[The Himachal Pradesh Electricity Grid Code, 2008]
Amended, repealed or otherwise affected by:-
1. (First Amendment) Regulations, 2018 notified vide Not. No. HPERC-Grid Code
(388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p.
5404-5418.
NOTIFICATION
Dated: 05 August, 2008
No: HPERC-Grid Code (388).- In exercise of the powers conferred under sub-
section (1)(h) Section 86 of the Electricity Act, 2003 (Central Act 36 of 2003) and all other
powers enabling it in that behalf, the Himachal Pradesh Electricity Regulatory Commission
hereby specifies the Himachal Pradesh Electricity Grid Code (hereinafter also referred to as
“HPEGC” or “Grid Code”). The HPEGC shall come into effect from the date of its
publication in the Rajpatra, Himachal Pradesh.
CHAPTER–1
GENERAL
1.1 Introduction
1.1.1 The Himachal Pradesh Electricity Grid Code lays down the rules, procedures and
standards to be followed by the various Users and participants in the Intra -State
Transmission System to plan, develop, maintain and operate the Intra -State
Transmission System, a part of Northern Region Grid System, in the most efficient,
reliable, economic and secure manner.
1.2 Objective
1.2.1 The Grid Code is designed to facilitate the development, and maintenance of an
efficient, coordinated, secure and economical Intra-State Transmission System
(IaSTS). It accordingly provides the following:
(a) Documentation of the principles and procedures, which define the relationship
between the various Users of IaSTS as well as the Regional Load Despatch
Centre and the State Load Despatch Centre.
(b) Technical Standards, Rules and Procedures (technical, operational and for
information sharing) to be adopted by State Load Despatch Centre (SLDC),
State Transmission Utility (STU) and Users connected to the IaSTS.
(c) Common basis of operation of the IaSTS to facilitate open access and trading
of electricity, applicable to all the Users of the IaSTS.
1.3 Scope and Extent of Application
2
[1.3.1 This Code shall apply to all parties that connect with and/or utilize the IaSTS,
including SLDC, which are required to abide by the principles and procedures
1. Published in R.H.P. dated 11
th
August, 2008 at p. 3140-3188.
2
Subs. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“This Code shall apply to all parties that connect with and/ or utilize the IaSTS or those, including SLDC, which
are required to abide by the principles and procedures defined in this Code to the extent it applies to them.”[
2 Compendium of HPERC Regulations, March 2021
defined in this Code to the extent it applies to them and, where the context so permits,
shall also apply to those connected to and/or using such component(s) of the State
Power Grid as may not form part of IaSTS.]
1.3.2 The Grid Code shall apply for the Intra-State
1
[flow] of electricity. For the Inter-State
transmission of electricity the Indian Electricity Grid Code (IEGC) shall be
applicable.
1.3.3 This Grid Code shall not affect the obligations of the STU, SLDC and Users as laid
down under the Indian Electricity Grid Code notified by the Central Electricity
Regulatory Commission, and/or the Electricity Act, 2003 and rules and regulations
made thereunder.
1.4 Structure of the HPEGC
1.4.1 The HPEGC is structured in distinct chapters as follows:
(a) Chapter-1: General
This chapter outlines the broad features of the HPEGC. The various terms used
in the HPEGC are also defined in this chapter.
(b) Chapter -2: Role of various Organizations & their linkages
This chapter defines the functions of the various organizations as are relevant to
HPEGC.
(c) Chapter -3: Planning Code for Intra-State Transmission
This chapter specifies the principles, procedures and criteria that shall be used
in the planning and development of the IaSTS.
(d) Chapter -4: Connectivity Conditions Code
2
[This Chapter specifies the minimum technical and design criteria which shall
be complied with by STU and any User connected to, or seeking connection to
the IaSTS. This chapter also sets out the procedures by which STU shall
ensure compliance by all Users with the above criteria as a pre-requisite for
the establishment of an agreed connection.]
(e) Chapter -5: Operation Planning and System Security Code
This Chapter describes the operational philosophy to maintain efficient, secure,
economic and reliable grid operation. This chapter covers the requirement for
the exchange of information in relation to security aspects, demand estimation,
demand management, outage planning, operational liaisoning, and events
occurring in the State Power System and the Northern Grid, which have had or
may have an effect on the Regional Grid and/or the State Power Grid and/or
1
Sub. for word “transmission” vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018
published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418.
2
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“This chapter specifies minimum technical and design criteria to be complied with by any agency, connected to
or seeking connection to the IaSTS, to maintain uniformity and quality across the system.”
Compendium of HPERC Regulations, March 2021 3
Users’ System connected to the State Power Grid. This chapter also formulates
the recovery and normalization of power supply process to be followed by all
the Users connected to the State Power Grid in the event of failure of State
Power Grid and/or the Northern Grid (total or partial collapse) causing
blackouts.
(f) Chapter -6: Scheduling & Despatch Code
This chapter deals with the procedure to be adopted for scheduling and
despatch of generation of the State Sector Generating Stations (SSGS)
including complementary commercial mechanisms, on a daily basis with the
modality of the flow of information between the SSGS, other Users and SLDC.
(g) Chapter -7: Management of HPEGC
This chapter deals with the procedure for review/amendment and management
of the HPEGC.
1.5 Non-compliance
1.5.1 State Transmission Utility shall be responsible for monitoring the compliance by the
Users with the provisions contained in Chapter 3 and Chapter 4 of this Code.
Responsibility for monitoring the compliance by the Users with the provisions
contained in Chapter 5 and Chapter 6 of this Code rests with the State Load Despatch
Centre.
1.5.2 In monitoring the compliance of the Users with the relevant provisions of the
HPEGC, the STU/SLDC shall not unduly discriminate against or unduly prefer any
User.
1.5.3 In case of a persistent non-compliance of any of the stipulations of the HPEGC, such
matter shall be reported to the Commission.
1[1.6 Restricted Governor Mode of Operation
1.6.1 All thermal and hydro (except those upto three hours pondage) generating units shall
operate under Restricted governor mode of operation with effect from 01.04.2019.
1.6.2 Any exemption from the above, other than that already provided for in Chapter-5, may
be granted only by the Commission for which the concerned agency shall file a petition
in advance.]
1.7 Charge/Payment for Reactive Energy Exchanges
1.7.1 The rate for charge/payment of reactive energy exchanges (according to the scheme
specified in section 6.6 shall be at such rate in paise/kVArh w.e.f such date, and shall
1
Subs. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P.
dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“1.6 Free Governor Mode of Operation
1.6.1 All thermal and hydro (except those with zero pondage) generating units shall operate under free governor mode of operation
with effect from the date to be separately notified by the Commission.
1.6.2 Any exemption from the above may be granted only by the Commission for which the concerned agency shall file a petition
in advance.
1.6.3 Gas turbine/Combined Cycle Power Plants shall be exempted from sections 4.8.3, 4.8.4, 5.3.6, 5.3.7, 5.3.8 and 5.3.9 till the
Commission reviews the situation and provides otherwise.”
4 Compendium of HPERC Regulations, March 2021
be escalated at such rate per year thereafter, as the Commission may determine in
this behalf.
1.8 Exemptions
1.8.1 Any exemption from provisions of HPEGC shall be allowed by the Commission only
on receipt of a petition from the concerned User giving reasons /justification for
exemption sought therein. The Commission may invite comments from various
stakeholders before allowing any such exemption.
1.9 Definitions after
1.9.1 In the HPEGC, the following words and expressions shall, unless the subject matter
or context otherwise requires or is inconsistent therewith, bear the following
meaning:
Item Definition
Act
The Electricity Act, 2003(Central Act No. 36 of 2003), including
amendments thereto.
1
[Area Load
Despatch Centre
(ALDC)
A Load Despatch Centre established by the distribution licensee
operating in the State to carry out the relevant operating directives
issued by SLDC to the distribution licensee and to assist SLDC for
safe and integrated operation of the concerned network.]
Agency
A term used in various sections of HPEGC to refer to SGS/Licensee
that utilize the IaSTS.
Authority
Central Electricity Authority referred to in sub-section (1) of Section
70 of the Act.
Automatic
Voltage Regulator
(AVR)
A continuously acting automatic excitation control system to control
the voltage of a Generating Unit measured at the generator terminals.
Backing Down
Reduction of generation by a Generating Unit on instructions from
SLDC under abnormal conditions such as high frequency, low system
demand or network constraints.
BBMB Bhakra Beas Management Board
Beneficiary
A person who has share in an ISGS, SSGS and BBMB generating
stations.
Black Start
Procedure
The procedure necessary to recover the grid from a partial or a total
blackout.
BIS
The Bureau of Indian Standards
2[Bulk Consumer Any consumer who avails supply at 33 kV or above]
1
Ins. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated
12
th
October, 2018 at p. 5404-5418.
2 Ins. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated
12
th
October, 2018 at p. 5404-5418
Compendium of HPERC Regulations, March 2021 5
Captive
Generating Plant
(CGP)
A power plant set up by any person to generate electricity primarily
for his own use and includes a power plant set up by any co-operative
society or association of persons for generating electricity primarily
for use of members of such co-operative society or association.
Capacitor An electrical facility provided for generation of reactive power.
CEA Central Electricity Authority.
