify the application and documents at the time of receipt of
application. If the application is incomplete, the shortcomings shall be intimated to
the applicant for compliance in writing within 3 working days. After a complete
application is received from the consumer, the licensee shall issue a written
acknowledgement to the consumer immediately within 2 working days of receipt
14
of the completed application form. The licensee shall intimate the consumer the
proposed date of inspection, which should be within the next 5 working days in
urban areas and 10 working days in rural areas.
(2) On receipt of application, the Licensee shall inspect the premises of the applicant
and the applicant along with the licensed contractor or his representative shall be
present during the inspection. During the inspection, the Licensee shall:
(i) Specify the point of supply and the place where meter and the cut-out/ MCB
shall be fixed.
(ii) Specify the layout of the proposed lines and substation and estimate the
distance between the point of supply and the nearest Distribution mains
from where supply could be given.
(iii) Verify other particulars mentioned in the application form, as required.
(iv) The licensee shall inspect the work completed by the consumer and release
supply only after work is found satisfactory.
(v) If the Licensee is not satisfied, he shall intimate to the applicant
shortcomings on the spot. The applicant shall get the defects rectified.
(3) (a) The licensee shall prepare an estimate for release of connection.
(b) The estimate shall include security deposit, charges for laying the service line,
distribution mains (if required) & material, and service connection charges etc,
as approved by the Commission from time to time.
(c) The Licensee shall publish a cost data book, and make it available to any
interested person at a reasonable charge, and shall also place it on their
website. The estimate as at (b) above shall be in accordance with the data
published in the cost data book.
(d) If the work is to be done by the developer/ applicant / development authority,
the Licensee may charge supervision charges as a percentage, of the
estimated cost as specified in cost data book, which shall be deposited with the
licensee before work begins.
In other cases, Licensee shall commence the work after the applicant has
deposited the cost of the estimate.
(e) A final bill shall be prepared after completion of the work by the Licensee.
- If the final bill exceeds the cost of the estimate, the difference shall be
deposited by the applicant before connection is energized.
- If the bill is less, the difference shall be adjusted in subsequent electricity bills
issued towards current consumption of the applicant.
(4) In case it is possible to extend supply from the existing mains, the licensee shall
intimate the consumer, within 20 days, the amount of security deposit and any
15
other charges as applicable. The amount shall be payable in full within 7 working
days, after which only any work for laying the service line will be taken up. The
licensee will also intimate to consumer to execute the agreement for the service
connections.
(5) In case it is necessary to extend distribution mains for giving supply to the
consumer, the licensee shall intimate the consumer, within 15 days in urban
areas and within 20 days in rural areas, an advice containing the charges for
extension of the distribution main, laying the service line, the amount of security
deposit, any other charges as applicable and will also intimate if any additional
formalities are required to be carried out by the consumer. In case where the
consumer has to lay the service line and extension of mains, the consumer shall
pay the supervision charges on cost of extension of the distribution mains and
laying the service line in addition to payment of other charges as may be
applicable. The amount shall be payable in full within 7 working days along with
completion of formalities, after which only any work for laying the distribution
mains and service line can be taken up.
(6) Licensee on request of consumer may extend the date of payment beyond 7
days, upto 15 days but this extended time shall not be counted for delay in giving
connection, and no compensation shall be paid during the said period. In case
the consumer fails to complete the formalities within 15 days, the licensee shall
give him notice to complete the formalities within the next 15 days failing which,
his requisition for supply shall be cancelled. Thereafter the consumer shall have
to apply afresh for supply or additional supply as the case may be.
(7) On deposit of charges as indicated above by the consumer, execution of the
agreement and intimation that the service line and extension work have been
completed, the licensee shall intimate the consumer, within 3 working days, the
date of testing of the consumer’s installation. The consumer shall ensure that the
licensed electrical contractor, who has carried out the wiring, is present during the
testing.
(8) On testing the consumer’s installation, if the licensee/competent authority is
satisfied with the test results, the licensee shall arrange to install the meter with
the cut-out or MCB, seal the meter in presence of the consumer and provide
supply.
16
(B) LT Supply to Multi-Consumer Complex Including Commercial Complexes:
(9) For the purpose of providing new power supply to a building or a group of
buildings having more than one connection with a total load exceeding 30 kW,
the premises shall be considered as a multi-consumer complex. Such new
connection shall be provided with single meter. However this shall not restrict the
individual owner for applying for individual connection and the licensee shall
sanction such connection on LT. The applicant / developer / development
authority shall be responsible to develop, construct the entire infrastructure
required for distribution network from the licensee’s sub station 33/11KV or 11/0.4
KV, upto the connection outlets in individual owner’s premises, at his own cost.
The cost of construction/augmentation of 33/11 kV power sub station if required shall be
borne by the licensee.
Note: The developer/ builder/ society/ consumer includes any agency whether
Government, local body or private that constructs the Multi-Consumer Complex.
(10) Meters shall normally be provided at the ground floor in accordance with the
procedure stated in Chapter 7 of these regulations.
(11) The land/room required for housing the transformer substation and meters shall
be provided by the developer /builder/ society/ consumer free of cost for which
rent or premium shall not be paid by the licensee. Transformers should preferably
be placed in open areas. In case of installation of transformer in a room or closed
area is unavoidable, all safety measures as per prevailing rules and regulations
shall be taken.
(12) Connections for common facilities like lift, water pumps etc. shall be given in the
name of the builder/developer/society.
(13) In case the original approved plan is for a multi-consumer complex, but the
builder/developer/ society/ consumer desires to avail connection for a portion of it,
the connection shall be provided treating it as multi-consumer complex.
(14) If a building comes under the category of multi-consumer complex and if a
separate distribution transformer of sufficient capacity is necessary, for giving
supply to such building which was not provided earlier, it will be provided at the
cost of the builder/developer/ society/ consumer. Alternatively, the builder/
developer/ society/ consumer shall bear the additional cost to augment the
capacity of the existing 11/0.4kV substation, if found necessary by the licensee.
(15) On receipt of requisition from the builder/developer/ society/ consumer for supply
of electricity to multi-consumer or commercial complexes, the licensee shall take
17
action for extending the supply as per procedure given in Regulation 3.6 (1) to
3.6 (8) above, as applicable.
(C) LT Supply to Housing Colonies and Multi storied Buildings:
(16) The developer/ builder/ society/ consumers of a housing colony shall bear the
cost of extension including the cost of 11 kV line, distribution transformer and LT
lines/ LT cables. The cost of construction / augmentation of capacity of power sub
station of 33/11 kV if required, shall be borne by the Licensee.
[Note: The developer/ builder/ society/ consumer includes any agency whether Government,
local body or private that constructs the building/ colony.]
(17) On receipt of requisition from the builder/developer/ society/ consumer for supply
to housing colony, the licensee shall take action for extending the supply as given
in Regulation 3.6 (1) to 3.6 (8) above, as applicable.
