Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010.
Regulations made under The Electricity Act, 2003
- Made under: The Electricity Act, 2003
This text is shown as one document.
Full text
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
1
UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION
No. UPERC/Secy/Regulation/10 - 787 Lucknow: Dated, 17th August, 2010
[Along with amendment as per notification no. UPERC/Secy/Regulation/2019-294
Dated: August 16, 2019.]
In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the
Electricity Act, 2003 and all other powers enabling it in this behalf, and after previous
publication, the Uttar Pradesh Electricity Regulatory Commission hereby makes the
following regulations, namely:
1. Short Title and Commencement
1.1 These regulations may be called the Uttar Pradesh Electricity Regulatory Commission
(Promotion of Green Energy through Renewable Purchase Obligation) Regulations,
2010.
1.2 These regulations shall come into force from the date of their publication in the
Official Gazette.
1.3 These regulations shall apply throughout the State of Uttar Pradesh.
2. Definitions and Interpretations
2.1 In these regulations, unless the context otherwise requires,-
(a) “Act” means the Electricity Act, 2003 (36 of 2003);
(b) “captive user” means the person or member within the meaning of section 2(8)
of the Act being the end user of the electricity generated in captive generating
plant primarily for his own use and the term ‘captive use’ shall be construed
accordingly;
(c) “Central Agency” means the agency operating the National Load Despatch
Centre or such other agency as the Central Commission may designate from
time to time;
(d) “Central Commission” means the Central Electricity Regulatory Commission
referred to in sub‐section (1) of section 76 of the Act;
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
2
(e) “Certificate” means the renewable energy certificate issued by the Central
Agency in accordance with the detailed procedures laid down by it and under the
provisions specified in the CERC REC Regulations;
(f) “CERC REC Regulations” means the Central Electricity Regulatory
Commission (Terms and Conditions for recognition and issuance of Renewable
Energy Certificate for Renewable Energy Generation) Regulations, 2010 and
amendments thereof;
(g) “Commission” means the Uttar Pradesh Electricity Regulatory Commission as
referred to in sub‐section (1) of section 82 of the Act;
(h) “eligible entity” means the entity eligible to receive the certificates under the
CERC REC Regulations;
(i) “floor price” means the minimum price as determined by the Central
Commission in accordance with the CERC REC Regulations, as amended from
time to time, at and above which the certificate can be dealt in power exchange;
(j) “forbearance price” means the ceiling price as determined by the Central
Commission in accordance with the CERC REC Regulations, as amended from
time to time, within which only the certificate can be dealt in power exchange;
(ja) "Hydropower Purchase Obligation (HPO)" means a separate entity within
Non-Solar Renewable Purchase Obligation (RPO). The HPO shall cover all Large
Hydro Power (LHPs) commissioned after issue of Ministry of Power Office
Memorandum F.No. 15/2/2016-H-I (Pt.) dated March 8, 2019, as well as the
untied capacity (i.e., without PPA) of the commissioned projects. This HPO will
be within the existing Non-Solar RPO after increasing the percentage assigned for
it so that existing Non-Solar RPO for other renewable sources remains unaffected
by the introduction of HPO.
(k) “MNRE” means the Ministry of New and Renewable Energy, Government of
India;
(l) “obligated entity” means the distribution licensee, captive user and open access
consumer in the state, which is mandated to fulfill renewable purchase obligation
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
3
under these regulations subject to fulfilment of conditions outlined under clause
3.2 hereof;
(m) “open access consumer” means the consumer availing open access under sub-
section (2) of section 42 of the Act;
(n) “Power Exchange” means any exchange operating as the power exchange for
electricity in terms of the orders issued by the Central Commission;
(o) “preferential tariff” means the tariff fixed by the Appropriate Commission for
sale of energy from a generating station based on renewable energy sources to a
distribution licensee;
(p) “renewable energy sources” means renewable electricity generating sources
such as small hydro, wind, solar, biomass, biofuel cogeneration (including
bagasse based co-generation), urban or municipal waste and such other sources
as recognized or approved by MNRE or State Government;
(q) “renewable purchase obligation” means the requirement as specified in clause
4 hereof, under clause (e) of sub-section (1) of section 86 of the Act, for the
obligated entity to purchase electricity generated from renewable energy sources;
(r) “State” means the State of Uttar Pradesh;
(s) “State Agency” means the agency in the State as designated by the Commission
under clause 8.1 hereof;
(t) "year" means a financial year.
