The Chhattisgarh Electricity Regulatory Commission (Intra-State Open Access in Chhattisgarh) Regulations, 2005
Regulations made under The Electricity Act, 2003
- Made under: The Electricity Act, 2003
This text is shown as one document.
Full text
l
'
j
__.
·~ ~ t- ~ sTcfi
~t--;rrrc:: ~ (~ sTcfi
~)t°~~~-~
;;ft. 2-22-3mfl'I~ •"f'iR:/38 fu. ~
f~, ~ 30-5-2001."
~62]
( ~ftltll~OI )
~ * Y ch I fit I a
~. ~. ~ 4 ~ 2011-~ 13, Wli 1932
~~
'3mft•l~~/09/2010-20"12."
Chhattisgarh State Electricity Regulatory Commission
~rrigation Colony, Shanti Nagar, Raipur
Raipur, the 4th March-2011
No. 35/CSERC/2011.-ln exercise of powers conferred by section (30), 39 (2)
(d), 40 (c), 42 (2, 3),·86 (l)(c) re~d with Section 181 (1) of the Electricity Act, 2003,
the Chhattisgarn State ~lectricity Regulatory Commission hereby makes the following
Regulations related to Ir:itr~-State qpen Access in Chhattisgarh. On commencement
of these Regulations, the Chhattisgarh Electricity Regulatory Commission (Intra-State
Open Acce~s in Chhattisgarh) Regulations, 2005 and amendments notified shall stand
repealed.
..;
1-23
124
CHHATTISGARH STATE ELECTRICITY REGULATORY COMMISSION.
(CONNECTIVITY AND INTRA-STATE OPEN ACCESS)
REGULATIONS,2011
.
PART 1 ·
PRELIMINARY
. __ 1. ~· Short Title and Commencement
(1) These _regulations shall · be called the Chhattisgarh State Electricity
Regulatory Commission . (Connectivity and . Intra-State 'open Access)
: Regulations, 2011.
. .
(2) · These regufations shall come into force from the fi_rst da_y of the calendar -"'
month coming after the d~te o~ their publication·in ChhaUisgarh Rajpatra.
· 2. Extent of Application
These regulations shall apply to· open access customers for. use of intra
State transmission system and/or the ':distribution systems of licensees in
the State, including such sy~tem when it is used in conjunction with inter
State tran~mission system.
3~ Definitions·
(1) In these regulations, unless the context otherwise requires:
~- '!Act" means the Electricity Act 2003 ·(36 of 2003);
b. "Applicant" means a. gener~ting. station including a captive
generating plant, a buik consumer, a captive user, an electricity
trader or a distribUtio"n licensee,. in respect of long-term open -~
access or medium-term open access or short-term ·open access, as
the case may be;
c. "Allotted Capacity" means the power transfer in MW between the •
specified point(s) of injection and point(s) of drawal allowed to a
d.
. . ' '
long-term/medium-term open access customer on the intra-State
transmission system and the expression "allotment of capacity 11
shall be -construed accordingly;
~'Bulk consumer~' nieans a consumer who avails supply at voltage
of 33 KV and above;
I
...
124 ( 1)
e. "Bilateral t~ansaction" means a transaction .for exchange of
~nergy (MWh) between a specified buyer and a specified seller,
directly or through a trading licensee or discovered at power
f.
g.
. . .
exchange through ·anonymous bidding, from a specified point of
injection to a specified point of drawl for a fixed or yarying quantum
of power (MW) for any time period.
"Central Commission" means the Central Electricity Regula~ory ·
Commission referred to in Section 76 of the Act
"Commission" means the C:hhattisgarh State Electricity Regulatory
Commission referred to in sub-section ( 1) of section 82 of th'e Act;
h. "Connectivity"· for a generating station, including a captive
generating plant, a bulk consumer, a captive · user, distribution
license.e or an transmission licensee mE:ans the state- of getting
connected to the intra-State transmission system and/or
distribu~ion system;
i. "Day'' means the day starting at oo.oci hours and ending at 24.00
hours;
j. "Detailed procedure" means the procedure approved by the
· Commission.
k.
I.
"IEGC" means Indian Electricity Grid Code Specified· by Central
Electricity Regulatory Commission ·under Regulation (h) of sub
section (1) of s~ction 79 of the A ct, ·and as .amended from time to
time;
"Intra-State entity" means a person ~hose metering, scheduling
a11d energy accounting is done at the State level;
m. "Intra-State. requester" means a person such as generating
company including captive generating plant or a transmission
licensee ( excluding Central Transmission . Utility and State
Transmission Utility) or0 9istribution licensee or bulk consumer or
captive user who is seeking. connecti_on of its new or expanded
electrical plant to the State grid at voltage level 3~ K\( arid above;_
n. "Intra-State user" means a person such as a gener_ating company·
including captive generating· plant or transmission licensee ( other
than CTU and -STU) or distribution licensee· or bulk consumer
124 ( 2)
including captive user whose electrical plant is connected to the
State grid at voltage level of 33 KV-and above,
o. "Interface meters" means meters installed at interface point in
accordance with the Centrai Electricity Authority (Installation and
Op~ration of Meters) Regulations, 2006, specified by the Central
Elect_ricity Authority and amended from time to time;
p.
,-q.
"Inter-connection point "means a sub-station .or. switch yard or
any other point. at which the interconnection is established· between
· the intra-state requester anc;I Stat~ grid.
"Long-term open access".hleans the right' to use the intra-State
transmission system and/or distribution _system for a period
. ' '
exceeding 12 years ·.but not exceeding 25 years;·
r. "Long.;.term open· access customer" means a person who has
been g·ranted long-t~rm open. acc_ess;
s. "Medium-term open access.'' means the right to. use the intra
Stc!te transmission system and/or distribution system for a _.period
exceeding 1 year but not exceeding 7 years;
t. ·"Medium-term open access customer" means an open access
. I
customer who has been granted medium-term open acce'ss
u. ·"Mont_h" means a calendar month as per the British calendar;
v. "~odal agency"_ means the_ State · Transmission Utility or
transmission licensee or SLDC or distribution licensee referred to in
table-1 ar:id regulation 12(3) thereof;
w. "Open access customer11 means r1 con~umer permitted to receive
sup.ply of electricity from a person other than the distribution
' .
licensee of his area of supply, or ci ge11erating company (induding
caplive generating plant) or. a licensee or a captive user who has ·
availed of or intends to avaih of long.:ter:m ;open access or m_edium
_term open access '<:>r short-term open ~ccess, as the c~se may be;
X. ..·Reserve CaP.adty' means th'e( power transfer (in _MW or MU) for
b(la~eral transaction and collective tran·saction· all6wed to a short
term open access customer on. the intr:a:-State tra_nsmission system
, '
and/or distributi~n systen:, depending on availability of. transmission
capacity · and/or· capacity . of dis'tribution system and expression
"reservation.of capacity" shalf_be construed accordingly;
-I
"j
124 (3)
y. "Short-term open access" means open access for a period up to
one (1) month at one tirne ·
z. "Short-term open access customer" mear.is an open access .
customer who has been granted short-t~rm open access;
aa. "SLDC" means the State Load Dispa~ch Centre established under
subsection (1) of section 31 of the Act;
bb. "State grid". means the intra-State· transmission system owned by
the State Transmission Utility, transmission licensee and/or the
network of any other person 'who has been grantee;! li~ence by the
Commission to establish or operate distribution lines within the
State;
cc. "State Grid Code" means the State Grid Code specified by the
Commission under Regulation (h) of sub-section (1) of section 86 of
the Act;
· dd. "Stranded capacity" means the transmission capacity in the
lntra~State transmission system and/or distribution system _which is
likely to remain unutilized due to relinquishment of access rights by
a long-term open access customer in accordance with regulation
20.
ee. "time block" means 15 mir.iutes time period specified in the Grid
Code for the purposes of scheduling and despatch;
(2) Words and expressions used in these regulations and not defi'ned herein.
but defined in the Act or the State Grid Code or any. other regulations
specified by the Commission shall, unless the context otherwise requires,
have the meanings assigned to them under the Act or the State Grid Code
or. other regulations specified by the Commission, as the case may be.
.
'·;.
124 (4 )"
Scope
PART. 2
GENERAL PROVISIONS
These Regulations, after they come into f~rce, shall be applicable to_ the
grant of connectivity to the. State ,grid, use of intr.a-State th.msmission . . .
system and/or distribution system includin·g such system when it is used
in conjunction with inter-state -tran~m_ission system for _long-term open
• , 0 ., ... ~·· M ,,..
access, medium':'term open access and sh.ort-term open access,
. - . -•
Provided that a generating station·, induding captive geoeratLng plant or a
. _. (• •••"'$ 'I • ,/" A • • •~. •
bulk consumer or a captive,. user· who. i's not corihected fo. State gtfd- · ·
.. . •· l>I • .. r.. ~. . ·: . .• ... ,
cannot apply for long-term <>pen -access or· rii'edium-term open access
. without applying for connectivity: · ·' ·
Provided further that .a person may apply for connectivity and long-term
op.en access or medium-term ope~ access simultaneously.-
5. Eligibility for open access
(1) $ubject to the provisions of these regulatior:is, intra-State. users or an .
. applicant seeking open access for one MW and above shall be. eligible for
open access_ to the intra-state transmission system of the STU and/or any
other transmission lic~nsee and / or distribution system of distribution ·
· · licensee.
(2) Such open access shall_ be. ava·itable for use by an open access customer
on payment of such charges as may be determined· by the Commission
from time to time,
(3) An intra-State user or an applicant having been declared insolvent or
bankrupt .(?r having outstanding dues against him of transmission or
distribution licensee- or fees .and charges of SLDC shall not be eligible for
. .
open .access. The nodal agency shall not grant open access to the intra-
State user or applicant, who had defaulted in payment of Unscheduled . . . .
Interchange charges, transmission charges,· wheeling charges, reacqve
. .
energy .charges, congestion charges etc-an~ fees and other charges of
-SLDC for a period _exceeding one month. from the due ·date of bill.
j
. I
124 (5)
· ( 4) If the applicant is an electricity trader, it must· submit a copy of valid
tr_ading license issued by Central Commission or Commission,· as
applicable. . ·
(5) Open access shall · be permissible to the intra-State users having
connectivity through a dedicated feeder emanating from a grid sub-station·
(6)
. .
of licensee with online data commuhication facilities to _SLDC.
Provided further that the bulk consumers who are not connected through
dedicated feeders shall be allowe_d · open access subject to con.ditions tha~
they have on lin~ data communication facilitj~s to SLDC and agree to load
. .
restrictions, if any, impose.d by the licensee on the feeders serving· them.
Such generating company or captive generating plant or seller which has·
. .
entered into a power purchase agreement for sale of electricity to a:
licensee or consumer shall not, in case of prer :mature ,termination of the
agreemenl, be eligible .for using State grid for transmission and wheeling .
of electricity ·for a· period of three years from the date ot ter~ination of
such agreement o~ till the scheduled date of expiry of power _purchase
agreement .whichever is earlier, •if any order or ruling is found to have
been passed by an Appropriate Commis?ion or a compete!1t court against
. . .
the ·generating comp.any for material breach of the terms an_d conditions of
the. said power purchase agreement.
6.. Provisions· for Existing Entities
7.
The persons asing the intra-state transmission system and / or
distribution system in the State on the date of .coming into force of these
. .
regulations, · under an· existing agreement / contract shall be entitled to
continue to avail such op_en access to. the transmission and distribution
system on · the same terms and conditions, of existing ag_reement /
contract.
Criteria for allowing open access
(1) · Before ·awarding long.-term op~n access, the State Transmission Utility
... . '.
. -
and /. or dist_ribution licensee shall give due ~E;gard to the augmentation of
"'
I
• i
...
124 ( 6)
(2)
. .
ihrlfl,,~ m, ~ 4 'qRf fo11
intra-Sta_te transmission system and / or distribution system proposed
under the business plan approved by the Commission.·
. .
Medium-term open access shall be granted if the resultant power flow can
be acc;on:,modated in the existing intra-state transmission· system and/or
distribution ~ystem. ·
Provided that no augmentation shail be carried out to the intra-State
transmission system and/or distribution system only for th.e purpose of
granting medium-ter!'ll operi access: .
(3) The sh'ort"'."term open access custo·mer shall bE: :eligible for short-term open - .. _
access for the sur:plus capacity available· on the intra-State transmission
system and/or distribution system after use by_ the long-term open access
customer and the medium-term open access customer, by virtue of-
(a)
(b)
(c)
inherent design margins;
· margins available due to variation. in power flows; arid .. .. . .
Margins available due to in-built spare transmrssion e:apacity and/or
_distribution cap~city created to cater to futwre load growth or
generation addition.
( 4) ·, · Construction of a dedicated tr_ansniission line ·shall not be c.onstrued as
augme1,tation of the transmission system and/or distribution system for·
.the purpose-or this regulation.
8.
. · (1)
Relative allotment priority
. .
A distribution licensee shall have the highest priority in th~ allotment of
npF>n rir.r.P.ss r.npar.ity whether in ttie long-term or medium -te.rm or short
term open access.
(2) The applicant s~eking long-term open access· shall .~ave priority over the
applicant seeking medium-term open access. for use 0f the intra-State
• tra,:,smissiori system and/or c;listribution system ·
(3) The_ applicant seeking long-term open access and the medium-term open
-·
access shall have priority over the short-term open access for use Of the
intra-State transmission system and/or distribution system.
"'
124 (7)
( 4) Applications for long-term open access or medium-term open access shall
be processed on first-come-first-served basis separately for each of the
aforesaid types of access:
9.
(1)
(2)
Provided that applications received for long term open access and medium
term open access during a calendar month shall be construed to have
arrived. concurrently;
Provided further that while process_ing applications for medium-term open
access received du.ring a month, the applicati<?n seeking. open access for a
longer duration shall have higher priority;·
Provided also that in the case of applications for long-term open access ..
requiring planning or augmentation of transmission system, such planning
or augmentation, as the case may be, shall be considered on 30th of June
and 31 st of December in each year in order to develop a coordinated
transmission plan, in accordance with the perspective transmission -plans
approved by the Corilmissjon.
Interface .Meters •
Interface meters (main meter) shall be installed and maintained by the
State Transmission Utility or transmission lic;ensee or distribution licensee
for and at the cost of the intra-State requ~ster see.king connectivity at
STU or transmission licensee or distribution licensee system as the case
may be.
Interface meters (main meter) shall be installed and maiotained by the
State Transmission Utility or transmission licensee or. distribution ticensee
for' and at the cost of the intra-state user connected to STU or
transmission licensee or distribution licensee as the case may be.
(3) The check meters having separate metering _equipments shall be installed
owned and · maintained by the STU/transmission licensee/distribution
licensee as the case may be.
( 4) The intra-state requester or intra-State user or applicant shall provide .
necessary · facilities for. voice and data communication and transfer of
online operational data such as voltage, frequency, load _flow, etc. The
State Transmission Utility or transmission licensee as the case may .be
124 (.8) ffnlflll<t m, ~ 4 i:rrtf 2011 . .
shall install such infrastructure facilities for and at the cost of the intra
State requester or intra-State user or applicant:
(5) The metering at the inter-conne·ction point for main meters and check
meters shall be as ABT compatible meters. All matters and arrangements
. .
relating to metering shall be governed by CEA (Installation a_nd Operation
of meter), Regul~tion, 2006 and ·as· per the prov·isions · of Chhattisgarh
State Grid Code, 2007, as amended time to tim~. The interface meters for
m€asur~ng _the· quantum of ~nergy _ir:,jected into, the grid by generator or
captive generating plant shall_ be· installed at the grid sub-station of
licensee. For bulk consumet.s availing power through open· 'access, the
interface meter for measurement of ·energy drawal shall be installed in
consumers premises.
(6) The main and check meters shall always be mafntaineci' in good condition
l
c1nd periodical_ly tested and calibrated by the concerned licensee i~ the
presence o·f the open access customer. The meters shall be sealed iii the
presence of both parties-. Defective meters shall be replaced immediately.
(7) Reading of the main and check meters shall be taken periodically, on
appo.inted date and hour, by an officer· of · the concerned licensee
authorized for the purpose, and the open access customer or his
. represei:,tative, as the case may be. Meter reading shall be communicated
to the nod91 agency and the open access customer, as the case may be,.
by the licensee, within 24 hours of such reading.
(8) If i~ any month. the readings of main arid check meter differ~ from the
reading of corresponding check meter beyond permissible accuracy lir:nit,
4 • • •
as prescribed, the main and check meters shall· be tested in turn and ..
errors at various levels as per standard procedure would pe determined
and billing shall be done accordingly.
. .
(9) When main meter is found to be defective or has stopp~d~ reading of the
· ch.eek meter shall be considered for billing purpose subject to condition
. .
that the checR meter has been found working properly.
(10) In case of outage of both the main and che-ck meters, if any energy -is
interchanged in the 1ntervening period the assessment has to be done on
the basis of reading recorded in generator's sending end meter if found
..
wcih-1•1~ m, ~ 4 "1-lf<f 2011 124 ( 9)
working properly by considering average of previous 3 months
percE;ntage iine loss when both interface meter and generators meter
were found working properly.
(11) In case of· outag~ of both the main meters and check meters so also
generator's sending end meters, the energy injected into the State grid
may be assessed on the basis of average of previous three months energy
loss calculated of the respective _sub-station of licensee when main/check
meters were working properly.
(12) In ·case the meter installed in the premises of bulk. consumer who is
availing open access become? defective, the assessment of energy drawl
is to be done as per the provisions specified for consumers iri Chhattisgarh
State Electricity Supply Code as amended from time to time.
. .
. .
124 (10)
PART3
CONNECTIVITY
10. Gra.nt of co·nnectivi~y
(1) . The voltage level for injection o(power by a g~neratin·g station/captive ,,,_.·
generating plant to the· intra-state tran~rrfrssion syste~ and distributfon
system with reference to quantum of injected power shall be as specified
· in the State Grid Code .. ·
(2) The _voltage ~evel for drawl of power by a consumer fr:om the jntra-state
transmis,sion system and distribution system (i.e. sum of quantum· of open_'
access power and contract demand with licensee· shall b.e as specified in
the_ Supply Code.
(3) Application procedure for Connectivity
(i) Connectivity to STU system
a. The Application shall be accompanied by a non-refundable fee
specified in Table-1 of these regulations.
b. · The application for c~nnectivity shall be· submitted to nod~I agericy' in
prescribE:d format which shall co_ntain details sue::h as, proposed
geographical location· of the_· !ntra-State requester, quantum of
maximum power to oe interchan_ged, that is the qu_antum of
maximum power to be injected and quantum of maximum power to
· be drawn with the. intra-State transmissior:1 system and such other
. .
. details as may be laid 'down in the det~il procedur'e;
. . ' ' .
c;_ Provided that in cases where once an application has bee~ filed and
therealter there has been· any material change 1n the locatiori uf lhe
. . (.
intra-State requester o~ change in the quantum of maximum power
. . . .
to be interchanged with the intra-State· transmission system, the
intra·--state .requester shall have to make a fresh application, which
. _.,. . . ~ . . . . . .
sha_ll'be considered.in accordance witt) these regu.lations .
.
d. On .re'ceipt of the application, the _r.iodal agency, in consultation and
• . !., •
through ·coordination with other agencies involved: .. in bilateral
transaction, -shall_ process the application and_ carry out the necessary
· interco.nnection study as specifi_ed ~n 'th·e Central Electricity Authority
0'ffifPI~ ~, ~ 4 i:iy.f 2011 124 (11)
(Technical Standards for Connectivity to the Grid) Regulations, 2007
or as amended from time to time .
. e. When a generating station including captive generating plant or
licensee is an intra-State requester the interconnection point shall_ be
the substation of the licensee and the cost of interconnection shall be
borne by the intra-State requester ( other than· State distribution
licensee). While granting connectivity, the nodal agency shall specify
the name of the sub-station or pooling station. or switchyard where
connectivity is to be granted. The nodal agency shall intimate the·
timeframe for completion of the dedicated transmission line, tf it is to
be executed by licensee. Jn case the line work is to be executed by
intra state requester the broad design features of the dedicated
trnnsmission line and other technical specifications can be provided
by nodal agency on payment of necessary charge$·.
f. The intra-State requester and the State Transmission Utility shalr
comply with the provisions of Central Electricity Authority (Technical
Standards for Connectivity to the Grid) Regulations, 2007 or as
amended from time to time.
g. Eve·ry connection of the intra-state requester system to the State
Transmission Utility system shall be covered by a connection
agreement between the intra-State r.equester and State Transmission.
