Development Authority Compounding of Offence Bye-Laws, 2009
Rules made under The Uttar Pradesh Urban Planning & Development Act,- 1973
This text is shown as one document.
Full text
Government Of U.P.
Housing &Urban Planning Section-3
No. 4824/8-3-09-09misc/09
Lucknow: Dated: 14 January, 2010
NOTIFICATION
In supersession of Development Authority Compounding of Offences Bye-laws, 1997. The Governor, in exercise of
powers under clause (Kha Kha) of Section-57 of U.P. Urban Planning and Development Act, 1973 (Presidential Act, N0.11
of 1973), as re-enacted with modifications by U.P. Presidential Act (Re-acted with modifications) Act,1974 (U.P. Act.-30
of 1974), for determination of guiding principles for Compounding of offences, makes the following Bye-laws under
Section-32 of the Act with prior approval of the state government:-
Development Authority Compounding of Offence Bye-Laws, 2009
1. Short title &Commencement
1.1 This bye-Laws may be called Development
Authority Compounding of offences bye-laws,2009
1.2 This shall be extended to entire Development Area.
1.3 This bye-laws shall come into force from 14.01.2010
2. Mitigation of Offences
2.1 The action for Compounding of any offence punishable under U.P. Urban
Planning and Development Act, 1973, before or during the institution of the
action shall be taken by Vice-Chairman Development
Authority or by any authority authorized by him through special order under
Section-32.
2.2 Compounding of offence in relation to Compoundable construction shall be
done with the restriction that the accused shall not further continue offence
on relation to the non- Compoundable construction and shall remove the non-
Compoundable unauthorized construction or development work within the
period specified by the officer ordering the Compounding of the of the
offence, which shall be free to take action against him for re-prosecution and
demolition.
3. Granting Permission or Refusal to grant Permission
3.1 In Granting or refusing to grant permission of Compounding of unauthorized
construction or development work, Vice-Chairman,
Development Authority, or any officer authorized by him in this behalf through
a general or special order, shall ensure that:-
3.1.1 Where has the unauthorized construction been done i.e.
Basement, Semi-basement, Ground floor, First floor or
Subsequent floors and what is the effect of the same on the
safety, lighting and ventilation as well as privacy of the
attached buildings?
3.1.2 Has the basement been built in excess of permissible limit, if
yes, what is the effect of the same ore attached properties and
existing infrastructure facilities?
3.1.3 Has the permission for construction been refused earlier, if
yes, what is the justification for Compounding at present?
3.1.4 Is the construction unfavorable to existing building line, if yes,
what is the effect of the same?
3.1.5 Is the construction affected by Roadside Land Control Act, if
yes , has the no objection been obtained from competent
authority for the same?
3.2 Following offences shall not be Compoundable:-
3.2.1 Construction done on the land reserved for or related to public
and semi-public amenities Services and utilizes such as road,
railway line, park, green verge etc.
3.2.2 Construction done in contravention of land-use prescribed in
Master Plan or Zonal Development Plan or Lay-out plan or
lease.
3.2.3 Construction done on the plot or in the building situated under
illegal land- sub division , which has not been regularized.
3.2.4 Construction done on government or public land without
permission of the department concerned.
3.2.5 Construction done on the disputed land.
3.2.6 Construction done inside the stilt floor or the area reserved for
parking.
3.2.7 Construction done, without earthquake resistant arrangement,
in the buildings of more than three storeys including ground
floor or buildings of more than 12 meter height and in
buildings of infrastructure facilities having more than 500
square meters Ground coverage.
3.2.8 Construction done in buildings of more than four storeys floors
or buildings of 15 meters or more height and specific buildings
such as educational assembly, institutional industrial, buildings
of storage and hazardous usage and buildings of mixed
settlement of above said usages having Ground converge
more than 500sqmt which is without Fire Fighting
arrangement, as required under Building Constructions and
Development Bye-Laws and without prescribed minimum set-
back.
3.2.9 Construction done without obtaining No Objection Certificate
from local Fire Brigade authority, such structural alterations/
modifications or re-construction, in already built buildings as
may adversely affect Ground -coverage, F.A.R, height, set-
back, strength of the building, etc.
