5.9 Authorizing entities to lay, build, operate or expand city or local natural gas distribution network, Amendment Regulation, 2015
Regulations made under The Petroleum and Natural Gas Regulatory Board Act, 2006
This text is shown as one document.
Full text
REGD. NO. D. L.-33004/99
o Cl at
Che Gazette of India
EXTRAORDINARY
am Wii-—aves 4
PART I1I—Section 4
iter & weatfera
PUBLISHED BY AUTHORITY
F402) aé faocit, anerart, Fearat 15, 2015 /STUETAUT 24, 1937
No. 402] NEW DELHI, TUESDAY, DECEMBER 15, 2015/AGRAHAYANA 24, 1937
Ferra aie wipes te faPrarrs ss
afireerat
we feet, 11 faraz, 2015
wr. &. dhoastteredtaisitvetie 20152 aie oupicr 4
faftanes are afafrar, 2006, (2006 a 19) Ft erat 61 are yan afeeat ar gary aed eT
4. afere oft aire wrest
(1) 3a Rrerat ar Gaeae aie oepiers tre Patan are (ae ay carta orgie
iq flan aeas fare, Fay, waraa a7 faeae ea & fa Fafa at
orfepet ear) Aeitee Fafa, 2015 Fer ATTA
(2) Tarart cara F ore vars Ht area F TAT SAT
2. darferrr ate wgifte ie falar ate (ere aT carta tpt te Perr
azad fam, Pato, sare at faeare aes *& fore afar ar wrferpa Hear)
Fate, 2008,-
(7) fatrae 5 ofattae (6), ave (i) Fer Grafted sfeearite er,
qa:
5224 GI/2015 ad)
2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEc. 4]
“() atch seqa veda wat aoe are oor Hed HF aifaa fafa S us at gaa Ft sata % ser
arferfrrn a steava 1X &H aga afea sel At TE St pay Ta Te are 28 aga Peet ware Hr HAT
Fel STAT TAT SAT ATT";
(@) fafa 7 4, oo-fafrae (3) 8, oedt & far “atett aoat & dhe agen Pita stat a
Waar at Ft feafe F tet aofaay ay afetee fatter ates geqa wen & fed ar aT
foreaht afar ve fata aafeta ost are fear seat gat aT Hat Ty ais & fea fafaer
ates weqa Sut, saat ana ate arat afta Pear sear’ great aT “ateftarat Hafsat F
ata gan fate oat & un vars ara Ai feafe & sega at Fagan afefte att aice
alchdl Sale Bl het Aleflarar H Va A Mla Pear area aa a fH aa aia fear
OT Tel @, SH TATA aT SAH 21 art feaat H, fafea ate ye ate Fh ag afoteer aeeht
ates yeqa aoft, tar ea Ff aaHe SA Ve, SHS aT Veda waG ate aire yar at aT
wet at off art gear Ue Aaa HF, sa aoe ar afetes sreft ates seght & fem aaaz
vara feat sent rast f afefes att ates act serra atch oft cer vat aoett are &
fafa ea a arr ofa & 24 art feat ft aaa F afer sieht ates geqa aot, res
aape et We Te Host are veda At TE aaa ate ates yar of ar Her ae al TTA
sath WaT ce oH Steere art cat aa aw fe afefees ate ates ar at ora ert Z
Aaa UH Tare stat arch sre oft Host oe sel ee TT zB:
aad fe 0a aaa F ser ae fe tar eet & few ates & Gar wa & sata Sot afar
ag ft arf & foro afite arf" a afaearite fear sa;
(7) fafrenrt 10 #,-
(i) oa-Pan (1) 4, Prafertae vega at sist area, ATA:
“are froqrad ates Ft yeqta & fore arta F faeare He amar S aad FH 15
