The Telangana Infrastructure Development Enabling Act, 2001.
Telangana Act
- Act 36 of 2001
- Enacted: 2001-10-09
- In force from: 2001-08-20
- Ministry: NO MINISTRY
- Department: Infrastructure and Investment
- Status: no repeal is recorded
This text is shown as one document.
Full text
THE TELANGANA INFRASTRUCTURE DEVELOPMENT ENABLING
ACT, 2001.
(ACT NO. 36 OF 2001)
ARRANGEMENT OF SECTIONS
Sections
CHAPTER - I
PRELIMINARY
1. Short title, extent, application and commencement.
2. Definitions.
CHAPTER - II
ESTABLISHMENT, CONDUCT OF BUSINESS AND
EMPLOYESS OF THE INFRASTRUCTURE AUTHORITY.
3. Constitution of Infrastructure Authority.
4. Composition of the Authority.
5. Term of Office of the Members.
6. Terms and conditions of service.
7. Meetings of the Authority.
8. Appointment of officers and staff of the Authority.
9. Constitution of Committees.
10. Functions of the Infrastructure Authority.
11. Powers of the Infrastructure Authority.
12. Report to the Government.
CHAPTER - III
INFRASTRUCTURE PROJECT DELIVERY PROCESS
13. Participation in infrastructure project.
14. Project Identification.
15. Prioritisation of Projects.
2 [Act No. 36 of 2001]
16. Recommendations by the Infrastructure Authority.
17. Sanction by the Government.
18. Consultant selection.
19. Developer selection processes.
20. Approval of contract principles.
21. Selection criteria.
22. Treatment of Sole Bid.
23. Treatment of limited response.
24. Treatment of Bid submitted by a consortium.
25. Speculative bids.
26. No negotiation on financial or commercial proposal.
27. Bid security.
CHAPTER - IV
GENERIC RISKS DISCLOSURE AND ALLOCATION,
SECURITISATION, RIGHT OF LENDERS AND
FACILITIES TO BE PROVIDED BY THE GOVERNMENT
AGENCY OR THE LOCAL AUTHORITY.
28. Generic Risks Disclosure and its allocation and
treatment.
29. Facilitation of securitisation.
30. Rights of Lenders.
31. Facilities to be provided by the Government Agency or
the Local Authority.
CHAPTER - V
CONCILIATION BOARD
32. Establishment of the Board.
33. Constitution of the Board.
34. Head Quarters.
[Act No. 36 of 2001] 3
35. Term of Office of the members.
36. Terms and conditions of appointment.
37. Functions of the Board.
38. Administrative assistance.
39. Powers of the Board.
40. Judicial proceeding.
CHAPTER - VI
CONCILIATION PROCEEDINGS.
41. Application and scope.
42. Commencement of conciliation proceedings.
43. The Board and certain Enactments.
44. Co-operation of the parties with the Board.
45. Suggestions by parties for settlement of dispute.
46. Settlement agreement.
47. Status and effect of settlement agreement.
48. Termination of conciliation proceedings.
49. Resort to Arbitral or Judicial Proceedings.
50. Commencement of arbitral or judicial proceedings.
51. Costs.
52. Deposits.
53. Admissibility of evidence in other proceedings.
CHAPTER - VII
INFRASTRUCTURE PROJECTS FUND.
54. Establishment of the fund.
55. Fees and charges to be credited to the fund.
56. Administration of the fund.
57. Utilisation of the fund.
4 [Act No. 36 of 2001]
58. Operation of the fund.
59. Formulation of policy and regulations for the fund.
60. Audit report of the fund.
CHAPTER - VIII
MISCELLANEOUS
61. Control by the Government.
62. Transparency.
63. Abuser charges.
64. Polluter Charges.
65. Appeal.
66. Indemnity by the Developer.
67. Recovery of costs, charges, dues, fees and fines.
68. Application of fines and charges.
69. Penalties.
70. Offences by companies.
71. Power to compound offences.
72. Cognizance of offences.
73. Penalties and proceedings not to prejudice other
actions.
74. Protection of action taken in good faith.
75. Members and staff of Infrastructure Authority or
Conciliation Board to be public servants.
76. Bar of Jurisdiction.
77. Power to remove difficulties.
78. Power to make regulations.
79. Power to make rules.
80. Delegation of Powers.
[Act No. 36 of 2001] 5
81. Act to override other State Laws.
82. Repeal of Ordinance.
Schedule - I.
Schedule - II.
Schedule - III.
Schedule - IV.
Schedule - V.
THE TELANGANA INFRASTRUCTURE DEVELOPMENT
ENABLING ACT, 2001.1
ACT No.36 OF 2001.
CHAPTER - I
PRELIMINARY
1. (1) This Act may be called the 2Telangana Infrastructure
Development Enabling Act, 2001.
(2) It extends to the whole of the State of 2Telangana.
(3) It shall apply to all Infrastructure Projects
implemented through Public Private Partnership in the
sectors enumerated in Schedule III of the Act and to such
other sectors as may be notified by the Government under
the Act from time to time. The Act will not apply to any
Infrastructure Project which is undertaken by any joint
venture between the State or Central Government
Departments or between the State or Central Government
and any Statutory Body or between any Statutory Bodies or
between the State or Central Government or Statutory Body
and any Government Company or any Infrastructure Project
which may be taken over by any private party or private
sector undertaking upon privatisation or dis-investment by
the State or Central Government or Government Agency or
by any Statutory Corporation or any Government Company
or any Infrastructure Project which does not involve fresh,
1. The Andhra Pradesh Infrastructure Development Enabling Act, 2001
received the assent of the Governor on the 9th October, 2001. The said
Act in force in the combined State, as on 02.06.2014, has been adapted
to the State of Telangana, under section 101 of the Andhra Pradesh
Reorganisation Act, 2014 (Central Act 6 of 2014) vide. the Telangana
Adaptation of Laws Order, 2016, issued in G.O.Ms.No.45, Law (F)
Department, dated 01.06.2016.
2. Substituted by G.O.Ms.No.45, Law (F) Department, dated 01.06.2016.
Short title, extent,
application and
commencement.
2 [Act No.36 of 2001]
new, additional investment being made by a private sector
participant or any Infrastructure Project which is expressly
notified to be excluded from the provisions of the Act by the
Government.
(4) It shall be deemed to have come into force with
effect on and from the 20th August, 2001.
2. In this Act unless the context otherwise requires,-
(a) “Act” means the 3Telangana Infrastructure
Development Enabling Act, 2001;
(b) “Best Effort” means best efforts made in the
circumstances;
(c) “Bidder” means any entity including any Bidding
Consortium who has submitted a proposal to undertake an
Infrastructure Project under Public Private Partnership;
(d) “Bidding Consortium” means if the proposal for the
Project is made jointly by more than one entity, then such
group of entities shall be referred to as a Bidding
Consortium;
(e) “Categories of Projects” means categories specified
in Schedule II of the Act and such other categories as may
be notified by the Government from time to time;
(f) “Charges for Abuse or Abuser Charges” means the
levy of charges by the Infrastructure Authority on any
Developer if any Developer abuses any right accorded
under the Concession Agreement, in the course of
development, implementation, operation, maintenance,
management and transfer of any Infrastructure Project, to
3. Substituted by G.O.Ms.No.45, Law (F) Department, dated 01.06.2016.
Definitions.
[Act No.36 of 2001] 3
the extent as may be specified in the Concession
Agreement or such other agreement as may be prescribed
by the Government;
(g) “Company” means any entity incorporated by
memorandum of association under the *Companies Act,
1956 or incorporated under any other statute or deemed to
be incorporated under the laws of India or the laws of any
other country of the World;
(h) “Concession Agreement” means a contract of the
nature specified in Schedule-I between the Developer and
the State Government or Government Agency or the Local
Authority relating to any Infrastructure Project or such other
contract as may be prescribed from time to time by the
Government;
(i) “Conciliation Board” means the Conciliation Board
established under section 32 of the Act;
(j) “Construction” means any construction,
reconstruction, rehabilitation, improvement, expansion,
addition, alteration and related works and activities including
supply of any equipment, materials, labour and services
related to build or rehabilitate any Infrastructure Project
comprising of physical structures or systems or
commodities or for utilization of resources or provision of
services;
(k) “Developer” means any Private Sector Participant
who has entered into a contract for the Infrastructure Project
with the Government or Government Agency or Local
Authority under the Act;
* See the Companies Act, 2013 (Act No.18 of 2013).
Central Act 1 of 1956.
