JSERC (Methods & principles for fixation of charges receverable by distribution licensee) regulation 2006
Regulations made under Electricity Act, 2003
- Made under: Electricity Act, 2003
This text is shown as one document.
Full text
I
I
\
· - · · - ·-- · ------------ · -~- -~°;- -: -, , i=U.,....H""':: ;=n"'P :m-,r n rnnnan wfi!1ffl·ij·tp1iw·1r·m1.~· m- h.i i m
id 1·11,·1i:}·!1·l,Jliij'1"1ip':,'f-!lL l . tt l1.i0f11f11 ::.:nbl
•• !l jl 11tll IJ I JI•· i '•l• ur . · 1ti'1•1•~l·iJ ,!tf ' ·• rr11·1·11·.JJ. t 11· :•l ii•!iil.diUliq. ,. l ,,1. 1-1 f 1jl1.11; 1rH1,r· 1, , lH1, [ ~ lldfH:1~!1ln11hB J,; I .r 1·£1 .1, ii1nh1!1r
I
f. 1. PublishPd in Jharkhand Gazette (ex-ord.) dt. 24.9.2007.
No. JSERC/74/390 dated the 12th April, 2006.-ln exercise of the powers
under Sections 39(2), 42(2) and 45 read with section 181 (1) and 181 (2)(k), (p) and
(u) of the Electricity Act, 2003 (36 of 2003) and all other powers enabling it in that · ·
behalf, the Jharkhand State Electricity·Regulatory Commission hereby makes the
following Regulations providing for methods and principles for fixation of charges
recoverable by the distribution licensee for supply of electricity:-
1. Short title, extent and commencement
· 1.1 These Regulations shall be called the Jharkhand State Electricity
Regulatory Commission (Methods and principles for fixation of charges
including cross subsidy charges recoverable by distribution licensee)
Regulations 2006.
1.2 These Regulations shall apply to all distribution licensees including
deemed-licensees operating within the State of Jharkhand S.dte and
all consumers receiving supply· as per proviso 1 of section-ea (2) of
the Electricity Act 2003. .
1.3 These Regulations shall come into force from the date of their
publication in the official gazette.
2. Definitions.
1.4 In these Regulations, unless the context or subject matter otherwise
reequires:-
(a) "Acf' means the Electricity Act, 2003 (3 6 of 2003);
(b) "Commission" means the Jharkhand State Electricity Regulatory
Commission;
.Iharkhand State Electricity Regulatory
Commission (Methods and principles for
fixation of charges lncludinq cross subsidy
charges recoverable by distribution licensee)
. R--· ·•- ... ions '"""'n~,1 . c~u1au 11~, ~VUOJ · ·
• I • • • ~ • I ,. . . . .. ·- ... , .. . . . . . . .
I
I
i
\
\'
(c) "Distribution Licensee" means a !icensee authorised to operate and
maintain a distribution system for supplying electricity to the
consumers in his area of supply:
(d) . "Extra High Tension (EHT) Consumer' means a consumer who is
supplied electricity at a voltage higher than 33000 volts; .
(e) "High Tension (HT) Consume? means a consumer who is supplied
electricity at a voltage higher than 440 volts but not exceeding 33000
volts;
(f) "Low Tension (LT) Consumer' means a consumer who is supplied
electricity at a Voltage up to 440 Volts;
(g) "Authorised load' means load duly sanctioned by the utility to any
consumer for the purpose of electric connection to that consumer's
premises. This shall be expressed in kWA, kVA or HP units and shall
be determined as per procedure laid down in Electricity-Supply Code
at relevant clauses;
(h) "Words and expressions" used and not defined in these regulations
but defined in the Act shall have the meanings as assigned to thern.,
in the Act. · ·
3. General Principles for-fixation of charges. ;;\11 •
1.5 The Commission shall endeavour to ensure that the charges ;~}c,_
recoverable. from different consumer categories for the actual·.J. .1:_
electricity consumed by the consumer as well as the expenses·1~:
incurred on its debery (wheeling) and consumer care services reflect ,:· ·
the efficient cost incurred-by the distribution licensee towards providir,g ·:ji:
service and supply to each consumer category to the extent possible. .::
The extent of cross subsidy given to or recovered from each t'$i1.
category of consumers shall be shown in the schedule of charges:~;.;
approved by the Commission from time to time. Also, the extent of·;.$.
system loss incurred by tbe distribution licensee in different areas in·:; :.
its jurisdiction in respect of EHT, HT and LT consumers shall also be}~{
taken into consideration while computing the cost incurred in the.,· ··
distribution process.
