Guidelines specific to hydrocarbon sector for undertaking 'seismic surveys and exploratory drilling in forest areas - reg.
Regulations made under The Van (Sanrakshan Evam Samvardhan) Adhiniyam, 1980
This text is shown as one document.
Full text
F. No. 11-423/2011-FC
Government of India
Ministry of Environment, Forest and Climate Change
(Forest Conservation Division)
Indira Paryavaran Bhawan,
Aliganj, Jorbagh Road,
New Delhi-11 0003
Dated: ~h September, 2019
To 3of'J
The Principal Secretary (Forests),
All State/UT Governments
Sub: Guidelines specific to hydrocarbon sector for undertaking 'seismic surveys and
exploratory drilling in forest areas - reg.
Sir,
I am directed to refer to this Ministry's guidelines given under para 6.8 of Chapter-6 of
the Handbook of the Forest (Conservation) Act, 1980 regarding prospecting of minerals and
hydrocarbons and to inform that the Ministry vide letter dated 22.05.2019 constituted a
Committee with a view to holistically, address the issues related to prospecting of
hydrocarbons in forest areas. The said Committee submitted its report which was considered
by the Forest Advisory Committee (FAC), in its meeting held on 31 st July, 2019.
The FAC observed that prospecting (including seismic surveys) and exploration
activities in hydrocarbon cannot be regulated as per general guidelines meant for mining. of
other minerals and accordingly, recommended separate guidelines for Hydrocarb9n sector.
Based on the recom,mendations of the FAC, following guidelines specific to hyd~ro;;carbon
sector for undertaking seismic sLlrveys and exploratory drilling in forest areas are
hereby issued by the Ministry:
(i) For the purpose of Seismic survey, the maximum permissible number of shot holes
may be fixed as 80 per sq km of maximum size of 6.5 inch each so that reliable data
can be collected. The permission for such temporary activity can be granted at state
level:
(ii) Vehicle/tractor mounted drilling rig equipment can be allowed only for drilling of shot
holes in the grids which falls in open area and which are adjoining to existing forest
paths after due permission of local forest officer. In other areas manual drilling through
Dekhi/ tripod structure with jet flesh unit or portable mechanical (rig) drilling machine
• may be allowed. The vehicle carrying the compressor and observation trucks shall be
parked in open areas.
(iii) No tree felling and construction of new roads will be allowed. However, user agency
can use the existing forest road /paths with permission of local forest officer.
(iv) User agency shall plant at least two tall plants near the shot hole site before leaving
the site. In case if it is not possible to do the same then user agency shall deposit cost
of two tall plants along with 10 years maintenance cost per shot hole with concern
DF0. State Government shall ensure tl:lat the money charged shall be used to
supplement plantation in degraded forest area as per working plan prescriptions.
(v) Prima facie the activity does not cause any permanent damage. User agency shall
take all precaution that the contractor and labour engaged by them do not cause any
damage to flora and fauna of the area. Any incidence of damage by the staff/ labour
/contractors of 'user agency shall be treated as negligence on part of user agency and
shall be dealt as per law.
(vi) Permission granted for conducting seismic survey over forest land shall in no manner
be construed as surety for getting actual diversion of forest land under section(ii)of
FCA 1980.The case under section 2(ii) of FCA will be considered independently on
merits and case to case basis.
(vii) The process of exploration drilling for hydrocarbon in 130 m x130 m area causes total
damage to vegetation (both flora( and faunal elements) in the area and cannot be
considered as temporary vegetation change. It is a case of proper diversion for the
purpose of FCA 1980 and must be considered for processing with application in form A
of FCA rules and not under Form C. This will enable the user agency to use the area
fully and can change the land use~within the diverted area if the change in land use
plan is approved by any Government agency. .
(viii) The approach road to the exploratory site shall be part of the total proposal.
(ix) State Government shall not insist on approval under section 2(iii) of FCA 1980 at the
time of PEL (Petroleum exploration license). However, the user agencies s~,>all to take
all statutory permission before executing of lease/breaking of forest land. ;' 'y
This issues with the approval of competent authority.
Yours faithfully,
~ \~9o$);J)
(Sandeep harma)
Assistant Inspector General of Forests
Copy to:
1. The Principal Chief Conservator of Forests, All State/UT Governments J
2. The Dy Director General of Forests (Central), All Regional Offices of the MoEF&CC
3. The Addl. PCCF & Noda.1 Officer (FCA), Office of the PCCF, AILState/UIT Governments
4. Monitori~g Cell, FC Division, MoEF, N-ew Delhi tY\ ~
5. Guard File \J,dt. "I j i).dr .1;
(Sandeep harma)
Assistant Inspector General of Forests