4 [Act No.36 of 2001]
(l) “Generic Risks” means circumstances that have the
potential to adversely affect the development of a Project or
interest of the participants to the Project or interest of the
Government or Government Agency or Local Authority and
in the nature of construction period risk, operation period
risk, market and revenue risk, finance risk, legal risk and
miscellaneous risks as enumerated in Schedule IV of the
Act;
(m) “Government” means the State Government of
4Telangana;
(n) “Government Agency” means any department of
the Government or any corporation or body owned or
controlled by the Government by reason of the Government
holding not less than fifty one percent of paid-up share
capital in such corporation or body;
(o) “Government Company” means any company in
which not less than fifty-one per cent of the paid-up share
capital is held by the Central Government, or by any State
Government or Governments, or partly by the Central
Government and partly by one or more State Governments
and includes a company which is a subsidiary of a
Government company as defined;
(p) “Fund” means the Infrastructure Projects Fund
established under section 54 of the Act;
(q) “Infrastructure Authority” means the Authority
constituted under section 3 of the Act;
(r) “Infrastructure” means public woks relating to
infrastructure for utilising the natural resources and
providing services by either public works of physical
4. Substituted by G.O.Ms.No.45, Law (F) Department, dated 01.06.2016.
[Act No.36 of 2001] 5
structure or systems for facilities or commodities or
utilisation of resources or provision of services;
(s) “Infrastructure Project or Project” means a Project in
the sectors as notified under the Act by the Government;
(t) “Investment” means preliminary and pre-operative
expenses, capital expenditure, lease on land and
equipment, interest during construction, administrative
expenses, all operating and maintenance expenses
including expenses incurred on recovery of User Levies;
(u) “Lead Consortium Member” means in case of a
Bidding Consortium, that consortium member vested with
the prime responsibility of developing a Project, holding not
less than 26% equity stake in the Bidding Consortium and
also holding the highest equity stake amongst all other
consortium members. In the event of two or more
consortium members holding the highest equal equity
stake, the Bidding Consortium shall clearly indicate in the
Bid which consortium member is to be considered the Lead
Consortium Member and the consortium member so
indicated or named shall be the Lead Consortium Member;
(v) “Lender” means any financial institution or bank or
any entity providing financial assistance with or without
security or giving any advances to any Developer for
completing or implementing any Project under the Act;
(w) “Linkage Infrastructure Project” means from any
Project under the Act any road link to the nearest State
highway, national highway or rail link or water transmission
link to the nearest practical water source including an
existing pipeline or canal or water body or sewerage link to
the nearest practical sewerage transmission line or
sewerage treatment facility or such other facility;
6 [Act No.36 of 2001]
(x) “Mega Infrastructure Project” means any Project
implemented or undertaken through Public Private
Partnership under the Act requiring an investment as may
be prescribed by the Infrastructure Authority;
(y) “Local Authority” means any municipal corporation
or municipal council or any panchayat or any other statutory
body formed, elected or appointed for local self-
Government;
(z) “Local Laws” means laws other than central laws
and applicable to the State;
(aa) “Member” means a member of the Infrastructure
Authority which includes the Chairperson, the Vice
Chairperson and any other member of the Infrastructure
Authority;
(bb) “Non Profit Organisation” means any
organisation formed for promoting commerce, art, science,
religion, charity or any other useful object and applies its
income in promoting its objects and prohibits the payment
of any dividend to its members and does not allow its
corpus or income to be lent or advance or diverted or
utilised or exploited by its members or office bearers or any
other company in which they or any of them may be
interested or connected;
(cc) “Notification” means a notification published in
the 5Telangana Gazette and the word “notified” shall be
construed accordingly;
(dd) “Person” shall include any company or
association or body of individuals, whether incorporated or
not;
5. Substituted by G.O.Ms.No.45, Law (F) Department, dated 01.06.2016.
[Act No.36 of 2001] 7
(ee) “Polluter Charges” means levy of prescribed
charges by the Infrastructure Authority on any Developer, if
any Developer pollutes the environment or does not adhere
to the specifications and measures for environment
preservation and conservation agreed under the contract
with the Government or the Government Agency or the
Local Authority or fails to stop polluting the environment
within 30 days of receipt of notice in writing from the
Infrastructure Authority or the Government Agency or the
Local Authority;
(ff) “Prioritised Project” means any Project, which is
notified by the Infrastructure Authority as a prioritised project
under the Act;
(gg) “Private Sector Participant” means any person
other than Central Government or State Government or
Government Agency or any joint venture between Central
Government or State Government Departments or any,
Statutory Body or Authority or Local Authority or any
Corporation or Company in which Central Government or
State Government or Government Agency, Statutory Body
or Authority or Local Body is holding not less than fifty one
percent paid-up share capital;
(hh) “Prescribed” means prescribed by rules or
regulations made under this Act;
(ii) “Prospective Lenders” means financial institutions,
banks or any other entities of such project financing track
record as may be prescribed, who in principle or agreeable
to provide guarantees or finance to the Bidder under any of
the financing documents;
(jj) “Public Private Partnership” means investment by
Private Sector Participant in an Infrastructure Project of the
Government Agency or the Local Authority in the State;
8 [Act No.36 of 2001]
(kk) “Regulation” means regulations made under
section 78 of the Act;
(ll) “Responsive Bid” means a bid from an eligible
Bidder which complies with all the requirements prescribed
by the tender documents or other documents as the case
may be;
(mm) “Rules” means rules made under section 79 of
the Act;
(nn) “Sectors” means sectors as notified under
Schedule III of the Act and as may be notified from time to
time by the Government;
(oo) “Sector Regulator” means the regulatory
authority for a Sector or Sectors as may be notified by the
Government from time to time;
(pp) “Sole Bid” means when in competitive bidding
process there is only one Responsive Bid received by the
Government Agency or the Local Authority;
(qq) “State” means the State Government of
6Telangana;
(rr) “State Support” means grant by the State of any
administrative support, asset-based support, foregoing
revenue benefits support, undertaking contingent liabilities
by providing guarantees or financial support to the
Developer as enumerated in Schedule V of the Act;
(ss) “Swiss Challenge Approach” means when a
private Sector Participant (Original Project Proponent)
submits an Unsolicited or suo-motu proposal and draft
6. Substituted by G.O.Ms.No.45, Law (F) Department, dated 01.06.2016.
[Act No.36 of 2001] 9
contract principles for undertaking a category II Project, not
already initiated by the Government Agency or the Local
Authority and the Government Agency or the Local Authority
then invites competitive counter proposals in such manner
as may be prescribed by the Government. The proposal and
contract principles of the Original Project Proponent would
be made available to any interested applicants, however,
proprietary information contained in the original proposal
shall remain confidential and will not be disclosed. The
applicants then will have an opportunity to better the
Original Project Proponent's proposal. If the Government
finds one of the competing counter proposals more
attractive, then the Original Project Proponent will be given
the opportunity to match the competing counter proposal
and win the Project. In case the Original Project Proponent
is not able to match the more attractive and competing
counter proposal, the Project is awarded to the Private
Sector Participant, submitting the more attractive competing
counter proposal;
(tt) “Unsolicited or suo-motu Proposal” means a
proposal in respect of a Project not already initiated by the
Government or Government Agency or Local Authority and
which proposal is submitted by any Private Sector
Participant to the Government Agency or Local Authority in
respect of any Infrastructure in the State supported by
project specifications technical, commercial and financial
viability and prima facie evidence of the financial and
technical ability of such Private Sector Participant to
undertake such Project with full details of composition of the
Private Sector Participant and his financial and business
background; and
(uu) “User Levies” means the right or authority
granted to the Developer by the Government Agency or the
Local Authority to recover investment and fair return on
10 [Act No.36 of 2001]
investment and includes toll, fee, charge or benefit by any
name.
CHAPTER - II
ESTABLISHMENT, CONDUCT OF BUSINESS AND
EMPLOYESS OF THE INFRASTRUCTURE AUTHORITY.
3. (1) The Government may, by notification and with effect
on and from such date as may be specified therein
constitute an authority to be called, “the Infrastructure
Authority”.
(2) The Authority constituted under sub-section (1)
shall be a body corporate having perpetual succession and
a common seal, with power to acquire, hold and dispose of
property both movable and immovable to do all things
incidental to and necessary for the purposes of this Act and
to contract and may by the said name sue and be sued.
(3) The headquarters of the authority shall be at
Hyderabad or at such other place as may be notified.
4. (1) The Authority shall consist of a Chairperson, 7[Vice
Chairperson] and such other members not exceeding fifteen
in the aggregate including Ex-officio members.
8[(2) The Chief Secretary to the Government or any
other person with equivalent experience shall be the
Chairperson of the authority.]
7[(2A) The Principal Secretary to Government,
Infrastructure and Investment Department shall be the Vice
Chairperson of the Authority.]