CERC
The Central Electricity Regulatory Commission
Central
Transmission
Utility (CTU)
Any Government company, which the Central Government may
notify under sub-section (1) of Section 38 of the Act.
Commission /
HPERC
The Himachal Pradesh Electricity Regulatory Commission
Connection
Agreement
An Agreement setting out the terms relating to a connection to and /or
use of the IaSTS.
Connection Point
A point at which a User’s Plant and /or Apparatus connects to the
Intra-State Transmission System.
Data Acquisition
System (DAS)
A device provided to record the sequence of operations in time, of the
relays /equipments / system parameters at a location.
Demand The demand of Active Power in MW and Reactive Power in MVAR
of electricity unless otherwise stated.
Despatch
Schedule
The, ex-power plant, net MW and MWH output of a generating
station, scheduled to be exported/despatched to the Grid from time to
time.
Disturbance
Recorder (DR)
A device provided to record the behaviour of the pre-selected digital
and analog values of the system parameters during an Event.
1[Distribution
Licensee
A licensee authorized under section 14 of the Act to operate and
maintain a distribution system for supplying electricity to the
consumers in his area of supply. At present "Himachal Pradesh
State Electricity Board Limited (HPSEBL)" is the distribution
licensee in the State.]
Drawl Schedule
The ex-power plant MW that a licensee/ User is scheduled to receive
from SSGS/ISGS and BBMB generating stations, including bilateral
exchanges from time to time.
Event An unscheduled or unplanned occurrence in the grid including faults,
incidents and breakdowns.
Event Logger
(EL)
A device provided to record the sequence of operation in time, of the
relays/equipments at a location during occurrence of an Event.
Ex-Power Plant
MW/MWH
Net MW/MWH output of a generating station, after deducting
auxiliary consumption and transformation losses.
1
Ins. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418.
6 Compendium of HPERC Regulations, March 2021
Extra High
Voltage (EHV)
Where the voltage exceeds 33,000 volts under normal conditions
subject, however, to the percentage variation allowed by the
Authority.
Fault Locator
(FL)
A device provided at the end of a transmission line to measure/
indicate the distance at which a line fault may have occurred.
Flexible
Alternating
Current
Transmission
(FACT)
Facilities that enable power flows on A.C. lines to be regulated, to
control loop flows, line loadings, etc.
Forced Outage An outage of a Generating Unit or a transmission facility due to a fault
or other reasons which has not been planned.
Generating
Company
Any company or body corporate or association or body of individuals,
whether incorporated or not, or artificial juridical person, which owns
or operates or maintains a generating station.
Generating Unit
An electrical Generating Unit coupled to a turbine within a Power
Station together with all Plant and Apparatus at that Power Station (up
to the Connection Point).
Good Utility
Practices
Any of the practices, methods and acts engaged in or approved by a
significant portion of the electric utility industry during the relevant
time period which could have been expected to accomplish the desired
results at a reasonable cost consistent with good business practices,
reliably, safely and with expedition.
Governor Droop In relation to the operation of the governor of a Generating Unit, the
percentage drop in system frequency which would cause the
Generating Unit under free governor action to change its output from
zero to full load.
Grid Standards Grid Standards specified by the Authority under clause (d) of Section
73 of the Act.
High Voltage
(HV)
Where the voltage exceeds 650 Volt but not exceeds 33,000 volts under
normal conditions subject, however, to the percentage variation
allowed by the Authority.
IEC The International Electro-technical Commission
Independent
Power Producer
(IPP)
A generating company not owned/controlled by the Central/State
Government.
Indian Electricity
Grid Code
(IEGC)
A document describing the philosophy and the responsibilities for
planning and operation of Indian power system specified by the CERC
in accordance with sub-section 1(h) of Section 79 of the Act.
Inter-State
Generating
Station (ISGS)
A Central/other generating station in which two or more than two
States have a share and whose scheduling is to be coordinated by the
Regional Load Dispatch Centre.
Compendium of HPERC Regulations, March 2021 7
Inter-State
Transmission
System (ISTS)
Inter-State Transmission System includes:
(i) any system for the conveyance of electricity by means of a main
transmission line from the territory of one State to another State.
(ii) the conveyance of electricity across the territory of an
intervening State as well as conveyance within the State which is
incidental to such Inter-State transmission of energy.
(iii) the transmission of electricity within the territory of State on a
system built, owned, operated, maintained or controlled by CTU.
Intra-State
Transmission
System (IaSTS)
The Intra-State Transmission System shall include the entire
transmission network within the State excluding the Inter-State
Transmission System.
Licensee A person who has been granted a licence under Section 14 of the Act.
Load The MW/MWH consumed by a utility/ installation.
Long-term open
access customer
A long-term open access customer as defined under the HPERC
(Terms and Conditions for Open Access) Regulations, 2005 as
amended from time to time.
Maximum
Continuous
Rating (MCR)
The normal rated full load MW output capacity of a Generating Unit
which can be sustained on a continuous basis at specified conditions.
National Grid The entire inter-connected electric power network of the country,
which would evolve after inter-connection of Regional grids.
Non-Conventional
Energy Sources
(NCES)
NCES shall mean generating plants based on non-conventional energy
sources e.g. solar, wind, bagasse, biomass, bio-gas, industrial waste,
municipal waste and small hydro generating stations.
Net Drawal
Schedule
The drawl schedule of a beneficiary after deducting the apportioned
transmission losses (estimated).
Operation A scheduled or planned action relating to the operation of a System.
Reactor An electrical plant specifically designed to absorb Reactive Power.
Regional Power
Committee
(RPC)
A Committee established by resolution by the Central Government for
a specific region for facilitating the integrated operation of the power
systems in that region.
Regional Grid The entire synchronously connected electric power network of the
concerned Region, comprising of ISTS, ISGS and Intra-state systems.
Regional Load
Despatch Centre
(RLDC)
The Centre established under sub-section (1) of Section 27 of the Act.
Short Term Open
Access Customer
A short-term open access customer as defined under the HPERC
(Terms and Conditions for Open Access) Regulations, 2005 as
amended from time to time.
Single Line
Diagram
Diagrams which are a schematic representation of the HV/EHV
apparatus and the connections to all external circuits at a Connection
Point incorporating its numbering nomenclature and labeling.
8 Compendium of HPERC Regulations, March 2021
Site Common
Drawing
Drawings prepared for each Connection Point, which incorporates
layout drawings, electrical layout drawings, common protection/control
drawings and common service drawings.
Spinning Reserve Part loaded generating capacity with some reserve margin that is
synchronized to the system and is ready to provide increased
generation at short notice pursuant to dispatch instruction or
instantaneously in response to a frequency drop.
State Energy
Account
1[An Account, in terms of the energy quantum as well as the
amounts payable/receivable by various State Entities for the billing
and settlement of various charges, to be prepared by SLDC on the
basis of transactions during the period to which such account
relates.]
2[State Entity Such person who is in the SLDC control area and whose metering and
energy accounting is done at the state level and as described in more
detail in sub-para 6.5.5 of para 6.5 under Chapter-6 of this Code.
State Power Grid The Intra-State Transmission System/network owned by the State
Transmission Utility (STU)/Transmission Licensee(s) and/or the
EHV/33 kV Distribution System/network owned by the distribution
licensee(s) within the State.]
State Pool
Account
3
[The account which shall be opened, maintained and operated by
the SLDC for receiving/making payments on account of Charges for
Deviation, Additional Charges for Deviation, and interest if any,
based on the weekly deviation statements to be prepared by SLDC
in accordance with the provisions of Himachal Pradesh Electricity
Regulatory Commission (Deviation Settlement Mechanism and
related matters) Regulations, 2018.]
State Government
Government of the State of Himachal Pradesh.
State Load
Dispatch Centre
(SLDC)
A Centre established by the State Government under sub-section (1) of
Section 31 of the Act.
State
Transmission
Utility (STU)
The Board or the Government Company specified as such by the State
Government under sub-section (1) of Section 39 of the Act.
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated
12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“A State energy account, for the billing and settlement of ‘Capacity Charge’, ‘Energy Charge’, ‘UI Charge’ and ‘Reactive
Charge.”
2 Ins. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated
12
th
October, 2018 at p. 5404-5418.
3 Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated
12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“State account for:
(i) payments regarding unscheduled- interchanges (UI Account) or
(ii) reactive energy exchanges (Reactive Energy Account), as the case may be.”
Compendium of HPERC Regulations, March 2021 9
State Sector
Generating
Stations (SSGS)
1[Generating Stations connected with the State Power Grid
including IPP, Captive Generating Plant, Co-Generators and NCES.
However for the purpose of scheduling/dispatching the provisions
made in Chapter-6 shall be applicable.]
Static VAR
Compensator
(SVC)
An electrical facility designed for the purpose of generating or
absorbing Reactive Power.
Time Block
Block of 15 minutes each for which special energy Meters record
specified electrical parameters and quantities with first time block
starting and 00:00 Hrs;
2[Provided that the Commission may revise the duration of time
block to 5 minutes, or any other duration, from the date to be
notified by it from time to time.]
Transmission
Licensee
3[A licensee authorized under section 14 of the Act to establish or
operate transmission lines. At present "Himachal Pradesh Power
Transmission Corporation Limited (HPPTCL)" is transmission
licensee in the State.]
Transmission
Planning
Criteria
The policy, standards and guidelines issued by the CEA for the
planning and design of the Transmission system.