1.6 The . charges to be recovered from the consumers for supply of
electricity may include all or any of the tollowinqt--;
·.(i) Fixed charges.-A fixed charge in addition to the charge for
the actual electricity supplied to recover the expenditure on
fixed network, while the licensee incurs to maintain 'and upgrade
network for sub transmission shall be recoverable by the
licensee. Fo~ HT consumers and LT consumers with demand
based tariff, the fixed charges shall be linked to their full
contract demand. For LT consumers, the fixed charges shall be
linked to their connected load (authorised load for domestic and
non-domestic.connections), The licensee shall be entitled to
receive fixed charges in full only if supply of power is maintained
as per scheduled supply hours as approved or ordered by the
Commission in tariff order from time to time unless the
I, I
,.
I
, . ; .
... :t·: :.,
• • - • : ! •
Commission orders regulation of supply under Section-23 of the
Act. For this purpose the supply hours shall be reckoned at 33 I
11 KV substation. Routine maintenance of network in the
aggregate duration in a month shall be a factor kept in
consideration whole fixing the supply duration norms. The
licensee shall prepare a supply duration index for each 33/11 KV
sub-station each month and a discount or rebate in the fixed
charges may be allowed to the consumer if the index falls below
the level fixed by the Commission. The licensee shall intimate
the supply duration index for each month to the consumer
through the bill sent to the consumer.
Revenue earned by the licensee from fixed charge shall be counted towards
the total expected revenue of the licensee and shall be disclosed for public
information at the time of determination of tariff.
(ii) Energy Charges.-These are recoverable from the consumers to
meet the cost incurred by the distribution licensee towards purchase
of electricity supplied to the consumer and shall reflect the average
cost of power purchased by the distribution licensee during different
parts of a year. Energy charges for all units shall be recoverable by
· the licensee at the tariff approved by the Commisssion.
(iii) Loss Compensation Charges.-The loss compensation charges
shall be recoverable .from consumers to meet the cost incurred· by
the distribution licensee towards aggregate transmission and
distribution losses at the voltage of supply and in different areas and
shall be limited to the level approved by the· Commission in the tariff
order applicable for any relevant period.
(iv) Distribution licensee will be entitled to recover rent or other charges for
meter or electrical plant/equipment provided by the licensee at different
stages of distribution system as approvedby the Commission.
(v) Special charges authorised to be recovered under sections-46 and ·
47 of Electricity Act; 2003. These charges are recoverable by the
licensee as these are incidental to the business of distribution and
retail supply of electricity to particular consumers, as for example:
(a) Fee for test of meters at consumer's request at premises: For
test at laboratory separate charges shall be payable.
{b) New Service Connection or load enhancement. Separate
charges payable for disconnection/reconnection charges.
(E:·planatfon: When new connection or upgradation in sought·for
a load of more than 1 OKW, the licensee may recover the
proportionate cost of transformer if the load required is more
than 1 OKW ~nd may additionally recover proportionate cost of
suo-statton if theload required is more than 200KW).
, (c) Cost of burnt or damaged meters ·if responsibility can be fixed
on consumers.
(d) Shifting of connection (including shifting of meter) from one
premises to another or another site within the same premises at
the request of the consumer .
[Reg. 3 Jnarkbano Local Acts 152]
I
\
i'
I
'1
(e) Supervision charges for specific services of capital entensivs
or labour intensive nature. ·
(t) Hiring of licensee's plants and equipments.