7. Inserted by Act No.9 of 2006.
8. Substituted by Act No.18 of 2002.
Composition of
the Authority.
Constitution of
Infrastructure
Authority.
[Act No.36 of 2001] 11
(3) The Ex-officio members of the Authority shall be the
following:-
(i) Secretary to the Government, Finance and
Planning (Finance Wing) Department;
(ii) Secretary to the Government, Transport, Roads
and Buildings Department;
(iii) Secretary to the Government, Municipal
Administration and Urban Development Department;
(iv) Secretary to the Government, Information
Technology Department;
9[(v) Managing Director, Infrastructure Corporation of
10Telangana];
11[(vi) [XXX]]
(4) The Members other than those specified in sub-
section (3) shall be appointed by the Government in the
manner prescribed.
5. Every member other than the Ex-officio member shall
hold office during the pleasure of the Government.
6. The terms and conditions of service of the members of
the Authority including the honoraria and the allowances to
be paid to them shall be such as may be prescribed.
9. Substituted by Act No.9 of 2006.
10. Substituted by G.O.Ms.No.45, Law (F) Department, dated
01.06.2016.
11. Omitted by Act No.9 of 2006.
Term of Office of
the Members.
Terms and
conditions of
service.
12 [Act No.36 of 2001]
7. The Authority shall meet at such times and places and
observe such procedure in regard to transaction of business
at the meetings including the quorum as may be provided
by the regulations.
8. The Authority may appoint such officers and members
of staff as it may require in carrying out its functions and
discharging its duties under this Act in such manner as may
be prescribed.
9. (1) The Authority may, from time to time constitute
such committee or committees consisting of such members
for performing such of its functions as may be provided by
the regulations.
(2) The Authority shall invite such persons from the
fields of banking, commerce, industry, environment, law,
technology and the like as may be nominated by the
Government from time to time to assist the Authority in
carrying out its functions under this Act on such terms and
conditions as may be prescribed.
10. The functions of the Infrastructure Authority shall be as
follows:-
(a) to conceptualise and identify projects and ensure
their conformance to the objectives of the State;
(b) to receive and consider projects under the Act from
the Government or Government Agency or Local Authority
and process the same;
(c) to advise the Government or Government Agency
or Local Authority, as the case may be, on the project and
give recommendations or suggestions in that behalf;
Meetings of the
Authority.
Appointment of
officers and staff
of the Authority.
Constitution of
Committees.
Functions of the
Infrastructure
Authority.
[Act No.36 of 2001] 13
(d) to co-ordinate between concerned department of
the Government and Government Agency for a project;
(e) to monitor the competitive bidding process for
Category II Projects and provide for course correction, if
required;
(f) to provide enablers for projects;
(g) to prioritise and categorise projects and to prepare
a project shelf;
(h) to prepare road map for project development;
(i) to identify inter-sectoral linkages;
(j) to approve the terms of reference for consultancy
assignments in Category II projects and the consultant
selection process thereof;
(k) to decide financial support and approve allocation
of contingent liabilities for projects;
(l) to recommend and approve bid documents, risk
sharing principles and bid processes for Category II
projects;
(m) to approve the scale and scope of a suo-motu
proposal or project undertaken through Swiss-Challenge
Approach and to recommend modifications of a non
financial nature if required;
(n) to resolve issues relating to project approval
process;
(o) to prescribe time limits for clearances necessary for
any project;
14 [Act No.36 of 2001]
(p) to review periodically the status of clearances and
ensure that clearances are accorded within specified time
frames and grant clearances if not granted within time
frames or if denied, as may be specified;
(q) to decide issues pertaining to user levies including
but not limiting to prescribing mechanism and procedure for
setting, revising, collecting and/or regulating user levies and
to decide and settle disputes relating to user levies;
(r) to approve sectoral policies and model contract
principles;
(s) to issue and/or amend guidelines needed to
effectively implement the Act;
(t) to coordinate with sector regulator/s;
(u) to administer and manage the Fund and its assets;
(v) to coordinate execution of the projects with
Government, Government Agency and Local Authority;
(w) to supervise or otherwise ensure adequate
supervision over the execution, management and operation
of project;
(x) to build public opinion;
(y) to fix and provide for recovery of fees, levies, tolls
and charges as may be specified from time to time;
(z) to levy and recover charges for abuse and polluter
charges from the developer;
(aa) to prescribe regulations to regulate its own
procedures;
[Act No.36 of 2001] 15
(bb) to take all steps necessary for enforcing the
provisions of the Act and realising the objectives of the Act.
11. (1) Notwithstanding anything contrary in any other laws
for the time being in force, the Infrastructure Authority shall
have the power to grant any clearance or permission
required for any project save and except sanction to the
project by the Government as provided under this Act and
such clearance or permission when granted shall be final,
binding and conclusive on the concerned state level
statutory bodies or administrative bodies or authorities, as
the case may be.
(2) Notwithstanding anything contrary in any law for the
time being in force, the Infrastructure Authority may give
directions to any Government Agency or Local Authority or
other Authority or Developer or Person with regard to
implementation of any project under the Act or for carrying
out its functions under this Act and such Government
Agency or Local Authority or other Authority or Developer or
Person shall be bound to comply with such directions.
(3) The Infrastructure Authority shall have power to call
upon any Government Agency, Local Authority or any other
Body or Authority or Developer or Person to furnish
information, details, documents and particulars as may be
required by the Infrastructure Authority in connection with or
in relation to any project, which such Government Agency,
Local Authority or Body or Authority, Developer or Person,
shall furnish to the Infrastructure Authority without any delay
or default.
(4) The Infrastructure Authority shall have power to
inspect, visit, review and monitor any project and its
implementation, execution, operation and management
through its official or officials and the persons in charge of
Powers of the
Infrastructure
Authority.
16 [Act No.36 of 2001]
the project shall be bound to give full cooperation to the
Infrastructure Authority.
(5) The Infrastructure Authority shall have all powers to
enable to carry out its functions under the Act.
12. The Infrastructure Authority shall submit quarterly
report as regards its working and operation to the State
Government.
CHAPTER - III
INFRASTRUCTURE PROJECT DELIVERY PROCESS
13. Any private sector participant may participate in
financing construction, maintenance, operation and
management of Infrastructure Projects covered under the
Act.
14. Either the Infrastructure Authority or the Government
Agency or the Local Authority may identify or conceptualise
any Infrastructure Project. If the Authority identifies or
conceptualises any Infrastructure Project, then the same will
be referred by the Authority to the concerned Government
Agency or the Local Authority for its consideration and
further action. If the Government Agency or Local Authority
identifies or conceptualises any infrastructure project, then
the same will be referred to Infrastructure Authority for its
consideration, evaluation and further action as may be
required.
15. The Infrastructure Authority will prioritise projects
based on demand and supply gaps, inter-linkages and any
other relevant parameters and create a project shelf.
16. The Government Agency or the Local Authority in
accordance with the advice, recommendations and
suggestions of the Infrastructure Authority shall submit the
Report to the
Government.
Participation in
infrastructure
project.
Project
Identification.
Prioritisation of
Projects.
Recommen-
dations by the
Infrastructure
Authority.
[Act No.36 of 2001] 17
project to the Government along with the proposed
concession agreement relating thereto for its consideration
and sanction.
17. The Government shall consider the proposal submitted
by the Government Agency or Local Authority and the
proposed Concession Agreement and either accept the
proposal and Concession Agreement with or without
modification or return the proposal and concession
agreement to the Government Agency or the Local Authority
for reconsideration or reject the proposal within such time as
may be prescribed. The Government Agency or the Local
Authority will take suitable action on the decision taken by
the Government on the proposal and the concession
agreement including revising and resubmitting the proposal
and the concession agreement if returned by the
Government for reconsideration by the Government Agency
or the Local Authority:
Provided that if the Bidder whose proposal submitted
for sanction is not in a position to implement the project, the
Government may at the request of the Government Agency
or the Local Authority with the approval of the Infrastructure
Authority consider the proposal of the Bidder offering the
second most competitive bid for sanction.
18. The Government Agency or the Local Authority shall
ensure adequate competition in the consultant selection
process for any project. They may, frame the terms of
reference for consultant studies and in case of Category II
projects and present the same for approval and
modification, if necessary, by the Infrastructure Authority:
Provided that in the case of such selection process
adequate weightage shall be given to the technical
capabilities.
Sanction by the
Government.
Consultant
selection.