UUity. The intra-state requester granted connectivity will b_e
required to sign "Connection Agreement" with STU prior to the
physical inter-connection
(ii) Conr:ectivity to system of intra-state transmission licensee
(other than STU)
a. Tr-.'.:; Regulation 3(ii) shall be.applicable if the power is proposed to be
inycted ar:id/or drawn from intra-state transmission licensee ( other
th,~n STU) system and if there is no involvement- ·of STU system in
pr, ;:)Osed transaction. The procedure specified in Regulation (3)(i)
-
ab,we shall, mutatis mutandis, apply to cases of intra-State requester
SE-:cking connectivity to intra..:State licensees system ( other than STU)
Hc-•Never, every co.nnection of the intra-state requester system to the
. int.7a-State transmission system ( other than STU) shall be cov~red by
· 1'24 (12) ffah-ii1~ m, ~ 4 ~ 2011
a connection agreement· between the intq3-State requester and
transmission licensee and the -State transmission 1,1tility (tri-partie
agreement):
(iii) Connectivity to distribution licensee
a. The procedure _specified in Regulation- (3)(i) above shall, mutatis
mutandis, apply to cases of intra-State requester seeking connectivity
to distribution licensees system.
b. Every · connection of .the intrc1-state requester ·system to the
distribution licer:-isees · system shall oe covered by a connection .
agreement between the intra-State · requester and .distribution
licensee.
( 4) The ·grant of connectivity shall not entitle an intra-State requester to
interchange any power with the grid · unless it obtains long-term open
access,• medium-term open access or short-term open access.
(5) A generating station, including captive· generating plant which has been
granted connectivity. to the .State grid shall be allowed. to undertake
,(6)
. . .
testing including full load testing by injecting it~ infirm power into the grid··
before being put into commercial operati_on, even before availing any type
of open access, after obtaining permission of. the State Load Despatch
Centre, which -shall keep grid security in view while granting· such
. '
·permission. The charges for testing and tariff of this infirm power from a
generating station or its unit thereof,_ shall be as determined by the
Commi:,sion from time to time. Before injecting infirm power, the
generating stcition inc::llirling · captive generating plant, shall have
agreement wi.th· distribution licensee to· supply infirm power otherwise it
may riot entitled for payment ot such 1nf1rni power.
The intra-State .user already. -connected to State: _grid or for which
conn·ectivity is already grante~ under the p_resent arrangement, shall not
' ' .
be required to apply for connec::tivity_ for the same capacity. However, in
.case· of extensiqri -of capacity of,generator including captive generating
plant or increase_ -iri power requirement of _bulk consumer, including
captive user it shall be required to make fresh application for .modification
iri conr1ectivity arrangement as per the provisions of. Regulations· and.
-.
3-dh-Pi~ m, ~ 4 l-lT"f 2011 124 ( 13)
detail procedure and shall be treated as an· intra-State requester. The
existing intra-State user shall however be required to execute a
connection· agreement with the licensee.
(7) An intra-state r"equester will have option to construct dedicated line upto
the inter-connection point to enable connectivity to the grid.
s
No
1
2.
3
If an intra-State user is a generating station or captive generating plant it
can operate and maintain its ded_icated transmission line.
~
Table-1 Connectivity
Licensees Nodal Applicant Max. Quantum of Power Applicati Time frame for processing of
system where agency to be injected / offtaken on fee application and execution of
Connectivity into/ from intra-state (Rs'in work
required transmission system lakhs)
and / or distribution
system
ST\J STU Generating 1 MW and above and up 2 1. Informing feasibility after
company to 50 MW receipt of the application-30
or captive More than 50 MW and . working days.
generating up to 250 MW 4 2.Issue of demand note 9f . plant estimate charges after issue
More than 250 MW and
6 of notice of feasibility -60
up to 1000 MW working days ie Maximum
· 90 working days for
processing application from
date of receipt of complete
More than 1000 MW 9
application
. · -3. Time frame for execution
- of connectivity shall be as
specified in supply code for
EHT connectic;>n
Bulk 1 MW and above and up 2 Consumer,. to 50 MW As above
captive
More than 50 MW 4 user
Licensees To be specified in detc;iil.ed procedure
Generating 1 MW and above and up 2
company to 50 MW
or captive More than 50 MW and 4 Same as tor STU
generating u_p to 250 MW
Transmission Transmis plant Moi:e than 250 MW 6 ..
licensee other sion
Bulk than STU lice.n_see 1 MW and_ above and up· 2
Consumer; to 50 MW Same as for STU
capti"'.e
More than 50 MW 4 user
Licensees To be specified in detailed procedure
Generating
company
As per the provision in supply or captive _15 MW and below 2 code for HT connection
Distribution Distribu generating
licensee - . tion plant
licensee Bulk
Consumer, 1 MW to 9 MW 2 As per the provision in supply
captive code for HT connection
. user
124 (14).
Part-4
Procedure for availing open access
11.: Categories of Open Access Customer
Tne procedure for application, application fee payable and the time frame_
for processing request of applicant seeking open access shall be based on·
the following criteria:
(1) Inter-se lqcation of drawl and injection p_'oints:
(i) Int_er-se location·. of injection and drawl point is at State
Transmission System (STU) system
(ii) Inter-se location of injection and drawl point is at intra-state
transmission licensee ( other than STU) network and there is no .. '
involvement of STU netw_ork for conveyance of elecfFicity.
(iii) lnter-se location of injection and drawl point is at STU network :and
intra-state transmission licensee ( other than STU) network or vice
versa, i.e. network of both licensees are· used .for conveyance of
electricity.
(iv)
(v)
(vi).
Inter-se location of injection and · drawl point is at intra-state
transmission system (STU/transmission licer:see) and distribution
licensees system respectively.
Inter-se location of injection and drawl point is at distribution
-
licensees system and intra-state transmission system ·(STU· / ·
transmission licensee) respectively:
Inter -:se ·1ocatlon of inJection and drawl point is 'at same distribution . '
licensee system and there _ is no involvement of intra-state
transmission system for conveyance of electricity.
- (vii). · Ihter-se location ·of injection and. <;lrawl point is at same distribution
.' I
licensee · system and there is involyement of intra-state
trans~ission sYstem for. conveya_nce of electric,ity.
(viii)·
·; .
Inter-se location of injection and drawl point is within the same
' . . . . ..
State but in areas of different distribution licensees.'
..
-·
124 ( 15)
(ix) Inter-se location of injection and drawl point is in different State
(inter-State o_pen access).
(2) . Duration of Open Access
(i) Long term open access
(ii) Medium-term open access
(iii) Short-term open access
12. Application procedure for Open Access
(1). All applications for long-term open access, medium-term open access and
short-term open access shall be made in the prescribed form as approved
in the detailed procedure and submitted to the Nodal agency in
accordance with these regulations.
(2) All applicants seeking open access shall submit an undertaking or
declaration of not having entered into. PPA or any other bilateral
agreement for the capacity ( quantum of power) for which operi access is
sought.
Provided further that in case where bilateral agreement exists betw·een
applicants and the licensee· or buyer or seller as· the case may be, for the
proposed capacity for open access, "no objection" may be obtained by the
applicant from the concerned licensee, buyer or seller as the case may be
for the period of open access sought. The applicant shall submit such no
objection certificate to the· nodaJ -agency while submitting application for
· open access.
(3) The N_odal agency, Appliciiltion fee, Documents to accompany the
application and time frame for disposal of application shall be· as specified
in the following tables :
i24 ( 16)
Table-2
Long-term open· access
S:. Inter-se location of Nodal Application
..
Docllments to Time frame for disposal
No drawal and injection agency fee (Rs. in accompany the of application (days from
point . . lakhs) application the receipt of application)
1 Both in the networ-k of STU 2 Proof of payment of 90 working days . ·
STU Application fee, Bank Disposa~ of application
Guarantee, P~A or Sale- shall mean sanction of ·
purchase ag~eement of LTOA.
power, In case of ..
generating station or
consumer not already
connected to grid, .
documentary evidence
for. completion of. the
connectivity showing that . -
..
the same shall be
completed before
intending date of L TOA.
' Declaration-that there is
no existing agreement
- for the capacity{quantum
of power) for which open
. access is sought
Both in the network of Concerned . 2 As above As above
2 intra-state transmiss1on Transmissio I
licensee network (other n licerisee ,
than STU) and there is
no involvement of STU
network for conveyance
of electricity.
3 The injection and drawl STU . 4 As above. Additional 90working days
point is located at STU requirement of consent
network and intra-state of transmission .licensee
transmission licensee
(other than STU}
network or vice versa.
4 The injection and drawl STU 4 Same as above. -do-
point is at intra-state Additional requirement of
transmission system and consent of distribution
distribution licensees licensee
system respectively .
5 The injection an.ct drawl STU 4 Same as above. -do-
point is at distribution .. Additlonal requirement of
licensees system and· consent of distribution
intra-state transmission licensee
Sys~em respectively.
,
6 Both within the same _Concerned_ 2 As above -do-·
Di::;tribution licensee an:d Distributinn
.
.there is no involvement Licensee
of state transmission
network
Both within the same STU 4 Same as above. As above
7 Distribution licensee but Additional requirement of . there is involvement of consent of distribution .
state transmission licensee
network in conveyance of
' electricity
8 Both within the same STU 4 Same as above. As above
State but different . Additional requirement of
Distribution Licensees consent of distribution
licensee
..
•
I-
•
124 (17)
Table-2
Long-term open access
S.· Inter-se location of. Nodal ~pplication Documents to Time frame for disposal
No drawal and injection agency fee (Rs. in accompany the of application (days from
point lakhs) application the receipt of application)
9· In different States CTU As per Proof of payment of As per Central
(inter-State open access) Central Application fee, PPA or Commission·s·Regulation.
Commission's Sale-purchase
Regulation agreement of power, In
case of generating
station not already
. connected to grid,
documentary evidence
for completion of the
connectivity showing that
the same shall be
completed before .
. intending date of LTOA,
Consent from concerned
. SLDCs and Distribution
licensees as applicable.
Oedaration that there is
no existing agreement
for the capacity for which
open access is sought.
Other documents as
specified by Central .
Commission.
Note: The application fee for consent from transmission licensee
/ distribution Ucensee ~hall be Rs 2 lakhs
Table-3
Medium~term. open access
s. lnter-se location of Nodal agency Application Documents to Time frame for disposal of
No drawal and.injection point fee (Rs. In accompany the application (days from the
lakhs) application receipt of application)
1 Both in the network of . 'STU 1 Proof of payment of 30 working days
STU . Application fee, Bank
Guarantee, PPA or Sale-·
purchase agreement of
po·wer, In case of
C
generating station or
consu.mer ·not already.
connected to grid,
documentary evidence
for completion of the
connectivity. showing
that the same shall be .
completed before
intending date of MTOA.
Declaration that there is
no existing agreement
. for the capacity for .
which open access is
sought
2 Both in the network of Concerned 1 As above .. As above
intra-state transmission Transmission
licensee (other than STU) licensee
' network and there is no .
involvement of STU
network for conveyance .
of electricity.
l .... • - --
124 (18).
Table-3
Medium-term open access
s. Inter-se location of Nodal agency Application Documents to Time frame for disposal of
No drawal and injection point fee (Rs. In accompany the application (days from the
lakhs) aj:)plic~tion receipt of application)
3 The injection and drawl STU 2 As above .Additional 40 working .days
point is located at STU requirement of consent
network and intra-state of transmission iicensee.
transmission licensee
..
(other than STU) network
or vice versa .
. The injection and drawl - STU. 2 Same as above. 30 wo'.king days.
4 point is at intra-state Additional requirement
transmission system and . of consent of distribution
distribution licensees licensee
system respectively .
The injection and drawl STU 2 . Same as abo,;,e. 30 working days.
5. point is at distribution Additional requirement·
licensees system and of consent of distribution
intra-state transmission licen?ee
system respectively~
6 Both within the same Concerned 1 . As above 30 working days. ·
Distribution licensee and Distribution
there is ·no involvement of Licensee
state transmission
network .
·7 Both within the same STU. 2 Same as above. 30 working days.
Distribution licensee but Additional requirement
there is involvement. of of consent of distribution
state transmission licen~ee
\.
network in conveyance of ·.
electricity
ff Both within the same STU' 2 Saine as above. 30 working days ..
State but different .Additional requirement
Distribution Licensees of consent of both
•,
distribution licensee·s.
9 In different States CTU As per Proof of payment of As per Central
i.e: inter State Centra.l Application fee, PPA or Commission's Regulation
Commission Sale-purchase
Regulation. agreement of power, In .
., case of generating
-station not already ..
connected to grid, .
documentary evidence
for compietion of the .
connectivity showing
that the same shall be
completed befure
intending date of MTO~,
Consent from concerned .
~LDCs and Distribution . . . licensees as applicable~
.. Declaration that there is
.. - . no existing agreement . ' ..
\ .. .,forthe capacity for ..
which operi access is
, .
.. /',
.. . ,•;_. soug~t; · Other . . .
' ._;; - documents as specified .. . : . . · by Centri'I_Co~mission. ·
. .
Note:
~·· , !' ~,:'l:;.:
T:h~ ~ppUcation :fee .. for consent fro_irl,transmis~~o~·nc~~see ·l.
distribution.'licensee shall be Rs 1 lakhs . .. ·... · · · · . . -. . . . . . ' . . .
,·
,;,··. .· ... ::-. .
i.:'i'iJi:::ki;i
,·
.. ~·!-~':-~· .. ,
wdh-1 11~ m, ~ 4 lTT:d 2011 124 ( 19)
Table-4
Short-term open access
s. Inter-se location of Nodal Application Documents to Time frame for disposal
No. drawal and injection agency fee (Rs.) accompany the of application (days
point application from the receipt of
application)
1 Both in the network of SLDC 2500 Proof of payment of 10 working.days in
STU Application fee. case STOA applied for
Declaration that there first time.
. . is no existing 7 working days on
agreement for the subsequent STOA
- capacity for which applications.
open access is sought .
2 working days for
. informing deficiency or
defect in application.·
2· Both in the network of Concerned 2500 As above• As above
intra-state Transmissi
transmission licensee on licensee
(other than STU)
network and there is
no involvement of STU
network for
conveyance of
electricity.
3 The injection and SLDC 5000 As above. Addition.al As above
drawl point is located requirement of
at STU network and consent of
intra-state transmission licensee
transmission licensee
(other than STU)
network or vice versa
4 The injection and SLDC 5000 · Same as above. As above
drawl point is at Additional
intra-state requirement of
transmission system consentof ·
and distribution distribution licensee
• licensees system
respectivefy
5 The injection and SLDC 5000 Same as above. As above
drawl point is at Additi9nal
distribution licensees requirement of
syste_m and intra- consent of
state transmission distribution· licensee
system respectively.
6 Both within the same Concerned 2500 As abo'(e As above
Distribution licensee Distributio
and there is no n Licensee
involvement of state·
transmission network
7 Both within the same SLDc; 5000 Same as above. As'above
Distribution licensee Additional
but there ls requirement o_f .
involvement of state -consent of
·· transmission network distribution licensee
8 Both within the same SLDC 5000 Same as above. As above
State but different Additional
Distribution Licensees requirement of co
sent of distribution
licensee
9 In different States RLDC of As per Consent from As per Central
t~e region Central concerned SLDCs and Commission's
where Commission' Distribution licensees Regulation
consumer s Regulation as. applicable, Proof .
· is locates:! of payment .of
Appt~ation fee, .
Declaration that
124 (20)
- Table-4
" -
Short-tern, open access
-·- -
S .. Jnter-se location· of Nodal Application Documents to Time frame for disposa1
No. drawal and lnj~on agency fee (Rs.)· accompany the of application (days
point ·application from_ the receipt
application)
- -
there i.s no existing . agreement for the .
capacity for ·which
open access is
- sought. Other
documents as ,·
specified· by Central
Commission.
Note: The application fee for consent from transmission licensee /
distribution licensee shall be Rs 2500.
13. Conse~t of STU/ SLDC /transmission licensee (other than STU)/
Distribution Licensee
(1) ~nter-State open. access : STU in the case of application for grant of
' long-term ·open access and SLDC in the case of 9rant of medium-term
open access and short-term open access shall convey ifs consent or
otherwise · as per· the prqvisions · of Central Electricity Regulatory.
C~mmission (Grant of Connectivity, Long~term Access anti· Medium-term
of
Open ·Access ·in inter-State Transmission and related matters) Regulations, •
2009 and Central Electricity Regulatory Comtnis~ion (Open Access in inter-
State Transmission) Regulations, 2008, respectively or their statutory re-·
enactments, as amended from time to time.
Provided that in respect of a generating statio.n or consumer connected to
a transmission licensee (other than STU) /distribution lke_nsee and
intending to seek open access, the STU/SLDC before giving its consent to
the CTU/RLDC as required under the. Central Commission's n~gulations,
. ~ . . . . . .
shall require the. generating company or con.sumer to submit the consent·
of the distribution licensee concerned.
(2) . Intra-State Open Ac~ess: · .
(D Where the proposed bilateral transaction involves a transmission
lit_ensee (other than STU) or distributior:, licensee, concurrence· of
the transmiss!on licensee. or distributi<;>n licensee as the case may
~e shall be obtained in advance by the applicant and be submitted
along with the application to.the nodal agency. However, for short-
124 (21)
'
term open access, the concurrence of the licensee shall be required
only for first time. For subsequent short-term- open access in
_continuation the applicar:it shall fi_le application directly to the nodal
agency. ~n case of break in continuation, the concurrence of
licensee shall be again required.
(ii) In case ·tne· licensee finds that the application for consent is
incomplete or defective in any respect,. ·it shall communicate. the
deficiency or defect to the ap13licant by_ e-mail or fax or by any
other usually recognized mode of communication; within following
time frame from days of receipt of the application:
• Long-term open access-7 working days
• Medium-term open access.:.7 working days
• Short-term open access-2 working _days
(iii)' While processing the application for medium~term and short-term
open a~cess the licensee shall· ensure that the applicant . fuUills
eligibility criteria specified in Regulation 5 a·nd on being satisfied
that t_he requirement~ specified under Regulatio~ 7(2) or Regulation
7(3) as the case may be are fulfilled, the licensee shall verify the·
following, -
. a)
b)
Existence of infrastructure necessary for · time-block-wise . ' '
energy metering, accol.lnting and data communication facility
in accordanc.e with. the provisions of the State Grid Code in
force, and
Availability of capacity _in the licensees network ..
(iv) On being satisfied that all conditions are fulfilled, the licensee shall
convex its consen~ to the applicant by e-mail or fax or by any other
usually recognized mode of communication, within following time
frame from day'of receipt of the application.
•
•
•
Long-term open_ acces~-30 working days
Medium-term open access-30 working days
$hort-term open access-10 working days
----:-•~-::~-____ ,.~-·
I.
(v) In case the application has been found to be ih order but the.
licensee refuses to give consent on the grounds of non-fulfillment of
eligibility criteria or non-~xistence· of necessary infrastructure or
· unavailability of surplus capadty in- -the licensees network, such
refusal shall be communicated to the applicant by e-mail or fax or .
by any other usual_ly recognized mode of communication, within the
following time from the date of receip_t of the application, along with
reasons for such re"fu,sal:
" • Long-term open acc!;!SS-30 working .days
■ Medium-term open access-30 working days
■ · Short-term open a·ccess-10 working days. ·
-
(vi) Where the licensee has not communicated any deficiency o_r defect
in the application. within time period referred in· Regulation · (ii)
above from the date of receipt of application, or refusal or consent
. within the specified period as mer:tioned ih Regulation (iv) and (v)
above f._rom the date of receipt of the application consent shall be
'. .
cjeemed to have been granted.
· (vii) Provided further tha't where concurrence or 'no objection' or prior
stanctirig clearanc;:e,. as the case may b_e; is deemed to have bee'n
granted by the concerned licensee,. the applicant while .making .
·application shall submit to· the nodaJ age_ncy an affidavit. (i~ the
format provided . in the detailed procedure), duly notarized,
declaring that -
a) The licensee has fajled to convey any deficiency or defect in
thP. ~nnlication or· its refusal or cnncurrence or 'no objection'
or prior: standing clearance, as the case may be, within the
specified time,·
b) A.'pplicant fulfills eligibility . criteria and necessary
infrastructure for time-block-wise · energy metering and
. / \ . .
accounting, data communication etc-in accordance with the
. . .
provisions of the Grid Code in force, is av9ilabl~ in place. The •
followi~g document shaJi.· be submitted by .the applicant with
affidavit -
. ; )
_:;__:.,,.
...
gfih-i'I~ m, ~ 4 ~ 2011 124 (23)
■ A copy of the complete application after removal of deficiency
or rectification of defects, if any communicated, made to the
transmission licensee / distribution licensee for seeking
concurrence or 'no objection' or prior standing clearance, as
the case may be,
0
0
A copy of the acknowledgement, if any, by transmission
licensee/distribution licensee, or any other evidence in
support of delivery of the application to the transmission
licensee/distribution licensee and
An undertaking that there is no bilateral agreement with any
licensee, buyer or seller for the proposed quantum of power
for bilateral transaction.