User
4[A term used in various sections of HPEGC to refer to the
person/agencies using the IaSTS and shall also include distribution
licensee and/or any other person/agency not using IaSTS but using
any other component of State Power Grid, as the context may
require and as more particularly identified in each section of
HPEGC.]
Note: 1. Terms defined in singular shall be considered to apply for plural also.
2. Words and expressions used and not defined in this Code but defined in the Act
shall have the same meanings assigned to them in the said Act. Subject to the
above, expressions used herein but not specifically defined in this Code or in the
Act shall have the meaning as is generally assigned in the electricity industry.
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“Generating Stations connected with the IaSTS including IPP, Captive Generating Plant, Co-Generators and
NCES. For the purpose of scheduling/dispatching, SSGS shall include Hydroelectric Projects only above 5
MW capacity.”
2
Sub. for sign “.” and added proviso vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018
published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418.
3
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“A Licence granted under Section 14 of the Act to transmit electricity.”
4
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“A term used in various sections of the HPEGC to refer to the persons/agencies using the IaSTS, as more
particularly identified in each section of HPEGC.”
10 Compendium of HPERC Regulations, March 2021
CHAPTER -2
ROLE OF VARIOUS ORGANSIATIONS & THEIR LINKAGES
2.1 Introduction
2.1.1 In the light of the provisions of the Electricity Act, 2003, it has become necessary to
specify the role of State Load Dispatch Centre (SLDC), State Transmission Utility
(STU), Regional Load Dispatch Centre (RLDC), Regional Power Committees
(RPC), the Central Electricity Authority (CEA), the State Co-ordination Forum, the
Central Transmission Utility (CTU) etc. and their organizational linkages so as to
facilitate development and smooth operation of State Power Grid and the Regional
Grid. This Chapter defines the functions of the various organizations connected with
the functioning and operations of the State Power Grid, as envisaged in Electricity
Act, 2003 and rules and regulations made thereunder.
2.2 Regional Load Dispatch Centre
2.2.1 The RLDC is the apex body to ensure integrated operation of the power system
within the concerned regional grid. In respect of wheeling, optimum scheduling and
dispatch of electricity through Inter- State transmission lines, the RLDC shall comply
with the principles, guidelines and methodology as specified by the CERC in the
IEGC or otherwise. The RLDC may give such directions and exercise such
supervision and control as may be required for ensuring integrated Grid operations
and for achieving the economy and efficiency in the operation of the power system in
the region under its control. All licensees, generating companies, and any other
person connected with and/or utilizing the ISTS shall comply with the directions
issued by the RLDC.
2.3 Regional Power Committee
2.3.1 Regional Power Committees have been constituted by resolution dated 25.05.2005 of
Central Government for all the five regions for facilitating the integrated operation of
the power system in each region. Regional Power Committee, established by the
Government of India for the region may, from time to time, issue guidelines on
matters concerning the stability and smooth operation of the Grid and economy and
efficiency in the operation of the power system in that region. Such directions shall
be binding on all the entities covered by this Code to the extent they are applicable to
the State Power Grid.
2.3.2 RPC would perform the following functions to facilitate the stability and smooth
operation of the integrated grid:
(a) To undertake Regional Level operation analysis for improving grid
performance.
(b) To facilitate Inter-State/Inter-regional transfer of power.
(c) To facilitate all functions of planning relating to Inter-State/Intra-State
Transmission System with CTU/STU.
(d) To coordinate planning of maintenance of generating machines of various
generating companies of the region including those of Interstate generating
Compendium of HPERC Regulations, March 2021 11
companies supplying electricity to the Region on annual basis and also to
undertake review of maintenance programme on monthly basis.
(e) To undertake planning of outage of transmission system on monthly basis.
(f) To undertake operational planning studies including protection studies for
stable operation of the grid.
(g) To undertake planning for maintaining proper voltages through review of
reactive compensation requirement through system study committee and
monitoring of installed capacitors.
(h) To evolve consensus on all issues relating to economy and efficiency in the
operation of power system in the region.
2.4 Central Transmission Utility
2.4.1 Power Grid Corporation of India Limited (PGCIL) is the Central Transmission
Utility as notified by Government of India. CTU is responsible for the entire Inter-
State transmission of electricity and in that context; the relevance of this Code shall
be limited to the connectivity between the Intra-State Transmission System and the
Inter-State Transmission System.
2.5 Central Electricity Authority
2.5.1 The Central Electricity Authority, established under Section 3 of the Electricity
(Supply) Act, 1948, continues to operate as the Central Electricity Authority under
the provisions of Section 70(2) of the Act.
2.5.2 Under Section 3(4) of the Act, CEA would prepare and notify once in five years a
National Electricity Plan in accordance with the National Electricity Policy notified
by the Central Government.
2.5.3 The Central Electricity Authority in accordance with the provisions of Section 177 of
the Act may make regulations, which may provide for the following matters:
(a) Grid Standards as stipulated in Section 34 of the Act.
(b) Measures relating to safety and Electricity Supply as stipulated in Section 53 of
the Act.
(c) Installation and operation of meters as stipulated in Section 55 of the Act.
(d) Technical standards for construction of electrical plants and electric lines and
connectivity to the Grid and all other matters as stipulated in Section 73 of the
Act.
(e) The form and manner in which and the time at which the State Government and
Licensees shall furnish statistics, returns or other information under Section 74
of the Act.
(f) Any other matter as may be specified under the Act.
2.5.4 Irrespective of whether the provisions under the regulations stated above are
explicitly provided for or not in this Code, they shall apply to all the entities covered
by this Code to the extent it applies to them.
12 Compendium of HPERC Regulations, March 2021
2.6 State Load Dispatch Centre
2.6.1 The State Government shall establish a center to be known as the State Load
Dispatch Centre for the purpose of exercising the powers and discharging the
functions under sub- section (1) of Section 32 of the Act. This State Load Dispatch
Centre shall be operated by a Government company, or any authority or corporation
established or constituted by or under any State Act, as may be notified by the State
Government. Till such time the State Government notifies the same, STU shall
operate SLDC.
2.6.2 The SLDC shall be the apex body to ensure integrated operation of the power system
in the State. The SLDC shall be responsible for:
(a) Optimum scheduling and despatch of electricity within the State, in accordance
with the contracts entered into with the licensees or the generating companies
operating in the State.
(b) Monitoring of grid operations.
(c) Keeping accounts of the quantity of electricity transmitted through the State
Power Grid.
(d) Supervision and control over the Intra-State Transmission System.
(e) Carrying out real time operations for grid control and despatch of electricity
within the State through secure and economic operation of the State Power Grid
in accordance with the Grid Standards and the Grid Code.
2.6.3 In addition to above functions under the Act SLDC shall also discharge the following
function as per the provisions of this Grid Code:
(a) System operation and control covering contingency analysis and operational
planning on a real time basis;
(b) Re-scheduling of despatch and drawl schedules as per system conditions and
request of Generating Stations and Distribution Licensees;
(c) System restoration following grid disturbances;
(d) Specifying metering points and data collection;
(e) Compiling and furnishing data pertaining to system operation;
1
[(f) Operation of State Deviation pool account and State reactive energy account;]
(g) In case of open access in Intra-State transmission, the SLDC shall be the nodal
agency for the short-term open access. The procedure and modalities in regard
to short-term Open Access shall be as per the HPERC (Terms and Conditions
for Open Access) Regulations, 2005 as amended from time to time.
2.6.4 SLDC may give such direction and exercise such supervision and control as may be
required for ensuring the integrated Grid operation and for achieving the maximum
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“Operation of State UI pool account and State reactive energy account;”
Compendium of HPERC Regulations, March 2021 13
economy and efficiency in the operation of the State Power System. All Users shall
comply with the directions issued by the SLDC.
2.6.5 The SLDC shall ensure compliance of the directions of the RLDC by issuing suitable
directions to the Users.
2.6.6 If any dispute arises with reference to the quality of electricity or, safe, secure and
integrated operation of the State Power Grid or in relation to any direction given by
the SLDC, it shall be referred to the Commission for decision. Pending the decision
of the Commission, the Licensee or Generating Company shall comply with the
directions of the SLDC.
2.6.7 If any licensee, generating company or any other person fails to comply with the
directions issued by SLDC, he shall be liable to a penalty, as per the provisions of the
Act.
2.7 State Transmission Utility
2.7.1 The State Transmission Utility as notified by the State government shall be deemed
to be a transmission licensee under Section 14 of the Electricity Act, 2003.
2.7.2 As per the Act, the STU shall be responsible for:
(a) Transmission of electricity through Intra-State Transmission System.
(b) Discharging all functions of planning and coordination relating to Intra-State
Transmission System with:
(i) Central Transmission Utility,
(ii) State Government,
(iii) Generating Companies,
(iv) Regional Power Committee,
(v) Central Electricity Authority,
(vi) All Licensees,
(vii) Any other person notified by the State Government in this behalf.
(c) Ensuring development of an efficient, coordinated and economical system of
Intra-state transmission lines for smooth flow of electricity from a generating
station to the load centers.
(d) Providing non-discriminatory open access to its transmission system for use
by:
(i) any licensee or generating company on payment of the transmission
charges, or
(ii) any customer, as and when such open access is provided by the
Commission under sub-section (2) of Section 42 of the Act, on payment
of the transmission charges and a surcharge thereon, as may be specified
by the Commission.