18 [Act No.36 of 2001]
19. The Government Agency or the Local Authority may
adopt appropriate Developer Selection Process including
any of the following processes, namely:-
(I) DIRECT NEGOTIATIONS:
(i) The Government Agency or the Local Authority may
directly negotiate with a Bidder for implementing:-
(a) Category-I projects initiated by a Bidder; or
(b) the projects which involve proprietary technology
or franchise which is exclusively available with the Bidder
globally; or
(c) the projects where competitive bid process has
earlier failed to identify a suitable Developer; or
(d) the projects in prescribed social infrastructure
sectors where a non-profit organisation seeks to develop a
project; or
(e) a linkage Infrastructure Project with the concerned
Developer of Mega Infrastructure Project;
(ii) In case a developer is selected through direct
negotiations, the Government Agency or the Local Authority
may renegotiate the financial offer or recommend that all
subsequent procurement for the project is made through
the competitive bidding, procurement process, the cost of
the project be determined after such competitive bidding
procurement process and renegotiate the financial offer
based on the revised cost of the project.
Developer
selection
processes.
[Act No.36 of 2001] 19
(II) SWISS CHALLENGE APPROACH:
(i) The Swiss Challenge Approach will be followed in
any project belonging to Category -II initiated by a private
sector participant who is hereinafter referred to as „Original
Project Proponent‟, by a suo-motu proposal;
(ii) The Original Project Proponent must submit to the
Government Agency or Local Authority:-
(a) details of his technical, commercial, managerial
and financial capability;
(b) technical, financial and commercial details of the
proposal;
(c) principles of the concession agreement;
(iii) The Government Agency or the Local Authority
would first evaluate the Original Project Proponent's
technical, commercial, managerial and financial capability
as may be prescribed and determine whether the Original
Project Proponents capabilities are adequate for
undertaking the project;
(iv) The Government Agency or the Local Authority
shall forward such suo-motu proposal to the Infrastructure
Authority along with its evaluation within the prescribed time
for the approval of the Infrastructure Authority;
(v) The Infrastructure Authority would then weigh the
technical, commercial and financial aspects of the Original
Project Proponent‟s proposal and the concession
agreement along with the evaluation of the projects by the
Government Agency or the Local Authority and ascertain if
the scale and scope of the project is in line with the
requirements of the State and whether the sharing of the
20 [Act No.36 of 2001]
risks as proposed in the Concession Agreement is in
conformity with the risk-sharing frame work as adopted or
proposed by the Government for similar projects, if any and
if the project is in conformity with long term objective of the
Government;
(vi) If the Infrastructure Authority recommends any
modification in the technical, scale, scope and risk sharing
aspects of the proposal or the Concession Agreement, the
Original Project Proponent will consider and incorporate the
same and resubmit its proposal within prescribed time to
the Government Agency or the Local Authority;
(vii) If the Infrastructure Authority finds merit in such
suo-motu proposal, the Infrastructure Authority will then
require Government Agency or the Local Authority to invite
competing counter proposals using the Swiss Challenge
Approach giving adequate notice as may be prescribed.
The Original Project Proponent will be given an opportunity
to match any competing counter proposals that may be
superior to the proposal of the Original Project Proponent. In
case the Original Project Proponent matches or improves on
the competing counter proposal, the project shall be
awarded to the Original Project Proponent, otherwise the
bidder making competing counter proposal will be selected
to execute the project;
(viii) In the event of the Project not being awarded to
the Original Project Proponent and being awarded to any
other Bidder, the Government Agency or the Local Authority
will reimburse to the Original Project Proponent reasonable
costs incurred for preparation of the suo-motu proposal and
the Concession Agreement. The suo-motu proposal and the
Concession Agreement prepared by the Original Project
Proponent shall be the property of the Government Agency
or the Local Authority as the case may be;
[Act No.36 of 2001] 21
(ix) The reasonable costs of preparation of the suo-
motu proposal and the Concession Agreement shall be
determined as per the norms prescribed by the Government
and shall be binding upon the Original Project Proponent.
III. COMPETITIVE BIDDING:
(i) Competitive Bidding will be adopted in all Projects
initiated by the Government Agency or the Local Authority.
The notice inviting participation will be adequately
publicised by the Government Agency or the Local Authority
as may be prescribed;
(ii) The bid process will be designed to assist and
ascertain, technical, financial, managerial and commercial,
capabilities of the Developer;
(iii) In case of a two stage process being adopted for a
Mega Infrastructure Project, the Government Agency or the
Local Authority may require all Bidders to obtain from their
Prospective Lenders, financial terms, expectations regarding
State Support, comments on the Concession Agreement
and other project documents (hereinafter called
“Deviations”);
(iv) Any Deviations proposed shall be enclosed in a
separate envelope and shall not be part of the envelope
containing the financial or the commercial offer with regard
to a Project. The procedure for determining the common set
of Deviations and the effect to be given to such common set
of Deviations shall be as may be prescribed;
(v) All proposals shall be opened and evaluated at a
common platform in a free and fair manner;
22 [Act No.36 of 2001]
(vi) It will be open for the Government Agency or the
Local Authority to adopt one or two stage process
depending upon the complexity of the Project;
(vii) The Government Agency or the Local Authority will
periodically inform the Infrastructure Authority of the
progress of all Projects undertaken through a two-stage bid
process.
20. In case a model contract for a Sector has not been
adopted or in case there are Deviations proposed vis-a-vis
the approved model contract for a Sector, then, the
Infrastructure Authority will formulate or approve the
contract principles as the case may be.
21. The Government Agency or the Local Authority will first
satisfy itself about the technical ability of the Developer to
undertake and execute the Project and will follow,-
(a) one or combination of one or more of the following
criteria for Developer selection through competitive bidding
in Build Own Operate and Transfer, Build Operate and
Transfer and Build Own and Operate Projects,-
(i) Lowest bid in terms of the present value of user
fees;
(ii) Highest revenue share to the Government;
(iii) Highest up front fee;
(iv) Shortest concession period;
(v) Lowest present value of the subsidy;
(vi) Lowest capital cost and Operation & Management
cost for Projects having a definite scope;
Approval of
contract
principles.
Selection criteria.
[Act No.36 of 2001] 23
(vii) Highest equity premium; and
(viii) Quantum of State Support solicited in present
value;
(b) For Build Transfer, Build Lease and Transfer and
Build Transfer and Lease Projects selection criteria used will
be the lowest net present value of payments from the
Government.
(c) Such other suitable selection criteria the
Infrastructure Authority may allow or determine.
22. In case of the competitive bidding process resulting
into a Sole Bid, the Government Agency or the Local
Authority shall in consultation with the Infrastructure
Authority, either,-
(i) accept the Sole Bid, or
(ii) re-negotiate the financial offer, or
(iii) reject the Sole Bid.
23. In case the competitive bidding process does not
generate sufficient response and if even a Sole Bid is not
received, then the Government Agency or the Local
Authority shall in consultation with the Infrastructure
Authority either,-
(i) modify either the pre-qualification criteria and/or the
risk sharing provisions and restart the bid process; or
(ii) may cancel the competitive bid process; or
(iii) in case of (ii) above, may have direct negotiation
with any Private Sector Participant.
Treatment of Sole
Bid.
Treatment of
limited response.
24 [Act No.36 of 2001]
24. (a) All proposals submitted by a Bidding Consortium
shall enclose a memorandum of understanding, executed
by all consortium members setting out the role of each of
the consortium members and the proposed equity stake of
each of the consortium members with regard to a Project;
(b) The Lead Consortium Member of a pre-qualified
Consortium cannot be replaced except with the prior
permission of the Infrastructure Authority and which
permission will be considered only in case of acquisition or
merger of the Lead Consortium Member Company. Further,
after a Bidding Consortium is selected to implement any
Project, the Lead Consortium Member shall maintain a
minimum equity stake of 26% for a period of time, as
specified in the Sector Policy or the Concession Agreement;
(c) Replacement of other Consortium Members may be
permitted, provided the same is not prejudicial to the
original strength of Consortium as determined in course of
the evaluation of original bid or proposal;
(d) Any change in the shareholding or composition of a
Consortium shall be with the approval of the Infrastructure
Authority.
25. The Government Agency or the Local Authority with the
approval of the Infrastructure Authority will be entitled to
treat the speculative or unrealistic bids as non-responsive
and reject the same. By reason of any speculation or
unrealistic bid or rejection of such bid, shall not necessarily
lead to termination of the bid process. The Infrastructure
Authority will prescribe the norms for determining the
speculative or unrealistic bids.
26. Save as otherwise provided in the Act the Government,
or the Government Agency or the Local Authority will not
Treatment of Bid
submitted by a
consortium.
Speculative bids.
No negotiation on
financial or
commercial
proposal.
[Act No.36 of 2001] 25
negotiate with the Bidder on the financial or commercial
aspect of the proposal submitted by the Bidder.
27. (1) The Bidder will be required to submit a bid security
along with the proposal for undertaking the Infrastructure
Project, the bid security amount will be determined based
on the Project cost by the Government Agency or the Local
Authority.