3.2.10 Construction of height more than 10% of permissible height
without changing the number of floors under plotted
development.
3.2.11 Construction done on the minimum area, minimum width and
internal height of the inhabitable room being more than 10%
less and in buildings without arrangement for mechanical
ventilation, area of light and ventilation being more than 10 %
less than the prescribed standards, under plotted
development.
3.2.12 Construction done in violation of height on building in heritage
Zone, Protected Monuments and Civil Aviation area or in the
area of restricted height.
3.2.13 Construction done in absence of required parking arrangement
as per standards prescribed in Building Construction and
Development Bye-laws.
3.2.14 In Group Housing and other multistory buildings, Construction
done on land of co-ownership and inside the area reserved for
common services.
3.2.15 Construction done in buildings of all kinds of 300 square meter
or more area without roof, top rain water harvesting
arrangement.
3.2.16 Construction done on land covered by ponds/reservoirs, river,
drain, etc, identified in Master Plan/Zonal Plan/ Lay-out Plan or
entered into revenue records.
3.2.17 Construction done in functional buildings and in residential
buildings of area of 500 sq meters or more without setting up
of solar water heating plant as required under Building
Construction and Development Bye-laws.
3.2.18 Construction done in public utility buildings and in public
convenience places in violation of requirements of Building
Construction and Development Bye-laws for safety,
applicability and ease of physically disabled persons.
3.3 Construction permissible as per Building Construction and Development Bye-laws
and illegal construction shall be shown separately in the plan. Unauthorized
construction in front, side and rear set-back shall be Compoundable only in
contiguity of main building and construction in excess of permissible Ground-
coverage and floor area shall be Compoundable upto the limit, as under:-
3.3.1 In the residential buildings under plotted development
construction, construction done upto 25% of total area of front
se-back but upto a maximum width of 1.0 metre.
3.3.2 In residential buildings under plotted development,
construction upto maximum 10% of the area rear set- back(in
addition to permissible 40%)
3.3.3 In residential buildings under plotted development,
construction upto a maximum of 25% of width of set-back in
side set-back.
3.3.4 In other buildings under plotted development such as
commercial, industrial, office , institutional and community
amenities etc, construction upto a maximum of 10% of total
area of the plot, in front, rear and side set-back in addition to
permissible land-coverage, subject to the limits prescribed for
mitigation in clause-3.3.1. to 3.3.3. respectively.
3.3.5 In Group Housing and multi-storey Commercial, office and
institutional buildings in the event of minimum set-back
required for Fire safety not being less, additional Construction
upto a maximum of 10% of permissible Ground-coverage.
3.3.6 Construction upto a maximum of 10% of floor area permissible
for construction in buildings of all nature such as plotted
development, Group housing, Commercial, office, institutional,
industrial and others.
3.3.7 Construction done upto the permissible limit of purchasable
F.A.R. with the approval of Board of Authority on the basis of
recommendations of the Committee constituted in Clause-4(3)
of Notification No. 5136/8-3-2008-11 Misc/08, dated 25.9.2008
for built area, developed area and group housing, Commercial,
Office, and public and semi-public/ community amenities in
new/ undeveloped areas.
3.3.8 Construction upto a maximum of 20% from the limit
permissible under basement.
3.3.9 Construction upto a maximum of 10% from the limit
permissible limit of height of compound wall.
3.3.10 Under plotted development, construction upto a maximum of
10% height from permissible limit without changing the
number of floors.
3.3.11 In residential buildings in addition to permissible units, the
maximum number of Compoundable units, on the basis of area
of the plot, shall be as under:-
(A) Maximum of one unit in plotted development.
(B) In Group Housing proportionate units relative to
percentage of Compoundable additional F.A.R./
Purchasable F.A.R.
3.3.12 Construction done in buildings of all ;and uses according to
generally permissible and conditionally permissible activities/
usage as per applicable Master Plan Zoning Regulations Of
development area concerned.
4. Schedule of Compounding Fee
The calculation of Compounding fee for various kinds of illegal constructions
and development works shall be in accordance with the rates given schedule
enclosed here with.