Supply to Group Users
(18) The Group user shall be eligible to opt supply by a distribution licensee at a
single point provided that the supply shall be primarily used for residential
purpose including the loads of common amenities for the group user like pumps
for pumping water supply and lighting of common area. The consumption of
energy for common services shall be separately metered with meters installed by
the consumer and tested and sealed by licensee. The consumption of energy
over and above 10% of the total consumption of energy shall be billed at LT
commercial tariff. The Group user shall inform the details of every non-domestic
activity along with the connected load to the licensee at the time of seeking
connection or at the time of enhancement in contract demand.
(19) On receipt of requisition in manner specified under regulation 3.5 from the group
user, the licensee shall verify the application and the attached documents at the
time of receipt of application. In case of a Cooperative Group Housing Society, a
certified copy of the registration of the Cooperative Group Housing Society shall
also be annexed along with the application requiring supply at single point.
(20) The provisions of these regulations shall not in any way affect the right of a
person residing in the housing unit sold or leased by Cooperative Group Housing
Society to demand supply of electricity directly from the distribution licensee of
the area on the following terms and conditions:
18
(i) The Cooperative Group Housing society must permit any person of the
society to avail supply of electricity from the Distribution licensee
directly.
(ii) The Cooperative Group Housing Society shall have no objection in
respect of the following:
(a) The electricity supply by the licensee to such person shall be served from the
licensee’s distribution network.
(b) Extension of adequate distribution network by the licensee to release the
supply to such person.
(c) Providing access for the licensee’s representative to approach at any point of
time to network of licensee in the premises of the group user including the
point of supply to such consumer to discharge service obligations without any
resistance.
(d) The meter shall be installed by the licensee at the appropriate place in the
premises of such consumer and the reading and billing of electricity for
consumption by such consumers shall be done by the licensee.
(e) The licensee shall recover the charges for the electricity consumed by such
person at the approved rate applicable to the domestic category.
(D) LT Supply for Agriculture/Irrigation Pump sets:
(21) The procedure laid down in Regulation 3.6 (1) to 3.6 (8) above, as applicable,
shall be followed for giving supply to agriculture/irrigation pump sets where
extension of distribution mains and /or augmentation of distribution transformer is
not required.
(22) Supply for agriculture/irrigation pump set, at one point, may also be given to a
registered co-operative society or to a group of farmers recognized by the
licensee.
(23) If, On inspection of the premises, if it is found that extension of distribution mains
augmentation of distribution transformer capacity providing of additional
distribution transformer etc are required, necessary estimate as per the cost-data
shall be prepared and got approved by competent authority. If any amount
towards cost of the works, after considering subsidy from the Government or any
appropriate authority shall be intimated to the consumer along with other charges
such as security deposit etc to be paid. The work of electrification of such pump
set(s), will be taken up and completed within the period as laid down in
Regulation 3.7 after the amount as intimated is deposited by the consumer(s).
New connection shall be given on the broad principle of first-come first serve
19
basis. Within 7 working days of completion of work, the licensee shall intimate the
date of testing of the installation of the consumer and inspect the wiring in the
premises of the consumer. In case the licensee is satisfied the connection shall
be served within 3 working days of the inspection.
(24) An agricultural consumer, if he so desires, may shift the location within his
premises of his connection, with the approval of the licensee, after payment of
charges if any.
(E) LT Supply to Public Street Lightings:
(25) Requisition for power supply to new or additional public street lights shall be
submitted in the prescribed format to the local office of the licensee by the
Municipal Corporation or Municipality or Municipal Board or Gram Panchayat or
Local Body or the Government Department or any other organization responsible
to maintain public street lights (in context of public street lights herein after called
‘local body’).
(26) The requisition for public lights shall be accompanied by resolution of the local
body and the sketch indicating the number of poles, existing or new, where
streetlights are required.
(27) The fittings, brackets or any special fittings shall be in accordance with the
relevant BIS specifications or its equivalent, and shall maintain required
clearances as per prevailing rules and regulations. The local body shall bear the
full cost of arranging of power supply to public streetlights including complete
fittings and brackets. In case, any special fittings are to be provided, the local
body shall arrange for it.
(28) The licensee shall intimate the cost of extension in writing within 20 days from the
date of application. The work shall be taken up only after deposit of the amount
and execution of agreement by the local body.
(29) A suitable double compartment weatherproof metal box to house the energy
meter and streetlight switch/ M.C.B./ timers shall be provided by the licensee.
(30) It shall be responsibility of the municipal body/local body to maintain and replace
streetlight fittings and also switch on and switch off the streetlight. However the
licensee may carry out the maintenance of streetlight fixtures on payment basis
and shall arrange to switch on fifteen minutes before sunset and switch off the
streetlights fifteen minutes before sunrise as per local sunset/ sunrise timings or
any other timings agreed upon between the Licensee and the local body. The
licensee shall also carry out replacement of fixtures/ bulbs (of same wattage) etc
on the poles on request by the streetlight consumers. The fixtures, bulbs etc.
20
shall be supplied by the consumers and replaced by the licensee within 7 days of
receipt. All such services shall be chargeable. Such maintenance charges shall
be included in the schedule of miscellaneous charges.
(F) Temporary Power Supply
(31) Any person requiring power supply for a purpose temporary in nature, for a period
of less than 90 days or as provided in the tariff order of the Commission may
apply for temporary power supply in the prescribed form. The period of
connection can be extended upto two years for building construction activities
and for purpose of installation of equipments by industrial consumers for setting
up their units. Application for temporary supply shall normally be given in
advance. In certain exceptional case like marriage, political meeting etc the
application can be given on the day on which supply is required. The proof of
ownership / occupation or permission from the local authority or from the owner of
the premises, as the case may be, where temporary connection is required has
also to be attached with the application.
(32) In case temporary supply is required in premises/ place where 100 or more
persons are likely to assemble, the consumer shall comply with the provisions of
section 54 of the Act.
(33) If supply is technically feasible, the licensee shall intimate the charges to be paid
by the consumer for the cost of service line, meter, cut-out/ MCB and other
charges etc, together with charges for the estimated electricity consumption for
the period of supply applied as per tariff order of the Commission in force. All the
charges shall be payable in advance.
The consumer shall have the option either to take the material used for temporary
connection or receive credit, in the final bill, for materials dismantled and returned
to stores of the licensee after disconnection of supply.
(34) In case temporary supply is required for a period more than 90 days, the licensee
may permit the consumer to pay charges for estimated consumption for 90 days
in advance and serve the bills for monthly consumption. In case the consumer
fails to pay the bills in time and the advance with the licensee does not cover the
charges for the balance period, the supply shall be liable for disconnection.
(35) The licensee shall release the supply within 3 days after payment of charges and
compliance of other requirements by the consumer for loads up to 10 KW and
within 15 days for load exceeding 10KW where extension of distribution mains is
not required. Where extension of distribution mains is required, the supply shall
21
be released within 60 days in case of LT consumers, 90 days for HT consumers
and 180 days for EHT consumers.
(36) The readings of the meter may be taken during the period of the temporary
connection to ensure that the charges for actual consumption does not exceed
the advance payment received.