2.7.3 STU, in discharge of its functions under the Act and this Code, shall take into
consideration recommendations, if any, of the State Co-ordination Forum.
14 Compendium of HPERC Regulations, March 2021
2.7.4 STU shall act as nodal agency for all long-term open access customers.
2.8 Transmission Licensee
2.8.1 Every Transmission Licensee shall comply with such technical standards of
construction of electrical plants, electric lines and connectivity with the grid and
safety requirements as specified by the CEA, and follow the principles and
procedures as specified in this Code and /or Indian Electricity Grid Code as
applicable to the Intra-State Transmission System.
2.8.2 It shall be the duty of the transmission licensee:
(a) to maintain and operate the part of the IaSTS which are licensed to him and
comply with the directions of RLDC and SLDC as the case may be;
(b) to provide non-discriminatory open access in pursuance of open access to its
transmission system for use by any licensee or generating company or other
Users on payment of the charges as determined by the Commission.
2.9 Generating Company
2.9.1 Any generating company may establish, operate and maintain a generating station
without obtaining a licence under the Act if it complies with the technical standards
relating to connectivity with the grid referred to in clause (b) of Section 73 of the
Act.
2.9.2 As per the provisions of Section 10 of the Act, the duties of a generating company
shall be:
(a) to establish, operate and maintain generating stations, tie-lines, sub-stations and
dedicated transmission lines connected therewith in accordance with the
provisions of the Act or the rules or regulations made thereunder;
(b) to supply electricity to any licensee in accordance with the Act and the rules
and regulations made thereunder and may, subject to the regulations made
under sub-section (2) of Section 42, supply electricity to any consumer;
(c) to submit technical details regarding its generating stations to the Appropriate
Commission and the Authority;
(d) to co-ordinate with the Central Transmission Utility or the State Transmission
Utility, as the case may be, for transmission of the electricity generated by it.
2.10 Distribution Licensee
2.10.1 Any person granted licence under Section 14 of Act for distribution of electricity in a
particular area should develop and maintain an efficient, co-ordinate and economical
distribution system for supplying electricity to the consumers in his area of supply in
accordance with the provisions of the Act.
2.10.2 It shall also be the duty of the distribution licensee:
Compendium of HPERC Regulations, March 2021 15
(a) to provide open access to the consumers in its area of supply in such phases as
may be specified by the Commission on payment of wheeling charge,
surcharge and additional surcharge as may be determined by the Commission;
(b) to give supply of electricity, on an application by the owner or occupier of any
premises, within a period of one month after receipt of the application requiring
such supply:
Provided that where such supply requires extension of distribution mains, or
commissioning of new sub-stations, the distribution licensee shall supply the
electricity to such premises immediately after such extension or commissioning or
within such period as may be specified by the Commission.
2.11 State Coordination Forum
2.11.1 As per Section 166 (4) of the Act, Government of Himachal Pradesh shall constitute a
State Coordination Forum for smooth and coordinated development of the power
system in the State. State Coordination Forum may give its recommendations on
matters related to overall planning and development of the State Power System.
2.12 Himachal Pradesh Electricity Regulatory Commission
2.12.1 The functions of HPERC relevant to HPEGC are:
(a) To determine the rates, charges and terms for the use of the transmission
facilities of licensees.
(b) To specify the fees and charges payable to SLDC.
(c) To issue directions on matters of non-compliance of HPEGC or any dispute
referred to it regarding interpretation of any provisions of the HPEGC.
(d) To issue transmission/distribution licences.
(e) To issue amendments to the HPEGC as and when required.
2.13 Government of Himachal Pradesh
2.13.1 The State Government may issue directions to SLDC; to take such measures as may
be necessary for maintaining smooth and stable transmission and supply of electricity
in the State. SLDC shall abide by such directions if they are not inconsistent with the
provisions of the Act and this Code.
CHAPTER-3
PLANNING CODE FOR INTRASTATE TRANSMISSION
3.1 Introduction
3.1.1 In accordance with Section 39(2)(b) of Electricity Act, 2003, the State Transmission
Utility (STU) shall discharge all functions of planning and coordination relating to
Intra-State Transmission System in coordination with CTU, State Governments,
Generating Companies, Regional Power Committees, Central Electricity Authority
(CEA), licensees and any other person notified by the State Government in this
behalf. The Act also envisages role of Generating Companies and CTU, apart from
16 Compendium of HPERC Regulations, March 2021
the Central Government and State Governments in the process of transmission
planning at various levels.
3.1.2 This Planning Code comprises various aspects of planning and development relating
to Intra-State Transmission System.
3.2 Objective
3.2.1 The objectives of Planning Code are as follows:
(a) To specify the principles, procedures and criteria to be applied in the planning
and development of IaSTS.
(b) To promote co-ordination amongst all Users in any proposed development of
the IaSTS.
(c) To provide methodology and information exchange requirements amongst
SLDC, STU and Users in the planning and development of IaSTS.
3.3 Scope
3.3.1 This Planning Code applies to STU, other licensees, State Sector Generating Stations
(SSGS), connected to and/or using and/or involved in developing the IaSTS
including those intending to connect their system to IaSTS. This shall also apply to
the other Stakeholders like CTU, Generating Stations connected to (or intending to
connect) to the Inter State Transmission System by laying transmission lines through
the territory of Himachal Pradesh.
3.4 Planning Policy
3.4.1 The STU shall prepare and submit to the Commission a long-term transmission
system plan (time span 5 years) for the expansion of the IaSTS to meet the future
demand within six months from the date of notification of this Grid Code. In
preparing the above plan, the following shall be considered in addition to the data of
authentic nature collected from and in consultation with SSGS, licensees, SLDC,
etc.:
(a) Perspective plan for development of the electricity system formulated by the
CEA under the provisions of clause (a) of Section 73 of the Act.
(b) Electric Power Survey of India report of the CEA.
(c) Transmission Planning Criteria and Guidelines issued by the CEA.
(d) National Electricity Policy issued by the Government of India to the extent
applicable for the development of Intra-State Transmission System.
(e) Recommendations/inputs, if any, of the Regional Power Committee and the
State Coordination Forum.
(f) Any other information/data source suggested by the Commission.
3.4.2 The STU shall submit to the Commission an updated long-term transmission system
plan by 28
th
February every year taking care of the revisions in electricity load
Compendium of HPERC Regulations, March 2021 17
projections, additions in the generation capacity and all (approved/pending)
applications for open access.
3.4.3 The primary responsibility of load forecasting of a particular supply area shall be that
of the respective Distribution Licensees. The Distribution Licensees shall forecast the
peak load and energy requirement of their areas for each category of loads for the
succeeding 5 years and submit the same annually by 31
st
December to STU along
with forecast methodology, assumptions and daily load curve on which the forecasts
are based. These forecasts shall be reviewed annually or whenever major changes are
made in the existing system and updated accordingly. While indicating requirements
of a single consumer (one MW or higher), the Distribution Licensee shall personally
satisfy itself, as to the degree of certainty of the demand materializing. STU shall
apply an appropriate diversity factor and also satisfy itself regarding the probability
of materialization of bulk loads of consumers with demands above 1MW in
consultation with concerned Distribution Licensee.
The Generating Companies intending to connect their stations with the IaSTS and
those intending to connect the generating stations with the Inter State Transmission
System by erecting transmission lines(whether dedicated or otherwise) during
succeeding five years shall also submit complete details to the STU as well as to
Government of H.P. at the earliest possible, but in any case before applying for open
access to STU/CTU or seeking transmission licence for erection of any line in
Himachal Pradesh.
3.4.4 STU in consultation with SLDC and the concerned Distribution Licensee, may review
the methodology and assumptions, used in making the load forecast and shall
further re-work:
(a) Projected loads and losses of the system, the net energy requirement and peak
load requirement at generation end. The installed capacity, peak availability,
surplus and deficit both in generation and demand shall also be worked out by
STU.
(b) Additional transmission capacity required after taking into account, the existing
capacity, projects under construction, proposed projects, availability from
captive power plants, co-generators & NCES, bilateral trades and also share of
the State from Central sector Power Projects both within and outside the State.
STU shall also examine the economic, technical and environmental aspects of
all the available alternatives.
3.4.5 In addition to the Intra-State Transmission System, the STU shall plan from time to
time, system strengthening schemes, need of which may arise to overcome the
constraints in power transfer and to improve the overall performance of the grid. The
Intra-State transmission proposals including system-strengthening scheme identified
on the basis of planning studies would be finalised by STU based on the inputs
received from various stakeholders i.e. generating companies and distribution
licensees, SLDC and any committee created for the transmission planning purposes
by the Commission.
3.4.6 In case long term open access cannot be allowed due to system constraints, the
prospective open access customer may request STU to carry out system studies to
identify system strengthening requirements and cost estimates. In case of Long Term
18 Compendium of HPERC Regulations, March 2021
Open Access applications requiring any strengthening in the Inter-State Transmission
System to absorb/evacuate power beyond IaSTS, the applicant shall also coordinate
with CTU.
3.4.7 The long term transmission system plan prepared by STU shall contain a chapter on
additional transmission requirement, which may include not only Intra-State
transmission lines, but also additional equipment requirement such as transformers,
capacitors and reactors, etc.