(2) The procedure for refund of bid security will be
specified in the request for proposal. In any event, the bid
security of unsuccessful Bidder would be returned within 30
calender days from the date of selection of the Developer.
CHAPTER - IV
GENERIC RISKS DISCLOSURE AND ALLOCATION,
SECURITISATION, RIGHT OF LENDERS AND FACILITIES
TO BE PROVIDED BY THE GOVERNMENT AGENCY OR
THE LOCAL AUTHORITY.
28. The Government Agency or the Local Authority will as
far as possible disclose Generic Risks involved in a Project
and a list of such Generic Risks along with allocation and
treatment of such Generic Risks may be provided in the
Concession Agreement or other contract to be entered into
between the Government Agency or the Local Authority and
the Developer. The Government Agency or the Local
Authority will make optimum disclosure of the Generic
Risks, however if any risk is not disclosed due to
inadvertence or due to circumstances beyond the control of
the Government Agency or the Local Authority, then the
same shall not be a ground for any claim, demand or
dispute by the Developer.
29. The Government Agency or the Local Authority may
facilitate a Developer to securitise Project receivables and
Project assets in favour of Lenders subject to such terms as
Bid security.
Generic Risks
Disclosure and its
allocation and
treatment.
Facilitation of
securitisation.
26 [Act No.36 of 2001]
may be fixed by the Government or by the Infrastructure
Authority to safeguard the successful implementation,
completion, working, management and control of the
project.
30. The Lenders will be entitled to recover their dues from
the Developer and Project receivables in the form of User
Levies and in the event of default by the Developer in
completing or implementing a Project, the Lenders will have
the right to substitute the Developer with the consent of the
Government and subject to the approval of such substituted
Developer by the Government Agency or the Local Authority
and by the Infrastructure Authority, on the same terms and
conditions as applicable to the previous Developer or with
such modifications as may be specifically approved by the
Infrastructure Authority.
31. The Government Agency or the Local Authority will
provide all facilities to the Developer for obtaining statutory
clearances at state level, for providing power and water at
Project Site during construction on such terms as may be
prescribed and provide best effort support for obtaining
Central Government clearances and assistance in
rehabilitation and resettlement activities, if any, incidental to
the Project on such terms as may be prescribed.
CHAPTER - V
CONCILIATION BOARD
32. The State Government may, by notification, establish a
Board to be called the “Conciliation Board” with effect from
such date as may be specified.
33. The Board will comprise of 3 members and will have a
retired High Court Judge acting as its Chairperson and two
other members who shall be experts in the field of either
infrastructure or finance or banking or law.
Rights of Lenders.
Facilities to be
provided by the
Government
Agency or the
Local Authority.
Establishment of
the Board.
Constitution of the
Board.
[Act No.36 of 2001] 27
34. The Board will have its permanent Head Quarters at
Hyderabad and the Board shall meet under the
Chairpersonship of the Chairperson.
35. Every member of the Board shall hold office for a term
of 3 years from the date of appointment. The State
Government shall be entitled to reappoint any member or
members for one more term of 3 years.
36. The terms and conditions of appointment,
remuneration and perquisites of the members shall be such
as may be prescribed by the Government.
37. The functions of the Board shall be as follows,-
(a) To assist the Government Agency or Local Authority
and any Developer in an independent and impartial manner
to reach an amicable settlement of their disputes arising
under the Act or the Concession Agreement;
(b) The Board shall be guided by principles of the
objectivity, fairness, obligations of the parties, the usages of
the trade and the circumstances governing the disputes
including the good business practice prevalent in the
national and international field covered by the dispute
between the parties;
(c) The Board may conduct the conciliation
proceedings in such a manner as it may consider
appropriate, taking into account the circumstances of the
case, the wishes of the parties that may be expressed and
for reaching a speedy settlement of the dispute;
(d) The Board may, at any stage of the conciliation
proceedings, make proposals for settlement of dispute.
Such proposal need not be in writing and need not be
accompanied by any statement of reasons therefor.
Head Quarters.
Term of Office of
the members.
Terms and
conditions of
appointment.
Functions of the
Board.
28 [Act No.36 of 2001]
38. In order to facilitate the conduct of the conciliation
proceedings, the Board with the consent of the parties, may
arrange for administrative assistance by a suitable institution
or person.
39. The Board shall have the same powers as are vested in
a Civil Court under the Code of Civil Procedure, 1908 while
dealing with the conciliation proceedings in respect of the
following matters, namely:-
(i) The summoning and enforcing the attendance of
any party or witness and examining the witness on oath;
(ii) The discovery and production of any document or
other material as evidence;
(iii) The reception of evidence on oath;
(iv) The requisitioning of the report of any body or any
analysis or decision from the appropriate forum or
laboratory or other relevant sources;
(v) The issuing of any commission for examining any
witness;
(vi) The power to regulate its own procedure and
prescribe rules; and
(vii) any other matter, which may be prescribed.
40. Every proceeding before the Board shall be deemed to
be a judicial proceeding within the meaning of section 193
and section 228 of the Indian Penal Code, 1860 and the
Board shall be deemed to be a Civil Court for the purpose of
section 195 and Chapter XIV of the Code of Criminal
Procedure, 1973.
Administrative
assistance.
Powers of the
Board.
Central Act 5 of 1908.
Judicial
proceeding.
Central Act 45 of 1860.
Central Act 2 of 1974.
[Act No.36 of 2001] 29
CHAPTER - VI
CONCILIATION PROCEEDINGS.
41. Any dispute, claim or difference arising out of or in
connection with or in relation to any Concession Agreement
or contract between the Government Agency or Local
Authority on the one hand and the Developer on the other
hand, shall as far as possible, be amicably settled between
the parties. In the event of any dispute, claim or difference
not being amicably resolved, such dispute, claim or
difference shall be referred to the Conciliation Board.
42. (1) The party initiating conciliation shall send to the
other party a written invitation to conciliate under this part,
briefly identifying the subject matter of the dispute, claim
and/or difference. The party initiating conciliation shall file
the invitation with the Board, in such Form as may be
prescribed.
(2) The conciliation proceedings shall commence when
the other party receives the written invitation from the party
initiating conciliation.
(3) If the other party does not reply or does not
participate in the conciliation proceedings, then the Board
shall have power to call upon the other party to file its reply
or give notice to the other party and proceed further without
reply.
(4) The Board may request each party to submit to it
further written statement of their position and the facts and
grounds in support thereof, supplemented by any document
and other evidence as such party deems appropriate. The
parties shall send a copy of such statement, documents and
other evidence to the other party.
Application and
scope.
Commencement
of conciliation
proceedings.
30 [Act No.36 of 2001]
43. The provisions of section 66 of the Arbitration and
Conciliation Act, 1996 shall apply to the Board as regards
the Code of Civil Procedure, 1908 and the Indian Evidence
Act, 1872.
44. The parties shall co-operate with the Board and in
particular, shall comply with requests by the Board to
submit written materials, give evidence and attend
meetings.
45. Each party may on his own initiative or at the invitation
of the Board, submit to the Board suggestions for the
settlement of the dispute.
46. (1) When it appears to the Board that there exists a
possibility of a settlement, the terms and conditions of which
may be acceptable to the parties, the Board shall formulate
the terms and conditions of the possible settlement and
submit the same to the parties for their observations. After
receiving the observations of the parties, if any, the Board
may reformulate the terms and conditions of the possible
settlement.
(2) If the parties reach agreement on a settlement of
the dispute, they may draw up and sign a written settlement
agreement. If requested by the parties, the Board may draw
up or assist the parties in drawing up the settlement
agreement.
(3) When the parties sign the settlement agreement, it
shall be final and binding on the parties and persons
claiming under them respectively.
(4) The Board shall authenticate the settlement
agreement and furnish a copy thereof to each of the parties.
The Board and
certain
Enactments
Central Act 26 of 1996
Central Act 5 of 1908
Central Act 1 of 1872.
Co-operation of
the parties with
the Board.
Suggestions by
parties for
settlement of
dispute.
Settlement
agreement.
[Act No.36 of 2001] 31
47. The settlement agreement shall have the same status
and effect as if it is an arbitral award on agreed terms on the
substance of the dispute rendered by an Arbitral Tribunal
under section 30 of the Arbitration and Conciliation Act,
1996 or its amendment or re-enactment as the case may be.