(37) After the period of temporary supply is over and supply has been disconnected,
the licensee shall send the final bill to the consumer within 10 days from the date
of disconnection of supply and refund the balance amount, if any, within 20 days
of surrender of original money receipt or submission of indemnity bond by the
consumer. On any delay beyond the said time limit, the licensee will be liable to
pay an interest @ 1.5% per month on the amount to be refunded or outstanding
for the number of days beyond the last date of payment, as specified above.
(G) H.T. Supply
(38) After receipt of application for supply of electrical energy at H.T. in the prescribed
form, the licensee shall intimate the consumer in writing the date of inspection of
the site to examine the feasibility. The licensee shall intimate the feasibility or
otherwise of supply within 10 days of such inspection. The consumer or his
authorized representative shall remain present at the time of inspection. In case
supply is found feasible, the licensee shall fix the point of entry of the supplier’s
line, the position of meter, metering equipment and other equipments of the
supplier. The consumer may with the written permission of the licensee house his
own HT switchgear and other apparatus connected with the supply of electrical
energy to him under the agreement signed between the consumer and the
licensee but such enclosure shall not be used for any other purpose. The
licensee may insist on use of ‘Underground Cable’ or ‘Ariel Bunched Cable’,
wherever considered appropriate, for the last span. The difference of cost of the
last span on account of laying of ‘Underground Cable’ or ‘Ariel Bunched Cable’
with respect to overhead bare conductor shall be borne by the licensee.
(39) Supply to HT industrial consumers shall normally be given through HT feeder
exclusively meant for industries. It may be preferable to extend supply through a
separate feeder from the nearest 33/11 kV or EHT substation in case of
consumers with continuous process industry or load of 3 MVA or more.
(40) Supply to new HT consumer shall normally not be extended from the rural feeder.
If due to the prohibitive cost of extension of separate feeder from the nearest
33/11 kV or EHT sub station, or for any other reason, the supply is given from a
rural feeder, the consumer shall be informed that the supply shall be restricted
22
and regulated in accordance with the restrictions imposed on the rural feeders as
per grid conditions, which shall be compiled with.
(41) The licensee shall intimate the consumer, the charges required to be paid for the
cost of extension, if any, and the amount of security deposit and other charges if
any. Copies of the draft agreement and the form of the required test report shall
also be forwarded simultaneously.
(42) After payment of charges including security deposit, and execution of the
agreement, the licensee shall take up the work of extension of mains. If the
consumer wishes, he may execute the job on his own after payment of due
supervision charges to the licensee. After completion of the installation, the
consumer shall furnish to the licensee the test report and the permission from the
Electrical Inspector to energize the installation. On receipt of the report(s), the
licensee shall intimate the consumer in writing the date (not later than 7 days) of
inspection and testing of the consumer’s installation. In case the consumer’s
installation is found in order, the licensee shall seal the meter in the presence of
the consumer and serve the connection.
(H) Supply at Extra High Tension (EHT):
(43) After receipt of application in the prescribed form for supply of electrical energy at
E.H.T., the licensee shall intimate the consumer in writing the date of inspection
to check his installations. The consumer or his authorized representative shall
remain present at the time of inspection. In case supply is found feasible, the
licensee shall fix the point of entry of the supplier’s line, the position of meter,
metering equipment and other equipments of the supplier. The Licensee shall
intimate the feasibility of supply within 10 days of receipt of the application.
(44) The licensee shall intimate the consumer the charges required to be paid for the
cost of extension, if any, and the amount of security deposit and other charges, if
any. Copies of the draft agreement and the form of the required test report shall
also be forwarded simultaneously.
(45) After the payment of charges including security deposit and execution of the
agreement, the licensee shall take up the work of extension required to give
supply. If the consumer wishes he may execute the job on his own after payment
of due supervision charges to the licensee. The work shall be completed within
180 days.
(46) After the consumer executes his internal electrical works, he shall furnish to the
licensee the test report and the permission from the Electrical Inspector to
energize the installation in accordance with clause 47 of IE Rules. On receipt of
the report(s), the licensee shall intimate the consumer in writing the date of
23
inspection and testing of the consumer’s installation. If the consumer’s installation
is found in order, the licensee shall seal the meter in the presence of the
consumer and provide the connection.
3.7 Target Period of Completion of Various Activities
The following table provides the target period of completion of various activities:
S.No Type of Service Time Limit for
Rendering the
Service
1 LT Connection
1. Acceptance and Notice of inspection on receipt of complete
application.
2. Inspection after sending the notice
a. Urban areas
b. Rural areas
(i) if the extension work is not required and the connection is to
be given from the existing network
3. Issue of demand note to the applicant for payment of estimated
charges.
a. Urban areas
b. Rural areas
4. Serving of power availability notice for commencement of supply
after payment of necessary charges
a. Urban areas
b. Rural areas
(ii) If the extension work or enhancement of transformer
capacity is required.
5. Issue of demand note to the applicant for payment of estimated
charges
a. Urban areas
b. Rural areas
6. After payment of necessary charges serving of power availability
notice for commencement of supply – All connections
5 days
3 days
7 days
3 days
5 days
5 days
7 days
20 days
30 days
2 High Tension Connection
a) Information feasibility after receipt of the application
b) Issue of demand note of estimated charges (after issue of
notice of feasibility)
(i) If no extension of work is involved
(ii) If extension work is involved
c) Serving of power availability notice for commencement of
supply / release of connection after receipt of estimated
charges subject to receipt of clearance from Electrical
Inspector
(i) If no extension of work is involved
(ii) If extension work is involved
- Construction of 11 kV line
- Construction of 22 kV or 33 kV line
10 days
7 days
45 days
7 days
30 days
45 days
3 Extra High Tension Connection
a) Informing feasibility after receipt of the application
b) Issue of demand note of estimate charges after issue of notice
feasibility
10 days
60 days
24
c) Serving of power availability notice for commencement of supply /
release of connection after receipt of estimated charges
(i) involving construction / extension of EHT line
(ii) involving construction / extension of EHT line and additional
transformer
45 days (Subject
to receipt of
clearance from
Electrical
Inspector)
180 days
3.8 The licensee shall maintain a priority register in respect of the following categories
(a) Where no extension of distribution mains is required
(b) Where extension of distribution mains upto two poles is required
(c) Where extension of distribution mains of more than two poles is required
3.9 The Commission may for reasons to be recorded, direct / permit deviations from the
above Regulation 3.1 to 3.8 if in the opinion of the Commission the circumstance
warrants such deviation. The Commission may issue such direction / permission by an
order to the licensee.
25
CHAPTER – 4:
WIRING AND APPARATUS IN CONSUMER PREMISES
4.1 Wiring at Consumer’s Premises
(1) For the safety of the consumer and the public in general, it is necessary that the
wiring on the consumer's premises should conform to the Indian Electricity Rules,
1956. The materials used for wiring shall conform to the relevant specification of
the Bureau of Indian Standards or its equivalent. Wherever applicable, the
materials used shall bear ISI mark.