2.2 Words and expressions used in these regulations and not defined herein but defined in
the Act or the CERC REC Regulations or any other Regulations issued by the
Commission, shall have the same meanings as assigned to them respectively in the Act
or the CERC REC Regulations or such other Regulations issued by the Commission.
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
4
3. Scope and Extent of Application
3.1 These regulations shall apply to generating companies, in respect of the grant of
accreditation by the State Agency to the renewable energy projects.
3.2 These regulations shall be applicable to:
(a) distribution licensees;
(b) captive user(s) - who consumes electricity generated from its grid connected
captive generating plant having installed capacity of 1 MW and above (or such
other capacity as may be stipulated by the Commission from time to time by an
order); and
(c) open access consumer(s) - who consumes electricity procured from conventional
fossil fuel based generation through open access subjected to renewable purchase
obligation to the extent of his consumption met through such source.
4. Renewable Purchase Obligation
4.1 Every obligated entity shall purchase a minimum percentage of its total consumption of
electricity (in kWh) from renewable energy sources under the renewable purchase
obligation during each financial year.
The minimum percentages referred to above are given below in Table – A:
Table – A: Minimum Quantum of Purchase (FY 2010-11 to FY 2018-19) (%)
Year
Minimum quantum of purchase from renewable energy
sources as % age of total energy consumed (in kWh)
Non-Solar Solar Total
(1) (2) (3) = (1+2)
2010-11 3.75 0.25- 4
2011-12 4.50 0.5 5
2012-13 5.0 1 6
2013-14 5.0 1 6
2014-15 5.0 1 6
2015-16 5.0 1 6
2016-17 5.0 1 6
2017-18 5.0 1 6
2018-19 5.0 1 6
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
5
Table – B: Minimum Quantum of Purchase (FY 2019-20 to FY 2023-24) (%)
Year
Minimum quantum of purchase from renewable energy sources as
% age of total energy consumed (in kWh)
Non-Solar
Total
Other Non-Solar HPO Solar
(1) (2) (3) (4) = (1+2+3)
2019-20 5.0 1 2 8
2020-21 6.0 2 3 11
2021-22 6.0 3 4 13
2022-23 6.0 3 5 14
2023-24 7.0 3 5 15
Provided that on achievement of Solar RPO compliance to the extent of 85% and
above, remaining shortfall if any, can be met by excess Non-Solar energy purchased
beyond specified Non-Solar RPO for that particular year.
Provided further that on achievement of Non-Solar RPO Compliance to the extent
of 85% and above, remaining shortfall if any, can be met by excess Solar energy
purchased beyond specified Solar RPO trajectory.
Provided the Other Non-Solar and HPO, under the head of Non-Solar RPO, will
have 100% fungibility.
Provided further that such obligation to purchase renewable energy shall be
inclusive of the purchases, if any, already being made from renewable energy sources
by the concerned obligated entity:
Provided further that renewable energy being received if any, by the obligated
entity for own use from its own generating station, shall be accounted for fulfilment of
its renewable purchase obligation:
Provided also that the power from renewable energy sources being purchased by
the distribution licensees under the existing power purchase agreements shall continue
till the validity of the existing agreements, even if the total purchases under such
agreements exceed the percentages specified hereinabove.