124 (24)
PART 5
Procedure to avail long-term open access
14. Application for long-term open access
(1) The application for grant of long-term open access shall contain details
such as name of the entity or entities to whom electricity is proposed to
be supplied or from whom electricity is proposed to be procured along
with the quantum of power and such other details as may specified by the
Commission in detailed procedure.
Provided that in the case where augmentation of transmission system
and/or distribution system is required for granting open access, if the
quantum of power has not been firmed up in respect of the person to
whom electricity is to be supplied or the source from which electricity is to
be procured, the applicant shall indicate the quantum of power along with
name of the area in which this electricity is proposed to be interchanged
(buy or sell as the case may be) using the intra-State transmission
system and/or distribution system;
Provided further that in case augmentation of intra-State transmission
system and/or distribution system is required, the applicant shall have to
bear the transmission charges and/or wheeling charges and other
applicable charges for the same as per these regulations, even if the
source of supply or off-take is not identified;
Provided also that the exact source of supply or destination of off-take, as
the case may be, shall have to be firmed up and accordingly notified to
the nodal agency at least 3 years prior to the intended date of availing
long-term open access, or such time r>Priod estimated by Stote
Transmission Utility and/or distribution licensee for augmentation of the
transmission system and/or distribution system, whichever is lesser, to
facilitate such augmentation. The applicant shall submit an undertaking
stating that they have a valid contract with seller/ buyer as the case may
be with a copy of the contract.
Provided also that in cases where there is any material change in location
of the applicant or change in the quantum of power to be interchanged
(injection or drawl as the case may be) using the intra-State transmission
mihP1~ m, ~ 4 llRf 2011 124 (25)
system and/or distribution system or change in the area from which
electricity is to be procured or to when supplied, a fresh application shall
be made, which shall be considered in accordance with these regulations.
(2) The applicant shall submit any other information sought by the nodal
agency including the basis for assessment of power to be interchanged
(injection or drawl as the case may be ) using the intra-State transmission
system and/or distribution system and power to be transmitted to or from
various entities or regions to enable the nodal agency to plan the intra-
. State transmission system and/or distribution system in a holistic manner.
(3) The application shall be accompanied by a bank guarantee of Rs 10,000/
(ten thousand) per MW of the total power to be transmitted. The bank
guarantee shall be in favour of the nodal agency, in the manner laid down
under the detailed procedure.
(4) The bank guarantee of Rs. 10,000 /- (ten thousand) per MW shall be kept
valid and subsisting till the execution of the long-term open access
agreement, in the case when augmentation of transmission system and/or
drstribution system is required, and till operationalization of long-term
open access when augmentation of transmission system and/or
distribution system is not required.
(5) The bank guarantee may be encashed by the nodal agency, if the
application is withdrawn by the applicant or the long-term open access
rights are relinquished prior to the operationalization of such rights when
augmentation of transmission system is not required.
(6) The aforesaid bank guarantee will stand discharged with the submission of
bank guarantee required to be given by the applicant to the State
Transmission Utility and/or distribution licensee as the case may be during
construction phase when augmentation of transmission system and/or
distribution system is required, in accordance with the provisions in the
detailed procedure.
15. System Studies by the Nodal Agency
(1) On receipt of the application, the nodal agency shall, in consultation and
through coordination with other agencies involved in bilateral transaction,
124 (26)
process the application and carry out the necessary system studies as
expeditiously as possible so as to ensure that the decision to grant long
term open access is arrived at within the timeframe specified in regulation
Provided that in case the nodal agency faces any difficulty in the process
of consultation or coordination, it may approach the Commission for
appropriate directions.
(2) Based on the system studies, the nodal agency shall specify the intra
State transmission system and/or distribution system that would be
required to give long-term open access. In case augmentation to the
existing intra-State transmission system and/or distribution system is
required, the same will be intimated to the applicant.
16. Communication of estimated open access charges, etc. to the
applicant
While granting long-term open access, the· nodal • agency shall
communicate to the applicant, the probable date from which long-term
open access can be granted and an estimate of the applicable charges (in
'
kind and in cash) likely to be payable based on the prevailing rate, as
specified by the Commission.
17. Execution of Long'.'"term ()pen Access Agreement
(1) The applicant shall sign an agreement for long-term open access with the:
,. . (a,) State Transmission Utility in case long-term open access is granted
by the State Transmission Utility for open a·ccess mentioned in S No 1
of table-2 of these regulations, in accordance with the provision as
J
specified in the detailed procedure.
(b) ·'·'· lnt.ra:..~t~_te transn11siion ·1icehsee '(other than STU) in 'case long_;term
.. ·· · ':;: · op.en\a~c~ss·i~ grat,ted hy infra:..state transmission 'licensee (other
•' .- ., ·.' ... ; .,.. -'· .. • ~ ,·· ·, • I' . ·• - , '_ . --~. ' ... .' • ~ . • ' • ; • • • ' . • . . . ,.
,i:.·· ''.' - ··· th~n 5TU)',Jor· open· access 'mentioned· in .S No 2 of table.,-2. of these
' .. : . ' .. ;') ·:::,-e'~dlatio'J~~-/ it;i,:·accordince . V\lith·,.·the prpvision., as. specified', in the '
· .. ··. ·c1et~ne~/~r6~~c1~re . ··.
,· .:' -.' :: .. ,:_,. ~ .:. ~)- .: .:;{J ·_;··.-; -.~ -. '. : :
. . . . ., '
::··(c} ···,· ,At:trip~IT.ie,:ag,reem_ent Jor .Jqng-t~rm .. open.·. access w_ith the State
- ' ' ~ . ···.:·, .~- . , . ' .. -.. . .: ' •, ; - . . . ~~ .. ~.,.,_~.:. :, . . . .' . ' ' . , ·,: •·\ ; .' .. _ . . . . - ,
Transmission .:.tJtility;,and. intra:itate: .. transmission. licensee in case . ,· . . .. : .. , ,. . .•. . ·.. ~~ '-· : ,' -·- .. . . . ..
,;,,-· .. -
. -
(2)
124 ( 27)
long-term open access is granted by the STU for open access
mentioned in S No 3 of table-2 of these regulations.
( d) A tripartie agreement for long-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 4 of table-2 of these regulations
(e) A tripartie agreement for long-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 5 of table-2 of these regulations.
(f) Distribution licensee in case long-term open access is granted by the
distribution licensee for open access mentioned in S No 6 of table-2
of these regulations.
(g) A tripartie agreement for long-term open access with the State
Transmission utility and distribution licensee in case long-term
transmission and distribution open access is granted by the STU for
open access mentioned in S No 7 of table-2 of these regulations.
(h) A quadra partie agreement for long-term open access with the State
Transmission utility and both the distribution licensees in case long
term open access is granted ·by the STU for open access mentioned in
S No 8 of table-2 of these regulations.
(i). Agreement for long-term inter-state open access S No 9 of table-2 of
these regulations shall be the as per the provisions specified by
Central Commission.
The long-term open access agreement shall contain the date of
commencement of long-t~rm open access, the point' of injection of power
. into the State grid_ and point o( dra~I from the State grid and the details
' - . . . . " . .
of dedicated transm,i$Sio~ lin~s. required, if any. In case augmentation of
transmission system and/or distribution system is required, the long-term
-, .
. . open a.ccess agreement shall contain the time period for construction of
the facilities for the applicant by -•·• the transmission· licensee and/or
, .· . ..... .
- distributio·n licensee, the~ bank' guarantee -required, to be given by the
applicant and other details in accordance with the detailed procedure.
124 (28) g-tih-ll Id m, ~ 4 ~ 2011
18. Information to SLDC
Immediately after grant of long-term open access, the nodal .agency shall
inform the SLDC so that they can consider the same while processing the
requests for grant of future short-term open access, received under these
Regulations.
19. Renewal of term for long-term open access
On the expiry of the period of long-term open access, the long-term open
access shall stand extended on a written request provided by the long
term open access customer in this regard to the nodal agency mentioning
the period for extension that is required:
Provided that such a written request shall be submitted by the long term
open access customer to the nodal agency at least six months prior to the
date of expiry of the long-term open access;
Provided further that in case no written request is received from the long
term open access customer within the time period specified above, the
said long-term open access shall stand withdrawn after completion of
open access period so granted.
20. Relinquishment of open access rights
(1) A long'"term open access customer may relinquish the long-term open
access rights fully or partly before the e_xpiry of the full term of long-term
open access, by making payment of compensation for stranded capacity
as follows: -
(a) Long-term open access customer who has availed open
access rights for at least 12 years
; ! .
(i) Notice of minimum -one (1) year ,... ff such __ a customer
submits ,an application to the nodal agency at least 1 (one)
(ii)
., <' -1-
, , year pripr to the date 1fcom "wh_ich .such customer desires to
.,
relinquish the access rights, there .$hall be. no charge_s~
. '., ~ ' .
Not'ice 'of less than ;one- {l:) year ' - If such a customer
submits 'an application to the nodal agency' at any time lesser
" t,,; ,, , "' ,, ' " . '' ' '
tnari a period of 1 (orie')year -p'rior·to the date from which
.,;
124 ( 29)
such customer desires to relinquish the access rights, such
customer shall pay an amount equal to 66% of the estimated
transmission charges (net present value) and/or wheeling
charges (net present value) for the stranded capacity for the
period falling short of a notice period of one (1) year.
(b) Long-term open access customer who has not availed open
access rights for at least 12(twelve ) years - such customer
shall pay an amount equal to 66% of the estimated transmission
charges (net present value) and/or wheeling charges for the
stranded capacity for the period falling short of twelve years of
access rights:
Provided that such a customer shall submit an application to the
nodal agency at least 1 ( one) year prior to the date from which
such customer desires to relinquish the access rights;
Provided further that in case a customer submits an application for
relinquishment of long-term open access rights at any time at a
notice period of less than one year, then such customer shall pay
an amount equal to 66% of ,the estimated transmission charges
(net present value) and/or wheeling charges for the period falling
short of a notice period of one (1) year, in addition to 66% of the
estimated transmission charges (net present value) and/or
wheeling charges (net present value) for the stranded capacity for
the period falling short of 12(twelve) years of open access rights.
(2) The discount rate that shall be applicable for computing the net present
value as referred to in sub-Regulation (a) and (b) of Regulation (1) above
shall be the discount rate to be used for bid evaluation in the Central
Commission's Notification issued from time to time in accordance with the
Guidelines for Determination of Tariff by Bidding Process for Procurement
of Power by Distribution Licensees issued by the Ministry of Power.
(3) The compensation paid by the long-term open access customer for the
stranded capacity shall be used for reducing transmission charges and/or
wheeling charges payable by other long-term open access customers and
medium-term open access customers in the year in which such
124 (30)
compensation payment is due in the ratio of transmission charges payable
for that year by such long-term open access customers and medium-term
open access customers.
21. Inter-State open access: The procedure for using the State grid in
conjunction with the inter-state transmission system shall be governed by
the procedure for inter-State long,-term open access as specified in Central
Electricity Regulatory Commission (Grant of Connectivity, Long-term .
Access and Medium-term Open Access in inter-State Transmission and
related matters) Regulations, 2009 or its statutory re-enactment as
amended from time to time:
Provided that in respect of a generating station or consumer connected to
a transmission licensee(other than STU)/distribution licensee and seeking
inter-State long-term open access, the SLDC, before giving its consent to
the RLDC as required under the Central Commission's regulations, shall
require the generating company or consumer to submit the consent of the
distribution licensee concerned.
Provided further that all applicants intending to use the State grid for
long-term inter-State open access shall be required to fulfill the eligibility
criteria as specified under regulation 5 of these Regulation and while
submitting application for inter-State open access shall follow Regulation
12(2) of these Regulation.
mih-1•1~ m, ~ 4 i:rr:;i 2011 124 (31)
PART6
Procedure to avail medium-term open access
22. Application for medium-term open access
(1) The application for grant of medium-term open access shall contain such
details as may be laid down under the detailed procedure and shall, in
particular, include the point of injection into the State grid, point of drawal
from the State grid and the quantum of power for which medium-term
open access has been applied for.
(2) The start date of the medium-term open access shall not be earlier than 5
months and not later than 1 year from the last day of the month in which
application has been made.
(3) On receipt of the application, the nodal agency shall, in consultation and
through coordination with other agencies involved in bilateral transactions,
process the application and carry out the necessary system studies as
expeditiously as possible so as to ensure that the decision to grant or
refuse medium-term open access is made within the. timeframe specified
in table-3 of regulation 12.
Provided that in case the nodal agency faces any difficulty in the process
of consultation or coordination, it may approach the Commission for
appropriate directions.
23. Grant of medium-term open access
( 1) On being satisfied that the requirements specified under Regulation 5 and
Regulation (2) of regulation 7 are met, the nodal agency shall grant
medium-term open access for the period stated in the application:
Provided that for reasons to be stated in writing, the nodal agency may
grant medium-term open access for a pc110d less than that sought for by
the open access customer;
(2) The applicant shall submit an undertaking stating that they have a valid
contract with seller / buyer as the ca~e may be along )Nith a copy of the
contract.
{3) While granting me~ium-term open access, the nodal agency shall
communicate to the -appHcant, an estimate of the applicable charges (in
124 (32)
kind and in cash) likely to be payable based on the prevailing rate, as
specified by the Commission.
24. Execution of medium-term open access agreement
The applicant shall sign an agreement for medium-term open access with ,
the
(a) State Transmission Utility in case medium-term open access is
granted by the State Transmission Utility for open access
mentioned in S No 1 of table-3 of these regulations, in accordance
with the provision as specified in the detailed procedure.
(b) Intra-state transmission licensee(other than STU) in case medium
term open access is granted by intra-state transmission licensee
( other than STU) for open access mentioned in S No 2 of table-3 of
these regulations, in accordance with the provision as specified in
the detailed procedure
( c) A tripartie agreement for medium-term open access with the State
Transmission utility and intra-state transmission licensee in case
lohg-term is granted by the STU for open access mentioned in S No
3 _of table-3 of these regulations.
(d) A tripartie agreement for medium-term open access with the State
Transmission utility and distribution licensee ih case long-term
transmission and distribution open access is granted by the STU for
open· access mentioned in S No 4 of table-3 of these regulritions.
(e) A tripartie pgreenienl_for m_cdium-term open access with the State
Transmission utility and distribution licensee in case , long-term
'fransmi~sion ahd distribu.ti6'n ·open access is ·granted by the· STU .for
' l ' ~ {. • I ' --,\_ '. , I • ."'- • , • ' - !
open access m¢ritiohed in S No 5 of table-3 of these regul~tio·ns.
~ .r. ; ;: ·" .'
(f) Distribution '.licensee i_n case medium-term open' access .. ls granted
.• by. th_e \Hlf/ibtltion 'ficensee 'for op~h access m'eAti~ned in' s· No 6 of
r ,) • ~ ' ; • C • ' '! !..i.~ • • -' < ~ • ;- -:-:. • • •
table-3 of these regulations.
, (g) · A tripartie a.9reement for. medium-term open access with the State
') ii ,, ,---:-Ti~n~~lssion:,1Ltility and distf-ibut,on; tfcin§ee ~;iii ··•,case long~term
. :·<~--!· ~<- ~~:· 1·,; ;::· ... : .~~ ·:-·-. l~. r ·
..
124 (33)
transmission and distribution open access is granted by the STU for
open access mentioned in S No 7 of table-3 of these regulations.
(h) A quadra partie agreement for medium-term open access with the
State Transmission utility and both the distribution licensees in case
long-term open access is· granted by the STU for open access
mentioned in S No 8 of table-3 of these regulations.
(i) Agreement for medium-term inter-state open access S No 9 of
table-3 of these regulations shall be as per the provisions specified
by Central Commission.
(2) The medium-term open access agreement shall contain the date of
commencement and end of medium-term open access, the point of
injection of power into the State grid and point of drawal from the State
grid, the details of dedicated transmission lines required, if any, the bank
guarantee required to be given by the open access customer and other
details in accordance with the detailed procedure.
(3) Immediately alter grant of medium-term open access, the nodal agency
shall inform the State Load Despatch Centre about the
modalities,quantum of power to be interchanged and terms of conditions
of such open access approval etc- so that they can consider the same
while processing requests for future short- term open access received
I - under these Regulations.
25. No overriding preference
On the expiry of period of the medium-term open access, the medium
term open access customer shall not be entitled to any overriding
preference for renewal of the term.
26. Exit option for medium-term open access customers
A medium-term open access customer may relinquish rights, fully or
partly, by giving at least 90 days prior notice to the nodal agency:
Provided that the medium-term open access customer relinquishing its
rights shall pay applicable transmission charges and / or wheeling charges
124 (34)
and other applicable charges for the period of relinquishment or 90 days
which ever is lesser.
27. Inter-State open access: The procedure for using the State grid in
conjunction with the inter-state transmission system shall be governed by
the procedure for inter-State mE:dium-term open access as specified in
Central Electricity Regulatory Commission (Grant of. Connectivity, Long
term Access and Medium-term Open Access in inter-State Transmission
and related matters) Regulations, 2009 or its statutory re-enactment as
amended from time to time:
Provided that in respect of a generating station or consumer connected to
a distribution system seeking inter-State medium-term open access, the
SLDC, before giving its consent to the RLDC as required under the Central
Commission's regulations, shall require the generating company or
consumer to submit the consent of the distribution licensee concerned.
Provided further that all. applicants intending to ·use the. State grid for
· medium-term inter-State open access shall be required to. fulfill the
e1igibility criteria as specified under ·Regulation 5. · of these. Regulation and. ·
· ·while submitting . application • for inter-State open access. shall follow
Regulation 12(2) of these Regulation.
·., i ,,.· .:,
..
milwt~ ~. ~ 4 .:irct 2011 124 (35)
PART7
Procedure to avail short-term open access
28. Application for short-term open access
(1) The application for grant of short-term open access shall contain details
which include the point of injection into the State grid, point of drawal
from the State grid, the quantum of power for which short-term open
access has been applied for, duration of availing open access, and other
information as may be required by the Nodal agency
(2) The start date of the short-term open access shall not be earlier than 30
days and not later than 60 days from the date application has been
made.
Eg. application for grant of open access commencing from i5t July shall be
received from 1st May and up to 31th day of May.
(3) An application made for each bilateral transaction and/or collective
transaction shall be accompanied by a non-refundable fee as decided by
the commission from .time to time .
. ·. .. -· '. •..:
. - .
Provided that the fee for bilateral transaction or collective transaction shall
be deposited on the day of the application or within three working days of · .. ~. . , . . , . •. . -
submission of the application.
(4) - A ·consumer of distribution licensee intending to avail open access shall_
(6)
·_ , also furnish a copy of his application to the distribution licensee of his area
of supply.
the·' Nodal ·agency shall acknowledge receipt of the application by
andkating time and date an "ACKNOWLEDGEMENT" to the applicant.
Based on the type of transactions, the nodal agency shall take a decision
on the applications for short-term open access.
(i) · All applications received under Regulation 28(2) above shall be
processed as per allotment priority criteria specified under
Regulation 8 on first-come first serve basis.
124 (36)
(ii) Nodal agency shall check transaction for congestion of any element
(line and transformer) of transmission and distribution system
involved in transaction.
(iii) Nodal agency shall convey grant of open access or otherwise in
format specified in detailed procedure along with schedule of
payments to the applicant.
(iv) Nodal agency shall assign specific reasons if open access is denied.
(7) - While processing the application for short-term open access, the nodal
agency shall ensure that the applicant fulfills eligibility criteria specified in
Regulation 5 of these Regulation and verify the following, namely-
(i) Existence of infrastructure necessary for time-block-wise energy
metering and accounting, data communication etc in accordance
with the provisions of the Grid Code in force, and
(ii) Availability of surplus capacity in the State grid.
(8) In case the nodal agency finds ·that the application for short-term open
access is incomplete or defective in any respect, it shall communicate the
deficiency or defect to the applicant by e-mail or fax, in addition to any
other usually recognized mode of communication, within · time frame
specified iri table 4.
Provided that in cases where the nodal agency has communicated any
deficiency -or defect in the application, the date of rec:eipt of application
shall be the date on -whicti; the application has been received duly
·: complet,ed, after removing the deficiency or rectifying the defects, as the
' .. . . , .. ., . . . , ·.
case may be.
(9) After the feasibilitY. for, existence. of necessary infrastructure and
!It \. ..... ,~ ., ~ t~ !! ~•, , • - t/-: ' . • . ' . . . • . ··., ( . • ~ !-- ~; , ·,
, •. 17 c!Vpilabil/~Y of.~~ffP,lus .ca_pacit'{i irJ t.9/~!_,~tate grid has, bee~ established the
. . ~ -- _., : . , . . '!.. ~
no9al agency shalJ cq_nvey, jts .app~o_y~J 9( shprt~t~rm _open access to the
+ ,. f;..S ?, \. -, •' ' ~~ -~., • t C ; 1 0 f I ' \, t" ' .... '..:f~.-':, .
applicant by e-mail or fax, in addition to any other usually recognized
mode of communication, within time frame specified in table 4.