(2) All electric lines, equipment and apparatus should be of sufficient rating for power,
insulation and estimated fault current and sufficient mechanical strength for the
duty which they are required to perform and shall be constructed, installed
,protected worked and maintained in such a manner as to ensure safety of human
beings, animal and property.
(3) The relevant code of practice of BIS (Bureau of Indian Standard), including
National Electric Code may be followed in all installations. However, in case of any
inconsistency, the relevant provisions of the IE Rules 1956 shall prevail. The
material and apparatus used shall conform to relevant BIS specification where such
specifications are available.
(4) All electrical installation works should be carried out by a licensed electrical
contractor as required under Rule 45 of the Indian Electricity Rules, 1956.
4.2 General Wiring Conditions
(1) Mains
The consumer's mains shall, in all cases, be brought back to the licensee’s point of
supply and sufficient cable shall be provided for connecting up with the licensee's
apparatus.
(2) Switches and Fuses
The consumer shall provide MCB or quick break linked main switches of requisite
capacity to carry and break current in each conductor near the point of
commencement of supply. The switches in the consumer’s premises shall be on
the live wire and the neutral conductor shall be marked for identification where it
leaves the consumer's main switch for connecting up to the meter. No single pole
switch or cut-out should remain inserted in any neutral conductor.
(3) Balancing of Load
The consumer taking three-phase supply shall balance his load between the
phases as per IE Rules
26
(4) Earthing
Proper earthing with earthing pipe should be done and gas and water pipes shall
on no account be used for earthing purposes. All wiring shall be kept as far as
possible away from gas and water pipes.
(5) Domestic Appliances:
For the safety of the wiring at the consumer’s premises, separate circuit for
heaters, geysers, air-conditioners and for cooking apparatus like oven, microwave
oven shall be run with adequate size of wire from the main distribution board of the
consumer. Wall plugs used on the circuits for domestic appliances shall be of the
three-pin type, the third pin being connected to "earth".
(6) Plugs
All plugs shall be provided with switches on the live wire and not on the neutral.
Preferably plugs shall be of three – pin type, the third pin connected to earth.
4.3 Apparatus Interfering with Licensee’s System
The licensee may discontinue the supply giving reasons if the consumer installs any
instrument, apparatus that are likely to affect adversely, the supply to other consumers.
Supply shall be restored on taking appropriate remedial action to the satisfaction of the
licensee.
4.4 A.C. Motor Installations
The motor shall be provided with control gear with necessary protective devices so that
the starting current of consumer's installation does not in any case exceed the limits
given in the following schedule:
Nature of Supply Size of Installation Limit of Maximum current
demand
Single Phase Upto and including 1.5
Horse Power
6 X full load current
Three Phase Upto and including 3
Horse Power
Above 3 Horse Power and
upto including 15 Horse
Power
Above 15 Horse Power
and upto including 100
Horse Power
Above 100 Horse Power
6 X full load current
2 X full load current
1.5 X full load current
1.25 X full load current
Failure to comply with these regulations will render the consumer liable for
disconnection forthwith.
27
4.5 Consumer’s Apparatus
The apparatus/ appliances/ gadgets used by consumers should conform to the
standards and specifications prescribed by the Bureau of Indian Standards or
equivalent
4.6 Power Factor of Plant and Apparatus
(1) Welding Transformers
LT installations with welding transformers will be required to have suitable shunt
capacitor(s) installed so as to ensure power factor of not less than 90%. .
(2) Induction Motor
2. (a) Every L.T. consumer, including irrigation pump set consumer, whose
connected load includes induction motor(s) of 3 HP and above and other
low power factor consuming appliances shall arrange to install Low
Tension Shunt Capacitors of appropriate capacity so as to ensure power
factor of not less than 90% at his cost across the terminals of his motor(s).
(b) Supply to LT installation with induction motor(s) of capacity of 3 HP and
above will not be given unless suitable capacitor to improve power factor is
installed.
(c) Such consumers with poor power factor below the percentage specified by
the Commission shall be liable to pay surcharge at the rate (s) as specified
by the Commission in the Tariff Order from time to time.
(3) The licensee may discontinue supply, after due notice of 15 days, to any
installation where the average power factor in a month is less than 70% where
meter installed is having P.F. measuring feature. In case LT capacitors are not
installed or installed but not in working condition, in such cases also the supply
shall be disconnected after due notice of 15 days without prejudice to the right of
the licensee to levy / minimum charges as applicable during the period of
disconnection.
4.7 High Tension Consumers
The following controls shall be installed (refer section 50 of IE Rules, 1956)
(1) A linked switch with fuse(s) or a circuit breaker for consumers having aggregate
installed transformer/ apparatus capacity up to 1000 kVA if supplied at voltage of
11 kV and 2500 kVA if supplied at a voltage of 33 kV.
28
(2) A circuit breaker along with linked switch for consumers having an aggregate
installed transformer/ apparatus capacity above 1000 kVA if supplied at 11 kV and
above 2500 kVA if supplied at 33 kV.
(3) In either case, suitable automatic circuit breakers shall be installed on the low
tension side of each transformer or on each LT feeder emanating from the
transformer.
4.8 Extra-High Tension Consumer
Extra-High Tension consumer shall install a circuit breaker on HV side of the
transformer (refer section 50 of IE Rules 1956).
4.9 HT/ EHT Consumers
(1) All transformers, switch-gears and other electrical equipments in the installation of
the consumer and also those directly connected to the feeders or lines of the
licensee shall be of suitable design and be maintained by the consumer to the
reasonable satisfaction of the licensee. The setting of fuses and relays on the
consumer’s control gear, as well as the rupturing capacity of any of his circuit
breakers, shall be subject to the approval of the licensee.
(2) Notwithstanding the provisions under Regulation 4.4 it is necessary that the
consumer should obtain prior approval of the Electrical Inspector about the
suitability of protective devices or circuit breakers in accordance with the provisions
of the prevailing laws, rules and regulations.
(3) The consumer shall maintain a power factor of 90% and above. Consumers shall
be liable to pay surcharge or receive incentive specified by the Commission, from
time to time, on account of variation from specified power factor. The licensee may
discontinue supply, after due notice of 15 days, to any installation where the
average power factor is less than 70% without prejudice to the right of the licensee
to levy demand / minimum charges as applicable during the period of
disconnection.
4.10 Inspection and Testing of Consumer’s Installation
(1) Before any wiring or apparatus in the case of low-tension consumer, and any
transformer, switchgear or other electrical equipment in the case of high-tension
consumer is connected to the system, it shall be subject to inspection and approval
of the licensee/competent authority and no connection shall be made without the
licensee’s/competent authorities’ approval. In addition, all high-tension installations
29
will have to be approved by the Electrical Inspector and all electrical installations in
mines will have to be approved by the Inspector of Mines.
(2) Upon receipt of the test report, the licensee will notify to the consumer the time and
day when the licensee proposes to inspect and test the installation. The consumer
shall ensure that the Licensed Electrical Contractor or his representative,
technically qualified, employed by him is present at the time of inspection to furnish
to the licensee any information concerning the installation required by him. The
licensee shall provide a copy of the inspection report to the consumer and obtain
the acknowledgement of the consumer.