3.4.8 The long term transmission system plan shall also indicate the action taken to fulfill
the additional requirement and actual progress made on new schemes. The planning
report and power map shall be made available to any party interested for making
investments decision/ connection decisions to the IaSTS.
3.4.9 As voltage management plays an important role in the Intra- State transmission of
energy, special attention shall be accorded to planning of capacitors, reactors, SVC
and Flexible Alternating Current Transmission Systems (FACTS), etc.
3.4.10 Based on the Plan prepared by the STU, other Transmission Licensees/ Distribution
Licensees shall plan their systems to further evacuate power from the IaSTS.
3.4.11 The Inter-State Transmission System and associated Intra-State Transmission System
are complementary and inter-dependent and therefore planning of one affects the
planning and performance of the other. The STU shall accordingly plan the
development of associated Intra-State Transmission System in line with the
development of the Inter-State Transmission System. However, it is expected that
CTU shall also duly consider the constraints of transmission corridors in the State
while planning the Inter State Transmission System, so as to ensure the optimum
utilization of the scarce transmission corridors in the State.
3.4.12 Generating Companies intending to evacuate the power from the generating stations
through Intra State Transmission System shall also duly co-ordinate in advance with
STU and shall also abide by all such requirements as may be intimated by STU
keeping in view the constraints of transmission corridors in the State.
In case of any difference of opinion in this regard for the system to be erected in
Himachal Pradesh the matter shall be suitably referred to HPERC.
3.4.13 STU’s planning department shall use load flow, short circuit, transient and steady
state stability study, relay coordination study and other techniques for transmission
system planning.
3.4.14 STU’s planning department shall simulate the contingency and system constraint
conditions for the IaSTS and incorporate the results in the long-term transmission
system plan.
3.4.15 STU should maintain a historical database based on operational data supplied by
SLDC and use advance software tools for demand forecasting.
3.4.16 STU shall extend full support to CTU to finalise the annual planning corresponding
to a 5 year forward term for identification of major Inter-State Transmission System
Compendium of HPERC Regulations, March 2021 19
including inter-regional schemes which shall fit in with the long term plan developed
by CEA.
3.4.17 STU shall furnish the requisite planning data to CTU as required by it from time to
time.
3.5 Planning Criterion
3.5.1 The planning criterion are based on the security philosophy on which the IaSTS has
been planned. The security philosophy may be as per the Transmission Planning
Criterion and other guidelines as given by CEA. The general criterion shall be as
detailed below:
(a) As a general rule, the IaSTS shall be capable of withstanding and be secured
against the following contingency outages without necessitating load shedding
or rescheduling of Generation during Steady State Operation:
(i) Outage of 66 kV/132 kV D/C Line or,
(ii) Outage of 220 kV D/C Line or,
(iii) Outage of 400 kV S/C Line or,
(iv) Outage of Single Inter-Connecting Transformer or,
(v) Outage of one pole of HVDC Bipole line or,
(vi) Outage of a 765 S/C line.
(b) The above contingencies shall be considered assuming a pre-contingency system
depletion (planned outage) of another 66kV/132 kV D/C line or 220 kV S/C line
or 400 kV S/C line in another corridor and not emanating from the same sub-
station. All the Generating Units may operate within their reactive capability
curves and the network voltage profile shall also be maintained within voltage
limits specified.
(c) In exceptional cases like transmission corridors constraints and environment
concerns, the STU may deviate from the above stated criterion provided that the
STU shall duly bring out the details of deviations alongwith the reasons thereof
in this regard while submitting the long term transmission system plan as per
section 3.5.
3.5.2 The IaSTS shall be capable of withstanding the loss of most severe single system in
feed without loss of stability.
3.5.3 Any one of the events defined above shall not cause:
(a) Loss of supply;
(b) Prolonged operation of the system frequency below and above specified limits;
20 Compendium of HPERC Regulations, March 2021
(c) Unacceptable high or low voltage;
(d) Unacceptable overloading of IaSTS elements.
3.5.4 The Transmission System should therefore have sufficient additional capacities and
redundancies to cater to the above needs.
3.5.5 STU shall carry out planning studies for Reactive Power compensation of IaSTS
including reactive power compensation requirement at the SSGS’s Switchyard.
3.6 Planning Data Requirement
3.6.1 To enable the STU to discharge its responsibilities to conduct system studies and
prepare long term transmission system plan, Users shall provide the required
planning data/information pertaining to their systems in the formats as may be
devised by STU. In devising these formats, the STU shall also be guided by the
formats, developed under the provisions of the Grid Code specified by the Central
Commission under clause (h) of sub-section (1) of Section 79 of the Electricity Act,
2003.
3.6.2 The generating companies connected or those intending to connect their stations to
the IaSTS as well as those connected to or intended to connect their stations to the
ISTS through transmission lines(dedicated or otherwise) and transmission licensee
erecting or intended to erect transmission lines in the territory of Himachal Pradesh
shall also provide requisite planning data or information pertaining to their stations in
the formats as may be devised by STU. The CTU shall also provide similar data for
the system pertaining to its system connected to or to be connected to any of the
transmission lines passing through territory of Himachal Pradesh in the formats as
may be devised by STU in-accordance with section 3.6.1.
3.6.3 The one time data shall be submitted by all the Users to STU within 4 months from
the date of notification of this Grid Code. Users shall thereafter submit yearly data to
STU latest by 31
st
December for the ensuing year.
3.6.4 STU shall supply the data as may required by the Users for the coordinated planning,
design and operation of their plants and systems with the transmission system.
3.7 Implementation of Transmission Plan
3.7.1 The actual program of implementation of transmission lines, Inter-connecting
Transformers, reactors/capacitors and other transmission elements will be determined
by STU in consultation with the concerned Users. The completion of these works, in
the required time frame, shall be ensured by STU.
1
[3.7.2 Users shall mean any person/agency using IaSTS (or intending to use IaSTS) and shall
also include a person/agency using the ISTS(or intending to use the ISTS) through their
lines (or otherwise) erected or to be erected in State of Himachal Pradesh.]
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“Users shall mean any person/agency using IaSTS (or intending to use IaSTS) and shall also include a person/agency
using the ISTS(or intending to use the ISTS) through their transmission lines(or otherwise) erected or to be erected in
State of Himachal Pradesh.”
Compendium of HPERC Regulations, March 2021 21
CHAPTER-4
CONNECTIVITY CONDITIONS CODE
4.1 Introduction
4.1.1 The Connectivity Conditions specify the minimum technical and design criteria
which shall be complied with by STU and any User connected to, or seeking
connection to the IaSTS. This chapter also sets out the procedures by which STU
shall ensure compliance by all Users with the above criteria as a pre-requisite for the
establishment of an agreed connection.
4.2 Objective
4.2.1 The connection conditions are designed to ensure that:
(a) The basic rules for connections are complied with and all Users are treated in a
non-discriminatory manner.
(b) Any new or modified connections, when established, shall neither suffer
unacceptable effects due to its connection to IaSTS nor impose unacceptable
effects on the system of any other connected User.
(c) The ownership and responsibility for all the equipments is clearly specified in a
schedule (Site Responsibility Schedule) for every site, where a connection is
made.
4.3 Scope
4.3.1 The Connectivity Conditions Code shall apply to STU and all Users connected to
and/or involved in developing the State Power Grid and includes Generating
Companies/ Transmission Licensee/Distribution Licensee, which are engaged in or
are intending to engage in generation/ transmission /distribution of power through the
State Power System.
4.4 Procedure for connection
4.4.1 Prior to being connected to the IaSTS, User shall ensure that all the necessary
conditions outlined in the HPEGC in addition to mutually agreed requirements have
been complied by it.
4.4.2 Any User seeking to establish new or modified arrangements for connection to
and/or use of the assets of the Intra-State Transmission System, shall submit the
following report, data and undertaking along with an application on standard format
to STU along with the following details:
(a) Report stating the purpose of the proposed connection and/or modification,
transmission licensee in whose system the connection is proposed, connection
point, description of apparatus to be connected or modification to the apparatus
already connected and beneficiaries of the proposed connection.
(b) Construction schedule and target completion date.
(c) Undertaking that the User shall abide by HPEGC, Indian Electricity Rules and
various standards including Grid Connectivity Standards made pursuant to the
Act.
4.4.3 The STU shall forward a copy of the application to the Transmission Licensee in
whose system the connection is being sought, to SLDC and to every Transmission
22 Compendium of HPERC Regulations, March 2021
Licensee within the State whose transmission system is likely to be affected by such
application.
4.4.4 The STU on receipt of application, complete in all respects and after considering all
suggestions and comments from the parties identified in section 4.4.3 make a formal
offer to the applicant within thirty days from the date of receipt of all details along
with the proposed changes, if any. The offer shall be subject to obtaining the required
consents, approvals, and permissions for right of way or any other requirements as
per the provisions of this Grid Code, Electricity Act, 2003 and rules and regulations
made thereunder. A copy of the offer shall also be furnished to the transmission
licensee in whose system the connection is being sought.
4.4.5 The offer shall specify, and take into account, any works required for the extension
or reinforcement of the existing transmission system and/or supply system as
necessitated by the applicant’s proposal.