(10) In case the application has been found to be in order but the nodal agency
refuses to give approval, on the grounds of non-existence of ,necessary
"'
0'ffi•Wi~ {pifq'"5[, ~ 4 ~ 2011 124 (37)
infrastructure or unavailability of surplus capacity in the State grid or non
fulfillment of eligibility criteria, such refusal shall be communicated to the·
applicant by e-mail or fax, in addition to any other usually recognized
mode of communication, within time frame specified in table 4, along with
reasons for such refusal:
Provided that where the nodal agency has not communicated any
deficiency or defect in the application or refusal or approval as the case
may be, within the specified time period from the date of receipt of the
application, the applicant may approach the Commission for intra-State
open access.
29. Day ahead transactions:
(1) Day ahead transactions shall be permitted ,in case there is availability of
surplus capacity in the licensee system, which has been expressly
surrendered whole or part thereof, or not in use for more than three days
in past.
An application for grant of such open access may be submitted to SLDC
within three days prior to the date of scheduling but not later than 1300
hrs of the day immediately preceding the day of scheduling for day ahead
transaction.
For example, application for day-ahead transaction on 25th day of July
shall be received on 22nd day or 23rd day or up to 1300 hours on 24th
day of that month.
(2) Nodal agency shall check for congestion and convey grant of approval or
otherwise, in the format as approved in detailed procedure. All other
provisions of application for short-term open access shall apply.
30. Payment of open access charges
Advance payment for one month or period of open access, whichever
period is less, shall be made within three working days of grant of open
access. The SLDC shall schedule power for bilateral transaction only after
receiving payment from the applicant.
124 (38) ~.9'ffift•I~ -m, ~ 4 i:rr;:;f 2011
31. No overriding preference
On the expiry of period of the short-term open access, the short-term
open access customer shall not be entitled to any overriding preference
for renewal of the term.
32. Inter-State open access
Notwithstanding anything contained in above Regulations, procedure for
inter-State short- term Open Access shall be as per Central Electricity
Regulatory Commission (Open Access in inter-State Transmission)
Regulations, 2008, or its statutory re-enactments, as amended from time
to time.
Provided further that all applicants intending to use the State grid for
short-term inter-State open access shall be required to fulfill the eligibility
criteria as specified under Regulation 5 of these Regulation and while
submitting application for short-term inter-State open access shall follow
Regu.lation 12(2) of these Regulation.
.,.
_,
124 (39)
PARTS
Charges for using State grid
33. Open access charges
The licensee/SLDC providing open access shall levy only such fees and/or
charges as specified by the Commission from time to time. The principles
of determination of the charges shall be as under.
( 1) Transmission Charges -
The transmission charges for use of the transmission system of the STU/
transmission licensee for intra-state transmission shall be regulated as
under:
(a) The transmission charges for use of the intra-State transmission
system shall be recovered from the long-term open access customers
and the medium-term open access customers in accordance with
terms and conditions of tariff specified by the Commission from time
to time. These charges shall be as determined by the Commission
under section 62( l)(b) of the Act, and shall be applicable as per the
tariff order issued by the Commission from time to time. These
charges shall be shared by the long-term open access customers and
medium-term open access customers as per allotted capacity
proportionately.
Illustration: The basis for sharing of transmission charges shall be
the maximum demand in MW served by the intra-state transmission
system of the transmission licensee in the previous financial year ..
Suppose, the maximum demand in previous financial year i,e 2009-10
is 3000 MW.
The capacity contracted by long-term open access customer is 50 MW.
The capacity contracted by medium-term open access customer is 20
MW.
The capacity served for distribution licensee shall be 3000-50-
20=2930 MW
124 ( 40)
Suppose if annual estimated and approved transmission charge for
2010-11 is Rs 300 crores, then monthly transmission charges for year
2010-11 shall be shared as follows:
Distribution licensee= (300 x 2930) /(3000 x 12) = Rs 24.4H?6 crores
Long-term open access customer= (300 x 50)/(3000 x 12) = Rs
0.4166 crores
Medium-term open access customer=(300 x 20)/(3000 x 12) = Rs
0.1666 crores
(b) The transmission charges shall be payable by the short-term open
access customer for the energy approved /contracted for bilateral
transaction at the point or points of injection. The energy approved
shall be computed by considering the reserved capacity for bilateral
transaction. The transmission charges payable by a short-term open
access customer for the use of intrastate tr c.Jr1smission system shall be
calculated in accordance with the followinc; :,10thodology:
ST _RATE = TSC / Net annual estimated energy input to the
transmission system of STU/transmission licensee for- the relevant
year,
Where:
ST _RATE is the rate for short-term open access customer in Rs per
kwh or in Rs/MWh
"TSC" means the annual transmission charges or annual revenue
requirement on account of the transmission system as determined by
the Commission.
The transmission charges for use of intra-state transmission system
for all type of transactions (bilateral or collective inter-State
transactions through exchanges) shall be the same.
Illustration: Suppose if annual estimated and approved transmission
charge for the year 2010-11 is Rs 300 crores, and net annual
estimated energy input to the transmission system of STU for the year
2010-11 is 15000 MU.
ST _RATE = 300/15000= 20 paise per kwh
Or ST _RATE=Rs 200/MWh
124(41)
( c) The revenue thus earned from the short-term open access customers
by the STU/transmission licensee for bilateral transaction and
collective transction in a month shall be directly disbursed to the long
term and medium term customers to reduce the transmission
charges of the long-term and medium term open access customers
for the successive months in proportion to monthly charges payable
to them. The STU/ transmission licensee shall maintain separate
account for the revenue earned from short-term customers and shall
submit it to the Commission.
(2) Wheeling Charges-
The Wheeling charges for use of the distribution system of a licensee shall
be regu_lated as under: -
(a) The wheeling charges for use of the distribution system shall be
recovered from the long-term open access customers, medium
term open access customers and short-term open access customers
in accordance with terms and conditions of tariff specified by the
Commission from time to time. These charges shall be as
determined by the Commission under section 62(1)(c) of the Act,
and shall be applicable as per the tariff order issued by the
Commission from time to time. The wheeling charges shall be
payable by the long-term open access customers , medium-term
open access customers and short-term open access customer for
the energy approved/contracted for bilateral transaction at the
point or points of injection. The energy approved shall be computed
by considering the reserved capacity for bilateral transaction
(b) The wheeling charges payable by a long-term open access
customers, medium-term open access customers and short-term
customer for the use of distribution system shall be same.
( c) The revenue thus earned from the open access customers in a year
shall be utilized to reduce the wheeling charges of licensee for the
124 (42)
successive years. The distribution licensee shall maintain separate
account for the revenue earned from open access customers.
(3) Fees and Charges of SLDC -
An open access customers shall pay to the SLDC, the scheduling and
system operation charges as determined by the Commission in
accordance with the regulation as may be framed for levy and collection of
fees and charges of SLDC.
( 4) Unscheduled Interchange (UI) charges
(a) The mismatch between the scheduled and the actual drawal at
drawal point(s) and scheduled and the actual injection at injection
point(s) shall be met from the grid and shall be governed by the
CERC (UI charges and related matters)·, Regulation, 2009 till the
notification of CSERC (Intra-State ABT, Unscheduled Interchange
charges and related matters) Regulations and thereafter it will be
as per the regulations to be notified ·and amendments, if any.
(b} A separate bill for UI charges shall be issued to open access
customers.
(c) The billing, collection and disbursement of the Unscheduled Inter
change charges shall be governed by the CERC (UI charges and
related matte.rs) Regulation 2009 till the notification of CSERC
(Intra-State ABT, Unscheduled Interchange charges and related
matters) Regulations and thereafter it will be as per th_e regulations
to be notified and amendments, if any.
{d) The payment of UI charges shall have a high priority and the
concerned constituent (including distribution licensee and all other
open access customers) shall pay the indicated amounts within
stipulated: r.?~riod 'as· specifi~d in CERC (UI charges and related
matters}, Regulation, 2009 till .the notification of CSERC (Intra-
. . '
. ,· State, ABT/t!rts:ctieduled, Ihterchang~ charg~s and related matters)
·-:,R~g(d~tlbns··~nfs<is cfmended from time 'to tinie
(5} Reaci:iJe· E~ergy'Ch~·rget- . . . . .•.·· ,',
'.. {Jh~ ... 6iifinii"an~ 'pay~er1t·-'6f:·1:11~-. reactive
7
-~ri~rg'y:.'.charges· by ·-the open
· . ~ ;, a'ccess·c:ustdmers shall bet~J a·p~;O;P.d 'b~ ~he ·2;rf,,,~i~~'i'6~
0
f~~m time to
..._,,; .
t : . . .. ,~
~,;,j, ,,,
.· -,
,,., . ... .
i'l.'ti .. :',,_;;.., : .. ~'!,:·.f,'"•~.t!-4 • ,
')J
124 (43)
(6) Cross subsidy Surcharge - ·
(a) The Commission may specify cross subsidy surcharge voltage
wise/slab wise /individual categories of consumers separately.
(b) The principle and procedure for determining cross-subsidy
surcharge shall be as under:
(i) Every consumer requiring supply of electricity through open
access in accordance with these Regulations shall be liable to
pay the cross-subsidy surcharge, as may be specified.
Provided that such surcharge shall not be leviable in case
open access is provided to a person who has established a
captive generating plant, for carrying the electricity to the
destination of its own use.
The cross subsidy surcharge shall be payable by the open
access customer for the actual energy received through open
access at the point of drawl.
(ii) Cross subsidy surcharge shall also be payable by such
consumer who receive supply of electricity from a person
other than the distribution licensee in whose area supply is
located, irrespective of whether it avails such supply through
transmission/ distribution network of the licensee or not.
(iii) Such surcharge shall be based on the current level of cross
subsidy of the tariff category / tariff slab and / or voltage
level to which such consumer, belong or are connected to, as
the case may be. It is to be calculated based on the average
cost method by taking the difference between the average
tariff for such supply voltage for the consumer of subsidizing
category and the average cost of supply for the licensee.
~ . . . ' .
(iv) For consumers procuring power through open access in first
control period of MYT regime, the cross subsidy 1 sur~harge
. '. ' . . .
shall be levied at 90% of cross subsidy surcharge determined
by the Commission . for that year. The cross subsidy
surcharge for subsequent control period shall -be as decided .. ,. '
by the Comm.ission from time to time.
Illu~1:~ation: Su~p~se the ~-r~ss subsi~y s'urcharge worked out.
for 2011-12 is 75 paise per kwh. Then applicable cross
1
j
l
·l
1
j
124 ( 44)
(v)
€9'ffifl'i~ {I~,~ 4 lWif 2011
subsidy surcharge for consumers procuring power through
open access shall be 90% of 75 paise i.e. 67.5 paise
(rounded of to 68 paise) per unit for the year 2011-12.
Suppose the cross subsidy surcharge worked out for 2012-13
is 70 paise per kwh. Then applicable cross subsidy surcharge
for consumers procuring power through open access shall be
90% of 70 paise i.e. 63 paise per unit for 2012-13,
For consumers procuring power through renewable energy
based power generating plant, the cross subsidy surcharge
shall be 50% of the cross subsidy surcharge determined for
that year.
Illustration: Suppose the cross subsidy surcharge worked out
for 2011-12 is 75 paise per kWh and the cross subsidy
surcharge worked out for 2012-13 is 70 paise per kWh. For
consumers procuring power through renewable energy based
power generating· stations, the cross subsidy surcharge shall
be 38 paise per unit and 35 paise per_ unit for the year 2011-
12 and 2012-13 respectively.
(7) Additional Surcharge -
The Commission shall determine the additional surcharge as required
under Section 42( 4) of the Act .The additional surcharge shall become
applicable only if it is conclusively demonstrated that the obligation of a
licensee, in terms of existing power purchase commitments, has been and
continues to be stranded, or there is an tmavoidable obligation and
incidence to bear fixed costs consequent to such a contract. The fixed
costs related to network assets would be recovered through wheeling
charges .. ·
Provided 'that such:surcharge shall not be leviable in case open access is
'pro\tided-to'a 'person who has established a captive generating plant, for
·, ·carryir\'g;the'eiectridty to a destination.of its own use ..
J'[, ''.(\. f .. , ·;·
. Provided further ·that the aqditiona.t sqrcbarge sha_ll be decided by the
: ... .,_ ~r.· : '!F.~'-. . , . :···-·~.:•-. •,: . • .· ' ,,
Commission on case to case basis.pf1:er due regulatory p~ocess.
. •-'·"!'")' ., 't . ;-..... , '.!1f•Z.,_:· . • ,; • ,.
. .
·. __ ,,.,_,..,,._ --;:~.!~ -,-<· . ··~·· ---- ..... ·---• ~-'••-- ...,... .. ·- . ___ . - .. -~ -~----.1;..,;· --~-.
124 ( 45)
(8) Connectivity Charges -
Charges related to connectivity as specified by the Commission shall be
payable by the intra-State requester for getting connected with the State
grid.
(9) Any other charges, in cash or kind as may be specified by the Commission
shall be payable by the open access customer.
( 10) In case the open access customer uses inter-state transmission system
~· and services of Regional Load Dispatch Centre and State Load Dispatch
Centre of any other state, the transmission charges of CTU and STU of the
other State and service charges of Regional Load Dispatch Centre and
State Load dispatch Centre of other state shall be payable by such
customer in addition to the charges provided under these Regulations.
(11) In case of outages of generator supplying to a consumer through open
access, standby arrangements should be provided by the distribution
licensee on the payment of charges as specified by the Commission. In
case of outages of captive generating plant supplying to a captive user
and/or consumer on open access, standby arrangements should be
provided by the distribution licensee on the payment of charges as
specified by the Commission. The generating company or captive
generating plant selling directly or through any licensee shall inform the
SLDC and the buyer about their outage of plants through email or fax,
along with probable date of resuming injection of electricity into the grid. .
For drawl of power up to the contracted capacity of open access, the tariff
for· availing stand by support from the distribution licensee shall be 1.5
'"' times of the per unit average tariff of HT and EHT consumers as decided
by the Commission in tariff order from time to time.
For drawl of power in excess of the contracted capacity of open access,
the tariff for availing stand by support from the distribution licensee shall
be two times of the per unit average tariff of HT and EHT consumers as
decided by the Commission in tariff order from time to time.
The modality of demand and energy accounting during the period of
availing star,id by support from distribution licensee shall be as per CSERC
(Intra-State ABT, Unscheduled Interchange charges and related matters)
Regulations to be notified and amendments, if any.
124 (46)
Provided also that open access customers would have the option to
arrange stand-by power from any other source other than distribution
licensee.
Provided further that open access customers connected to CTU system
would have the option to avail stand-by power from distribution licensee
of the area on terms and conditions as approved by the Commission. Such
open access customer may approach the Commission for availing stand by
support.
(12) All long-term open access customers and medium-term open access
customers shall pay the charges payable under the open access
agreement from the date of com_mencement of open access specified in
such_ agreement, regardless of whether or not such open access is actually
availed from that date, except if the failure to avail open access is due to
the default of the concerned licensee(s) whose network is being used."
(13) All open access customer must make reasonable endeavor to ensure that
their actual demand or actual sent-out capacity (power), as the case may
be, at an inter-connection point does not exceed the contracted capacity
or reserved capacity.
Provided that for carrying out balancing and settlement of energy and
demand at ·all entry and exit points relating to open access agreements,
the licensee shall strictly adhere to the provisions of CSERC (Intra-State
ABT, Unscheduled Interchange charges and related matters), Regulations
to be notified by the Commission and its amendments, if any.
Provided further, that till such time the CSERC (Intra-State ABT,
Unscheduled Interchange charges a'nd related: matters), -Regulation~ is
notified by ·the ,Gommission, the terms and condition~ for energy.: and
demand: 0balancing; as:iset out intt:,e existing agreements shall continue to
a,pply. _, ' , ,- ·i- - .
(14) , .T,he. charges related to ·transmission,:c:tnd,.wheeling,;charges· shall, be 6% of
' ' . ~ ·~.... . . . .
~he:: energy -inp_ut into the. system,· for the:. consi.J mer ·using · State g·rid for
procuring powenfrom renewable.energy based.po~er generating stations;
'· located in ~he State. 9,ther: than these charge~,-.they shall not be liable to
i
"'
124 (47)
pay any transmission charges or wheeling charges either in cash or kind.
However, surcharge shall be payable where the wheeling of energy is
other than for its own use.
( 15) Energy loss-
s.
No.
1
2
3
The open access customer shall bear energy loss of the transmission
system and/ or distribution system as approved by the Commission in its
relevant tariff order passed under section 62 of the Act, from time to time.
The energy losses in the transmission and distribution systems shall be
compensated by additional injection at the injection point
The energy losses shall be calculated on the basis of the energy scheduled
for transaction at the point or points of injection.
Illustration
The applicable transmission and wheeling charges to be levied to
open access customers shall be as follows
Table-5
- Aoolicable Charges and enerm Losses
Inter-se location of drawal and Injection Drawal Applicable Charges
injection point Point point
Both in the network of STU EHV side of EHV side of 1. Transmission
EHV S/s (132 EHV S/s Charges of STU.
Kv and (132 Kv 2. Transmission loss of
above) and above) STU
Both in the network of intra-state EHV side of EHV side of l.Transmission
transmission licensee (other than EHV S/s EHV S/s Charges of
STU) network and there is no transmission licensee.
involvement of STU network for 2.Transmission loss of
conveyance of electricity. transmission licensee
The injection and drawl point is located EHV side of EHV side of l.Transmission
at intra-state transmission licensees EHV S/s(132 EHV Charges of STU.
system and STU network or vice Kv and S/s(l32 Kv 2.Transmission loss of
versa above) and above) STU
3 .Transmission
Charges of
transmission licensee.
4.Transmission loss of
transmission licensee
124 (AS)
Table-5
Applicable Charqes and enerm Losses
s.
No.
Inter-se location ofdrawal and Injection Drawal
injection point Point point
4 The injection and drawl point is at
intra-state transmission system and
distribution licensees system
respectively.
5 The injection and drawl point is at
distribution licensees system and
intra-state transmission system
respectively
6 Both within the same Distribution
li[ensee and there is no involvement
of state transmission network
7 Both within the same Distribution
licensee but there is involvement of
state transmission network
8 Both witnin the same State but
different Distribution Licensees
EHV side of 33 KV
EHV S/s(132
Kv and
above)
33 Kv side of
EHV S/s
33 KV side of
33/11 S/s
33 Kv side of
EHV
side(132
KV and
above)
EHV
side{132
KV and
above)
EHV S/s or 33 KV
33/11 KV S/s
33 Kv side of 33 KV
EHV S/s or
33/11 KV S/s
33 Kv side of
EHV S/s or
33/11 KV S/s
,i,+
..;;. j ' ,,=
i '-
33 KV
Applicable Charges
!.Transmission
Charges of STU.
2.Transmission loss of
STU
3.Wheeling Charges of
distribution licensee.
4.Distribution loss of
distribution licensee
for that voltage level
!.Transmission
Charges of STU.
2.Transmission loss of
STU
3. Wheeling Charges
of distribution
licensee.
1.Transmission
Charges of STU.
2.Transmission loss of
STU
3.Wheeling Charges of
distribution licensee.
4.Distribution loss of
distribution licensee
for that voltage level
1. Wheeling Charges
2. Distribution losses
1. Transmission
Charges of STU.
2. Transmission loss of
STU
3. Wheeling Charges
of distribution
licensee. 4.Distribution
luss of distribution
licensee
1.Transmission
Charges of STU.
2.Transmission loss of
STU
3. Wheeling Charges of
distributior)_ licensee
no 1. "
4.[Hstribution loss of
distdbution licensee
no i
: ;'.5.W,h~ee!ing; C~arges of
distribution licensee
no 2.
6.Distribution loss of
·•
•
124 (49)
Table-5
Applicable Charqes and enerq\ Losses
s. Inter-se location of drawal and Injection Drawal Applicable Charges
No. injection point Point point
distribution licensee
no 2
9. In different State As applicable Out of !.Applicable charges
(Inter State open access) State as per type of
transaction mentioned
above
2.The transmission
charges and/or
wheeling charges and
energy losses of CTU
and STU/licensees of
the other State
34. Billing, Payment, Collection and disbursement of charges
( 1) Unless specified otherwise in detailed procedure or in any other order
issued by the Commission, the bills against charges mentioned in
regulation 33 ( other than UI charges) shall be prepared by the respective
nodal agency and shall be disbursed to the respective licensee /SLDC
/open access customer as the case may be before the 5th day of the
succeeding calendar month.
(2) The distribution licensee and all other open access customers as the case
may be, shall pay the charges within seven days from the date of issue of
the bill.