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
6
Provided that from FY 2016-17, the Renewable Purchase Obligations shall be on
total consumption of electricity by an obligated entity, excluding consumption met from
hydro sources of power (not covered under HPO).
4.2 The Commission may, either on its own motion or on recommendation of the State
Agency or on receipt of an application from the obligated entity, revise for any year the
percentage targets given in clause 4.1 hereinabove as deemed appropriate.
4.3 The renewable purchase obligation specified for the year 2023-24 shall continue beyond
2023-24 until any revision is effected by the Commission in this regard.
4.4 The renewable purchase obligation so specified in these regulations shall supersede the
renewable purchase obligation as may be mentioned in any other regulation or order
thereof issued/passed by the Commission.
Explanation - The purchases by an obligated entity at preferential tariff, if any, from a
generating station based on renewable energy sources shall continue to be inclusive in
the renewable purchase obligation.
4.5 Each Obligated entity will file the Annual Return of RPO within 60 days of completion
of the Financial Year and Quarterly Return within 30 days of the end of the quarter, in
which all details regarding the purchase of other Non-Solar RPO and HPO RPO and
Solar RPOs will be given along with reasons in case of non-achievement of the targets
set and roadmap to bridge the gap.
4.6 The RPO of Captive Power Plants (CPP) may be kept fixed at the RPO level applicable
in the year in which CPP was commissioned. As and when the company adds to the
capacity of the CPP, it will have to provide for additional RPO as obligated in the year
in which new capacity is commissioned.
Provided if the CPP is commissioned prior to the issuance of Uttar Pradesh Electricity
Regulatory Commission (Promotion of Green Energy through Renewable Purchase
Obligation) Regulations, 2010, RPO for CPP will be kept equivalent to that notified for
FY 2010-11.
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
7
5. Certificates under the Regulations of the Central Commission
5.1 Subject to the terms and conditions contained in these regulations, the certificates
issued under the CERC REC Regulations shall be the valid instrument for the
discharge of the mandatory obligations set out in these regulations for the obligated
entities to purchase electricity from renewable energy sources:
Provided that in the event of the obligated entity fulfilling the renewable purchase
obligation by purchase of certificates, the obligation to purchase electricity from
generation based on solar energy source can be fulfilled by purchase of solar
certificates, and the obligation to purchase electricity from generation based on
renewable energy other than solar can be fulfilled by purchase of non-solar certificates.
5.2 Subject to such directions as the Commission may give from time to time, the obligated
entity shall act consistent with the CERC REC Regulations in regard to the
procurement of the certificates for fulfilment of the renewable purchase obligation
under these regulations.
5.3 The certificates purchased by the obligated entities from the power exchange in terms
of the regulation of the Central Commission mentioned in clause 5.1 hereinabove shall
be deposited by the obligated entities to the State Agency in accordance with the
procedure laid down under these regulations.
5.4 In case of genuine difficulty in complying with the renewable purchase obligation on
account of non-availability of renewable power or certificates, the obligated entity can
approach the Commission to carry forward the compliance requirement to the next
year.
6. Obligated Entities
6.1 Distribution Licensee
6.1.1 Every distribution licensee shall, on a yearly basis on or before 15th March, submit to
the State Agency under intimation to the Commission, the details of the estimated
quantum of purchase from renewable energy sources for the ensuing year. The
estimated quantum of such purchase shall be in accordance with clause 4. In the event
of the actual consumption being different from that approved by the Commission, the
commitment towards renewable purchase quantum shall be deemed to have been
modified to that extent in accordance with clause 4.
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
8
6.1.2 The distribution licensee shall submit quarterly status to the State Agency in respect of
compliance of renewable purchase obligation in accordance with the procedure as
referred to in clause 8.2.
6.1.3 The distribution licensee shall also submit a detailed statement to the State Agency
under intimation to the Commission at the end of each year in respect of compliance of
renewable purchase obligation.