5. Calculation of Compounding Fee
5.1 If in any case Compounding construction falls under illegal construction of more
than one kind, the Compounding fee shall be realized by adding fee payable for
each kind of illegal construction.
Beside, calculation of Compounding fee for each floor shall be done separately,
However for Compoundable Ground- coverage Compounding fee in the form of
F.A.R. shall not be payable separately.
5.2 For Compounding of illegal construction, the builder shall deposit amount of
Compounding fee, as per the Schedule, in lump-sum or in installments with
interest, as may be decided by the Board of the Authority, along with the
Compounding plan. Besides, other fees prescribed by the Authority and affidavit
for demolition of non- Compoundable part shall also be deposited and only after
that the action for Compounding of plan shall be taken. Compounded plan shall
be issued only after the total amount of Compounded fee is deposited. The terms
and conditions regarding approval shall compulsorily be recorded on the plan by
the officer authorized for Compounding.
6. The building or any part there of shown in the plan submitted for Compounding, which is within the limits of
Compounding shall not be demolished. However, there shall be no restriction on demolition of non-Compoundable
portion by the development authority, in accordance with the law.
7. Subsequent to approval of the plan, action under Section-27 of U.P. Urban Planning And Development Act, 1973
shall cease, in case the order for demolition of Compounded portion is passed, the same shall be deemed null and
void. Remaining non-Compoundable portion shall be removed by the builder on his own expense or else, the same
shall be demolished by the Development Authority and the expenses incurred on the same shall be realized from
the builder as per the rules.
8. Realization of Compounding Fee
The amount of Compounding fees imposed under Rule-5.2shall be deposited by
the builder in lump-sum or in such installments, with interest, as may be decided
by the Development Authority and the action shall be considered completed only
after the total amount is deposited. The Development Authority may frame rules
separately regarding fixation and deposit of amount of installments with interest.
9. Congelated description of Compounded Construction
The details of Compounded illegal construction shall be tabulated by the officer
authorized for Compounding in prescribed form and the congelated description of
the same shall be submitted in the meeting of the Board of the Development
Authority, for information.
10. The applications under consideration for Compounding shall also be disposed of under the provisions of this Bye-
law.
11. The Compounding fee imposed under Rule-5.2 and the Expenses incurred on demolition action by the authority
under rule-7 shall be realized in accordance with Section-40 of U.P. Urban Planning And Development Act, 1973.
Note:
1) In case the applicant fails to duly apply for availing of facility of Compounding, the Development Authority shall
take action, as per rules, for demolition of illegal construction.
2) Where No Objection Certificate will be required from Fire department , Department of Archeology, Airport
Authority of India, National Highway Authority of India/ Public Works Department, Directorate of Environment,
Pollution Control Board, etc, the Compounding action shall be considered only after receipt of the said No
Objection.
3) The cost of land shall be assessed at the prevailing residential rate of the plan, where this rate is not available;
the circle rate fixed by the District Magistrate shall be applicable. For calculation of Compounding. For
calculation of Compounding fee for all kinds of constructions only the residential rate of the land shall be taken
into consideration.
4) At the time of calculating Compounding fee in accordance with rates mentioned in the Schedule, the price of
land shall compulsorily be taken once, but will not be taken for every subsequent/ higher floors.
5) Compounding fee for Compoundable construction in mixed land use shall be payable on the basis of nature of
use.
6) In addition to charges payable as per rules for purchasable F.A.R Compounding fee shall also be payable at the
rates prescribed under Serial No.-2 of the Schedule. However, purchasable F.A.R charges for first 10%
purchasable F.A.R. shall not be payable.
7) It shall be compulsory to provide additional parking arrangement in accordance with the rules in relation to
Compoundable F.A.R/ Purchasable F.A.R.
8) In case of use of illegal construction done in the basement being different from use permissible in Building
Construction and Development Bye-laws, the same shall be counted towards F.A.R and the illegal construction,
on the basis of nature odd use, shall be Compoundable with the restriction that the arrangement for parking as
per the standards is available inside the plot.
9) Projections such as balcony /chhajja etc. shall be Compoundable only upto Compoundable limit in set-back
area.