(3) Manufacturer’s test certificate in respect of all H.T. apparatus shall be produced, if
required, by the Licensee.
(4) The licensee shall not connect the conductors and fittings at the consumer’s
premises with its works unless it is reasonably satisfied that the connection will not
at the time of making connection cause a leakage from the installation or apparatus
of a magnitude detrimental to safety. The value of the insulation resistance should
be as provided in Rule 48 of I.E. Rules 1956.
(5) If the consumer’s installation is found to be not safe for connection, the licensee
shall advise the consumer in writing specifying the defects to be rectified. On
receipt of intimation of rectification of defects, the licensee shall retest the
installation.
(6) The licensee shall levy no charge for the first test. Subsequent tests, necessitated
due to faults found at the initial test shall be charged for in accordance with the
rates approved by the Commission. The licensee will not accept any responsibility
with regard to the maintenance or testing of wiring on the consumer's premises.
4.11 Extensions and Alterations:
(1) No electrical installation work, including additions, alterations, repairs and
adjustments to existing installations, except such replacement of lamps, fans,
fuses, switches, low voltage domestic appliances and fittings as in no way alters its
capacity or character, shall be carried out upon the premises of or on behalf of any
consumer, for the purpose of supply to such consumer except by an electrical
contractor licensed in this behalf and under the direct supervision of a person
holding a certificate of competency. Extension or alteration of load to all high
tension installations will have to be approved by the Electrical Inspector and
similarly for all extensions and alterations of electrical installation in mines will have
to be approved by Inspector of Mines.
30
(2) If, as a result of such proposed extensions and alterations, there is possibility of an
increase in connected load or contract demand over sanctioned connected load or
contract demand, the consumer shall take steps to submit a requisition for
additional supply. Failure to regularize the increase in connected load or contract
demand may not only result in billing at the penal rates, as provided in chapter – 10
under unauthorized use of electricity but may also result in disconnection of supply
after due notice.
4.12 Access to Consumer’s Premises
(1) An authorized person, at any reasonable time, and on informing the occupier of
their intention, enter any premises to which electricity is supplied or has been
supplied by the licensee to any premises upon which the electric supply lines or
other works have been lawfully placed by the licensee, for the purpose of (i)
inspecting and reading meters (ii) for disconnecting supply, (iii) for removing the
licensee’s apparatus, (iv) for inspecting, testing, repairs, replacing, altering and
maintenance of its property or for doing all things necessary or incidental to proper
continuance and maintenance of supply to the consumer. All such persons visiting
consumer’s premises must carry photo identity cards issued by the licensee and
shall produce the same to the consumer or the occupier before entering the
premises. The consumer should immediately check with the licensee if the
credentials of representatives are doubtful.
(2) An authorized person shall be entitled to enter the premises immediately after
informing the consumer, for checking unauthorized use of energy, unauthorized
additions and alterations to equipment, theft and misappropriation of energy,
diversion of power, by-passing or tampering of the meter or for inspection and
testing.. On detection of unauthorized use of energy, unauthorized addition and
alteration to equipment, theft and misappropriation of energy, diversion of power or
bypassing or tampering of the meter the licensee may take action as per prevailing
laws.
(3) Provided that no inspection, testing or checking of any domestic premises shall be
carried out between sunset and sunrise except in the presence of an adult male
member occupying such premises.
(4) If the consumer does not provide access to the licensee or its authorized
representatives to enter the premises for the reasons stated in Regulation 4.12(2)
and Regulation 4.12(3), the licensee may give a 24 hours notice in writing to the
consumer, of its intention to discontinue the supply. If the consumer still does not
31
provide access, the licensee shall be entitled to discontinue supply to the
consumer.
4.13 Rating of Installations
(1) The connected load of Domestic category of consumers shall be determined as per
the procedure given in Annexure–1. Survey of load shall be carried out normally
once in two years. The licensee may also carryout verification of load in selected
areas periodically. However, if the licensee has reasons to believe that a particular
domestic connection or a group of domestic connections might be involved in
unauthorized abstraction of power, an authorized person for the purpose may
conduct a survey of such consumer’s premises.
(2) The licensee shall send formats of ‘self declaration of connected load’ along with
electricity bills to all consumers once in six months. The consumers may fill-up the
form, if his actual current connected load is at a variance from the recorded
connected load and submit to the licensee while making payment of the bill. The
domestic consumers may also declare enhanced connected load of his premises,
any time during the year, by completing the format given in Annexure– 2 and
submitting the same to the licensee along with an application for change in
connected load.
On receipt of application / declaration the licensee may arrange to conduct a
survey of the premises of the consumer to determine the load of the premises. In
case such a survey is not carried out within thirty days from the date of submission
and the load applied for is higher than the recorded load of the consumer, the load
declared by the consumer shall be deemed to have been accepted. The licensee
shall issue the demand note for additional charges, if any, immediately.
(3) The connected load of all categories, other than Domestic category of consumers,
shall be the aggregate of the manufacturer’s rating plates of all energy consuming
devices, in the consumer’s premises, which can be used simultaneously. This shall
be expressed in kW, kVA or HP. During the process of determination of connected
load, if the manufacturer’s rating plate is not available, the licensee may use
suitable apparatus to determine the load of such device. If, both air-conditioner and
room heater are found in the same premises, the load of the item with higher rating
shall be taken into account. Items stocked for the purpose of sale/ repair or
genuinely as spare shall not be considered for the purpose of determination of
connected load. The licensee shall carryout periodical survey of streetlights and
record the type of lamps being used along with their load.
32
(4) All installations other than those of Domestic category are subject to rating/re-rating
by the licensee at its discretion. If the consumer is not satisfied with the rating
determined by the licensee, he may get his apparatus rated by one of the
recognized engineering institutes approved by the Commission for determination of
load of apparatus. Both the consumer and the licensee may appoint their
respective representatives to be present during the process of determination of
load at the institute. The final report issued by the institute shall be accompanied
with the details of test(s) conducted. The rating determined by the said institute
shall be final and accepted by both the consumer and the licensee.
(5) Where for any reason, it is not possible to determine the maximum demand, power
factor or any other electrical quantity in respect of an installation, the licensee shall
determine such quantities periodically by rating/re-rating, and the procedure for the
same shall be got approved by the Commission.
(6) If a consumer applies to the licensee for re-rating his installation due to additions or
alternations in the installation, the procedure as stated in Regulation 4.13 (1) to
4.13 (5) shall apply.
4.14 Generators in the consumer’s installation and parallel operation with the supply
system of the licensee
(1) Operation of generator in consumer’s installation in parallel with the licensee’s
system is permissible only with the written consent of the Licensee.
However, the consumer may install generator, inverter to use only in the case of
failure of power supply, and the consumer shall install double link switch changer
so that the current of generator/inverter may not be injected in the licensee's
distribution system. The capacity of the generator/inverter shall not be taken into
account for calculation of connected load.