6.1.4 Despite availability of power from renewable energy sources and certificates, if the
distribution licensee fails to fulfill its commitment towards minimum purchase from
renewable energy sources, it shall liable to deposit amount into a separate fund as per
clause 7.
6.2 Captive User and Open Access Consumer
6.2.1 Every captive user and open access consumer shall have to submit in advance
necessary details regarding total estimated consumption of electricity and the quantum
of power proposed to be purchase from renewable energy sources for fulfilling its
renewable purchase obligation. The details shall be submitted to the State Agency on a
yearly basis on or before 15th March under intimation to the Commission.
6.2.2 The captive user and open access consumer shall submit quarterly status to the State
Agency in respect of compliance of renewable purchase obligation in accordance with
the procedure as referred to in clause 8.2.
6.2.3 The captive user and open access consumer shall submit under affidavit a detailed
statement in respect of compliance of renewable purchase obligation to the State
Agency at the end of each year under intimation to the Commission.
6.2.4 Captive user and open access consumer shall purchase power from renewable energy
sources in accordance with clause 4. They may also fulfil their renewable purchase
obligation through purchase of certificates. If the captive user or open access consumer
is unable to fulfil the minimum purchase criteria, then it shall deposit into a separate
fund the amount as per clause 7.
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
9
7. RPO Regulatory Fund
If the obligated entity does not fulfil its commitment towards minimum purchase from
renewable energy sources during any year as provided in these regulations, the
Commission may direct the obligated entity to deposit into a separate fund such
amount as the Commission may determine on the basis of the shortfall in units of
renewable purchase obligation, RPO Regulatory Charges and the forbearance price.
For this purpose, a fund shall be created and maintained by such obligated entity in
accordance with the procedure as referred to in clause 8.2:
Provided that RPO Regulatory Charges shall be equivalent to the applicable floor
prices of Solar and Non-Solar RECs or any other rate as may be stipulated by the
Commission:
Provided further that the RPO Regulatory Fund so created shall be utilised, as
may be directed by the Commission, for purchase of the certificates or may be
provided to UPNEDA and/or any other Govt. agency notified by the Government of
Uttar Pradesh, for development of transmission and distribution infrastructure in the
State related to generating stations based on renewable energy sources or in any other
manner as may be provided by the Commission:
Provided also that the obligated entity shall be in breach of these regulations if it
fails to deposit the amount directed by the Commission within fifteen days from the
date of communication of the direction:
Provided also that where any obligated entity fails to comply with the obligation
to purchase the required percentage of power from renewable energy sources and/or the
renewable energy certificates, it shall be liable for action as may be decided by the
Commission.
8. State Agency and its Functions
8.1 The State Agency shall act as the agency for accreditation and recommending the
renewable energy projects for registration and to undertake such functions incidental to
the compliance of renewable purchase obligation as may be assigned by the
Commission from time to time:
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
10
Provided that the Commission shall, by general or special order, designate, as it
considers appropriate, any agency to function as State Agency.
8.2 The State Agency shall discharge its functions in accordance with the procedure laid
down under these regulations:
Provided that the State Agency shall develop and submit within sixty days of
issue of these regulations the draft procedure for approval of the Commission:
Provided further that nothing in these regulations bar the Commission from
issuing the procedure on its own motion, by general or special order as it considers
appropriate, in consultation with the State Agency and other stakeholders in case the
State Agency fails to submit the draft procedure or in view of special circumstances for
which the reasons shall be recorded in writing.
8.3 The Commission may issue directions to the State Agency with regard to the discharge
of its functions and the State Agency shall comply with those directions.
8.4 The State Agency shall act in a manner consistent with the provisions of the CERC
REC Regulations, to the extent applicable to it.
8.5 The State Agency shall submit to the Commission a quarterly status and an annual
statement regarding compliance of renewable purchase obligation by the obligated
entities, in accordance with the procedure as referred to in clause 8.2 and may submit
recommendations, if any, to the Commission.