(3) The open access Charges for use of State grid and fees and charges of
"",," SL.:bC ''shaH · be disbursed by the nodal agency to the licensee/SLPC
r,, ,, .,..... .I .-,.-,.,..,I"",,.,'
concerned, within 5 working days after completion of the billing cycle on
receiving the same from the open access customers.
124 (SO) €9'1ifPli1> ~, ~ 4 -qrcf 2011
(4) If payments against the open access charges are not made within the due
date as mentioned in the bill issued by the nodal agency, the defaulting
open access customers shall have to pay simple interest @ 0.04% for
each day of delay.
(5) If the nodal agency does not disburse the payment received from open
access customers to the licensee/SLDC within five working days after
completion of the billing cycle, the nodal agency shall have to pay simple
interest@ 0.04% for each day of delay.
(6) In case any open access customer exclusively uses the facilities of inter
State transmission system (CTU · or other inter-State transmission
licensee) the surcharge shall be collected by CTU or other inter-State
transmission licensee as the case may be and shall be paid to the
distribution licensee in whose area the consumer is located.
35. Security deposit for payment
( 1) Long-term open access customers
(-2)
. .
All long-term open access customers shall be required to open Letter of
Credit (LC) for 105% of estimated applicable average monthly billing for
charges mentioned in Regulation 30 in favour of nodal agency. In addition
to opening of Letter of Credit (LC) the long-term open access customer
would provide security in the form of irrevocable Bank 'Guarantee (BG), in
favor of nodal agency, equivalent to two months estimated applicable
average mo·nthly billing, three months prior to the scheduled date of
connectivity. Initially the security mechanism shall be valid for a minimum
period of three (3) years and shall be renewed from time to time.
The payment security mechanism for the State distribution licensee using
the network of State Transmission Utility shall be governed by the
transinl~sion ser..r.fite: ~greement executed between the utilit'ies;. . ·.
Medium _;term ope.n access customers
' . , .,, . .
After signing of _the Medium Term Open Access fgreemen.t (MTOA), the
' . ~ ,'.' •·. . i_· , . -. . .
'~ · · · applicant shall submit a Bank Guarantee (BG.) to nodal agency equivalent
:J:'G~·i.J<tc3ll'ftsf1mateaitlaitpl_i,fijt5!~1fa·e~~s ofjty..r,o. •;fL10flth?fVViJ;l]in,~Q,s1day~.Jrom· the
. .· . ,, . . ... , ··r ·. • . . .
grant 'of MTOA. Tne estimated average ,opeh ~ccess .charges would be ·
r~viewed ever"y six.lJ}Oflths/MTOA, pef:iod whitnever'.;is·less aod.accordingly
::_ ,--.~··,~ ~ .. ~.~·- .
:"ii-·',\, ~
.. ".42?>:·2:~·
•
..
m-ih-i11~ m, ~ 4 m1:f 2011 124 (51)
the amount of Bank Guarantee would be enhanced/reduced by Medium
term customers.
(3) Payment security for UI charges
The payment security for UI charges shall be governed by the (Intra-State
ABT, Unscheduled Interchange charges and related matters) Regulations
to be notified by the Commission and as amended from time to time.
36. The intra-state user or any intra-state entities using the State grid
including such system when it is used in conjunction with inter-state
transmission system (availing intra-State and/or inter-State open access)
defaults in payment of Unscheduled Interchange charges, the SLDC shall
follow up with concerned open access customer under intimation to State
distribution licensee and shall inform RLDC also in case of inter.:.state open
access.
The intra-state user or intra-state entity using the State grid including
such system when it is used in conjunction with inter-state transmission
system (availing intra and/or inter-state open access) defaults in payment
of Unscheduled Interchange charges for two weekly billing : cycles, the
SLDC, shall not schedule, in case of intra-state open access arid withdraw
the consent in case of inter-State open access under intimation to open
access customer and distribution company. In case of inter-State open
access, intimation of withdrawal of consent shall also be given to RLDC,
for taking further necessary action at its end .
In case of prolonged default in payment of the charges specified under
these regulations or UI charges, the licensee or SLDC may, approach the
Commission.
37. If any open access customer or intra-state user using the State grid
including such system when it is used conjunction with inter-state
transmission system defaults in payment of any open access charges due
from him to the licensee or SLDC, the licensee may initiate. action such as
disconnection with the State grid or any other suitable action under
provision of Act or State grid code or any other regulations after giving
due notice and following necessary procedures.
124 (52)
38. Sc::heduling :
,Jffiflll~ ~, ~ 4 lTT1'r 2011
PART9
Miscellaneous
(1) Notwithstanding anything contained in the succeeding Regulatfons of this
regulation, scheduling of all types of inter-State open access transactions
shall be as specified by the Central Commission.
(2) For long-term open access customers and medium-term open access
customers the provisions of the State Grid Code, as amended from time to
time, shall be applicable for declaration of capacity and_ scheduling for
intra-State open access transaction.
(3) For short-term open access customers, the scheduling procedure shall be
as specified by the Commission in CSERC (Intra-State ABT, Unscheduled
Interchange charges and related matters) Regulations, as amended from
time to time for intra-State open access transaction.
39. Curtailment
(1) When for the reason of constraints in the State grid or in the interest of
grid security, it becomes necessary to curtail power flow on a State Grid,
the transactions already scheduled may be curtailed by the 6tate Load
Despatch Centre.
(2) Subject to provisions of the Grid Code and any other regulation specified
by the Commission, the short-term open access customer shall be
curtailed first followed by the medium-term open access customers, which
shall be followed by the long-term open access customers and amongst
the customers of a particular category, curtailment shall be carried out on
pro rata basis. ,
(:3), ·· The reservation· of transmission capacity to the .short-term ·open access
customer may be reduced or cancelled by the SLDC, if Government of
':. India I Governmer:it of Chhattisgarh allocates power from the Central . ' .,~
. -,-!'.",! -
v1t,G,:i'l;~enerating·'.6tation(,s}.:r/ 1State··.Gener?tir;i.9; ~ta_ti.o,Q.{s)/;~!'~~/P:~~2, as the
c~se may pe, in an area to a person in· another area· and such allocation,
in the opinion of the SLDC, cannot otherwise be implemented due to
-
124 ( 53)
congestion in the transmission link. If the SLDC decides to reduce or
cancel capacity reserved for a short-term open access customer under this
Re~ulation, it shall, as soon as possible, intimate the short-term open
access customer concerned of its decision for its implementation to reduce
or cancel transmission capacity.
( 4) In case of curtailment of more than 50% of the reserved transmission
capacity by the SLDC, on any particular day, on account of transmission
constraints or constraints in distribution network, the transmission
char;ges and /or wheeling charges as the case may be for that day shall be
payable by the short-term customers on pro rata basis in accordance with
the transmission and /or distribution capacity actually provided.
Provided that operating charges shall not be revised in case of such
curtailment.
40. Non-Utilization or excess utilization of reserved capacity by Open
Access Customer
(1) In case an open access customer is unable to utilize, full or substantial
part of the reserved capacity, he shall inform the nodal agency along with
reasons and period for his inability to utilize the reserved capacity and
.,
shall surrender the non-utilized capacity.
(2) The short term open access customer, who has surrendered the non
utilized capacity under Regulation ( 1) above shall bear the transmission
and/or wheeling charges, the fees and charges of SLDC and all other
applicable charges based on the original reserved capacity for seven days
or the period of reservation surrendered, as the case may be, whichever
period is shorter.
(3) The transmission/distribution capacity becoming available as a result of
surrender by the open access customer under regulation (1) may be
reserved for any other open access customer in accordance with these
regulations.
( 4) The SLDC shall prepare a quarterly report of open access transactions
indicating 'the ·capacity utilization trend .. of 'rese'rved· transmission capacity
by the open access customers ·and submit it before the Commission.
124 (54) ih'flf!ll~ m, ~ 4 ~ 2011
(5) The provisions for preventing gaming and misuse of State grid during real
time operation by the open access customers shall be specified by the
Commission in CSERC (Intra-State ABT, Unscheduled Interchange charges
and related matters) Regulations as amended from time to time.
(6) The Commission may, either suo motu or on a petition filed by the SLDC
or licensee, initiate proceedings against any open access customer on
charges of misutilization of allotted capacity/reserved capacity and if
requirG.d, may order an inquiry in such manner as decided by the
Commission. When the charges of misuse of allotted capacity/reserved
capacity is established _in the above inquiry, the Commission may, without
prejudice to any other action under the Act or regulations there under,
reduce or cancel the reserved capacity of a open access customer
41. Grid Discipline and Quality of Supply
(1) The licensee must make all reasonable endeavors to ensure that the
quality of supply standards as prescribed by the Commission under
section 57 of the Act, the Indian Electricity Grid Code and the.
Chhattisgarh State Electricity Grid Code are met in respect of all open
access customers of its network, to the extent these quality parameters
are applicable to such customers.
_ (2) The open access customer shall abide by the Indian Electridty Grid Code,
the State Grid Code and the instructions given from time to time by the
STU /licensee/SLDC.
42. Detailed Procedure for implementation
(1) Subject to the provisions of these regulations, the State Transmission
Utility after consultation with distribution licensee and SLDC shall submit
the detailed procedure within 60 days of notification of these regulations
in the Official Gazette to the Commission for approval. The detail
procedure shall be approved after inviting suggestion/ comments from all
the affected parties for implementation.
(2) The detailed procedure shall, in particuJar, include-
(a) The proforma for the connection agreement, referred to in
regulation (3) of Regulation 10 above.
"
124 (55)
(b) The proforma for the long-term open access agreement referred to
in regulation 17 above:
Provided that the Transmission Service Agreement issued by the
Central Government as part of standard bid documents for
competitive bidding for transmission in accordance with section 63
of the Act shall be a part of this Agreement along with necessary
changes;
Provided further that in case transmission system augmentation is
undertaken through the process of competitive bidding in
accordance with section 63 of the Act, the Transmission Service
Agreement enclosed as part of bid documents shall be used as a
part of the proforma agreement to be entered into between the
applicant and the State Transmission Utility for long-term open
access.
( c) The time line for phasing of construction/modification of the
transmission elements by the State Transmission
Utility/transmission licensee and/or distribution licensee, as the
case may be, and the coming up of generation facilities or facilities
of bulk consumer, as the case may be shall be such as to match
the completion times of the two;
(d) Aspects such as payment security mechanism and bank guarantee
during the period of construction and operation:
(e) The proforma for the medium-term open access agreement,
referred to in 24 above.
(f) Provisions for collection of the open access charges for intra- State
transmission system and/or distribution system from the long-term
customers or medium-term customers, as the case may be, by the
transmission licensee or the State Transmission . Utility or
distribution licensee as and when so designated in accordance with
the regulation 34 hereof and disbursement to the State
Transmission Utility and/or the transmission licensees or
distribution licensee as the case may be.
(g) Formats for short-term o'pen access.
l.
124 (56) ffcth-1•1~ m, ~ 4 l-!'fcf 2011
43. Redressal Mechanism
All disputes arising out of or under these regulations shall be decided by
the Commission on an application made on this behalf by the person
aggrieved.
44. Information System
The nodal agency shall post the following documents / information on its
website in a separate web-page titled "Long-term open access, Medium
term open access and Short-term open access information":
(a) These regulations;
(b) Connection Agreement and open access agreement;
( c) List of applications where approval for connectivity or long-term
open access or medium-term open acce~s or short-term open
access, as the case may be, has not been granted during the year
along with reasons thereof.
(d) List of applications, separately, for long-term open access, medium
term open access and short-term received by the nodal agency
whose cases are under process of approval along with necessary
details ..
(e) Separate lists for long-term open access , medium-term open
access and short-term open access granted indicating-
(i) . Name of customer;
(ii) Period of the r1c:r.ess granted (start date and end date);
(iii)
(iv)
(v)
(.~i)
Point or points of injection along with voltage level;
Point or points of drawal along with voltage level;
__ , .. .
Transmission systems and/or distrib~ti~n system used
'ff''." .: '
Provid~d furtlien~hat it shall be i1 constant endeavor of the nodal
agency to take-ste·ps in·accordance with t'tie requiremenfs herein to
provide as much information ·suo · motu · to the p't:Jblic · at regular
,.
-· ?i-.:.,/~
..
124 (57)
intervals through various means of communications, including
internet, so that information is disseminated widely and in such
form and manner which is easily accessible to the public
45. Repeal and Savings
(1) On commencement of these Regulations, the Chhattisgarh
Electricity Regulatory Commission (Intra-State Open Access in
Chhattisgarh) Regulations, 2005 and amendments notified shall
stand repealed.
(2) Notwithstanding anything contained in Regulation (1), long-term
open access granted in accordance with the Chhattisgarh Electricity
Regulatory Commission (Intra-State Open Access in Chhattisgarh)
Regulations, 2005 shall continue to be valid till the expiry of the
term of long-term access.
By order of the Commission,
N. K. RUPWANI, Secretary .
124 (58) g:a,fPI~ m, ~ 4 -i::fR 2011
Raipur, the 4th March 2011
No. 36/CSERC/2011. -Section 86(1)(e) of the Electricity Act, 2003 (the
Act) mandates the State Commission to promote co-generation and generation
of electricity from renewable sources of energy by providing suitable measures
for connectivity with the grid and sale of electricity to any person, and also
specify, for purchase of electricity from such sources, a percentage of the total
consumption of electricity in the area of a distribution licensee.
The National Electricity Policy has emphasized urgent need to promote electricity ..
generation based on such sources of energy. The Tariff ::>olicy also provides that ..__
pursuant to the provisions of section 86(1)(e) of the Act, the SERCs shall fix a
minimum percentage for purchase of energy from such sources taking into
account availability of such sources in the region and its impact on retail tariffs.
Ministry of New & Renewable Energy (MNRE), Govt. of India has developed
conceptual framework for Renewable Energy Certificate (REC) mechanism that
will facilitate inter-State transactions bast~d on electricity generation from
Renewable Energy (RE) sources which wiil CiiJb!,2 the obligated entities to fulfil
their obligation to purchase power gen1:::rat:?d from renewable energy sources
and also specified provision of soiar &. non-solar REC. Further, based on the
above, Forum of· Regulators (FOR) has circulated model regulations for REC
framework to be considered by State Commissions.
Keeping the above in view, the Chhattisgarh State Electricity Regulatory
Commission, in exercise of the power vested to the Commission under section
86(1)(e) of the Act read with section 181 of the Act, hereby makes the following
regulations regarding renewable purchase obligation and rmplementation of REC
framework.
CHHATTISGARH STATE ELECTRICITY REGULATORY COMMISSION
, .. · . (RENEWABLE PURCHASE OBLIGATION AND REC FRAMEWORK
· IMP:I: .. EMENTATION) REGULATIONS,. 2011
· · ·· '· ·: : 1,., · ·· ,short :Title,' E>Ct\!fit/air10:. Co~mencement;. ..
·1: 1 · ,: • ... · These Regulatitins shrtll be. ca!fod the Chhattisgarh State ·Electricity
· ·Regulator;y- tom mission (R€;newable · Purchase Obligation and REC
frameworkI111plementation) -Regu!£1tio'ris,·2011.··
.•
·• L2. These.: r;,:egplapons shat! extend to the whole of the State of .
Chhattisgarh.
'·"'/•· . .-
...
..
..
.,.
124 (59)
1.3 These Regulations shall come into force from the date of notification
in the Chhattisgarh Gazette (Rajpatra).
2. Definitions
2.1 In these Regulations, unless the context otherwise require~:
I. "Act" means the Electricity Act, 2003 (36 of 2003), including
amendments thereto;
II. "Captive User" shall have same meaning as defined in rule 3(2) of
Electricity Rules 2005;
III. "Central Agency" means the agency as the Central Commission
may designate from time to time;
IV. "Central Commission" means the Central Electricity Regulatory
Commission referred to in sub-section (1) of section 76 of the Act;
V. "Certificate" means the Renewable Energy Certificate (REC) issued
by the Central Agency in accordance with the procedures prescribed
by it and under the provisions specified in the Central Electricity
Regulatory Commission (Terms and Conditions for recognition and
issuance of Renewable Energy Certificate for Renewable Energy
Generation) Regulations, 2010;
VI. "Commission" means the Chhattisgarh Electricity Regulatory
Commission as referred in subsection (1) of section 82 of the Act;
VII. "Existing RE Project" means the renewable energy project whose
date of commercial operation (COD) falls prior to date of notification
of these Regulations;
VIII. "Floor p_rice" means. the. minimum pric~ as determined by the
Central Com~ission in accordance with Centrai Electricity Regulatory
Commission (Terms and· Conditions for recognition and issue of
Renewable energy Certificate for Renewable Energy Generation)
Regulations, 2010, as. amended from time to time, at and above
which the Certificate can be dealt in.the power exchange;
IX. "Forbearance price". means the ceiling. price as determined by the
Central Commission in accordance with the Central Electricity
Reg.ulatory Commission {Terms and Conditions for recognition and
issue of Renewable Energy Certificate for Renewable Energy
124 (60)
Generation) Regulations, 2010, as amended from time to time,
within which only the Certificate can be dealt in power exchange;
X. ·"New RE Project" means the renewable energy project whose date
of commercial operation shall be on or subsequent to the date of
notification of these Regulations;
XI. "Power Exchange" means any exchange operating as the power
exchange for electricity in terms of the order(s) issued by the Central
Commission;
XII. "Obligated Entity" means the distribution licensee(s), user(s)
owning captive power plant(s), open access consumer(s) including a
open access consumer meeting part of energy from distribution
licensee & part through open access in the State of Chhattisgarh,
who have to mandatorily comply with renewable purchase obligation
under these Regulations subject to fulfilment of conditions outlined
under Regulation 3;
XIII. "Quantum of purchase" means the share of el~ctricity from
renewable sources required to be purchased by obligated entity(s),
expressed on a percentage of its total consumption, as specified in
these regulations. The quantum would be the sum of all direct
purchase from generating stations based on renewable sources.
XIV. "Renewable Energy Sources" means renewable sources such as
hydel, wind, solar, biomass including bagasse, bio fuel cogeneration,
urban or municipal waste and such other sources as recognized or
approved by MNRE;
XV. "Small Hydel Plant (SHP)" means hydel power station with an
installed capacity upto and including 25 MW, which includes mini
hydP.I r:1nd micro hydel plants.
XVI. · "State" means the State of Chhattisgarh.
XVII. "State Agency" means the agency designated by theiCommission
from".tim'e \to time to act" as the • agency for accreditation and
recommending the renewable energy projects for registration and to
undertal<e'fur:ittions und-er th~se;·Regulations; ·
, 'XVIII. ;"Year" mea'ns a financial year-.
..
124 (61)
2.2 Words and expressions used and not defined in these Regulations but
defined in the Act shall have the meanings assigned to them in the Act.
Expressions used herein but not specifically defined in these
Regulations or in the Act but defined under any law passed by a
legislature and applicable to the electricity industry in the state shall
have the meaning assigned to them in such law. Expressions used
herein but not specifically defined in the Regulations or in the Act or
any Law passed by a competent legislature shall have the meaning as
is generally assigned to them in the electricity industry .
3. Obligated Entities and Operating Period:
The minimum percentage as specified under Regulation 4.3 shall be
applicable to all Distribution Licensees in the State of Chhattisgarh as well
as to open access consumers and captive users within the State of
Chhattisgarh, subject to following conditions:
I. Any person who is a captive user (from other than renewable energy
based power generating plant) with connected load of 1 MW and above
( or such other capacity as may be stipulated by order( s) of the
Commission from time to time); shall be subjected to minimum
percentage of Renewable Purchase Obligation (RPO) to the extent of its
consumption met through such captive source.
II. Any person having a contract of not less than 1 MW and who consumes
electricity procured from other than renewable energy source based power
generation through open access as per Section 42(2) of t_he Act or co
located shall be subjected to minimum percentage of RPO to the extent of
its captive consumption. Energy purchased through open access or
through co-located renewable energy source based power generating
- plants shall be accounted for energy under RPO.
- III. Any open access consumer who also avails part of its power requirement
from distribution licensee shall also be subjected to minimum percentage
of RPO to the extent of his consumption met through such open access
source.
/.
124 it .. ,
Provided that the Commission may, by order(s), revise the minimum capacity
referred to under sub-clause (I) and sub-clause (II) above from time to time.
The RPO framework outlined under these Regulations shall commence from
the date of notification of these Regulations and shall generally be applicable
until March 31, 2013 (i.e., upto the financial year . 2012-13). The RPO
specified for the Financial Year 2012-13 shall be continued beyond 2012-13
till any revision is effected by the Commission in this regard.
4. Quantum of Renewable Purchase Obligation (RPO) for Obligated
Entity.
4.1 Licensee(s) shall purchase a minimum percentage of their total
consumption of electricity from renewable energy sources, during a
financial year in their respective areas of distribution, from the power
· stations generating electricity from various renewable sources of
energy.