4.4.6 The estimated time schedule for completion of such works should also be specified
in the offer, taking into account the time required to obtain statutory clearances etc.,
wherever necessary. In respect of offers for modifications to the existing
connections, the offers shall also take into account the terms of the existing
Connection Agreement, if any.
4.4.7 A User whose development/connection requires the STU/Transmission Licensee to
obtain any consents, approvals, permissions, and right of ways or compliance with
any other requirements mentioned in the HPEGC shall:
(a) Provide necessary assistance, supporting information or evidence; and
(b) Ensure attendance by such witnesses as the transmission licensee may
reasonably request.
4.4.8 The User shall give its consent to the offer and submit the same to STU within a
fortnight from the date the offer was made by the STU. Final decisions on
applications for connection to the IaSTS shall be provided by the STU within 45
days from the date of submission of the consent to it by the User.
4.4.9 If the nature of complexity of the proposed development is such that the specified
time limit for making the offer is not considered adequate, the STU shall make a
preliminary offer within the specified time limit indicating the necessity and the
extent of further time required for more detailed analysis of the issues.
4.4.10 The STU shall make a revised offer, upon request by a User, if necessitated by
changes in data furnished earlier by the User.
4.4.11 The STU shall, upon compliance of the required conditions by the concerned User,
notify that the User can be connected to the IaSTS.
4.4.12 The applicant and the Transmission Licensee, in whose system the connection is
being sought, shall enter into a Connection Agreement on acceptance of the offer by
the applicant. The copy of the Connection Agreement shall also be provided to the
STU and the SLDC by the Transmission Licensee.
4.4.13 All offers (other than preliminary offers) including revised offers shall remain valid
for a period of 60(sixty) days from the date of issue of the offer. In the event of an
offer becoming invalid or rejected by the applicant, STU shall not be required to
consider any further application from the same applicant within twelve months from
Compendium of HPERC Regulations, March 2021 23
the date of offer unless the new application is substantially different from the original
application with regard to system changes.
4.4.14 The User shall furnish the relevant Planning Data to the STU within thirty days of
acceptance of an offer or such longer period as the STU may agree in a particular
case.
4.4.15 The STU may reject any application for connection to and/or use of the IaSTS under
the following conditions:
(a) If such proposed connection is likely to cause breach of any of the provisions of
Transmission Licence/Grid Code/ IEGC/Grid Standards and Technical
Standards set out by CEA/Electricity Act, 2003, or any provision of planning
criteria/any covenants/deeds/regulations by which the STU is bound, or
(b) If the applicant fails to give the undertakings in accordance with section
4.4.2(c) of this chapter.
4.4.16 In the event of any dispute with regard to rejection of application by the STU, the
User may approach the Commission.
4.5 Connection Agreement
4.5.1 All Users connected to or seeking connection to the IaSTS shall enter into a
connection agreement with the STU/Transmission Licensee. However, in respect of
existing connections a relaxation of one year is allowed so that present arrangement
may continue in the interim. The process of re-negotiation of the connection
conditions shall be completed within this period of one year. In case it is determined
that the compliance of connection conditions would be delayed further, the
Commission may consider further relaxation for which a petition will have to be filed
by the concerned User along with STUs recommendation/comments. The cost of
modification, if any, shall be borne by the concerned User.
4.5.2 A connection agreement shall include (but not limited to), as appropriate, within its
terms and conditions, the following:
(a) The basic rules for connections are complied with and all Users are treated in a
non-discriminatory manner.
(b) Details of connection, technical requirements and commercial arrangements.
(c) Details of any capital expenditure arising from necessary reinforcement or
extension of the system, data communication, RTU etc. and demarcation of the
same between the concerned parties.
(d) Details of equipment and plant to be connected.
(e) General philosophy, guidelines, etc., on protection and telemetry.
(f) A “Site Responsibility Schedule” detailing the division of responsibility at
Connection Sites in relation to ownership, control, operation and maintenance
of plant & apparatus and to safety of persons.
4.6 IaSTS Parameter Variations
4.6.1 General
Within the power system, instantaneous values of the system frequency and voltage
are subject to variation from their nominal value. All Users shall ensure that their
plants and apparatuses requiring service from/ to the IaSTS are of such design and
construction that satisfactory operation is not hampered by such variation.
24 Compendium of HPERC Regulations, March 2021
4.6.2 Frequency Variations
Rated frequency of the system shall be 50.0 Hz and shall normally be controlled
within the limits as per regulations/standards framed by the Authority.
4.6.3 Voltage Variations
(a) The variation of the voltage may not be more than the voltage range specified
in the regulations/standards framed by the Authority.
(b) The agencies engaged in sub-transmission and distribution shall not depend
upon the IaSTS for reactive energy compensation when connected. The
agencies shall estimate and provide the required reactive energy compensation
in its transmission and distribution network to meet its full reactive power
requirement.
4.7 Equipment at Connection Points
4.7.1 Sub-Station Equipment
(a) All EHV sub-station equipments shall comply with Bureau of Indian Standards
(BIS)/IEC/ prevailing Code of practice.
(b) All equipment shall be designed, manufactured and tested and certified in
accordance with the quality requirements as per IEC/BIS standards.
(c) Each connection between the User and the IaSTS shall be controlled by a
circuit breaker capable of interrupting, at the connection point, the short circuit
current as advised by STU in the specific connection agreement.
4.7.2 Fault Clearance Times
(a) The primary protection system shall be such that the fault clearance time of all
equipments/lines connected to the IaSTS and for a three phase fault (close to
the bus-bars) on IaSTS connected to User's equipment, shall not be more than:
(i) 100 milli seconds (ms) for 400 kV
(ii) 160 milli seconds (ms) for 220 kV &132 kV
(iii) 300 milli seconds (ms) for 66 kV
1[(iv) 400 milli seconds (ms) for 33 kV.]
(b) Back-up protection shall be provided for required isolation/protection in the
event of failure of the primary protection systems to isolate the faulty element
within the above fault clearance time requirements. If a Generating Unit is
connected directly to the IaSTS, it shall have the capability to withstand
disturbances, until clearing of the fault by back - up protection on the IaSTS
side.
4.7.3 Protection Planning
(a) Protection systems are required to be provided by all Users in coordination
with the Protection Committee (to be constituted by STU with the approval of
HPERC). In case of installation of any device, which necessitates
modification/replacement of existing protection relays/scheme in the network,
1
Ins. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418.
Compendium of HPERC Regulations, March 2021 25
owner of respective part of network shall carry out such modification/
replacement.
(b) Protection systems are required to isolate the faulty equipments and protect the
other components of the system against all types of faults, internal/external to
them, within the specified fault clearance time with reliability, selectivity and
sensitivity.
(c) All Users connected to the IaSTS shall provide protection systems as specified
in the connection agreement.
(d) Relay setting coordination shall be done at regional level by RPC.
4.8 Generating Units and Generating Stations
4.8.1 A Generating unit shall be capable of continuously supplying its normal rated
active/reactive output within the system frequency and voltage variation range
indicated at section 4.6 above, subject to the design limitations specified by the
manufacturer.
4.8.2 Generating units must be provided with AVR and protective & safety devices, as set
out in connection agreements.
4.8.3 Each Generating Unit must be fitted with a turbine speed governor having an overall
droop characteristic within the range of 3% to 6%, which shall always be in service.
1
[4.8.4 All thermal generating units of 200 MW and above, open cycle gas turbine/combined
cycle generating stations having gas turbines of more than 50 MW each and all hydro
units of 25 MW and above operating at or above 100% of their Maximum Continuous
Rating (MCR) shall have the capability of (and shall not in any way be prevented from)
instantaneously picking up to 105%, 105% and 110% of their MCR, respectively, when
the Grid frequency falls suddenly. After an increase in generation as above, a generating
unit may ramp back to the original level at a rate of about one percent (1%) per minute,
in case continued operation at the increased level is not sustainable. Any generating unit
not complying with the above requirements shall be kept in operation (synchronized
with grid) only after obtaining permission from SLDC.]
4.8.5 No generating units shall be synchronized with the State Power Grid without the
necessary instructions from SLDC.
4.9 Reactive Power Compensation
4.9.1 Reactive power compensation and/or other facilities should be provided by the
Transmission Licensee/Distribution Licensees, as far as possible close to the load
points thereby avoiding the need for exchange of reactive power to/from the IaSTS
and to maintain IaSTS voltage within the specified range.
4.9.2 Line Reactors may be provided to control temporary over voltage within the limits as
set out in connection agreements.
4.9.3 The additional reactive compensation to be provided by the User shall be indicated
by STU in the connection agreement for implementation.
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“Each generating unit must be capable of instantaneously increasing output by 5% when the frequency falls,
limited to 105% MCR. Ramping back to the previous MW level (in case the increased output level cannot be
sustained) shall not be faster than 1% per minute.”
26 Compendium of HPERC Regulations, March 2021
4.10 Data and Communication Facilities
1
[4.10.1 Reliable and efficient speech and data communication systems shall be provided to
facilitate necessary communication and data exchange and supervision/control of the
grid by the SLDC, under normal and abnormal conditions. All Users, including
generating stations not falling under the definition of State Entity, shall provide
systems to telemeter power system parameter such as power flow, voltage and status
of switches/transformer taps etc. in line with interface requirements and other
guideline made available to SLDC. The associated communication system to
facilitate data flow up to SLDC, shall also be established by the concerned User as
specified by STU in connection agreement. All Users in coordination with STU shall
provide the required facilities at their respective ends and SLDC as specified in the
connection agreement.]