8.6 The Commission shall, either on its own motion or on request of the State Agency,
constitute by an order as deemed appropriate a co-ordination committee for facilitating
the implementation of these regulations:
Provided that the State Agency shall nominate any one of its officer to head such
committee.
9. Eligibility for Accreditation
A generating company engaged in generation of electricity from renewable energy
sources shall be eligible to apply for accreditation subject to following conditions:
(a) it has connectivity to the State network;
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
11
(b) it does not have any power purchase agreement for the capacity related to such
generation to sell electricity at a preferential tariff determined by the
Commission; and
(c) it posses the necessary infrastructure required to carry out energy metering and
time-block wise accounting.
10. Grant of Accreditation
10.1 A generating company fulfilling the eligibility criteria as provided in clause 9 may
apply for accreditation with the State Agency:
Provided that the application for accreditation shall also include geographical
location of the applicant, metering details, point of injection and quantum of power to
be injected to the State grid/network for which accreditation has been applied for.
10.2 The State Agency shall, in consultation with the concerned transmission licensee and/or
distribution licensee, process the application and grant accreditation or otherwise to the
applicant within thirty days from the date of receipt of application:
Provided that an applicant shall be given a reasonable opportunity of being heard
before his application is rejected:
Provided further that in case application is rejected, then the reasons for rejection
shall be recorded in writing:
Provided also that in case the State Agency faces any difficulty in the process of
consultation or coordination, it may approach the Commission for appropriate
directions.
10.3 A person aggrieved by the decision of the State Agency under proviso to clause 10.2
may approach the Commission for redressal within fifteen days from the date of receipt
of communication of such decision and the Commission may pass order, as deemed
appropriate.
10.4 Accreditation shall be valid for a period of five years from the date of accreditation
certificate unless otherwise revoked prior to expiry of such validity period under clause
13.
10.5 Grant of accreditation shall not entitle an applicant to inject any such power to the State
grid/network unless the applicant/renewable energy generating company or buyer, as
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
12
the case may be, obtains open access in accordance with the regulations specified by
the Appropriate Commission:
Provided that if a generating plant is embedded in the distribution system of a
distribution licensee, it shall not require to obtain open access for supplying electricity
to such licensee.
11. Renewable Energy Pricing under REC mechanism
The generating company (i.e. eligible entity), after obtaining accreditation, shall sell
the electricity so generated and subsequently obtains and sells renewable energy
certificates (representing environmental attributes associated with renewable energy
generation) in the following manner:
(a) it shall sell the electricity generated either -
(i) to the distribution licensee(s) of the State, at a price not exceeding the pooled
cost of power purchase of such distribution licensee(s);
(ii) to any other licensee, open access consumer or a captive user in the State at a
mutually agreed rate;
(iii) to any person through power exchange.
Explanation- for the purpose of these regulations ‘Pooled Cost of Power
Purchase’ means the weighted average pooled price at which the distribution
licensee purchased electricity including cost of self generation, if any, in the
previous year from all the long-term and short-term energy suppliers, but
excluding those based on renewable energy sources, as the case may be.
(b) it shall obtain certificates from the Central Agency based on certified injection
report of SLDC;
(c) it may sell the certificates in power exchange within the band of a floor price and a
forbearance price subject to the provisions of CERC REC Regulations:
Provided that the Central Commission may, in consultation with the Central
Agency and Forum of Regulators, from time to time provide for the floor price and
forbearance price separately for solar and non-solar certificates:
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
13
Provided further that, with the progressive development of the electricity sector,
the pricing methodologies for electricity compon ent and renewable energy
certificates shall be reviewed at periodic intervals as may be considered appropriate by
the Commission.