4.2 Similarly, Captive user(s) and Open_ Access consumer(s) coming under
the definition of obligated entity shall purchase a minimum percentage
of • their total consumption of electricity from renewable energy
sources, during a financial year
4.3 The defined minimum percentages of RPO are given below in the
Table 1.
Table 1: Minimum quantum of electricity to be procured by
· Obligated Entity as percentage of total consumption
Year Solar Non Solar Grand
Total
Biomass Other RE! Total
(hydel, wind
'
etc)
2010~11 0.25?/o 3.75% 1.00% 4.75% 5 .. 00% , .. ,. : ·, f,-.
, ·,~ :0
~· ~ f,'.' }? •· ..
. -2011:--12
-,-...... ::..;ol·· .. I :. ;
0.25% .. . 3.75% . 1.25% . 5.00% -,5.25%
;,2012:-'13 ~0;50°,lo a
3.75% ~1.50% 5.25% ·s.75%
4.4
g-ah-l•I~ m, ~ 4 l-Jri;f 2011 124 ( 63)
Provided that subject to the ·overall purchase obligation, the obligated
entities may, for sufficient reasons and with the approval of the
Commission, vary the percentage of purchase from one or more of
renewable sources of energy and make good the shortfall in purchase
from one source by purchase from another source only for the year
2010-11. In the subsequent years (after year 2010-11), the obligated
entities may make good the shortfall in purchase from one source to
another source only within non solar renewable energy sources.
Provided further that such obligation to purchase renewable energy
shall be inclusive of the purchases, if any, from renewable energy
sources already being made by the obligated entity concerned.
Provided also that the power purchases under the power purchase
agreements (PPA) for the purchase of renewable energy sources
already entered into by the distribution licensees shall continue to be
made till their present validity, even if the total purchases under such
agreements exceed the percentage as specified herein above._
Provided further that the Distribution Licensees shall include the plan
for procurement of power from RE sources under its long-term power
procurement plan to comply with minimum RPO target as stipulated
above.
Such purchase shall be made at tariffs determined by the Commission
from time to time. Purchase already contracted by the licensees as per
the orders of the Commission for biomass-based power plants, small
hydel plants or solar power plants in the State shall be reckoned for
the purpose of the purchase obligation given above.
4.5 While indicating the quantum of purchase from renewable sources, the
distribution licensee(s) shall indicate the sources from which purchase
of the specified quantum is planned. The distribution licensee(s) shall
as far as possible shall source the proposed quantum of electricity from
renewable sources within their respective areas of supply. However,
non availability of such sources in . .the distribution licensee's area will
' 4,~., ,.... :. - . ,- ,,... . ~ --. .
not be accepted as a ground for exemption from the purchase
124 (64) m·ilwr~ m, ~ 4 llfi'.f 2011
obligation or for reduction in the quantum required to be purchased as
per these regulations.
4.6 Every "Obligated Entity" may meet its RPO target by way of its own
generation or procurement of power from RE developer or by way of
purchase from other licensee or by way of purchase of Renewable
Energy Certificate (REC) or by way of combination of any of the above
options.
4. 7 While contracting new sources, priority st:all be given to the date of
commercial operation of the generating stations.
4.8 The obligated entity may ensure adequate payment security
mechanism for purchase of energy from renewable sources.
4.9 The Commission shall review the purchase obligation from renewable
sources of obligated entity(s) after three years. The purchase
obligation as under clause 4.3 above shall be valid till it is revised by
the Commission.
4.10 Non-compliance of purchase obligation under clause 4.3 shall be
treated as a violation of these regulations and punishable under the
provisions of Section 142 of the Act.
5. Certificates under the Regulations of the Central Commission
5.1 Subject to the terms and conditions contained in these Regulations,
the Certificates issued under the Central Electricity Regulatory
Commission's (Terms and Conditions for recognition and issuance
of Renewable Energy Certificate for Renewable Energy Generation)
Regulations, 2010 shall be the valid instruments for the discharge
of the mandatory obligations set out in these Regulations for the
obligated entity to purchase electricity from rem~wahlP. P.nP.rgy
sources.
Pr_ovided that in the event of the obl_igated entity fulfilling the
ren~~able ,p,tir_~~ase obligation by PU[Chas~ of ~ertiflfat~s, the
.,., obligati9n;1 !o ... , ,.~urch~se .. electricity_ fror:n g.e.~eratio~~~ ,basJ;d on
·,,, · . • . :. renew.able en~rg\(other tha·h solar can be fulfi!!ed by piJrcnase of
"(--':' . ..1t,".r.'-, ....,..,...,..,,_ Vt.,L! ,~, l-'~·••~L·..1~' .J\.J :l_) , ... ~. t,..'.·_,_._.~;-,J,,...,1 'U....IJ'\.~;_., .... J.._, 11t'..J(,_';i/,;::, ·.,' I'
_. ,non~~ol~r. cen;ificate~.and the .9bligation, to P,urch9se el~ctricity from
., •'..- • ,·....,, . • . ' . ! '
generation based on solar as renewable energy source can be
.. _
X
124 (65)
fulfilled by purchase of solar certificates only during the control
period except for the year 2010-11.
5.2 Subject to such direction as the Commission may give from time to
time, the obligated entity shall act consistent with the Central
Electricity Regulatory Commission's (Terms and Conditions for
recognition and issuance of Renewable Energy Certificate for
Renewable Energy Generation) Regulations, 2010 notified by the
Central Commission with regards to the procurement of the
certificates for fulfilment of the RPO under these Regulations.
5.3 The photocopy of Renewable Energy Certificates ( duly attested by
any charted account) purchased by the obligated entity from the
power exchange in terms of the regulations of the Central
Commission mentioned in clause 5.1 and 5.2 of these Regulations
shall be produced by the obligated entities to the Commission
within 15 days of its purchase.
6. State Agency
6.1 An agency designated by the Commission is the State Agency for
accreditation and recommending the renewable energy projects for
registration shall undertake functions under these Regulations.
6.2 The State Agency shall function in accordance with the directions
issued by the Commission and shall act in accordance with the
provisions of the Central Electricity Regulatory Commission (Terms
and Conditions for recognition and issuance of Renewable Energy
Certificate for Renewable Energy Generation) Regulations, 2010.
6.3 The State Agency shall develop suitable protocol for collection of
information from various sources such as renewable energy
generating companies, obligated entities, SLDC, chief electrical
inspector etc., on regular basis and compile such information to
compute the compliance of RPO target by such Obligated Entities.
6.4 The summary statement of RE procurement and RPO compliance by
different Obligated Entities shall be published by the State Agency
on cumulative basis quarterly by'lSth of next month on its website.
124 (66) wt=ilf-PI~ ~, ~ 4 ~ 2011
7.
6.5
6.6
6.7
The State Agency shall submit quarterly status by 15 th of next
month to the Commission ir:, respect of compliance of renewable
purchase obligation by the obligated entities in the format as
stipulated by the Commission and may suggest appropriate action
to the Commission, if required, for compliance of the renewable
purchase obligation.
The Commission may from time to time fix the remuneration and
charges payable to the State Agency by an order for discharge of
its functions under these Regulations if required.
If the Commission observes that the State Agency is not able to
discharge its functions satisfactorily, it may by general or special
order, and by recording reasons in writing, designate any other
agency to function as State Agency as it considers appropriate.
Distribution Licensee(s) ...
7.1 Each distribution licensee shall indicate, along with sufficient proof
thereof, . the estimated quantum of purchase from renewable energy
sources for the ensuing year 1n tariff/ annual performance review
petition in accordance witl1 Regulations notified by the Commission.
The estimated quantum of renewable energy purchase shall be in
accordance with clause 4.3 of these Regulations of the approved power
purchase quantity for the ensuing year(s). In the event of the actual
consumption in the license area being different from that approved by
the Commission, the RPO in MUs shall be deemed to have been
modified in accordance with percentages fixed in clause 4.3 of these
Regulations. If the distribution licensee is unable to fulfil the obligation,
the shortfall of the specified quantum of that year would be added to
the specified quantum for the next year.
7.2 If the distribution licensee fails to fulfil the minimum quantum of
purchase from renewable energy sources, it shall be liable for action as
per clause 9 of these Regulations.
r~-f:_ ~;',J_-. · · 'is~ - ,Captive,11User(~)raa,d~'Open;,Access .Consumer.(~l·~·,_,.;J e
... , ,·.;-·,• 1J;,,.nr-n hpr:::;,,c;;p r,t ni"ln•;)'1i\Hbl)fHfv c,c ~.,t;.f: .. · pY> .-,~,;.i; • , ,.
··• 8.1 _ T,he quantul)1 of RPO" mentioned in clause 4.3 :of these Regulations shall
f be applicable to, c:apt,fve, user(s) arnf open access consumer(s) from the
I
....
124 (67)
date as would be ::otified in the Official Gazette. Captive user(s) and
open access· consumer(s) may fulfil its RPO through the Renewable
Energy Certificates as provided in clause 4 above.
8.2 Every Captive user(s) and open access consumer(s) shall have to
submit necessary details regarding total consumption of electricity and
purchase of energy from renewable sources for fulfilment of RPO on
quarterly basis to the State Agency .
. , 8.3 If the Captive user(s) and Open Access consumer(s) are unable to fulfil
9.
the criteria, the shortfall of the targeted quantum would attract
compensation as per clause 9 of these Regulations.
Consequences of default
9.1 If an obligated entity does not fulfil the renewable purchase obligation
as provided in these Regulations during any year and also does not
purchase the RECs, the Commission may direct the Obligated Entity to
maintain a separate fund for such amount as the Commission may
determine on the basis of the shortfall in units of RPO and the
forbearance price decided by the Central Commission.
Provided that the fund so created shall be utilised, as may be directed
by the Commission.
Provided that the obligated entities shall not be authorized to use the
fund created in pursuance of the above, without prior approval of the
Commission.
Provided further that the Commission may empower an officer of the
State Agency to procure from the Power ExchangE: the required
number of certificates to the extent of the shortfall in the fulfilment of
the obligations, out of the amount in the fund.
Provided also that the obligated entity shall be in breach of its RPO
Obligation, if it fails to deposit the amount directed by the Commission
within specified time from the communication of the direction .
- ........ ~
. Provide<;I that in case of any genuine difficulty in complying with the
.~; ~- C"'"" ~ . ~ -.
renewable purchase obligation because of non-availability of power
from renewable energy sources or the RECs, the obligated entity can
124 (68) gffifllJ<f: ~, fuajcf) 4 ~ 2011
approach the Commission to carry forward the compliance requirement.
to the next year only.
Provided further that where the Commission has consented to carry
forward of compliance requirement, the provision regarding creation of
such fund as specified above shall not be applicable.
10. Non Availability of Renewable Energy Certificate
10.1 In the event of non compliance of the RPO by distribution licensees by
any of the modalities as specified above as per· the orders of the
Commission, from non-solar renewable energy plants or solar power
plants in the State, the distribution licensee whose purchase of
renewable energy is maximum during the year shall be compensated
by other distribution licensees so that percentage of renewable energy
consumption by all the distribution licensees functioning in the State
become equal.
Explanation - for the pur·pose of this Regulation, the compensation
shall mean the sharing of differential of average cost of RE power
purchase and average cost of Non RE power purchase of distribution
licensee, which is to ·be compensated for the year under consideration
calculated as per following example. For the example the year under
consideration for RPO has been taken as year 2010-11;
Name of Annual Applicable RE RPO Total 0/o RPO Eq. MUs Shortfall of
the energy RPO to be actual actually actual of year for actual
licensee . consump met purcha met for RPO 2010- differential purchase of
tion of including sed year 2010 purchase 11 met cost RE
FY 10- solar & during 11 during for the by end computati considering
11, MUs non solar FY 10- FY 2011- FY 2010· of year on ilctual
for FY 10- 11, Mus 12, MUs 11 at the 2011- average
11, MUs end of FY 12 RPO, MUS
2011-12,
MUs
A B= A*5% C D E= C+D F= E/A G= A* % of H=G-E
,· ("f_E/2A)
Licensee -A 15000 750 600 5 605.0 4.0% , 585.5 --19.5 -·
Licensee -B 700 35 4
..
7 11.0 1.60/c
...
27.3 16.3
Licensee -c. -~ 210 10.5 2 .3 5.0 2.4°/c .. 8.2 3.2
Total
" 15910 795.5 600 15 621.0 3.9% 621.00
, ,t, ·•" l ... , . ,,, .. :: .. , ~ .. · .•. , - . , . , . • .
Annual energy consumption by tt;iree-licerisees -for-the':.year,, 2010-1 Lis
'1'59'f6 Mu's'v(t'o'fa·1 of :three ilcensees-A;· ff"& C). arid tota·1 actu'al RE
'· . .
, ,:••. • {_ ~ ..,, .,' ·• • r '\
purchased by all the licensees for the year 2010-11 is 621 MUs i.e.
....
"'
"
124 ( 69)
together all the licensees have met 3. 9% RPO in the State, where as
RPO percentage target for the Year 2010-11 is 5%. Individually
licensee-A, B & C could finally make RPO as 4%, 1.6% & 2.4%
respectively for the year 2010-11 by all the modes of RE purchase as
specified above, which is well below the RPO target.
Though none of licensee could meet the RPO for the year 2010-11, it
will be proper that licensee-A, which has procured more than average
RPO purchased during the year, should be paid differential cost by
other licensee(s) who met RPO lesser than average during the year
(3.9%). The sharing obligation will be (-)19.5 MUs for licensee-A,
16.3 MUs for licensee-B and 3.2 MUs for licensee-C. Licensee-B will
pay to licensee -A equivalent to 16.3 MUs at the rate of differential of
average cost of RE power purchase and average cost of Non RE power
purchase by licensee - A for year under consideration i.e. 2010-11.
Similarly licensee-C will pay for 3.2 MUs to licensee-A at the rate of
differential of average cost of RE power purchase and average cost of
Non RE power purchase by licensee - A for year under consideration
i.e. 2010-11.
Further if average cost of RE purchase for the year 2010-11 in respect
of distribution licensee- A is Rs. 5.40 per unit and average cost of non
RE purchase by distribution licensee- A is Rs. 3. 90 per unit than
differential cost will be Rs. 1.50 per unit (5.40-3.90). Licensee- B will
pay to licensee -A Rs. 244.83 Lakh (16.3 MU X 1.5 Rs./kWh).
Similarly licensee -C will pay to licensee -A Rs. 47.95 Lakh (3.2 MU X
1.5 Rs./kWh).In case the average cost of RE purchase in respect to
licensee-A is iesser than the average cost of non-RE purchase, then no
compensation will be payable to licensee-A by licensee-B and
licensee-C.
The above payments will be made as per the directions of the
Commission and will be considered in Annual Revenue Requirement of
concerned licensee.
11 .. , ,P.riority for Gr.id C_onnectiyity1 ... ·,; ,.... , , "7 ,., •• _
· 11.1 Any person- generating electricity from renewable ener.gy sources,
irrespective of installed capacity, shall have priority for open access,
I
i--
124 (70)
connectivity with distribution system or grid as the case may be. On
an application from such person, the transmission licensee or
distribution licensee shall provide appropriate interconnection
•
. facilities, as far as feasible, before commissioning of the renewable
energy project. Such interconnection shall follow the grid connectivity
standards as specified in the Indian Standard Grid Code, State Grid
Code and/or the manner prescribed by the Central Electricity
Authority.
12. Renewable Energy Pricing
12.1 All the new renewable energy projects commissioned during the
Control Period as specified above, shall have an option of following
either the tariff structure and other conditions as stipulated in the
Chhattisgarh State Electricity Regulatory Commission (Terms and
Conditions for determination of generation tariff and related
matters for electricity generated by plants based on non
conventional sources of energy) Regulations, 2008 and its
review/amendments from time to time and/or adopt the REC
mechanism for pricing of the electricity generated from the project.
Provided that such a renewable energy generating plant having
entered into a power purchase agreement for sale of electricity at a
preferential tariff shall not, in case of premature termination of the
agreement, be eligible for participating in the Renewable Energy
Certificate (REC) scheme for a period of three years from the date
of termination of such agreement or till the scheduled dntP of
expi, y of power purchase agreement whichever is earlier, if any
;.,. .. ' ~._,,
order or ruling is found to have been passed by an Appropriate
Commission_ or a competent court against the generating company
.. -•,, ·~fi -,~- . . .· ... ·,, . " . . .':,. J, • ·;... •
for material breach of the terms and conditions of the said power
.. ,· •• . f;! ,,:--
·purchase, ag·reement. ·
. .··v:-. '
Prf>Videlthat such projects that op_t for either preferential tariff or
. ~ • ., .,;., .• ,.,'·"~·tott• ~- ,.,.,,;.·_.,r - ... :_., .... -r~~••v; .Jr~::,~___:_:_~~~·,..,,,,,_,~ --~~~ .. ·J<S.J,..r .. 4\',•4'~·~:~• . .;., ~-,) --~ ::. ·r:, "'.(,
• ·· ~~E~ meGl,anisrp o·r the· mix t_here·~of, ·shall have 1to~c6ntinue with the
~~•-. < ',.~;:,,t:1\r ..r.tc._ ••":':r•/'"',"'-,..-.,_'.· 1· ••-- •-· .,.,. ...... ,;~ .,, .... ~. •.:,.o-•w• ,·.•
selected pricing mechanism for the e,:itire Tariff Pe'f-iod or until
'! ;\ ~: • -.::: " :•' :,;_ -:~ :;--~.. . .,•. r~ ... . . . . !) .. . - . .. _, : . ·. ·.
validity: ot:PPA:· whichever is later, as 6otli~ed 'under- Chhattisgarh
le
State Electricity Regulatory Commission (Terms and Conditions for
determination of generation tariff and related matters for electricity
generated by plants based on non-conventional sources of energy)
Regulations, 2008 and its review/amendments from time to time.
Provided further that such new renewable energy project shall
exercise its choice for selection of appropriate Pricing Mechanism
prior to execution of the PPA with distribution licensee or with open
access consumer, as the case may be.
12.2 The REC mechanism entails pricing of two components, namely,
electricity component and renewable energy component or REC
component representing environmental attributes of renewable
energy generation. For the purpose of the Operating Period from FY
2010-11 to FY 2012-13, the effective electricity component price for
the year shall be equivalent to Pooled Cost of power purchase
excluding renewable energy -of the host Utility for the previous year
in whose area of jurisdiction such RE generation project is situated,
whereas, the price of RECs shall be as discovered in the Power
Exchange.
Explanation - for the purpose of this Regulation, "Pooled Cost of
Power Purchase□ means the weighted average pooled price at
which the distribution licensee has purchased the electricity
including cost of self generation, if any, in the previous year from
all the long-term and short-term energy suppliers, but excluding
those based on renewable energy sources, as the case may be.
Provided that the Central Commission may, in consultation with the
Central Agency and Forum of Regulators, from time to time provide
for the floor price and forbearance price separately for solar and
non-solar RECs (renewable energy component);
Provided further that, with the progressive development of the
electricity sector, the pricing methodologies for Electricity
component and REC shall be reviewed at periodic intervals as may
be considered by the appropriate Commission.
124 (72)
12.3 Tariff rate, tariff structure and other conditions for existing
renewable energy project(s) have already been covered under
respective renewable . energy Tariff Orders issued by the
Commission and the same shall continue to be operative as
amended from time to time during the Operating Period, FY 2010-
11 to FY 2012-13.
12.4 The consumers procuring power from RE sources through open
access route shall be required to pay cross-subsidy surcharge as
per condition of the open access regulations as specified by the
Commission. However, no banking facility shall be provided for
supply (third party sale) from renewable energy sources through
open access.
13. Power to remove difficulties
The Commission may either suo motu or on an application from any person,
review these regulations and pass appropriate orders to remove any
difficulty in exercising the provisions of these regulations.
14. Power to Amend
The Commission may from time to time add, vary, alter, modify or amend, in
provisions of these regulations and pass appropriate orders.
15. Repeal
After issuance of these regulations the previous regulations namely
Ctihattisgarh State Electricity Regulatory Commission (Procurement of Power
frorr,i r~newable sources of energy by distribution licensees) Regulations,
•'i'\. '; •... . • ' ' . • -: ~ >. '
2998 shall stand, iepeafod automatically. However Power Procurement
. . - . ~. .. : ~ \ .. - ' . . ' , ..
Agreement(s) already executed as per previous Regulations of 2008 shall be
. . .·' .. , ~ ~-· ". .. ·.: . ·-- . - '
. further governed by these Regulations.
By order of t~e Commission, . '
~: ; :· ,··•,N. ~-~ 8UP.'JVANI, Secretary.
. . ~ ...
.
_:._':
'
j
.,
.