48. The conciliation proceedings shall be terminated,-
(a) by the signing of the settlement agreement by the
parties, on the date of the agreement; or
(b) by an order of the Board, after consultation with the
parties, to the effect that further efforts at conciliation are no
longer justified, on the date of the order; or
(c) by a written communication of the parties jointly
addressed to the Board to the effect that the conciliation
proceedings are terminated on the date of the
communication; or
(d) on the expiry of the period of 3 months from the
date of the commencement of the conciliation proceedings,
if the parties to conciliation proceedings request in writing to
continue conciliation, such conciliation proceedings shall
stand terminated on the expiry of period of 90 days from the
date of such joint communication in writing to the Board
requesting the Board to continue conciliation.
49. (1) The parties shall not initiate during the conciliation
proceedings any arbitral or judicial proceedings in respect
of any dispute, claim or difference i.e. the subject matter of
the conciliation proceedings.
(2) Notwithstanding the provisions of sub-section (1)
herein the party may initiate arbitral or judicial proceedings,
where, in his opinion, such proceedings are necessary for
preserving his rights during the conciliation proceedings.
Status and effect
of settlement
agreement.
Central Act 26 of 1996.
Termination of
conciliation
proceedings.
Resort to Arbitral
or Judicial
Proceedings.
32 [Act No.36 of 2001]
50. No party shall commence any arbitral or judicial
proceedings in respect of any dispute, claim or difference
arising out of or in connection with or in relation to any
contract or concession agreement, without first initiating the
conciliation proceedings and commencing the conciliation
proceedings by sending to other party a written invitation to
conciliate and filing the same with the Board.
51. (1) Upon termination of the conciliation proceedings
the Board shall fix the costs of the conciliation and give
written notice thereof to the parties.
(2) For the purpose of sub-section (1) “costs” means
reasonable costs relating to,-
(a) the fees of the Board as may be prescribed and
expenses of the Board and witnesses requested by the
Board with the consent of the parties;
(b) any expert advice requested by the Board with the
consent of the parties;
(c) any assistance provided by the Conciliation
Board;
(d) any other expenses incurred in connection with
the conciliation proceedings and the settlement agreement.
(3) The costs shall be borne equally by the parties
unless the Settlement Agreement provides for a different
apportionment. All other expenses incurred by a party shall
be borne by that party.
52. (1) The Board may direct each party to deposit an
equal amount as an advance for the costs referred to in sub-
section (2) of section 51, which the Board expects, will be
incurred.
Commencement
of arbitral or
judicial
proceedings.
Costs.
Deposits.
[Act No.36 of 2001] 33
(2) During the course of the conciliation proceedings,
the Board may direct supplementary deposits in an equal
amount from each party.
(3) If the required deposits under sub-sections (1) and
(2) are not paid in full by the parties within thirty days of the
direction, the Board may suspend the proceedings or may
make a written order of termination of the proceedings to
the parties, effective on the date of that order.
(4) Upon termination of the conciliation proceedings,
the Board shall render an account to the parties of the
deposits received and shall return any unexpended balance
to the parties.
53. The provisions of section 81 of the Arbitration and
Conciliation Act, 1996 shall apply to the matters before the
Board relating to admissibility of evidence in other
proceedings.
CHAPTER - VII
INFRASTRUCTURE PROJECTS FUND.
54. The Government shall establish a fund to be called the
“Infrastructure Projects Fund” and shall contribute a sum of
Rs. 100 lakhs to the fund. The Government will make such
further contributions to the fund as it may deem appropriate
from time to time.
55. The Government Agency or the Local Authority will
inter-alia levy fees and charges on the application for the
projects and project fee on the developer under the
Concession Agreement as may be prescribed from time to
time and which fees shall be credited to the fund.
Admissibility of
evidence in other
proceedings.
Central Act No.26 of
1996.
Establishment of
the fund.
Fees and charges
to be credited to
the fund.
34 [Act No.36 of 2001]
56. The fund will be administered and managed by the
Infrastructure Authority and the Infrastructure Authority will
be entitled to appoint an officer or officers for the
management, control and administration of the fund.
57. The Infrastructure Authority will utilise the fund for
achieving objects and purposes of this Act and for financing
the activities of the Infrastructure Authority for realising the
objects and purposes of the Act from time to time.
58. The fund will be operated by and under the name of
the Infrastructure Authority.
59. The Infrastructure Authority shall formulate its policy
and regulations for financing, working, administration and
management of the fund.
60. The working of the fund shall be subject to audit by
Comptroller and Auditor General and the Infrastructure
Authority shall submit a report every year as regards the
working and operation of the fund to the State Government
who will present the same before the Legislature of the
State.
CHAPTER - VIII
MISCELLANEOUS
61. (1) The Infrastructure Authority shall exercise its
powers, and perform its functioning under the Act in
accordance, with the policy framed and guidelines laid
down from time to time, by the Government and it shall be
bound to comply with such directions, which may be issued,
from time to time, by the Government for efficient
administration and effective implementation of the Act.
(2) If, in connection with the exercise of the powers and
the performance of the functions of the Infrastructure
Administration of
the fund.
Utilisation of the
fund.
Operation of the
fund.
Formulation of
policy and
regulations for the
fund.
Audit report of the
fund.
Control by the
Government.
[Act No.36 of 2001] 35
Authority under the Act, any dispute arises between the
Infrastructure Authority and the Government, the
Government shall decide the matter and the Government's
decision shall be final.
62. The Infrastructure Authority shall ensure transparency
while exercising its powers and discharging its functions.
63. (1) The Infrastructure Authority shall be entitled to levy
abuser charges for abuse, on the Developer, if any
Developer abuses the rights granted to the Developer under
the Concession Agreement:
Provided that the Infrastructure Authority shall give an
opportunity of not less than fifteen days from the date of
service of a notice to the Developer to show cause in
writing, why such abuser charges should not be levied on
him, before passing the order under this section.
(2) The Concession Agreement will provide what will
constitute abuse of rights granted to the Developer. The
abuser charges will be as prescribed by the Infrastructure
Authority from time to time:
Provided that the abuser charges levied under this
section shall be final and conclusive subject to provisions of
section 66 of the Act.
64. (1) The Infrastructure Authority shall be entitled to levy
Polluter Charges for pollution of the environment on the
Developer, if the Developer pollutes the environment and/or
does not adhere to the specified mitigation measures as
provided in the Concession Agreement.
(2) The Infrastructure Authority shall give an
opportunity of not less than fifteen days from the date of
service of notice to the Developer to show cause in writing,
Transparency.
Abuser charges.
Polluter Charges.
36 [Act No.36 of 2001]
why such Polluter Charges should not be levied on the
Developer, before passing the order under this section.
(3) The Polluter Charges will be as prescribed by the
Infrastructure Authority:
Provided that the Polluter Charges levied under this
section shall be final and conclusive subject to provisions of
section 66 of the Act.
65. (1) An appeal shall lie to the Government against the
order passed by the Infrastructure Authority under sections
11, 63 and or section 64 of the Act within 30 days from the
date of receipt of the order subject to the rules prescribed
by the Government in this regard.
(2) The decision of the Government under sub-section
(1) shall be final and conclusive.
66. The Developer shall be bound to indemnify the
Government Agency or the Local Authority against any
defect in design, construction, maintenance and operation
of the Project and shall undertake to reimburse all costs,
charges, expenses, losses and damages in that behalf.
67. The Infrastructure Authority or the Government Agency
or the Local Authority or the Conciliation Board shall be
entitled to recover all sums due to it under the Act, whether
by way of costs, charges, dues, fees or fines, in accordance
with the provisions of the 12Telangana Revenue Recovery
Act, 1864 as if any such sum may be recovered in the same
manner as arrear of land revenue under the provisions of
the said Act and remit the same to the Infrastructure Projects
Fund as it may direct.
12. Adapted by G.O.Ms.No.45, Law (F) Department, dated 01.06.2016.
Appeal.
Indemnity by the
Developer.
Recovery of costs,
charges, dues,
fees and fines.
Act II of 1864.
[Act No.36 of 2001] 37
68. The Infrastructure Authority or the Government Agency
or the Local Authority or the Conciliation Board imposing the
costs, charges, fees and fine under the Act may direct that
the whole or any part thereof shall be applicable towards
payment of the costs of the proceedings.
69. (1) Whoever fails or omits to comply with or
contravenes any of the provisions of the Act or order or
directions of the Infrastructure Authority shall be liable for
each of such failure or omission or contravention for fine
which shall not be less than Rs. 50,000/- (Rupees Fifty
Thousand) but which may extend up to Rs. 100,00,000/-
(Rupees One Crore) or shall be punishable with
imprisonment for a term which shall not be less than one
month but which may extend to three years or with both.
(2) Whoever fails or omits to comply with or
contravenes any of the provisions of the Act or order or
directions of the Board shall be liable for each of such failure
or omission or contravention for fine which shall not be less
than Rs. 50,000/- (Rupees Fifty Thousand) but which may
extend upto Rs. 1,00,00,000/- (Rupees One Crore) or shall
be punishable with imprisonment for a term which shall not
be less than one month but which may extend to two years
or with both.