12. Monitoring during Accreditation
Subject to the procedure as referred to in clause 8.2, the State Agency shall, in
coordination with concerned transmission licensee and/or distribution licensee, monitor
the accredited project, maintain operation of accounts and undertake other functions
incidental to the monitoring of such accredited project:
Provided that generating company after obtaining accreditation shall submit
annual status to the State Agency in respect of accreditation and other matters
connected therewith:
Provided further that an application for extension of validity of existing
accreditation shall be made to the State Agency at least ninety days prior to expiry of
validity of existing accreditation.
13. Revocation of Accreditation
13.1 If the State Agency, after making an enquiry or based on the report of Central Agency,
is satisfied that public interest so requires, it may revoke accreditation of the renewable
energy generating company where such company (a) breaches any of the terms and
conditions of its accreditation which is expressly declared by such accreditation so as
to render it liable to revocation; and (b) makes willful and prolonged default, in the
opinion of the State Agency, in doing anything required of it by or under these
regulations.
13.2 The State Agency before revoking the accreditation under clause 13.1 shall give to such
renewable energy generating company reasonable opportunity for being heard.
13.3 Notwithstanding the provisions of clause(s) 13.1 and 13.2, the Commission may from
time to time direct the State Agency to initiate enquiry and/or revocation process
against such renewable energy generating company if the Commission deems it fit.
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
14
13.4 A person aggrieved by the decision of the State Agency under clause 13.1 may
approach the Commission for redressal within fifteen days from the date of such
decision being communicated and the Commission may pass order, as deemed
appropriate.
14. Fees and Charges
14.1 The Commission may from time to time, based on the proposal in this regard from the
State Agency or on its own motion, determine, by order, the fees and charges payable
by the obligated entities and/or the persons applying for accreditation, and for
maintaining the validity of accreditation and other matters connected therewith.
14.2 The fees and charges payable may include non-refundable application fee, one-time
accreditation fee, annual fee and other charges for discharging its function in
accordance with these regulations, as the Commission may consider appropriate.
14.3 The fees and charges paid by the obligated entities and the renewable energy
generating companies shall be collected by the State Agency and utilised in
consultation with the Commission.
15. Information System
The State Agency shall post the following documents / information on its website in a
separate web-page titled “Accreditation of RE Projects”:
(a) These regulations;
(b) Procedure as mentioned in these regulations;
(c) List of applications along with necessary details received by the State Agency for
accreditation;
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
15
(d) List of accreditation granted, indicating-
(i) Name of RE generating company/station;
(ii) Point of injection;
(iii) Capacity (MW) for which accreditation has been granted.
(e) List of applications where approval for accreditation has not been granted along
with reasons thereof;
(f) Summary statement of RE procurement and RPO compliance by obligated
entities.
16. Redressal Mechanism
All disputes arising out of or under these regulations shall be decided by the
Commission on a petition made in this behalf by the person aggrieved.
17. General Power to Amend
The Commission may, at any time and on such terms as it may deem fit, amend / vary
/ delete / modify any of the provisions of these regulations and make necessary
amendments thereof.
18. Power to relax
The Commission may by general or special order, for reasons to be recorded in writing,
relax any of the provisions of these regulations on its own motion or on an application
made before it by an interested person.
19. Miscellaneous
19.1 Nothing in these regulations shall be deemed to limit or otherwise affect the power of
the Commission to make such orders as may be necessary to meet the ends of justice or
to prevent abuse of process of the Commission.
19.2 Nothing in these regulations shall bar the Commission from adopting a procedure in
conformity with the provisions of the Act, and is at variance with any of the provisions
of these regulations, if the Commission, in view of the special circumstance of a matter
or class of matters and for reasons to be recorded in writing, deems it necessary or
expedient for so dealing with such a matter or class of matters.
UPERC (Promotion of Green Energy through Renewable Purchase Obligation) Regulations, 2010. (with amendments)
16
(These Regulations are made in English and translated into Hindi. In case of dispute,
English version shall prevail.)
By order of the Commission
(A. K. Srivastava)
Secretary
Uttar Pradesh Electricity Regulatory Commission
Lucknow