.
wa'h-1•1~ m, ~ 4 -qr-cf 2011 124 (73)
Raipur , the 4th March 2011
No. 38/CSERC/2011. - In exercise of the powers vested in the Commission under
the provisions of sub- sections (5), (6) and (7) of Section 42 read with clauses (r) and (s) of
sub-section (2) of Section 181 of the Electricity Act, 2003 (36 of 2003) (the Act), and in
pursuance of the provisions of Electricity Rules, 2005, as amended, the Chhattisgarh State
Electricity Regulatory Commission had notified the regulations namely Chhattisgarh State
Electricity Regulatory Commission (Redressal of grievances of consumers) Regulations,
2007 on 22nd December, 2007. Forum of Regulators (FOR) constituted under section 166 (2)
of the Act has now prepared and circulated draft of the model regulations for protection of
consumer interest. Considering the difficulties experienced and the provisions made in the
abovesaid draft of model regulations, for the purpose of bringing improvement in mechanism
for redressal of grievances of consumers, the Commission hereby makes the following
regulations providing for guidelines to the licensees in the State of Chhattisgarh for setting
up a comprehensive system of redressal of consumers' grievances, including setting up of
Forums for Redressal of Grievances, appointment of Electricity Ombudsman by the
Commission, and the procedure to be followed for redressal of grievances by the Forums
and Electricity Ombudsman, and for matters incidental and ancillary thereto. These
regulations shall supersede the earlier regulations on the subject notified by the Commission
on 22nd December, 2007.
Chhattisgarh State Electricity Regulatory Commission (Redressal of grievances of
consumers) Regulations, 2011
CHAPTER 1: SHORT TITLE AND COMMENCEMENT
Short Title and Commencement
1. These regulations shall be called the Chhattisgarh State Electricity Regulatory
Commission (Redressal of grievances of consumers) Regulations, 2011.
2. These. regulations shall be applicable to all distribution licensees in Chhattisgarh in
their respective licensed areas.
3. These shall come into force from the date of their publication in Chhattisgarh
Rajpatra.
124 (74 i
Definition
4(1) In these regulations, unless the context otherwise requires:
(a) "Act" means the Electricity Act, 2003 (No. 36 of 2003) and its amendments;
· (b) "Aggrieved person" or "complainant" means and includes the following who have
a grievance or a complaint as defined in (e) belovy:
(i)
(ii)
a consumer as defined under clause (15) of section 2 of the Act;
an applicant for a new electricity connection;
(iii) any association or group of consumers, wliere the consumers have common
or similar interests; and
(iv) in case of death of a consumer, his legal heir(s) or representative(s).; . . .
(c) "Chairperson" means the Chairperson of the Forum;
(d} "Commission" means the Chhattisgarh State Electricity Regulatory Commission
constituted under section 82 of the Act.
(e) "Grievance" or "Complaint" means a grievance or complaint regarding any of the
following:
(i) Interruption in power supply;
(ii) voltage related complaints;
(iii). load shedding (unscheduled outage);
(iv)·. meter reading related complaints;
(v) electricity bill related complaints not relating to unauthorized use and theft of
electricity covered under sections 126 and 135 of the Act;
(vi) disconnection and reconnection of power supply;
(vii) delay in release of new connection;
(viii} non-achiav~nt of standards·· of performance as laid down by the
Com~1:rord~tribution licensees and payment of compensation there of;
and
(ix) any other grievances refating to damage to consumer's equipment / network I
premises: requests for reduction/ · enhancement in load l demand; non
payment of- interest on security deposit or recovery of .excessive charges for
·· any services; etc. .
@ffiffll~ m, ft;-ricfl 4 -qr,:f 2011 124 (75)
(f) "Forum" means a forum for redressal of grievances of consumers', constituted by
each licensee in terms of sub-section (5) of section 42 of the Act.
(g) "Licensee" in these Regulations means a distribution licensee and shall include
Chhattisgarh. State Power Distribution Co. Ltd.
(h) "Ombudsman (Lokpal)" means an authority appointed or designated by the
Commission, under sub-section (6) of Section 42 of the Act.
(i) "Rules" means the Electricity Rues, 2005 as amended from time to time.
4(2) Words and expressions used in these regulations but not defined above shall have
the same meaning as in the Act or in the CSERC (Conduct of Business) Regulations,
2009.
CHAPTER 2: REDRESSAL OF CONSUMER GRIEVANCES: INSTITUTIONAL
MECHANISM
CONSUMERS' RIGHTS AND GRIEVANCE REDRESSAL
5. Every consumer of the licensee is entitled to the most economic and efficient service
confirming to the standards · 1aid down by the Commission in CSERC (Standards of
performance in distribution of electricity) Regulations, 2006 and as amended from
time to time.
6. The licensee shall make effective use of Information Technology (IT) for redressal of
consumer grievances. It shall also set up assistance / call centres at major consumer
centres for centralised receipt and monitoring of redressal of consumer's complaints/
grievances and for general assistance to consumers, with the help of IT.
7. · For expeditious resolutions of problems of complainant if any mechanism is existing
within the licensee, other than Forum established under these regulations, may be
retained.
·Forum for ~edr~ssal of.Con,s.umers' Grievances (Forum)
8. · · Every licensee,·aShall. within six months.from the date of grant of distribution licence,
establish, in terms of sub-section 5 of section 42 of the Act, one or more Forum(s) for
.redressal of. grievances_ p~ c~ns4rners in accordance with these regulations, with the
approval of the. Co.mrnission. . . . ·.. ; . ' .
9. The number of Forums, ·their locations and.Jtle area of their jurisdiction may be
decided by the licensee, with the approval of the Commission.
124 (76)
Constitution of the Forum, appointment of members, tenure
10. The Forum shall consist of not more than three members of which two may be
appointed by the licensee and one independent member may be nominated by the
Commission. The members of Forum shall be persons of experience, ability, integrity
and repute. The composition of the Forum shall be as following:
.
(a) A maximum of two full-time members may be appointed by the licensee from out of
(i)
the following:-
A Senior working / retired officer of the licensee who possess a degree in Electrical
Engineering and have at least 20 years' experience in the field of distribution of
electricity; ar,d
(ii) A working / retired officer of the licensee, having at least 15 years experience in
finance/accounts/legal matters / engineering in the electricity sector.
The Commission shall verify to its satisfaction the eligibility criteria of the members
mentioned (i) and (ii) above.
(b) One independent member to be nominated by the Commission who may be a
representative of consumer as·sociation/ Non-Govt. Organisation actively engaged in
consumer advocacy, or a person familiar with consumer affairs. However, he should
not have worked as employee/officer of the licensee concerned at least two years
prior t_o his nomination.
(c) The member at 1 0(a) (i) above shall be the chairperson of the Forum.
11. (a) The member(s) at 1 0(a)(i) and 1 0(a)(ii) above shall be appointed by the licensee for a
period of 2 years which can be extended for the further period upto two years. These
members shall not be replaced during this period, except with the prior approval of
the Commission. However in case of regular employee of the licensee, he will demit
office of Forum from the date of his superannuation from the service of licensee.
The age of any member at the time of appointment should not be more thap 63
years, and can work up to the age of maximum 65 years. The member of Forum at
10(b) may be a part time member and shall be nominated by the Commission for a
period of two years.
(b) The members of the Forum appointed by the licensee shall not hold any other office,
during their tenure iri the Forum.
...
12.
124 (77)
(c) A member may be removed from his office by the appointing/nominating authority, if
i. he is adjudged an insolvent; or
ii. he is convicted of an offence which involves moral turpitude; or
iii. he has become physically or mentally incapable of acting as member; or
iv. having acquired such financial or other interest which is likely to affect
prejudicially his functioning as a member; or
V.
vi.
has abused his position so that his continuance in office is considered
prejudicial to the public interest; or
has been guilty of misbehaviour, or
vii. has been negligent to his duties and/or not attending to the work of the
Forum, without any valid reason.
(d) No member of the Forum as at Regulation 1 0(a) and 1 0(b) shall be removed from his
office on the grounds _specified in (iv) to (vii) of sub clause (c) above, except on the
recommendation of the Ombudsman on an enquiry conducted by him on the request
of the licensee and/or on the direction of the Commission. In case of the member
nominated by the Commission as at Regulation 10(b), the enquiry shall be conducted
by the Ombudsman only on the direction of the Commission.
(e) Any member of the Forum (other than the regular employee of licensee) may
relinquish office by giving in writing to its employer / nominating authority a notice of
not less than one month.
On occurrence of any vacancy in the Forum for any reason, the licensee shall take
action to fill up the vacancy withi~ a month of the date of occurrence of the vacancy.
Procedure before the Forum
13. The quorum for meeting of the Forum shall be two, and each member shall have one
vote and in case of equality of votes on any issue, the chairperson shall have a
casting vote.
14. All decisions of the Forum shall, as far as possible, be unanimous or be ~n the basis
of decision by majority of the members present.
15. No act or proceeding of the Forum shall be deemed to be invalid by reason-only of
some defect in the constitution of the Forum or by reason of the existence of a
vacancy among its members.
124 (78)
Process for submission of grievance before Forum
16. Grievances/complaints may be submitted to the Forum by the aggrieved person(s)
either in person or by post. The Forum shall maintain true and correct record of all
complaints received by it.
17. To facilitate the consumers the licensee may establish a "complaint receiving and
redressal centre" at O&M I city circle level, by nominating an officer as nodal officer,
The complaint / grievances meant for Forum may also be collected at these centres,
and acknowledgment issued to complainant. The complaints / grievances shall be
forwarded by the nodal officer to the respective Forum at least once in a week i.e.
within maximum period of seven days. In the mean time nodal officer also shall
endeavour to resolve the grievance of the consumer by contacting the respective
officer(s) of the utility. The complainant shall have right to approach Forum directly.
18. A complaint/grievance may be submitted to the Forum in writing in a plain paper
containing the following informations: - (i) Name and full postal address, telephone /
mobile number of aggrieved person, (ii) centre / office of licensee with which the
grievance is related, (iii) type of electrical connection and connection number,
(iv)details of grievance(s), (v) nature of relief sought (vi) declaration that the
complaint is not pending before any other Commission / other Forum, court, etc. and
(vii)signature of the aggrieved person.
19. The office of the Forum /complaint receiving and redressal centre shall issue
acknowledgment of the receipt of the grievance/complaint to the person presenting it
in person at the time of presenting the. grievance/complaint, or by post if complaint is
received by post, indicating the receipt number and date of receipt. An
acknowledgement sent by post, shall be sent withi~ two working days.
Limitation / precondition for submission of grievances to Forum
20.
21.
In case of billing complaints the Forum may receive only such complaints, where the
disputed amount is more than Rs.1,000/ (excluding cases where the disputed
' . .. ; . . - . - -~. .., '
amou_nt is due to arithmetical or clerical errors),in case of HT/LT industrial and non-
, - • . '.I ' ... . ~ .-· • ;,. ...~. . : ., "
domestic consumers., and where the disputed amount is more than . Rs. 500/-,
' ·., t' •
, (excluding cas.es where the disputed amount is due to arithmetical ·or clerical errors)
. in cas~-df aomestic / agriculture and agriculture allied c..,onsur:ners:'
•• ; •• <.. •• ·:'.or:;,;., ,"~~'!"J .. :~, , .•. :.:-~:· ;-.,,--. ·, ,' ~
. The Forum shall take up all consumer grievances for redressal except those
· pertaining'to:-
(i) Adjudication of'· the disputes between the·: ~ii~e~se~s and generating
,·:..: ,. ) . ··.1; .. '.
companies.
"' ,.
124 (79)
(ii) unauthorised use of electricity as defined in section 126 and 127 of the Act;
(iii) offences and penalties under section 135 to 139 and 152 of the Act; and
(iv) accidents and inquiries as specified under section 161 of the Act unless
authorised by the State Government by general/special order.
Explanation:
Filing of a grievance before a Forum shall not in any way prejudice the right of a
consumer to seek relief/compensation under section 57 of the Act.
22. The Forum shall not take up cases where proceedings in respect of the same matter
and between the same aggrieved person and the licensee, are pending before any
court, tribunal, Commission, arbitrator or any other competent authority, or in respect
of which a decree or award or a final order has already been passed by any such
court, tribunal, Commission, arbitrator or authority.
Investigation and hearing process by Forum
23. (a)
(b)
On receipt of a grievance the Forum should register it, allot and convey the
registration number to the complainant within two working days of the receipt
of the grievance. The Forum should first satisfy itself if a grievance is prima
facie made out. If, it is found that there is a grievance, which needs to be
redressed, it will not reject any application only on technical grounds. In case
it is found that the complaint is frivolous or prima facie without substance, the
Forum shall send a reply to the complainant indicating reasons for not
considering the complaint / grievance within four working days from the date
of receipt of the complaint. The consumer may, however, be given an
opportunity of being heard subsequently, if complainant so desires.
A notice along with a copy of complaint shall be issued by the Forum within
three days of the receipt of the grievance to the concerned officer of the
licensee, asking him to send his point wise reply by a day not later than fifteen
working days from the date of issue of the notice, as to (i) whether the
grievance can be redressed by him and (ii) if it can not be redressed, the
reasons thereof.
(c) The Forum can call the officer concerned of licensee for discussion in suitable
-case(s), in order to seek redressal of the grievance filed before it. In case the
'
matter is settled in discussion, it may be recorded as a decision and
conveyed to the complainant and the licensee.
' .
124 ( 80)
(d)
(e)
In case the Forum comes to the conclusion that the complainant and the
concerned officer of the licensee are required to be heard for redressal of the
grievance, it shall call the- complainant and the concerned officer with the
details of the case and documents, if any, as may be necessary.
(i)
(ii)
If the concerned officer of the licensee, on receipt of a copy of the
complaint referred to him under Regulation 23 (b) above, fails to take
any action or submit reply, within the time given by it, the Forum may
proceed to settle the grievance ex-parte on the basis of evidence
brought before it by the aggrieved person.
In case of default in attendance in course of the proceedings, the
Forum may proceed to settle the grievance on the basis of evidence
submitted to it by the aggrieved person and the concerned officer of
the licensee up to that time.
(f) No adjournment shall ordinarily be granted by the Forum unless sufficient
cause is shown and the reasons for grant of adjournment have been recorded
in writing by the Forum; If the aggrieved person fails to appear on the date of
hearing, the Forum may either dismiss the complaint in default or decide it on
merits ex-parte. In case of non-appearance of representative/official of
licensee on the date of hearing the Forum may decide it on merits ex-parte.
(g) The Forum may allow any association of consumers to file complaints on
behalf of the consumer(s).The Forum may permit a representative of any
consumer association / NGO dealing with consumer issues to remain present
during hearings of any complaint by a consumer.
(h) It is not necessary for the aggrieved person/complainant to take assistance
from an advocate. The complainant can plead its case itself or can take
assistance of any person, which may include an advocate, or an
association/society of which it is a member; or an NGO, for putting forth its
case before the Forum. The complainant can take back its complaint at any
.
stage of proceedings of case.
(i) The· time_ limit for disposal of a complaint/redressal of grievance shall be forty
five ~ay: of it~- registratio~·- The F~rum- sh~II en;Jte that thEttinie limit for
•-vrv.~· ::i,, 9:' 'I" ..... ,. ,.· ,., ~!'""."''! ·,-·r.., ~ ,•·.,:,.· ~;;~ ~i:~ ~//·-·. --•,~1 / ...,~,,.~ •
"disposal of a complaint is· adhejed t~ .. In c_ase of del~y' in any" case, the
El~~t,ri~ity Ombudsman shall be informed by- Foru~➔~i~~inlttff{easons in .
·:·· .,, detailJor.ttie·delay. .: ·,.: :'h :: ::~Wn· :· ·< ,.;, .. /'(_,·., ·' '.''
U)
~i ~--.~;i>,s"; ·)~:~ ~ ;~- ~> .. · .. ,. . ? _,,; .'-:.•"':"'{ .; -~.. .. -~, .. ~· .. :• ' _.; ~
The F6r_ufn ·may ·call for any record 'from the respondent party or from the
." •• ••: •, ;: • ,/,' • •:~•~$ •, •,?;.. j,. •~ • t.J, ••:,;.,., .... •~i,{~_1,t?",: ,• } ,_,,~•,w•},,. ~: ' •, •
·co'mplainaht, as is relevant for examination·ahd disposal of the grievance and
~ . ,,. : .' ''•~ , .. , -~ ;J. t,;,r ·,. .•: .•; ',: : ., "'.-' ...
both the . parties shali be under. obligatidn. ·tc{. prgvide such ·information,
., ,, < " •
Ill
• •
124(81)
document or record as the Forum may call for. Where a party fails to furnish
such information, document or record and the Forum is satisfied that the party
in possession of the record is withholding it deliberately, it may draw an
adverse inference.
(k) The Forum may ask the concerned officer of the licensee to undertake an
inspection or engage a third party to undertake an inspection, as may be
required, for expeditious redressal of the grievance. The Forum _can also
engage a third party (other than the licensee) at the instance and request of
the aggrieved person, to undertake inspection and obtain an independent
report. The Forum shall record the reasons for the need for such third party
inspection, which should generally be resorted to rarely and keeping in view
the special circumstances of a case. The expenses of such third party
inspection, except expenses of inspection at the request of the aggrieved
person, shall be borne by the licensee, and to the extent reasonable and
justifiable· such expenses shall be allowed in the determination of tariff in
accordance with the relevant Regulations of the Commission. In case,
inspection is taken up at the request of the aggrieved person, the expenses
shall be deposited in advance by him, which may or may not be refunded by
the Forum depending on the complaint being found to be of substance or not.
If considered necessary, the Forum may inspect the electrical installation of
consumer or licensee, and record the findings of such inspections.
(I)
(m)_
The language of the proceedings of the Forum shall normally be Hindi.
The Forum shall not be bound to follow the procedure prescribed in the Civil
Procedure Code, 1908 (Act 5 of 1908) or the Indian Evidence Act, 1872 (1 of
1872) in its proceedings. Subject to these Regulations the Forum may evolve
procedures conforming to the principles of fair play and justice for efficient
discharge of its functions .
24. The Forum may consult the higher authorities of the distribution licensee for
settlement of any grievance, if required in any case.
Issue of order
25. The order of Forum should be consistent with provisions of the Act, Rules,
Regulations and Codes notified by the Commission from time to time. It should be
ensured that the orders issued by the Forum are clear, speaking, unambiguous and
consistent with the provisions-of the Act, Rules and Regulations and Codes issued by
the Commission.
124 (82)
26. On receipt of the comments from the Licensee or otherwise and after conducting or
having such inquiry or local inspection conducted as the Forum may consider
necessary, and after according reasonable opportunity of hearing to the parties, the
Forum shall take a decision by a majority of votes of the members of the Forum
present, and in the event of equality of votes, the Chairperson shall have the second
and casting vote:
If, after the completion of the -proceedings, the Forum is satisfied after voting that any
of the allegations contained in the grievance are correct, it shall issue an order to the lo.,
Distribution Licensee directing it to do one or more of the following things in a time •-
bound manner, namely - .._
. I:
,'~} .
',, _:.;,-
• 'J, .•
l
·• ~;?,
27.
a) to remove the cause of grievance in question;
b) to return to the Complainant the undue charges collected by the licensee.
Forum may also direct licensee to pay the interest at the rate the licensee is
required to pay interest to the consumers on the security deposited by the
consumers with the licensee as per the relevant regulations of the
Commission;
c) any other order, deemed appropriate H1 the facts and circumstances of the
case .
Every proceeding shall be recorded. Decision given by the Forum shall be a
reasoned order- and signed by the members conducting the proceedings. The order
may specify the time periodwithinwhich it is to be complied by the concerned officer
of the licensee.
In case, Forum is convinced that the complainant is entitled for receipt of
compensation related to non fulfillment of standards of performance by the licensee
~s . per the .CSERC (Standards of· Performance in. distribution . of electricity)
Regulations,.2006 and its amendment(s) / revision from time to time .then on request
of the complainant, the Forum in ·its order may .ask the distribution licensee. to pay
suitable compensation to the complainant as per provision(s) in above Regulations.
The :Forum shall send' the. copy of the order to the: aggrieved person, ·to. the
:'-". ''.·:•·".\·" . · ,,_~:.'··: . "•. ·•· . concerned ·affidefr··bf· ifte~l:censee· ·an'd,·10 the·· next•· higher ·authority :of the· officer
.Special,,provision," Interim, ordf!r, Reyiew of; <>r:der.
~---· •'!:•~ , •29.-t.:.,i,.,.".;The:·F.arum,rhayraiso,is_s.ue:interini orders on theTequestof:the aggrieved person, as
jJ
•
. . , :. "'·~ . -.... ,' .,· i' 1r.i,.._ . .: •. ~·-· • _.•._,.Ji-, . ~- :~. . . •. ·.• :· .. . •. .
\<'·. ':-1/1;r,,.Ji;•,.J.'...f~.,._"'j!t,, .. ;~"~0~·/\_~ ,,,.,it c6nsiders,appropriate/ pending: finai:c!ispo.,:;al · .ofi:the"complaint. ''."'. ;:,,·; -,2;
.•. ' .. ·, .:..· . , ~·. ~ ' . - . .