70. (1) Where an offence under the Act has been
committed by a company, every person who at the time
when the offence was committed, was in charge of, and was
responsible to the company for the conduct of the business
of the company, as well as the company, shall be deemed
to be guilty of the offence and shall be liable to be
proceeded against and punished accordingly:
Provided that nothing contained in this sub-section
shall render any such person liable to any punishment if he
proves that the offence was committed without his
Application of
fines and charges.
Penalties.
Offences by
companies.
38 [Act No.36 of 2001]
knowledge or that he had exercised all due diligence to
prevent the commission of such an offence.
(2) Notwithstanding anything contained in sub-section
(1), wherein an offence under this Act, has been committed
by a company and it is proved that the offence has been
committed with the consent or connivance of, or is
attributable to any neglect on the part of, any director
manager, secretary or other officer of the company, such
director, manager, secretary or other officer shall be
deemed to be guilty of that offence and shall be liable to be
proceeded against and punished accordingly.
For the purposes of this section,-
(a) “Company” means a body corporate and includes a
firm or other association of individuals; and
(b) “Director” in relation to a firm means a partner in the
firm.
71. The Infrastructure Authority and the Conciliation Board
may for reasons to be recorded in writing either before or
after the institution of proceedings compound any offence
relating to contravention of any provisions of the Act or
order made by it.
72. (1) No Court shall take cognizance of any offence
punishable under the Act, except upon a complaint in
writing made by an officer of the Infrastructure Authority or
the Conciliation Board generally or specially authorized in
this behalf by the Infrastructure Authority or Conciliation
Board as the case may be and no Court other than the
Metropolitan Magistrate or a Judicial Magistrate of First
Class or a Court superior thereto shall try any such offence.
Power to
compound
offences.
Cognizance of
offences.
[Act No.36 of 2001] 39
(2) The court may, if it sees reasons so to do dispense
with the personal attendance of the officer of the
Infrastructure Authority or the Conciliation Board filing the
complaint.
73. The proceedings and actions under this Act against a
person contravening the provisions of the Act or orders
passed by the Infrastructure Authority or the Conciliation
Board shall be in addition to and without prejudice to
actions that may be initiated under other Acts.
74. No suit, claim or other legal proceedings shall lie
against the Infrastructure Authority or Conciliation Board or
the Chairman or other members of the Infrastructure
Authority or Conciliation Board or the staff or representatives
of the Infrastructure Authority or Conciliation Board in
respect of anything which is in good faith done or intended
to be done under the Act or any rules or regulations or
orders made thereunder.
75. The Chairman, other members and officers and other
employees of the Infrastructure Authority or Conciliation
Board appointed for carrying out the objects and purposes
of the Act shall be deemed to be public servants within the
meaning of section 21 of the Indian Penal Code, 1860.
76. Any order or proceeding under the Act including but
not limiting to any notification of a Project as Infrastructure
Project, categorisation or prioritisation of Projects,
Concession Agreement, bid process, selection of
Developer, modification of any proposal, sanction of any
proposal, implementation and execution of any Project,
actions of Infrastructure Authority, actions of the
Government or the Government Agency or the Local
Authority, actions of the Board, grievance or objection of
any party or person or group in respect of any Infrastructure
Penalties and
proceedings not
to prejudice other
actions.
Protection of
action taken in
good faith.
Members and
staff of
Infrastructure
Authority or
Conciliation Board
to be public
servants.
Central Act 45 of 1860.
Bar of
Jurisdiction.
40 [Act No.36 of 2001]
Project, validity, legality, efficacy of any action or decision in
respect of any Infrastructure Project of Infrastructure
Authority or the Government or the Board, dispute
settlement or dispute resolution in respect of any matters
under the Act shall be heard only by the High Court and by
no other court or courts subordinate to the High Court.
77. (1) If any difficulty arises in giving effect to the
provisions of the Act or the rules, regulations, scheme or
orders made hereunder, the State Government may by
order published in the Official Gazette, make such provision,
not inconsistent with the provisions of the Act as appears to
it to be necessary or expedient for removing the difficulty.
(2) All orders made under sub-section (1) shall, as
soon as may be after they are made, be placed on the Table
of the Legislature of the State and shall be subject to such
modification by way of amendments or repeal as the
Legislature may make either in the same session or in the
next session.
78. The Infrastructure Authority and Conciliation Board
may make regulations, with the approval of the Government,
by notification in the Official Gazette, for the proper
performance of their respective functions under the Act.
79. (1) The Government may, by notification, make rules
for carrying out all or any of the purposes of this Act.
(2) Every rule made under this Act shall, immediately
after it is made, be laid before the Legislature of the State if it
is in session, and if it is not in session, in the session
immediately following for a total period of fourteen days
which may be comprised in one session or in two
successive sessions, and if, before the expiration of the
session in which it is so laid or the session immediately
following, the Legislature agrees in making any
Power to remove
difficulties.
Power to make
regulations.
Power to make
rules.
[Act No.36 of 2001] 41
modifications in the rule or in the annulment of the rule, the
rule shall from the date on which the modification or the
annulment is notified, have effect only in such modified form
or shall stand annulled as the case may be, so however, that
any such modification or annulment shall be without
prejudice to the validity of anything previously done under
that rule.
80. The Government may by notification, direct that any
power exercisable by the Government under the Act shall be
exercisable by an officer of the Government, subject to such
terms as may be specified in such notification.
81. If any provision contained in any State Act is repugnant
to any provision contained in the Act, the provision
contained in the Act shall prevail and the provision
contained in any such State Act shall to the extent of
repugnancy be void.
82. The Andhra Pradesh Infrastructure Development
Enabling Ordinance, 2001 is hereby repealed.
Delegation of
Powers.
Act to override
other State Laws.
Repeal of
Ordinance 4 of
2001.
42 [Act No.36 of 2001]
SCHEDULE - I
(see section 2(h))
The following Concession Agreement or arrangements
with their variations and combinations may be arrived at by
the Government Agency or the Local Authority for
undertaking Infrastructure Projects. The arrangements
enumerated hereinafter are indicative in nature and the
Government Agency or the Local Authority shall be entitled
to evolve and arrive at such Concession Agreement or
arrangement incorporating any of the arrangements
enumerated hereinafter or any other arrangements as may
be found necessary or expedient for any specific Project:
(i) Build - and Transfer (BT) - A contractual
arrangement whereby the Developer undertakes the
financing and construction of a given infrastructure or
development facility and after its completion hands it over to
the Government, Government Agency or the Local Authority.