(2) Where no such consent has been given, the consumer shall arrange the plant,
machinery and apparatus of his generating units, including an extension of or
addition to the same, to operate in an isolated mode and the generator, in no case,
should get connected to the licensee’s system. The licensee, on intimating the
consumer, can enter the premises and inspect the arrangement to ensure that at
no time the generator gets connected to his system.
(3) Where consent has been given for parallel operation, the consumer shall arrange
his installation to protect it from disturbances in the licensee’s system. The
consumer should also ensure that his supply does not get incorrectly connected to
the licensee’s system. The licensee shall not be liable for any damage caused to
the consumer’s plant, machinery and apparatus on account of such parallel
operation, or any adverse consequence arising thereof. For parallel operation with
33
the grid, the consumer shall have to follow the provisions of the Electricity Grid
Code as specified by Joint Electricity Regulatory Commission for state of Goa and
UTs and other relevant regulations. The actual operations shall be carried out in
coordination with both the State Transmission Utility and the licensee.
(4) In case the consumer’s supply gets extended to the licensee’s system from a
generator or inverter or from any other source, without appropriate approval from
the licensee, causing damage to the licensee’s apparatus or to human life, the
consumer shall be made responsible for the same and shall be liable to fully
compensate the licensee for all losses caused to the licensee or to the licensee’s
other consumers.
4.15 Harmonics
(1) The licensee shall publicize the need for installation of Harmonic filters. All HT
consumers, and LT commercial consumers (above 15 KW) to begin with, shall be
given a time period of one year from the date of implementation of these
Regulations, after which, Harmonic filters shall become mandatory on such
consumers.
(2) If the licensee detects and proves to the consumer that the consumer’s system is
generating harmonics above acceptable limits, the licensee shall request the
consumer to install appropriate harmonic filter and the consumer shall install such
filters within a period of six months from the date of request by the Licensee.
34
CHAPTER – 5:
POINT OF SUPPLY AND LICENSEE’S EQUIPMENT IN PREMISES
5.1 Point of Supply
(1) Supply shall be given at a single point, in premises, at the outgoing terminal of the
Licensee’s cut-outs fixed after,
(a) Meters in case of Low Tension consumers.
(b) Control switchgear that may be installed in Licensee’s or consumer’s premises
as agreed mutually in case of High Tension consumers.
The Licensee shall determine the point of supply such that the meters and other
equipment are always accessible to the Licensee without obstruction for inspection.
(2) All EHT & HT consumers / applicants shall provide access to the licensee to the
meter or metering cubicle.
(3) However, in special cases, the licensee may agree to give supply at more than one
point in the installation of the consumer / applicant having regard to the physical
layout of the installation and the requirements of the consumer / applicant. The
arrangement will be subject to the condition that separate metering will be done
and summation of demand and energy recorded at all points will be taken as
parameters for billing under the relevant tariff schedule.
5.2 Installation of Equipment at Point of Supply
(1) At the point of commencement of supply, the consumer / applicant shall provide a
main switch / circuit breaker from the outgoing terminal of the meter.
(2) In addition, HT / EHT consumers / applicants shall also provide suitable protective
devices as per the provisions of Rule 56 and 64 of the Indian Electricity Rules,
1956. The system of protection shall be got approved by the Licensee before
commencement of supply.
(3) In case of HT / EHT consumer / applicant, Meter, circuit breakers and its
associated equipment shall be installed by the Licensee at the point (s) of supply.
(4) HT / EHT consumer / applicant shall install step down transformers with a vector
group of delta winding on the high voltage side and star winding on the low voltage
side, with the neutral terminal brought out and solidly earthed.
5.3 Dedicated Feeder
Consumers desirous of getting power supply from dedicated feeders may make a
request for such facility to the licensee. The dedicated feeder shall be extended from
the power substation to the consumer’s point of supply. In such cases the consumers
shall be liable to pay the cost of Bay and all protection switchgears and its accessories
35
provided at the power substation for this feeder in addition to the cost of the feeder. On
receipt of such request, the licensee will check the feasibility, based on merit, of
providing a dedicated feeder to the consumer’s premises. If found feasible, the
consumer will be provided with a dedicated feeder and the consumer will be liable to
pay additional charges such as supervision charges, etc. as approved by the
Commission from time to time. The Licensee shall not extend electric supply to any
other consumer from the dedicated feeder.
5.4 Licensee’s Equipment at Consumer’s Premises
The consumer shall provide free of cost to the licensee necessary land belonging to
the consumer and afford all reasonable facilities for bringing in not only the direct
cables or overhead lines from the licensee’s system for servicing the consumer, but
also cables or overhead lines connecting licensee’s other consumers and shall permit
the licensee to install all requisite switchgears and connections thereto on the above
premises and to extend supply to such other consumers in the same housing complex
through the cables and terminals situated on the consumer’s premises, provided
supply to the consumer in the opinion of the licensee is not thereby affected.
5.5 Damage to Equipment at Consumer’s Premises
(1) The meter, cut-out/ MCB, service mains and other equipment belonging to the
licensee, must on no account be handled or removed by any one who is not an
authorized employee/representative of the licensee. The seals, which are fixed on
the meters /metering equipments, load limiters and the licensee’s apparatus, must
on no account be tampered, damaged and broken. The responsibility for the safe
custody of licensee’s equipments and seals on the meters/metering equipments
within the consumer’s premises shall be on the consumer.
(2) In the event of any damage caused to the licensee’s equipment’s in the consumer’s
premises by reason of any act, neglect or default of the consumer or his authorized
/ representatives, the cost thereof as claimed by the licensee shall be payable by
the consumer. If the consumer fails to do so on demand, it shall be treated as a
contravention of the terms and conditions of supply agreement and the supply shall
be liable to be disconnected after due notice. The consumer shall however be liable
to pay the charges, as applicable.
(3) The licensee is responsible for maintaining the meters and equipments, installed at
consumer’s premises from where electricity is supplied to the consumer.
(4) If the insulation resistance of the consumer’s installation is found to be so low as to
prevent safe use of energy, the licensee or his authorized representative after
giving 48 hours notice shall, without prejudice to other actions as per law,
36
disconnect the supply of power to premises till the defects are removed, in
accordance with Rule 49 of India Electricity Rules 1956.
5.6 Ownership of the equipment and apparatus:
All meters and other equipments belonging to the licensee and installed in the
premises of the consumer, shall be and continue to be at all times the property of the
licensee, not withstanding that such meters and other equipments or any part there of,
may be fixed or fastened to or embedded, in any part of the consumer’s premises,
including land belonging to the consumer. Such equipment shall not be disturbed or
dealt with in any manner except by the employee of the licensee duly authorized for the
purpose.
5.7 Failure of Fuse / Supply:
In the event of failure of the licensee’s service fuse, at any time, complaint thereof
should be lodged by the consumer to the licensee’s local office/call center and the
Licensee shall ensure registration of complaints on round the clock basis. Only
authorized employees possessing the photo-identity card of the licensee shall be
permitted to replace these fuses in the licensee’s cut-outs. Consumers are not allowed
to replace these fuses. The licensee should not allow its employees to carry out any
repairs in the consumer’s installations.