• •
124 (83)
30. The Forum may review its order suo motu, at any time on account of mistake or error
apparent on the face of the record and on the application of any of the parties to the
original proceedings within 30 days of the order on the following grounds:
(i) Discovery of new and important matter or evidence which, after the exercise
of due diligence was not within the knowledge of the person seeking the
review or could not be produced by it at the time the order was made; or
(ii)
(iii)
On ac·count of improper interpretation of provisions of the Act/ Rules or
Regulations / Codes notified by the Commission.
Any other sufficient reason.
Duty of licensee to ensure compliance of order(s) of the Forum
31. The concerned officer of the licensee shall comply with and implement the orders of
the Forum within the period specified therein. In the absence of any such time limit,
considering the nature of the case, compliance shall be ensured within the period of
30 days. In appropriate cases, considering the nature of case, the Forum, on the
request of the aggrieved person/licensee may extend the period for compliance of its
order up to a maximum period of 3 months. Non-compliance of the order of the
Forum shall be treated as violation of Regulations of the Commission and shall be
liable for action under secti~n 142 of the Act. The Commission upon information
received from Forum or any complaint regarding non compliance of order {s) -of
Forum filed by affected person may proceed under section 142 of the Act.
Repc;,rting compliance of order
32. The concerned officer of the licensee shall furnish compliance report of the order of
33.
· the Forum Within seven days from the date of compliance, to the Forum, to the
· coniplainant·and also to __ his next superior officer to whom copy of the order was
endorsed by the Forum ..
The Forum shall keep recor_d of the compliance of its orders and review the same
and ·shall-submit report in this·.regard to Electricity Ombudsman every month. ·ln·case
of non-compliance of its orders the F.orum shc!II take up matter with the higher -
authorities of the licensee for compliance. If ~ven after that the order is not complied
with, the Forum shall inform the Commission regarding such non-compliance.
the 'Forum shall submit a·· quarterly· -·report of-. disposai of grievances along with ·. ,.
1
compliance·of.order to the licensee, the Ombudsman -and the_-Commission, in the - ~
. . . -
··form, as: may .be prescribed ;by t~e Commission. The report -should .be ,sµbmitted . _ ,·. ', -F. . . .
within 15 days of the close of the quarter to which it relates. This report will ·be in
124 (84) <&-cth-111ct m, ~ 4 l-fTi'f 2011
addition to the report required to be sent by the Forum to the Ombudsman /
Commission under Regulation 33.
35. The Forum shall also furnish a yearly report containing a general review of activities
of the Forum during the calendar year to the licensee, Commission and Ombudsman.
The report should be submitted within 30 days of close of the calendar year to which
it relates.
General
36. The chairperson shall have the general powers of superintendence and control over
the Forum.
37. The Forum shall comply with such general directions as the Commission may issue
from time to time in the interest of more efficient and effective redressal of
grievances. Forum can also approach Commission regarding interpretation of
regulations I codes notified and applicability of tariff in tariff order(s) issued by the
Cqmmission.
38. The licensee shall from time to time give due publicity about the Forum. and its
charter through advertisement in widely circulated local newspapers and in such
other manner as it considers appropriate and as the Commission may direct, from
time to time. The names of the members of the. Forum, their addresses and p_hone
numbers shall be displayed prominently at all the offices of the licensee which has
interface with consumers and shall also be duly published, including on the electricity
bills raised on the consumers.
39. The Forum is an institutional mechanism created by the licensee for redressal of the
grievances of its consumers. It is, therefore, the responsibility of the licensee to
empower it and take necessary measures to make it effective in the interest of its
consumers. The licensee shall ensure that necessary instructions are issued to all
concerned officers sensitising them about the Forum and its functions, and about
their duty to comply with its orders promptly.
40. The licensee shall provide required supporting staff and appropriate office
accommodation to the Forum.
41. The. salary or honorarium and other allowances payable to the members shall be
:ch;~g-ed to·the·licerisee who·shall be responsible for timely and'regular pa"yment.
· · l~ r,, ' '"b "' .. ,; 1 ·'•· -"'
42. The licensee shall meet all the costs and expenses of the Forum including the cost of
"r ! • ,' ! •· - • ~I • , • '. ••,,~,; •.• ....... , '. '. ~ • ' . ..,
establishment and staff requi-ne'd to assist the ·Forum in the discharge of its functions
. ' ' ,.-. •, . •. . . . t . 1 . :"' . . .
u11~er th,e~e re~ul_ation-s_. , - - •- : ' -. . . .
43. · ,The expenditure on the,Forun:,(s) will be considered in the revenue requirement of
the license~ and wiWb_e allqwed_,as a pass through exp~nse.
. ....
.) ,
• •
124 (85)
CHAPTER 3: OMBUDSMAN (LOKPAL)
Appointment, qualification, tenure of Ombudsman
44. The Commission may, from time to time, appoint or otherwise designate such
person, as it considers appropriate, as Ombudsman under sub section (6) of Section
42 of the Act read with rule 7 of the Rules.
45.
46.
The Commission shall appoint or designate an Ombudsman for the State of
Chhattisgarh .
The Ombudsman shall be a person of experience, ability, integrity and repute. The
Ombudsman shall be selected from amongst persons who have experience and
exposure in any of the fields, such as legal affairs, engineering, industry,
administration, management, defence services and consumer affairs, of not less than
20 years. The age of the person to be appointed as Ombudsman should not exceed
sixty-three years at the time of first appointment, and can work upto age of maximum
65 years.
47. The Commission shall invite applications through public advertisement for
appointment of the Ombudsman. The Commission shall form a selection committee
for selecting the Ombudsman from all the applications received.
48. The Ombudsman appointed shall remain in office for a period of two years from the
date he assumes office. The period of appointment may be extended beyond two
years for a period upto two years at the discretion of the Commission.
49. The Ombudsman may relinquish office by giving in writing to the Commission a
notice of not less than one month.
50.
51.
The Ombudsman shall be deemed to be a public servant within the meaning of
section 21 of the Indian Penal Code, 1860 (No. 45 of 1860) .
The Ombudsman may be paid fixed fees or honorarium as may be decided by the
Commission from time to time.
52. Where the Commission is satisfied that in the public interest, it is necessary to
remove a person from the post of Ombudsman, the Commission may by giving one
month's notice or by paying one month's consolidated fees or honorarium in lieu
thereof,. remove such person, if such person:
(i) has been adjudged an insolvent; or
(ii) has been convicted of an offence which involves moral turpitude; or
(iii) has become physically or mentally incapable of acting as Ombudsman; or
124 (86)
(iv) has acquired such financial or other interest as is likely to affect prejudicially
his functionining as Ombudsman; or
(v) has so abused his position as to render his continuance in office prejudicial
to the public interest; or
(vi) has been guilty of misbehaviour, or
(vii) has been negligent to his duties and/or not been attending office, without
furnishing any valid reason.
Provided that no person shall be removed from office on any ground specified in
clauses (iv),(v),(vi) & (vii) above unless the Commission has, on an inquiry held by it,
concluded that the person ought to be removed on such ground or grounds.
Representation / appeal to the Ombudsman
53. An aggrieved person other than licensee not satisfied with the order of the Forum
may make a representation to the Ombudsman within a period of forty five days from
the date of receipt of such order.
Provided that, the Ombudsman may entertain a representation after the expiry of the
said period of forty five days if he is satisfied that there is sufficient cause for not filing
it within that period.
54. The Ombudsman shall' not admit for consideration any representation if the subject
matter of the representation is under consideration in a proceeding before the
Commission, Appellate Tribunal for Electricity established under section 11 O of the
Act, or any court of law.
55. If the representation to the Ombudsman concerns payment of any bill raised by the
licensee, it shall not be accepted unless the person making the representation has
deposited with the licensee at least one third of the amount required to be paid by
. . " ,
him in terms of the order of Forum.
56. . ~ rep~esentation _m~~e to the .Ombudsman shall -
' .'' .. ' ';,.
· -_ ·, (a) ,be:i!1 writing ·and;signed by the person making it,.-- "
. .,
, :(b)' - . gi"v~ · the h~m·e?afid address of the aggrieved persoh, ·along i,th tJTeph6~e,
- -1 ,• . ...-:• ·/ \(:
mobile.no.,·
. .
(c) contain the details of the complaint inclJ8irig copy cit ttie·bid~i-f>f'the Fo~um,
' • • ~. ' ' . . . :~ '-t
,- . -~~ .
. ·(d) .:; -.· :contain• a declaratiori:to the,effect that. the subject,matterco"f the representation
' ~ .
' -, ' ' , . -,- ' . :·· .... - . ,::-.
. is. not · under · consideration .·. <in.· -. any-r;.;i proceeding before the
. .Gommission/Apf?ellate Tribunal for Electricity or a·ny. ~ourt of law.
I ,,, . • , -~ .- •
0tih=111~ m, ~ 4 ~ 2011 124 (87)
57. The office of the Ombudsman shall acknowledge receipt of the representation in the
following manner:-
58.
i) If the representation is delivered personally, immediately on submission; and
ii) If the representation is received through post or courier, within two working
days.
(1) The Ombudsman may at any time ask an aggrieved person making a
representation -
(a) to provide further information or documents; or
(b) to verify all or any part of the representation on affidavit.
Provided further that the Ombudsman shall allow a reasonable period of time for
compliance with the above requirements.
(2) The Ombudsman may permit the aggrieved person to plead his case himself
or take the assistance df any person which may include an advocate or an
association/society of which he is a member, or an NGO for putting forth his
case
59. An aggrieved person may withdraw his representation at any time by making an
application to the Ombudsman in writing for such withdrawal. The withdrawal shall
take effect only when the Ombudsman agrees to such withdrawal.
Promotion of settlement by agreement
60. As soon as practicable to do so, but not later than one week from the date of receipt
of a representation, the Ombudsman shall serve a notice to the concerned officer of
the licensee along with a copy of the representation.
61. In suitable cases, the Ombudsman may endeavour to promote a settlement of the
grievance through conciliation or mediation and in doing so, the Ombudsman may
follow such procedure, as he considers appropriate.
Hearing of representation by Ombudsman
62. After registering the representation, the Ombudsman, within seven days of
registration, shall call for records .,relating to the representation from the concerned
Forum. The concerned Forum shall send the entire records within 3 days from the
date of receipt of such notice to the office of the Ombudsman.
124 (88) -Jrll-l-lllit m, ~ 4 ~ 2011
63. No adjournment shall ordinarily be granted by the Ombudsman unless sufficient
cause is shown and the reasons. for grant of adjournment have been recorded in
writing by the Ombudsman; provided further that the Ombudsman shall make such
orders as to the cost occasioned by the adjournment to be paid by the defaulting
party to the non-defaulting party.
64. Subject to the provisions of the Act and these Regulations, the Ombudsman's
decision whether a representation is fit and proper for being considered by it or not
shall be final.
65. The Ombudsman shall decide the representation, only after providing the parties an
opportunity of being heard.
66. The Ombudsman may require the licensee / aggrieved person, to furnish such
documents, books of accounts information, data and details as may be required to
decide the representation and the licensee / aggrieved person shall duly comply with
such requirements.
67. The Ombudsman may direct the licensee to undertake an inspection or engage a
third party to undertake such inspection with regard to any grievance, as may be
required, for expeditious redressal of the grievance. The Ombudsman can also
engage a third party (other than the licensee) on the request of the aggrieved person,
to undertake inspection with regard to the complaint and obtain an independent
report. This power may be exercised by the Ombudsman only when the facts and
circumstances of the case merit third party inspection. The Ombudsman shall record
the reasons for the need for such third party inspection, which should. generally be
resorted to rarely and keeping in view the special circumstances of a case. The
expenses of such third party inspection except expenses of inspection at the request
of the aggrieved person, shall be borne by the licensee, and to the extent reasonable
and justifiable such expenses shall be allowed in the determination of tariff in
accordance with the relevant Regulations of the Commission. In case of inspections
at the request of the aggrieved person, the expenses shall be deposited in atjvance
by the person, which may or may not be refunded by the Ombudsman depending on
the complaint being found to be of substance or not.
68. Th~ O~"b~
1
9:sn:ian shall1d~,C!P~ the representation. wit~in_Jti~ee mcmths Jrom ,t~e date
of it's receipt. In the ev~nUhe representatio_n is not_ desided within ttiree months, the
Ombudsman shall reco~d the reasons therefor. .
69. The Ombudsman may ref~ct the representation:at ~ny,:stage.;it:it appe~rs,to him.that
' > ' ,~ ~- -~ -~. ,,'":_'·· • ., ~ • ·--~:t-' •. ,. ..
.. the representation i·s-
, ··, ; . '~- . . . . . ~,
(i) frivolous, vexatio1,1sJmalafide;
(ii) . with9ut ~~y 'sl.Jffi6i~~t;~ause;-or
• .~-;~:t":" ;;l /f;,; ,-~
.----..11
124 (89)
(iii) not being pursued by the person making the representation with reasonable
diligence.
70. The language of the proceedings of the Ombudsman shall normally be Hindi.
Orders by the Ombudsman
71. In case an agreement is reached and the grievance is redressed by such agreement
between the aggrieved person and the licensee, the Ombudsman shall make a
record of such agreement in the case as his order(s) and thereafter close the case
72. Where the representation is not settled by mutual agreement between the person
aggrieved and the licensee, the Ombudsman shall proceed to hear the case and
decide the place, the date and the time of such hearing.
73. The Ombudsman shall decide the representations on the pleadings of the parties,
after providing them an opportunity of being heard. He shall pass a speaking order,
which he considers fair in the light of the facts and circumstances of the case and
principle of natural justice. The order shall clearly state the nature of relief the
complainant is entitled to as per rule including monetary compensation if any. The
order may specify time period within which it should be complied . .
74. The order of Ombudsman should be consistent with provisions of the Act, rules,
regulations and the codes notified by the Commission from time to time and general
orders or directions given by the Govt. of Chhattisgarh / this Commission in this
regard. It should be ensured that the order(s) issued by the Ombudsman are clear,
speaking and unambiguous.
75. In case, Ombudsman is convinced that the complainant is entitled for receipt of
compensation related to non fulfillment of standards of performance by the licensee
as per the CSERC (Standards of . Performance in distribution of electricity)
Regulations, 2006 and its amendment(s)/revision from time to time then the
Ombudsman in its order may direct the distribution licensee to pay suitable
compensation to the complainant as per provision~s) in above Regulations.
76. A copy of the order shall be_ sent to the aggrieved person, concerned Forum, the
concerned officer of licensee and its next higher authority.
7-7. The orders of the Ombudsman shall be final and binding on the parties. No party can
file an appeal before the Commission against this order. However, the rights of
complainant and licensee to file an appeal in .front of the other judicial bodies
(including but not limited to Appellate Tribunal for Electricity, Forums and
124 (90) 0'dlfl•I~ m, ~ 4 lTT'tt 2011
Commissions established under the Consumer Protection Act, 1986, High Court,
Supreme Court, etc.) shall remain protected.
Special Provision, interim order, review of order
78. On request of complainant, the Ombudsman may issue such interim order at any
stage during disposal of representation as it may consider necessary.
79. The . aggrieved person or the licensee may prefer an application for review of the
order to the Ombudsman, within thirty (30) days from the date of receipt of the order.
80. The Ombudsman may review his order(s) Suo motu at any time on account of
mistake or error apparent on the face of the record. The Ombudsman may also
review his order(s) on the following grounds on application of any of the party to
original proceedings:
. (i) Discovery of new and important matter or evidence which, after the exercise
of due diligence was not within the knowledge of the person seeking the
review or could not be produced by it at the time the order was made; or
(ii) On account of improper interpretation of provisions of the Act / Rules or
Regulations / Codes notified by the Commission.
(iii) Any other sufficient reason.
Responsibility of licensee to ensure compliance with orders of Ombudsman:
81. The licensee shall comply with and implement the order of the Ombudsman within
the period specified in the order or in the absence of any such time limit, within a
period of 30 days. In appropriate cases, considering the nature of the case, the
Ombudsman, on thA request of the aygrieved person / licensee, can extend the
period of compliance of order upto a maximum period of three months. The lir.Ansea
shall n:~rort compliance to Ombudsman within seven days of the day the order of
Ombudsman was complied with.·
~ ',·· ';~ ·, . '
Ombudsrriah wiW'review the compliance of his orders and compliance of orders of
, " . Forums.~ver;y month and .shall report non-compliance· of his orders' and orders,;of
: ,:; __ Forums, ifany, to the C6mmission.
t,
a';i. ·,; Ncm:-compliarice, with: th~ orders of the Omoudsni'~n shall· oe treated as violation of
. • . · r~!~~;~~9\/ision_s of RegGlations oMhe Com,missidri: Th,e·C~_mmissibn' upon friformation
.. .ii - ' . ' ' .' ••
.. received from·! the Ombudsm·an or any com·plaint regarding non-compliance. of
' ,,.., . .
)o.~ger(s):ofOni~udsmari filed by the affected person;·mayproceed under section 142
. /. t · -~?th~,Aft· · . .. ,· . · ·
:·_-J:,1;1:}?J'\;' '
. ~ ~ ~ -l":f"'" ';~ · .. ' ;' ' . I, ~~ . ' ... .,. .... ,
·· ~ . ·->~~f, .. :r:·~~~~~,.~,~~~~-:i. ~1~~· '.~:~~~/.E:'>~· >.
124(91)
Submission of report
83. The Ombudsman shall submit to the Commission a quarterly report on disposal of
cases by him. He shall also prepare a report on six monthly basis about the nature of
the grievances of the consumers dealt by hi~, the-response of the lice~sees in the
redressal of the grievances and the opinion of the Ombudsman about the licensee's .
. compliance or the standards of performance as. specified by the Commission under
Section 57 of the Act during preceding six months. This report shail be forwarded to
the Commission and the State Government within 15 qays of the end. of every six
months.
84. At the end of every calendar year the Ombudsman will also prepare a report bringing
out the main features of the· work done during the calendar year. The report shall be
made available to the Commission within 30 days of completion of calendar year to
which it pertains for inclusion in the annual report of the Commission prescribed
under section 105 of the Act.
General
85. The Ombudsman shall exercise general powers of superintendence and control over
his office and shall be responsible for the conduct of business of the office and shall
also perform other functions as may be specified by the Commission.
86. The expenditure on Ombudsman shall be borne by the licensees. The Commission
. -
will prepare every year the budget for the Ombudsman in consultation with him. The . .
Commission will indicate the respective sha~e of expenditure,· to be borne by each
licensee to be released quarter:ly in advance.
87. The Ombudsman can also approach Commission regarding interpretati"on of
. regulations/codes/notified,_and applicability of tariff as per tariff orcter(s)'issued by ttie.
Commission.
CHAPTER 4 : MISCELLANEOUS
Powers to remove difficulties
88. If any difficulty arises in giving effect to any of the provisions of these regulations, the
Commission may by gener~I or special order, direct the licensee to take suitable
action, not being inconsistent with the Act, which appears to it to be necessary or
expedient for the purpose of removing difficulties.
89. The licensee may seek guidance or clarification from the Commission for removal of
any difficulties that may arise in the establishment/ functioning of the Forum as per
.. these; Regulations ..
90. Nothing in these Regu.lations shall bar the Comr:nission from adopting, in conformitj
with the. provisions of the Act, a procedure, which is at variance with any of the
provisions of these regulations, if the Commission, in view of the special
. . . ' .
circumstances of -~ . matter· or clas·s of n:,,atters ·arid for reasons to, be recorded in
writing, considers it necessary or expedient to do ~o. ·
·,
91. Nothing. in these Re~~lations ·_ shall; expressly or impliedly, bar the Commission
dealing with any matter or exercising any power . under the Act with regard to
redressal of grievances of. con~umers for which no regulations have been frnmed,
and the Commission may deal with such matters, powers and ·functions in a manner . . ; . ' . ' .
it thinks fit.
92. Nothing contained in these Regulations shall affect the. rights and privileges of the
consumer under. any other law for the time being in force, including under the
Consumer Protection_ Act, 1986 (68 of 1986) .
. Power to Amend
93. The Commission may, at any time vary,· alter, modify-or amend any provision of
these regulations ..
Repeal and Savings
94.
. .
(i) CSERC (Redressal of Grievances :of Consumers) Regulations; 2007 are
hereby repealed and replaced by these Regulations. . . . ' ....
(ii.) . Notwithstanding such ,·repeal: anything done or·'any action taken including any
order passed or notice issued, any inspection done or any direction given
under the repealed Regulations shall be deemed to have been done or taken . .
under the corresponding provisions of these Regulations:
.'° Note:, In case of any difference in the interpretatic;m or understanding of the provisions of
the Hindi version of these Regulations with those of the English version and in case
of any dispute ih this·· regard, the decision of the Commission shall be final and
binding.
By order of the Comm'ission,
N. K. RUPWANI, Secretary