art ferat & afar a A, eens srt 9 aera aT Tar ara ferar ar fazer
TAT ATT:
gaa ant aed fe feared ates Pathte safe F vega a wet ae ateft
ates (afafte atch ates afea) yar oft ar sec ame aft strat site tet Sot
at att treat set ake ateft ward & fare pareve Sts ae Ht stay & fare
afte anf cae art arreft ager sve ot at wy aA stat ars Ft
wae A, aera var ar adh Hay atte orfeenre At aS SA & fw sa
ware &t ofa roars sresft set fs sare fatter 7 oa-fafaaa (3) F
fratita ft 7 2:
sae ant aad fH ga ae A wae ate te at HATA A Hl, Te ATT
aa $f aay atch sihar ce enit ate art Soe oe atefh ers A Sas tt
ag ft safer & feu Se oor F areas
(art -wrs 4] SR Al Wa: aT 3
(i) ga-faFrre (3) F, freferfare vegeta sitet ara ara:-
‘qad fe aadt waaa qeranftar at cat & feu ova wade aT
warfaa fan fear agar ore ata aeftere at orfttea ae aadt & shar Fe
fafrennt & oraear Ar 1e 2:
ant aad ff adie anfiar at nite eet % gare, er anita at Tet
& seerg 4, aod At efafe cara vised & afere Ft arf
(ii) sa-fataae (4) & “dtr aot Ft arafer orect ar “ara aed aga aaa
arian &t soafee, at ft cet at, & ofrertte erm;
(3) fafrre 14 4, so-fafrae 7 Ft, ave (&) BT ger ae aie VE (|) Ud GE
(4) FT ave (H) ue (a) eT H He: Ga: HATH Pear are:-
(=) faa 19 fares 20 &% eo Ge: wath eh ate star fF fafaas 20 qa: waif
fear wat 3 & vee Praferfea offs fear area, area:
“19. @fareat ex wear Ft af — ga fattoat & fat At oraenat at ward Fo afe, afar
sera dt ¢ @t ate anes or fade aes are afaftae & sodat & aera wet St aie HoaTeat
at €t eq ra @ ST ft agers aT aeistis oa at ge Ah ee aT BI
(4) ate aH ave 3 (&) H eal & fry “rex ain He H TH F vas At Target F Her TAT
2 f& chet & orien At at At arte @ diy wg & stat ora faite alerars oars Shale:
ax ooh & ofatde we fear sre wads Ft ate o aet atH HE TeT HL, Mes “et aH HE
% yan t vada AY aaqaeca & ag wer war 2 PS feat Fo yads ar Ara aitatort fra
Foo aq & aan aeoraes Et & oft ear se, awaaa-ag atelt cease F few we ws
B aqar gr are.” a ates sh
srey weft, ast
[fara -II1/4/2187./188/15(291)]
are froreft : yer fafaan aranr.f.196(4.) aie 19/03/2008 % Areva @ aftghrs EU Faiz
aera atanr. 800(ar.) feate 19/11/2008, aT.ar.fA 295 (at.) feats 30/04/2009, at aT.ft
478(x..) featH 07/06/2010, arar.f 605 (#.) feats 19/07/2010, Ha. thesia aie
Tae eta/Pey-2011/2012-1N feats 21/06/2013, ora. Stoarstt ance shet ae / 4/2013-79
fae feare 07/04/2014, wra.we-frevvii/2007 festa 01/01/2015, fiaasftarest / ahi
aye / wes / 2015 fate 13/02/2015 % avery & Senora Fea wz
4 THE GAZETTE OF INDIA : EXTRAORDINARY [Part I—Sec. 4]
PETROLEUM AND NATURAL GAS REGULATORY BOARD
NOTIFICATION
New Delhi, the 11th December, 2015
F. No. PNGRB/CGD/Amendment/ 2015/2.—In exercise of the powers conferred by section 61
of the Petroleum and Natural Gas Regulatory Board Act, 2006 (19 of 2006), the Petroleum and