4.11 System Recording Instruments
4.11.1 Recording instruments such as Data Acquisition System/Disturbance Recorder/Event
Logger/Fault Locator (including time synchronization equipment) shall be provided
in the IaSTS for recording of dynamic performance of the system. Users shall
provide all the requisite recording instruments as specified in the connection
agreement according to the agreed time schedule.
4.12 Responsibilities for Operational Safety
4.12.1 STU/Transmission Licensee and the concerned User shall be responsible for safety
as indicated in Site Responsibility Schedules for each connection point.
4.13 Site Responsibility Schedule
4.13.1 A Site responsibility schedule shall be produced by STU/transmission licensee and
User detailing the ownership responsibilities of each, before execution of the project
or connection including, safety responsibilities.
4.13.2 The Site Responsibility Schedule shall be prepared by STU/transmission licensee
pursuant to the relevant connection agreement and shall state the following for each
item of plant and apparatus installed at the connection point:
(a) Ownership of the Plant/Apparatus.
(b) Responsibility for control of the Plant/Apparatus.
(c) Responsibility for operation of the Plant/Apparatus.
(d) Responsibility for maintenance of the Plant/Apparatus.
(e) Responsibility for all matters relating to safety of any person at the connection
point.
4.13.3 All Users connected to or planning to connect to IaSTS would ensure providing of
RTU and other communication equipment, as specified by SLDC for sending real-
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“Reliable and efficient speech and data communication systems shall be provided to facilitate necessary communication and
data exchange and supervision/control of the grid by the SLDC, under normal and abnormal conditions. All Users (i.e. all 66kV
and above sub-stations and all SSGS) shall provide systems to telemeter power system parameter such as power flow, voltage
and status of switches/ transformer taps etc. in line with interface requirements and other guideline made available to SLDC.
The associated communication system to facilitate data flow up to SLDC, shall also be established by the concerned User as
specified by STU in connection agreement. All Users in coordination with STU shall provide the required facilities at their
respective ends and SLDC as specified in the connection agreement.”
Compendium of HPERC Regulations, March 2021 27
time data to SLDC at least before date of commercial operation of the generating
stations or sub-stations or lines being connected to IaSTS.
4.13.4 The Formats, principles and basic procedure to be used in the preparation of Site
Responsibility Schedules shall be formulated by STU and shall be provided to each
User seeking connection or modification of existing connection to the IaSTS.
4.14 Single Line Diagrams
4.14.1 Single Line Diagram shall be furnished to SLDC and STU for each connection point
by the connected Users. These diagrams shall include all HV connected equipment
and the connections to all external circuits and incorporate numbering, nomenclature
and labeling, etc. The diagram is intended to provide an accurate record of the layout
and circuit connections, rating, numbering and nomenclature of HV apparatus and
related plant.
4.14.2 Whenever, any equipment is proposed to be changed, the concerned User shall
intimate the necessary changes to STU and to all concerned. When the changes are
implemented, revised single line diagram shall be circulated by the User to SLDC
and STU.
4.15 Site Common Drawings
4.15.1 Site Common Drawings shall be prepared by STU for each Connection Point and
will include site layout, electrical layout, details of protection and common services
drawings. Users shall provide the necessary details to STU.
4.15.2 The detailed drawings for the portion of the User and STU/ transmission licensee at
each connection point shall be prepared individually and copies of the same shall be
made available to the other party.
4.15.3 If any change in the drawing is found necessary, the details will be furnished to the
other party as soon as possible.
4.16 Procedure for Site Access, Site Operational Activities and Maintenance
Standards Drawings
4.16.1 The Connection Agreement will also indicate any procedure necessary for Site
access, Site operational activities and maintenance standards for equipment of the
STU/ transmission licensee at User's premises and vice versa.
4.16.2 The User owning the Connection Site shall provide reasonable access and other
required facilities for other Users whose equipments are installed /proposed to be
installed at the Connection Site for installation, operation, maintenance, etc.
4.16.3 Written procedures and agreements shall be developed between entities to ensure that
mandatory access is available to the entity concerned, and at the same time
safeguarding the interests of both the entities at the connection site.
4.17 Schedule of Assets of the State Power Grid
28 Compendium of HPERC Regulations, March 2021
1[4.17.1 STU shall submit annually to the Commission by 30th September each year schedule of
such transmission assets, indicating ownership also, in electronic form, which constitute
a part of State Power Grid as on 31st March of that year and on which SLDC has
operational control and responsibility.]
2
[4.18 Cyber Security
4.18.1 All Intrastate Utilities shall have in place, a cyber security framework to identify the
critical cyber assets and protect them so as to support reliable operation of grid.]
.
CHAPTER-5
OPERATION PLANNING AND SYSTEM SECURITY CODE
5.1 Introduction
5.1.1 The primary objective of integrated operation of the State Power Grid is to enhance
the overall operational economy and reliability of the entire electric power network
spread over the geographical area of the State.
5.2 Operating Policy
5.2.1 Participant Utilities shall cooperate with each other and adopt Good Utility Practices
at all times for satisfactory and beneficial operation of the State Power Grid.
5.2.2 Overall operation of the State Power Grid shall be supervised from the State Load
Dispatch Centre (SLDC). All Users are accordingly required to comply with the
directions given by the SLDC.
5.2.3 All Users shall comply with this operation planning and system security code, for
deriving maximum benefits from the integrated operation and for equitable sharing
of obligations.
5.2.4 A set of detailed internal operating procedures for State Power Grid shall be
developed by SLDC in consultation with Users which shall be consistent with the
provisions of HPEGC and IEGC to enable compliance with the requirement of the
Grid Code and IEGC.
5.2.5 For efficient and secure operation of the State Power Grid the control rooms of the
SLDC, power generating plants, sub-stations of 66 kV and above, and any other
control centers established by the Transmission Licensee/ Users shall be manned
round-the-clock by qualified and adequately trained personnel. Detailed personnel
records shall be supplied for evaluation to HPERC by all concerned on an annual
basis.
1 Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated
12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“STU shall submit annually to the Commission by 30th September each year schedule of transmission assets in electronic
form, which constitute the State Power Grid as on 31st March of that year indicating ownership on which SLDC has
operational control and responsibility.”
2 Add. para “4.18 and sub-para 1.18.1” vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418.
Compendium of HPERC Regulations, March 2021 29
5.3 System Security Aspects
5.3.1 All Users shall endeavor to operate their respective power systems and power
generating stations in synchronism with each other at all times, such that the entire
system within the State operates as one synchronized mode.
5.3.2 No part of the State Power Grid shall be deliberately isolated from the rest of the
State Power Grid, except:
(a) under an emergency, and conditions in which such isolation would prevent a
total grid collapse and/or would enable early restoration of power supply;
(b) when serious damage to a costly equipment is imminent and such isolation
would prevent it;
(c) when such isolation is specifically instructed by SLDC under operating
conditions.
5.3.3 On isolation due to any of the above mentioned causes under section 5.3.2, complete
synchronism of grid shall be restored as soon as the conditions again permit it. The
restoration process shall be supervised by the SLDC, as per operating procedures
separately formulated by it.
5.3.4 No important element of the State Power Grid shall be deliberately opened or
removed from service at any time, except when specifically instructed by the SLDC
or with specific and prior clearance of SLDC. The list of such important grid
elements on which the above stipulations apply shall be prepared by the SLDC in
consultation with the STU and Users and shall be available with SLDC, STU and the
Users. In case of opening/removal of any important element of the State Power Grid
under an emergency situation, the same shall be communicated to SLDC at the
earliest possible time after the event.
5.3.5 Any tripping, whether manual or automatic, of any of the above elements of the State
Power Grid shall be precisely intimated by the concerned agency to SLDC as soon as
possible, say within ten minutes of the event. The reason (to the extent determined)
and the likely time of restoration shall also be intimated. All reasonable attempts
shall be made for the elements’ restoration as soon as possible.
1
[5.3.6 All thermal generating units of 200 MW and above and all hydro units of 25 MW
and above, which are synchronized with the grid, irrespective of their ownership,
shall have their governors in operation at all times in accordance with the following
provisions; namely :—
(i) all the Thermal generating units having capacity 50 MW and above and
Hydro (except those upto three hours pondage) generating units having
capacity 25 MW and above shall be operated under Restricted Governor
Mode of Operation with effect from 01.04.2019;
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“5.3.6 All generating units, which are synchronized with the grid, irrespective of their ownership, type and size, shall have
their governors in normal operation at all times. If any Generating Unit of over fifty (50) MW size is required to be
operated without its governor in normal operation, the SLDC shall be immediately informed about the reason and
duration of such operation. All governors shall have a droop of between 3% to 6%.”