The Government, Government Agency or the Local
Authority would reimburse the total Project investment, on
the basis of an agreed schedule. This arrangement may be
employed in the construction of any infrastructure or
development Projects, including critical facilities, which for
security or strategic reasons, must be operated directly by
the Government or Government Agency or the Local
Authority;
(ii) Build - Lease - and - Transfer (BLT) –A contractual
arrangement whereby a Developer undertakes to finance
and construct Infrastructure Project and upon its completion
hands it over to the Government or Government Agency or
the Local Authority concerned on a lease arrangement for a
fixed period, after which ownership of the facility is
automatically transferred to the Government or Government
Agency or the Local Authority concerned;
[Act No.36 of 2001] 43
(iii) Build – Operate – and - Transfer (BOT) – A
contractual arrangement whereby the Developer undertakes
the construction, including financing, of a given
infrastructure facility, and the operation and maintenance
thereof. The Developer operates the facility over a fixed term
during which he is allowed to a charge facility users
appropriate tolls, fees, rentals and charges not exceeding
those proposed in the bid or as negotiated and incorporated
in the contract to enable the recovery of investment in the
Project. The Developer transfers the facility to the
Government or Government Agency or the Local Authority
concerned at the end of the fixed term that shall be specified
in the Concession Agreement. This shall include a supply-
and-operate situation which is a contractual arrangement
whereby the supplier of equipment and machinery for a
given infrastructure facility, if the interest of the Government,
Government Agency or the Local Authority so requires,
operates the facility providing in the process technology
transfer and training to Government, Government Agency or
the Local Authority nominated individuals;
(iv) Build - Own - and - Operate (BOO) –A Contractual
arrangement whereby a Developer is authorised to finance,
construct, own, operate and maintain an infrastructure or
Development facility from which the Developer is allowed to
recover his total investment by collecting user levies from
facility users. Under this Project, the Developer owns the
assets of the facility and may choose to assign its operation
and maintenance to a facility operator. The transfer of the
facility to the Government, Government Agency or Local
Authority is not envisaged in this structure, however the
Government, Government Agency or Local Authority may
terminate its obligations after specified time period;
(v) Build - Own - Operate - Transfer (BOOT) - A
contractual arrangement whereby a Developer is authorised
to finance, construct, maintain and operate a Project and
44 [Act No.36 of 2001]
whereby such Projects is to vest in the Developer for a
specified period. During the operation period, the Developer
will be permitted to charge user levies specified in the
Concession Agreement, to recover the investment made in
the Project. The Developer is liable to transfer the project to
the Government, Government Agency or the Local Authority
after the expiry of the specified period of operation;
(vi) Build - Transfer - and - Operate (BTO) – A
contractual arrangement whereby the Government or
Government Agency or the Local Authority contracts out an
infrastructure facility to a Developer to construct the facility
on a turn-key basis, assuming cost overruns, delays and
specified performance risks. Once the facility is
commissioned satisfactorily, the Developer is given the right
to operate the facility and collect user levies under a
Concession Agreement. The title of the facilities always
vests with the Government, Government Agency or the
Local Authority in this arrangement;
(vii) Contract-Add-and-Operate (CAO) - A contractual
arrangement whereby the Developer adds to an existing
infrastructure facility which it rents from the Government,
Government Agency or the Local Authority and operates the
expended Project and collects user levies, to recover the
investment over an agreed franchise period. There may or
may not be a transfer arrangement with regard to the added
facility provided by the Developer;
(viii) Develop- Operate - and - Transfer (DOT) - A
contractual arrangement whereby favourable conditions
external to a new Infrastructure Project which is to be built
by a Developer are integrated in the BOT arrangement by
giving that entity the right to develop adjoining property and
thus, enjoy some of the benefits the investment creates
such as higher property or rent values;
[Act No.36 of 2001] 45
(ix) Rehabilitate - Operate - and -Transfer (ROT) - A
contractual arrangement whereby an existing facility is
handed over the private sector to refurbish, operate (collect
user levies in operation period to recover the investment)
and maintain for a franchise period, at the expiry of which
the facility is turned over to the Government or Government
Agency or the Local Authority. The term is also used to
describe the purchase of an existing facility from abroad,
importing, refurbishing, erecting and consuming it within the
host country;
(x) Rehabilitate - Own - and - Operate (ROO) - A
contractual arrangement whereby an existing facility is
handed over to the operator to refurbish and operate with
no time limitation imposed on ownership. As long as the
operator is not in violation of its franchise, it can continue to
operate the facility and collect user levies in perpetuity.
46 [Act No.36 of 2001]
SCHEDULE - II
[see section 2 (e)]
CATEGORIES OF PROJECTS
All Infrastructure Projects may be categorized based on
the extent of Government support required and the
exclusivity of the rights granted. The Government Agency or
the Local Authority with the approval of the Infrastructure
Authority will be entitled to evolve any further category or
categories of the Project having combination of categories
as per the priority and other requirements of the
Government Agency or the Local Authority. The
Government Agency or the Local Authority with the approval
of the Infrastructure Authority may divide the Projects into
following categories:
1. CATEGORY - I PROJECTS shall be Projects where,-
(i) no fiscal incentives in the form of contingent
liabilities or financial incentives are required;
(ii) the Project is viable even when land is granted at
the market rates;
(iii) no exclusive rights are conferred on the Developer;
(iv) minimal inter-linkages are required.
2. CATEGORY - II PROJECTS shall be Projects where,-
(i) Government or Government Agency will be required
to provide asset support;
(ii) financial incentives in the form of contingent
liabilities or direct financial support are required to be
provided;
[Act No.36 of 2001] 47
(iii) exclusive rights are conferred on the Developer;
(iv) extensive linkages i.e. support facilities for the
project such as water connection etc., are needed.
48 [Act No.36 of 2001]
SCHEDULE - III
[see section 2 (nn)]
SECTORS
1. Roads (State Highways, Major District Roads, Other
District Roads & Village Roads), Bridges and Bypasses
2. Health
3. Land reclamation
4. Canals, Dams
5. Water Supply, treatment and distribution
6. Waste management
7. Sewerage, drainage
8. Public Markets
9. Trade Fair, Convention, Exhibition and Cultural Centres
10. Public buildings
11. Inland water transport
12. Gas and Gas Works
13. Sports and recreation infrastructure, public gardens
and parks
14. Real Estate
15. Any other Projects or sectors as may be notified by the
Government.
[Act No.36 of 2001] 49
SCHEDULE - IV
[see section 2(l)]
GENERIC RISKS
The Government Agency or the Local Authority will
endeavour to disclose, allocate and provide for the
treatment of the following risks in the Concession
Agreement as may be applicable to a Project.
I. Construction Period Risks:
(i) Land Expropriation.
(ii) Cost Overruns.
(iii) Increase in Financing Cost.
(iv) Time & Quality Risk.
(v) Contractor Default.
(vi) Default by the Developer.
(vii) Time, Cost & Scope of identified but related Work,
and variations.
(viii) Environmental Damage – Subsisting/On going.
II. Operation Period Risks:
(i) Government Agency Default.
(ii) Developer Default.
50 [Act No.36 of 2001]
(iii) Termination of Concession Agreement by
Infrastructure Authority or Government or Government
Agency.
(iv) Environmental Damage - Ongoing.
(v) Labour Risk.
(vi) Technology Risk.
III. Market & Revenue Risks:
(i) Insufficient Income from User Levies.
(ii) Insufficient Demand for Facility.
IV. Finance Risks:
(i) Inflation
(ii) Interest Rate
(iii) Currency Risk
V. Legal Risk:
(i) Changes in Law
(ii) Title/Lease rights
(iii) Security Structure
(iv) Insolvency of Developer
(v) Breach of Financing Documents
[Act No.36 of 2001] 51
VI. Miscellaneous Risks:
(i) Direct Political Force Majeure
(ii) In-direct Political Force Majeure
(iii) Natural Force Majeure
(iv) Sequestration
(v) Exclusivity
(vi) Development Approvals
(vii) Adverse Government Action/In-Action
(viii) Provision of Utilities
(ix) Increase in Taxes
(x) Termination of Concession by the Government
(xi) Payment Failure by the Government
52 [Act No.36 of 2001]
SCHEDULE - V
[see section 2(rr)]
STATE SUPPORT
The Government will consider the grant of following
forms of State Support, ranked in its order of preferences
i.e.:
(i) Administrative Support
(ii) Asset Support
(iii) Foregoing Revenue Streams
(iv) Guarantees for contingent liabilities; and
(v) Financial Support
I. Administrative Support:
(i) The State Government will offer the following
administrative support to all the Projects covered under the
Act, namely:-
(a) Provide State level statutory clearances within
specified time limits after the Project is sanctioned in favour
of the Developer;
(b) Automatically grant non-statutory State level
clearances, if a Project meets specifications as may be
prescribed;
(c) Provide Best Effort support for obtaining all central
level clearances;
[Act No.36 of 2001] 53
(d) Undertake all rehabilitation & resettlement activities
and recover the cost from Developer;
(e) Provide construction power and water at Project
site;
(f) Acquire land necessary for the Project, if the same
does not already belong to the Government.
II. Asset Based Support:
(i) The State Government will offer asset based support
to all Category II Projects covered under the Act. The
Category I Projects will receive asset based support only if
the sector policy specifically provides for the same. The
asset based support comprises:
(a) Government owned land would be provided at
concessional lease charges for Projects where ownership
would revert to the Government, within a maximum period of
33 years from the date of grant of land;
(b) The State Government will commit/facilitate
development of linkage Infrastructure for Projects.
III. Foregoing Revenue Streams:
(i) The Government will forego revenue streams in case
of all Category II Projects. Government will forego revenue
streams in case of Category I Projects only if the sector
policy specifically provides for the same. Such support
would be in the form of,-
(a) exemption of sales tax on all inputs required for
Project construction.
54 [Act No.36 of 2001]
(b) exemption of stamp duty and registration fees on
the first transfer of land, from the Government to the
Developer and on Project agreements registered in the
State;
(c) exemption from payment of seigniorage fees i.e.
cess on minor minerals during construction period.
IV. Guarantees:
(i) The Government may guarantee receivables only in
the case of Category II Projects, provided they are not
collected directly from users;
(ii) The Government may also provide off take
guarantees if it is the service distributor and is responsible
for collection of user levies.
V. Financial Support:
(i) Direct financial support may be considered only in
the case of Category II Projects;
(ii) The Government will have the final authority to
approve direct financial support;
(iii) Infrastructure Authority will ensure that appropriate
Project structuring will eliminate, to the extent possible, the
need for financial support;
(iv) Extent of financial support will be used as one of
the selection criteria whenever financial support is to be
provided.
* * *