37
Chapter –6:
SERVICE CONNECTION RELATED MATTERS
6.1 Change of category
(1) “Category of Consumer” means the Tariff Schedule under which a consumer is
billed as per latest applicable Tariff Order of the Commission. The applicant shall
apply for change of category from one tariff rate schedule to another to the
concerned officer of the licensee. Tariff change from any L.T. category to
Agriculture category shall not be permissible. Tariff change from higher rate to
lower rate shall be done only after completion of compulsory period of availing
supply as per the agreement.
(2) In case sanction of new category is not permitted under any law in force, the
Licensee shall inform the consumer within 15 days from the date of receipt of
application.
(3) The Licensee shall inspect the premises and shall change the category within the
time limit specified in the Standards of Performance of Distribution Licensee
Regulations from the date of receipt of application.
(4) Change of category shall be effective from next billing cycle.
(5) No case of unauthorized use of energy shall be booked by the Licensee if detected
after the consumer had applied for change of category and change is legally
permissible.
(6) An application of the consumer for change of category shall be treated as a fresh
application and he shall deposit processing fees, new additional security, if any,
and execute supplementary agreement if necessary.
(7) Where a consumer has been classified and billed under a particular category and
subsequently, it is observed that the previous classification is not correct, the
Licensee may alter the classification and suitably revise the bills accordingly.
6.2 Transfer of Connection and Mutation of Names
(1) A connection shall be transferred in the name of another person upon the death of
the consumer or in case of transfer of ownership or occupancy of the premises,
upon an application of the consumer.
(2) Application for mutation shall be filed, along with prescribed fee by the transferee or
the legal heir or successor of the deceased consumer with the local office of the
Licensee.
(3) The application shall be accompanied by documentary evidence of transfer or legal
hire ship or succession and proof of no arrears on account of electricity charges on
that connection.
38
(4) The Licensee shall decide the mutation case within the time limit specified in the
Standards of Performance of Distribution Licensee Regulations.
(5) If the mutation application is to be disallowed and is refused the orders shall be
passed only by a speaking order after the applicant has been given an opportunity
to represent himself, Provided further, that in case where mutation is not allowed,
the transferee seeking the transfer, may agree to continue the connection in the old
name (but not in case of consumer’s death), or may have choice to seek
permanent disconnection and apply for new connection.
(6) The transferee or the legal heir shall submit a fresh agreement, in the prescribed
format, along with outstanding dues, if any, within 14 days of receipt of intimation.
The transfer shall be affected and a copy of the agreement shall be sent to the
consumer within 7 days after receipt of fresh agreement.
(7) In case of Private Tubewell (PTW) consumers, suo-motu mutation may be under
taken after taking the report from the Government revenue department. However
the legal heir shall be responsible for clearing the electricity dues, and shall submit
an affidavit to this effect.
(8) In case of Govt. residential quarter mutation in favor of any new occupant shall be
allowed after the new occupant furnishes the letter of allotment and proof of date of
occupancy in such cases mutation shall be allowed from date of occupancy
provided there are no arrears outstanding.
6.3 Procedure in Case of Change in Wiring and / or Apparatus or Shifting of
Service Line in the Premises of the Consumer:
The consumer may apply to the licensee for any changes in their premises related to
wiring / apparatus / service line, after clearing all dues pending, if any, provided the
same are not stayed by any court, subject to the following:
a) The consumer shall get all work relating to wiring on his premises only by or
under the supervision of a Licensed Electrical Contractor and obtain a Work
Completion certificate and Test report., as prescribed by Indian Electricity
Rules, 1956 until Regulations are issued under the Electricity Act, 2003.
b) No reference shall be made to the Licensee if the change in wiring of LT
loads does not result in dislocation of the meter or other related apparatus
and there is no change in the load. However, the consumer shall produce the
test report if required by the Licensee at any time.
c) In other cases, if the consumer desires to alter the wiring on his premises, or
change the location of meter or other related apparatus or shift the service
line on his premises notice thereof shall be sent in writing with the modified
wiring diagram and other necessary details to the Licensee. The Licensee
39
shall after due enquiry grant approval, intimating the estimated charges to be
deposited by the consumer with or without modification to the proposal, or
reject the request stating reasons thereto, in writing, within the time limit
specified in the Standards of Performance of Distribution Licensee
Regulations.
d) The work relating to change in wiring shall be done by the consumer through
a licensed electrical contractor and the work completion certificate along with
test results shall be provided to the Licensee. The Licensee shall inspect the
premises to confirm that the alteration(s) is in accordance with the approval
given by him and the Indian Electricity Rules, 1956 until these Regulations
are issued under the Electricity Act, 2003.
e) The work of change in position of point of supply, meter or related apparatus
and shifting of service line shall be done by the Licensee at the cost of the
consumer. The estimate for this work shall be sent to the consumer along
with the approval and work shall be completed within the time specified in the
Standards of Performance of Distribution Licensee Regulations from the date
of deposit of the estimated cost.
6.4 Procedure for Enhancement of Contract Demand / Connected Load
(1) Applications for enhancement of load shall be submitted to the concerned officer of
licensee in the prescribed form.
(2) The licensee shall inspect the premises within seven days of receipt of application
or otherwise as provided in the Standards of Performance of Distribution Licensee
Regulations to examine the feasibility of supply of the enhanced load and intimate
the consumer covering the following aspects:
(a) Whether the additional power can be supplied at the existing voltage or at a
higher voltage.
(b) Whether any addition or alterations are required to be made to the system
and the cost to be borne by the consumer.
(c) Amount of additional security deposit, cost of additional infrastructure and the
system strengthening charges if any, to be deposited.
(d) Change in the classification of consumer, if required.
(3) The application for enhancement of the contract demand will not be accepted if the
consumer has any arrears to the licensee. However, the application may be
accepted if the payment of arrear due from the consumer has been stayed by a
Court of law, or by the Commission or an authority appointed by the Commission.
(4) If supply of enhanced load is found feasible, the consumer shall be asked to:
40
(a) Furnish work completion certificate of consumer’s installation and Test report
from a licensed electrical contractor where alteration of installation is involved.
(b) Furnish Letter of approval for the electrical installation of the consumer from
the Electrical Inspector, if required.
(c) Deposit additional security deposit, cost of addition or alteration required to be
made to the system, if any, and the system strengthening charges as
applicable.
(d) Execute a fresh agreement as per enhanced load which shall be enforceable
during agreement period and the old agreement shall stand terminated.
(5) If no addition or alteration to the system including new/ alternate metering
arrangement is required, the enhanced load will be released as specified in the
Standards of Performance of Distribution Licensee Regulations subject to
completion of the requisite formalities. If the system needs any alteration or
addition, the procedure as given for a new connection shall be followed.