(g) Fee for verification of old dues/records or obtaining duplicate
copies of bills or documents.
(h) Fee for special meter reading when requested by consumers.
(i) Maintenance of public streetlights or other equipment when
requested by a consumer.
0) Replacement of fuses/glass/meter seals or meter reading cards.
(k) Resealing of meters, MD indicators and instruments of the
licensee in the. consumer premises if seal is found broken.
(I) Re-rating of installations . where done at the request of the
consumer.
(m) Testing of installations at consumer's request.
(n)_ Any other service provided by the licensee on the request of
the consumers.
(vii Gross subsidy charge or support In terms of the Section 61 (g) of
the Act, the Commission shall be guided by the objective that the
tariff progressively reflects the efficient and prudent cost of supply
of electricity. The determination of tariff is done based on various
. factors as enumerated in Section-62(3) of the Electricity Act, 2003.
Due to.differential tariff for various categories of consumers, some
consumers shall pay the tariff more than the cost of supply i.e.
subsidizing category of consumers and some shall pay less than
the cost of supply i.e. subsidized category of consumers. The
difference between the tariff and cost of supply is termed as cross
subsidy charge or 'support. While determining the tariff, ·the
Commission has to balance the amount of cross subsidy payable
by subsidizing category of consumers and the amount of cross
subsidy receivable by subsidized category of consumers. Section-
61 (g) of the Act also stipulates that tariff shall progressively
reduce. As per clause 8.3(2) of National Tariff Policy, tariff should
be brought within± 20% of the average cost of supply latest by the
end of year 2Q10-2011.
1. 7 After due scrutiny and consultation, the Commission shall· accord
approval for charges; proposed by the licensee and in doing so shall
constder the reasonableness and actual cost to the licensee and
such charg_es shall be recoverable only after the approval of the
Commission. Licensee shall not recover any charges without the
specific approval of the Commission.
4. General:
1,8 Bl-Annual Publlcatlqn of Information:
Licensee must keep account of revenue (demand raised) accruing
on account of fixed charges, energy charges, Metering charges,
-· -·-··-··- -·---·. ·--:::,· --·· .. ···--·-····. ·-.;J-·--·---·--
I
!'
I
I
I
i
I I
I
·I ; ,I
I-· f
r
: I
I I I I
I I
1. I,
· I
.
I
I
I
I
I
I
I
·I
•
The Commission may consider providing rabate to consumers for
maintaining appropriate power factor, achieving higher load factor or
for implementation of errergy conservation measures. The Commission
may provide incentive or penalty in its tariff structure for adherence
to or deviation from the standards approved by the Commission in
its regulations on performance standards.
Billing aod recovery/realisation charges. Miscellaneous Service
charges, any other charges and arrears payable for each administra
tive unit of division level and the revenue (demand raised) and
collected for each category of consumers under each of the
components of tariff (including sub-category whenever provided) and
the compiled data at company level must be published for public
information and presented to the Commission in January and July
each year for half year ending in September and March respectively.
This information must also be placed on the website of the licensee.
The Distribution Licensee is to publish abstract of statement of
accounts six monthly as required under Companies Act.
1.9 Tariff Categories and Intimation ofTariff Rates to Consumers:
The Commission, while determining the tariff for retail sale and
wheeling of electricity under Section-61 (i) shall provide consumer
category wise details of charges to be recovered by the distribution
licensee and may also lay down special conditions for seasonal
surcharge. Time of use surcharge and power factor, load factor,
reactive energy charges etc. The licensee shall send a tariff card
within two months of tariff order to each consumer showing the
details of various charges recoverable from the particular category
or sub-category in which any consumer is listed as per current
agreement.
1.10 Demand Based Tariff:
The demand-based tariff shall be applicable to all consumers with
connected load of 1 OKW and above. However, consumers with
connected load of 25BHP(18KW/23KVA)or more shall have KVA
based demand tariff.
1.11 Power factor, load factor, demand side Management and quality
of supply:"
[ Reg. 4 Jharkhar c L·:,c21 Acts :54 j