15.2 Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines, Amendment Regulations, 2014
Regulations made under The Petroleum and Natural Gas Regulatory Board Act, 2006
This text is shown as one document.
Full text
xia do So Wee 33004/99 REGD. NO, D. L.-33004/99
tIstGa
— Che Gazette of . Gudia
cxbenomniial?
art [1l—ave 4
PART [1l—Section 4
PUBLISHED BY AUTHORITY
a. 85] ae facet, Wawa, Het 14, 2014/HT RYH 23, 1935
No. 85 NEW DELHI, FRIDAY, MARCH 14, 2014/PHALGUNA 23, 1935
aerferan six wpe ie fafrarara ats
we feet, 14 ar, 2014
ad, sree aauereasttites/ 1/2012. Aare aire sepia fata are afatran,
2006 (2006 #r 19) t aret 61 Bret yaet abeaa aT WaT Het ET Fetes ae wTpfaH Ta
farms ae vazere tas sik orate te fafrarrs aS (pfs er crevereat & fare
ogee araat afea aattht arta atte faferfeeat) fata, 2009 # aeitea wea H feu farafefad
fafaae ara @, aaa: -—
1. afece ara ae WET:
(1) ea ftw ay ASere ate orephitar dhe Parone aS ( (apie tte aredersat &
fara azar araat ated aaeteht area site faforfteat) deter fatraa, 2014 wer
aT
(2) & arardt versa & Saree warerat Ft aretha A yged shT
2. tarerra ate orpfte the fafa ate (orp te oreversat & fore aca arat ate
aaciht are atx faPriteat) fafa, 2009 A aaact 14 A afaerst At ear’ sfiaa & sata
“shenfitae aa # arrré ant art sha vat arctan" GS STA aT AT So GIL HTSATE
are ff soars ers oT aT 2" F TATCT SIA are eat F Perit Hr TST ATT, ATA: -—
1169 GI/2014 (1)
2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART IfI-—SEC. 4]
‘ce Hara & fearttéeit ate fanfare aqeare wae ae HUTT AY Ta are
arate ae Soft a aenter Hoare Seed aT AST VATA SA HY ECA AAT TAT ATS TAT
sah art aie atrentire Ba Ff ore aed are Shara caeht areca aa @ awe dia (3) tex
oft att aree fare Sax 0.6 Hex arfaera areas are oe ST
zzcfiiue aftr (ars) Saat, Gears ares (wad) eeorat, qe Keerayi, wilet
afiaat arfe soft aa earoare, fared aft @ ate 1H tentla Hecayel AAT AAT @, Tet Ie
ay at strentfirn aa Ff arg art are Shera wee areas aera aa fer HRT HH a Ha
rq (3) Hex Saft ert arieu, free sux 0.6 Her si2are are ort at Tare, Ye Hares
fror-freort/RrarPeat 4 aaarx Bett @ aie a earqard, seat aa fer feet elt ar, set
earaat a aaffaco A aster aeat & fer ae Fae a aa we are STR aH HUTA STAT
are
svat wraarat ar Sopra Hea ferv, tethers ax orice we fatears aie (arpita
iq orevereat & fro aren areat afea saith arn atx faferiteat) dead fatraa,
2014 # ary am Ft atta F at ad ar aaa fear seat are”
Hh, UAT UA, ACAET (AR)
[ FASTA /111/4/STAT./1 88/13]
are fecquft: wer fafaaat ar aarft. 808(a), feats 11 taaz, 2009 aret afaatad far war at
ACTA TAH H.4.186, FRATH 03/09/2012 erat serra far war Ari
PETROLEUM AND NATURAL GAS REGULATORY BOARD
NOTIFICATION
New Delhi, the 14th March. 2014
F. No. REG/T4S/NGPL/1/2012.—In exercise of the powers conferred by Section 61 of the
Petroleum and Natural Gas Regulatory Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory
Board hereby makes the following regulations to amend the Petroleum and Natural Gas Regulatory Board
(Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines) Regulations,
2009, namely:—-
|. Short title and commencement:
(1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Technical
Standards and Specifications including Safety Standards for Natural Gas Pipelines) Amendment
Regulations, 2014.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. Under heading “PROTECTION OF FACILITIES” in Schedule 1D of the Petroleum and Natural Gas
Regulatory Board (Technical Standards and Specifications including Safety Standards for Natural Gas
Pipelines) Regulations, 2009. for the words beginning with “Proper industry type boundary masonry
wall...... “and ending with “....... barbed wire on top can also be provided.”, the following shall be
substituted, namely:--
“Proper industry type boundary masonry wall at least three (3) metres high with an additional 0.6
metres barbed wire on the top shall be provided all around the Compressor Stations and other
installations identified as vital under Category-A based on the Risk Assessment carried out from
time to time in line with Ministry of Home Affairs (MHA) guidelines and recommendations.
[3PT WITS 4] ART AT USA + ASTART
For other installations like Intermediate Pigging (IP) stations, Sectionalizing Valve (SV) stations,
Delivery/Dispatch stations, Receiving Terminals etc. identified as vital under Category B and C,
either proper industry type boundary masonry wall or chain link fencing at least three (3) metres
high including 0.6 metres barbed wire on top may be provided. However, the Category B and C
installations having chain Link Fencing shall be required to carry out Risk Assessment at least
once every year for review of categorization of installation in line with MHA
guidelines/recommendations.
For compliance of the above provisions, two years time shall be allowed from the date of coming
into force of the Petroleum and Natural Gas Regulatory Board (Technical Standards and
Specifications including Safety Standards for Natural Gas Pipelines) Amendment Regulations,
2014.”.
K. RAJESWARA RAO, OSD(R)
[ADVT. ILI/4/Exty./188/13]
Foot Note: Principal regulations were notified vide No. G.S.R. 808(E), dated 11th November, 2009
subsequently amended vide S. No. 186. dated 03/09/2012.
Printed by the Manager. Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.