6.5 Procedure for Reduction of Contract Demand / Connected Load
(1) Application for reduction of load, after the expiry of initial period of agreement, shall
be made to the concerned officer of Licensee in the prescribed form along with the
following data / documents:
(a) Details of alteration/ modification/ removal of the electrical installation along
with work completion certificate and Test report from a licensed electrical
contractor where alteration of the installation is involved.
(b) Maximum demand recorded in the last two billing cycles if the meter has
facility to record maximum demand along with the electricity bills for the
same.
(c) Details of generators, if any, installed by the consumer along with copies of
the safety clearance certificate issued by the competent authority for
installation of the generators.
(2) On receipt of the application for reduction of load, the licensee after verification
shall sanction the reduction of load within thirty days or notice period for termination
of agreement as specified in the agreement whichever is later from the date of
receipt of application.
(3) If the sanction is not granted by the licensee within the period specified in above
Regulation 6.5 (2) above, the applicant may, by a written notice to the licensee,
draw its attention to the matter and if the decision is still not communicated to the
applicant within the period of further thirty days, the permission of reduction of
contract demand shall be deemed to have been granted.
41
(4) The reduced Contract Demand shall take effect from the first day of the month
following the month in which the sanction is communicated or ‘deemed permission
is granted’.
(5) The above reductions are subject to permissible minimum contract demand
specified in Tariff Order. Request of the consumer for reduction in contract demand
of his connection shall not be refused by the licensee on the ground that there are
dues payable to the licensee against the connection.
(6) In all existing agreements executed prior to the commencement of these
Regulations, if there is any provision regarding restriction on reduction of Contract
Demand, the same shall be deemed to have been modified to the extent of the
provision made in this Code.
(7) When reduction of contract demand is agreed to, the consumer shall execute a
fresh agreement for reduced load. The licensee shall recalculate the security
deposit and any excess security deposit shall be adjusted in future bills not
exceeding six succeeding bills.
(8) The reduction of Contract Demand load shall not be permitted in following cases
(i) Arc / Induction furnaces, rolling and re-rolling mills and mini steel plants shall
not be allowed to reduce the load below the total rating of machines and
furnaces installed in the premises, except in case of removal of any equipment
or replacement of any old equipment by new equipment and also to the extent
of captive generation capacity that may be installed and is operating in parallel.
Auxiliary load shall be excluded.
(ii) Contracted load shall not be reduced below the total rating of installed
machines in case of Small & Medium industrial and private tube wells of
consumers, having no MDI meter.
(iii) Load shall normally not be reduced within initial period of the agreement from
the date of commencement of supply. However, if the consumer is willing to pay
the fixed/minimum charge applicable for the quantum of contracted load
surrendered / reduced for the balance period of initial period of agreement or
period of notice specified in the agreement for that category of consumer,
whichever is later, reduction may be allowed.
(iv) No application for reduction of load shall be rejected without recording reasons
and the decision shall be communicated to the applicant.
42
6.6 Permanent Disconnection
The supply shall be disconnected permanently in following cases:
(a) With the termination of the agreement.
(b) If the cause for which the supply was temporarily disconnected is not removed
within the notice period specified in the agreement for termination of agreement
or initial period of agreement whichever is later.
(c) On request of consumer.
(d) On non payment of bills as provided in regulation 9.1 below.
6.7 Notice of Vacation or Transfer of Premises:
(1) A domestic consumer about to vacate or sublet his premises shall give to the
Licensee a notice not less than 7 clear days in writing to that effect and arrange to
settle his account. He may either ask for disconnection of supply or may transfer
the connection in the name of the new owner / occupier. The licensee cannot
guarantee that the meter reading will be taken on the required date unless due
notice and facility to record the meter reading is given. Failing such notice, the
consumer will be responsible for all energy consumed on the premises and for the
safety of Licensee’s apparatus installed for him on the premises.
(2) In case of consumers, other than the domestic consumers, the provision in sub-
regulation (1) above will apply only in so far they are inconsistent with the provision
of agreement and where they are not inconsistent, the provision of their respective
power supply agreement will always prevail.
6.8 Agreement
(1) An agreement, in the prescribed format, shall be executed by the applicant on a
stamp paper of a prescribed value, for getting a new connection and for change in
the agreed parameters like contract demand, etc. In case of single phase domestic
and non domestic consumers, the application form itself shall be treated as
agreement and the main ingredient of agreement shall be incorporated in the
application form. In any special circumstances, special clauses may be added to
the agreement, if agreed to between the licensee and the consumer, provided such
clauses do not contravene the provisions of the Electricity Act 2003 (36 of 2003),
the Electricity Supply Code, and other rules and regulations in force. These special
clauses shall form a part of the agreement. The maps submitted, agreed upon and
signed by both the consumer and the licensee shall form a part of the agreement.
43
(2) The Electricity supplied to the consumer shall not be utilized by the consumer in
any manner prejudicial to the licensee and all usage must be in accordance with
provisions of the agreement and the Act as applicable.
(3) The compulsory period of availing supply from the date of commencement of
supply or initial period of agreement shall be one year for LT consumers and two
years for HT consumers. The licensee may modify the structure of the agreement
formats presently in use with the approval of the Commission in order to meet any
requirement that may arise as a consequence of the provisions of these
Regulations, so that the format is consistent with the Act and prevailing Rules,
Regulations and the provisions of these regulations.
(4) If there is a need to modify / amend the agreement signed between the licensee
and consumer, it can be done by a supplementary agreement by mutual consent.
(5) Any amendment for the purpose of change of name, shifting of premises within the
same billing area, change in connected load/contracted load, change of tariff
category, etc. shall be done and the same shall be incorporated in the agreement
by execution of a supplementary or a fresh agreement.
(6) A register of agreements executed by all LT and HT consumers shall be
maintained by the Licensee at its designated office.
6.9 Termination of Agreement
(1) The agreement shall remain in force even after completion of the initial period of
agreement until it is terminated. Domestic and single-phase Non domestic category
of consumers may terminate the agreement after giving one month’s notice.
Consumers other than domestic and single phase non domestic LT category can
terminate the agreement on giving three month’s notice. In case of HT and EHT
category six month’s notice is required.
Provided that the agreement shall normally be terminated after expiry of the initial
period of agreement. However, if the agreement is to be terminated for any reasons
whatsoever, before expiry of the initial period of agreement, the consumer shall be
liable to pay charges as per tariff order for the balance period of the said one-year in
case of LT and two years in case of HT and EHT or notice period specified in the
agreement whichever is later.
The licensee shall arrange for special meter reading, at a mutually acceptable date,
to facilitate preparation of the final bill of the consumer.
The agreement shall be terminated on the last day of the billing month and the
licensee shall raise the final bill accordingly.
(2) If power supply to a consumer remains disconnected for a period more than notice
period for non-payment of charges or dues or non-compliance of any direction
44
issued under these regulations, the licensee shall issue a show cause notice, to be
replied within seven days, to the consumer for termination of the agreement. In
case no effective steps are taken by the consumer for removing the cause of
disconnection and for restoration of power supply, the agreement of the licensee
with the consumer for power supply shall be terminated on expiry of the period of
seven days, prov