30 Compendium of HPERC Regulations, March 2021
(ii) the restricted governor mode of operation shall essentially have the following
features;
(a) there should not be any reduction in generation in case of improvement in grid
frequency below 50.05 HZ (for example, if grid frequency changes from 49.9
to 49.95 Hz, there shall not be any reduction in generation). For any fall in
grid frequency, generation from the unit should increase by 5% limited to
105% of the MCR of the unit subject to machine capability;
(b) ripple filter of +/- 0.03 Hz shall be provided so that small changes in
frequency are ignored for load correction, in order to prevent governor
hunting;
(c) if any of these generating units is required to be operated without its governor
in operation as specified above, the SLDC shall be immediately apprised
about the reason and duration of such operations. All governor shall have a
droop setting of between 3% and 6%; and
(d) after stabilization of frequency around 50Hz , the SERC may review the
above provision regarding the restricted governor mode of operation and
free governor mode of operation may be introduced;
(iii) all other generating units including hydro having the pondage upto 3 hours,
Gas turbine/ Combined Cycle Power Plants, wind, solar generators and
nuclear power station shall be exempted from the provisions of clauses (i)
and (ii) of this para as well as of sub-paras 5.3.7, 5.3.8 and 5.3.9 till the
commission review the situation:
Provided that if a generating unit cannot be operated under restricted
governor mode operation, then it shall be operated in free governor mode
operation with manual intervention to operate in the manner required under
restricted governor mode operation.]
1
[5.3.7 Facilities available with/in load limiters, Automatic Turbine Run-up System
(ATRS), Turbine supervisory control, coordinated control system, etc., shall not be
used to suppress the normal governor action in any manner. No dead bands and/ or
time delays shall be deliberately introduced:
Provided that periodic checkups by third party should be conducted at regular
intervals at least once in two years through independent agencies selected by SLDC.
The cost of such tests shall be recovered by the SLDC from the Generators. If
deemed necessary by SLDC, the test may be conducted more than once in two
years.]
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“5.3.7 Facilities available with/in load limiters, Automatic Turbine Run-up System (ATRS), Turbine supervisory control,
coordinated control system, etc., shall not be used to suppress the normal governor action in any manner. No dead
bands and/or time delays shall be deliberately introduced.”
Compendium of HPERC Regulations, March 2021 31
1
[5.3.8 All thermal generating units of 200 MW and above and all hydro units of 25MW and
above operating at or up to 100% of their Maximum Continuous Rating (MCR) shall
normally be capable of (and shall not in any way be prevented from) instantaneously
picking up to 105% and 110% of their MCR, respectively, when frequency falls
suddenly. After an increase in generation as above, a generating unit may ramp back
to the original level at a rate of about one percent (1%) per minute, in case continued
operation at the increased level is not sustainable. Any generating unit not complying
with the above requirements shall be kept in operation (synchronized with the grid)
only after obtaining the permission of SLDC. For the purpose of ensuring primary
response, SLDC shall not schedule the generating station or unit(s) thereof beyond ex
bus generation corresponding to 100% of the Installed capacity of the generating
station or unit (s) thereof. The generating station shall not resort to Valve Wide Open
(VWO) operation of units whether running on full load or part load, and shall ensure
that there is margin available for providing Governor action as primary response. In
case of gas/liquid fuel based units, suitable adjustment in Installed Capacity should
be made by SLDC for scheduling in due consideration of prevailing ambient
conditions of the temperature and pressure vis-à-vis site ambient conditions on which
installed capacity of the generating station or unit (s) thereof have been specified:
Provided that scheduling of hydro stations shall not be reduced during high inflow
period in order to avoid spillage:
Provided further that the VWO margin shall not be used by SLDC to schedule
Ancillary Services.]
2
[5.3.9 The recommended rate for changing the governor setting, i.e., supplementary
control for increasing or decreasing the output (generation level) for all generating
units, irrespective of their type and size, would be one (1.0) percent per minute or as
per manufacturer's limits.]
3
[5.3.10 Except under an emergency, or to prevent an imminent damage to a costly
equipment, no User shall suddenly reduce his generating unit output by more than
1
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P.
dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“5.3.8 All Generating Units, operating at or up to 100% of their Maximum Continuous Rating (MCR) shall normally be
capable of (and shall not in any way be prevented from) instantaneously picking up five percent (5%)
extra load when frequency falls due to a system contingency. The generating units operating at above
100% of their MCR shall be capable of (and shall not be prevented from) going at least up to 105% of their
MCR when frequency falls suddenly. After an increase in generation as above, a generating unit may
ramp back to the original level at a rate of about one percent (1%) per minute, in case continued operation at the
increased level is not sustainable. Any generating unit of over fifty (50) MW size not complying with the
above requirements shall be kept in operation (synchronized with the State Power Grid) onlyafter
obtaining the permission of SLDC.”
2 Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P.
dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
“5.3.9 The recommended rate for changing the governor setting, i.e., supplementary control for increasing or decreasing the
output (generation level) for all generating units, irrespective of their type and size, would be one (1.0) percent per minute
or as per manufacturer's limits. However, if frequency falls below 49.5 Hz, all partly loaded generating units shall pick up
additional load at a faster rate, according to their capability.”
3
Sub. vide Not. No. HPERC-Grid Code (388) dated 9
th
October, 2018 published in R.H.P.
dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it stood as under:-
32 Compendium of HPERC Regulations, March 2021
20% of installed capacity or 10MW whichever is less without prior intimation to and
consent of the SLDC. Similarly, no User shall cause a sudden variation in its load by
more than 20% or 10MW whichever is less without prior intimation to and consent
of the SLDC. All users shall ensure that temporary over voltage due to sudden load
rejection and the maximum permissible values of voltage unbalance shall remain
within limits specified under Central Electricity Authority (Grid Standards)
Regulations, 2010.]
5.3.11 All Generating Units shall normally have their AVRs in operation, with appropriate
settings. In particular, if a generating unit of over fifty (50 MW) is required to be
operated without its AVR in service, the SLDC shall be intimated immediately about
the reason and duration of such operation, and its permission obtained. Power
System Stabilizers (PSS) in AVRs of generating units (wherever provided), shall be
got properly tuned by the respective generating unit owner as per a plan prepared for
the purpose by the STU from time to time. STU will be allowed to carry out
checking of PSS and further tuning it, wherever considered necessary.
1
[5.3.12 Provision of protections and relay settings shall be coordinated periodically
throughout the State Power Grid, as per the plan to be separately finalized by the
STU in coordination with all Users and the RPC and/or SPC, wherever required. The
STU shall also prepare islanding schemes and ensure its implementation in
accordance with Central Electricity Authority (Grid Standards) Regulations, 2010.
All users shall ensure that installation and operation of protection system shall
comply with the provisions of Central Electricity Authority (Grid Standards)
Regulations, 2010.
5.3.13 All Users and SLDC, shall take all possible measures to ensure that the grid
frequency always remains within the 49.90 –50.05 Hz band or as may be specified in
IEGC from time to time.]
5.3.14 Users shall provide automatic under-frequency & df/dt relay based load shedding in
their respective systems, wherever applicable to arrest frequency decline that could
result in a collapse/disintegration of the grid, as per the plan separately finalised by
the SLDC in consultation with STU/RPC, and shall ensure its effective application to
prevent cascade tripping of generating units in case of any contingency. All Users
shall ensure that the above under frequency and df/dt relay based load shedding/
islanding schemes are always functional. However, in case of extreme contingencies,
these relays may be temporarily kept out of service with prior consent of SLDC. STU
shall carry out periodic inspection of the under frequency relays and produce the
report to the SLDC. SLDC shall maintain the record of the under-frequency and/or
df/dt relay operation.
“5.3.10 Except under an emergency, or to prevent an imminent damage to costly equipment, no SSGS shall suddenly reduce
its generating unit output by more than fifty (50) MW without prior intimation to and consent of the SLDC, particularly when
frequency is falling or is below 49.0Hz. Similarly, no User shall cause a sudden increase in its load by more than fifty (50) MW
without prior intimation to and consent of the SLDC.”
1 Sub. sub-paras “5.3.12 & 5.3.13” vide Not. No. HPERC-Grid Code (388) dated 9
th
October,
2018 published in R.H.P. dated 12
th
October, 2018 at p. 5404-5418 and before its substitution it
stood as under:-
“5.3.12 Provision of protections and relay settings shall be coordinated periodically throughout the State Power Grid, as per
a plan to be separately finalized by the STU in coordination with all Users and the RPC, wherever required.”
“5.3.13 All Users shall make all possible efforts to ensure that the grid frequency always remains within the 49.0 –50.5 Hz
band.”
Compendium of HPERC Regulations, March 2021 33
5.3.15 All Users shall also facilitate identification, installation and commissioning of
System Protection Schemes (including inter-tripping and run-back) in the power
system to protect against situations such as voltage collapse and cascading. Such
schemes would be finalized by the STU, and shall be kept in service. SLDC shall be
promptly informed in case any of these are taken out of service.
5.3.16 Procedures shall be developed to recover from partial/total collapse of the grid and
periodically updated in accordance with the requirements given under section 5.8.
These procedures shall be followed by all Users to ensure consistent, reliable and
quick restoration.
5.3.17 Each User shall provide adequate and reliable communication facility internally and
also with SLDC/other Users to ensure exchange of data/information necessary to
maintain reliability and security of the grid. Wherever possible, redundancy and
alternate path shall be maintained for communication along important routes.
5.3.18 All Users shall send information/data including disturbance recorder/sequential event
recorder output etc., to SLDC for purpose of analysis of any grid disturbance/event.
No User shall block any data/information required by the SLDC for maintaining
reliability and security of the grid and for analysis of an event.
1
[5.3.19 All Users shall make