Natural Gas Regulatory Board hereby makes the following regulations, namely:-
1. Short title and commencement.
(J)These regulations may be called the Petroleum and Natural Gas Regulatory Board
(Authorizing Entities to Lay, Build, Operate or Expand City or Local Natural Gas
Distribution Networks) Amendment Regulations, 2015.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. In the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or
Expand City or Local Natural Gas Distribution Networks) Regulations, 2008,-
(a)in regulation 5,in sub-regulation (6), for clause (i), the following shall be substituted, namely:-
“(i) entity submitting the bid should not have been imposed any penalty under section 28 or
punished under Chapter IX of the Act during the period of preceding one year from the last date for
submission of the bid”;
(b) in regulation 7, in sub-regulation (3), for the words “In case of a tie in the highest composite score
between the bidding entities, such entities shall be asked to submit additional bid bond for an
amount to be decided by the respective entity and the entity that submits bid bond for higher amount
shall be declared as successful bidder”, the words “In case of a tie in the highest composite score
between the bidding entities, the entity which has quoted the highest additional bid bond in the bid
submitted shall be declared as successful bidder. The entity on being declared successful, through a
written communication, shall submit the quoted additional bid bond within 21 working days from
the issuance of the said communication, failing which the entire bid bond submitted by the entity
shall be encashed or forfeited and in such a case, an opportunity to submit the additional bid bond
shall be offered to the entity whose quote for the additional bid bond was next highest and such an
entity shall submit the quoted additional bid bond, within 21 working days of such intimation in
writing from the Board, failing which the entire bid bond submitted by that entity shall be encashed
or forfeited. The above process shall be repeated till additional bid bond is either received or no
entity in a tie is left out:
Provided that in such a case where an entity does not submit the additional bid bond upon receiving
intimation to do so from the Board such entity shall be considered at default and shall be barred for
a minimum period of three years from bidding.” shall be substituted;
(c) in regulation 10,-
G@) in sub-regulation (/), the following provisos shall be added, namely:-
“Provided that the Board may extend the date for submission of Performance Bond for a
period not exceeding 15 working days failing which LOI shall deemed to be withdrawn or
cancelled:
Provided further that in case of non submission of Performance Bond within the stipulated
time the bid bond (including additional bid bond) shall be forfeited or encashed and such
entity shall be considered at default and shall be barred for a minimum period of three
years from bidding. Further, the process of issuance of LOI and grant of authorization to
the next qualified entity at the stage of tie shall be carried out in the same manner as
prescribed in sub-regulation (3) of regulation 7:
Provided also that, in case of single bid remaining at this stage, the entire bidding process for
the said geographical area shall be annulled and the defaulting entity shall be barred for a
[art WIS 4] FRA Al USA : AAT 5
minimum period of three year from bidding.”;
Gi) in sub-regulation (3), the following provisos shall be added, namely:-
“Provided that the entity may induct eligible new partner as long as it remains a lead partner
without impacting the eligibility criteria as provided in the regulations:
Provided further that, for the purpose of remaining to be a lead partner, the entity shall have
equity of more than fifty per cent. after inducting the new partner.”;
Gii) in sub-regulation (4), for the words “three years period”, the words “five years or till achievement
of Minimum Work Programme, whichever is earlier” shall be substituted;
(d) in regulation 14, in sub-regulation (7), clause (a) shall be omitted and clause (4) and clause (c) shall
be renumbered as clause (a) and clause (b) respectively;
{e) regulation 19 shall be re-numbered as regulation 20 and before regulation 20 as so re-
numbered, the following shall be inserted, namely:-
“19. Power to remove difficulties —
If any difficulty arises in giving effect to any of the provisions of these regulations, the Board
may, by general or special order, do anything not being inconsistent with the provisions of the
Act, which appears to it to be necessary or expedient for the purpose or removing difficulties.”;
(f) In clause 3(G) of Schedule C, for the words “Promoters undertaking in the form of letter of comfort
stating that their financial contribution in the project shall be converted into equity share capital
within three months of the date of grant of authorization. Enclose the letter of comfort from the
promoters.”, the words “Promoters undertaking in the form of letter of comfort stating that
promoter’s contribution in the project shall be infused in a phased manner as per the project
financing schedule as per the format given in the application cum bid document.” shall be
substituted.
UPAMANYU CHATTERIEE, Secy.
{ADVT.-ID/4/Exty./188/15(291)]
Foot Note: Principal regulations were notified vide no. G.S.R. 196(E) dated 19” March, 2008 and
subsequently amended vide G.S.R. 800 (E) dated 19th November, 2008, G.S.R. 295 (E) dated
30th April, 2009, G.S.R. 478(B) dated 7” June, 2010, G.S.R. 605 (E) dated 19th July, 2010,
F. No. PNGRB/CGD/REGULATIONS/REVIEW-2011/2012-III_ dated 21° June, 2013,
F. No. PNGRB/CGD/BID/4/2013-PRE BID dated 7th April, 2014, F. No. L-MISC/VI/I/2007 dated
1st January, 2015 and F. No. PNGRB/CGD/Regulations/Amend/2015 dated 13 February 2015.