10) In Case illegal construction is not demolished by the applicant within the prescribed period in accordance with
the affidavit for demolition of non- Compoundable portion, action for demolition shall be taken by the
Authority after the prescribed period and the cost of the demolition realized from the party. In case the
demolition cost is not paid by the party within shall realize the same as arrears of land- revenue.
11) The disposal of matters under considerations for Compounding prior to date of application of these
Compounding Bye-Laws shall be ensured under the Provisions of Development Authority Compounding Bye-
Laws in force earlier.
Encls: Schedule
By order,
(Arun Kumar Sinha)
Principal Secretary
No. & date as above
Copy forwarded to Joint Director, Government Principal Press, Lucknow with the Purpose that action may
please be taken for publication of above notification in the issue of Ordinary Gazette dated
January,2010 and making applicable 100 (one hundred) printed copies of the notification to the government:
By order
(Ram Niranjan)
Under Secretary
No. & Date as above.
Copy Forwarded to following for information and necessary action:-
1. Principal Secretary, House, Govt. of U.P.
2. Chairman, All Development Authorites, U.P.
3. Housing Commissioner, U.P. Housing & Development Board.
4. Vice-Chairman, All Development Authorities, U.P.
5. Chairman, All Special Area Development Authorities, U.P.
6. All Controlling Authorities/District Magistrate, U.P.
7. Chief Town & Country Planner, U.P., Lucknow.
8. All Chief Fire Officers, U.P.
9. Executive Director, Awas Bandhu, U.P.
10. Addl. Director, Awas bandhu with the direction that the notifications under question may be got
forwarded to all concerned besides getting uploaded the same on the website of Housing &Urban
Planning department.
By order
(Ram Niranjan)
Under Secretary
Schedule Of Mitigation Fee (Rule No.-4)
SNo.
Nature of Construction Rates of Mitigation Fee for Various land-uses
Residential Commercial Office Industrial Facilities /
Others
1. 2. 3. 4. 5. 6. 7.
1. On construction
without permission
under permissible
Ground-coverage and
Floor Area Ratio
1.1 Rs. 10 per sq
meter for
constructions of
all nature on
plots upto 100
sq meter.
Two times
the
residential
1.50 times
the
residential
0.40 times
the
residential
0.50 times
the
residential
1.2 Rs 15 per sq
meter for
constructions of
all nature on
plots upto101-
300 sq meter.
As above As above As above As above
1.3 Rs. 20 per sq
meter for
constructions of
all nature on
plots upto 301-
500 sq meter.
As above As above As above As above
1.4 Rs. 25 per sq
meter for
constructions of
all nature on
plots upto 501-
2000 sq meter.
As above As above As above As above
1.5 Rs. 25 per sq
meter for
constructions of
all nature on
plots of area of
more than 2000
sq mts /Group
Housing Plots.
As above As above As above As above
1.6 On
Compoundable
units in addition
to permissible
units- Rs. 50000
per unit.
- - - -
2. On Additional Floor
Area(F.A.R.) under
permissible Ground-
coverage
In construction
of both the
nature of plotted
development
and Group
Housing-Rs. 200
per sq meter and
50 % of required
Rs. 400 per sq
meter and
100 percent
of required
land price for
additional
floor area
Rs. 300 per
sq meter
and 75
percent of
required
land price
for
additional
Rs. 150 per
sq meter and
40 percent
of required
land price for
additional
floor area
Rs. 150 per
sq meter and
50 percent of
required land
price for
additional
floor area
land price for
additional floor
area
floor area
3. On Ground coverage in
addition to permissible
Ground coverage
(A) In every
direction in
group housing
and other
multistory
buildings.
100 percent of price
of land
200 percent
of price of
land
150 percent
of price of
land
40 percent of
price of land
50 percent of
price of land
(B) Plotted
Development
(1) In Front
Set-back
100 percent of price
of land
200 percent
of price of
land
150 percent
of price of
land
40 percent of
price of land
50 percent of
price of land
(2) In side Set-
Back
75 percent of price
of land
150 percent
of price of
land
100 percent
of price of
land
40 percent of
price of land
50 percent of
price of land
(3) In rear set-
back
50 percent of price of
land
100 percent
of price of
land
75 percent
of price of
land
20 percent of
price of land
25 percent of
price of land
4. On construction of
basement in addition
to permissible limit
50 percent of price of
land
100 percent
of price of
land
75 percent
of price of
land
20 percent of
price of land
25 percent of
price of land
5. Internal height of room
being less than the
minimum prescribed
height
Rs. 100 per sq meter on
the area of the room
Rs.200 per sq
meter on the
area of the
room
Rs. 150 per
sq meter on
the area of
the room
Rs. 50 per sq
meter on the
area of the
room
Rs. 75 per sq
meter on the
area of the
room
6. On width of room
being less than
minimum prescribed
width.
Rs. 50 per sq meter on
the area of the room
Rs. 100 per sq
meter on the
area of the
room
Rs. 75 per
sq meter on
the area of
the room
Rs. 20 per sq
meter on the
area of the
room
Rs. 25 per sq
meter on the
area of the
room
7. On area of the room
being less than the
prescribed area
Rs. 50 per sq meter on
the area of the room
Rs. 100 per sq
meter on the
area of the
room
Rs. 75 per
sq meter on
the area of
the room
Rs. 20 per sq
meter on the
area of the
room
Rs. 25 per sq
meter on the
area of the
room
8. On arrangement of
light and ventilation in
the room being less
than prescribed area.
Rs. 50 per sq meter on
the area of the room
Rs. 100 per sq
meter on the
area of the
room
Rs. 75 per
sq meter on
the area of
the room
Rs. 20 per sq
meter on the
area of the
room
Rs. 25 per sq
meter on the
area of the
room
9. On the height of
Compound wall being
more than the
prescribed height
Rs. 50 per running
meter but a minimum
of Rs. 5000/-
Rs. 100 per
running
meter but a
minimum of
Rs. 10000/-
Rs. 150 per
running
meter but a
minimum of
Rs. 7500/-
Rs. 20 per
running
meter but a
minimum of
Rs. 1000/-
Rs. 25 per
running
meter but a
minimum of
Rs. 2500/-
10. Land-division/
Development work
without approval,
which is in conformity
with Building Bye-law.
1.0 percent of price of
land on saleable area
2.0 percent
of price of
land on
saleable area
1.5 percent
of price of
land on
saleable
area
0.40 percent
of price of
land on
saleable area
0.50 percent
of price of
land on
saleable area
11. Land division of more
than one acre, whose
approval is not
permissible as per
rules.
Compounding fee at the rate of two times of price of land equivalent to decrease in the
area required, as per rules, for roads, parks and open spaces and other community
amenities in the said divided plot.
12. Land division of more
than one acre, whose
approval is not
permissible as per
rules.
In such matters, action shall be taken in accordance with the guidelines issued by the
government for regularization of unauthorized colonies.
Note:
1) On other illegal constructions apart from constructions of the above nature, which are against
the Bye-laws or directions or are not approved (such as – porch, balcony/chhajja etc. but are
Compoundable, Compounding fee @Rs. 200/- per square meter shall be charged. The rate of
Compounding fee for commercial shall be two times, for office 1.5 times, for industrial 0.40
times, for facilities and other usages 0.50 times.
2) For mitigation of “generally” and ‘conditionally permissible’ activities/uses in accordance with
Master Plan Zoing Regulations, apart from impact fee payable as per rules, @10 percent of
Impact fee shall also be payable.
3) The rate of mitigation fee for charitable institutions, which an exempted under Section-80(G)
of Income Tax Act, 1961 and facilities and service provided by public Sector and educational
institutions shall be 50 percent of the residential rate.
4) In plotted development, in the event of height of the building being in excess of upto 10
percent of the permissible height, without changing the number of floors, mitigation fee @Rs.
2500/- per meter of height shall be payable.
5) The rates, which are not based on the price of the land, i.e. which are prescribed on the basis
of per square meter, shall be updated by the authority every year on the basis on cost index,
for the purpose of compounding of unauthorized construction.
( Ram Niranjan )
Under Secretary